Loading...
HomeMy WebLinkAboutSW6140304_APPROVED PLANS_20140502STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. swm�z o DOC TYPE ❑ CURRENT PERMIT APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD ��o a HWY 401 A _ L � C � O N L` z N O W '� = v N -- 0 t w U -0 p 0, 00 OTT TO Q 0 t0 Oo N 0 o O 00 Z y Cie z F VICINITYMAP00 Z c M N th N O O r, to 0) 00 O x o O F 5 J 0 M � i.1= W a OM 0_ti Z GENERAL NOTES 1. DEVELOPERIOWNER INFORMATION: HCC INVESTMENTS, LLC 3077 N. MAIN STREET, SUITE 201 HOPE MILLS, NC 28348 oa�uuiiimum, 46 Al ATTTN: JACK HAIRR uauir '11 . .L <' ' 2. THE CONTRACTOR SHALL HAVE A COMPLETE SET OF CONTRACT DOCUMENTS AS WELL AS ALL APPROVALS ON THE JOB SITE AT = 1459, rq e ALL TIMES. 3. CONSTRUCTION AND MATERIAL SPECIFICATIONS SHALL CONFORM TO THE CITY OF FAYETTEVILLE AND NCDOT STANDARDS AND Fy SPECIFICATIONS. ""'�nwrna anew"°o 4. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ACCURATELY LOCATE BOTH HORIZONTALLY AND VERTICALLY ALL EXISTING HCC INVESTMENTS., LLC UTILITIES PRIOR TO THE START OF CONSTRUCTION (NC ONE CALL CENTER 1-800-632-4949). COST TO REPAIR DAMAGED UTILITIES SHALL BE BORNE BY THE CONTRACTOR. ANY LOCATION OF UNDERGROUND UTILITIES AS SHOWN ARE BASED ON VISIBLE SITE NOTES EVIDENCE AND DRAWINGS IF PROVIDED TO THE SURVEYOR. LOCATION OF UNDERGROUND UTILITIES AND STRUCTURES MAY VARY FROM LOCATIONS SHOWN HEREON, AND ADDITIONAL BURIED UTILITIES MAY EXIST. CONTACT THE APPROPRIATE UTILITY 1. PROPERTY SUBJECT TO ALL EASEMENTS, RIGHTS -OF -WAY AND RESTRICTIVE COVENANTS COMPANIES FOR INFORMATION REGARDING BURIED UTILITIES. OF RECORD. O N T R U C T I O N DRAWINGS 5. CONTRACTOR SHALL BE RESPONSIBLE FOR THE RECONNECTION OF DISTURBED UTILITY SERVICES ENCOUNTERED WITHIN 8 2. TAX PINS:4946 60-2010 HOURS OF INTERRUPTED SERVICE. CONTRACTOR SHALL NOTIFY USERS 24 HOURS PRIOR TO POSSIBLE INTERRUPTIONS OF SERVICE. 3. UNLESS NOTED OTHERWISE, THERE WERE NO U.S.G.S., N.C.G.S. OR OTHER 6. EXCEPT AS SPECIFICALLY STATED OR SHOWN, THE BASE SURVEY DOES NOT REPORT ANY OF THE FOLLOWING: EASEMENTS, GOVERNMENTALLY RECOGNIZED HORIZONTAL CONTROL MONUMENTATION FOUND WITHIN FEBRUARY 18,2014 OTHER THAN THOSE VISIBLE DURING FIELD EXAMINATION OR AS IN DOCUMENTATION PROVIDED BY THE CLIENT OR ATTORNEY, 2,000 FEET OF THIS SUBJECT PROPERTY. BUILDING SETBACKS, RESTRICTIVE COVENANTS, ZONING OR LAND USE REGULATIONS AND ANY FACTS THAT A TITLE SEARCH MAY DISCLOSE. 7. ALL DISTANCES SHOWN ARE HORIZONTAL GROUND DISTANCES UNLESS OTHERWISE NOTED. 8. PROPOSED BUILDING SETBACKS ARE AS SHOWN HEREON. IF NO SETBACKS ARE SPECIFIED, ANY STRUCTURES OR UTILITY NOTES o ii IMPROVEMENTS PLACED ON THIS SUBJECT PROPERTY MUST COMPLY WITH RESTRICTIVE COVENANTS, ZONING, DOCUMENTS OF > RECORD GOVERNING SUCH IMPROVEMENTS AND ANY BINDING AGREEMENT BETWEEN THE DEVELOPER AND THE 1. OCCUPATIONAL SAFETY & HEALTH ADMINISTRATION REGULATIONS (OSHA): CONTRACTOR SHALL ENSURE BUILDERIOWNER. ALL CONSTRUCTION AND EXCAVATION ACTIVITIES PROCEED ACCORDING TO THE LATEST OSHA GUIDELINES. 9. IF WETLAND AREAS ARE SHOWN ON THIS SUBJECT PROPERTY, THOSE AREAS WERE STAKED AND DETERMINED TO BE SUCH BY 2. UTILITY LOCATIONS: o OTHERS. THE SURVEYOR'S CERTIFICATION HEREON CERTIFIES TO THE LOCATION OF THOSE AREAS, AS STAKED BY OTHERS, o BUT LOCATED UNDER THIS SURVEYOR'S SUPERVISION AND PLATTED HEREON. LEGEND ABBREVIATIONS A. NOT ALL EXISTING UTILITIES ARE SHOWN ON THE PLAN. THE CONTRACTOR IS RESPONSIBLE FOR 10.SUBSURFACE AND ENVIRONMENTAL CONDITIONS WERE NOT EXAMINED OR CONSIDERED DURING THIS SURVEY. NO LOCATION OF ALL EXISTING UNDERGROUND UTILITIES. CALL CAROLINA ONE CALL (PHONE EXISTING PROPOSED z STATEMENT IS MADE CONCERNING THE EXISTENCE OF UNDERGROUND CONTAINERS, WHICH MAY AFFECT THE USE OF THIS 1-800-632,4949) 48 HOURS PRIOR TO EXCAVATION. ADA = AMERICAN WITH lim TRACT. ❑ CONCRETE MONUMENT 0 CATCH BASIN DISABILITIES ACT B. COORDINATE WITH UTILITY OWNERS FOR LOCATION OF EXISTING UTILITIES AND WORK WITH __. Owner: 11.1E THE BASE SURVEY IS LABELED "ZERO LOT LINE" THERE ARE, IN ADDITION TO OTHER EASEMENTS SHOWN, MAINTENANCE THEM TO REMOVE CONFLICTS. 123 —123— CONTOURS CB = CATCH BASIN OJ CONTROL CORNER EASEMENTS ON ALL INTERIOR LOT LINES, SAID EASEMENTS BEING 10 FEET IN WIDTH AND UNLESS OTHERWISE NOTED, 5 FEET _11� DRAINAGE SWALE EACH SIDE OF SAID INTERIOR LOT LINE. C. VERIFY LOCATION AND ELEVATION OF EXISTING UTILITIES BEFORE CONSTRUCTION BEGINS AND ❑ DROP INLET CL =CENTER LINE HCC INVESTMENTS, COORDINATE WITH THE ENGINEER FOR CHANGES TO THE SEWER LINE LOCATION AND, OR -L- ELECTRIC LINE LLC 12. IF THE STREETS AND ROADS SHOWN ON THIS MAP ARE LABELED AS PRIVATE STREETS, THE FOLLOWING NOTICE APPLIES TO UTILITIES. IF CHANGES ARE NEEDED, PLANS MUST BE APPROVED BY THE APPROPRIATE AGENCY. FIRE HYDRANT DI = DROP INLET THOSE STREETS: NO PUBLIC AGENCY IS PRESENTLY RESPONSIBLE FOR MAINTENANCE OF THE PRIVATE STREETS SHOWN ON GAS LINE THIS PLAT. PRIVATE STREETS ARE FOR THE USE OF ALL OWNERS OF PROPERTY WITHIN THIS SUBDIVISION, THEIR GUESTS AND D. LOCATION AND ELEVATION OF EXISTING UTILITIES AS SHOWN ON THE PLANS ARE APPROXIMATE. GATE VALVE DIP = DUCTILE IRON PIPE CONTACT.. IRON PIPE, REBAR OR 3077N. MAINST ALL REPRESENTATIVES OF GOVERNMENTAL AGENCIES FOR INGRESS AND EGRESS, AND FOR THE CONSTRUCTION, INSPECTION HOPE MILLS, NC 28348 3. ALL MATERIALS FURNISHED AND WORK PERFORMED SHALL BE IN CONFORMANCE WITH CITY OF BREAK IN LINE EIP = EXISTING IRON PIPE AND MAINTENANCE OF PUBLIC STREETS, UTILITIES, AND DRAINAGE STRUCTURES. THE STREETS ARE THE SOLE RESPONSIBILITY ^� (910)237-5846 FAYETTEVILLE AND/OR PUBLIC WORKS COMMISSION. OVERHEAD LIGHTING OF THE DEVELOPER AND/OR HOMEOWNERS ASSOCIATION. • SANITARY SEWER CLEAN OUT ER = EXISTING REBAR 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATION OF EXISTING UTILITIES IF REQUIRED DURING —�— SANITARY SEWER MAIN 13.CONTRACTOR SHALL VERIFY EXISTING ELEVATIONS AND GRADES IN FIELD AND NOTIFY ENGINEER OF ANY DISCREPANCIES SANITARY SEWER MH Project: PRIOR TO ANY CONSTRUCTION OR GRADING ACTIVITY. INSTALLATION OF NEW WORK. X123.23 SPOT ELEVATIONS EX = EXISTING STORM DRAIN JUNCTION BOX 14.CONTRACTOR SHALL MAKE EVERY EFFORT TO SAVE PROPERTY IRONS, MONUMENTS, OTHER PERMANENT POINTS AND LINES STORM DRAIN PIPE FEMA =FEDERAL EMERGENCY OF REFERENCE AND CONSTRUCTION STAKES. PROPERTY IRONS, MONUMENTS, AND OTHER PERMANENT POINTS OF REFERENCE ;ty UTILITY POLE MANAGEMENT AGENCY THE DESTROYED BY THE CONTRACTOR SHALL BE REPLACED BY A PROFESSIONAL LAND SURVEYOR AT THE CONTRACTOR'S EXPENSE. WATER BLOW OFF COMMONS AT -v;- -W- WATERLINE FES = FLARED END SECTION 15.CONTRACTOR SHALL INSTALL AND MAINTAIN MEASURES AS NECESSARY DURING CONSTRUCTION FOR EROSION AND WATER^+ N WATER REDUCER SEDIMENTATION CONTROL AND SHALL AT ALL TIMES ADHERE TO THE EROSION AND SEDIMENTATION LAWS AS PRESCRIBED BY FFE = FINISHED FLOOR ELEVATION BRIDGEPORT� WATER TEE THE NC DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES. w ►� WATER VALVE FH = FIRE HYDRANT 16.ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH ALL APPLICABLE CUMBERLAND COUNTY, CITY OF FAYETTEVILLE, AND INV = INVERT ELEVATION NCDOT STANDARDS AND SPECIFICATIONS. 17.00CUPATIONAL SAFETY &HEALTH ADMINISTRATION REGULATIONS (OSHA): CONTRACTOR SHALL ENSURE ALL CONSTRUCTION JB = JUNCTION BOX ACTIVITIES PROCEED ACCORDING TO THE LATEST OSHA GUIDELINES. LF = LINEAR FEET fax Id #: 0426-91-9724 18.AMERICAN WITH DISABILITIES ACT (ADA): CONTRACTOR SHALL ENSURE THAT ACCESSIBLE PARKING SPACES, ACCESS AISLES, MH = MANHOLE township: Cross Creek RAMPS, AND ACCESSIBLE ROUTES TO ALL ACCESSIBLE BUILDINGS (AS DETERMINED BY THE OWNER) MEET THE CURRENT MINIMUM REGULATIONS AS OUTLINED IN THE ADA STANDARDS FOR ACCESSIBLE DESIGN. IF CONTRACTOR IS UNABLE TO MEET OSHA = OCCUPATIONAL SAFETY & county: Cumberland THE CURRENT MINIMUM REGULATIONS AS OUTLINED IN THE ADA STANDARDS FOR ACCESSIBLE DESIGN, FOR ANY REASON, THE SHEET LIST HEALTH ADMINISTRATION CONTRACTOR SHALL NOTIFY LARRY KING AND ASSOCIATES, RLS, PA, AND THE OWNER/DEVELOPER, IN WRITING, PRIOR TO state: NC COMMENCING ANY CONSTRUCTION ACTIVITIES. C-00 COVER SHEET PROP = PROPOSED 20. LIGHTING PLAN BY OTHERS. C.-01 SITE PLAN PVC =POLYVINYL CHLORIDE C-02 UTILITIES PLAN C-03 DRAINAGE PLAN RCP = REINFORCED CONCRETE C-04 - C-09 ROADWAY PLAN AND PROFILES PIPE COVER C-10 EROSION CONTROL PLAN R/W = RIGHT-OF-WAY SHEET C-11 EROSION CONTROL DETAILS SR = SET REBAR C-12 UTILITY DETAILS APprovod Swrr iv,ii r `a "hilt ual umtr1110 SS = SANITARY SEWER c risouctlon in accordance with these documents is CONSTRUCTTON C-13 ROADWAY & DRAINAGE DETAILS roquirsd by the stormwater permit. North Carolina DOCUMENTS STA STATION rules require that the stormwater system designer Inspect during construction: certify conformity with th C-14 POND DETAILS plans and specs; and certify compliance with the job no.: p13-084 T 4 �Ye rules. (15A3NCAC 2H1008 Da e(S�2 "r0 rF 02/18/14 - date: sion o1 sheet If Revision Date 1JEM drawn by: TA survey by: MR checked by: JN PRELIMINARYM�� - sheet no.: DO NOT USE FOR CONSTRUCTION "' L THIS DRAWING HAS NOT BEEN REVIEWED BY ANY _ 0 0 GOVERNMENTAL AGENCY FOR COMPLIANCE WITH ANY - U iv APPLICABLE LAND DEVELOPMENT OR OTHER 0A1186FO 6 YOA WIG �1�osW STORb>rtATEB'.:,�`��� REGULATIONS. PHILLIP W. HORNE D.B. 644, PAGE 185 TAX PIN: 494660201019 ZONED R-15 SITE NOTES: 1) TAX PARCEL(S) #: 4946-60-2010 21 2) PROPOSED SUBDIVISION: 70 LOTS = 17.90 AC (779,877 SQ. FT.) 3) SMALLEST LOT = Lot 33, 0.17 AC (7,274 SQ. FT.) 4) ZONING: RMF 5) TOTAL SITE AREA: 21.52 AC (937,599 SQ. FT.) R/W AREA = 3.62 AC (157,722 SQ. FT.) 6) SEWER AND WATER BY: HOKE COUNTY 7) DEVELOPER OWNER(S): HCC INVESTMENTS, LLC 3077 N. MAIN ST. SUITE 201 HOPE MILLS, NC 28348 8) PHYSICAL ADDRESS: 3600 BLOCK JOHNSON MILL RD. RAEFORD, NC 28376 9) STREET CENTERLINES: STREET "A" = 989.44 LINEAR FT. STREET "B" = 1,213.45 LINEAR FT. STREET "C" = 473.99 LINEAR FT. STREET "D" = 270.00 LINEAR FT. 10) REFERENCES: DEED BK. 646, PG. 262 F— -----------� I \ \\ 1 1 I I \\ \ 1 r I I v vv - JI 1 48 I I — _J SETBACKS: RMF - 10' FRONT 5' SIDE 25' REAR ZONED R-15 CATHERINE L. FAIRCLCTH TAX PIN: 494760101227 I I I I I I I I I I f I I I I I I i I I I I I I I r I I I I I I I I I I I I I I I I I 1 I I I I I I I I 49 I I 50 I I 51 I I 52 I I 53 I I 54 1 1 55 1 I 56 1 I 57 I I 58 I I 59 1 I 60 I 1 61 II I I I I I I I I I I I I I I I I I I I I I I I I I \ I I I I I I I I I I I I I I I I I I I I I I I I I � I --- L---� L--- ---J ----� --- L---�-- ---J ---J L---J --- I I- -------N 1+00 2+00 3+00 4+00 - I 1 I I I I I L--1 L----J 1 I J L—_-- '- 1 1 00 � I I I I 1 1 36 1 I 37 O oCn z �gN -03 0 5+00 z rn 2 0+00 Q N v,.4+00 W~ N 1+00 W N 2+00 .O n c�2 3+00 a + + A r r I I 1 39 1 g I I v I I m1 a. LID I I + W o 38 N I I 5+00 6+00 7+00 8+00 9+00 STREET "C" 50 FT. PUBLIC R/W 10+00 +—I- F---- -1 I I L--- I I I F — — — — I I I I I I I I F-----1 I I I I 24 1 I I I 1 25 I I I I 26 I I I I I ! 27 I I I I 28 I I I I 29 I I I i 1 30 1 I I I I L____J I I L — — — — J I I L — — — — J I I L____J I I L — — — — J I I L---_J I I L----J L -1 I I L— --J I I L I I I f J I I L----J I I I I I I I I I 23 I I I I I I 22 I I I I I I 21 I I I I I I 20 I I I I I I 1 g I I I I I I 18 I I I I I I 17 I I I I I L____J I I L — — — — J I I L--_—J I I L----J I I L----J I I L — — — — J I I L_—_—J 6+00 .. `?'0 ,yh 7+00 8+00.. 9+00 10+00 11+00 - o STREET "A" 50 FT. BUC R/W 12+00 � I I I I ryy. 23 L - - to ' R 13 o• L---------J I L—_ I J N t + O 0 I 65 I � U I I L- - - - - - - - - J Cal a ZONED n + I �r N o m L-- J UO — of 0 W � W w� N Z z wa U� I A 0 ' -. ZONED OP 68.45 - - INCLUD D N LE = 09-35-3 r /I r INCLUDED ANGLE = 09-35-39 - rADI S = 595.80' I / N i CLUpED ANGLE = 08 46-12- - - - r TANGENT LENGTH = 50.00' / + rRADIUS = 652 04 F- SAD US - 5958D AR¢ L NgTH = 99.77' o p / I I I TA�lGENT LENGTH a 5 .ObS' TANGNN L NGTH = 50.00' 1 CHORD B A IN = S 52-57'23" E 20 4m• AR N TH = 99.77' 1 1 1 'o I ARC LENGTH = $9. 0' 1 � CHO D ENGTH = 99.65' CHORD EA INO = S 52.57'23 E EXTERNA SECANT = 2.09' CH Rq BEARING = S 43' 6'�7" E CHOI D LE GTH = 99.65' 3 CHORD LENGIH = 9 71 MIDI 0 DINATE = 2.09' I I SO' r EXIfERNAL SET TI= 9 EXTERN L ECANT = 2.09' DEGREE F CU VE = 09-37- 0 9 { MI o DI ATE - 2.09' 1 1 P 1 1 16 1 I I IttID ORDINATE =11. 1' q - 12 13 14 15 I DE ROE OF CURVE = 108 471-14 DEGREE 10F CURVE = 09-37-p0 O 1 O O 1_O_ 5 _ _ _ _ 20' DRAIN GE E SEMENT O_ I ----� ---- F-----I ---- r-----t t---- 1 � I \ I 3 _ — 20' D AINAGE EASEMENT 20 DRAIN�GE EASEMENT O O O O i 1 1 1--- 1 1 --- ----------- 1 �-- --- 20�DR N GE EASEMENT 1--- __� L----� �----- ---- I ----� ----- ----� ---- ---- r T \ +l I I 1 1 * 0\Pao I I I I I 1 I I I I I I I I I I I P 0 N D If �ErLANDS I I I I 1 I J _ - - , EX. WETLANDS IL---------------J ----- L----J L---� �--_ _ _ f _ i I / - - — — — --7 f/ � 10 BRIDOEPdET NORTH z/ r CAB 4 SLIDE 4 4-0, MAP 001 WE TLANDr �� ZONEDR-e QI �f / INV-2 ZSBra IN 237.42 ----WET— .T x.z R P WET WETy td y I I I 1I i -- - - - a� ; T : — - -- - _ -- J ,. -- - (3 rg�aBfi-@/tctrr lv'atprir��is I I , , C `, I , I ;�_. ,� I t;qr Ir,4i tlonIII a�ordnnce with'ifo�e d riie�nts i" LI INARY GRAPHIC �, - -' required by the "to mwetei pe n t. North Carolina DO NOT USE FOR CONSTRUCTION C SCALE ruses ct usingkv ct the "toonwcer if ystem des confonnit goer o z5 so too Inspect during construction certity conformity with th! THIS DRAWING HAS NOT BEEN REVIEWED BY ANY GOVERNMENTAL AGENCY FOR COMPLIANCE WITH ANY pions and specs; end ce C Campl;1008ance with L APPLICABLE LAND DEVELOPMENT OR OTHER SSoflri+YuSiceflN�les. (15A NCAC ZH 100t3 US REGULATIONS. 1 INCH = 50 FEET berT� Oate_ _ HORIZONTAL 11 Rewsbon D to iO Sheet # i h Lo h oDO � N o 00 v a .0 N� pocc) v� O-00 N Lj- I U 06 ^o0pCOo MDo C3 M 0 �C �— co J x0> NZo m^E� on C Q M >1 M 3 a Z Vq ..... � 9 `a '= SEAL c 0 •N m m O 0 Z Owner: HCC INVESTMENTS, LLC CONTACT 3077N. MAINS HOPE MILLS, NC 28348 (910)237-5846 Project: THE COMMONS AT BRIDGEPORT tax Id #: 0426-91-9724 township: Cross Creek county: Cumberland state: NC SITE PLAN CONSTRUCTION DOCUMENTS job no.: P13-084 date: 02/18/14 drawn by: TA survey by: MR checked by: JN sheet no.: C-01 ' & w NOT TO SCALE Ol S<iar 0 Fv\ 19 AO A �9q o 2" SDR-21 WATER------ 242. v STA: 0 4 62 238.3 2" BL OFF STA-O+ .36 - - J - _ ----- ---I 0 37:9 S 109.29 63 N '9 58.98LF S MH-4 "-SDR=26 - - 1sIANH6L� TA-1+50, 0 0+39 7.9 IM-241.88 I 1 TA: 9 9.29 641 IN (5)- 35.94 INV IN (t'� 30.72 r� 1241.911- - - - INV OUT--2 67 N N I 0 238.5 1 STA: 2 29.2 65 I m T - 270 L 1 a�SDR-26 �a o ST RIM-245.16 a ro J O-230. m 2.9--------J o RIM-244.2 I V IN 6 49 _� 1INV IN-235.21 I 11V OUT-234.2 +o I I� NV OUT-229.44/ W `ro I IN 0 2 S A- 7 1 r 1 1 INV OUT-235.16 ry W o I 245 /I W m I I 1 RIMI-247.n z ilk$ I 1 I O �`' O O 18 I 17 w \ I L�tT INV IN-240. 0 I 1 1 2q7 1 1 37 38 ti � 23 LF 23 22`' q5 21 20 19 27 111V OUT-239.17 O to 8"Rb),P 2 2 1.dOLF 0 a 3 31 I 1 1 6 I 35 I '^ N R- IIt 4- '� cEN1�Ro I �p n CE TERED m 8" SD 26 N S R 6 x I 32 34 1 1 a 246 J J 0 245 244 �N ®0 77 243 R� ~ x 1 .. L 2AS a J r m N J �� + J + J + GNJP I �< l I 24 4 o m n rn n 3 0 o m N fl" SD -26 -I 1 J cn o ad H ad 'i ao i r` cv O a U � r7• 48 rn �`^9 I / M � � O M •• N � � N •¢ a N •¢ � � •a a M � I fD xi f�i•S-i_ O �. d' I P. 2% M .. 1 L O. J N O J pr 1- tl- {- N H N F N m y A� J +o Zq6 N 45 rn rn rn m rn 42 m 4, O O �a 7 mt-MA N O N- W rn O .. - - + I Z 2 O o 0 2 0+ N y N N va N - 5 00 24 +00 8+00 �2q 43 9+00 10+00 2 1 OD 1 +00 g ;; a J w o0 3 do~ a N - 1 00 > 2+00 24 u i 3+00 6 m n m rn a M N 2 4 N rn n v to 43 lV IM N jjj - 2 ... � N M + a M�4. _ �. _ -._- m .� - -- � n 7 - _ tA. -pp •� 8"X8" TAPPING R N -- - F zv F F i SLEEVE &VALVE a h N 47 of n m u a c� r' m 173. SL • • .. q3 .. - \ STA-0+25.02 a o> a oo rq r d a" 7L a a a a a 8" C-9 0 a I d -� / r - v "r o J.d m -i w F- r 8 SC- 6 r- r- r f- \ Z3- I '• - 00 r tp a f N U 2'-I N + N + 1 Ot N - _ ad N I:.. rn m e r SSMH- R- 6 m N H SEMBLY 8"X8" GV 1 WA SSMH�Q I i - �- I _� rn - - - --ST4 �2_+08 42 / � �\ \` 2- -_ I " ®0.51 m �" F- NA R 01as 2 _ w S 0.00 4 TS A 5+66.55 43 _ o 4 STRIM9 242. 7 TA 4+24.7 �A-6+91.45= I ?. -- 3 M-245.97 3+15.00 42 -WATER INV IN-238.02 L q3 I _I INV IN-232. 2 1 --- -=12+23. 5 > INV OUT-237.9� 2 - INV OUT-232.✓g7 41 F ? __ _ , 16E.10LF _245- - 1 1 1 1 2 1 1 , O 1 7 I O 1 9 _2az 10 1 I 11 13_ ---- I 1_ 1 _ 16_ e® Q4a - - 1 14 5 _ z- - , ,, - - - - ' S 4 - - - - _ 1 L 1 - - - 20 AIN GE E SEMENT I- - �45 _ O _ _ 2q -1 - - - - i- -F - - - - fi 20' DRAIN�GE- i 2 - - - I _2I40 -245---� 20'DR INAGEM3 1 L--'------ 1----� ----- '---240--�-- 20' D AGE EASEMENT 242 - - F -24 - -f _ - - - 1 1 1 1 1, 2 �-I I j I I - - --_ s- _ 1 - 1 1 I -� I ---- -- - �I i I � �xl �y 1"--I (�M^ 240.40 - 1 I T 225�88.66 3h� I-2 - 28.61 I 4" --• -- - ._..__ - -- I _ I--� 1 1-... -1 _.. WETLAONDS� >`t / \ 1 - WETLANDS '' �' Io, „11I a L------- ---. ��o L __� 240-_;I -Nos4� _J _L_;I EX _ / P 0 N ex. 1 I ti�/iii� 2 240- I %I\mil - - - r i I � l a,, �,� +' � � -�- gyp/ - -, � BRIDGEPORT FORTH CAB 4 SLIDE 4-40, MAP 001 i l y I 3 W E T L A N �D r- r ZONED R-B 'I ®/ 05 Qq 1 I I� I 7� �Y • � � � W� � �?I I Nv_z 237.42X2aa WATER UTILITY NOTES I ;Y- _- a� WET��WET� S I 1. WATER MAINS SHALL BE INSTALLED IN ACCORDANCE -� IQ3I `J N I� 1 WITH HOKE COUNTY UTILITIES SPECIFICATIONS AND IN 3 1 - ACCORDANCE WITH NCDOT POLICIES AND PROCEDURES FOR ACCOMMODATING UTILITIES ON AIGHWAY ,� M I Cg - - - Ss- RIGHTS -OF -WAY AND ENCROACHMENT AGREEMENTS. --L 2. CONTRACTOR SHALL INSTALL WATER MAINS TO A - 3 I I ISS j.. RIM. 24©6 ss ss - Ss i I MINIMUM DEPTH OF BURY OF 36". _ I � I INV-230.75.. - - - - 6 _ - J-RlM-242 70SANITARY SEWER NOTES - 332.' s - 3. CONTRACTOR SHALL INSTALL DUCTIL_ IRON PIPE 10' 89LF a 1 --- - - _ ,;; - -- --- 0. -EACH SIDE OF STORM DRAINAGE PIPE CZOSSING AND 1 SS � 43qSs MAINTAIN MINIMUM24" VERTICAL SEPARF(ION WHEN 1 •CONTRACTOR SHALL VERIFY THE LOCATIONS OF ALL _ - EXISTING UTILITIES PRIOR TO BEGINNING _ SSMH ��� fY, ' - I - CROSSING UNDERNEATH STORM DRAINA;E PIPE. -- 5' DOGHOUSE /s4 ss CONSTRUCTION. - (W� CA�ILOCK) 1 1 �© I % - --- _ 4. CONTRACTOR SHALL MAINTAIN 36" VER'1CAL COVER RIM-221.9 RIM 240.54 - - - - 2.ALL SEWER MAINS, LATERALS AND APPURTENANCES INV-226.97 ; wV-225'99 -- - I STORM DRAINAGE PIPES. IF LOESS THENC 8"� IVERTI/CAL SHALL BE INSTALLED AND TESTED IN ACCORDANCE WITH - - EX _ NV-226.� ; 1 SEPARATION, THEN CONTRACTOR SHALL WE DUCTILE FAYETTEVILLE PUBLIC WORKS COMMISSION TECHICAL -- IRON PIPE 10' ON EACH SIDE OF CROSSING. SPECIFICATIONS. 3. ALL DUCTILE IRON PIPE IN SANITARY SEWER SERVICES Approvod 8t�rr r atcu withPL rit a ocum n d r �n accordance with `Hasa documents Is ZONED R-15 CATHERINE L. FAIRCLOTH TAX PIN: 494760101227 250- 248 F- - - - - - --�-"-� ---� �- 247 4� __1 (---- \ / I ZAPPED 2" 1Elf ANTI (2) 8" GV / W 2 BALL 2q ASSEMBLY 4146-� PHILLIP W. HORNE I \ 24g � VAL STA-3+99.44 STA-4+805.00 D.B. 644, PACE 185 I \ I I TA�3+ 4 ! 246 TAX PIN: 494660201019 I ,C:) \ \ I I 48 1 1, (4 9 I 1 50 24> 51 52 247 53 55 56 ZONED R-15 I V\ \ y J I 1 921444LF q8 2" S R-21 8" C 9 0 A SDR�2� n W TE n n p6 n y�A R 2 i 0.72% g. Go -lot � to � o � I Co � I :C4. N O to N mm N M O> Ncni I!m .0 IDN k N N "r 2 N H N N Fa- t H N p N H N H N N H N N•• N SSMH-5 STA-0+91.02 RIM-241.93 LAT INV IN-237.04� INV OUT-236\11 h ISM -11 2LE q�' I RNAL DROPS EPPED >� V trA 7-f124.44 I I 8" I G M 24 .50 ,'� q4 - 8" PLU 2" I i V N- .62 2 W� ALL VALVE -232.14 ( I ST +30. O= 1019.44 5 I 59 I; I 60Ln 61' 11 I ^ D00 242 \ Of n M n m N O) m 2 to N H N \ N F N N H N m rn w L V, 8+00 oNV-240.34 2�r I �1 o { r�0 to m N L00 m m In M- m- N. O m. -. b N -' 24 h. m N m 2¢ n nN n avj a n� a� a ti mc� rn a M M n \ n+ m a 2¢ d N A '� m 01 m fV N O OI S Oi M m a0 of rG N t0 Of N N + + + N' -- 23 F N M a+ Mt M M a M+ M R82RIDIP. rrr h r 8" JDIP 257.00 1E)R-�26 OF I / d c 250. OL a a r rn 8" S - 6 N CENTERED 26 < a, _ CENTE ED + o n N $ ON RCP n rn to to a4 ON CP / v 248 ® 0.183 o ®Q 4 1}5 I \ Q.45X 243 I 42 1 _ 1�3 4 1 40 1 3g O 24 25 26 1 27 1 1 28 gs� 29 1 !ko' 1,. 1 1 s�A 2+117.4a 1 2 2\ 0 / BLOW OFF RM 24�.91 SSMH-12 U j AS I 4 \ FlRE I Q L\ / y 0+60.45 1 V N- 38.96 ST-4+67.44 m- HYDRANT g _ i Q 1 0+25.00 >I \ � o/ 1 1 L INV OUT 236.82 d 246 - r - - - - L - - J STA-2+85.00� LY 0, g J INV IN 236.77 \ 1 _ _ INV U r3esl----� L----J----�-- -J L--- sal+ N I 248 Z SSMH-7 p 8" C-900 246 �N STA: 4+20.00 SSMH-8 S-6+71.45 WATER - " L0=12+43.45 +Zs6067=2+95.eQ e� r-----1 r r---/� r-IiIM-2a1.ay3 Ell GRAPHIC SCALE U. WATER MAINS SHALL MAINTAIN 10 MINIMU9 Cohsuu to I . o zs w oo HORIZONTAL SEPARATION FROM STORM DRANAGE SHALL HAVE GRIFFIN "SEWPER" COAT OR PROTECTO 401 required by the atormwater permit. North Carolina J LININGrules requln3 that the atormwater system designer PIPES. CONTRACTOR SHALL USE DUCTILE IR(N PIPE FOR . Inspect during construction, certify conformity with the S LESS THAN 1 O' SEPARATION AND MUST BE APFIOVED IN plans and specs; and certify compliance with the 1 INCH = 50 FEET WRITING BY ENGINEER. 4. REFER TO DETAIL S.12, UTILITY CONFLICT SEPARATION stormwater rules. (15ANCAC 2H 10080)) HORIZONTAL REQUIREMENTS, FOR ALL SANITARY SERVICE LATERALS. Pe * ' 1 / Y Date /� 6. ALL PROPOSED FIRE HYDRANTS SHALL BE LC;b ATED AT Y on of V dMi eWy THE RIGHT-OF-WAY LINE. 5. ALL MANHOLES MUST BE VACUUM TESTED. Sheet a Revis D&tP DtL,22-4-JIT d i tz N tr) N O O C p O N z fir• w V 00 a o U o .t Q t U 0 a > �LL ^ 00 O t00 U c^D �Zv C: r, C CM O N M O O Lo =Con z he x 0 > , O �� w �' m� M w O d Z N9 y ` SEAL c 0 •N m O 0 0 z Owner: HCC INVESTMENTS, LLC CONTACT.- 3077N. MAINST HOPE MILLS, NC 28348 (910)237-5846 SOON Project: THE COMMONS AT BRIDGEPORT tax Id #: 0426-91-9724 township: Cross Creek county: Cumberland state: NC UTILITY PLAN CONSTRUCTION DOCUMENTS job no.: P13-084 date: 02/18/14 drawn by: TA survey by: MR checked by: JN sheet no.: C 02 STORM DRAINAGE NOTES GENERAL SITE NOTES 1 THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL INSPECTIONS, CERTIFICATIONS, EQUIPMENT, ETC. THAT MAY BE REQUIRED. 1. ALL PIPE SLOPES AND LENGTHS ARE HORIZONTAL • n DISTANCES TO CENTER OF STRUCTURE. 2. THE CONTRACTOR SHALL NOTE THAT THE DRAWINGS ARE SCHEMATIC IN NATURE AND DO NOT SHOW EVERY OFFSET, TRANSITION, FA HWY 40 T I 2. CONTRACTOR SHALL REMOVE ALL SEDIMENT FROM FITTING, ETC. THAT MAY BE REQUIRED FOR A COMPLETE AND WORKING SYSTEM. POND UPON COMPLETION OF CONSTRUCTION. 3. THE ENGINEER AND / OR OWNER DISCLAIM ANY ROLE IN THE CONSTRUCTION MEANS AND METHODS ASSOCIATED WITH THE PROJECT 3. TOP ON CATCH BASIN LABELS REFERENCE THE TOP AS SET FORTH IN THESE PLANS. BACK OF CURB ELEVATION AT STRUCTURE. 4. CONTRACTOR SHALL MAINTAIN AN "AS BUILT" SET OF DRAWINGS TO RECORD THE EXACT LOCATION OF ALL PIPING PRIOR TO CONCEALMENT. DRAWINGS SHALL BE GIVEN TO THE ENGINEER UPON COMPLETION OF THE PROJECT WITH A COPY OF THE 7E TRANSMITTAL LETTER TO THE OWNER. ° 5. IF DEPARTURES FROM THE SPECIFICATION OR DRAWINGS ARE DEEMED NECESSARY BY THE CONTRACTOR, DETAILS OF SUCH DEPARTURES AND REASONS THEREOF SHALL BE SUBMITTED TO THE ENGINEER FOR REVIEW. NO DEPARTURES FROM THE CONTRACT DOCUMENTS SHALL BE MADE WITHOUT THE WRITTEN PERMISSION OF THE OWNER. VICINITY MAP NOT TO SCALE 6. THE CONTRACTOR MUST, AT ALL TIMES, KEEP THE PREMISES FREE FROM ACCUMULATIONS OF WASTE MATERIALS OR RUBBISH CAUSED BY HIM, HIS EMPLOYEES OR HIS WORK. ALL DEBRIS SHALL BE REMOVED FROM THE PROJECT SITE ON A DAILY BASIS. 7. GEOTEXTILE FABRIC SHALL BE APPRVED BY ENGINEER. \ I ZONED R-15 CATHERINE L. FAIRCLOTH TAX PIN: 494760101227 tia tia L ` tia tid ti 248 248 Ir-�---------� --- 1 �B_ 249 F_ F- � CB-1� 247 -�� 1+g3.441- 1STA-2+78.4d / STA- __2471 CB-12 1 j/ C I I A�-- 0`18410 / \ \ 5°� TOP,247.26 248 / / 47 OP-245.26 STA-6+53.94 46 246 STA- 8.94 d STA-9 9 44 PHILLIP W. HORNE I \ \ /� �49 ti y 4 1NG 244.36 I �, TOP-246.56 2 INV-242.36 TOP-244.0 ? 24 ,cS3 I 244 TOP- 4 33 / 6 >: INV- 6 r INV-241.18 a >r rr D.B. 644, PAGE 185 \ -Y/) / I / 46 2 INV-2.03 j� cp INV-3 .53n, TAX PIN: 494660201019 I N 4g 6 \ AU I 1 O S I\\ 9 50 '9 O 'L 4'I 'L O 20 `L O sc' O / 1 n 2 PAD EL: 48 49 24 51 52 2 53 55 56 58 59 60 ZONED R-15 YARD I \/ \ 24s.7s rDE I NPAD EL: 4 PAD EL: PAD L: (T1'P ),yg0 ?A 249 27 D 8 PAD EL: 1 1 PAD EL: AD EL•/PAD EL: 0/1 PAD EL I PAD EL: 2 PAD EL: PA L: I PAD EL E� \ 243.62 -242. 6 L \ 2,-,. 49.03 248.66 248.49 248.0� 247.33 / 246.70 246.23 246 I 245.84 a 5.21 244 k� YARD I 242 \ 46 \ N> L ---� --- - -2y3- g I O 248 28.50 LF 47 8.50 LF SLE 62.25 LF 28.50 LF 0 PA EL: 248.60 r 15" RCP ti e \ 28.50 LF \ O 0 LF ( •) a 25 .O7 h 3% R P P RC S 24" C h• 15" a• 15" P ry� 3% La \ °� "•�3% ryas ° 00.33% ryN L - +.'_ 1+0 2+0 3.00 S s 4+00 +00 S Z 6+00 A6 7+00 +00 v Z 00 04 S w w / 9• a 4 6 4 j 8.r60 02� •ft� �0 F s� t�5 0 � 8 RCP ®0 5 .�0 LF 24" RCP 202.50 L R P 00.50% 4 s ,:.. I o r 9 _ ., .,., .._ s I C. n z 07 CB-0XN sS PAD EL: \ a a CB 03 \\ I 250.38 \ 48.60 N71 xs % 174.75 LF ryh STA-4+5 19 STA, +15.4 S� 2AAe a O £�� krya a�• -ell, A-9+91.44 6 z 2� 70 rya0 TQP-245.26 c l T 33 5') �42 zs 242.46 L IN b 1 �) 236.53 PAD EL• / ( )- $4")-241. 7 L PAD EL: PAD EL: L PAD EL: L PAD EL\� PAD P 0 L: PAD EL: / EL: INV(24")-241.53 Low I PAD EL; 245. I I A I 249.20/ 248.72 OPAU 248.30 2 PAD EL: � + I 245.98 2 5 45.70245.76 09 \ 244.44 43. \ 81 0 33.79 Lf 1\ I 1 z \I / \ 249 1 / O O a� O 61;10 PAD EL: I 42 4 4p a7.7° 39 '�cP242.5 26 12728 29 0 �'0GGYARD ya -oaj \ ®0.�3% ya ' yas,� a CB-04 a 3 L \ `to✓ / 61'2 %I 1 STA-ti13 .44 SWALE I STA-2+ .4 �' CB-43 U \ _ CB-05 / 2 STA-7+88.94 A2 \ D' I I 62.2 LF ST 0+73.00 STA 6+53� TOP- 47.26 TOP-24 / m \ - TOP-242.93 36" a (TYP') _ WJVF15"-)--243. - - - L RI-245.48 ] L - - - - J L J TOP=244 08 Z \ L J -- -- Nu(15"}a23993 L-- J L---�. % z \ 9 0 °/ INV(15")- 4.26 L - - INV(18")-243.3 p0 IN 242.58 G p R Oa 2A INV(15")-241.08 a \ INV(24")-239.13 h \ \�5 (NV(18")- 21J ?4 _3? INV(24")-242.76 a$ ?4j ?�07 ° 246 s ss INV(24")-240.28 ay 9�� INV(36 3 s� - 6AZ 48.g4 ? 248 CB_ 42 \ I / CB-22 S-2+47.00 O \ CB-19 246 SWALE ph1 CB-17 a CB-1 _ to STA-7 CB-18 STA-10+53.96 ya STA-4+05.75 STA r A�6631 NV-242.95 • '` (� RNA-24?1 a LTYr�_ SlA-9+09_4 _=12+57.70 ^� 3 G _ ?4 RIM-244.76 O INV 15")-240.93 r L RIM-242.90 r - - r - - - r - - - - ry \ I CB-24 ( CB-2 3 9 ,) III 15" 42.481 I e / INV(15")-239.12 / I - 1.76 PAD EL: ro INV(24")-240.13 I I INV(15")-239.90 I INV 30" 237.821 INV(24.1 s(Lox I STA-1+4Z68�249 I �, STA-2t I 1 V 24")-242.231 1 I t V 24" 247.05 ` ~' o INV TO" 239.63 �IJV(30')-238.50- ( )- INV(36")-236. O I RIM-247.03 ( )-241.68 d ( )-240.96 1 W ( )- I ? 4 INV(36")-236.82 8 4� INV(4 U I 2�9-246.26 a0 I A ry� o/ 7g 4g 245 ?g I ? I I INV-244.03 I > a8 33.75 2 2 1 ( 18 ? \ m I I d IN�V(15")-243.26 I I ti a7 I I 37 38 ti / 15" Rc 23 a5 21 20 19 a 3 �� 31 I ti `':� 1 v(1s')-z43.o11 ?4j, s I 35 IB-zo to I 2 1 I I L; Ida PAD EL: I I PAD EL STA-6 57 21� ®2.73 pAD EL: EL: PAD EL: PAD EL PAD EL: L PAD EL: L 1 I r I 1 / I 244.55 244.02 g. I 32 34 I 247.64 2+ 075 245.73 245.44 2 4�t \ O I O I EL: a� I I 246 RIM 4.03 S 245 244 243 CB-16 FAQ EL: �� I PAD -t PAD EL: 2� 247.95 `L __ 2--- J L- x� - ---� L-----1 --- -- =---J --J LsTA-i1+a5,A�5_1 1 / 1 INV 1)-241 / 244 - - - - - TOP-241.3 3a48.>33 ByZ\ 1 I // 248.74 \ 248.7P 2 I I / J 2AS 124"3RGR _ ^ NV 40.47 / a0/ 243 Ai INV i 36 L - - - - - - J 28.50 LFZa6 ? �0 53% 45 46 244 L ° a / rya 42 36")�36.56 o o 1 a 141.69 LF 2a7 1 8"6R L j 15" 33% rya ? y _ +00 d . 15" RCP rya6 �d6 Z - 00 6 7+00 / 8+001 0 00 LF 30 bZ 9+00 144.50 L 30 RCPI 0+00 2 i 00' 141.50 LFr 36 1 +00 m c.42 . + TR ET 00 W 5 FT Pit i 00 6 0 LF 0 90.71 A o .. 44 28.50 LF d r 2&50�. 2F 28.50 LF .. 28.50 LF , ti x STA 0+53.96 I - 2 .33 a 24 12 - - - 15 RCS - - - - - - ary_ - 15" RCP - _ - 15' RCP - - � u a � 4�43 RCP �242.12 s r ay' TOP 24 �- - - _ �_�0.54% 62.25 LF 33% 00.33% _ f��_ _ _ 243 -3 6 25 LF _ z4 r z4` RCP r r r z CB 47 x 2850 LF 2 28. 2131 r STA- 09. SWALE I I g ISTA-11+95.45 �0,16% 15" RCP RCP O _ �A5 / 1 / TA-5+66.50 �� STA-7 / / CB-27 1 4i� CB-25 � O ®0.54% CB 4g � YARD � 3 -RCP i0� 247 03 ®0.33% _/_ r I INV-24dB6 - - a �NV�2 - � ') I INV-238.46 / M33% 246 TOP-244. T Z� OP-242.90 TOP-241.36 I 3 I INV-244.73 ---� r--- 2 r2 -- 3 _ � YARD � I INaJ--2 0 I � 2 � � -242-- - rZ Z-1 - - - .�L- - I- _ / Za5/ SWALE dd / 46 I, 243 zbz- - _ 2 _TMP�246.26 I (TYP.) A5 PAD EL: �t I / PAD EL: EL: PAD EL PAD EL: -2417- -I INV-243.36PAD EL: 245.61 2 ZPAD E 43- PAD EL: iPAD EL 242. I ' 3 I j 246.43 EL: 243 P�tD __EL_244.49 �-PALLEt:2 244.04 d2 242.77 242.77 242.78 PAD EL: PAD EL 46.24 244.62 244. 2 243.26 241/ qbZ 1 - - I alb I 40$ I I 247.39 PAD EL: 247.29 a / 24� PAD EL -245- i / 247.48 1 246.69 1I 2 1 7 i�43 I O- 9 24 10 42� 11 1 1 / 13 I - 14 - 22 AGE E 1-- - 6 1\ t 46- - 5 24a _ _ - - 1-�� - L - - - - -I- - - - ° . 3 I �45301- - - -,~ �- - EN - - - + 20' DRAINAGE EASEMENT Z� I - 20 D GE EASEMENT /- - 247 - I 1 1 1 1 24� _ _� 138.81 L�j 1 " DPE 136.01 L 1 " E 136.01 1(f 4: HOPE - -2� 0 _136.01 HIl1P�- Ot F 2" HOPE- - - 2 - - - - - - 90.17R \ - -_-----245-- 20' DR IN GE EASEMENT � /-- L L- - ---- �p -----1 } -------q0.1 %j - 23T T----240-- - -Sb -� -i DPE _ 8 % I GI-36 .ice 6f Z&L-.3 ---}}} I I I 141.55 Lf 1 ' I- - J- GI-38 GI-37 / �- -� 146.00 LF 12 HOPE _ _ �R F DRAIN TIE IN 240�� i ( OF B%RIM 5+__& / _ - - - _ s-�4 - �I 24� GI-3! ( DRAIN TIE IN ( (R(OF DRAIN TIE IN / F012 OT� 11 AND 12) J �239 / �/ / �R 0Bj V IOP-240.82 �I 4 I _244-'-�- - - FO L TS 7 AND 8) 1 FOR LOTS 9 AND 10 RIM -24t181-1� GI-41 -OOF DRAIN TIE IN I 242 (P ) _ ZZg GI-3S I�- I (ROOF DRAIN GI g0_243 - F R OTS 5 AND 6)� RIM-242.07 I - 241� 1 RIM-241.62 24 1 1 I 18'-237.J3 1 �23 / / P O ` I TIE N-FOR -FbZ - - � - N.1-243:86 NV (12" 239.07 INV-23831 2L4�)=2�7.2� r 3_ j FOR(ROOLOTSA13 ANON -- I (R O DRAIN TIE IN 8")-238.5� �� I % -' INV (12")-240.28 ' 238_� I RIM-240.16 I 30' WIDE WEIR / l � I / INV- LOTRIM AND 2) FOR L T 3 AND 4) _ I 240- fi f e r/ �I I J J I �243� RIM-244.44 �IM 244.12 I- J � � I 1/ - INV-237.00 I EL-240.60 FAIRCLOTH SKIMMER / / I 3 ' I INV-241.44 INV-24i$5242 1 - -241 240 - - - T 2140- - - - f t - -6$Z i - �- P 0 N D I I AT ELEV. - 236.00J I I �-- - -ZbZ- - - - - - )- -L2 g�- - - - A --239- - �" �_ --, / l ex. wETLi ' - - 241- - 240 = = J �_ 38=.+- - r X-WE'TCAIVDS 38 / 237� ANDS I I SKIMMER - 5.0" I -ZbZ- _ - - J- -z e = - --_ L�'------- J L---- L-------_� -239- N05 - I 0 (FICE DIAMETER - DAYS N I I - - - - -241��� _ �3 -237- - - - RA OWN TIME - 3 DAYS _ / I 14 LZ ------- 3----� �- BRIDGE).�(RT NOfMTiI------1 I-----� r----� r'--------I--ZI%-- I----- % / WE T L A / 2 --I I I CAB4SZND B IAP001 I I I i I 1/ �I N/D y / � iy I I I I I I I I I I � 2 zaa azaz I I I I / I / � A!/ X.2 R P 3 WET WET / /� +'� 1 I I L- - g - l wET I i «l WETS M I� 55 5S �� , I - I i rt- u SS 55 - _ J 1 1 1 1 1 1 3 -� I 55 55 II-- 55 I- s I SS a sI LI I _ O I I I O219 II II I III II 218 217 O O1 1 -�IjI I ss 216 11 11 21O5 1 I ss-0 O r -21 5 t ss ,�L .��TtW&4L �t�rr rv',a1e f y .flip. lluoYrt*rRa7�..'i, ConsGUctlon in accordance wi h °nose documents Is requtred by the 0ormweter pe"k. North Carolina PRELIMINARY GRAPHIC SCALE DO NOT USE FOR CONSTRUCTION 0 25 50 100 rules ct uri that the ection eler v confo designer Inspect during construction, ca, afy conlormity with the HIS DRAWING HAS NOT plans and specs; and certify compliance with the BEEN REVIEWED BY ANY stommater rules. (15A NCAC 2H 1008 (j) ) $ 317 _ � d.. _ �n GOVERNMENTAL AGENCY FOR COMPLIANCE WITH ANY b - Date ision of-t Permit # REGULATIONS. APPLICABLE LAND DEVELOPMENT OR OTHER 1 INCH = 50 FEET HORIZONTAL Sheet # Recision Dstntb i� rn L(2 i <V \ I 62 I 1121. . 4 2` L J a i - + CP o I; ®0.33% v /N PAD EL: 63 N I 243.19 L d'� • 41� CCA�BB-82- rye1 rTA-1+64.25 10+53.69 64 PAD EL: I i � 1IOP-241.82 243.58 a I V(36")-236.4 III V(42")-236_4 - LN a' \ i 9 F--------/ 247ri L- �. 0 PAD EL� 66 5' WIDE WEIR 1 244.03 EL-235.50, :gOp LF FES-42 ZONED ZONED R-81 RISER-43 TOP-239.75 INV-236.00 41 LF OF 24' RCP ® 0.20% Z Z y Loull N N i 00 5 O 2 C in - o o p p in CCOO pU o z y Q Cie � " U E t O O W C ^ O 00 U CC) C Z � Q O M U -0 u fM N LO 2 = DO _I t3 Z �C XSO >� O J Lu z S. m ` M m�LL = a QM'-� w J - n. CV) li Z EAIL a - �;}031459 y __ 00 ''''' ����f�ne u,` 0 0 .y CD m D: N 0 0 0 Z Owner: HCC INVESTMENTS, LLC CONTACT.• 3077N. MAINST HOPE MILLS, NC 28348 (910)237-5846 Project: THE COMMONS AT BRIDGEPORT tax Id #: 0426-91-9724 township: Cross Creek county: Cumberland state: NC GRADING & DRAINAGE PLAN CONSTRUCTION DOCUMENTS job no.: P13-084 date: 02/18/14 drawn by: TA survey by: MR checked by: JN sheet no.: C-03 / r SSMH _22 I II STA-4+98.06 tt I STA-5 CB-21 I qB-42 -4+33.28 RIM-245.16 P-244.76 STA-2+.00 RIM-2 749J + TOP-245.48 INV IN-235.21 INV 15"-241.76 LJ:DO LLJ CB-23 k� I�JV(18")-242.23 � INV OUT-235.16 I INV(24")-240.96 INV-2 .0 F•- O srA-2+so.o2 II `� I v(24")-241.68 '7 R e I TOP-246.26 q1 3 / 3 ��TAA JB-2o 3 �� STA 4S 7.87 t I NV((18") 243 061 I �t ��_ 124"3RCP I Ln (R M� 44.03 RIM-247.17 I 4g INV 15" 24].13 \ I 1 LAT INV IN-240.00 t I 32 3 4 INV(24"),240.47 y I INV OUT-239.17 - 2z� 2qt� -a �- - 0) I S A-1 N N P } 3 1 IJDP-2i17.03 O) L L_ � I V- 44.03 M T '1� I J i W Ul 33. 5 LF I u M 2 � - � � � O p Q 24" RCP 15" RCP 4B O t / d F' M L Cn 00 _ J L co + ccam�,, J _ w (:a r� J -P +p cr1 24 � U1 � N 45 00 Gn N 1 + p r CN O O> $ N IQ- N Q dp Q W Coo N N (J1 Cn00 - ICA 0+00 Ir 3 S 173.35LF 8" DRR-26 ® 0.51% v -- - - _ m � I _ 00 141 69 LF 15" RCP ®p•55% L 2 + 0 0 SDR-26 4 3 _ 247 S 1m .54% SS S� 148.011 _ s` W W W W W_ 4 O - 28.50 LF g 28.50 LF W N O 222. OLF 8" SDR-26 ®0.52% b N O ,62. LF y - 15" RCP 15" RCP W : M �+00 00.33% ®0.- W N 00 00 CO O) 2 0 R� N O O c0 C7J ®0. 4% - - - 0 �� W N -� � M W NV W W W N N 28.50 F D 17 + d �+ dA -� + d 246 �=,8 - SSMH-7 r CB-19 , STA-9+09.45 STA-6+.45 STA-7+19.45 I TOP -242.90 STA 0 TOP-243.93 INV(15")-239.90 RIM-244122 INV(15")-240.9 INV(30")7238.60 INV IN- 4.27 INV(24")-240.1 INV 0 T 234.22 INV(30")-239.61 245 23 22 �2451 21 245 , 1 8" RJDIP i CENTERED 00 0') 190.0 LF 244 p 00 ON RCP DO ' 30" CP Nj 00 t 00 NN U) N N (J7 N n i a �h 251.00LF 8- SDR-268+00 J • 6 '� I q4 tf) N rill 8" C-90 I� M 1") WATER r O 43 fn r - N N -1 p 15" RC Pd Al N F_ � (�i r PJ + F_ ! 00 N (n (n ®0.33 P � p 247 N m�_o 8" C- 00 Iv N N U' I I I I 43 - -- � i d O W TER p D O O C3fi 2� i I N + cn 1 - V) 1 cn nLn � - r -- 2� r - j 1s 50Re sYA 2s+66.50 8"X8" TEE -_ - U > Q J N CB-30 2 9 �33% TOP-244.76 O 8" GV / l\ '_ C -32 2 O INV-241.86 STA-6+9 - i 9 STA-4+33.28 o I II c° I - - - - FIRE HYDRANT 243 +15.00 00 �i - -- -- - - 03 _ - - -- _ - - TCB- Z NOV-242558�i �� ASSEMBLY c^R 1 O) SMH-9 STA-5+66.55 4 STA-1+7. CB-31 9q _I - - �4I s A 2+so.o2 srA-3+50.00 TOP-246.26 PRIM-245.97 INV-243.36 INV IN-238.02 _ 43 INV OUT- 2 - - •. � I I I I �� 24� I I -��� 1 I • I - I I I 7 = 8 1 9 242 ----- -- -�,_- 45 - 1 2qA --I---=----------------1-_==-I 20 I D_ IAGE EASEMENT I I -- 242 I I _ nnf 111 L IA CIA lo­ r-A!'�f-\If-AIT/ ���" Jr � 25( 241 241 24, 24: 241 23 23 23, 23: 231 DATUA! ELEV 228.00 n 28.50 LF 42 T1+=7+19.45 " 15" _ - OP-243.93 / 33% 1 v-241.03 CB>27 STA 9+09.45 i I ---TOP-242.90 12 I INV-240.00PSMH 1 STA_g+22. 5 I- RIM1242. 7 Zd INV INS 10 1 --- 1 I t232 7 1/ 42-_- t / 20 DRAIN GE EASEMENT - - _ T <4 - \ t / I 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 PRELIMINARY DO NOT USE FOR CONSTRUCTION THIS DRAWING HAS NOT BEEN REVIEWED BYANY GOVERNMENTAL AGENCY FOR COMPLIANCE WITH ANY APPLICABLE LAND DEVELOPMENT OR OTHER REGULATIONS. GRAPHIC SCALE GRAPHIC SCALE 0 15 30 60 0 1.5 3 6 1 INCH = 30 FEET HORIZONTAL 1 INCH = 3 FEET VERTICAL a z y LO o00a z � � O � z v on .- o O n W V -0 6 C, OD a O U . 0 c� 1A Q V O a 06 C:O O Z CO O Q C)on =he C xSO �`r C)W 0:E �O EJ `a z qm U w J CL �a:Z �1 ruuul„ 031459, rn zcA c�i:�s1��94i5 ""'pnnnu uuuaao°"• 0 0 .N 61 d' m O O Z Owner: HCC INVESTMENTS, LLC CONTACT: 3077 N. MAIN ST HOPE MILLS, NC 28348 (910)237-5846 Project: THE COMMONS AT BRIDGEPORT tax Id #: 0426-91-9724 township: Cmss Creek county: Cumberland state: NC PLAN & PROFILE SHEET #1 CONSTRUCTION DOCUMENTS job no.: P13-084 date: 02/18/14 drawn by: TA survey by: MR checked by: JN sheet no.: C-04 A� SSMH B STA_ 6+71.45 �� 24� - - _ - - - - - - - -STA 12+43.00/ I CJ oA z 4+95.00 r _ f ---7 r----- - 7 F-- -� Ca T7 2416$ o } 3 x L o �tIM-244.22 -� 83 INV IN-234.27 _i STA 7+19.45 STA-9+09.45 STA-10+53.96 / / r INVIN-23 . YYY INV 24"-240�13 `TOj 242.90 I 144.50 L 54%" RCP INV(30p)-237.82 / INV BT--� 34.2 s 21 " TOP-243.93 TOP-242.12 i / INV I - 45 rmrl ' JN ( )- INV 30"-238.60 INV 0"-239.12 INV OUjf- 29.40 STA-847 W + W,LL 0 ' INV(30")-239.63 245 INV(36) 236.82 I/ A33 ® =2 .32 n / . I ST- s Top-N. li- / 18 O7 INV0.52 / ; 2 3(22, �5 21 2 0 19 / INV(15"p , 2 INV(3Is" L 3 In I`�� I d- I �� � I I � I I d- N ��' I I N I IN3 62.2�i LF245 00 244 In �N 241 1 36" IRCP � st + N co + _J L LQ + n + L _+ 00J 6% ` 1 ao rn ao 244 u rn ,, d o Clo o .I 1.00LF 00 0�0 Mj CO 72.91 LP .�\ N �. - 6 N N N N N N N Q 1 24" ® 0.52% N N ®0 4 \` \ + _- 4 24 %+00 8 F 00 190.00 LF 3 141 50 LF 36 RCP 00.54% 2q 43 9+00 10+00 2 11400 S 2a.5o F 1 +00 ®0.18% M@- -- S - -- + - S r. S S51 321.00LF 8" SDR - 6 ® 0.77% B � STREET A 50 FT: PUBLIC R/W 15" RCP an vi% W _ W W W / - - w_ . w W-_-�W: w w - W w w w_ W w W w W w. W 44 N � �2CY) RCP 8.. WA+95.45 R� N 00 N 00 15" RCP 6" W OR N o STA-11 CB-25 �I UN -F Pd Pl +Jn ,CST" G4� + CO + ONO o ®0. 3% N + INV-238.46 N 43 r 42� o o co 30 I rn N C�1 �`1 I I I I Q Q ¢ Q B-26 as a" BENp T 2'� 4_ -' Q srA-10 53.9 G Q Q STA 12+08. 2 - U) _ I_- U) U) (n TOP- 42.1 F-- C71 >T : 2 89.29 / STA-4+05.75 2 2.9( =12+57.70 TOP-241.92 L - - -T_3 A24 )=236 8"XB" TEE - L 28.50 LF 2 - I _ IINV- 39.2r2 45. 8 BEND + \ A=7+19 45 (2) 8. OV 15" - STA +24.97 O STA-6+9 - OP-243.93 33% SSMH-6 = +23.45 O I V-241.03 STA-9+22.45 2[ �j +15.00 RIM-242.87 INV 2.92 _I _ - �F2 INV OUT 3 32.87 �3- L STA-9+09.45 -- -- - - - ��� TOP-242.90 - INV-240.00 I I I I I I I I I g 10-���2-I_ I- - 1 4 1 5 242 I_ I_ 91------- L-------�- a --- I- -t---- 20 AINIGE EPHMENT !. 2 - 1 20 DRAINAGE EPISEMENT _ 1 2�0 1 24 - \- 1 ---------�- -�------- L -------i-------- �- -f--7 --------- _1 -r------2J--- ----- = -=l - 40----� -`- / T .i--'240--\ I� - d PRELIMINARY DO NOT USE FOR CONSTRUCTION THIS DRAWING HAS NOT BEEN REVIEWED BY ANY GOVERNMENTAL AGENCY FOR COMPLIANCE WITH ANY APPLICABLE LAND DEVELOPMENT OR OTHER REGULATIONS. INV(36")-236 &IIPI� €II I _ 40.00 LF J 42" RCP ®0.40% z� ~ N O N J U � O Q O LL_ W z .. � Z LiJ i- X Q Q U F__ ZONED R-8 SOIL BORE #1 SHWT ELEV-238.05 Ksat-0.088in/hr INV-236.00 � � I I I I \ I I \� SOIL BORE #2 \ HWT ELEV-238.45 Ksat-0.0651n/hr I i I I I ' / SOIL BORE #3 HWT ELEV-236.92 L__ --=FwI 1 - Ksat-0.051in/hr _ _ I _77777 tin I -------- ----J 250 d SSMH -3 STA-12+- 43.45 +aI RIM-241.83 m� INV IN+230.40 Q - - - INV IN4229.45N 248 LO INV OUT-L229.40 - -_- - 01 LO L 246 -__ rn + _ C- Lo + d' _ II N N N CN _ II m 4 II EX_GROUND _ �� --- --I--LU ILLII -...... ro rJ'' W + '� atf II �._._.. 244 Q '. 00 w 25 62.i LF 24" RCP - - N. GROUND - 08 . Y0.50% g - 242 0054% 190.00 Lr 30" RCP, 00 54% 0 8"IC-900 WATER .50'LF 30' RCP 240 rn 00.549, - O � - 41.50 LF 36" RCP ®0.18% 62.25 G` 36" RC a 8C- 90.16% wFO>nooCo N N 238900TE - - "p4�� -_-I oo' •-_coy N 01 f in 0 T O 0 Q v w _ a -K U h ro O C a O 1= 3 O �^ Of to to O �O O f - O _... 236 o O U JrnU ®O- J ��,, �OFO J N �atn UN� r N F- 0 0 v1 y 001� U'. •- y N N WI V 0 <n. a1 251.00LF 8 _.SDR-26-.�_0.52% : in _ 0 �_.... _... N -_ ®,.. - p.;n J 000 _.. Zt m _. _. 234 O O N N' 3 rn rn O O om J L) of 3 to to in 47 N pO +.{ N' N U -. -O J O d_ J � U ® ... U) I_- O ® U H- O -.. y O N. _�~ r 1, II __ N� U D: _ `rn CB-2 -_STA-+19. :... ®_.i kt� a 5 - .__ CB-0 -� 321 " OOLF 8 SDR-26 _._ . _.. 232 3 TOP-243.9 STA-9+09. 5 ®0.77 CB-1 -SSMH-7 - TOP-242.. CB-26 - �- ----- - - __. -_. -- STA-12+57.70 CB-19 INV-240. 0 CB-17 STA-10+53.96 .- CB-25 TOP-241.92 _ TOP-242.12 CB-16 INV(24")-236.16 _ =2+95.00 RIM-244. 2---, T6P-243.9 INV(1S")-2 0.93 STA 9+09. TOP-242.9 STA-9+2 .45 TOP-242':12 1NV(15�)-239.12 INV-239.2 TOP-241.36 TOP-241 � INV(36")-236.46 INV(42")-236.16 INV IN-23 .27 INV 24" - _ 0.13 -_ INV(15") 239.9 RIM-242. INV IN-23 .92 INV 30 ( )-237.82 _ 1NV(15) 238:36- INV(36")-236.56 INVw238.46 INV OUT- 34.22 INV(30")- ( ) 9.63 INV(30")-238.6 INV OUT- 32.87 NV(36")-236.82 228 NN O �O r �W M ^W O �O r0 M1n rM '-17 O rnN O N r0 W cow LO �� �00 O3 `tom d'jr) 'n ^ n't N0 .-n mPO '00 r� u�,M AD t0 <O N N rn� N PO to . 1M vt r) a' rn rn N N 7 a N `r N � N d' y. N + � N d. � Q NN a' r7 r7 Nj tM M D NN NN NN N•h N� N NtF N N� N N N Na N N� N NC N �� N Na N Na` N N� N Nd N N N N N N N N N NNCqN N NN NN IN 7+00 7+50 8+00 8+50 9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50 GRAPHIC SCALE GRAPHIC SCALE 0 15 30 50 0 1.5 3 6 1 INCH = 30 FEET HORIZONTAL 1 INCH = 3 FEET VERTICAL ApproVvd Styr Y*'ator H lrlt GuCUMIN"tr Construction in accordance with these documents It required by the stormwater permit. North Carolina rules requ iro that the stormwater system designer Inspect during construction; certify conformity with the plans and specs; and certify compliance with the stormwater rules. (15A NCAC 2H .1008 (i) ) Permit W, 7 Date-S�e� b , ` vi s ion OAAlaier QW914 Sheet # Revision Drte_i1f1 1�1-'� Q h � h CV o� p� O O O N O j O d O O O N -00 0U -0 N Q E o C:toU o O O U Do EZ� C) M tll M U X x o � � J L u- CO< T-U OM D_ cM 1) ti Z �1 1n rR `0C�' Tto =` = SEAL 031459 0 0 N m a, `o 0 0 z Owner: HCC INVESTMENTS, LLC CONTACT 3077 N. MAIN ST HOPE MILLS, NC 28348 (910)237-5846 Project: THE COMMONS AT BRIDGEPORT tax id #: 0426-91-9724 township: Cross Creek county: Cumberland state: Nc PLAN & PROFILE SHEET #2 CONSTRUCTION DOCUMENTS job no.: P13-084 date: 02/18/14 drawn by: TA survey by: MR checked by: JN sheet no.: C-05 6 144 \ \ I o \ \ I co W O O \ N > - - J SSMH-14- - _ STA-0+25.00 RIM-248.3 4 INV-240.34 25 25 25 24 24 24 24 24 23 23 23 23 DATUM ELE; 230.00 Lf') CB-15 TOP-247.26 I INV-244.36 I 48 I v 2" SDR-21 \ -- WATER �- 1+0 { SSA; 192.44LF 8 SDR-26 00.72a. n 1 / \ HYDRANT STAB+25.Od I 2 SSMH-1 247 SSMH+ -3 - - -� ] 1 STA-2+17144 ��� ASSEMBLY I I RIM-245.61 4� I CB-12 RIM-246.91 PLUG TAPPED 2" INV IN CB-13 1 �" I TA-6+53.94 INV IN-238.96 IN -236.7 STA-5+15.44 i INV OUT-2311.91 W 2" BALL VALVE �T@p TOP-244.08 STA-3+99.44 INV-242.36 INV-241.18 -I I I I I I I I I I I I I I 1 I 50 4 49 1 2471 51 52 2 53 1 6txe" 1 55 56 1 ce�14 1 (2) 8" GV' STA-2+78.44 S 4+87.44= 2q8 TOP-246�56 OT 500 A �SL9r o p SWZ AN1 FR ve ttfW HOLE� INSTAM+\24�44P �9A - IN RIM-243.50 IINV IN-235.62 INV OUT-232.14 I \ � I I II 581 Jl 1 LiC14 INV-243I66 I ro I I N 1 n 1 n I I n 1 -N "o I I A 44 00 00 O 00 WATE M 00 n 00 n aN N ,o' 00 L + J L L -I L - J L- J - J L Jh L iy # L O N Ln N a0 d C4 «) O� b O O i O O 00 Of 000Q dQ d Q �} Q d 28.50 L 17 Q WA R 17 Q M,''17 Q17, N N F- N F N F- N O F- N 15" RCP N N F-NN N F- (n (n y (n (n 00.33% (n (n \ , (n AT 78.50 LF 15" RCP 24� Ln � + 2 BLOW OFF Cn ;'jK-0+60.45 � I i 4-3 � I � I ( � I I � I I o - W W W W W N& --W W W W W W W W W 2+00LC 1®033� 3 05 OOL 8" SDR-26 ® 0.83%, 4+00 +�� 2�Jr 257.00LF 8" SDR 20 ®0.45% 71 ®R3� S S SS - mmm- Sfi� - EET "C" 50 FT. PUBLIC R/W 62. 5 LF 24" RCP 6 ZQ' 00.26% 138.50 LF 24" RCP 00.79% 33.75 LF -' LO N r -dLn Ln JB. 15" RCP 135.0 FLcp ++59-0 00.33% LF NT Ln Cn f Lo INV(RJDIP18" P 3322Ln 52Ln ®0. LCTOP-4548t5 2.6 00 4CENERED 0,+INVL2-2 1.53 OTCP +C}O 4 + N N R� .C- n Q 74.751LF Q Q 2" OP Q 248 O +o 39 O 24 25 I 42 I I 4 � 1 40 1 I 1 1 B-08 CB-a3 3 CB-06 CB-05 1 STA-2 8.44 1 1 STA-0+73.00 I ( STA-5+15.44 j� STA-6+53.94 TOP-2 .56 RIM-245.48 TOP-245.26 TOP-244.08 1 1 INV(15")-24 56 1 1 1 INV-242.58 I p () I 1 INV(15")-242.26 INV( 41.08 J --INV(24""-242 7 L - - - - - J L - - - - J F m i INV(24")-241.37 INV(24')-240.28 1 INV 18" -243. 1 L___ - W 0- N F-: i, 246 24B LO zz)- --- I - 246 7+00 1 5.00 LF 24" RCP 00.86 _-_ O c0 L Ln N Cn 17 N 00 M r- - -1 r - I I Q I I Q I 2 5 ~ 26 i 27 I 6� F---------I r- I I II � � /G I 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 K' PRELIMINARY DO NOT USE FOR CONSTRUCTION THIS DRAWING HAS NOT BEEN REVIEWED BY ANY GOVERNMENTAL AGENCY FOR COMPLIANCE WITH ANY APPLICABLE LAND DEVELOPMENT OR OTHER REGULATIONS. GRAPHIC SCALE GRAPHIC SCALE 0 15 30 60 0 1.5 3 6 1 INCH = 30 FEET 1 INCH = 3 FEET HORIZONTAL VERTICAL Q 0. u z y J 0 im � N 0000 Iq N zDO A, .O O w V o, 00 H -00 ou .0 Q U > ^ o 0 0 U M O a) M () (9 Y C O% - 00 J a rc Lu x p O W III w a:M ll d Z �1 a i ! 14�9,j yg uunuaC`��"•` C O m m 0 0 0 z Owner: HCC INVESTMENTS, LLC CONTACT 3077N. AWNST HOPE MILLS, NC 28348 (910)237-5846 Project: THE COMMONS AT BRIDGEPORT tax Id #: 0426-91-9724 township: Cross Creek County: Cumberland state: NC PLAN & PROFILE SHEET #3 CONSTRUCTION DOCUMENTS job no.: P13-084 date: 02/18/14 drawn by: TA survey by: MR checked by: JN sheet no.- C-06 j SSMH-12 -j j j 247 I STA 4+67.44- 7 RIM- 4 s� 47 L - - INV IN-236.8 CB-13 4NV OUT- 7 r q�S�TTAA-5+15.44� Ads/-242.36 ' 53 I 81X8„ I I 55 I 4),A8" u11 so 5 0 T.44= r S eft ANHOLE - INTERNAL DROP CB-12 /k6 STA-7+24.44 STA-6+53.94 - RIM 243.50 TOP-244.08 r, INV IN-235.62 INV-241.18 I INV OUT-232.14 I O I I I 56 I h N rn r ] ao ,n 1 00 L CSI + L- J d 00 d N Ln D CO (1)O Lo 00 O Lrj O) C- 00 00 00 N N p N N N F N N I- N N N 4+00 , 9S174.75 LF 2e RCP CB-07 STA-4+43.31 =0+49.14 TOP-245.35 INV-241.55 i 39 I mam �' 62. 5 LF 24" 00.26% 33.75 LF 15" RCP ®0i 257.00LF 8 SDR-26 ® 0. STREET "C" 50 FT. U L C �- 138.50 LFLb - 23 LF L 00 57 24" RCP 00.79% 8" RJDIP Ln T CENTERED N + �l + Lr� ON RCP F - , UD p1 ) 4 H 24 � i i 25 CB-06 CB-05 STA-5+15.44 STA-6+53.94 TOP-245.26 TOP-244.08 INV(15")-242.26 � � INVj15/"�4-1-.08 IN V(24")-241.37 INV(2r)-240.28 L - - - - - - - - J L---------J ED :SW 7+00 1 O CB-11 TA-7+88.94� 2N11b INV-242.03 4 58` 1 I � I `� Q 2� L n- N � N N Cn V _ - W W: 1 FW.P' 8+00 I I I I $'"X8�'� TEE � O I v Ir 8" PLUG TA0EDL - Q W/ 2" BALLI VALVE 2 STA-1+30.00=19+19.44 - 25FF I I I I I I I I \ N l� -10 DO th� 00 . - 2 s -9+ 1.44 7c� L L J L # TOP-24.33 + V-23' 00 N �8" W TER oc` F_ (n N LN N (n N I 28.50 2 9 00 24" RCF 0+00 I S_ 315.00LF 8" SD -26 00.4 S 3 135.00 LF 24" RCP 00.86 I 202.50 LF 38" RCP % -- - _ ---- -- -- O CO Ln N 24 Ito � L<) (0 N Q0 .2 LD 27 LF Gn OC)�t r7 N O N7 � 0-)N tD Pd N Q Q Q \ Q 5 26 27 04 \STA-7 94 TOP-2 3 INV(15")-239.9 -- -- - -- -- INV(24")-239.13 L-------�, INV(36")_237.54- L--------J L-- - � - x. I 8"RJDIP 7rL-L,+, CENTERED F N I I I CB 033 62.25 LF STAI-9+91.44 136" RCP TOP-241.33 0 00.15% (241)-237.43 I I I I L--------� L AD w z t•: \ Imo\ y, 242. I I STA: 0�4 5 62 1 238.38 I � I I O L-------------J v � r SSMH-4 -� 5'0-MANHOLV- 7 W/ INTERNAL DgOP/ 37.9 n STA-1+50.00 RIM-241.88 SSTA: 1 +09.29 INV IN (5)-235.�4 -23 2 1.9 INV OUT- 230.67 --------------- J CB-02 STA-1+64.25 TOP-241.82 r INV(42")-236.43 7.9 64 TA: 1 69.29 � N L------- ----- 1-i r �---------/ 238.5 65 STA: 2 29.2 O { 242.5 L j A 2� 38.9 �v 1 O ' ST 2 89.29 po II' 2 2.9 L - - - - - - - - - - - - - - - - J \ n A 7 In 00 254 +00 LOW POINT €LEV =1241.36 V) LOW POINT STA = 9 91.67 -PV1 STA-=9+85: 0- _. C, V)_w 252 1 PVI ELEV = 241.28 I SSMH - - A.D. _ 1.37 5 m �1. NHOLE +r CB-13 K = 36.40 W/ INIIERNAL [ STA-5+15. 4 CB-12 I I STAT1 +39.44 TOP _ - 1.88 Ilp II INV-242.36 ;TOP-244.08 - INV IN:235.94 _ 1NV-241.48 30.7 J8-07 STA-1+53.19 - I - w w - CB-06 -- SSMH-11 INV bT? 230J = O f 39.25 - - - STA-5+15. 4 CB-05 5' MANHOLE - + N � ..... - r-- 248 - JOP-245.42 g g TOP-245.2 STA-6+53.94 W/ INTE NAL DROP CB-11 w o INV15� 24T.48 - a a INV(15'F)_2 .26 ST 4.44 STOP7242.93 o + INV(24) 241.53 _ -�._ - INV(24) 2 1.37 1NV(l5") 241.06 M72?3:50' 4 m m o N -� „ __- m - - - - - - r INV(24")-240.25 INV N-235.62 _ - INV-240.03 w N - - - INV_ 23214 T - ZB=O - -1fl u > o car c�v... STA-7+88.94 _ _ _ STA-9+ 1.44; w Ld - II 1246 TOP-242.93 _ - TOP-2 1.33I II II > INV(15")-239.93 _ - _ INV-2 7.53' w w -0.85% _ INV(24")-239.13 INV(38")-237.54 EX. !GROUND - - --.. - C - -03 _ : ~. U 5 -.__ 244 STA- 44 - O TOP-2 1.33 a-_ - - 622 LF 24" RCP .26% _ - INV(24")-27.43 - C-900 WATER - 138.50 LF FIN. GROUND INV(36")-2 6.53 - 3 0091 2. 0 _ 242 24" RCP ®0.79% 0.53% ik n - - -135 00 LF " 24 - - R I ®0.86% o :Ln 240 zo N - N v,_ 6., C-900 202.50-LF 36" R P 00.50% - 6225 LF 36a R P _ - WATER 00.15% 238 to ILDrn _ 257.00LF 8" SDR-26 ®0.45 - o , (� J v v1 in In O N ,00 n p0 U co ; >JaO ._..2363O : f- N � U �Q O U�/O Q 0ij QOo UO X ON 0 1n n �O in ® > -U ,` (n � o.0 1n vNmEn V E n b I1 a0 <I_ c mo o 234 1n (n in 3 () In n . � V) o : co N O J �v� ® ® ® ® ® J o ® m31 SSMH ,2 a " _ 315.000E 6" SDR- 26 ': - N 232 STA-4+67 44 CB-U RIM-2459.61STA INV IN236.82 TOP-: INV 01? INV(3f INV(4: M O minN^ n N O u0 N� r NN, co NP NO M Nn M� O �N 0f �o r oJ0 t0 d0 Odd. M �,N N OQ O) oJ^ cps 00 N� O �M t0 Lo �[j N Q6 d'� to c6 d'"} tO d'�d-Y 4 to 4 cD s} t0 �� y: t0 a'a � co ��' Mj c ` e i co ' �..� � � � J � M � N c N � �Y �j r'i r.j N N N N N N N N N N N N N N N N N N N N 4 N 4 N N N N N N N N N N N N N N N N N N N N N N N N N N N 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+50 10+00 10+50 GRAPHIC SCALE GRAPHIC SCALE 0 15 30 60 0 1.5 3 6 1 INCH = 30 FEET HORIZONTAL 1 INCH = 3 FEET VERTICAL ROP 7 0+53.69 ^41.82 -236.44 )-236.43 �uwu p, --- eo � EAL'< -9 - 031459 0 .N • a� 0 0 0 z Owner: HCC INVESTMENTS, LLC CONTACT 3077 N. MAIN ST HOPE MILLS, NC 28348 (9I0)237--5846 Project: THE COMMONS AT BRIDGEPORT tax Id #: 0426-91-9724 township: Cross Creek county: Cumberland state: NC PLAN & PROFILE SHEET #4 CONSTRUCTION DOCUMENTS job no.: P13-084 date: 02/18/14 drawn by: TA survey by: MR checked by: JN sheet no.: C O■ GRAPHIC SCALE GRAPHIC SCALE 0 15 30 60 0 1.5 3 6 1 INCH = 30 FEET HORIZONTAL 1 INCH = 3 FEET VERTICAL PRELIMINARY DO NOT USE FOR CONSTRUCTION THIS DRAWING HAS NOT BEEN REVIEWED BY ANY GOVERNMENTAL AGENCY FOR COMPLIANCE WITH ANY APPLICABLE LAND DEVELOPMENT OR OTHER REGULATIONS. Z '+,), N TO ANHiLE / INTERNAL DROP STA 1+50100 Q0 f Ri 411188 INV IN (5) 235194 (11 I_IN 230172 # 00 OU 23067 L ' p 1 DO I N N Q N 2" BLOW STA-0 OF Oj 82.3� p � 2" SDR-21 WATER SSMH- -- J STA-0+91.02 RIM-241.93 V 0 LAT INV IN-237.04 0 � 1 +00 INY OUT-236.21 I � 98.918" 1 0 0.4 \ a"xa" TE 8" ATE VALVE TAPPED 20-/ - W/ 2 BALL VALVE STA-1+3 00=10+19,44 -10 -9i�91'.44-,- OP- 41.33 �V- 37.53 j QD Z-L +6 :VJ -l-� L 24 24 24 23 23 23 23 23 22 22 DATUM ELEV 225.00 H SSCO-LOT 64 RIM-241.97 INV-237.97 242 240 238 42"I1 INV-236.43 236 4" PVC O SEWER a SERVICE 234 232 8" PVC 230 SEWER 45' BEND INV-230.5 228 LOT 64 ICB-02 sr1 IIA•� Ilw L� SSCO-LOT 65 RIM-242.56 INV-238.56 242 240 42" RCP 238 INV-236.36 236 LT 4" PVC o 174 SEWER SERVICE 234 45' 232 BEND 9 230 8" PVC SEWER INV-230.32 LOT 65 SSCO-LOT 66 RIM-242.94 INV-238.94 242 240 42" RCP 238 INV-236.29 236 c. 4" PVC c. SEWER SERVICE 234 45' BEND 232 230 B" PVC SEWER INV-230.04 LOT 66 0 3+00 4 J271OOLF 8" SDR-26 00.45% S S ESI IR-26 8"RJDIP "B" t�Z cE oN RCP STREET 50 FT. PUBLIC R/W W W W ... W --W W W - - 62.25 LF CB-1 O 36" RCP STA-4+05 75 O 00.15% R 12+57.70 27 LF 8"RJ P O + FIRE H RANT -241.92 CENTERED ON P t O O CB-0 SEMBLY INV( 24") 36.16 CB-16 + STA- 1.44 - - - 2+85.00 INV(36� 2 .46 STA _11+95.4 3 TOP- 1.33 - - P-241�36 INV 42")-236. TO INV( 4`�-237.43 INV(15")-238. 6 6"-236.53 INV(36")-236.66 , 0 ZL' 9+16 :ViS' L•65+iLL 1S w a= E-9 N L- - - - - _ - - - - J L - - - - _ _ - - -J HIGH POINT ELEV = 242.80 SSMH-3 I STA-4+20.00 =12+43.45 (I RIM-241.83 r J INV IN (6)-230.40 INV IN (4)-229.45 - - - - - INV OUT-229.40 �� V I- I � r � 152.58 IF 24" RCP S5+00 - c�-�� - S- SS 45 8 \BEND 163.1OLF 8" SDR-26 00. STA 4+24.97 =12+23:45 STA 4+24 E. �� / / I )SSM 12 =12+23.45 / 6251 �\ �� IW/gMLOCK) : SA_ +83. 03P /8®0.1% INV- .66 r STA-5+5833 1 INV-229.61 I TOP-240.82 I CB-25 INV-236.52 S1A-111+95.45 I ico TOP-21.36 - _-_-��� I i„ INV,-23 .48 I I N nl co OL' C�a I L I o !� z I I ,_\ tZ 05' h L L `d1SLLJ j r9 I j I I I O I OLQ • z I C� J 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 244 242 240 238 236 234 232 230 228 Approved Shirrrr•alarPa-ndtUorWMRntp Construcoon in accordance with these documents is required by the stormwater permit. North Carolina rules requiro that the stormwater system designer Inspect during construction; certify conformity with the plans and specs; and cattily compliance with the 226 slormwater rules. (15A 12H .1008 (j) ) Perri #5W / 30t6. Date ,lllC Divisionno Sheet#_ Revision Dai -ii f_/c. d z N 0 LO O p O ii 1 z � j O � 2.- N � O O n w �% -6 `O p, 00 CO i N Q FLU- II U p o o o rn 01 00 C: � Q M O a) c� U -Q (9 Z�C - N R) - 00 _r X >'IIt w O J m `v M >,-u z o w ELM a o z o C n°.. o 9 `- o�? ,03145 c ' fill III c 0 N m 0 0 0 z Owner: HCC INVESTMENTS, LLC CONTACT.- 3077N. MAINST HOPE MILLS, NC 28348 (910)237-5846 Project: THE COMMONS AT BRIDGEPORT tax Id #: 0426-91-9724 township: Cross Creek county: Cumberland state: NC PLAN & PROFILE SHEET #5 CONSTRUCTION DOCUMENTS job no.: P13-084 date: 02/18/14 drawn by: TA survey by: MR checked by: JN sheet no.: C 08 6' Z �L•85 5 �dl. Z'6�Z 5 St�Z 2L'26 v :bls 18.62Z STA- 87.44=� V 8.F105.00 5tiZ 2/--ezt td1S Uv _ S MH-12 STA- +67.44 =0+25.00 j DI\I 2. R `i- INV IN-236.82 Oc INV OUT-236.77 1 250 248 246 244 242 240 238 E4sSy 234 232 DATUM ELEV 230.00 m N N II N C1 F_-7----1 - - - - - - - - - -- ' V O� 1 1 r� -b9• t� L ��/,L I' L1'St�ZI h Y 1 1 I I I I 62.25 LF L - - - - - 24" RCP 23 LF \ , ®0.26% 23 LF M 8"RJDIP 00 \ 8"RJDIP 8. -900 NTERED CENTERED WA R IN O + \ ON RCP O Of 11 fin - _ W �W_ W_ W = W. W __ W-W. W - w U _ _3 0 V M NofN N 1 +00 2+00i Co $ 33.75 LF 33.7500 33% RCP - - ) 50 T. PUBLIC R W ��� 15" RCP No 02.73% s CB-43 V STA-0+73.00 CB-42 JB-07 RIM-245.48 A-2J - 244.95 20� STA-6+ 7.21 I V- W STA 4+53.19 I� IN 242.05 TOP 75 245.4 2� =2+8 .03 F- YRIM-24 .03 INV(15" 42.46--------� - ----�A - INV( 24113 j N IN 1-241.53 6 INV(24")=240. 7 O 174.75 LF 1 00 ZL Z O 200.70% O { O S'26tS 1S a m -- W 3 5 •2�Z � V) -bZ' 2+IL :dl S6'�2Z ton 8" TEE V -8V- 3 A', 2 � 9+9 :vis 3 SSMH- L_ - - -3 / STA-6 71.45 RIM-2-22 INV IN 34.27 INV OUT 4:2Z- :v!_S 3 69'8�Z HIGH POINT ELEV = 245.96 HIGH POINT STA = 1+70.16 P oo PM STA = 2+09.98 w N� PM ELEV = 246.20 +� A.D. _ -3.62 1­ ,5 ON K=30.35 w+N NM JI�J00 MN 110.0' VC Na +ui U V)W + (n I N Q I N N U N II0 W N 00 N T. + STA-2+47.0 00 N M� a1 RIM-24REM-245.48 4.95 INV-242,05 � 11 Sa a 6, INV-242.58 6i + GROUND _ _ - � N Nj a Lu a W 03 Lou w I w 0.50 --- ---; ___ w� _--4 a ..--a 5- FIN. GRO ND 3 fi .0 % 08 VERTICAL-\ 53.751 LF -BEND 15" RQP- j 45 ®0.33% 3 �5 VERTICAL I� ---. 8"-90 WATER B,, C-90p RO - BEND WATER - 45• VERTICAL '',... _- BEND 45'VERT CAL 45' END VERTICAL 2 O' 2 23 LF 8"RJDIP BEND ENTERED ON RCP -_ II 20, ' 23 LF 8"RJDI CENTERED ON RCF 45 VERTICAL BEND _. JB-20 wCDo 0D o + JB ST 07 -4+53.19 ST -6+57.21 2+Sb.75 00 O + x o _ - RI -244.03 x n F ^ 245.4 I14V(15 )-241.13 00 < N I V(2A )-240.47 A IN (15"24">-242,46 -241,5,3 SSMH-7 __. SSMW-12 STA-2+5.00 STA+0+2 .00 RIM-2 f 4.22 RIM -245 i JNV1N-234.27 INV IIN-2 6.82 I V OUT-2�4.22 INV OUT- 36.7i7 :. '.. C? m� m� O� �^ N� M� N� O�N� to U5 r r� r`L6 r� c0 cow cps NN NN NN NN NN NN 1.1N NN NN NN NN NN 00 0+50 1+00 1+50 2+00 2+50 3+00 PRELIMINARY DO NOT USE FOR CONSTRUCTION THIS DRAWING HAS NOT BEEN REVIEWED BY ANY GOVERNMENTAL AGENCY FOR COMPLIANCE WITH ANY APPLICABLE LAND DEVELOPMENT OR OTHER REGULATIONS. GRAPHIC SCALE GRAPHIC SCALE 0 15 30 60 0 1.5 3 6 1 INCH = 30 FEET HORIZONTAL t INCH = 3 FEET VERTICAL RIM-240. Q�PJO / INV-225.9 N \ / I - \ 1 N SSMH-1 \ 5' DOGHOUSE (W/ CAMLOCK)i U \ RIM-241.48 � INV 226.97 , ---=_--------------------------- -�; - ------ EX. INV-226.55 - - 273.32LF 8" RJDIP 0 0.60% ----------- _ - - - - v - -- - ----- S STEEL - - - - - - - - - - - - - - - 216�94 30'OPUBL CDUTILITIINEASEMENT - - - ---------- - SSMH-2 � (W/ CAMLO ) STA-5+83.1 RIM N-220 IV)� INV N-228.66 I INV OUT-228.61 _ I V) N -- - _ z � - -_ N J �1 --� - 00 Ln CD LLJ 24, 23 23 23 23. 23' 22 22 22 22 221 21 I 21 DATUM ELEV 215.00 0+00 0+50 1+00 1+50 2+00 2+50 APPrQvwd St,.trr,rater F k 111t 11409YR1Mt1lif Construction in accordance with those doeUmorris is required by the stormwater permit. North Carolina rules requlro that the stormwater system designer Inspect during construction; certify conformity with the plans and specs; and certify compliance with the stormy,- rrules.(15ANCAC2H.1008(j)) Perm p.307 Dates z /Y b Nision of Sheet # 0 Revision D2t= 1�Ern,.1f., z N J 2 W) ON CO3 01 ul a 2 C,0 =a W"u `_ 0 0 y pU 00 >Q N �t0 o Lu od^ 0 0 MO N U cc) N cZv NQ MLr) O N (h U-0 Y 2 W 0 0 0 E SZ o SZ - i z m C O M >'�U i- �D._Z n "` a11111C urq�„/ r p = n `- SEAL _ = 031459 = 0 0 N N 0) 0 li Iz Owner: HCC INVESTMENTS, LLC CONTACT: 3077N. AWNST HOPE MILLS, NC 28348 (910)237-5846 Project: THE COMMONS AT BRIDGEPORT tax Id #: 0426-91-9724 township: Cross Creek county: camberlana state: NC PLAN & PROFILE SHEET #6 CONSTRUCTION DOCUMENTS job no.: P13-084 date: 02/18/14 drawn by: TA survey by: MR checked by: JN sheet no.: C-09 DEVELOPER/OWNER INFORMATION: HCC INVESTMENTS, LLC 3077 MAIN STREET, SUITE 201 HOPE MILLS, NC 28348 DISTURBED AREA = 19.45 acres LIMITS OF DISTURBANCE IS SHOWN. NOT TO SCALE EROSION CONTROL LEGEND NONSENSE!LODississississ LIMITS OF DISTURBANCE SILT FENCE -�-TD- TEMPORARY DIVERSION TEMP. HARDWARE CLOTH AND GRAVEL INLET PROTECTION p� STONE PROTECTION OUTLET W/ CHECK DAM ZONED R-15 CATHERINE L. FAIRCLOTH TAX PIN: 494760101227 *SEE SHEET C13 FOR DETAILS **NOTE: ALL pBERMS AND EMBANKMENTS SHALL SEEDED AND 'NTHMULCHED IMASMSPECIFIED. AND RIP RAC Pf DESIGN Q= 63.63 CFS Vel = 7.82 ft/sec D50=0.7' (MIN,) Dmax=1.05' (MIN.) Apron Thickness = 1.58' (MIN.) Do = 3.5' 22' 3Do=10.5' w=25.5'Imin) 25.5'D10.5' La=22'fmin) Use Class A Rip Rap with fabric SEE DETAIL SHEET FOR CROSS SECTION. RIP RAP ECTI LET VROTDESIGN Q= 23.37 CFS Vel = 3.46 ft/sec D50=0.4' (MIN.) Dmax=0.60' (MIN.) Apron Thickness = 0.9D (MIN.) Do = 2.0' D 3D =6.0' w=15'fmin) 15 6' Lo=IS min) Use Class A Rip Rap with fabric SEE DETAIL SHEET FOR CROSS SECTION, -- - - - -� I � I 62 I I I iL--- - - - I I \\ 248 CB-15 24 CB-13 CB-12 CB-11 � CB-10 -- -n N 63 N ! o s o tid N 1 GRAVEL CONSTRUCTIONIW- ..., Vv L -- ENTRANCE /EXIT , - - + \ +0 2+00 3 00 4+00 +00VWT 6+00 7+00 ?g3 00 v 2 2 9 00 00 CB-02 n 47 s 46 s "C" 50 FT. PU C R s N----- --f J,/ \ ti� 64 oOE CB-0 CB- 7 rCB-06 2 CB -OS CB-04 2q3 \ 24 03 \ I \ 8 I 247 Asy. \ 2 �N L `J f !(------�Z4 -�-2�3 r----N F--- - - - - - i 24e 245 1 I 24s ` I 1 6 5 26�1112 28 29 0 ImoI O O I I IMP, HARIDWARE i 4 �1 PROTECTION - EACH CATCH BASIN TYPICAL - - - - J L - M I L - - - - J L - - J L - - -J L - - - - IDPURIN MON - -- \ - / �� DURING GRADING ACTIVITIES. REPLACE WITH - -EACH CATCH BASIN TYGRAVE�PICALIN�Ei - - - - - - ADING ACTIVITIES. REPLACE WITH O- `r J GUTTERBUMY (OR EQU& INLET - OUTiERBIIOOY (OR EOUALI INLET I tie - - - - - - - r' . O ' I PROTECTION PRODUCT AFTER PAVING IS 246 ' 3 I - - - COMPLETE. THESE PRODUCTS MUST REMAIN ROTECTION PRODUCT AFTER PAVING IS V ,I,. coNsTRUCTION NT&ANCE EI0T 2g9,1 N PLACE UNTIL CONTRIBUTING DRAINAGE O 46 COMPLETE. THESE PRODUCTS MUST REMAIN O " 66 14 DAY GROUND - - - - - 2 IN PLACE UNTIL CONTRIBUTING DRAINAGE USE 2-3 IN, STONE, 6" THICK, 25 FT. AREAS ARE STABILIZED. � ; STABILIZATION I WIDE, 50 FT. LONG MINIMUM. CONSTRUCT _ _ - - - - - r - - - a - - - - ,AREAS ARE STABILIZE . -�� • m o REQUIRED ' I RIDGE 6-8 HIGH WITH 3:1 SIDE SLOPES, O J r L J L J PROTEC71 m 5' WADE WEIR _ - LONG POND -a 15' FROM EXISTING PAVEMENT TO DIVER T I I I s + i I I I F L-235.50 RUN OFF AWAY FROM EXISTING r I I I W O U I I o 5245 S-I 42PAVEMENT ON LAKEWOOD DRIVE. 2 38 19 1722 i m I a I 1 I ( I 35 I fn 31 I g I I t I I I CB-1 I I 32 34 I I I 246 -21 2 245 244 243 CalI 2 --- �--- cBJ RS ----J ---_J CB-18 - �S�J ----J ----J L---� I I 2 \. 2CB-17 =16 - __J - - 244 c r I �4 I ) a 39• 48 e� I _ �z�ro R 42 / o o�' vw- ao . CB-24 a= 24I 00 / 8+00 39+0+05 24 410+00 1 00 a 0 g m s� S a+ ET A 5 FT. /W - = JJ W- wti2 00 6 ya o d i r---J / 244 ti CB 27 CB-26 - CB -I 243 "a3 7 DAY NO L----J - 4 --_ �2i- ABIUZATION I rAh ry ---� r-- = r----� - �- --� 4 ---,- r-- EQUIRED 5 2a r __ _ INSIDE POND A 3 -- CB 21°6 - - - CB-30 h 1I/ /1 7 1 1 " - ! I I 1 1 / + _ _ - \ I CB-32 A5 I dY 1 242 I i 1 - _ -_ .- 1 0 \ �42- _ I I t--- Z d 243 I MMER A 246 1- a 1 1 I I I ! 1 I SKIMMER - s 06.00 I - 42 B- ORIFICE DIAMETER - 5.2" 4O 43 CB-38 - I I 241. 1 3 DRAWDOWN TIME - DAYS a I 2 ,,245- 2 8 1 CB-37 L- I 1 1 I ,: - z -za' ._ 16 I ce-33 I I CB-39 I 1 14 1' 15 1 I O O 9 4 10. z - ____ 1_ L 1- O ---- F-------- - _ 5 244 _ - - - - 20 A N SEMEN I 245 "" O 2A4� (q I - - - 20'} D AGE EASEMENT I- - - -24z+ �� fi 20' DRAINTGE EtSEMENT - \ -245- - is _245 OR IMAGE EASEMENT 1 I J - _ - - - - TD I ce-3s� 1 Xo- L� �p Ce-� - - - - - - _Z PROTE"n4 . I I L��F� ap 1 - I i %- 240� -I-_ 1 I -f -I-_ STONE TD �� ! I- r ouTLEr w/ 1 Qi 1 F I Lao ao - - 7D J l- Z i 76 - HECK DAM LOD `� .-o I I - � i +D L I I 1 I I _ �I �- _ Lao ! 240-'t 1- - I ONE PROTECTION 30' WIDE WEIR LOD SaD TD Tm 240 1 - - - 2140- - - - � t I , PROTECTION P 0 N D CHECK DA_M Ex. 4 I RIP RAP WTLET t� EL-240 6 -- l - - L I- J I I / OUTLET W/ �TTANDS I PROTECTION 2 \ 1 r _ -- - WETLAND Sy i}r qo LOp J �- -- J ----J ------ ---- -- J - _ If J. 131f _ -� r BRIDGEPQRT �, NORTH- � - - 2� ,- - - - - /, CAB 4 SLID 4-40, MAP 001 I ' I , 4- W E T LAN ,� r -_I ,� Z13NLD 0-8 y, INV-2 2 7381 I �INV 37.42 g ' i z-29� R�P - VET _ WET-r ^s - _ WET tyETyyl� I WET \S I� -MAINTENANCFFLAT�-�. '\,,\ Eu � CONSTRUCTION SEQUENCE l II I I vrT 1. IT is the responsibility of the developer to inspect or have inspected all erosion control measures no less than once a week and after each run - --L off producing rain event. Any repairs should be made immediately to retain all control measures. 1. Obtain all plan approvals and applicable permits. Approved erosion control plan, 2. Maintain t vconstructionT permit, NPDES monitoring forms and a rain gauge should be placed on site and � he gravel pad of the entrance. he entrance should be checked weekly and after each high traffic event. This will help to prevent sediment from leaving the construction site. Periodic topdressing with 2-3 inch stone may be required. Immediately remove all readily available for NCDENR Inspectors. -- - ss--I--ss n SsI SS SS I 3 PURSUANT TO G.S. 113A-57(2) The angle for graded slopes and fills shall be no greater than the angle that can be retained by vegetative cover or other adequate erosion control devices or structures. In any event, slopes left exposed will, within 21 calendar days of completion of any phase of grading, be planted or otherwise provided with temporary or permanent ground cover, devices or structures sufficient to restrain erosion. PURSUANT TO G.S. 1 13A-57(3) Provisions for permanent ground cover sufficient to restrain erosion must be accomplished for all disturbed areas within 15 working days or 90 calendar days (whichever is shorter) following completion of construction or development. PRELIMINARYGRAPHIC SCALE DO NOT USE FOR CONSTRUCTION a 25 so too THIS DRAWING HAS NOT BEEN REVIEWED BY ANY GOVERNMENTAL AGENCY FOR COMPLIANCE WITH ANY APPLICABLE LAND DEVELOPMENT OR OTHER 1 INCH = 50 FEET REGULATIONS. HORIZONTAL \v Iry zap 51 52 2^� 53 ry \ -_J / 50I I I I I � ti`'°/ \\ \ I I 246 I I I I I I I ! I I I I I 46 \ N� L- -J L---J L� - --- L-- 7 GROUND STABILIZATION NOTES Site Area Stabilization Stabilization Time Description Time Frame Frame Exceptions Penniter dikes, swales, ditches None and slopes 7 days High Quality Water (HOW) None Zones 7 days If slopesare 10' or less in Slopes steeper length and are not steeper than 3:1 than 2:1, 14 days are 7 days allowed Slopes 3:1 or 7-days for slopes greater flatter 14 days than 50 feet in length All other areas None (except for with slopes flatter perimeters and HOW than 4:1 14 days Zones) **"Extensions of time may be approved b the permitting Y PP Y P 9 authority based on weather or other site -specific conditions that make compliance impracticable." (Section ILB(2)(b)) Z06 ,. ___ 41 - ( ---� (- 247 -- - -� - 55 56 I 7 I I I I I I i 11Z!_ 1 \I -� ----I r-- T7 244 ti°` 59 I} 60 In I I I I I I \ dy .l 2.42 � �_J L---_J --2.--� objectionable materials spilled, washed or tracked onto public roads. 2. Prior to any land disturbing activities, Install gravel construction entrance as / / _____L / 3. Inspect sediment traps after every rainfall. Remove sediment and restore to original volume when sediment accumulates to one half the indicated. Entrance will be constructed of 2-3 inch stone, a minimum of 6" thick, 25 ft, wide and 50 ft. long. If the slope towards the r exceeds 2 construct a design volume. Check the structure for erosion, piping and rock displacement after each significant rainfall. Remove the structures offer the 9 P o e road %, c construction site has been permenently stabilized and a release has been obtained from the regional ncdenr land resources land quality ridge, 6-8 inches high with 3:1 side slopes, across the foundation, approximately 15 section office. All water and sediment should be removed from the reservoir area prior to removing outlet sections. Sediment should be ft. from the pavement to divert run off away from the public road. SS laced in a designated disposal area, stabilized and not allowed To flow into streams, ditches or drainage was during the structure removal 3. Install silt fence and stone outlet protection devices around perimeter of site as �� S 1 P 9 P 9 Y 9 S process. Smooth the basin area to blend with surrounding shown. p g grade and stabilize. - -_4. Inspect silt fence at least once a week and after each rainfall. Make an required repairs immediate) Should the fabric collapse, tear or - 4. Construct Sediment Basin, Stone Outlet Protections wy Check Dams, and- � P Y q P Y� P r. l _�}`�, , c_ become ineffective, replace immediately. Remove sediment deposits as needed to provide adequate storage volume for the next rain Temporary Diversion Berms. - ' S Rou h rode site ro ZDNED ZDNED event and to reduce pressure on the fencing materials. Sediment should never exceed half the designed storage volume. g g I 1 --_. _ / / _ /S$ 6. Install storm drainage system as designed. Install temporary excavated drop inlet 5. Inspect temporary diversions once a week and after every rainfall. Immediately remove sediment from the flow area and repair the diversion ss ' ridge if needed. When the area protected is permanently stabilized, remove the ridge and the channel To blend with the natural round level protection at each inlet. Add dprap per dimensions and directions shown on plan -T- 9 P P Y 9 9 7. Install water and sewer and other utilities as shown on plans. and appropriately stabilize it. P i 8. Install concrete curb and utter as shown on Ions. , 9 P 6. Inspect hgravel inlet r} wi hardware cloth ande o ection measures at least once a week n after p and a e each rain event. Clear the wire mesh of any 9. Complete grading and paving according To plans. Replace excavated drop inlet --� debris to provide adequate flow for subsequent rains. Take care not to damage or undercut the wire mesh when removing sediment or protection with "Gutter Budd Inlet r cleaning. Replace stone as needed to maintain design specifications. P y" protection products at each catch basin or 8. Inspect gutterbuddy inlet protection products at least once a week and after each rainfall. Reposition products as needed to maintain drop inlet as paving is completed. These products must remain in place until control around the perimeter of the basin. III positioned products will result in sediment deposits into the drainage system. Wiring product To contributing drainage area is permanently stabilized and a release has been A rpy„d Slurr ra�alar F:Ytlt GceUmen grate is acceptable as a means to keep the product in place. Make sure all open areas of the grate are within the perimeter of the obtained from the local NCDENR Land Resources office. pp utterbudd product. Cleaning should take lace during d 10. After construction is complete, apply soil amendments on all areas left exposed, Construction In accordance with tnese documanls is g y p g p g dry periods. Clean the area around the basin when inspection shows debris and required by this storrrwater permit. North Carolina sediment deposits. Washing of utterbudd products should take lace in a protected area and only during d sow grass seed, fertilize and mulch. Temporary ground cover should be provided P 9 9 Y P P P y g dry periods. Immediately rules Ito that the stormwatar system designer replace product at basin after cleaning. If the product shows wear from Traffic, replace immediately. within 7 or 14 calendar days as noted on plans. Permanent ground cover should Inspect during construction: certify conformity with the 9. All vegetated areas will be reseeded, fertilized and mulched as necessary To maintain a dense vegetative cover. Check for damage and be provided within 15 working days or 90 calendar days, whichever period is p lans and specs; and certify compliance with the washingout of materials after each rain. Repair damaged, bare or arse areas b fillip an shorter, past completion of construction. See seeding schedule for recommended stormwater rules. 15A NCAC 2H .1008 (1) ) p g p y g y gullies, reseeding and mulching. Tacking of mulch with netting or a tackifier may be necessary in areas of concentrated flow. If vegetation fails to emerge, have a soil test performed specifications. Permit # S y 0-3 Dell and re-evoulate the choice of plant material. ].I. Remove temporary measures after the lot has been permanently stabilized and Nislon or 10. Inspect mulches after every rainfall to check for rithe threat of erosion no longer exists. b VLU fill erosion and dislocation of materials. Where erosion is witnessed, apply additional mulch. Revision Dzta � �Jn L _ Mulch should be applied to 100% soil coverage. If necessary anchor mulches by tacking with asphalt, netting or crimping with a mulch 12. Contact the regional NCDENR Land Quality Section office for a final inspection Sheet # anchoring tool. A disk with blades set neatly straight can be used as a mulch anchoring tool. and close out of project. , Q d. z N J 0 LO o CC4OMOq (V i + j 6 00 0- a Vf44 _ i ->Q N � L u- E o Ly �t0 _O O O U Cn co CZ� (D M N M U C E 0 O � J m } OCI: ` ZW `a o M T-u W J fl.. - L Z CA.,o R 'W% C� 0 0 N m 0 0 6 Z Owner: HCC INVESTMENTS, LLC CONTACT.- 3077N, AWNST HOPE MILLS, NC 28348 (910)237-5846 Project: THE COMMONS AT BRIDGEPORT tax Id #: 0426-91-9724 township: Cross Creek county: Cumberland state: NC EROSION CONTROL PLAN CONSTRUCTION DOCUMENTS job no.: P13-084 date: 02/18/14 drawn by: TA survey by: MR checked by: JN sheet no.: Cr.1 0 m 0 M TEMPORARY SEEDING SPECIFICATIONS PURPOSE To temposinly stabilize denuded areas Met will not as brought to final grade far a Period of more than 21 Calendar days. Temporary seeding controls run off and erosion unfit permanent vegetation or other erosion control measures Can be established. In addition, it provides residue for soil protection and seedbed preparation and reduces problems of mud and dust production from bare soil surfaces during Construction. IF] 9Ytl19LNIr11-11F Complete grading before preparing seedbeds and install all necessary erosion control practices, such as dikes, waterways and basins. Minimize steep slopes because they make seedbed preparation difficult and Increase me erosion hazard. R soils become Compacted during grading, loosen them or a depth of 6 - 8 inches using a ripper, hanow or chisel plow. Liming -Apply lime according o soil test recommendations. If me pH of the soil is not known ana application of rounds agricultural limestone at the pp 9 g e ale of 1 to i Yz ons/acie on coarse-texaretl Mote and 2-3 tons/am on foe- i oxared see is usually sufficient Apply limestone uniformly and incorporate into the lop 46 inches of soil. Soils wit a pH of 6 or higher need not be timed. Fertlizer-Base application miss on snit tests. When these are not possible, apply a 10-10-10 grade fertilizer at a 700-1000 Ib/acre rate. Both femlizer and lime should be incorporated into the op 4.6 inches of soil. If a hydraulic seeder is used, do not mix seed and fertilizer more than 30 minutes before application. Surface roughening -If recent tillage operations have resulted in a loose surface, additional roughening may not be required except to break up large clods. If minfell causes me surface to become sealed or capped, loosen ft just prior o seeding by Making, taking, harrowing, or other suitable methods. Groove or furrow slopes steeper than 3:1 on the concur before seeding. PLANT SELECTION Select an appropriate species or species mlxare from welding tables at nght SEEDING Evenly apply seed using a cyclone seeder (broadcast) drill, cuffipacker seeder or hydroseuder. Use seeding miss given in tables at right. Broadcast seeding and hydroseeding am appropriate for steep slopes where equipment cannot be driven. Hand broaticasling is not recommended because of the dea lty in achieving a uniform distributor. Small gains should be planted no more man 1 inch deep, and gasses and legumes no more than Y inch. Broadcast seed must be covered by raking or chain dragging and then lightly armed with a roller or culbpacker. Hydroseeded mixtures should include a wood fiber mulch. MULCHING The use of an appropriate mulch will help ensure establishment under normal conditions and is essential to seeding success under hamh site conditions. Hash site dandithoninclude : -seeding in aall for winter cover (wood floor mulches are not considered adequate for his use) -slop -excessively ea steeper than 3:1 axcessivey hot or dry weather adverse soils (shallow, rocky, or high in day or sand) areas receiving concentrated flow If the area to be mulched is subject to concentrated water flow, as in channels, anchor mulch with netting. MAINTENANCE Reseed and mulch areas where seedling emergence is Poor, or where erosion occurs, as soon as possible. Do not mow. Protect from tragic as much as possible. REFERENCE: NO Erosion and Sediment Control Planning and Design Manual - Practice 6.10 TEMPORARY SEEDING RECOMMENDATIONS FOR LATE WINTER AND EARLY SPRING SEEDING MIXTURE: Rye Install1201blacre Annual Lespedeza - 501b/ecre -Omit annual lespede ce when duration a temporarycover is help extend beyond June. SEEDING DATES Mountains - above 2500 ft.: Feb. 15 - May 15 below 2500 ft : Feb. 1 - May 1 Reactant- Jan. 1 - May i Coastal Plain - Dec. 1-Apr. 15 SOILAMENDMENTS Follow recommendations of soil test or apply 20001b/acre 0 pp y ground agnwlomi limestone and 75 ILVacre 10.10-10 fertilizer. MULCH 40001b/acre strew. Anchor straw b tacking with asphalt, neffin Or a mulch anchori tool. A disk APPy Y 9 P 9 rig with blades set tea straight Can be used as a mulching sod. riY g 9 MAINTENANCE Refertilize R growth is not fully adequate. Re dl referdlize and mulch immediately following erosion or other damage. TEMPORARY SEEDING RECOMMENDATIONS FOR FALL SEEDING MIXTURE: Rye rain-1201Ism re SEEDING DATES Mountains -Aug. 15 - Dec. 15 Peidmont - Aug. 15 - Dec. 30 Coastal Plain - Aug. 15-Deo. 30 SOILAMENDMENTS Fallow recommendations of soil test or apply 2000 fivacre ground agricultural limestone and 750 laacre 10-10-10ferflizer. MULCH Apply 40001aacre straw. Anchor straw by tacking with asphalt, netting or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulching tool. MAINTENANCE Repair and referglize damaged areas immediately. Topdmss with 50 two= of nitrogen in March. If R is necessary to extend temporary ground rover beyond June 15, overoeed with 50 Ib/acre Lespedeza in late February or earl Martin. early TEMPORARY SEEDING RECOMMENDATIONS FOR SUMMER SEEDING MIXTURE: German Millet -401b/acre SEEDING DATES Mountains - May 15 - Aug. 15 Piedmont - May 1 -Aug. 1 Coastal Plain - Apr. 15 - Aug. 15 SOIL AMENDMENTS Follow recommendations of soil test or apply 2000 Iblacre ground agricultural limestone and TOO laacre 10.10.10 fertilizer. MULCH Apply 4000 Heaae straw. Anchor straw by acting v41h asphalt netting or a mulch anchoring tool. A disk with blades set ready straight can be used as a mulching tool. MAINTENANCE Refemlize if growth is not fully adequate. Reseed refenilize aA mulch immediately following erosion or offer damage. REFERENCE - NC Erosion and Sedimentation Control Planning and Design Manual - Tables 6.108, 6.10b 6.10c. er 19-gauge hardware NCDOT #5 or #57 washed stone clolh.(Y4 mesh openings) Sided posts I T�4' maximum spacial I II NCDOT #5 or #57 washed stone "�\\ - CONSTRUCTION SPECIFICATIONS ry 1. Unifonny grade tle a shallow depression appro the inlet. 2. Drive 5-foot steel posts 2 feet into the ground surrounding the (oot. Space posts evenly around the 'ti) 2� perimeter of the inlet, a maximum of 4 feet apart. an 3. Surround the posts with wire mesh hardware cloth. Secure the Wire mesh to the posts at the top, middle and bottom. Placing a 2-foot flap of the wire mesh under the gravel for anchoring is recommended. 4. Place coon gravel (NCDOT #5 or 457) on a 2:1 slope with a height of 16 inches around the wire, and smooth to an even grade. 5. Once the contributing drainage area has been stabilized, remove accumulated sediment. dispose of properly and establish Final grading elevations. 6. Compact the area properly and stabilize with Filtered Water groundcover. MAINTENANCE Inspect infers at least weekly and offer each significant (6 inch or greater) rainfall event. Clear the Hardware Cloth L Gravel Inlet ProtecBon mesh wire of any deans or other objects to provide adequate Flow for subsequent rains. Take care not to damage or undercut the wire mesh during sediment Reference: NC Erosion and Sedimentation Control Planning and Design Manual - Practice 6.51 removal. Replace stone as needed. Construction 8' max standard smmi fabric w/wire feriae 1. Construct the sediment barrier of standard strength or extra 6' max eta Moral fabric w/o wire fence strength synthetic filter fabrics. Steal Plastic or 2. Ensure that the height of me sediment fence does not exceed 24 Post Z We Ties inches above the ground surface. (higher fences may impound volumes of water suffecient to cause failure of the sturdure.) WireT 11 3. Construct the filter fabric from o continuous roll cut to the length Fence of the banierto avoidjoints. When joints are necessary, securely . fasten the flod roth only at o support post with 4 feet minimum overlap to the next post. 4. Support standard shegth filter fabric by we mesh fastened - securely to the upslope side of the posh. Extend the wire mesh support to me bottom of the trench. Fasten the whe reinforcement. Fs Na rural then fabric on the upslope side of the fence pat. Wire or Plastic zip ... ... Grou id ties should have minimum 50 pound tensile stregfh. 5. When a wire mesh support fence is used, space posts a Ricer Fabric maximum of 8 feet apart. Suppp t posh should be driven securely ' into the ground a minimum of 24 inches. L8" 6. Extra strength filter fabric with 6 feet post spacing does not down 3 4" require mesh support fence. Securely fasten the filter fabric directly forward along to post. Wire or plastic zip figs should have minimum 50 Pound Wire the trench tensile strength. Fence 7. Excavate a March approximately 4 inches wide and 8 inches Steel Z Fitter seep along the proposed line of posts and updope from the Post Backfill trench and ban*. SFabric compact 8. Place 12 inches of the fabric along the bottom and side of the thoroughly Natural trench. Natural Ground --v 1l` Ground 9. Backfll the french with sal placed over the fiber fabric and compact. Thorough compaction of the backfiil is anxious to sill fence performance. 10. Do net attach filter fabric to existing trees. upstage MAINTENANCE C_ I. Inspect sediment fences at least once a week and after each For rainfall. Make any required repairs immediately. 2. Should the fabric of a sediment fence collapse, tear, decompose w become ineffective, replace it promptly. _ 3. Remove sediment deposits as necessary to provide adequate storage volume for the next rain and to reduce pressure on the fence. Take care to avoid undermining the fence during deanout. 4. Remove all fencing material and unstable sediment deposits ono bring the area to grade and stabilise it after the contributing Sediment Fence drainage area has been properly stabilized. Felarmc.: NO friction antl swimenlafian Cori Rennin, ant cosign Manual Pmctc, 662 PRELIMINARY DO NOT USE FOR CONSTRUCTION THIS DRAWING HAS NOT BEEN REVIEWED BY ANY GOVERNMENTAL AGENCY FOR COMPLIANCE WITH ANY APPLICABLE LAND DEVELOPMENT OR OTHER REGULATIONS. �Op PveJ/ AGGREGATE- I SIZE = 2"-3" PERMANENT SEEDING SPECIFICATIONS PURPOSE To reduce amskm and decease Moderate, yield from disturbed areas, and to permanentlystabllire such areas in a mother tat Is economical, adapts to site occarb rsand allows selection of the .9aPPro appropriate PeMri a als Areas to be witilved wM erranem tin p ,ftetea must aeseeded crplanted within 15 wonting days or 90 calendar days aRerflnel grade is readied, whldiever penal is ahader. PLANT SELECTION Sae table at right Use mnMetl seed for pennament seeding whenever passible. Certified seed Is impeded byte Name Contra Crop Improvement Association. Labeling of ...OW seed Is required by law. SEEDSEO PREPARATION total flocfloci mechanical erosion mrill proo thave before eeedirg, and compete grading acmNing a the aPPmvatl plan. Lime and fertilizer needs should bra determined by.I1 testa. When eofl test are not m aliable, follow retes suggested on table at right. Application rates usuaally fall Into Me Following ranges: u3mund agricultural limestone Leavy-tdursocaycoils:,- i3 f rice. Heavy -textured, clayey arils: 23 onelaacre ae -Fenner Grasws10-10-10 euhisme) (a%leiturne mixtures: 800.1200blacal 5-10-10. Apply lime and NNlhaer evenly and Incorporate into to top 446 inches dsoil by asking Motor wall team. Coal machinery on to contour. When using a hydrometer, lime and fernmer W a tough, loose surface. Ytl . apply 9 , unif Cam wedged organ b breaking u large kln Into a month Wale Papa dope and ra s Y 9 P g g wide, m l (slopesless open 3:1). Fillinorlevetdd that has collect water. Broadcast seetl Into a ireehly Loosened seedbed tat has not been sealed by rattail. MULCHING The see of an wprppnaa mulch will help enure eetalishment under normal mndiWns ant Is essential to sewing... ufder heap site conditions. Harsh site condition Indutle'. elopes steeper tan 3:1 -eueea.1, hot ordry weather - Yefd a race (shalow, cocky, or high in day or Monti) -areas receiYing water flow if to area to be mulched Is subject to comeMmtad water, flaw, as in channels, anchor mulch with netting. IRRIGATION MdsWm is a Mial for cad seetl erni g moon sur Meadle as stands in d 9 9 Supplementaldde a pme can be ve r. n euutln adequate stands in d seasons 9 vary Pkr g eq dry or ro apeetl development Of roll cover. Water applicatian rates must be carefully ha tr l tl n prevent remand. Inadequate or exmselve amounts pfweler can be more namdul tan n0 upplemeMMl watt. MAINTENANCE Carol a stand of vegetation cannot be determined W be fully estaalshad unr0.i corer has been maintained for one full year past planting. Impact seadetl areas for failure and make nemssa m im an ry pe tl reseedinga will the same season, R passlae. Reseedln9-If. a wdwI half tadegpme, corer, reevaluaa choice of Want materials antl compares of lime and budget. Re-eabblisii the stand alter seedbed preparton or over-seetl the stand. Consider seeding temporary, annual species If to lime of year a not appropriate for permanent seeding. It Me vegetation fails to grow, have sal tested to determine d scull or nutrient imbal. Is responsible. Femllarson-On are typical disturbed site full establishment usually requires monaural in to second growing wawn. Fine turf mount, annual maintenance Ndilizetion. Use wit toads flpossible orfolbw the guidelines given For die specific seeding.w m. REFERENCE- NO Erosion and Sediment CoMroI Planning and Design Manual - Paccce6.t1 FOR WELL4 MNED SANDY LOANS TO DRY SANDS, LOW MAINTENANCE MIXTURE: Pensacola Rotational - 501b/acre Serwas lespedeza-301b/acre Common Bemruds,ress -10 Warm German millet-10 Waco SEEDING NOTES: i. Where a neat appeamnco is desired, omit senora. 2. Use common Bevnudagress only on isolated ages wham ft cannot become a pest Bmmudagmss may be replaced wit 5 licaars con8pe legid ss. SEEDING DATES: Apr 1 - July 15 SOILAMENDMENTS Apply lines and fertilizer according ro soil teats, or apply 300 ground agricultural limestone and 5001aacre 10.10-10 fardizer. MULCH Apply 400 Iblacre gain strew or equivalent cover of another suitable mulch. Anchor by unde with hen nrvi or or Y sg asp rig 8 by cnmping wit a mulch anchoring root. A disk wit blades set neatly evaiga can bra used ore a mulch anchoring rod. MAINTENANCE Rann ize the foliovrkig Am it wit 50 Mom nitrogen. Rapt ar grown requires. May be mowed only once a year. Where a neat appearance Is desired d omit senora and mow as often as neede REFERENCE - NC Ero&on and Sediment Cord Plannln and 9 Deal9 nManual Table 6.1 It WELL to POORLY ORAINED SOILS wish GOOD MOISTURE RETENTION: LOW MAINTENANCE MIXTURE: Tell Fescue- 80101acer Pensacola Bethiewas. -N Hoare Santa leepadeza - 3011 Kobe lawaideza-101aam, SEEDING NOTES: i. From Sept.1 - Mar. 1, use propertied senora seed. 2. On poo ly drained sites omit sedow and Increase Kobe to 30 laacre. 3. Wham a near appearance is matted, omit serkaa and increase Kobe to 401blaae. NURSE PLANTS Samoan Apr. Augr. 15 and Au 15 rm add 10ltrywor Gean millet cer 15 laacre Sudangass. Prior to May 1 or after Aug. 15, add 25 Homes rye (gain). SEEDING DATES: Eady sprang - Feb.15-Ma .20 fi eu) Fea.15 -Acr. 30 (possible) Fall - Sept. 1 -Sept. 30 (best) Sept. 1 - Oct. 21 (Possible) SOILAMENDMENTS Apply lime and fenilim, wmar, to it toad, m apply 30005000 lance ground agricultural limestone (use the lower rate on sandy soils) and i000 laacre to-10-10 famber. MULCH Apply 40001aacal grain straw or wukvalent corer of another suitable mulch. Archar by tack v, Win asphalt, roving or netting or by cdmWrig wit a mulch anchoring too. A disk wit blades set lean straight can be used as a mulch anchoring tax, MAIMENANCE If growth Is Nor tan fully adequate, reamlize In the second year, according to wit tool or topdress wMh NO shams 10-1out 0 fertilize,. Mow as needed when writes Is omgled from to mixture. Reseed, ferfill. antl mulch damagetl areas immetlietely. REFERENCE - NO Erosion and Sediment Control Planning and Design Manual, Table 6Alp TOPSOILING Construction Specifications Materials 1. Determine whether the quality and quantity of available topsal justifies selective handling, Quality topsoil has the following characteristics: a. Texture -loam, sandy loam, and silt loam are best: sandy clay loam, silty clay loam, clay loam, and sand are fair. Oo not use heavy cloy and organic soils such as peat or muck for topsoil. b. Organic matter content - should be greater mall S%by weight. C Acidity - pH should be greater than 36bofarelmitg, and liming is required uired if it is less than 6.0. . solube salts - shouldbeless than Fall e. Sodium - sodium absomoration shapes be less than 12. 2. The depth of material should be at least 2 inches. Soil factors such as rock fragments, slope, depth to water table, and layer thickness affect the ease of excavation and spreading of topsol. 3. Generally, the upper part of the soil, which is richest in organic matter, is most desirable, however, material excavated from deeper layers may be worth storing it it meets the other chard listed above. 4. Organic soils such a mucks and pests do not make good topsol. They can be identified by their extremely lignt weight when dry. Stripping PP 9 1. Strip topsoil only from those areas that will in tlepth is by moo, but d filling, v varies building, or compaction by equipment. A 4-6 inch shipping depth is common, but depth vanes depending on the site. Determine depth of shippingb takin it cores of several locations within each ores to be shipped P Y 9w o Topsoil depth generally varies along a gradient from hilltop to foe of the slope. Put sediment basins, tliversions and other controls into place before slipping. Stockpiling I. Select stockpile location to avoid slopes, natural drainage ways and traffic routes. On large sites, respreading is easier and more economical when topsoil is stockpiled in small piles located near areas where they wit be used. 2. Use sediment fences or other loam where necessary to retain sediment. ors e c ry 3. Protect topsoil stock its 1 'n on as aside no more than 21 calendar says so e b era oranl seeding as so P P Y P Y 9 Po after oc formation of the stockpile. 4. If stockpiles wall not be used within 90 days they must be stabilized with permanent vegetation to control erosion and weed growth. Site Preparation 1. Before spreading topsoil, establish erosion and sedimentation control practices such as diversions, bents, dikes, waterways and sediment basins. 2. Maintain grades on the areas to be topsoiled according to the approved plan and do not alter them by adding topsoil. 3. Where the pH of the existing subsoil is 6.0 or less, or the soil Is composed of h l bays, incorporate agricultural limestone in amounts recommended by soil test or specified for the seeding mixture to be used. Incorporate lime to a depth of at least 2 inches by doing. A. Immediately prior to spreading the topsoil, loosen the subgrade by disking or scantying to a depth of at least 4 inches, to ensure bonding of the topsoil and subsoil. If no amendments have been incorporated loosen the soil to a depth of at least 6 inches before eareatling the topsoil. spreading To kl P 9 Pao 1, uniformly distributedeto topsoil vminimumcam acted depth ar us sand flinches on YP P P Pe flatter slopes. Todeterminethevolume of topsoilrequiredfor applicationto variousdepths, use Table 6regul Do not the surface topsoil while it is howl re muddy other o the wgrade a wet a how. Correct any irregularities in the surface that result from topsdling or other operations to prevent the formation of depressions or water pockets. 2. Compact the to soil enough to ensure contact cosh the underlyingsoil but avoid excessive p p g e d a good co ac compaction as it increases run off and inhibits seed 9ertvinahed. tight packing with a roller is recommended an where hag t will not e m turf is to be dace established. 3. On slopes and areas that a blot log mowed, the surface may be left rough after spreading topsoil. A disk may ps used to promote bonding at the interface edNre p the topsoil antlare to . 4.m After topsoil application, follow procedures for seedbed preparation, faking care to avoid excessive cooing of topsoil into the subsoil. TABLE 6.04 a Cubic Yards of Topsoil Required for Apptication to Various Depths DEPTH (inches) Per 1000 sq. ft. Per Acre 1 3.1 134 2 6.2 268 3 9.3 403 4 12.4 536 5 15.5 670 6 18.6 804 Reference: NC Hosion and Setlimentation Confrol Planning and Design Manual, Practice 6.sM PURPOSE To protect work areas from umfope.naff and to divert son iment4oden water o approprade Compacted three or stable outlets. Soil \ 2-ft min DESIGN CRITERIA Drainage area - 5 acres or less. Capacity - peak runoff from 10i storm 'E Fj Ridge Design - sl Side slope: 2:1 or gaffer 3:1 or flatter where vehicles crass Top Width: 2 ft. minimum Freeboard: 0.3 ft. minimum Settlement: 10% d total fill height minimum Channel Design - 6-Rtypical shape: parabolic, or V shaped b r side slope: flattezoitlal or flatter 3:1 or flacros Flatter where vehicles s Grades - Either a uniform or a gradually increasing grade is preferred. Sudden depresses in TEMPORARY DIVERSION grace accumulate sediment and should be expected to cause overtopping. A large increase in grade may erode. Temporary diversions designed to Function 1 year or more, or they may be Constructed anew at the end of each day's grading operation to protect new flit. Diwmlons that are to serve longer than 30 working days should be seeded and mulched as soon as they are constructed to preserve dike height and reduce maintenance. Coate Wherever feasible, build and stabilize diversions and Outlets before inMafing other Aggregate \ _ Iand4sturbing activities.. r' 3y j i l y l. � 'esi2gr„ E F\O`N / CONSTRUCTION SPECIFICATIONS s 5h !1 ., i m 1. Remove end pmourly dispose of all trees, brush, stumps and other objectionable material. 2. Ensure that the minimum constructed areas section meets all design requirements. ' 3. Ensure that the top of the dike is not lower at any point than the design elevation plus the specified settlement. -. 4. Provide sufficient room around diversions to pernit machine regrading and desnout. 9' typical 5. Vegetate the ridge immediately after Construction, unas It will remain in place less then (- �1 30 working days. MAINTENANCE TEMPORARY DIVERSION (FOR VEHICULAR CROSSING) Inspect temporary dwenwns at least once a week and after every himself. Immediately BERM remove sediment from the flow area and repair the dhretion ridge. Carefully check outets TEMPORARY DIVERISIOIN and make timely repairs as needed. When the area protected is pemranently stabilized, remove me dope and to channel to blend wit me natural ground level and appropriately (NOT TO SCALE) stabilize it. REFERENCE - NC Erosion and Sediment Control Planning and Design Manual - Practice 6,20 FLOW/s,Filter [loth CHECK DAM DETAIL SHOWN ON THE INLET SIDE OF STONE OUTLET ifT of NCDOT #5 or #57 washed stone Class B Riprop _ a?� CHECK DAM WEIR LENGTH = 3,0 FT. MINIMUM STEEL POS WDOT #5 OR #57 WASHED STONE 2' max, at center e h NI] MINIM DETAIL OF STONE PR❑TECTI❑N OUTLET WITH CHECK DAM - (V U T S-ONE ❑ULETOPROTECTION Table 6.14a Mulching Materials and Application Rates MATERIAL RATEPERACRE QUALMY NOTES Organic Mulches straw 1-2 tons Dry,uneho ed Should come from wheat or oats unweathered, avoid spread by hand or machine; must weeds be tacked down_--_ --_-_ Wood chips - 5-6 tons Air dry Treat with 121bs nitrogen/ton. Apply with mulch blower, chip handier, or by hand. Not for use in fine turf. Wood fiber 0.50-1 tons Also retained to as wood cellulose May be hydroseeded. Do not use in hot dry weather. -- Bork 35 cubic yards _ Air dry, shredded a _____ Apply With mulch blower, chip handier ham ter -milled or a b hand. Do not use asphalt tack. Y p chips --- Coco stalks 4-6 ions _ - Cut arshreddedin4-6 A with mulch blower or hand. Apply y inch lengths Not fa use in tine Curt_ Sence , 1-3 tons Green or dry: should I e contain mature seed seed -bearing ng stems Nets and Mats ------_------_-_.--____ Jute Net Cover Area Heavy, uniform: woven Withstands wotedlow. Best when used of single jute yam with organic mulch. Fiberglass net Cover Area Withstands woferflow. Best when used With organic mulch. Faceaior Mot Cover Area Withstands watedlow. Fiber) _(Wood Fiberglass roving 0.50-1 tons Continuous fibers of Apply with a compressed air ejector. drown glass bound Tack with emulsified asphalt at a rate together With a non- of 25-35 gal 000 sf -a9-n1---_- ---_--to-i Chemical Stabtllzet - Actual Follow manufacturers Not beneficial to plant growth Aerosproy instructions Curasol AK Pertoset Sit, Tema Tack Crust 500 Genaquo 743 M-145 REFERENCE: North Carolina Erosion and Sediment Control Planning and Design Manual Practice 6.14 3d Construction Specifications CUT SLOPE ROUGHENING FOR AREAS NOT TO BE MOWED 1. Star -step grade or groove cut slopes with a gradient steeper than 3:1 2. Use stair -step grading on any erodible material soft enough to be ripped with a bulldozer. Slopes Consisting of soft rock with some subsoil are particularly wiled to stale -step grading. 3. Make me vertical cut distance less than the horizontal distance, and slightly slope the horizontal position of the "step" in towed the vertical wall. 4. Do not make individual vertical cuts more than 2 feet in soft materials or more than 3 feet in rocky materials. 5. Groove using any appropriate implement that can be safely operated on the slope, such as disks, Fliers, spring harrows or f front-end leader bucket. D not make such Groover less than 3 inches des nor more than 15 inches apart. he teeth on a ho c ot aerie buc e o g p P FILL SLOPE ROUGHENING FOR AREAS NOT TO BE MOWED 1. Place IF ropes with a gradient steeper than 37 in lifts no to exceed 9 inches, and make sure each fiff is property compacted. Ensure that the face of the slope consists of loose, uncompacted fill 4 fo 6 inches deep. Use grooving to roughen the face of the topes. 2. Do not blade or scrape Pe the final No face. CUTS. FILLS AND GRADED AREAS THAT WILL BE MOWED 1. Make mowed slopes no steeper than 3:1. f shallow grooves normal fiRn disking, borrowing or use of cuM ocker-sdeedec More the final 2. Roughen hose areas s a grth ant g. g. g p pass k any such tillage implement such m the contour. 3. Make grooves, formed d such implements, close together (less man 10 inches) and not less than I inch deep. 4. Excessive toughness is undesirable where mooring's planned. ROUGHENING WITH TRACKED MACHINERY machinery t n f avoid undue compaction of the soil surface. Taal a 1. Generally haste with hacked acts o sandy wk o w 9 ery rh P n9 9 not effective the terra roughening methods described. Operate tracked machine u and down the do el a leave o rat a act a as O u P machinery P dope 9 Y 9 9 i its L D not back -blade during the final radio operation, o leave horizontal depressions n e 5a O b epre rig grading Pero SEEDING Immediately seed and mulch roughened areas to obtain seed germination and growth. Maintenance Periodically check the seeded slopes for rills and washes. RII these areas slightly above the original grade, than reseed and mulch as soon as possible REFERENCE: North Carolina Ericson and Sediment Control Planning and Design Manual, Practice 6.03 / ROCK BAG ROCK BAG/ TUBE OR CURB INLET GRAIN FILTER INSTALLATION GENERAL INSTALLATION REQUIREMENTS: (SEE INDIVIDUAL MANUFACTURERS FOR DETAILS INSTALLATION INSTRUCTIONS) is INSTALL THE INLET PROTECTION AS SHOWN ABOVE EACH END OF THE TUBE SHOULD BE SECURED AT BACK OF BASIN. a THE TUBE SHOULD BE CLEANED IF A VISUAL INSPECTION SHOWS SILT AND DEBRIS BUILD UP AROUND THE TUBE. or TO REMOVE THE TUBE, UFT OUT OF THE OPENING. ROCK BAG / GUTTER BUDDY CURB INLET PROTECII ROCK BAG/SEDIMENT FILTERING BAG SPECIFICATIONS BAG MATERIAL• HI DENSITY POLYETHYLENE -COVERING FIBER MATRIX BLANKET NTERIOR IR 3 PEA GRAVEL WEIGHT (DR LBS eKUSE A FrOWER WASHER OR STRONG HOSE FOR CLEANING" FLOW TEST RESULTS FREE FLOW WATER (NO DEBRIS) 30 GPM SAND 29 GPM TOP SOIL 28 GPM CLAY 24 GPM Section A -A OUTLET TO FLAT AREA WITH NO WELL DEFINED CHANNEL NOTE: In both figures, the thickness of ripmp is a shown in plans (minimum thickness is 1.5 Times the maximum stone diameter. CONSTRUCTION 1. Excavate subgmde below design elevation to allow for thickness of fitter and ripmp. Install Flores tp minimum thickness of 1.5 finres maximum stone diameter. Final structure should be to lines and etevations shown in plan. 2. Construct apron on zero grade. If there is no well defined channel, cross section may be level or slightly depressed in the middle. In a well defined channel, extend ripmp and fitter fabric to the top of the bank or as shown on plans. Blend riprap smoothly to the surrounding land. 3. Apron should be Straight and property aligned with the receiving stmam. If a curve Is necessary to fit silo con ttions, curve the apron near the upstream and. 4. Compact any fill used in the subgrade to the density of surrounding undistrubed material. Subgrade should be smooth enough to protect fabric from tearing. 5. Instal a confinur us section of extra strength filter fabric on smooth, compacted foundation. 6. Protect fitter fabric from tearing while placing ripmp With machinery. Repair any damage immediately by removing ripmp and installing another section of filter fabric. Upstream section of fabric should overlap downstream section by a minimum of 1 fL 7. Make sure top of ripmp apron a level with receiving stream or slightly below It. Ripmp should not restrict the channel or produce an overall. a. Immediately following installation, stabilize all disturbed areas with vegetarian as referenced in seeding schedules. EXAMPLES OF ROCK BAGS: ROCSOC BY MARATHON MATERIAL. INC. SILT SIFTER BY POLLUTION SOLUTIONS. INC. EXAMPLE(S) OF CURB INLET FILTRATION TUBE GUTTERBUDDY BY ACE ENVIRONMENTAL CATCH-ALL BY MARATHON MATERIALS, INC. h I Section A -A OUTLET TO WELL DEFINED CHANNEL No Overfall Filter Fabric or Filter Blanket MAINTENANCE 1. Inspect ripmp outlet structures after heavy rains for erosin at sides and ends of apron and for atone displacement 2. Make repairs immediately using appropriate atone sizes. Do no place stones above finished grade. 3. Repair any damage to filter fabric by removing the riprap and placing another piece of filter fabric over the damaged area. All connecting joints should overlap by at least one foot. if the damage to the fabric is extensive replace engre filter cloth. OUTLET STABILZATION STRUCTURE (not to scale) REFERENCE: NC Erosion and Sediment Control Planning and Design Manual, Practice 6.41 d� Z ? y LP) to a p� to QV DOo a , 1 (DN M Z Z W 00 = C) 00 Z y all . 0�111 LU �% O i7 p, co ` G p y aU--00 O Z y Q � I tY L E Uo w > C °� C t C:)4) U ^ O c) n �- Z C y CA -0 n I a) M a O M U� 6 C Lr) 2) = DO J w he x IS �G 0 } E Z _ V m N ^ LL- M OT Z III a J (5 L'7 �a U o_LLdZ All M R b .v Is e AL ps 031459 = T� - !y '�i� "�411II1111U1\\\\x � 0 A , \\\\. rllr1111111111\\\\\ C O 4) m m a O O Z Owner: HCC INVESTMENTS, LLC CONTACT,' 3077N. MAINST HOPE MILLS, NC 28348 (910)237-5846 Project: THE COMMONS AT BRIDGEPORT tax id #: 0426-91-9724 township: Cross Creek County: Cumberland state: NC EROSION CONTROL DETAILS CONSTRUCTION DOCUMENTS job no.: P13-084 date: 02/18/14 drawn by: TA survey by: MR checked by: JN sheet no.: C-11 2 a C 1 N N I N m N 3 F3 W 0 3 0 w M a Z L, s 0 F z MJ 8 m i f f 0 m H x 0 M C. 1. CONTRACTOR SHALL REPAIR ALL SEWER LATERALS AND WINS DAMAGED DURING B. OROBSINGAWATER IMIN OVEftABEWER: WHENEVER IT IBNECE334RY FORA CONSTRUCTION. THE CONTRACTOR SHALL INANIMATELY REPORT ALL SEWER MAIN WATER MAIN M GROSSOVERA3EN£R MAINMTERPI. THE WATER MIN SHALL, AND LATERAL BREN(S TO THE POOL PROJECT CWRCHNATOR THE CONTRACTOR BE UIDAT SUCIf AN ELEVATION THAT THE BOTTOM OF THE WATER MIN IS AT SHALL INITIATE IMMEDIATE REPAIRS IN ACCORDANCE WITH PWC BTANDAgpS, LEAST IS INCHES ABOVE THE TOPOF THE SEWER M WILATERAL. UNLESS 2. SEWEREDCUISTEWINµAMANHWESLATLL Be INSTALLED UTIL121NGAPWC LWAL OROITIONS R SARRIERS PREVENTION 18 INCH VERTICAL SEPARATION- IN WHICH CASE BOTH THE WATER MAIN AND SEWER MAINMTERAL SHALL BE APPROVED CUT$HEEL INDICATING INSTALLATION DEPTH. CRSTRUCTE° OF FERROUS MATERIAL AND WITH JOINTS tIUTME 3. TRANSFER OF SEWER SERVICES SHALL BE ACCOMPLISHED AS FOLLOWS: EW NALENT TO WATER MMN STMMROS FRA DATMM OF IB FEET R EACH S'DE OF THE POINT OF CROSSING. A. INSTALL AND TEST NEW MAINS, WNHOLE9, All LATERALS. CLEWCUTS SHALL BEINSTALLEOIM'INSIDE RNJ RLE980THERWI9E DIRECTED BY MAC. C. CROSSING WATER MAIN UNDER A SEWER: WHENEIERITI3NECESSARYFRA B,CONNECT EXISTING PLUMBING TO NEW LATERAL UTILIZING WE NECESSARY WATER MAINTO CRRSUNDER pSEWER "BILATERAL. BOTH THE WATER WAR FITTINGS AS DIRECTS Y DIRECTED PWC. C. AFTER ALL SERVICES HAVE BEEN TRANSFERRED TO THE NEWMAIN,THE AND THE SEWER MAINMTERAL SHALL BE CONSTRUCTED OF DUCTILE IRON EXISTING SEWER SYSTEM SHALL BE ABANDONED IN ACCORDANCE WITH PNC WTERPLANOWITHMIMS EOUIVALEWTO WATER MAIN STANDARDS FORA OISTANLE OF t0 FEET ON EACH SIDE OF THE POINT OF CRRSING. pSECTION REQUIREMENTS, OF WATER WIN PIPE SHALL BE CENTERED AT THE POINT OF CROSSING, 4. WHEN THE EXISTINGLIT NOT TO BEABANDONED,THE CONTACTORS SHALL UNCOVO. MAIRC AND BOTHL LAND OABANDOVE CR°SBWO STORM DRAINAGE LWEB: A MINIMUM OF 24-INp1E9R VERTICAL R CFL CERAMICS THEU USING CURANCLU THEEXISTINGC IEIONOUT AND WMBINIOTX)N. AND PLUG THE UTERgLT°gHA.yWN COMAL BINATION. PLUGTHT LATERAG TO SHALLBE MAINTAINED BETWEENASEWERMAINhATEFAL CROSSING UNDER ASTORM MANAGE DUCTILE 'AM PIPE IS TARE CLD SERVICE. USED.IFDUCTILE IRON PIPE ISUSED,AMINIMUMS SF MINIMUM OF 5. ALLTHE HE TO ANY OEBRIS TERIFL SEPARATION SHALL BE MAINTAINED, UNLESS OTXEIYSE APPROVEDBY PYJC, ACTIVE SEED FROMSEWERENTERING THE RSYSTEM UP TANCE FTHENHER UPON PTANCEOFTHENEW SEWER SYSTEM, CONTR3EJlERSYSTEM SEWER SYSTEM, E CO ORSHALLCIFAN THE NEW MAINS, REMOVE KL DEBRIS. AND THEN REMOVE THE PLUG. N REMOVE THE 6. SEPARATION REQUIREMENTS: A. L!GT SEPAMTR%OF SEWERS ANO WATER "NO: WATER MAINS SHALL BE UIDAT LEAST 10 FEET LATERALLY FROM EXISTING OR PROPOSED SEWER MAIRLAMM UNLESSLOCALCONDITIONS OR BARRIERS PREVNA 10.FCOT LATERAL SEPARATION- IN WHICHCASE I. THE WATER MAIN IS LAID IN ASEPAPATE TRENCH. WITH THE ELEVATION THE BOTTOM OF THE WATER MNN AT LFAWSi ISOF18INCHES ABOVE THE TOPOF THESEWERMpINMTERALR II. THE WATER MAIN IS _AID IN THE SAME TRENCH AS THE SEWER MNNMTERAL WITH THE WATER MAIN LOCATED ATONE SIDE ON A BENCH OF UNDISTURBED EARTH AND WITH THE ELEVATION OF THE BOTTOM R THE WATER MAW AT LEAST 18INCHES ABOVE THE TOP OF ME SEWER MAINMTERAL GENERAL NOTES PUBLIC WORKS COMMISSION NO, DATE REVISION SANITARY SEWER UTILITY CWOR COMMISSION SHEET rvo. DWG, NO. S.1 END. BY: FWc WATER RESOURCES I OF1II II ENGINEERING DEPARTMENT DATE: JM.Ot m14 APPROVED BY: J.E.G. 2. ALLPVC FRnEM-ROROP B. 8'OLIMANHOLE3BOLSOMFORALLDPoPS-AND NEW SANITARY STRUCTUB SIULL BESDRSPVCWR GREATME4DVMEMR µOMEN3ORMOREPOTWAS SEWER A SOLVEMW EMERMANHOLES ELOJOINS WRH4'INTEwM OROP3.NOMOB 3. MANHOLES GREATER TEAR IT IN DEPTH SHALL THAN FOUR I I.M. DROPS AB ALLOWED IN AS A XAVEMIN,S'IXTENDEDBASE. MANHOLE. ]. NO MORE TINNa FW RINCN fATEMLS di 3.9VIHCX ' a. DROPSTRDCRIR E SXALSE PLACED WHERE WTERAS BXAL ENTER A 4' 04AIElER IENMIHA 1'X1/0'STAINLE50 BETWENRVERETXCEE ERIICPL DROP MPNNIXE. NOMRETN µ3UTEMLB EG4RDLESS OF R STEEL STRAP BETWEEN INVERTS F%CEE052.W'. SEE PIPE SEE) SHALL EWER ALL OTHER4'DIAMETER MANHOLES. SLIDEWTNLSERDROPS LESS WAR WV ALL,ATERAAINNE SSHLM INDMOVALTROUGH6' PLAN VERTICALSEPARATON, DUMETERMANHOLM SHALL 8E USED IF IWASOVE CON DMONSAMBOTMWTHEIATERALINVERTSXALLBE SR35PVCSWTEE pTTXE TOPOF iNE3XELF. FLEXIBLE BOOTCONNEClE01 ® B.NOMRETHANSLATERALSSHALEMERAS 10 CONNECTRSTOEXISNNGMWHOLES DNMETERTERMINAMANHOLE. TO MH CORN SB EXP. RING \ SHALL HAVE CORE µD TOOT ONLY ® S. FIFX BOOT SHALL BE CONNECTED TO MX. WRX UNLESSAPPROVEDWHERVAMBYPNC NONSHRINKRWTSEAL 1 I STAINLESS STEEL EXPANSION RING. FLEXIBLE PROJECTCWRpINATR. 1 BO3r CONNECTOR68NPLLLRFORMlOg3TA 11.pLLMANHME6SH4L BE VAGUDM SDR26 PVC -- - \ 1 I GB95PEC. TESTEDINAWRMNOEW/PWC O'MIN 13'MA%.- SrµMApS FOR TRANSITION FROM °.I. TO PVC -- �, \`. USEACSOG BELLXSDR26SPJGOT I \ \ I SWIEE- ADAPTOR. I IT i, T G ATMIN. SDRX \ COMPACTED N0.5T OR N0.5 - GROUT SEXED - _ STONE FROM UNDISTURBED -, -1- SO IL TO SPRINGiINE°F PIPE FD0.TwW31nON F.%^.MO.LTO- ' AS DIRECTED Br TYc FMIN. PVCUSEAC BELL XBRID n rMIN PROJECT COORDINATOR. C&�V 5 - 4 J4' SPIGOTADAPTR 1119' STAINLESS STEEL STRAPS 'SR28PVO FLEnBLEBWT CONFORMING M THE PIPE ANCHORED A �: $u . -L WITH STAINLESS STEEL ANCHOR BUTS AND WEDGE ANCHORS, 2 STRAPS L''?. 4. MINIMUM, WRAP X x .DR 28PVC --II PUCE STMPB WITHIN iLRT SAND &�J -�,,-r S. WITHINTRISEND. ALLOTIERSTBAPS q,-, j SHALL BE3O.c. / 71C - S31PIP8- SDR35SWPVCIKBENDTOWARD _'/-Z,06I' X �I INVERT WT. BEND SHALL BE SWVABENO iY/k> 50R35 PLACED ON TOP OF SHELF. t1,F (�_•i,J"i CONSTRUCT TRCRGHRTROF Jy .p )Ir-Ip." Y,yy'I?- SHELFTODIRECTDISCHARGEIN Lyi�$. t `Y IT I"I'. THE DIRECTION OF FLOW. 1 1 1 IIII�IIIC - SECTION"A-A" INTERIOR DROP STRUCTURE PUBLIC WORKS COMMISSION NO, DATE REVISION GRAVITY SEWER MAINS 8 LATERALS n TS. FAYETTEVILLE, N.C. 3 JAN OB BODED NOTES 6,7 00 SHEET No. OWG.NO. S',•j DWG. BY: PWC WATER RESOURCES � 4 NOV. US REVISED FITTING MATERIAL t OFt GATE: JAN.01. m14 AvfROVED BY: JEc. ENGINEERING DEPARTMENT 5 JULY 12 REVISED NOTE55fl8 HUB ON INV. f 0MIN. HOw2pWgL O SE TER BETWEEN WATER M AND RATION DTW Is- MINIMUM SEPARATION BETWEEN BOTTOM OF WATER AND TOP OF SAN SEWER OTHERWISE BOTH THE & LATERAL WATER M41N SHALL SE DI. IF WATER MgIN IS EX, ONLY MIKE SS LATERAL DI, SEWER MAIN WMINIMUM BEPARpION F%I$TING BETWEEN BOTTOM R STORM STISTING IN ANOTOP OF SAN SEWER OTHERWISE LATERAL SHALL BE D.I. 10' MIN. HORIZONTAL SEPARATION BETWEEN WATER AND SEWER OD TO OD I B'MINNUMSEPARATION BETWEEN BOTTOM OF WATER AND TOP OF AM SEWER OTHERWISE, BOTH THE UTERALSWATERMINSHALL - BE DI. IF WATER ANN 15 EX, ONLY MAKE SS LATERPI DI. SEWER MAIN 201495DmpmRREV_1 HB , 1P MIN. HOPS SEPARATES AN08EVEM �,,r_CLEANOUT SHALL BESET EXISTING $TORM GEMS TO GLEN. INDICATED ON RgNS GAS yI EX UNDERGNWNO CROSSING IN ACCORD WITYI ELEDIED REQUIREMENTS FOR UNDERGROUND ELECTRICAL J }1� %�T/)/E�% _ CROSSINGS � 1-----�1 / / / � AND TOP OFRAN BE WER^ SEWER � . CLEANOUT SHALL BE SET MAIN TO GLEN, INDICATED ON FLANS iB'MINIMUM SEPARATION 18"MINIMUMSEPggATIR BETWEENBOTTOMR WATER BETWEEN BOTTOMRGAS ANDAND TOP OF SAN SEWER TOP R SAN SEWER LA OTHERWISE, BOTH THE 26'MIEENBCREP TI ARA R UTEML d WATER MAIN 3�'� WATER MAIN 3 BETWEEN BOTTOMRSTOPMgND 2 BEDL IF WATER MIN IS IX., TOP OF SrW.BEWER, OTHERWISE / /1 XDAS ONALLY WKE SS LAMPAL 01. LATERAL SWILL BE 0.1. EXISTING 1.LVEMHCAAND HORIZONTALSEPAMTIONSHALLBEIN UNOERRWND ACCORDANCE WITH STATE BGULAMONE EUSIRIC CLFANOW SHALBESET 2_WE SWISHES SHOWN ARE FORINFRMATIRA PURPOSES TO ELEV. INDICATED ON PLANS ONLY. 3. THE CONTRACTOR SHALL BE REQUIRED TO VERIFY ALL SAWING UTILITIES BOTH HORIZONTALLY AND VERTICALLY AT EACH CRRSING IN gCCROWITH CROSSING PRIOR TO WNSTRUCTIONRUTERAL TO ISSUES R-91 .ENT. F ORUNDERGROUND PROPER CLEARANCES ARE M4 WIOWfio ELECTRICAL CROSSINGS d. AL PIPE BEND1OMUC SµDMAXNUMBEROFBENS$ INSTALLED ON LATERALS SHpLI BE APPRISED BTTHEPROJECT ;COORDINATOR PRIORTOINSTALUTIR OF BENOOR EXTENDING 1B' MINIMUM SEPARATION THE LATERAL FROM THEBAIN. BETWEENSOTTOMOFGM ANDTOPOFSANSEWER 5,ALREWIREMENTSFRSEWERUTEMLNOTMMDDEMW 2P MINIMUM SEPARATION SHALLBEAPPLICABLE. BETWEEN BOTTOM OF SEALER B. REFER TO UNDERGROUND ELECTRICAL DETAILS FOR ADDITIONI AND TOP °FWORK LBEDILOTHERWISE LATERAL SMALL BE DI. INFORMATION WHEN CROSSING UNDERGROUND ELECTRICAL FACILITIES. UTILITY CONFLICTSEPARATION PUBLIC WORKS COMMISSION No. DATE REVISION REQUIREMENTS FAYETTEVILLE, LE N.C. BIT,' .�B I MOs SED NOTESt MO6 sBEr NO. DwG. NO. 5,12 DWG. BY: PNC WATER RESOURCES z ovlB DDSO NOTE RDI LATEwNs 1 °F1 GATE: JAN.M.2oB APPROVED BY. ENGINEERING DEPARTMENT 3 R10 DDEDUTERAdWMSEPAMTION 2014512 UTIL CONFUCTMp NOTES: 1. ALL MATERIALS SHALL BE APPROVED BY PWC. SEE DWG. W 4 SHT 2OF 2 FOR METER BOX LID DETAIL. 2. METER BO%SHALLNOT BE LOCATED WHERE H-m LOADINGS CAN IMPACT BOX OR COVER. 3. FOR I - WATER LATERAL INSTALLATION SEE PWC DETAIL W.2 4..WSi/;BU,NO PLAN - 17-W16" -JI - 12,W6- I 4_ i 21-1&16'--,_---__.- ---- le,ve"-..--- _._J ELEVATION "g I ELEVATION) ELEVATION VIEW 1-INCH METER BOX DETAILS N.Te, SHEET NO. CWO'N°" W.4 1 Of 2 DATE: JAN. Oi, 2U14 PRELIMINARY DO NOT USE FOR CONSTRUCTION THIS DRAWING HAS NOT BEEN REVIEWED BY ANY GOVERNMENTAL AGENCY FOR COMPLIANCE WITH ANY APPLICABLE LAND DEVELOPMENT OR OTHER REGULATIONS. CAST IRON FRAME d CWERSEEMTAIL - MAt(3)4'. 12)B',R FLEXIBLE BUTYL RESIN (1)YGRgDE RIN35 ®-� - SEALANT OF RUBBER GPS NET JOINT. MANUFACTURER INSTALLED POLY SEE NOTE I3. / PROWLENE COATED Nv 4 f ® __ STEP OVER INVERT -- 24' OUT SEE STEP QUAIL. U _ K DINT SEALER SEAL INSIDE ANDOUTSI OUTSIDE � JOINT WITH SET MORTAR E Fvo� SMOOTH FINISH FINISH s -, LIFT HOLES THAT E MD THEIR THE - -- WALL SHALL BE SEALED WITH B_ NONSHRINK GROUT, LIFT HOLES TEAT XAV E PVC MPS THAT OO NOT EMEND F � THRU THE WALL SHALL NOT REWIRE bo j GROUTSFAUNT. c�-e' E 4r MIN. _ Nu SEE CHART - - 1. FI E%. BWT 1.- 1EDC BOOT CONNECTOR CONS BRICK AND MORTAR INVERT a PLACED IN FIELD TO X4 HEIGHT OF 3 OUTLET PIPE. SEE SHELF DETAIL. L ---REINFRCING SEE CHART MOVE SEE CHART __. SEE NOTES tT mJ,.._ _ _ B'MIKMMM.M.NOST STONE !-' //UNDISTURBEOSUSGRME AROUND PIPE AT \ ENTRANNULU3 ENTRANCE WIT: NRSHRINK GROUT. STANDARD MANHOLE PUBLIC WORKS COMMISSION N.T.S. FAYETTEVILLE, N.C. SHEET rvo. DWG. No Sp DWG. By Pwc WATER RESOURCES Zdpft 10 DATE: AN. 01,m14 MPRovsO Bv'. JEc. ENGINEERING DEPARTMENT PAC RING µ0 COVER SEE DETAIL (2 TTPE9 GF RING µ0 COVERAPT!°) _ _CM0. GRADE RING MAX. 3 ) V, (2) S' Ofl (1) 2'. SEE NOTE 11 ._.SEAL LIFT HOLES -- JOINTSEALER 1- SEAL MOUND PIPE - -'SEE SHELF DETAIL FLEMBLEEPpMRUSBER BOOT - SANITARY SEWER (OUT) --NO 57 STORE REVISION SEATED STA ADDED NOTES 1117 3 rDEDSHEEI2CF2 201452 STANDARD MANHOI F Ma m CM LINKS 2 STAINLESS STEEL ( ) NOTES; SEE DETAIL 2 CPMLWKS O -ROLL PINS 1R' DIA MANHOLE FRAME µD COVER TO BE MACE OF GRAY /' %1�, CAST IRON CONFORMING T . I-LETTERINGCLASS ByASTE GAMPEGUFNCT 35. MANVFACNREp BY BIOME MANVFACTIIBR 'F r", AC-CAWNGS SHALL CONFORM TO THE SH4PE D W -(2)PICK BARS (% A pIMENSIONS SHOWN. THEY SHALL BE CLEAN AND ' SEEDETIL -/^- PEBECT, MRUT BLOW OR SAND HOLES OR ® ® \'(V ANY DEFECIB AND TENDING TOIMPIRTHEIR T O STRENGTH. NO FLOGGING OR STOPPING OF NOP ❑ DEFEcnvE HD LES WILL BE PERMITTED. y ED 2. OWINGS SHALL. B LYIPMNIEDAND SHALL HAVE 9 ® W © O © ////,////,CCCK���� THE LETTERS CAST TWO CEE0.CETTERS SHALL BEIWJSED DTARY R• CLEARLYWSIBLE, r - "('�C 3, MANHOLESINGANO COVERSHALLMIRSTANDH2O CDYER_FA� VEHICULAR TRAFFIC. NTS. I -mm DIA 4, MINIMUMAVERAGE MIGHT: PLUS OR MI NUS 5% FUN EA UB3., coVER,ea Les., DwT 315 LB5. t e ,� W, r: 5. BRFORgiEO COVERS WILL NOT BE ALLOWED bb RIIBBERj 11 ^7 GASKET CAM LOCK �ri � 0. SUPPLY SOCKET FORTIIUIING CM! LOOK ING C m'°VL ���"-""- MECHANISM. ONE SWKET PROJECT, - -- 1-I- CAM LOCK DETAIL_ \ -NTS T. USE OF WNCBTE GRADE wNG3PAE NOT ALLOWEO, UNLESS APPROVED BY THE AND Tr T SILLS' n PROJECTCWRBINAT00. COVER SECTION MIS T N l S. TEIS DETAIL IS TO BE USED ON ALL MANHOLES 4&i,S%4 ; i NU.I,t, ,� LOCAlEOW31LE OF FAVED AREA.$ UNLESS OTHERNSEAPPROVED. j 2TWB'2]4/iMDA A -_ 1 1 k :try y V 9, BFERTOCETML9ITFORINSTALUTONOF A"'CIA Be ROD VENT STACK I_�I--:Ire�1H---I( PICK BAR AND GASKET GROOVE DETAIL_. x.r.b. _ C APPROVED CASKET MATERUL COVER =4.OW, n'T S' . [ _241/r 01A �- 4EASR'ONHUTSTINLESS STEEL BOLTS L WM%EWE ANCHORS. (SCOW THBPITS 3a•°w, __ MANHOLE RING AND COVER PUBLIC WORKS COMMISSION No. DATE REVISION WITH WIPER GASKET B CAM LOCK FAYETTEVILLE, N.C. REVISEDNOTE A RAME 1 JDLM SHEET no. DWG. NO. DWG. BY: PWC S'6 WATER RESOURCES 2 z Dec oe RALA- EVISERAMD DIMENSIONSR AFF'- 1oFt ENGINEERING DEPARTMENT DATE: JAN. m. m1a IMPBoveo ev: J.Ec. JULN REWseD NOTes NE 2014SSRINGCOVE NOTES 1. ALL EXCAVATIONS SHALL COMPLY WITH THE TERMS AND CON°HIRS OF THE CONSTRUCTION STANDARDS FOR SEE PAVT PATCH DETAIL FOR "GAVATIRS IN OSHA'SAMTYAND HEALTH REGULATIONS LAST T OF FILL IN PAVED AREAS FOR CONSTRUCTTCN, CHAPTER XVI I DF TITLE N. CM PART L 19M THE COST ACTOR SHALL HAVE A COMPETENT PERSON T9 PACED TO DENSITY ON THE JOB AT ALL LTIMES AND EMPLOYAPRGFE9310 NA AB DETERMINED BY ASTM C088 ENGINEERTO ACT UPON ALL PERTINENT MATTERS FTX O E WORK 2 BEDDING MATERIAL QUANTITIES AB CALCULATED BASED ON TIEFOLLOWINGTRENCH WIDTHS L. MATERIAL SHALL il r L REGARDLESS INSTALLED OF PIPE MATERIAL. FOR4VRCPNIO=B',0=8' 1 �'•- FOR4TRCPNIB=5'.0=5'S' Y, _Tfl II. _ }L FR 30'RCPNIBJ'-0'.D�'S' �' - FOR M'RCPNIBJ', D-JL- FR1S'PVCNI.-3. D=3 UNDISTURBED SOIL-' I II FOR15'PVCNIB 3.0.3' FORITPVLNIS=2',0=-T1 - - FS'PVppIB4 0 -0' _ 1. 3 MATERIAL BE GRANULAR LFAN.COARSE BACWLL SHALL BE PLACED IN B' UYERSAND COMPACTED 2 PEA GRAVEL;,' R WELL G3RAND CRUSHED ROCKHALL PLACED IN LAYERS NOT TO EXCEED 5' LOUSE LETS FOR TO 00%MA%IMUM DENSITY A9 DEMRWNEOBYAWMp900 w� f, :Dm THE FULL WIDTH OF THE WRIGHT T012'ABOVETOP OF PIPE • T.("�, 4, BEDDING MATERIAL SHALL BE INSTALLED AND PAID FOR IN ACCORDANCE WITH THE FOLLOWING CHARTTO PRODUCE SELEOTBEDDINGMATEflML - r ^ 3.y'F,y J'T ^A _ -I CLASS BBE001NG. NOOVERAGEALLOWEDBE _� FOR B'PIPE OBTyB3HL OF PIPE NOTE 4 � (MIN 4') FOR 12-PIPE AS,13M OF PIPE FOR 15' PIPE I IASAL OF PIPE SUBBASE SHALL BE UNDISTURBED hS _ _ - _ MAX(DW2) FOR B' PIPE.1303AL OF PIPE FOR 24' PIPET503110F PIPE SOIL MERE SOIL I6 DEEMED _ FOR30'PIB.1SyE3/ROFPIPE UNSUITABLE BY THE KW MCC SEE PIPE OIq_ -. FOR W PIPE 25yCM OF PIB AUTHORIZED AREA SHALL BE UNDERCU" FOR 4T PIPE 32yE3rR R PIB AND BACKFILLE° WITH SELECT BEDDING I FOR4W PIPE.36,J OF Pin PITE MA' 4N TAVTMORI2E0 RNL. AREA 0 AS GNOERCUT LE0 B - - - - - SEE NOTES I A2. y 5. BEDDING MATERIEL SHALL EXPEND TO VNDISTURBEOTR NCX E AT CpWMCTQ49IXPENSE LYRH ONES DONE SER WITH WALLS AND TRENCH SOTTOM.OVEMGE OF REWIND MPTERIPL SELECT BEDDING MATERAL. WILL NOT SE PAID FOR UNLESS SPECI ICALY APPROVED BY THE PROJECT REPRESENTATIVE AND SHALL ONLY BE PAID FOR IN THE AMOUNT OF THE AUTHORIZED QUANTITY, B, BEDDING MATERIAL SHALL BE PROPERLY ROODEOARWNO WE PIPE HAUNCHES, ]. CONTRACTOR SHALL USE TRENCH BOX SHRING IN ALL OPEN CUTS INPAVEDAREM TRENCH WIDTH SHALL BE NANTAINED AT THE MINIMUM PRACTICAL WIDTH. SEWER BECDING PUBLIC WORKS COMMISSION fI No. °ATE REVISION N.T.B. FAYETTEVILLE N.C. 1 MN OS O sEon TEs SHEET No. DWG.rvo 5.13 AAG. er. PM'C WATER RESOURCES 1 GF1 °ATE JAN012014 AIPRovED ar: J.E.c. ENGINEERING DEPARTMENT TOP VIEW SOLID LID 1-INCH METER BOX LID N Ts. ° SHEET NO, � N0. W 4 2R2 DATE' JAN. 01. 2014 UNDERSIDE 2014-S13SEWERBEDDINI Mil-VMtINMETERBR,M, ( 2014W41 N METE Ew[ a°TPs: 13. CONCRETE GRADE FUNDS SHALL NOT BE USED FORABOVE 1. PRECAST REINFORCED CONCRETE MANHOLES SHALL BE IN GRMNADJUWMENTS0..,OUTFQ1AREAEL USEOFGFADE ACCORDANCE WITH ASTM tA]B, RING AREALLOWMLEINYgROAgEABANDPAVEMENT,WHERE THE RING AND COVER AREATGROUND LEVEL. 2. MINIMUM CONCRETE COMPRESSING STRENGTH SHALL BE 4AE PSI, 14, THE MINIMUM SLOPE ACROSS THE INVERT OF THE MANHOLE 3, MANHOLES GREATER THAN 1Y DEPTH SHALL HAVE MINIMUM B' SHALL BE I%. UNLESS OTHERWISE APPROVED SY END, EXTENDED BASE. 15, THEEXTERIOR MANHOLE RISERMINTS, INCLUDING WE JOINT AT 4, FUGU LE BUTYL RESIN) IN O TSEALANi SHALL 3E IN ACCORDANCE THE CONE, SHALL BE SEALED ON THE OUTSIDE BY AN APPROVED ARHASTM C990, RUBBER GASKET JOINTS SHALL BE IN JOINT MAP. THE WRAP SHALL BE IN ACCORDANCE WITH PWC ACCORDANCE WITH ASTM C44 3, SBCIFIMTION3, S. FLEXIBLE EPDM RUBBER T B00 CONNECTORS SHALL BE IN 18. °LEBWTFO 4 H R INCH UTEpALS. SHOULD ITBE - ACCRDANLESSTEEAST. CS23SLM By MANUFACTURER NEC NECESSARY TO INSTALL MINCH UTEMLINTO A MANHOLE THE WITH RING RING AND iP%E-0UP CLAMP RUBBER OCOT THAT THE LATERAL I5INSERTED I W O SHALL BE CONNECTION MAIN SHA MAIN SHALLCOMPRESSIONBE LL BE BY LON FACTOR WITH T CONNLESSS SECURELY FASTENED TO THE CORE HOLE BY UTILIZING A STEEL STAINLESS STEEL PIPE CLAMP. STAINLESS STEEL DAN° THAT IS TIGHTENED USING p JINX DNA TORQUE WRENCH (DIRECT NNE} BOTH STANDARD 412EAND 8. CONNECTIONS TO EXISTING MANXOLFSBE BY SHALL so ME BCOTSAREALLO`NED. THE TORQUE WRENCH SHALL INSTALLING AFLEC BOOT CONNECTOR DO CONNECTOR MANHONOT BESUMUEDBYTHEMANRACfURER, NOOTHERTYPEBµDS ALLOW DEBRIS TO NOT ALLOW DEBRIS TO ESTER $VSTEM. OR METHOD R SECURING THE BWT TO THE MAN. BHALLBE ACCEPTED. T. MORTAR SHALL BE QUICK SETTING, NON -SHRINK GROUT MIXED IN ACCORDANCE WIiN MANUFACTURER'S RECOMMENDATIONS. FOR FOUR(4) INCH BOB m LATERALS, THE PIPE OUTSIDE DIAMETER RANGE OF THE BOOT SHALL BE 15INCHES TO12S 8, MANHOLE STEPS SHALL BE IN AWRDANCE WITH ASTM G78AND INCHES, RHA REGULATIONS, ALIGN STEPS WITH INVERT OUT. FOR FOUR (4) INCH DUCTILE IRON LITERALS, THE PIPE OUTSIDE 9, PRECASTINVERMARENOT ALLOWED, STANDING WATERIN DMMETER RPNGERT HE BWTSHALL EITHERBEAS FOR VCR INVERT OF MPNXOLF IS NOT ACCEPTABLE. 4 251NLXES T04,81 INCHES. 10. VERTICAL DROPS BETWEEN THE INFLOW PIPES AND OUTFLOW IN ALL CASES, THE SCOT SHALL B TIGHTENED ON THE LATERAL PIPES SHALL RECUM THE FOLLOWING: BY MEANS OF A SINGLE STAINLESS STEEL STRAP. A. GREATER THAN 283EE DROP STRUCTURE DETAIL (MIN. 5' DIAMETER MH REQUIRED). THE LATERAL INVERT SHALL RE AT THE TOP OF ME SHELF. e. 1' TO 2.5' SEE PIPE SLIDE DETAIL. C. LESS THAN I' SEE MORTAR SLIDE DETAIL. t]. NO MORE THAN 4, FOUR INCH LATERALS R 3. SIX INCH UITRALS SHALL ENTER A 4' DIAMETER TERMINAL MANHOLE. NO MGM 11. AN ECCENTRIC CONE SHALL BE UTILIZED ON ALL MANHOLES. LATERALS (RARMHOLES. SEE)SHALLSHALL UNLESS OTHERWISE APPROVED BY NVC, OTHER DIAMETER OTHER 4' DIAMETEfl ARMHOLES. PI.L LATERALS SNAIL HAVE AN AL INDIVIDUAL TROUGH. 5' DIAMETER MANHOLES SHALL BE USED IF 12. INVERT ON PUNS IS TO MANHOLE CENTERLINE THE ABOVE CONDITIONS ARE NOTMET. 18. NO MORE THAN 5 LATERALS SHALL ENTER A S'DIAMETER 19, USE OF TEEWY ON LATERALS IS NOT ALLOWED. 20, ALL MANHOLES SHALL BE VACUUM TESTED IN ACCORDANCE WITH MO STANDARDS, PUBLIC WORKS COMMISSION NO DATE REVISION STANDARD MANHOLE FAYETTEVILLE, N.C. I tN8 REATEDDETAIL, ADDEDNC SHEET No. DWG. NO. S,2 pWG BY: PWC WATER RESOURCES 2 TH3 EVISE NOTES-R-13 S. 2 ofz paTE: JaN. M, mi4 AIPROVEDeY: .LEG. ENGINEERING DEPARTMENT 2014 WANDARDMANHOLE. NOTES: IQ' GRACE 00 1, COPOLYMER POLYPROPYLENE PLASTIC STEEL REINFORCEMENT WFPSHALLBEPUCEIWOD MM STRUCTURE85O' DEPNI R GREATER 2. STEPS SHALL BE INSTALLED BY (� M JXUFpCNRERANO9XALL BE V ALIGN EOOVEA9TRUCNB INVERT our. 3. DIMENSIONS SHOWN AB i0 CONVEY "A THE OESIBO SIZE OF THE STEP. STEPS SECTION -A" OFSIMILAR SIZE AND CONSTRUCTION MAY BE ACCEPTABLE PROVIDED MATERIAL SUBMTRALISAPPROVED BYPWC. 4. WMRINS OF CONSTRUCTION AND METHOD OF INSTALLATION SHALL BE IN ACCORDANCE WITH OSHA STANDARDS µOASTMc<r8. SERRATED TREADS WIDE ENOUGH IT -_-._ PLAN VIEW _. _.. n � FRONT VIEW 1 " MANHOLEWA 6-MIN, W ISOMETRIC VIEW OF STEP SIDE VIE STRUCTURE STEP PUBLIC WORKS COMMISSION NO. DATE W,SKK4 N.T.S. FAYETTEVILLE, N.C. Owc. No. S.g DWG. eY: PJJc rW{,i SHEET No WATER RESOURCES 1 OP1 DATe: JAN. D1, 2o1a APPRovED BY: J.E.G. ENGINEERING DEPARTMENT 2.7 TO FIND 'EH ENTER CHART AT LEFT WITH EFFLUENT PIPE SIZE AND ENTER PIPE AT TOP WITH INFLUENT PIPE SIZE. 'E' DISTANCE IS POINT OF CONVERGENCE OF COLUMN AND ROW. D2 4' I. B . 0.L, 2...- 1 IS 0 24 2L0] 2I.11 22,00 23_00 23.T5 N.50' m�00 WHEB 5' MH IS REQUIRED AW IQ' TO 'E' DISTANCE TOACCOUNT FOR THE ADDITIONAL V OF SHELF SLOPE. NOTES: 1. SEE SYNC STANDARD MANHOLE AND PIPE SUDS, MORTAR SLIDE AND SHELF DETAILS FOR AMITNINAL INFORM Ol 2, THE TE' DISTANCES INDICATED ARE FOR CONNECTION TO AN EXISTING MIMIC AND ARE THE MINIMUM DISTANCE ALLOWABLE 3. WHFRESANITARYSEWEROUTFALLS AND MAINS AB BEING CONSTRUCTED THE TOP R THE EFFLUENT PIPE AND THE TOP OF THE INFLUENT PIPE SHALL BE AT THE GAMES ELEVATION UN LESS NOTH W NDITIR3 ARE MORAINE TO THIS PRACTICE. MM,:OR LATERAL MR: SLOPE 4'@2.OE%MIN. 6'Mll.67%MIN .WIN O' 02DEB MIN MTEML g'®R.40%MIN. tYN022%MIN. 15' Q 0.15%MIN 10' p12%MW. MH CONNECTION DESIGN GUIDE PUBLIC WORKS COMMISSIONNoft P REv1s1R NTS, FAYETTEVILLE, N.C. Dwc.NQ 5.16 DWG. ev: Fwc SHEET No. WATER RESOURCES oF1 C DATe JAN. CH zD 1I APPROVED BY: J.E.G. ENGINEERING DEPARTMENT 2014S 1B PENETRATIONDETAI 1. CONTRACTOR SHALL REPAIR ALL WATER LITERALS AND WINS DAMAGED DURING B. CX°BMI°AWAT NINE OVER ASEWER: WHENEVER IT IS NECESSARY MAIN CONSTRUCTION. THE CONTRACTOR SHALL REPORT IMMEDIATELY ALL WATER MIN WAWFMAIN TO NOW OVER A SEWERMANMTERL, THE WATER MEIN SHALL AND LATERAL 5RE445 TO THE END PROJECT COORDINATOR. THE CONTRACTOR BE LAID AT SUCH AN ELEVATION THAT THE BOTTOM OF THE WATER MAIN ISAT SHALL INITIATE IGAN DATE BPAIRS IN ACCORDANCE WITH PWCSTANDARDS. -,HE UNLESS LCCM_ CONTRACTOR SHAL NOT OPERATE PWC WATER MAIN VALVES WITHOUT PWC CE DMONSORSABOrs W APPROVAL AND SHALL COORDINATE ALL VALVE CLRINGS'MTH PWC. W BOTH MACH CASEHTHE%ATER NrW SEWER AINAALSEPARHALL E MIN AND SEWER MMENTS. AL SHALL BE ;TILE IBM INACC ROATER DUCTILE IRON IN ACCQiUµCE WITH PWC REQUIREMENTS. 2, THE SHALL NOT USE SE OF ANTOTHERMENTS BLOW MIH DOMESSE TIC BLOW OFF WHIR ALLOWS pOMFSTIC WATER CONTAINING SE DIMENTSORNIGH WATER CONTAINING SEDIMENTS OR III C CATERING WATER MAN UXDFA p BEINEA: WHENEVER IT IS NECESSARY FORA To AWTHRUDAMAGES RESIDENTS METERSTHECONRR LEVELS OFCIBLEFO BOW WATER WATAND RR SHALL MUCTILE BE BSPoNwENT$PLUMBMMAGESM,RESULTING FROM ALL WATER TO WATER TO WE SE E MWITCROSS IRAL,ON B ACCORANCWITH AND WE AFULL DUILEINC IN AOC°flBANSTALLE ENTER SUCH AS WATER HEATERS. STAINED AS WATERMLOWING HATERS, STAIN JOINT OF D OF DUCTILE IRON PI G. 8E INSTALLED CLOTHING. CLOGGED SCREENS, ETC. ON THEWATE "N ,TESTED AT ON THE WATER MAIN WYTERED AT THE POINT OF CROSSING. WI 3. WATERMINS AND LATERALS SHALL BE INSTALLED UTILIZING A PWCAPPROVED D. CROSSING STORM COARAGE LINES; A MINIMUM S 12-INCHES OF VERTICAL CUTSHEET INDICATING INSTALLATION DEPTH. CLEARANCE SHILL BE MAINTAINED BETWEEN A WATER LINE CROSSING OVER STORM DRAINAGE LANE JNLESS DUCTILE IRON PIPE IS USED. IN ADDITION, a. TRANSFER OF WATER SERVICES SHALL BE ACCOMPLISHED AS FOLLOWS'. THREEANDARAF05=EWOFOOVERMUSTBMAIWAINEDONERTHE A INSTALL, TEST AND STERILIZE NEW MAIN AND LATERALS, LATERALS SHALL BE WATER MAIN R R SXL BE DUCTILE IRON, IF DUCTILE IRON PIPE IS USED INSTALLED IB-COME UNLESS OTHERWISE TOW ENS ERRBOX TIE BY PWC, MUST REAL NTAINED R THE B. TRANSFER STING ERTONEW METER AND TIENEWSAMWATERUTERA FOFCWER WATER MIN WATER MAIN ANDA MIN MUM MUMOF 41 V. NCHES OF VERTICAL CLEARANCE SHALL BE CLEARANCE SHALL TO IC MASS UTILIZINGNDDRESS �ITTINGCSTOMER. EIW MMNTAINEATEMEE. 'HE WATER MIN AND E LINE. NUMBER SHALL NUMBER SHALL BE INSTALLED O SAME ADDRESS ANDIR CUSTOMER. BWW BLOW STORM DRAINMW AGE LINE TEMI WATER W/.:OFVERUNDER ARATIO DHALL BEMINTHEMININD H SEBIBBEDR OFF SERVICE AT HOSE BIBS ON HOUSE ONLY PFTERMET ft E HAS BEEN OF TWELVE OF PNELVE(1211NOES OF VERTICAL SEPARATOR SHALL BE MMNTINEDANO TRANSFERRED. THE WATER MAIN 9ML_BE DUCTILE IRON FOR ADISTANCE OF iDFEETR G AF EXALL SERVICES ARE TO THE NEW SYSTEM, SHUT OFF VALVE EA CHSMEOFTHECAOSSING. ON ON EXISTING SYSTEM AND ABANDON EXISTING MAINS IN ACCORDANCE WITH PWC DETAI 'TING D. CONTRACTOR SHALL SUPPLY NEW METER BOXES AND DISPOSE OF EXISTING MWERBO%ES, 5. WHEN MAIN IS NOT TO BE ABANDONED, CONTRACTOR SHALL UNCOVER 0. CORPORATION AT MAIN, CLOSE AND PLUG CORPORATION TO ABANDON OLD SERVICE. 6 SEPARATION REQUIREMENTS: A LATERAL SEPARATION OF SEVERS AND WATER MIX.: WATER WINS SHALL BE Up LATERALLY LEAST 10 FEET LATERLY FROM EXISTING OR PROPOSED SEWER MAINMTEAAL, UNLESS LOCAL CONDITIONS OR BARRIERS PREVENTA 10-FOOT UTEML SEPARATION. IN WHICH CASE 1, THE WATER MAIN IS LAID IN ASEPARATE TRENCH, WITH THE ELEVATION OF THE SOT OM OF THE WATER MAIN AT LEAST 1B INCHES ABOVETHE TR OF THE SEWER MAINMTER L;OR li. THEWATERMAINISWDINTHESAMETRENCHp THESEWER MAINIA E AL WITH THE WATER MIN LOCATED AT ONE SIDE ON A BENCH OF UNDISTURBED EARTH AND WITH THE ELEVATION OF WE BOTTOM R THE WATER MAIN AT LEAST 18INCHES ABOVE THE TOP OF THE SEWER MINMTEPAL. WATER UTILITY NOTES SHEET NO DWG. NO. W 1 t OF2 DATE: JAN.Ot,m14 M10.W1 WATFR UTLITYNOTF5,1w" NOTES 1, MANHOLE MEETS ,LLREO MR. 5. ADROPSTRUCTURESHALLBE OF ASTM PLACED WHERE PIPE VERTICAL 2. CONCRETE IS MINIMUM 4W0PSI SEPARATION BETWEEN INVERTS EXCEEO.S25b. WE 5' DIAMETER COMPRESSIVE STRENGTH. MANHOLESVMMUROPSTRUCTURES 3, WTEROLL USED TOWN. AROUND ARE NEEDED. PIPE SHALL BE NON -SHRINK GROUT. S. NTH THE EXCEPTION OF THE 4. MANHOLE SHALL BE CONSTRUCTED MgNH01E BASE SECTION, ALL OF PRECAST CONCRETE. FIBERGLASS OTHER MATERIALS, INST&LANON WNHGLE IS NOT ACCEPTABLE. ANDWORKMANSHIPSHALLBE IN ACCORDANCE WITH THE PWC STANDARD MANHOLE DETAILS, T. DOGHWBE WNHCLESHALLSEF RE ® OFLEASE AND RAW NO SIGNS OF VISIBLE E. g. MANHOLESES GREATER GREATER THAN t21NDEPTH SHALL E MI HAVN 8' ENDED DAB, MANHOHO see LE DETAIL FOR /////]��\\\\ AMITIONALRE°UIREMENTS. SECTION A -A e \ CO CAN NSTRUCT INVERT IN ACCORDANCE WITH PWC IB' MIN. STAND . RT CONRETE'MVEµO BASE PLACED IN FIELD NEW TO BOTT°MOFMF SMITMY SEE SHELF DETAILFOR SE E� SHELF CONSTRUCTION. 2 FLEXIBLE RUBBER SOOT E Nv NRSHRINK GAT STEEL NCRMNO TO MH STEEL KORBlTD TO MIT SEPLANNULUSOVER ANDARORDPIPEAT T-9009TAINLESB STEEL DWNOUSEW i50 MAX. PIPE CLAMP TZLID RICI(PNO ° M RTM 2 f NEW SANRARYSEWER MANHOLE BASE SECTION SHALL BE SUPPORTED R 4NBN1d SWIDCRCRETE SAW SANITARY " BLOCKS STACKE02 HIGH �• ,.c - 'SEWER OUT ♦ M�OPHAINWBVwYM 1B0-m T. - C Y Y REMOVE EXISTINGTRQF i � . PIPE FSOVESPRING LINEAFTER ACCEPTANCE OF MANHOLE BASE BY . BASE ONLY - PNC.WWRACTRSHIOLLSAWCUT NO AND REMOVE EXISTING PIPE MOWN S]STM°MPACTEO UNDISTURBED TO FORM OPEN INVEST TROUGH, 4NSN1WSO1_IDWNCRETE SUB GRADE NOOEBRISSHALLBEALLOWED BLOCKS STACKED 2 HIGH TO EWER SANITARY SEWER INZAPART, SECTION B-B DOGHOUSE MANHOLE PUBLIC WORKS COMMISSION F nxs FAYETTEVILLE, N.C. SHEET No. DVJG, No 3,S wJc. er. Pvc WATER RESOURCES 1 OPt DATE: JM.31, 2D14 AFERGVEoeY: J.Ec. ENGINEERING DEPARTMENT 5'MIN. SING STMNI STEEL FLOW PVC SR380RDI. TEE SEE NDR. T 0 B ON 5.11 STANDARD TEE CONNECTION TAPPING SADDLE W11H STRAP NICE AND ALIGNMENTFLANGE SS GENW °RMPROVED EQUAL. REAP SEE TABLER8.11 NEW O I rCAPSHALLHAVE COVERNR TMFFIG AUATMAIDEMLB SREAT GRADEINPAVED T. AREAS AS Z �V' TAPPING SADDLE 1 ` (OPTIONAL) /tee NOTE: TAP SHALL BE 410 PERWNEWA8STJ FOR4'UTERAARD SEE CLFANOUTCMASSI SHALL BE 61Jr FOR 6' LATERAL RISER SELL BE P SDR-26 PVC - EXCEPT IT SHALL BE4-DAL IF ME LITERAL ITSELF IS DUCTILE IRON STONESWYLBE OPE2V6 A' EXIENDEDTO BED MI'Lt'1 SIN+^% S11 LATERALCONNECTWN 3DETA6 FROMUNDISTURBEDSOIL SEE�E THRTIE. LOTTED l: CPSTIRON W.UG C III- CAP -TRAFFIC ® I I.', iHREADE°CAST PVC SDR-R GASKIRED IRON HUB _ - i,__. UNDISTURBED COMBINATION (SEE n°1E ISBN 5.11)OR SOIL MECH JOINT FITRNGS, MIN. STAIN ESS T IF D L LITERAL, STEEL HONE �L °CBE 6'AC /O.L T04'C.I?LAST; MIN, Ile THICK EPDM COUPLING C/O CAP ASSEMBLY SEWER SERVICE LATERAL NO. (4-INCHIAND 6-INCH) PUBLIC WORKS COMMISSION D FAYETTEVILLE, N.C. 1 Ju SHEETNO. °WG.xO. S,iD DwG. er. PRIG WATER RESOURCES � z JA I OF1 DATE: JAN. D1, mta APPRovED Bv: JEG ENGINEERING DEPARTMENT $ Jp SEA EACH END OF ARMING - WITH SOLID CONMETE RICK AND 13 MORTAR 1Y MINIMUM ENG H. CARBON SMEL CARRIER PIPE BI VICE 11 SHALL BE PLACED 3' PRIOR TO AN° S' AFTER EACH JOINTS DUCTILE IRON CARRIER PIPE. (SEE DETAIL BORE UNDER \ ROADWAYS4UILROADB SHT 2 R 2 FOR '\ �l�y,%C(�Q/j/�/v� SPELIFICBOUIREMENT9) ✓ 104G13h.'n+ STEEL CASING$1ZEOAS ANOINTED TH " ON E BOB SgING QING;WWI. CARRIER PIPE SELL BE -- DUCTILE IRON WTH PROPER EXIERIRAND INTERDRCWTNGS COMPLETELYETL VOIDWTSIDEOF CASINGW IXGR0Ur '. REVISION 201483 DOGHOUSE MH REV 14 fnP.) 2 AIR W,= FOR rr R ORE MW 8 0€II o.yo I3 p SORT GASKETED PVC UTEILAL)RMI (IF OI LATERAL} UTILIZE TRANSITION TABKETro TROMMIR FF DIIAT RAJU IREFER TEIAL). BEER TO RYC OETILSI2 REGMDB G BENDS IL, LATERAL REVISION `..EACH SECTN)NR ENCASEMENT PIPE SHALL BE BUTT- LDED TO THE NOTE'. ADJACENT CASING PIPE 1. SEE DWG MS SHEET 2 OF 2 FOR ADDITIONAL INFORMATION. 2. CARRIER PIPE FR PRESSURE MPLIGTONB(WNWATERNSd FORCE MM 4B SHALL HAVE FACTORY RESTRMNED JOINTS. CARRIENPIPE FOR GRAVITY SEWER SWLL HAVE RESTRMEDJOWTSANDMAYUSE RESTRAINING GASKETS SUCH f5 FIELD ROK, SONS STOP 35U R OTHER APPRCA EDGASKETS. 3. CARRIER PIPE SHALL BE CLASS 330 OR OUPORWATER,ANDSH(LLLSE HALF SECTION ISOMETRIC OF BORE CLASS AS FOR SEWER. PUBLIC WORKS C MMISSION o. DA E RE SON BORE UNDER ROADW O AVS NATION GADS FAVETTEVILLE N.C. NTS. 1, JAN OS OED NOTE3263 Dwc. No. M.6 DwG. Br: PWC z. nDa INebBIMlpu3amenM. SEEET NO WATER RESOURCES 1Rz ATE: JAN.D1. zp1a APPRoveD ev: J.Ec. ENGINEERING DEPARTMENT 2014-M BONE POND MILgq ]. WATER WTA°EB: THE CONTRACTOR SHALL SCNEOULE A COORDINATION MEETING THE CONTRACTOR SRpLL COMPLETE THE REWIRED WORK AND RESTORE WATER WITH THE FIND PROJECT COORDINATOR AND PROJECT ENGINEER AMINIMUM OF SERVICE WITHIN THE GIVEN TIME PERIOD FOR WE OUTAGE. SHOULD THE THREEE)WORKING DAYS PRIOR TOANYPLWNEDWATER OUTAGE. THE CONWMMR FAIL TO COMPLETE THE WORK WITHIN THE AJOTTEDTIME,THE COORDINATION MEETING SEAL BE CONDUCTED PRIOR TO My NOTCES BEING ADDITIONALLY, THE COMPACTOR SHALL LOCATE(VERTICALLYAND PUBLIC WORKSCRAB MISSION SHALL NALTY OF M PER 15-MINUTEISSUED. HORIZONTALLY) MY UTIUTIES WITHIN THE VPoR AREA, IN ACCORDANCE WITH WERVALRANI'PORRONTHMERUNTLWAMRSERVICEISRESTRED.THIS PENALTY WILL BE DEDUCTED FROM THE COMPACTORS PAY APPLICATION OR BE TWSECONTRACTOCCUMEWS. THELOCpTION3RNLUTUTESWITHINTHE BILIEDDIRECTLYTOTHECONTRACTOR. THEPENLTYMAYBEWAIVEDFR WORKAREASHAL BE DETERMINED PRIOR TO THE COORDINATION MEETING. MY CIRCUMSTANCES BEYOND THE CONTRACTORS CONTROL, AS DEEMED SY THE WNFUCTSWRHTHEWNDINGWRKMIDTHEB%ISTINGUTILITIESBHALLBE PUB�WORKBWMMI N.WEPVECFROJECTCWRDINATRANOIORPROJECT IDENTIFIED, AND A PLAN FOR RESOLVING PNY CONFLICTS SHALL. BE PRESENTED. THE ENGINEER RESERVE ME RIGHT To MANI. OR POSTPONE WE OUTAGE AT MY PURPOSE OFTHIS COORDINATION MEETING IS TO ENSURE THAT THE CONTRACTOR GIVEN TIME. IF DEEMED NECESSARY. HAS A G000 UNDERSTANDING R THE REQUIREMENTS RELATED TO THE PENDING OUTAGE, VERIFY TTHEREARENOUMIT WNFLICTSTHATWILLPREVENTTHE WORK FROM BEING COMPLETED, ALL EQUIPMENT IS W CAOC WORKING ORDER, ALL EQUIPMENT IS FUNCTIONAL, ALL MATERIALS ME ON SITE, ALL NECESSMW TOOLS ARE ON SITE, DISCUSS MY NECESSARY CONTINGENCY PLANS, AND MY OTHER ITEMS NECESSARY TO ENSLIRETHAT THE PUBLIC WORKS COMMISSION HAS CONFIDENCE THAT WE WORK CAN BE ACCOMPLISHED WITHIN THE GIVEN TIME PERIOD. SHOULD, FOR ANY REASON. THE PUBLIC WRNS COMMISSION DEEM THAT WE CONTACTOR IS NOT PREPARED FOR THE PROPOSED WTAGE, THE OUTAGE NOTIFICATIONS WILL NOT BE DISTRIBUTED AND THE OUTAGE SHALL BE POSTPONED A MINIMUM OF TWO (2) WEEKS. THE PUBLIC WORKS COMMISSION WILL PROVIDE WRITTEN NOTIFICATION TO WECTR NO CONTRACT TIME WILL BE GRANTED FOR HOULDDECISION.W FORMTHIS DELAY.SHOULDTHE DELAY CONTRACT TIME TIME EXPIRE WITHIN (2) )WEEK PERIOD,TIE PUBLIC WORKS COMMISSION RESERVER THE RIGHTTO(2)WEEK O ASSESS LIQUIDATED °gµgRS, AS OUTLINED M THESE LINED THESE CONRiACTDWUMEMS. DOCUMENTS ONCE THE WATER OUTAGE NOTIFICATIONS HAVE BEEN ISSUED, AFOLLOWLP COGLIOINATION MEETING WITH THE PWC PROJECT CWpDINATRMD PROJECT ENGINEER SHALL BE HELD A MINIMUM OF 24 HOURS PRIOR TO THE SCHEDULED OUTAGE. THE PURPOSE OF THIS MEETING IS r0 VERIFY THAT THE CONTRACTOR IS WATER UTILITY NOTES SHEET NO. DWG. NO, W 1 20F2 DATE: JPN..I m14 DEENOTHATTHE SMERRATEEFT BEGIN SHELF TRANSITION AT 3N HEGWCFOURET PIPE 1: 12MIN. W NCRWE SHELF PLACED IN- FIElD.90LIO CONCRETE JUMBO BRICK MY BE USED TO BOLD LIP INVERTTO MO... GUANORE3 BOLD TFNWH TO SPRJRGUNEOFPIFE� ON SUB RRIGMANNOLES BDROM OF BOOT SHALL W EETI-ABOVESHELF •N � � S%UNGLINE OF PIPE Wi4INMWAF LL''HA�I NON SHRINK GROUT SLIDE WITH BEw.rx xMALO.MIM W 112PIPEPLA�W INFIELOSD F3NnpmmmR CONCRETE JUMBO BRICK MY BE MR� ts. T M.Ira M USEDTOBUIIDUPINVERTW REDUCE MORI'µ N11 OUpTIE3.j,C.y3®py.y,. eAUm iFU SUDESINLLBEINSTALEDON MKIG J. sFFA.MKBm TOP °FSHELF WITHATROWH g� im TO DIRECT FLOWINTOTHE .N.I.... ,inlXgpccT SEWER ctK `WEAL FwWTOGreANE"BB " M 3 pF1 g�WER m�Rm M\IN MVFKA[ e. HIR T c�Yvti[. MNN. Aslc uaEs ALIGN IN 57PS OVER A1IET . INVERT OUT ....3.. SHELF AFNNNyMTeawivrtrro.NLutvwa - MAY4FWRN URW9Oid3IX row+xu P.wxa[epls�ARANUFAWAl. mwI. I.- IRIANPLLBMNxinN6,4 - AMNI Tiny ASW 61 xiwxxwllgFNwL.Aa 11 . %% ...-moo. ., . L � i� _ w, McmAw,w..azvx RBRR6�A¢w'e ...' MORTAR SLIDE DETAIL SIEIFIn'PO......o..•` TOWHEIGHTOFamET n.T.G PIPE' SHELF DETAIL N.TS. PIPE SLIDE, MORTAR SLIDE PUBLIC WORKS COMMISSION NO. DATE REVISION AND SHELF DETAILS FAYETTEVILLE, N.C. 1 JAR.05 MRDNOTE B. N.T3. DWG. NO. DWG. BY: FWC � 2 FEB VISEDNOTEB, SHEETED, `S''4 WATER RESOURCES DEDNOTESB 'or' rL DATE: JM.Dt, mta MPRovEo en J.ec. ENGINEERINGDEPARTMENT 201,1454 MUDE 1. HOLE IN SMITPAY SEWER MIN MUST BE CUT WIN 11. SEE INTERIOR DROP STRUCTURE R SLR, MORTAR SLIDE& SHELL CNL=R1N°HMIMER TAPS ALLOWED, SHELF DETAIL FR VERTICAL DROPS R MgMB AND LATERALS, 2. LATERAL SHALL CONFORM TO ASTM SP ECS. D5031 12. LATERALS LESS THAN 3'IN DEPTH ORGREATER THALAMIC EPDISHALL BOR-28 UNLESS OTHER'M8E INDICATE°AS D.I. UTILIZE DUCTILE IRON PIPE AND FITTINGS WITH CERAMIC EPDXY ROTECT0401 RVMENSEPAMTION RE UI (P ), O BEMENTS CANNOTBEMET. 3. ALL PIPE d FITTINGS SHALL BE 4. OR e' UNLESS OTHERWISE SPECIFIED. 13. ENTIRE SEWER LITERAL ASSEMBLY SHALL BENRTESTED C°NCURRENRY WITH SEWER M41N. 4. ALL D I. PIPE SHALL HAVE M INTERIOR LINING R CERAMILATERAL EPO"SHALL (BE RED THE ENTIRE D.I. 14. INDIVIDUAL UTERALSSHALBECLEANEDAtq Fl.USHFD PRIOR TO LATERAL SHALL COMPRISED COMPRISED R D.I. PIPE d FLUSHING SIWITARY SEWERMgIN6. MECHANICAL JOINT FITTINGS. FITTINGS. 15 LATERALSHALLNOTBE DACWFILLE➢UNTR INSPECTED BYT1E FpYPWC B. ALL IRS SHPll HAVE RUBBER GASKET MAILS PRQIECT WROINATOR. INSTALLED . 18. WYE CONNECTIONS SHALL NOT BE USED To TIE LITERALS WO 8. SANITARY ER SEWSERVICE C10 STACK SHLL ABE MANHOLE. LOCATED ls' FROM WATER SERVICE LOCK VALVE WHEN IN THE GAME ORS, 17, IF BENDS ARE APPROVED BYTHE PROJECT COORDINATOR STRE BEDDING IS REOUBED MBE INSTALIPC FROM UNDISTUMEO (SEE Z INSTALLATION OTHER THAN M SHOWN MUST BE DETAILS.t2) SOILM BOTTOM R BEND. APPROVEDBYTHEPWQ Is. FVG WFBRUTION SHALL BE A MOUND ME AND BEND, GASKETED. 8, CONNECTRSTOTHETROFMAWSMU_NRBE SDR28.ASMNTUFACNREDBYNARW,GPKRAPWtOVE UA1. ALLOWED UNLESS OTHERWISE APPROVED BY WEE ENOPROJECTCOOMINATR. 19, NO MORE THAN 4, FOUR INGI LITERALS R S SM INCH UTENLLS SHALL ENTER A d' DIAMETER TERMINAL MANHOLE, NO MORE MAN 9. SLOPE AND DEPTH OF ME SERVICE LATERAL SIW.L BE LATERALS (REGARDLESS R SAE) SHALL ENTER ALL OTHER DEMRMMEDSYTHETOPIX'RAPHYCFWEUOfi DIAMETER MMIHOLES. ALL LATERALS SHALL HAVE AN INDMWAL APPROVEDBYTHEPWCENGMEERRASIIDIMIEDR TROUGH. S DIAMETER INJMWES SHALL BE USED IF WE ABOVE THE DRAWINGS. CRDDIOMAW NOTMET. 10 UTERMSIMLLCRFORMTOTWn MINIMUNIsLRE 20. ALL LATERALS (4-AND 61 SHALLUTILIZEAPRISER(STACK). FOR WE ORWE 1%MINIMUM SIRE MR WE r. MAXIMUM CLEAN OUT SPACING FOR a PIPE TB, IP PIPE 21. REFER M DETAIL SAS FOR SEPARATION REQUIREMENTS. IOU'. n. LOCATOR OFCLEANOUTSHALL BE NOCWSER THAN 10 TO FRONTON BUILDING. THE FOLLOWING TABLE SUMMARIZES THE MATERIALS TO BE UTILIZED FOR SEWER MAIN TO LATERAL CONNECTIONS: DI a mm� w PVC LmnI PVCBNBry...H. MJ Bmre.KNC+nBMFR9.II.L SEWER SERVICE LATERAL PUBLIC WORKS COMMISSION Na. DATE REVISION NOTES(4INCH AND 6-INCH) FAYETTEVILLE, N.C. 1 WY BB WSED NDTESad3w SHEET NO. CNCONQ SA DWG. BY: PNC WATER RESOURCES I Fwft 2 Tfl ABED NOTES 1°Ft DATE: JAN.Dymu APPROVED Br: JEc ENGINEERING DEPARTMENT 3 AN. 13 EMBED NOTES AND q01 3014Gi1 RE831 SORESQINGCHART" CAROLER PIPE SIZE MIN. Cp8WG3VF RMPNpY3 MW.MMICSNE33 MIN.WALTTHH`ICKNESS 4• 0• SAW 0. BB B' IT oss' a r 8' e 0 ' 12• 24• 025 0.3T4• :T SIT 0.31Y 0.40r IY m' GAIT 0.160• W %• 0.3TW aMT 30' 7 O.Spp' O.(GO 7,J, 0.MET 0AB• 1. INSTALLATION SEAL BE DRY BORE AND JACKING OF SMOOTH WALSTEEL PIB. JETTING OR WET BORING WITH WATER SIWLL NOT BE ALLOAM 2. SEE BOB SIZING CHART FOR CARRIER PIPE BORE .0 STEEL CASING SIZE MIN. DIA AND WALL , THICKNESS. 3, CARING PIFESHALL BE IN AWROAN CEWT00 PIN /r53 GRAPEB WITH p MINIMUM YIELD 9TBNGM OF 35W0 PSI 4. EACH END RCASiNG ENCASEMENT HALL PLUGGEDWITH BILLED WITH VOIDS OUTSIDE THE CASING PIPE ATWFF COMPLETELY FILLED WRH E PRTLWD CEMENTGROUTATSUFFICIENT METHCM ETOINSURE SHALLBNOSETTASAP ROVED BY WE METHOD RGROWING SHALBEASAPPRpVECBYTHE PERMITTING AGENCY. 5 R IS CO TX "CONTRACT OR MAYSUBBTIIUTE A URGER SEE OWING CPS N PIPE HAVING THE E SOB BE ACCOMPLISHED BEFORE PIPE CONSTRUCTION BEGINS, M SN OWN FR9EWER MIND. gLLADDITIO N OUSTS B. THE BRING SHALL BE PERFORMED FPOM'UPSTRFMI' TO ALL BE INCLUDFB $XALLBEIHCLDD N E01 WE UNIT PRICE BID FOR BRINGAN D JACKING MOWNSTREAMT DIRECTION MINTAINING THE CRITICAL DOWNSTREAM INVERT ELEVATION.SHOUL THE 80RENOT BEON GRACE ,AREVISED FASTENBRCEMPIPEW/ P UNSHALLBESUBM1TTEOOPWCFRMPAOAL HEAVY DO' WOES. NUTS T. WE"ING OPERATION SHUNT BE CONEXCTED IN AND WASHERS MpNTRAFFIC WINNER FLOW OF IS NOT IMPEDED ftUNNER33PALLBE MIN. 2'WIUS ---� MIN SUCHAMMVNERSOASNOTTOCREATEAHAZARD B. IF AN OBSTRUCTION IS ENCOUNTERED DURING THE BORING OPERATION. WE AUGER SEAL BE WRHOMWN THFE%CE35 CASING I'M CUT-0FF, CAPPED MG THE INTERIOR AND EXTERIOR '1V VOIDS SHALL BE COMPLETELY FILLED WHt POWIAND CEMENT 1„•,�% GROUT UNDER PRESSURE. NO SEPARATE PAYMENT FOR UNSUCCESSNL EMES. SWIDCONGRETE BRICK 1 B. CONTRACTOR$NALLFIEWD USTANDINSTALLPR°PERPPE AND 13 MORTAR, COMPLETELY BRACES TO ACCOMPLISH GRADE AND INVERTS AS SHOWN ON THE MANAGE. FILL VOIDS BETWEEN BRICK WITH MORTAR_ CLOSE EACH END -":. 10. A MANUAL -CONTROL STEERING HEAD OR OTHER GUIDANCE SYSTEM RCASING, ISBWMMENOEOFR BgB:530'DIAM. MUM LNyGERAND FOR BORES EXCEEDING 100' IN LENGTH ORASSPECIFIED. .;- ,n CLMPLETEV FlLL�; 1t. 9UBCR1RpCTRS $IULLAREB TO ALL PRIAT REWIBMEW8 VpDWTSIOER ... ,r"pY, :, ANC SHALL PROW DE MPROVE°INSURANCE MRTIFIMTEG AS CASING WRTIWT REWIRED. SEEN /''::"r 12. WMPX`TRBHALL EXECUTE AND PERFORM ALL BWNBMENTS AND CONDITIONS STIPUUTED BY THE PERMITTING AGENCY. RJDI CARRIER 13. SEE MG. M.B SHEET i OF FOR ADDITIONAL INFORMATION. PB SOLD-12GAMIN. STEEL CASING � 14. CARRIER PEE FOR PRESME APRIMTONS (WATER ENINSSFORCE w3ERSGAMIN MAINS) SHALL HAVE FACTORY RESTRINED JOINTS CARRIER PIPE FOR CARBON STEEL GRAVITY SEWERSHALL HAVE RESTRAINED JOINTS AND MAY USE SECTION"A-A"CARBON STEEL CARRIER PIPE BRACE RESTRAINING GASKETS SUCH AS FIELD LR SUB STOP M R DWOR APPROVEDGASK:TS, BORE UNDER ROADWAYS/RAILROAD S PUBLIC WORKS COMMISSION no. DA E REVISION NUTS FAYETTEVILLE, N.C. p00Eo 6•DARRIERPAPE Is 1. y11'OO TO CHART SHEET No. DWG-N6 M.6 OwG. ar: PRO WATER RESOURCES z July10 REv1sED NrnEs, saING CHART zRz DATe JAN. D1, zB14 APPROVE ar: J.ea, ENGINEERING DEPARTMENT 2014MBOW ROAD RAII 3ED \ VALVEISLOCATEDINNON- W NOTES: \ TRAFFIC AREAS. SEEVALVE PAVEMENT- \ BOXPROTECTRRING DETAIL I, ALL MATGRUMU) I_ BE IN ACCORDANCE WITI PW(:9TANMRDS OURS - \ 4"min.� 2. RESUENTWEDGEG4TEVALVESHALLBEAS CONRETE ,I .-y 1?.TURF I MMUFACNREO BY MI@LLER CORP.. y TRACER VNRE µAERICMI DARLING OR LLOW CORP. L 2m..1 ® j _.. -FINAL GRADE !I: '. < °°L°��:I I.- 3 ALLVALVESSRULHAVEr SQUARE , LJ. - OPERATING NUTMID SHALL OPEN m� ,. '.� -: COUNTERCLOCKWISE. .f _ -.'... _.:�--WNCRFTECWLAR - 4, VALVE BODY BONNET AND ATE SHALL. BE - - SQUALL BE PLACED I � WHERE VALVE IS ANp -: IN ACCORDANCE WITH AWWq CJiOB/C515 TRMFICAREA ANDDMEET. �--VALVE BO%- 5 VALVEBODYANDBONNETSHALLBE /.; SEE DETAIL / - COATED ON ALL INTERIOR AND EXTERIOR SURFACES VISIT N U81R BONDED �� N W CONEYS IN CIEWI ACCORDANCE WRH AWWAG8505p. I BRIM( 0 EAL SEWIRED EpC(9 H ECTION. @ ) HA VE 8. ALLFEWO 24'AN0ESSUE _ _ OF pSpFE WORKING PRESSURE OF 25B P51. - I MIN. 12 GAUGE, 9MGLE III i. SEE VALVE BOX DETAIL FOR ADDITIONAL STRAND. COATED CRPE� INFORMATION. TRACER WIRE (SWLL BE INSTALLED BETWEEN S. SEE VALVE BOX PROTECTOR RING DETAIL --� V&WSAN....E FRAD PRORALINFRMATON. ALLED ON ALLNR " e. VALVE BOX SECTIONS ARE REQUIRED. THE ALLIC PIPELINES) USE OF PIPE IN LIEU OF VALVE BOX AI'V CSHALL BESECTIONS SHALL NOTBE PERMITTED. OVEDBYTHEPWC 1��R I-V MINJEOT COORDINATOR. VALVE IN TRAFFIC AREA _ VALVE IN-N _____ _ NON-TRAFFICAREA VALVE N.T.S. SHEET NO. DWG. NO. WA t OFi OpTE. -.1.- Q I. VN •- O O7 OCN Do Q % H N N C') A, W }_ V DA C a AU N •- . 00 O n O D GO y Q �°z" U E -y �V Ito 0 O V tZd. C1 DO CQ c i p Q) M o� �" he `0 ") J x 0 ( M 0 }V Q C J GO } 1_ ^l M W D` qM o a .0 �� L/_ a z rL: 11111111111 X\\\\11 ///////,J'% ' ` 11 I " - S S OF Y 9 rS - S AL =_ C: 03145 E = - _ _ N= ' ^ s 0 - 41 N E. v `' 11 /IIIIIIIN111 17 rN 4) W m w 0 O Z Owner: HCC INVESTMENTS, LLC CONTACT 3077N. AMINST HOPE MILLS, NC 28398 (910)237-5846 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Project: THE COMMONS AT BRIDGEPORT tax id #: 0426-91-9724 township: Cross Creek county: Cumberland state: NC UTILITY DETAILS CONSTRUCTION DOCUMENTS job no.: P13-084 date: 02/18/14 drawn by: TA survey by: MR checked by: JN sheet no.: C-12 INOTES: MANUFACNRED BY SIOAU CORPoPATION 1 B NOTES: NOTES: Q ram- QQ�QQ L VALUFACTUHALLBEIGACOFF-TYPE - " STANDARD PENTAGONAL ONPt 1 I -ylI E(VB402), MER UNION B&558ERIES, STAR OYPI I�-OPEMTING NUT OPEN 1. ALL MATERIALS SHALL 4, BLOW OFF ASSEMBLY NOT 1. ALLMATE0.LILS SHALL BE • CJB'000p, OR w � GAUNTER CLOCHYIIBE NOTES: BE gPPROVEp BY FOUL TO BE RE -USED UNLESS APPROVED BY PWC. APPROVED BY PWC. L FIRE HYDRANT HALL BE MODE I PIPE PRODUCTS 3'; 9 L6 R. WHEN INSTALLED IN iTP 3 221n'NOIILE3fl 1-0-02"NOi21.E MANUFACNRED BY MUELLER LO. PAVED gREA METER BOX S. REMOVE ASSEMBLY CONCRETE DOLLAR IN ONCREfECOLLAH IN 2. WHEN INSTALLED INAPAVED _ WITH FIRE H0.4E COUPLING TXREAOIN HYDRANT DO NAAW73)gNO SHALL BE BET f/d'ABOVE FROM BENEXENDING HE CONCRETE THRUST BLOCK PAVED AREg6 CONC. PAVi..T 3CONC. CONCRETE CttIpR CONCRETE THRLV4T BLOCK AREA MEFER BO%SHALL BE U' y �� XWIRANT CO. M ) FINISHED PAVEMENL PIPE WHEN EMENDING THE %iOTELTORRING IN PROTECNRRING IN DOING. DMECT PAVEMENT GRACE AND �• r 2 VALVE CASHALLST TPIECECLOSE ACCORDANCE (OPROVED EQUAL OW PSPHALT NON-TRAFFlC DOING. PEROEf'VLN''1] C) GINNED CAST IRON 9I.IP-TYPEVKVE BOX STANDMD. NOZZLE CAPE SHALL MEDALLION OR APPROVED EQUAL. GRADE AND PAVEMENL MAIN ASPHALT NIX{-TRAFFILgREg6.RING PAVEMENT GRADE AND J I� DETAI VALVE BOX 2. mlw (SEEVALVE W% AREAS. NONi BOX PAVEMENT FF AST REO TO • 0 WINAMINIMUM THICKNE6S OF 3I18'. I BE SECURELY CHAINED TO THE FEATHERED TO TOP OF 2'min. OEINL W)) FINAL E DETNL W]I AREAS. VALVE BOX TOP OF BOX CAST IRON BOX � O M Q ^ HYDRANTS BODY 2. ALL NAIVES ANp HYDRANTS SNpLL BOX. TO BE INSTALLED IN IIH-------24' 10" SECTION"A-A" PLAN 3. VALVE BO%SHALL HAVE RNSEp LETTERS FIN GRADE' 1 VILLVEBO%- HgVE M.J. CONNECTION$WITH IRON FINAL ORpDE t2 Y ACCORDANCE WITH I 2 SHILL BE USED IN PAVED MEAS. � CV CO I' RETAINING GWIO M.J. RESTRAINT. 3 METER BOXAND VALVE PW11.T ` RVATER'CA6TIO COVER. _ �._.. � min. DETAIL W.B. 6 METER BO%gNO VALVE 80 • N M BOX SHALL BE IN B Sma S. % y O 4. VALVE BOX HgVE3R'HOLE DRILLED 3. FIRE HYORgNT3MPLL BEFIELD PAINTED ACCORDANCE WITH PAC 2'9CHED 80 PVC B-. d'mM. Ia 2ry 2•BM33I(y� SHILL BE IN ACCORDANCE (7 A4 t_ g ( -4-12' IN ACCORDANCE WITH FOUL STANDARDS, DETAILS SIT {-,',.;;: 6'mm. `+:I' ":*-'� ¢ H WITH PWC DETAILS. j_ VI H 5y4^ IN TOP 00 SECTION THRU WHICNAtIa'xt-In' � �� �4� _ r .lyl. _ Lt_ ivl0'y�I GN.VpNIZED BOLTSHALL BE USED TO S DEL BEFORE PROJECT IS ACCEPTED ASPHALT y� SLIPTYPE C.I TgACEq WIRE Yrrvn. "mM. 03°ELBOW rt• 1-��St/4' SECUREAMINIMUM I2 WUGE, SINGLE QIS -- BRICK SLIPttPECI.� TRACER WIRE VgLVE$O% -TB 4. VALVE PoRBLOW-0FFNBE Z � v3 ♦� ]JIB' _�' SEE CONCRETE VALVE BOX FINAL GRADE I METER BOX (a O Q - - r STRAND, COATED COPPER OR COPPER CIAO >ICm BGAE VALVE I TTNRUSTBLWK 4. HYURM'T VPIVESHALL BE PUCEDA9 t0• a T6DR21 PVC FIANGE� INSTALLED PETER IASTSERVICE. y •� � PIK TMLNUUMERFOR HALLBE FERROUS _ ♦I / .DETNL NOTPLCLOSEACEVXF BLETOOPOSED BUT OD FIANCE T[ DROP LID xETWENTIOU HE0.9HALLBEUBED NOTPUCEVALVEIN PROPOSED OR YSLIPONCAP BRIG( S 9 CENTER T9N331 PIPENMEER LLI V ON 00 00 HANDTIG NUTPNDIN6IOE OF BO%.TIGHTEN 1 -I Z 32 -.I - EXISTING CURB M'D GtITIER. IF THE L O TINT FOR PVC PAG BRICK - 2q u..B BOX C O 0 - O J- 2' RAT® p v ..._, I : 1 - STREET IS SOILPNO NO PAVING IS TO BE JOINT FOR PVC lC K T f NAND TIGHT. �� FINAL GRADEr d"min. TRACER WIRE BRICK BRAS4 ' y O 1 'mm IAPTOR DONE AT THS TIME. TIE LOCATION OF THE 8'mu' �122-BRASS NIPPLE t ,k 1p- NNFLE Ci LL C _ 5. SCREWNPEVALVESOXESARENOT 1-'�� B'DI PIPE VALVE BE OEEgMINED BY THE METER BOX CONCRETETHRUST % ` - 'Y COMPACTED SOIL jIYP) 'Z y U C ACCEPTABLE. "> � T -1 _z. PROJECT COORDINATIOq. CONCRETE COLUR 7 (SOCK, PER PAC d COMPACED601L(IYG) s'f BRICK BRICK }'O` - -� ,+p " - 1': VARIABLE SLIE PLUG lQ Q M/ y IN PAVED AREAS OETNLWt] � '` I4� W 6. DIMENSIONS $HOWN VARY BASED (NON I ` i`' \r SEE NOTE#d I 1 a. FlRE HYDRANTS SHALL BEPUCED qS CONIC PROTECTOR 2' BAIL VALVE, � �M1". 8DR-21 PVC 1 &LOTTED VALVE BOX 2'BgLL VPLVE i O N FITS ONTOP OF 2'PIPE (LENGTH/3 { 310TTE0VALVf BO% V �"3,. BRICKTO BE PLACED UNDER PNE 345n"B \ DIRECTED BY THE PAIL PROJECT ggpA6. (SEE VALVE � FITS ON TOP OFTPIPE TMPEOY � + Y BN.L VALVE BRgBb PIECES MIX.) rI�M I O THE MANUFACTURER. ACTUAL DIMENSIONS ,IjL� , r'--UN019TURBED \ � DI TEE, HYORPM TEE CWRDINATOR. RING IN NON -TRAFFIC N,Y,: REWIRED. TNO �" W � � M � Q SHKLBE APPROVED BY PWC, tjam- - AIL �t.ORTAPPING SLEEVE y tI A� BOX DETAIL W]) BRICK TO BE PLACED UNDER PIPE F( £ Erb 2 r. VALVE BOX SECTIONS ARE REQUIRED. THE VARIES \ AS REWIgEQ (SEE 6. HYDFNJT BPPNCH 6HRL NOT BE BACK 12'MJ SLEEVE pyCD1 F NIPPLE TA $ TOP UBE OF PIPE IN LIEU OF VALVE BOX \ TAPPING DETAIL) FILLED UNTIL INSPECTED AND APPROVED BY B'BRq$S NIPPLE 2'FVC 6DR2i WATER PIPE 12"MRASSNIR-21 PVC SCH MIFF = �i YTT \✓ MM U C > PWCPROJECTCCOROIIUTOR. IT y, •C ..y �I SECTION SECTIONS SHALNOT BE PERMQTB. LTLACEDM SEONE \\_ 2'SDR-Y PVC SLOTTED MIT C� >LACEDMA MJ.CONNECTION WITH IRON BRICK VALVE BOX ADAPTOR Z i X O n � J Y 1} 0, iMCNG WIRE31 Nl18E INSTALED ABOVE ORNN OPENING RETAINING GLAND MJ. RESTRAINT ]. GATEVALVE AND BOX 3HALLBE IN TRACER WIR IL C V/ OUTSIDEOF BOX SEE COTE2gNp WITH IR we WITH PWC STANOMOCETgIL. L_ J � PESTWJNING OEINL 2"SOR-21 PVC WATER 2'01YLONG BRAS6 NIPPLE YBRAS6 F.LP.x PACKJOIM 2'BFASS F.LPZPACK O >-- 5, 2'BALL VALVE FOR PVCPDP➢fOR W m � � d d 8. REFERTO PW'L DETNL W.B FOq 0, HYDRANT E%ENSIONS PNO/OR MAIN WHEN REQUIRED PIPE BEYOND JOINT FOR PVC z � LL 3 B'BRA95 NIPPLE 2'0 BRP99 NIPPLE M SSW` INSTALLATION REQUIREMENTS. OFFSETS SHALL BE APPROVED BY %YC BLOTTED BRASS NIPPLE SHALL BE SLAW ADAPTOR V PROJECT COORDINATOR. IFMAKINGWET 2'BCHEO 80 PVCCONNECEDWHRASSF.LP. Y9 BRg34 BALL VKVE YBRA88 (f v O(Y) TAP SEE DETAIL VALVE BO% PVC ES, 2'BRq$$F.LPXPgCK g0•ELBOW z V W.15B PACK JOINT FOR PVC Yq BRhS6 NIPPLE (12') JOINTFOR PVC CONCRETE THRU6T BLOCK W J M a II� BOTTOM ADAPTOR ADATOR PERDETAILWIT LT � Z SECTION WATER 'X2' TMPING SADDLE T 6DR-21 PVC I�fn' II�� 8 � MAIN TBMSS F.I.PZPAC MJ PLUG YO BRASS BP1yVALVE VARIABLE SVE WgER MAIN --III JOINT FOR PVC TO 6E REMOVED 2N BRASS NIPPLE (tYl 10.f14' gDATOR FORRWWCMgPTOR KJOINT 2'BMSS NIPPLE MAINN EMENDING TOP SECTION BOTTOM CONCRETE THRUST BLOCK '%2'TMPING SADDLE 2" MAIN LINE VALVE VARIABLE SIZE MAIN LINE TAPPED 2" VALVE BOX FIRE HYDRANT AND 2" BLOW OFF 2" VALVE INSTALLATION NTs VALVE INSTALLATION NTs. N S 2" BLOW OFF ON NT 2" WAITER MAIN DWG. NO. SHEET NO. W7 SHEET NO. UWG, NO. Y11.is OWG.NO. W.1. DWG. NO. W.7 fJA DWG. NO. W.1SC f OF t SHEET NO. SHEET NO. SHEET NO. GATE JAN.01.20N t OF 1 ME: ygN.Ot, 2Cta 1 OF 1 1 OF 1 1 OF 1 GATE: JrW.01, m14 DATE; JA.Ot.2o16 DAE: JPN.Of, 2016 \\\\\\\\\1111111111111//////i� xO16Wl VALVEBOX.Mwg 20W-W13 FHCC.OxT 2014-W153 BLpW0FF.Mg 20ibW15A2 VALVE INSTALLATION C 0 // Mp 201bWi5C 20LOWOFF.GWW \AA \\\V\1111111 - /-CONCRETE --- __ NOTES: MSC.-- _ 1 NOTES: NOTES: THRUST MIN. BEPAING AREA EgCH DIRECTION 1. THRUST BLWKS3HPLL BEINSTALLEO 15/18.6p. t. PAIL MATERIALS IN ACCORDANCE WITH q(DIA) B T-HEADGW4p BOLT 1. ALL MATERIALS gXALL Bf INACCORDNICE � ' of iXqusTNsauNRE FEET NOTES: Ma'rvT aRorvzE � '-ncHTEN Ta ]ssa T.LBB. (TYPICAL -NEW FIRE HYDRANTS CONNECTED TO EXISTING WATER MAINS) � BLOCK (IVP) ON WC WATER DISTRIBUTION LINES B' THE W00.0'OPEN'ANO PWCSTgNppFDS _I _ WTTHPWLSTN®AW6. SLEEVE BNRL C 60. HEAD PIPE PLLW ! _ _ SEAL I�aetl onwil wpppltlnp wWaof2W3 prt@S 2N peI9lM pamum) THgU 1T 0M. IN THE MANNER SHOWN. 1. 4'SpR-21 CONWITSHALL BE INSTALLED -__- ARROW INDICATING �-� -( 1 BEDWTILE IRONASTMPS3B. = L = 03145 -'-' -- IN CONJUNCTION WAYATER MAIN CONSTRUCTIONCOUNTERCLOCKWISE 2. R415E0 MAEfACE SHALL BE REQUIRED TO PROVIDE PIPE i TEESd 00° SEE PAC STANDMDALT. RESTRAINING r 3'<18"OIMWN �:, TPAVEMEMAROPTWVAY i �4SELBOW 22-112° AN09HN10E LOCATED 0.5 SXOWNINTNE DIRECTION CPBT HERE TAPPING SLEEVE �= SUE DFADENDS ELBOWS flCR0.43E3 ELBOWS DETNL W.IB FOR ACCEPTABLE ''. '. FOR PROPER ALIGNMENT OF THE TAPPING SLEEVE. � 2 MECHANICIAN. NOW TAPPING SLEEVE83HALL 1, pROPO6m FIRE HY0MNT96HALL BE IN6TKLED IN ADVNiLE OF SEWER T. E%I6TING VALVE DfTH3 ARE MEfSURED FROM E%ISTINGASPIW.T ANDpR i �.AH C ' -- � ----- PLTEgNAE RESTRAINING SYSTEMS. ,1 - FRONT BEAB MPNUFACTWEp BYCLOW,Mfl H, MAIN COH8IPUCTIQ`I. THE CONTRACTOR SHALL SEOUENCETHE HYDRANT VALVECOVERTO THE TOP OF THE OPERATING NUT. THE BARFRINFORMgTW �� �� }}�I``� !!� � 4� _3 2 'LP r - ��--_� THE PLAWPROFILE. 3, ALL VALVES SHALL HAVE 2'6pUARE OPERATING NUT MUELIER ORgL1ER)GN NN 3HPlLBE INSTALLATION TOPRWIpEPNG'OR SUPPLEMENT WATER MAIN FLUSHING IF SHOWIJ IS CALCULATED USING AN INTQtPoLATIOH BETWEEN THE TWORMODD j �'Y(iR1 r 1 P130VE DUAL UNLESS SHOWN OTHERWISE ON UI __ _ I j I '_ `c I ' ANO SHALL OPEN COUNTERCLOCKWISE �� FURNISHED WITH 9RITGLPNDS, SPLIT END 0; BREPi(B IX:CUR NEME6T VALVE6. THEGRWNO F1fVgTIONAND/OR WqO FORTME PROPOSED ii nn / \\\\ 'r //llllllllll\ 0 B• T m s .I i I __-,.___-3- 2. PIPE GgEpERTHAN 121NCH �I; ; ',_ ' 2ALLEXCAVATION65HKL COMPLY WTH THETERMS PAID ' (�2• f5 21 1111 B DIAMEE0.8HALL REQUIRE RESTRAINT 'I �' ; + GPSINI'. BOLTS. ETC. THE OUILETFIANGE FlRE HY011]WTIS INTERPOWTEO FROM CRO439ECTONSANOTXEftANGE � I T CONDITIONS OFTHE CONSTRUCTION STANDARDS FOR 4. RESILIENT VIEWEGATE VALVE SHALL BE PS "-- ---- SHALL BELL f25 PERAN51016i COMPATIBLE JOINT PIPE FORTiE PROPER LENGTH. .� E%CAVATIMSINOSM-WET MDHEALTHREGUUTnNBMAINUCORERICAN 2. FIATMMAMLONNEMDV&OE%STINTVA NPNSSHN18f MNIE ELEVATIONBHW"THEPRO%IMATE.FIRE VID lS Mn INSTALLED IN ���III 1 ,_ of J�4 0 I -UNDISNRBED 601E FOR CONSTRUCTION'. LHAPIERXV110F TITLE 28. CPR, PPRt ANTEING GLOW CORPUEORAPPRO EOAEpUN.. _ �H�ZI�NC PUTTED WITH MPROVED TAPPING VALVES. UWNOATN'PING8LEEVEMID VALVE BY WETTAP WNNECTION. THE TAPPING ACCORDANCE WRH THE FIgEHVORANTANp VALVE INOTALUTON DETNL 3. COMPACT FSEDWI6ARENC T6 Ui BLEEVETIO VALVE PRESENCE TESTED / \ -- THRUST UNDISTURBED gCCETPBLE. STANDPRD FlT➢NGS � WHEN REpUIgE04•SDR-21 1028 THECONTgpCTOR SHALL HAVEACOMPETENT PERSON -6=NO 8312E BOLT /IIII1111111111N v' ° TIGHTEN TO l5.0p FT. EBB. 3. DIMENSIONS SHOWN ARE FOR REFERENLE AND ELB W BLOCK /SOIL SHALL BE USED WITH CONCRETE 1 1 w' - + ly _-(FIBEROTIL CONDU?WIB'WtDE ON SITE AT DURING EXCAVATION AND BACNFRLING. '`. HOLES STRPDDLEQ ', COMPLETION OF THE TPP IN THE PRESENCE Of FINE OWNER. S. THE CONTRq(:TOR SHALLSUBSTIUE VPAIOUS BMAELDFPTHSWITHIN --4 - - POLYETSTALLEDA MINIMUM TAPE R _. 5. VALVE BODY,BWITH A NO GATE SHALL BE IN TAPPING BAC SLEEVE MgYVARTBALL BE SIMILAR INATURER, AFEAOF THRUST BLOCKING. i '�' ♦ Y1 `..1tY5 LB. RSA) '^ --- --- THE PROJECT Q.E. FIRE HYDRANT N0.11NDICAESAS'-0'OETH OF BURY, -' BEARING - NBEOVIECOEDAMINIMUM OF 3. CUTS IN PAVEDCTOR AREAS.HALL TRENCH BOX SNORING INNIOPEN z ACCORDANCE WITHgWWACEW/G515 PAID BACK SILEETHAT ES SHOWN ON AND SHALL. IN SENATE TO 3THE OF THE PROPOSEDINHYDRNTPRIO UO REQUESTING TXE RIDICI C A SIM DEPTH OF OCNITION REQUIRE ANTN0.2 4. THRUST STOCKS SHALL BE II /// ;,♦ � "- `.;-1YABOVECONOUIT) CUTSINPAVEDAREAS.EE WIDTWIDTH.$HALL BE MAINTAINED \ NSFBt. T-HEAD BOLT THAT SHOWNPND SHALL NOT DEVNE IN PACIPPIPY OF THE PROPOSED P HYORPMPRpRNREOUESHIFT NMCATESHEMA SETHOFBURYACT EMIN ORI ALLEOUIRISRORM DEPTH INSTALLED ONSEWER FORCE ��/"; �/ III; (SEE NOTED TIGHTEN TO 0 T. LOS. CONSTRUCTION BTPJ(EB. THE PROPOSED LOCATION MY BE SHIFTED OR OF BURY, THENASIIBSTINTONWILL BE REOUIREDI gLLE%TENSIONSSHNL ,1 I.; ATTHEWIDTH. ESSEFIIIALDTAILs RELOAMORYT1EOWNERIFCANFLICTSFJOST(LEGA89ERVICESUGE, BEAPPMWDBYTHEPWCP ECTCOOMRUTORPRNIRMIN6TA UM e MAIN IN THE MANNER BROWN. ;�O/ - �--�-r�--,- fiIUMM,PF. VALVEBOOYAND BONNET SHALL BE COATED ON ALL 4. OF COVER MUS BE MAITAIEDWHERE RESTRAINT BONDENTMJD WITH TXAFUBICN F 4. THOROUGHPIPESURFALY TO PERMIT GLEANED TELEPHONE. ETC.I. AND ONLYAFERALL EFFORTS OF SUBSTITUTION ARE E%HAIIBTED. BpC DEN ITY OP ESI tY -- BONDED EPDXY IN ACCORDANCE WITH AWWA ^- -- - -- -'-I,. PRIORY RISTAUPERMIT FOR gGOOD BEPl 5. IF SqC-0REE IS USED. MI%ING T' � �"^-.-__ABOVE PIPE IN 6'LIFT$(%% OF LOVE0. MUST BE MNMNHEp WHERE PE3igNNTJOINT "I - / -�., �/ I' PRESSPECIFIFp PN03.5'OF LOVER IN PLL OTHER LOCATION6 --'- } MUST BE ON SITE U'.ILUINGA II' MA%OENSITYCOHESIONLf3S SOILS I I G550.90. --- pRIORTOINSTALUTION. IN THETION AN MA $HILL KOCUREMENT THE EXISTING WARE 9. TRACTOR SK PTO TIE ALL FIRE HYDMNT TONEW MAIN, SEE GROW-0FF DETAIL FOR .. : / I B3%MIX DENSITY COHESIVE UNLESS SHOWNOTHERWISE ON THEPW4PROFILE. - -I -- CURIFICATION OF CONSTRUCTION ELBOW'/ NoCONCRETESHA. LI I--. / IS ) I 'i HY ANTLONNiOMATENDER AND LOCATION EXISTING WATER MAIN CDNTRACTORSMALLPROVIDE KLLABLR,TWL9, EQUIPMENT, MATERIALS, B.L0'NA SOIL ORSELECTIS DEFINED T ALL VpLVE324'AND SMALIERSHP1l. HAVE ASAFE S. EXTERIOR OF TAPPING SLEEVESHALL BE MATERULL,SRE,LVS6, DEPTH ANDLOLATICNFORFACNINDNIDUPLFIRE SETC.HALL BE TRANSFERRED TO NEW COMPLETE IGFt UNE AFTER FIRE HYDRATE{ REQUIRED At OFAD EN08 .II WATER MAINMATERIALAND SHOWN LENGTHS ANDTHEIN OUIRTO SUPPLYSTOACOAMODYPE$BPING HYDRANTS SHALL NOT BOUT OF NVICE MR UNETER THAN 2HOURS, ACCEPTED. B. NO CONCRETE SHALL BE 1 i_ ` AS'NATrvE'SOR EXCAVATED FROM THE TRENCH. I WORKING PRESSURE OF 2W P51. COpTEpw/[CMTSASPHALTIC VMNISH IS FACED ON BOLTS. PLASTIC. �`--' -- BE AS THE DF VIVIN AND SHOWN "' MIL-G50. I' ' - ON TNEOMWINGS. FREE OFRWK9, FOREIGN MATERNL. PNO .-.V � D O LENGTHSAXDOTHEftWWI{ffDhWERIPL6T0 ACWMMODAE EXISTING HYORANL83HPLLNOT BE OUT OF SERVICE NRGREATERTHAN 24 HOURS, HORIZONTAL BEND DEAD END JOINT FITTINGS WITH PlA6TIC. l '..{t ,i,l FROZEN EARTH. SUIg ¢ T Za; B. SEE TAPPING SLEEVE FOR .- _ MAERNLS ENCWNE�ON4D 9TE CONDI110N9. COMMCTORSHALLNOTFYTHEOCONSTFULPTFlREOEPMTMEMOF OUrOF 7. DONCRETESHALLBE , -$OIL SUITABLE LOOSE TRENCH - - -- ( o' PDDITIONAL INFORMA90N. A MINIMUMS000 i. I' II y - -- \ Q 8. ALLTAPFlNGSLEEVESSHALLBE II:- v B. BEDDING TRENCH BOTTOM. MATERIAL TRENCH Ei�Sl m III HYDROSTATICALLY PRESSURE TESTED IN SERVILE FIRE HYIXNNTBPRIORTO WN6TRUCTON. 1} III 4' MIN SUITABLE LOpBE _ m p_ - V - W 1 O "' 9. DIMENSIONS SHOWN NYE FOR REFERENCE MAY 5. THE INFORM,GEXS NGPWC ICORCS RE HYDR4Ni DATAGHAAP WP3 SIDEE%CAVATIONS- ,_ EXCAVATION (SEE NOTES6fl5) _ AWORHALL BEVTIEESSEDANDAPTIONB. PRODUCED USITHE%STN WITIO IS INTENDED OVAIUME FlECO 10. SOD SHALL BE REPLACED WHERE MPUL BE REPAIRED PAIRED RREPLA EDT 'Nt WILL NOT BE PAID FOR UNLESS SPECIFICALLY APPROVED BY VARY UPON MANUFACTURER. VPLVES SHALL I O. ALL TEST SHALL BEWRNESATIONP AOR TO BY SUT1SNTION. THE INFORMAECO8TFENDEDTOg3318AGEDTOERIFY&, THE PROPERTY OWNERS SATISFACTION, TOLCLUDE IREOORREPUCEDTO 610E E%CpVATIONS(tYP.I (iYPJ AGAINST UNDISTURBED BOIL AND �'_._-__UNOIBNRBEO 1Hf PROJECT flEPRESENTATIVEgN00NLY '. BE SIMIURIN NATURE TO THAT SHOWN AND SHALL 1 PWC PROJECT COORDINATION PRIOFITO BUr I6Ny GUAMNTEED. THEWNTMCTOR I6 ENCOURAGB TOVERIFYKL THE PROPERNOWNER'68AT6FACTIIXi, TOINQUDEWITHIN RIGHT-0FWAY. SHALL BE APPROVED BY PWC PROJ, 901E FOR THE AUTHORIZED SHALL PR. L _.1 +I NOT OEVNE IN ESSENTIALDETAILS. BE Y O O B ID i0 O I_. -- ` BEGNNING TAPPING PROCESS. THEPROVIDEDINFORMATION. THISINFORMATIONIOAPPROXIMATEANDMAY (NO SEPARATE PAYMENT). COORDINATOR PRIOR TO PLACEMENT i`- ]. BEDDING IMERIA SHALL BE PROPERLY RODDB ! ID. ALL TAPPING SLEEVE99H4LL BE HYDROSTATICALLY GGAPKETTHIOUGGES) 7. 9EEDETAILSW.BNAWATFORADDITIONAL NOTBEACCUIATE. -. - CONTINUOUS 12 GA. AND COMPACTED AROUND THE PIPE HAUNCHES. MJ. RUBBER ENp M.J. RUBBER SIDE --y "'- SINGLE STRAND COPED - ' --- - PRESS UREESTEDINACCORDANCEWITHPWC G#SNET GASKET ENOE2 REQUIREMENTS, 8. THE WNTMOTOR WILL BE REOUIREDTO SUPPLY VARIOUS IENGM80F B. USE OF PE STRAP JOINT DUCTILE COPPERWIRE REOUIRB B. EST FOR DENSITY OF COMPACTION WAY BE MADE AT THE TCp�- R� G-N0.8812E OF SPECIFICATIONS. TEST BE WITNEB6ED AND BMRELSAND HYDRANT EXTEN910N9 (NO MORETHPN ONE HTIXUNT. IRCIPIM1 SEREOUIREDIFSOIL FORKLNON --- APPROVED BY RYC PROJECT COORDINATOR PRIOR - FEIEBOX OPTION OF HE THE CONTRACOEFICI NO AD SHALL T �, �. _. -. A_ B. ; BOLT SLOTS EXTENSION OPOFEPETINGCU GRACE. TOP Po PAVEMENT. CONOITION6 p0 NOT ALLOW THE UBE VAO (FgOM VALVE BOXTO CORRECTED BY THE ENGINEER MAY AVE COMPACTION COST TO BEGINNING TAPPING PROCESS. IN REURACE A TOP OF EXISTING CURBGP N E LEV TI PAVEMENT, SSAROC AJUL CBLOCKS. YALV£80%) TOTHEOWNER.TXEENGINEERMAYIUVELOMPACNON WON GRACE ANGORRKi IOR WAYGROUNDELEVATIRN NCMWS . C; �'' ESi PERFORMED AFTE0.THE BACKFRL S COMPLETE. r ADDIBE REQUIRED TO MAINTAIN AINTA MIDRNET COVER R1MI APPROVED BY ONNECTORB j 10. ALL VERTICPI BEN0.55NALL(1E r B%B 8%6 S%g 12X8 13%0 'i2%12 18X8 i8X8 '. 18%12' 21X8 24X8 24%12 24X18 24%24 30%8 90X6 30X12 30X16 30%24 -1`.. I- RESTRAINED USING RESTRAINED CONTgACTOR SHALL BE REQUIRED TO EXCAVATE TO ,- --- _. ____ _.._. _,-_---.- __. P_IPEXBRNiCNj__ 1 -. 1 ___ _ _ _ _ ___ PROTECT COOREDTOR.(NO SEROPERCOVERA6APPROV£D BYTHEPWL -' VARIOUS ELEVATIONS FOR DENSITY TESTING EXCAVATION, !VALVE MAY WRNS ADN -9016 - --- __" ` - -�- - PROJECT COORDINATOR NO SEPARATE PAY). -j 1 �WNCREE " JOINT DUCTILE IRONPIPE. BACKFILL AND RECOMPACTIW SHALL BE PERFORMED AT NO A 8 C D E F G H J K L M N R S T TO WACC a031-.M ]010 ]i- 9016 ]018 9018 13018 ]Of8 9U18 13018 fl.W 13.5 19.0 23.5 IUS 11.W 13.5 19.0 5 322 AULBEARSHALLBE KET SIZE OPEN _W/ACC SURFACES ADDITIONAL CO3T$TO TNEOWNER. 1_-4 4JPo -6)114 11 1 9 ]1/2:: -4]/8 4J35a4-29I37 21n '__i V2 9--1b1R 1--.8-1 B3I4 1/4 -l4 '-11E-d B 1.11 i31 J1 _. 31 31 __31 131 Si- dt-31{�{-31__-+.]1 SIBS 3511 -3Ol .2 .2 '-WRFACES CLEAR OF PIPE -8 _B]R :-B-1/0 1 tSrS 11 aV3:6]18 6b.YN _.__ ] 2t2 - &12, 11 ;'175IB '113/4--I B]9 114' 21 115- C-J„1_]/B�&t[t6 i_..9 11.5re 11 b]�112-7J0 �1b11bi 1412 tN@, 185 yt9_6 t9b23_25 23.35 23.25 23L�Y1]5 SHELL BEAWINST JOINi3TlP.) - --- E 1134 1}718 I}`7re--]&12 1&1/R -- -_ ,_ --�- _ _ __ 6]9 1/4 2B 2]4 - 11&11R 2'i.1/L_3$tR 2]'12: 355 25.5_�b 35.5 35.5 r: AA�t] 4yi3] a•iy]_ _13$] TAPPING SLEEVE 0 &1n _Ig[4 1 ve 1a1a' 1}iT4 nary sne eavu ,_ B viz z 1n n 3/4 I 1}fn t n 141id ''. GROUND 12 ] _- - -__ _ty 17]/9 1&W _9]/8 12$1BM1 1_ }Y16 21n T] 18 2&1(4 ifft/8 121 1N -39 F 570 F t&tn t5 i5 _ 1&ll2_141R.:i (Q1R 2212 Y1J2 Y[12� 1p0 '. lBp-j40 Q_ b.0- 00360 TEE.. CROSS AND VALVE 1n 3D -ti&]re 2b1v1s.R&1vfB }1n ;_ _2a1rz ' 32 - _-, xsre 1 2&va 1&11re vd s5 ltap ' GROUND jiTP.l - _Rd �10.1rz Diu 11]7/B 2Z Fe�3t� 2t 12 ]A �1&1918 ,. 1T-3N61 i]2 21f/d Z4tY{ {I 5y5R IS].4e__[20-t 3/0 9t6';' 79 s23B CONCRETE THRUST BLOCK DETAIL WATER MAIN BEDDING DETAIL TAPPING VALVE DUCTILE IRON TAPPING SLEEVE FIRE HYDRANT N.TS. AND CONDUIT FOR FIBER OPTIC Nr.s. HIS, NTs. ADCiTIONAL GENERAL NOTES SHEET NO. DWG NO. W.17 SHEETNCL DWG. NO, l/II,79.A SHEET NO. DWG. NO. SHEETNO. SHEET NO. C W.9 DWG. No. W.10 pIIG. Np. W.12 10F 1 DATE JPN. M. 2014 10F 1 DATE: JAW. OL 2014 t OF t DAE; JAW. 01, 2014 t OF 1 10F 1 O DAE: JPN.Ot, 2010 DAE: JAN.Ot, 2014 2NiW1]TNRUSTBLOCK.QxO 2011 W19A WATER BEODINp W CONWIT.Cw9 2111bW9 MJTAPPING VALVE 201LW10 TAPPING SLEEVE.Ery •> ba'9 '1O16W13 FH NOE9.Ew9 '� O m m - 7¢ Q a Z NOTES: USE CUSS "B" CONCRETE THROUGHOUT. Z I ~ ~y NOTE: USE TYPE E", "F" AND "G" GRATE �� ~ 00 y HD OPENING PROVIDE ALL CATCH BASINS OVER S'-6" IN OEM WITH STEPS 12'• �m T 0010 O _ 4.i - -- 1- -iION CENTER. USE STEPS RHICH COYVIr WITH STD. ORANIxO B40.e0. r Q p o m �- C� MY � y O a r •_ • yyyXX Z - UNLESS OTHERWISE NOTED. - �" F•� I OP SLAB : OPTIONAL. R - z" NEWNr, 0w W4 WIR mAELfi AT F M S g" WALL 2 ¢ O > O #�' 2 i 12" GFRLLA'TEB A8 Y RECNED BY 111E EHOINER. 2 �* O Omyy / g,r WALL g,r WALL r B" WALL XHOxm PIT, .-! P O+U rl-I a 0 NH g' p iiiEY • Sm-I Z i S D 00 a x Z SmX Z -1 x D M O O ID' x Z m Z S� , TOP ELEVATIO1 � UBE FORYB FOR THE CONSTRUCTION OF TXE BOTTOM SLAB. J Z m p s o ti ¢ m m s � � T� � I "� ¢ y _ ~' � D �: AIF S BXAM OHE9 WNCRFTE PIPE I8 BET IN BOTTOM SLAB OF 00%, AW TO 9Lb p Q (D N.T.S. ,F S mIDDm q'• 4" W<3LL2 xpD�m Y4 WaZLL oyC'3m TD. Xo. eao.W. a2QZLL ^ Z �1 B' B" 8" g" r V as p m T Z -� rj F' U O:I T Z D q.. FOR B'-0" IN HEIGHT NT OR 0,0 U6E B° WwLL$ AND aDTTNI 9LPB. OVER x-U O 9 y O '�I�[�- Q y O � N a F _ y A O � - 1 J _ - � B'-0" TO 18'-0 IX XEIOXT USE B" WALLS AND BOTTOM SLAB. ADJUST � I x � � W Z 'oom QUANTITIES ACCOROINOLY. H r- - W G301-I yF-y.OJ 1-IOr X � ) X e" � mr LLOJ iv. O S y D ° j - . )• -! ,� - DEE C) z y D - SECTION - LL SECTION - MM O O y Q n 'n � 2 A � - Wx6Tqucr wxrH POPE CRMR14 SWITCHING. BY. O Iy S" D Z N •S' D 2 2' D D B I INSTALL II" WEEPHOING A9 DIRECTED O BY THE ENGINEER. Z H � 1/2 1" • :. HH �0 N q 00 p ALIGN FRAME WITM INSIDE r �4~,{ INSTALL BTNIE DMIX$ OF q MINIMUM OF 1 RABIC FOOT OF H0. ISM STONE INA q>H O m p ° ° L� •,. " - ° ° ^ �J CO, m • EDGE OF WALL AD ALLOW L_ p y m PCROW FABRIC BM OR MAP, AT EAGI WEEP {ALE 011 AS DIRECTED BY THE ENGINEER. Z Z r I�L�'1 L� t` L ' p 2 FOP VERTICAL APIUSTMENTJ10N 1 r. p i „1 - - - _ I DRAWING ALL EXPOSED CORNERS 1". p PART SECTION PART SECTION PART SECTION PART SECTION o WALL SE1 } m _ ° DRAW xD xDT TG 9wLE. 6 1 e L 'I • INCREASE THE SIZE OF THE B" OPENING TO S" MU(., A8 DIRECTED BY THE , T ♦t ` ENGINEER BY PCDIHO 2" TO THE WILL NIEOHT ABOVE THE TOP ELEVATION. PAIU9r 8" WALL 8" WALL WITH 4" LIP 8" WALL 8" WALL WITH 4' LIP SECTION - BB T fL 2" WEEP HOLES � NOTE WAni[ESgCCOROlxOLT. ° •^ 1 Owner: TABLES OF QUANTITIES FOR PIPE SET IN PAD M - �� O O y M z YPLAN 4 BAR 2 ' TOP SLPB �" O SECTION - PP SECTION - NN SECTION Y-Y PLAN 4 H HCC INVESTMENTS C.V. QUANTITIES O �, Z W O 2 PIPE "W" "W1" "T" WHEN L IS ¢ (% 9 T m FRAME, GRATE, 8 HOOD A33'Y � = � ¢ O NH y m F 0' ,. i. "iO y C C G3 �_ LL O a Z y TOP 9LPB i0P ELEVATION fAJ 0 = d _ B d 4- T T X D DIM DIM DIM 12" 18" 20" m o D T Xr-I gn 2r-On Brr - e (D S m G7 Z Xr-I M4 BAA Z 1 LLC z Q F- _ HZR D v � 171 2 B----- Iz. J it Z 2 �j' 12^ 1'-1%B" 0'-7LB" 0'-2" 0.005 0.007 0.008 E-I d Ci O ` IV O M �yH 4�W7�1 LT = Z y 3. Or• a 1 '• � = Be Z � _� m d Ia-I � 24" a D� pPFN[NO 6"• � I 0'-2" �. W da �T% � u� {� m G a a m y B� yr TOP ELEVATION= M 6 = m D 16" 1'-3�'3" 0'-eLB" 0.008 0.008 0.010 ¢ y et a - _ - U � � � f/J F yy� z I � q p � p x � m Z A T 112° cw. � (� J` -i- CONTACT.• m m D W /g•• i'-sV4" 0'-1pS'9" 0'-2" 0.007 0.010 0.012 p m N 2 O K L M K, a w. i s p (A C O 10Nx" m DO PART SECTION a W - > m a °' a LU o - 3 yl B _� ~ (THICKNESS VARIES) BE < a 3077N. MAINST 1 S O OF END ELEVATION 24" 1'-8�q" i'-DES" 0'-3" O.Ott 0.014 0.018 Z Q 90 H O SECTION - AA _-- Z Q Z m r O (MIN.) Z 0 ¢ y a J_ a("cLR. p HOPE MILLS, NC 28348 x a W Z a a¢� ' -+ Wa BAR z F F z Ix•. (910)237-5846 'a m y 30" 2'-OM° V-241P O'-3L2" 0.014 0.01E 0.023 f C Py O a D iD - H- y m R",F S a n y f 1r-err C� � L M '�� N� MI m� z � v� f �6EE NOTE I m W <• HX C iv TalrnArlcE ro TrFXCAT. Z 38" 2'-3i4" 0'-4" 0.017 0.029 0.025 x Z Q O Z FRAME PLAN SECTION - JJ N O m r D Z ^ y O W .- NEAREST 1/I6" 24" Rob'.. -SACK. D m H O p x c3 I 3=�.y m y 0 PART SECTION Y-Y N4 'Z J CJR3 9 O m 42" 2'.77,6" V-7" O'-51r4" 0.025 0.030 0.138 (Jr� 6i R m O m -�i 1 ` t III 3'-0 5 VJ, MI 9 M m SECTION X-X SHOWING DETAILS AT OPENING -1 O z Project: m a z O N O O - -..� "'1 R 3" Z N Z O Z V M REVISION V% 48" 2'-10`M'S" V-844" 0'-S%" 0.028 0.038 0.047 w W N•I O � _ ¢� _ - - - - - - - - w Tt y a Yxx. DxYExaxale ,wD wwrlrllls POR caNCRErE cATcx easxx aABED Dx Yxx, xfxavr x W (A Cp0 FILE; 24INRBC Z -p U. 0 V) OIN9 OF BO% 8 PIPE gEIN FORLIfN3 TOp a MOT. SLAB W. Y00. yHC, ipiA1 DYMBS DEDUCTION " Tpp� 39 1'-10t2" D'-gLi" 0.035 .r " ''`e' PIPE 8PN1 w3DTx NFIONT O.L % O. L - Y a L - 2 D[YEWIOW D1 BOX BDX 6 SLABS ONE PIPE OPExIlI3 , rr i 3 0. 4] 0.0 i GENERAL NOTES: 54" 3'-2L0" 0 SR T " g^ - „ D A e x NO. LENGTH 9 LENGTH NO LENGTH F D TOP •01 e0. wu250 In.MUF. Mxq C.S.01BID. W. USE THIS STANDARD WITH ALL DRAINAGE STRUCTURES 9 _ 3Y2 fir, OTq�y" O 1'2' ;.� 1z^ 3'-e° z'-a" 1•-10" a 3'.0" a 4•-3^ z r-s" s' e° 3'-s^ 0.181 0.271 D.2Jw 27 1.100 a.Ot3 u.co2 DIM THE USING REINFORCED CONCRETE PIPE SET IN BASE SLAB. 80" 3'-" 2'-GL4" 0'-BR$" 0.042 0.058 0.071 J- _ - 15 3-e z•-a^ z'.1^ 4 G-G a e'-s^ x 4'_s^ a'-e" 3'-s" O.1B1 O.M 0.260 27 I.M 0.03 o.M 0.00 SECTION - KK `_ 11{err '0 40 2'-B" Y-0" s 3'-5" r 4-0 2 4'-0" 8'0" 9'W" 0.228 0.810 0.284 35 1.8T8 0.0.99 0.040 O.oSS 88° 3'-8" 2'-2Vq" 0-714" 0.050 p, 0g7 0.084 lilt" l•- 4i g" 24" 4' 0" II'-B" 2'-ID" 5 3' 5" ] 4'-e" 2 9•-9" 5' 0" 3 B" O.22B 0.340 0.286 95 1.821 0.060 D.Oeb 0.053 4 9 2 4•-0 2 y 9 6 0 a 8" 0.278 0.510 0.352 a, 1.Y18 0.092 GTIS O.OSS COMMONS AT SHEET 1 OF 1 , , SHEET 1 OF 1 SHEET i OF 2 R SHEET 1 OF 2 SHEET I OF 2 se 4 8" a 0 9 10" 5 a e 10 B' 3 B 5 0" D.aw D.510 OSBY St 2.SY0 0.132 0. ve 0 .O6M gXEET 1 DF 2 T2' 4'-0 2'-33q" 0'-7 0.058 0.07& 0.088 SECTION - RR u B. _ _ _ l¢ _ D" q e s' 4" 5 a s 12 B'-9 x a'a" 9 D S -8 0.40! 0 811 O.SBB ea 2.9N O 100 0.2N3 0.086 84�.00 840•00 e•io. os HOOD ELEVATION 8Q0"o3 B4�"�/� 4e a<0^- -5-G' 4•-i6"- b a W^ i3--s'-Y x s=9" -B'D' �e'-o^ D.444 SPEED a.4o7 ad 5.2ea osss n.an O.ofie 840"Q4 _ BRIDGEPORT m NOTES: MORTAR JOINTS " TO " THICK. Z O m BACK OF CURB FPFYF MTF D D OT 9 14 YB •"' 9 � 8EE TD.NS� O. B 0.0 0- USE CLASS "B" CONCRETE TNROUGXOUT. O y DETAIL SHOWING TYPES OF GRATES 2�'$' > NH -1 X'-'> MEERBozwRH NOTES: L AUMAEgw.STO BE (PIPS ED ar I„I Z A` r 1- �• -� TOP ELEVATION USE FORMS FOR LaNBiRUCT10N OF THE BOTTOM SLAB. F- FLARED SIDE (BEYOND) RECESSEDAMR REPDINO TIBRAN. SIZE JJ 2'-11ryr' II� - aa� Iy Z ( Qa ( ) ]A / A �LIDSET iN'ABOVE OPAOE P.W.C. Np� USE ACCORDING TO WATER FLOW. GO Sy O y9' 1''0' DEOVID FOR PCAT S) M TOTAL CU. YDS. Of BRICK MASONRY. ar - J:1 VALES _ / 2. 6ERACEUENEUNLESS TH r O y B 1'),IZX M ¢ V, U D, ODID' \ r' PROVIDE CENT ALL CATCH MI OVER J' 8" !N DEPTH WITH STEPS 12" 2 6 L2 �P MAX I,p 'rem �I _ 18 -_ O r T m 11 ON CENTER. USE STEPS WHICH COMPLY WITH STD. DRAWING B40.03. I-'r CD •+' � SMpE Y.N�NF BR OXB pq Y A waMY X a POLYETHYLENE UNLESS OTHERWISE mZ S� LLJd•^IZ m0 �_� Y Y � LLJdMZ 1,. ;'T•ONC STAB ': .' MD YdM DY Lit _ ______ .. FllLBHEQGI]N!E -_.. _.- _ Z 9PECIFIEO p 9 00yS py Z.-0 D p- _ _ USE TYPE 'E" "F" AND 0" GRATES UNLESS OTHERWISE INDICATED. OOIDx `• P Ar 0U ,. •YIIIOt Bp 5 aR B% SY aV • �¢¢m 3. SERVILE VEF"P.W. ALUTION SHALL p O " " O p -r I Wa LLS y'y^0 QT�jI m OFSECTIONR40OR NCRETOF E BLOCKSTANDAOBPECMICH OMPLIES WITH THE REQUIREMENTS Wa�LL2 5• W Xy V Xy• PAVEMENT - EO._ OEAPPROVEOBYP.W.O. z oDO Do� TYPE "G TYPE E TYPE "F" T A 1 97/e apo XH�r MIN. wNEx INSTALLS i 'Z e IF REIXFORCEO CONCRETE PIPE 18 BEi IN BOTTgA BLAB OF BOX, A0O TO SLAB h60 Vr WNC CUR8flCUM Z,gL �z 4 WATERSMICELWKV&WMBE I"1 y p i pS 9XtlM1N fIN STD. H0. 040.00. a {- T 09' ]Y ]S BS • E IN SAMED ITCH. dSANYTARYSEWER zz x v o m - - B.. MIx. x z AIM TYP. ROLL CURB 3RCTTON m>, .FOfl 0' 0" IN HEIOXi OR LE88. UBE B" WALL. OVER 0-0" IN HEIGHT, UBF y1- O III WHEN VIDTR:H. -_WATER FLOW 1 ¢wp l-I o4� F4 o J e' aD' et a u'• D + o�0000 000000o B N s 9 � 12" WALL TO 8'-0" TO B TOP OF WALL AND B" WALL FOR THE REMAINING ¢ r 0, AT HANDICAP RAMP SECTION B-B SAG - WATER FLOW - p yw- MIN. D CON . OUANTITEB TO BE APIUSTEDING. [NOLT. O Ny' S. WHENNSTAVEM N GRACE$ REq 'L Z 'e: " a 0. DRAWING NOT TO SCALE. ' 2 OA 1WMI�� a' 10' a9 6Y M' J D� YW Z pY� NY -% rt'CC SINGLE N8E INNT WI ER InM TIN MEERBO%TOBEBEi1H'A90VE y� ~ D ERS t ING. O _____ _____________________________ a III 1 wp ~ PLAN X '. SHALL i ° CONSTRUCT WITH PIPE CRDMI6 MATCH D 6 EST ]Y TY W ,y{{ HQPo�TµgrOp SIEPSMEF , METER BOOKES FINISHED PAVEMENT GRAOf S AND y cK4MPfR ALL f%PDsfD yqx a. �I` � wm 5 E'• � aI• � Y tax Id �' 0426-91-977A N � M COMPRESSION FOR In PE INLET / �/ :' PAVEMENT FEATHEREDTO TOP OF HOX Z O ,Mp �� qp E, AND FEMALEMTERTi4"FAD F. iO PROVIDE DRAIN AWAY FROM BOX 1 p m SECTION X-X o RAINS= a °] ;STAINLESS SEELI NTSS / B.NTRAFFICAREA4SfEWAB.U6E • BE m TOP ELEVATION u d OxWI M JS' 4Y u' ♦I' mI I STRAPSPDOIf STEEL / 1. PERIMEIERSOLD CONCRETE BRICK ` ' m03fm9IX6 MJ1 SBCTTON A -A 5V III 45 1I py y4 1 /-13'METERCWPLING BASE WITH NO GAPS. OO NOT LAY SECTION BIB rr• / WITH 4i'FETER BgICKON PIPE. SEE INSET PAP township: Cr08$CICeIE BTEP9 BYO. W. 040.86 STEPS - STD. N0. B40.B8 x0 5 SC 10Y aY 11 n p6 WITH _ _ 4 A II THREAD METER SWIVEL - Z KIN. \/ I wB �� 1M IiBSSL ,1 BALL CORPORATION STOP T _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 1 0 _ xw[ L A g101x aY[ aA Sam Ws ORNUO3TFP S1YlE� � NUT% 'MIT. B. WHERE ASPHALT CURB OR STRIP FRNIF MTE PNO HOOD ELEVATION ! t•%i.12'SPgCER FOR BOX SEAS DIRECTED BY PW(. SEE BTD.N B40.D3 PgVEMENTFABT, THE LCC7SION OF 1 INpMPgEssuN FOR IRS PE,REPRES County: Cumberland 9 T m ta`Ir 2W L Q A MIN. TOP ELEVATION r WITI6TAMLE689TEEL DOMESTIC SERVICE, g DISTANCE FROM TOP OFLOCKVALVE '+Y ✓4 m " �E-^ -B LL F®B61XIlM 1 i'z10&4'&PACER FOR Z WATER FLOW SAG WATER FLOW -� �CIR �1 L088. 01 ALL ¢ m m _ _ mvx z ve mwml art n xL Sm B - X 4 a Yl INSEms. IRnlwTory segweE C � n• 7Wi��mP� 0 O Q Z I � � A O B. p01MYF Tqy IMNT DIg RSRwYK SPACER 6XPLL BE OPERATING STEM TOTOP OFBO% y SS r w O m O�%� waly wlT aT fTi paO)Bu[ �'{�?� t•ESWLYE(SYfDzYE PIPE- PURNI9XED av PwC. SNAl10E 8'MIN. TO 10'MAX State: NC r, „ r, rr SECTION A -A �� z = 9 m yIi °"SECTIGN YvY' 8 E� Q W ISOMETRIC 1TIRX Y ylp elmq ®wYLN f4# ' MDI FF SLdYX DAV ByX91a ML 1 '•'^',R�(__ -_ ouor CONNECT M�iN6TYPE01n uGA 61xGLE STRAnI 10. RE9iERWXLMEERBOxsHdTO- EET - r_ -- BRICK METER BOX BASE FI FIT Vnl y C.7 = � X-I = -Q A9TM DYuoass4ML 18'FROM RA•1 TO CENTEWJNE OF i „ Z V m 8 i r Z FI gpy![BOLt SEE INSET METEfl BOXPERP@IDICIIIAR TOTHE MN. i TYPE F" TYPE E TYPE G TYPE E "'I O F N M = p •'+ N a R DIF Mn .. aWl aF mDLxe lmrRaXW®NR n. LOCATION SHALL METER Box D / P 9 RA13Fs F ARROW ,214, MIO.m RL�R ¢ W p 3I y D VARIES M N -D MIS MIN. D WBiIX MBX N� CORPoRp 2'SOION O BWO(IMEER L EXTENDED METER LOCATION SHALL BEA4APPRWED O m '4 3 Z CR c B^ 3 Q lR[ IUIL tD amwX Rms aa. _ COPPER (PREFER NO METERBE INSTALLED LE88 THAN S J-BE BBC, E EWE ROAD WAY D OF BO%t IME NL MRMOAR p a C r� O RISER FIT. 8' p N _ Z RAISED FLOW ARROW 2 B a ~ fe ' 0 m 1 AND WRAPPED 12, WLOT�UNLE88LONERWSE NOTED. m y o 1B HIGH '� D O 1 LATIEFOWL y im y O „ ERE 30„ TO ON "PIPE I9 USED MIX y .Slit DAM Ylf SW XW I MB 9R1CK0% w > OF BO% B93E w EO EQ y a D ✓L r, •- m m0 (n I -I x -' e. WHERE 2'TOb4"M-M"i9 u5E0 O N R� PLAN YB+i,R LIiAt] _t"t' wy - ^ -"i ti. WATERWIN FIND NNOTS(2m su) SHALL PAGE s O ` z Q = v _ SECTION J-J z C,i /y PE BACK FLLED UNTIL INSPECTED BY /y�� D jj{�- , ` •� W 4E MII6 HYDROSTATIC LEAKAGE AND �N ~ O p O r I 1 \I II O 1 11 Yorr I �j = ~ T VPAIESRT MERE 30 TO 3B PIPE IS VSEO J �E J m 61 Pt .'* (W,� 1 , ° \`NMETER BOX BERILDWONTEBT9(RYTO. Z� t R7 D SECTION M-M Y YN1 �. o y W W _ DRAINAGE D r 2'-17�4" 11'2,IR -L 1' B,r w LL ''j Aul_ M W RY�E� w PROPOSED 9"WATER SERVICE LATERAL PLAN cEIJ ts. BMAI AREA FlTTINGSARE rvOr x 6 m m, y O 9 P t Y2 AccePraBLE (-- BF fe. WATERSE VI xELATERAY rocwCPTHE m y Z E SECTION"hA Z O �AA`� v IL O B TIERED WpTERgERVICEUTEPALAFULLCIRCLE DETAILS 2' ttsq' REPAIR BHNI OEPIACEp ON THE �B t � 1 i"2 e ioX�wnvll N T3. OF r 7lHIsDFiI.TAM BITI� �E.A SHEET I OF 2 ND. V,2CONSTRUCTION FOR WHEELCHAIR RAMP NOTE. : JAW. m,z9u DOCUMENTS SECTION A -A �� �Br+ =i MERE 42" TO a4" PIPE IS USED _ 201bW2 WUT.avq {MEET 2 OF 2 TYPE - F qEp� wl 108d' a SECTION A -A sxEEr z of z SHEET 1 of z DETAIL SO 64" PIG METHOD SHEET 1 OF 2 840.03 � fG8MR0 tlY071O08� TYPE G 1''I _ OF RISER CONSTRUCTION PLAN PLAN 8ao.o3 eao.ot 840.01 job no.: p13-084 I. COXSTB%T THE W,WIM6 sNEICE TERN SUP f£RISTIIBWICE AVD A TOM mNNASRNC CUOR TO THE SEEWID(. 10. USE CL\4 "B" CONCRETE WRH A SIDEW/O( iNBSH M ORDER 10 OBMN A ROUTE xpbs%m TYPE SUFFICE. 2, CR GESMIL( MOTS AM CO FIGUMPRI I WORK BUT MST mNFOMI TO 1 C OLICN SMMYRR 11, RACE A 1/2' 09P M JONT WHERE TE CONCfER WNEDCWJR Rvr AM BE CUM NO hA SHOWN ON M. M. GROG{. date: 02/1 8/14 3. NORM OPROUNA MI SIMUR 1I8-44.14 REQUIRES THAT Al STREET CUM BFINC Cm51MKR0 OR FECOXSIR M FOR IL•BIRII•BICE PROCEDURES, 12, PVLE THE ISBE PDIEESTI6W DRSOMMUM UNES m GOER IS TIE MRRECTION ff SEEMS THE RBR ECRON WIDE TERN NLOAIVEE DF A 4' Il£Nf ZUE 1PAEFIC OPERxiDK+, TEPWAS, CORREC110N OF MUTES OR n1EAm FUf /lA' REl%N /PIER SEPRIIRA t. t9)J SMNL PRD+81E WNFFLCXAR ARAM$ FOR W ME MINXNR 11NVIlWAY MIN ONE RNW g IIbTIDID. (TEE NOTE 17) ME PHYSICALLY USIBED AT ILL EDFIEECIIONS WHFAE BOM CUM AND WFlm AND 9ODUD5 ARE PRPADm AND AT OTHER PUNTS OF PE061RVN FlJM, drawn by: TA � TYPICAL SECTION FOR � ,1 WOISINME TIE CURB CUT AND THE PmRTRVI CRMSNIL( INm 50 ME iloUl 6 THE WXmLIWP PIMP WILL GALL WRNW TIE PmE5118W y p {TL ( CURB) D IN ADOOMH, ffIDKKI MR OF TIE 1973 RDDCV. AD HICHISO YEETY ICY RFOURR PRO.130N 6 CUB RAMPS ON ANY WE y11STMX.TIOX AfTOt JULY 1, JIM CIp53Yf4K UNE$, RACE OL•DOWL PIBPS WIN RNIED SRIR m 24" OF NLL XmMI PANT RWS M8R1 TE mO5SY011! NAMONOS U! E•EH � •J0 a P Y IYl' T ( l.z V RD> � MEDIER A SIOEYIILI 5 PgOPOYD MnW1r OR b PININED FUt A RARE DBE SBE a ixE R.WS ME AMFEWUNs MN DIs•Blunm ACf (I5'a 6 1990 F%IQIR TO LYDN1OW15 WRH DB•HIIIIES. COIPTENfM3PE LML M6H5 PRGRLRONB SBIIWf ro iHOff t4 mM51RUCI Tff Pm6TRN1 CROSSY.W(A MXWUY a S FEET. A CRMSMN% WWN 6 10 FFEI OR C44ATER 5 0R1RJMf. survey by: MR PFNSDm ro PERSUS OV THE BAQS ff RA(f. SIX, NMKKYL OWCVI WM RmGgX UXDIX TXE CML RENRS /Li OF 198f. TR3 CLPB WMR NM'E BFQI NOT TO SCALE O@6WID ro COMPLY WRH NE CUPoEIIT.N\ STNNNAS. f5. USE SRW UN6, MUMWLY PEWBmICUM ro THE UJE ONES, MfiE R 5 MPoRIMT 10 NpG3E 1NE POYT 50.0' PAIWDE WNmUWR RAMPS AT LOG(IOXS AS SHORN ON TIE PWi$ CR AS URECIEO BY iNE FNUNDR, mL\lE WHEFIIDWR RMRB A8 UIECIFD BY TIE QX2XmA AAREEI{RELL4Y RmOUTOIfSITEHINImFMPUlllff WRH ATPNFIC 9UitlSTOWPSNMO1RNEDRMRINILLAIREOUIIEWIAMYI.TIN LNBNUSUIY1YINP%PiRlG\fC1X8CIf5 checked by: J N 4. 25'� WHERE DOSTNC UGXT PUPS, FlAE HRMEWIS. DROP NIETS, OC. nFECT RALTIImT. WHERE 1WV RAMPS ARE BSIADEO NOT LESS 1WN 2 REI 6 NLL NECNT 16 10WIBPiE PAAWNC A MWWFJN ff 20 RET WAR a PmpTRIN CAOSSWMK sheet no.: WR SHx1 ff PVCFD BEiWEN 1HE RWPS PUCE OLL•1 TEMPS IS NEM PmPFN01WIIR TO TIE iRlrva ERNE ff9IG CRC65ID AS P'ri9B1E PRELIMINARY 2• 1 5. PAT FDR ]1L VIRIBLE NIiH CUIGEE USED fOR CON3IRUCIIUI Oi NHmDWR RAMPS AS CONCffIE NHFELIXYR PIMPS (S0. m5.j 17. PUCE Ill PAYDIIXI WAKINR IX If.WRYKE MSH NE LVEST mRMN Of NE Mwu'a ff UMFOWI 1RNRL CUTROL OE\iLfS Oa1m) 2- / 4' 4' ti. RIBLI9ED BY TIE fmWt HXYWMY AURXBIPAIION IND TIE ATRN WAgINA SUPRDgT ro 11E MMCD. ,\ 1 4" PER FT. 1 4" PER FT. 5. PAY FOR Ill D'SMSsm CU(GS Ai WHEIIUWR RIME 5 THE 11'PE WM3 IND 6UTTR . ADL10E11T 10 DEPg0.Tp OJFB. (tN, R.) DO NOT USE FOR CONSTRUCTION �1 1/4" PER FT. 2 / �_ � /� v� T. SW09NOfiR6tlY�I1NOMDJWE1M01� CONSIURm RILL yYPDR1TI0X FOR Au INiFIdVS. IIBUV, EmIPYEXT, to0I5 AND RIUDfNTNs xCc6YRT 10 -BV() (TYPICAL) 4, THIS DRAWING HAS NOT BEEN REVIEWED WITH ANY 24" ROL 2" SF9.5A 9" STBC 24" ROLL SIDE wAL1( B. W NOT UM 0.0E (ta2) SLOPE ON THE WHDDGwR TEMP IN rmAIDRwIP ro THE GROW OF 1!E SREEI. •HI�LCHAHt RAMP GOVERNMENTAL AGENCY FOR COMPLIANCE WITH ANY CURB PAVEMENT CURB (ONE SIDE NOTES APPLICABLE LAND DEVELOPMENT OR OTHER OF ROAD) 9. CONSTRUCT WHEELCHAIR RAMPS 40' (X' ') OR REATR FaR Dun RAMPS. 2 OF 2 SHEET' REGULATIONS. POND RISER DETAIL Scale: NIS WETLAND PLANTING SCHEDULE 194.0 4" FAIRCLOTH 192.0 -. SKIMMER ASSEMBLY',._ .. - OR APPROVED' 191.0 EQUIVALENT '. 3" ORIFICE .. f-... _ 190.0 & a 189.0 188.0 4" FLEXIBLE 187.0 -- CONNECTOR HOSE 186.0 ,. . _ _ ...... 4"0 PVC PIP W/ 185.0 .. OVER _ _ RAI my LVEI'All I tarot 184.0 - 0' o U 183.0 0 182.0 SKIMMER CONNECTION DETAILS Scale: Not to ca e PRELIMINARY DO NOT USE FOR CONSTRUCTION THIS DRAWING HAS NOT BEEN REVIEWED BY ANY GOVERNMENTAL AGENCY FOR COMPLIANCE WITH ANY APPLICABLE LAND DEVELOPMENT OR OTHER REGULATIONS. GRAPHIC SCALE 0 25 50 100 1 INCH = 50 FEET HORIZONTAL I - - - - AS _ 1 _ \ r� 10MAINTENANCE SHELF I I FOREBAY OVERFLOW WEIR MIN. 30' WIDE ELEV - 239.60 PROVIDE ARMORMAX ARVS (OR I'i M N 0 N at / 7 N .n■u/t//■. atnoii ' 1/tint//Nx••••/t/oGi:G::::::::::::::::::::::o:::/i::: .1//n t•••••x.::::::NNuu/•••••••••••••••••nutuuutrn� NNtu/N//tNN/_ auu vnm .Int/ �••/Y/Y. .i::::.-!!u�!!uuN■..----_ N�Nnoo....--_____Nun. u•• n/ut. .Nun ••/Y �....... .::::� �iiiiiiiiiiiiiiiiiiririririiiiiiiuiiuirirnni�rl _..,....::'"'o�ill� ICIAN I it / I i SOIL BORE #2 SHWT ELEV-238.45 SOIL BORE #3 �Ksat-0.065in/hr i�YY SHWT ELEV-236.92 li ( RISER-35 Ksot r0.051in/hr TOP-239.75 NV-236.00 - - - - - - - - - - - 229- - - - - - - - 230 231 / 232 - - CB-1 v STA-4+ =1 .70 -2 R41.92 INV(15 37.41 IN V(36")-2 IN V(42")-236.16 _. ___... 242 242- O 241 O - 241 'STREET "B" It/N■N••••••••••••••tttuN/tpN/N/ r7 _ -229- I N I - - FOREBAY N I N MIN0E,utu /tu IIII; ......./YY------:::i...Y7ii nnr■NYYNii�:G:::::uuu/N/ ••■t//■/•G�:smut//■ .tounr::oo::::■�i: •/uoii:::u ■u••/tt■NE mri.uNN••••Nu2 ----------- --------- a ••••••••/t//:: N//t//t■■NO••••••••••••/NN::::N/k NNNr■N••••••••••ttN•NN/ ;tN/r/N/NNNp•-=t/toot:::::::::::!!!!p�YUYN••..----_� tRpN/tOu.u-tot■::::::::::.!!!! 1 1 N"Nu.2 N.1 nun•ut/••••••••••••••••••u/uuuuuu/ ■ Ntt■/tt••r•••••••••■tt/t/■t �•NNt•••••■•••■/t/■tt■tit •NttN•••••••••NNNtN/ rtOttNN•••••Nttuu/t NNNNYY■■■Y•b-o---___N//NNuo--____■N■t■sort----___tN/Nu u----___. _-. _ _ 241 11 LF OF 24- RCP 10' MAINTENANCE SHELF 0% POND INSET Scale:"=27 9 241.0 - TOD YR. STORM EL 24078 - - --- -- 241.0 1 10 YR. STORM EL 240.26 239.0 238.0 .....-------------- ---------- ----_ __.. i _ _ -237.5 TPE-237.5 237.0 PPE-236.0- 1 235.0- - -------------- 234.0 cy' per 2 233.0 up lot 232.0_w \ ✓ A' 2310 Uli _m. SEDIMENT STORAGE EL.-230.00 _. 230.0 __._ _. _. _. _.. _ _... __.._.._._ _ _. _. o , 229.0 a _ �, T 228.0 k 6c tllTl$LS{ , 7� p e • - I t utTr mngnin iw r 1h " o IfAS 'y T-1r�'° L a, t r;t AeritOne: , . .f S c nr t . POND CROSS SECTION scale: Not To ca e This document provides general installation guidelines for theBrmorMaxa' anchored reinforced vegetation system used in son struclumal applications including levees, stream and over banks, and storm She Channels. These nonstructural applicatidtkare typically designed using Type 2 earth percussion anchors. For installation guidelines with Smortlaspo" and Type IA and/or 1H earth percussion anchors used in structural applcations, please contact Proper. Site Preparation / Prepare Subgraden • Gmtle and romped Area as directed and approved try behowee Setup shall be unifcrm are Smooth Remnre all opi clod, monsoon or other obl cis se IN inslaliN me will have direct m la[t mith soil sudace. • Pereadbed by returning the top 23 In(5095 mpol of Sall, • It H mggealed that a sod lest be trimmed to ensure ski fallen, Ipmrpvse aaendmous such as lime and larldn"and/or mar the sail if S... or • Do not moeb more mNk mat is to he placed. • For eddy al factors of Seery also amed prior to System kslalkdnn. • Coresfll Select plans duntspeoT F far mundi types no apporwhon rocks ease Installation • Instep tuner Tmlrch on N'e($No and Roteckd Side of the lsno refer No Fiore IA. • State HIRRM up the team, and across the crest. • Install sin and earth PCEMion Amounts based on reap en, and sparing.111, dnwn devrees shown In Flgum2 rose designed as p.jttt sue[ifimlitnz/drawings. Rome 3 details procedure for installation of earth confusion a Kra • Install torrudlnal Edge lmnch on the first and last poll of the i Jret- refer to Fiore n. • For Is,,, slopes tangy man 45 it p3.7 mLlnmall modeled [back sots -real 0 figure 5. Note. All seam anal shell an a normal bin (150 mml. For And of ad[ entraps see derail In Firm 1. WETSIDE FRaTECTEo sioE LEVEE CROSS SECTION VVLMVILyp Dp� ocl[L 31RCPEX` I THE ADVANTAGr CREPTOal- GEOSteniHETKS Figure 4 - INITIAL TRENCH DETAIL __ 240.0 239.0 1237.0 _.__ .._... __.. _. ..'. 236.0 a wlD A __ - - _ _- 234.0 !233.0 �i l�\V/'•__ u1 --- -'--- -- ---- w - - - -- - -- = 232.0 231.0 �. M230.0 O Y\ O a 229.0 _.--- .---- ------------------ O _-- ----- ---' ------ --.._. 228.0 a5 .mKI mr"avmmwm [gyouxua Figure , - LONGITUDINAL EDGE THEN _- III S,s�,e.:x'` � I '. I I �•.� � �.. Wn.se@ I- t e• e I 1 on northeastern loseoph i osp Figure 5 - PIN AND ANCHOR PATTERN DETAIL Npklne a:rt'AmpYrOr. siNmfxAl{pR nr auAN/eY)nm ntl lmenlovncioneeparear,mHMme rcnbVinnnmW4nl eAeNsta: iiz a I nav4AonIscomorsons being rune pkla of AM et o, herepor o, anaorwy n almwc:nMvro Figure 6 - EARTH PERCUSSION ANCHOR INSTALLATION WEIR ARMORING DETAIL ca e: micappappeoppers- Figure 9 - TERMINAL TRENCH or -E unrrm"` Figure N - MODIFIED CHECK $EDT ANCHORS El N PROPEKI THE ADVANTAGE llpl.RS.' GEOSYN MCS UNILEXa 1800 6G74811 Q o: z ar N 11) N oho Ep N z j par- o U o ,0 N i Q t 0 N U p O MO rn Z� j cc) �Q O Vr = Ln :� 010 J XO>� Y EJ wZhe m°� - W J OUl-) d Z N RoIr'Ishe 031459� Ern c` '� % ",, G �� nN�°°•``p0 nnua'C`"````` C O .y N m O O 0 z Owner: HCC INVESTMENTS, LLC CONTACT.• 3077N. AWNST HOPE MILLS, NC 28348 (910)237-5846 Project: THE COMMONS AT BRIDGEPORT tax Id #: 0426-91-9724 township: Cross Creek county: Clunberland state: NC POND DETAILS CONSTRUCTION DOCUMENTS job no.: P13-084 date: 02/18/14 drawn by: TA survey by: MR checked by: JN sheet no.: C-14