Loading...
HomeMy WebLinkAboutSW6140101_HISTORICAL FILE_20140204STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW_&Z�`"d DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE (❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD Stantec Consulting Services Inc. 5565 Centerview Drive Suite 107 Raleigh NC 27606 Tel: (919) 851-1919 Z7l l 7zs December 13, 2013 File: 140869.001: SOF Brigade Headquarters NCDENR — Water Quality Division 1617 Mail Service Center Raleigh, NC 27699 Reference: SOF Brigade Headquarters Facility (PN 69758) Stormwater Management Permit Review To Whom It May Concern, Stantec is pleased to submit this Stormwater Management Permit application package for the above referenced project at Fort Bragg. This application proposes to construct two roadways adjacent to the Brigade Headquarters Building, which was previously approved on September 27, 2013, Stormwater Permit No. SW6130802. New Dawn Drive consists of approximately 3,650 If of roadway and a roundabout, and Chaos Lane consists of 2,765 If of roadway. The site is located on Fort Bragg property within the limits of an old Ammunition Supply Point (ASP) south of Chicken Road. Enclosed please find the following: 1. Original and one (1) copy of the Stormwater Management Permit Application 2. One (1) check in the amount of $505.00 for the application fee 3. One (1) copy of the Drainage Analysis and Stormwater Management Plan that includes the Project Narrative, USGS Quad Map and other maps, drainage calculations and BMP modeling calculations 4. One (1) original of the applicable BMP supplement forms and O&M agreements for each BMP 5. Two (2) copies of construction drawings (G-001, C-001, CG125, CP201-CP208, CF209-CF211, C-301, C-519-0522, 6. One (1) copy of the Geotechnical Report and subsequent ECS Consulting. C-103, C-104, CG100, CG122- C-601) Addendum reports prepared by Please let us know if you have any questions or need any additional information. Sincerely, FEB 4 2014 STANTEC D JAN 0 2 2014 VVE11ANDMWSANDSTDR INA J nathan A. Allen, PE ATERBRANCH Project Manager Attachment: Enclosures