Loading...
HomeMy WebLinkAboutSW8050547_Historical File_20210610 (2)R Y CAPER DIONi I-GATTI BRIANN:VkMENN D June 10, 2021 New Hanover County Aftport Authority Attu. Granseur Dick, Facilities Director 1740 Airport Boulevard Wilmington, NC 28405 NORTH CARi3lINA subied'. Approved Minor Modification Stormwater Permit No. SW8 050547 Wigton Iatereati4nal Airport New Haver Canty On April 20, 2021, the Wilmington Regional Office of the Division of Energy, Mineral and Land Resources received and accepted a complete minor modification application for changes to the moved plans for Stormwater Mmagement Permit Number SW8 050547. It has been determined that the nature of the Wised change meets the definition of a min modification in. that it does not result in an increase in the size of the permitted stormwater control measure (SCM) and does not increase the amount of built -upon xm& Please refer to Athwhinent C €or a detailed description o€the current proposed min modification and a list of all the past mks moved during the effbative period of the permit. We are forwarding you an approved copy of the modified plans for your files. Please add the attached plans to the previously approved plan set. Please reps the previously issued permit with the revised: permit; dated June 10, 2021, attached:. Please be aware that all berms and conditions of the permit issued on April 20, 2021 and modified: as attached, remain in full force and of fi ct Please also understand that the approval of this minor lion to the sutoct State Stormwater Permit is done on a roe -byre basis. Any other changes to this proNd miml be approved through. this Office prior to constriction. The approval of this minor modification does not preclude the permittee from complying with all other amble statifts, rules, regulations or ordmanccs, which may have j over the proposed activity, and obtaining a permit or approval prior to construction. If you have any questions concerning this matter, please contact Garrett Zorda in the Wilmington Regional Office at (910) 745-7215 or garrett zorda�ncdenr.gov. Sincerely, u�- 1444 Brian Wrenn, Director Division of Energy, Mineral and Land Resources Enclosures. Airaehrnent A — Designer's Certification Form Attachmea C — Permitting History Application Documents DES\gdz \\\St0rMwatrr\Permtts & Prc jects\2005\050547 HD\2021 06 permit mi or 050547 cc: Jason NC Smith, PE, J M Smith F � , LLC Neer Hanover Comity Mlding Safety Dqxwtment. Wtimmgton Repocal Office Stormwater File MarthCwvUmDeparUmevofEnvbrmmentatQaaUty I DtvisbaofEmgy,Mf waland Land. rmces Mmkigmn RegiarwtO fce 1 127 Carkai Drive€xtenwn I Vftm nycott Nods+ Carojrna28405 State Stormwater Management Systems Permit No. SW8 050547 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO New Hanover County Airport Authority Wilmington International Airport Extended Dry Detention Basins (EDDB) 1740 Airport Boulevard, Wilmington, New Hanover County I11C9]9IMIl'.I 0 construction, operation and maintenance of three (3) extended dry detention basin "stormwater control measures" or "SCM") in compliance with the provisions of 15A NCAC 2H .1000 (1995 Rules) as amended on January 1, 2017 (p2017 Rules) (collectively, the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or "DEMLR") and considered an enforceable part of this permit. This permit shall be effective from the date of issuance until June 15, 2027, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. The drainage area identified as Phase All is subject to the 1995 Rules and as clarified in the 1995 specific conditions listed herein. The drainage areas identified as Phase IIIA, Phase IIIB and Phase IIIC are subject to the 1995 Rules and the 2017 Rules and as clarified in the 2017 Rules specific conditions listed herein. 2. This project and SCMs have been approved based on the "Wilmington International Airport Stormwater Master Plan" document approved on November 24, 2004 as a variation to the stormwater rules and in accordance with G.S. 143-214.7(c3). All future major modifications to this permit must either meet the 2004 "Wilmington International Airport Stormwater Master Plan" in its entirety, meet the most current set of stormwater rules, or provide technical justification that the proposed modification is providing equal or better control and equal or better protection of waters of the State as a variation under the current set of stormwater rules. Approval of such variations that do not meet all of the requirements is done on a case -by -case basis. 3. FAA requirements prohibit standing water (i.e., permanent pools) and stipulate that the design storm must be fully drained within 48 hours. This is supported by G.S. 143-214.7(c3) where the Division does not require the use of an SCM with standing water. The approved SCM design for the 3 extended dry detention basins includes a low flow device but does not include a permanent pool at the low flow outlet or sediment storage. 4. The approved "Wilmington International Airport Stormwater Master Plan" document is not intended to limit or restrict the airport or its current or prospective tenants from pursuing alternative or modified stormwater management solutions in various locations than those listed in the document itself. Since the approval of the "Wilmington International Airport Stormwater Master Plan" document, other stormwater control measure (SCM) options that do not contain areas of standing water have been developed and should be evaluated for future projects. Page 1 of 5 State Stormwater Management Systems Permit No. SW8 050547 5. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. The maximum amount of built -upon area (BUA) allowed for the entire project is 9,304,059 square feet. 6. The three (3) SCMs identified as "Phase I and II" Extended Dry Detention Basin, Phase IIIA Extended Dry Detention Basin and Phase IIIB Extended Dry Detention Basin have been designed to handle the runoff from 8,520,835 square feet, 116,598 square feet, and 367,596 square feet of BUA, respectively, within the delineated drainage areas. The BUA for future development within the drainage areas to the SCMs identifies as "Phase I and 11" Extended Dry Detention Basin, Phase IIIA Extended Dry Detention Basin and Phase IIIB Extended Dry Detention Basin is limited to 2,175,154 square feet, 48,788 square feet, and 264,031 square feet, respectively. 7. Where an individual project within the drainage area is being leased or sold, the stormwater collection system for that project must be located in either dedicated common areas or easements and the final plats will be recorded showing all such required easements. 8. The drainage areas for the on -site stormwater systems will be limited to the amounts of built - upon area indicated in this permit and the approved plans and specifications. The runoff from all built -upon area within the permitted drainage areas of this project must be directed into the permitted stormwater control measures. 9. (2017 Rules) The peak flow from the 10-year storm event shall not cause erosion downslope of the discharge point. 10. (2017 Rules) A 50-foot wide vegetative setback must be provided and maintained in grass or other vegetation adjacent to all surface waters as shown on the approved plans. The setback is measured horizontally from the normal pool elevation of impounded structures, from the top of bank of each side of streams or rivers, and from the mean high waterline of tidal waters, perpendicular to the shoreline. 11. The portion of the existing airport previously included in the drainage area of the permitted dry detention basin that is being removed, must be submitted in a future permit application as a modification or under G.S. 143-214.7(c4). 12. (1995 Rules) The following design criteria have been provided and must be maintained in the "Phase I and 11" Extended Dry Detention Basin. Phase I & II a. Drainage Area, acres: 287.63 Onsite, ft2: 12,529,107 Offsite, ft2: 0 b. Total Impervious Surfaces, ft2: 8,520,835 C. Design Storm, inches: 4,552,087 1" 3,968,748 @a 1.5" d. Basin Bottom Elevation, feet: 7.0 e. TSS removal efficiency: 50% f. Storage Elevation, FMSL: 13.0 gg Storage Surface Area, ft2 506,082 h. Permitted Detention Volume, ft3: 1,058,112 i. Seasonal High Water Table, FMSL: 6.0 Controlling Orifice: 12.0" O Drawdown Time for 12.0" 0 orifice, hours: 57 1. Receiving Stream/River Basin: Smith Creek / Cape Fear M. Stream Index Number: 18-74-63 n. Classification of Water Body: C;Sw 13. (2017 Rules) The SCMs identified as Phase IIIA Extended Dry Detention Basin and Phase IIIB Extended Dry Detention are permitted based on the design criteria presented in the sealed, signed and dated supplements, the sealed and signed "Technical Justification" document dated April 13, 2021 justifying the variations from the Wilmington International Airport Stormwater Master Plans well as the 2017 minimum design criteria, and as shown in the approved plans and specifications. These SCMs must be provided and maintained at the design condition. The approved supplements are incorporated by reference into this permit. Page 2 of 5 State Stormwater Management Systems Permit No. SW8 050547 14. (2017 Rules) If the SCMs identified as Phase IIIA Extended Dry Detention Basin and Phase IIIB Extended Dry Detention are found to not meet the approved design criteria, a modification must be submitted to either meet the requirements or propose another variation from the rules. This is based on a case -by -case decision and should not be used as a precedent for future permitting actions. 15. Tributary projects outside of the drainage area of the previously approved "for -credit" grassed swales, but inside the drainage area of the approved SCIVIs, must provide an additional BMP with a sufficient TSS removal efficiency such that the total TSS removal, including the extended dry detention basin, is at least 85%. H. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 3. The facilities shall be constructed, operated, and maintained in accordance with the provisions of this permit, the approved plans and specifications, and the supporting documents attached to this permit and on file with the Division. 4. The permittee is responsible for verifying that the proposed built -upon area for the entire project does not exceed the maximum allowed by this permit. 5. Upon completion of the project, the permittee shall determine if the project is in compliance with the approved plans anj take the necessary following actions: a. If the permittee determines that the project is in compliance with the approved plans, then within 45 days of completion, the permittee shall submit to the Division one hard copy and one electronic copy of the following: i. The completed and signed Designer's Certification provided in Attachment A noting any deviations from the approved plans and specifications. Deviations may require approval from the Division; ii. A copy of the recorded operation and maintenance agreement; iii. Unless already provided, a copy of the recorded deed restrictions and protective covenants; and iv. A copy of the recorded plat delineating the public rights -of -way, dedicated common areas and/or permanent recorded easements, when applicable. b. If the permittee determines that the project is not in compliance with the approved plans, the permittee shall submit an application to modify the permit within 30 days of completion of the project or provide a plan of action, with a timeline, to bring the site into compliance. 6. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at the design condition. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. 7. Records of maintenance activities must be kept and made available upon request to authorized personnel of DEMLR. The records will indicate the date, activity, name of person performing the work and what actions were taken. Page 3 of 5 State Stormwater Management Systems Permit No. SW8 050547 8. (2017 Rules) The operation and maintenance agreement must be recorded with the Office of the Register of Deeds. 9. (2017 Rules) The final plats for the project must be recorded with the Office of the Register of eedl.Te recorded plat must reference the Operation and Maintenance Agreement and must also show all public rights -of -way, dedicated common areas, and/or permanent drainage easements, in accordance with the approved plans. 10. Access to the permitted stormwater facilities shall be maintained via appropriate easements (as required) at all times. 11. No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below. For changes to the project or SCM that impact the certifications, a new or updated certification(s), as applicable, will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification. a. Any modification to the approved plans and specifications, regardless of size including the SCM(s), BUA, details, etc. b. Redesign or addition to the approved amount of BUA or to the drainage area. C. Further development, subdivision, acquisition, lease or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications. d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved SCM(s), the stormwater collection system and/or vegetative conveyance shown on the approved plan. e. The construction of any allocated future BUA. f. The construction of any permeable pavement, #57 stone area, public trails, or landscaping material to be considered a permeable surface that were not included in the approved plans and specifications. g. Other modifications as determined by the Director. 12. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet ni mimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 13. Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on -site stormwater system complies with the permit conditions. Any items not in compliance must be repaired, replaced restored, or resolved prior to the transfer. Records of maintenance activities performed to date may be requested. III. GENERAL CONDITIONS 1. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction 2. This permit is not transferable to any person or entity except after notice to and approval by the Director. The permittee shall submit a completed and signed "Permit Transfer Application Form" (available on the Division website) accompanied by the required fee and supporting documentation as listed on the form, to the Division at least 60 days prior to any one or more of the following events: a. The sale or conveyance of the project area in whole or in part, except in the case of an individual lot sale that is made subject to the recorded deed restrictions and protective covenants; b. Dissolution of the partnership, corporate, or LLC entity, subject to NCGS 55-14-05 or NCGS 57D-6-07 and 08; c. Bankruptcy; d. Foreclosure, subject to the requirements of Session Law 2013-121; Page 4 of 5 State Stormwater Management Systems Permit No. SW8 050547 3. Any individual or entity found to be in noncompliance with the provisions of this stormwater management permit or the requirements of the Stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. 4. In the event that the facilities fail to perform satisfactorily the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permittee grants DEQ Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit issued shall continue in force and effect until the.permittee files a request with the Division for a permit modification, transfer, renewal, or rescission; however, these actions do not stay any permit conditions. 7. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 8. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. 9. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. Neither the sale of the project, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the stormwater permit. 10. The permittee shall submit a completed "Permit Information Update Application Form" (available on the Division website) to the Division within 30 days to making any one or more of the following changes: a. A name change of the current permittee; b. A name change of the project; c. A mailing address change of the permittee; 11. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al. 12. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee as outlined in Title 15A NCAC 02H.1045(3). Permit modified, updated and reissued this the 10t' day of June 2021. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Brian Wrenn, Dir for Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Permit No. SW8 050547 Page 5 of 5 State Stormwater Management Systems Permit No. SW8 050547 Wilmington International Airport Stormwater Permit No. SW8 050547 New Hanover County Attachment A Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 1 of 2 f State Stormwater Management Systems Permit No. SW8 050547 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built - upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All drainage within the permitted contributing drainage area is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. A trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown device is correctly located and sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as pretreatment devices, outlet structure and/or forebay. 15. The required system dimensions are provided per the approved plans. 16. The maximum drainage area and/or built -upon area have not been exceeded for the "Phase 1 & I1" condition. CC' NCDEQ-DEMLR Regional Office New Hanover County Building Inspections Page 2 of 2 4 State Stormwater Management Systems Permit No. SW8 Attachment C - Permitting History Wilmington International Airport EDDB Permit No. SW8 050547 Approval Tate I Pernnit Act+L,n � AIMS Version Description of the C1=ges This original issuance approved the 150 acre area pocket of high density Phase I, in accordance with 6/15/2005 Original 1.0 SW8 040836, to be treated in an extended dry Approval detention basin (EDDB) #1 designed to handle the runoff from 4,247,100 square feet of impervious area. Approved the modification of the permit to include Phase II, which brought the total project area to 264 10/28/2009 Modification 1.1 acres and increased the size of the EDDB # 1 to handle a total of 8,468,064 square feet of impervious area. Approved the modification to include Phase III, which brought the total project area to 321.35 acres and increased the size of the EDDB #1 to handle a 10/26/2011 Modification 1.2 total of 8,468,064 square feet of impervious area. This permit also took into account the impervious area for SW8 060326 and SW8 060515, which both drain to EDDB #1 and were permitted as Offsite permits to SW8 050547. Approved the modification to the overall drainage area to 3 22.3 8 acres and the increased size of EDDB #1 to handle atotal of 9,751,185 square feet of 11/29/2012 Modification 1.3 impervious area. This modification included the addition of two grassed pre-treatment swales. This issuance left 3,177,214 square feet of Future allocation for the Phase I & II area. Approved the reallocation of 205,202 square feet of Future allocation for the development of the Rental 2/8/2013 Plan Revision 1.4 Car Facility within the Phase I & II drainage area. This issuance left 2,972,012 square feet of Future allocation. Approved the reallocation of 32,453 square feet of Future allocation for the expansion of the North 8/4/2015 Plan Revision 1.5 General Aviation Apron draining to EDDB #1. This issuance left 2,939,559 square feet of Future allocation for the Phase I & II area. Approved the reallocation of a total of 129,082 square feet of future allocation, 62,570 square feet 9/9/2015 Plan Revision 1.6 for the Business Park access road and 66,512 square feet for Lot 9 of the Business Park, both draining to EDDB #1. This issuance left 2,810,477 square feet of Future allocation for the Phase I & II area. Page 1 of 2 State Stormwater Management Systems Permit No. SW8 Approved the reallocation of 122,922 square feet of future allocation for the North General Aviation Hanger Taxiline and Corporate Hanger Complex. 6/29/2016 Plan Revision 1.7 This also took into account the 24,190 square feet of impervious area allocated to SW8 150723, which drains to EDDB # 1 and is permitted as an Offsite permit to SW8 050547. This issuance left 2,663,295 square feet of Future allocation. Approved the reallocation of 75,596 square feet of 8/22/2017 Plan Revision 1.8 future allocation for the Avis Car Rental Facility draining to EDDB #1. This issuance left 2,587,699 square feet of Future allocation. Approved the reallocation of 29,337 square feet of 4/18/2018 Minor 1.9 future allocation for the Social Bark Kennel draining Modification to EDDB #1. This issuance left 2,558,362 square feet of Future allocation. Approved the reallocation of 110,358 square feet of 10/5/2018 Minor 2.0 future allocation for the FBO #2 project draining to Modification EDDB #1. This issuance left 2,448,004 square feet of Future allocation. 10/3/2019 Renewal 3.0 This issuance renewed Permit No. SW8 050547 until June 15, 2027. Approved the reallocation of 224,194 square feet of future allocation for the Air Carrier Apron Expansion draining to EDDB # 1. This modification Major also adds Pre-treatment Swale #3 as pretreatment for 10/6/2020 Modification 3.1 EDDB #1. The submittal also included 9,268 square feet of impervious area that meets NCGS 143- 214.7(c4) that does not drain to EDDB # 1. This issuance left 2,223,812 square feet of Future allocation for the Phase I & II area. This issuance replaces the originally approved Phase III expansion (and "Overall" condition) of Extended Dry Detention Basin (EDDB) #1 with two new EDDB's. EDDB #1 remains unmodified at the Phase I&II condition. The two new EDDB's, identified as Phase IIIA and Phase IIIB on the plans, are permitted as a variation to the rules based on the 4/20/2021 Major 3.2 2004 "Wilmington International Airport Stormwater Modification Master Plan" document, signed and sealed "Technical Justification " document dated April 13, 2021, and supplements as shown in the approved plans and specifications. The Phase IIIA EDDB has been designed to handle the runoff from 116,598 square feet of BUA and he Phase IIIB EDDB has been designed to handle the runoff from 367,596 square feet of BUA. This issuance approved the reallocation of 48,658 Minor square feet of future BUA within the EDDB #1 6/10/2021 Modification 3.3 drainage area for the construction of the Aero Center Wilmington project. This issuance left a total of 2,175,154 square feet of future allocation. Page 2 of 2 DEMLR USE ONLY Da a 4eceixed Fee Paid Permit Number STORMWATER PERMITTING FORM 7: MINOR MODIFICATION Standard Permitting Program — No Fee for Minor Modification Express Permitting Program — See Express Fee Schedule Only complete applications packages will be accepted and reviewed. This form and the required items (with original signatures) must be sent to the appropriate DEMLR Regional Office, which can be determined by locating the project on the interactive online map at: http://dea.nc.gov/contact/reaional-offices. This form is to only to be used by the current permittee to notify the Division of a minor modification. Pursuant to Rule 15A NCAC 02H .1002, a minor modification is a change to the project that: 1) does not increase the net built -upon area; and/or 2) does not change the size or design of the SCM(s). A. GENERAL INFORMATION 1. State Stormwater Permit Number: SW8 050547 2. Current Permit Holder's Company Name/Organization: New Hanover County Airport Authori 3. Signing Official's Name: Granseur Dick, PE 4. Signing Official's Title: Airport Director 5. Mailing Address: 1740 Airport Boulevard, Suite 12 City: Wilmington State: NC ZIP: 28405 6. Street Address (if different): City: State: ZIP: 7. Phone: (910) 341-4333 Email: GDick(a)_flyilm.com 8. Describe the minor modifications that you are requesting, including any revised BUA allocations (attach additional pages or supporting tables similar to Section IV.10 of the original application, if needed): The proposed project will be revising the drainage area and utilizing 48,658 square feet of the permitted built -upon area allocated for the Airport's master storm water management system covered under permit SW8-050587. See additional pages. B. SUBMITTAL REQUIREMENTS Please mark "Y" to confirm the items are included with this form. Please mark `X" if previously provided. If not applicable or not available, please mark N/A.: Y 1. Two hard copies (with original signatures) and one electronic copy of this completed form. Y 2. Two hard copies and one electronic copy of the revised plan sheets (must be a revision of the originally approved plan sheets). X 3. If there is reallocation of lot BUA, a copy of the revised recorded deed restrictions and protective covenants OR the proposed recorded deed restrictions and protective covenants documenting the changes and a signed agreement to provide the final recorded document. NA 4. If applicable, the appropriate Express review fee. RE�E�vE ANzo202,p BY: Stormwater Permit Form 7: Minor Modification Page 1 of 2 July 14, 2017 C. CONTACT INFORMATION 1. The Design Professional who is authorized to provide information on the Applicant's behalf: Design Professional's Name:Jason M. Smith, PE Consulting Firm: J M Smith Engineering, LLC Mailing Address:P O Box 331 City:Cornelia State:GA Zip:30531 Phone: (706) 894-2331 Fax: (678) 267-3731 Email::imsmith(a-'Imsmithengineering.com [OPTIONAL] If you would like to designate another person to answer questions about the project: Name & Title: Organization: Mailing Address: City:_ Phone: Email: : D. CERTIFICATION OF PERMITTEE State: Zip: Fax: ( ) I, Granseur Dick, PE , the current permittee, certify that I have authorized the minor modifications listed in Section A and shown in the attached revised plan sheets. I further attest that this information is accurate and complete to the best of my knowledge. Signature: Date: I,3-rS%OH'i\) ' — �rb I"J , a Notary Public fof the State of � JV--Tt� �J9'12�U1f1 Nji', County of , do hereby certify that U personally appeared before me this the 1 S day of P 1 l�~ 20 „21 , and acknowledge the due execution of the forgoing instrument. Witness my hand and official seal, (Notary Seal) Notary Sig My commis co - V z a O &OVER G �ECEIVE APR 2 0 2021 er•_ Stormwater Permit Form 7: Minor Modification Page 2 of 2 Oct 6, 2017 T-1 ` all M s n n m N cs W C" CDO Q U�� f7't Gi p Q R y aL. _ V pq IV lfl N l/1 N m 10 N N N C y.y .--1 .•-1 � I UI m 10 L Q CD op L U iq Ln 9)i m ��pp d� Ln lO N kl O C e-I N y U 4 c E Ln Ln N En ❑ ml m m Y Q OPU U N m M 0) LO st O O O V1 ri ip 000 aL-. U tD' n l0' Ln an 00 a cc E F ❑ m� Q U rn m m 00 c3 4 N N p�� m e-1 1-1 to a--1 Ln C E N N e-4 f0 N ❑ Iv �r M Lo tL Ln N m o p Ln o o Ln o C r, Ol o f pp rp n pf N Rt% �{ M N u"I � O re cD co UIm ` O O Q 0 0 0 0 0 0 0 O o y to m N C N tlI ml m N N -1 to lD Q` � o 0 0 0 0C:� o m m o co C N a4 M n` MI lO m co o m Q 00 rn w O O O o O n O oc N m o .I C � m ❑ * c m N E m m Q* �' y m N °� j• Q D v �. z s v Q Q O m u m o0 00 00 * z tv m to w Q t c n tm CL m `• °y' m m E o y m Q E Co lu L L j0 no O N 'u m v to to M E n vi to to to t t^ '„ m CIS at M Vf H 0 a 3e � 0 0 0 0 0 2 O w H c cu n C � co-CU 7 f° > 3 > E N tw Iv o a � O lu y L 3 m Q N G1 7 ++ C f6 m N 0o E Y = m L L � a Q a m v O t N TO ,; a 3 0o a � C ++ C O O N C O -0 C v v m a E Ea c' o .� m c0 m -0 w o `^ b5 ° C v c m m u E m to c m c M -_ +. E cu aL lV y y Q a s ❑ ai +� a? � c m -0 IU 0, � c Q v, � L H m N C a ++ m NCD W 7 C C Y N O N E -0 v E U v a; m O_ M U m d r O n E x u 03 — N N ° 3 i! t t L E at ° CU a M ' * O * m •> c L a v` v s 0 � o cc0 Q A m w o L H 00 Ln 3 `0 u � N �p a o H m Burd, Tina J From: Burd, Tina J Sent: Friday, April 23, 2021 3:48 PM To: gdick@flyilm.com; jmsmith@jmsmithengineering.com Subject: SW8 050547 - Wilmington International Airport The Wilmington Regional Office of the Division of Energy, Mineral and Land Resources (Stormwater Section) accepted the Stormwater Permit Minor Modification Application for the subject project on April 20, 2021. The project has been assigned to Garrett Zorda and you will be notified if additional information is needed. Please be advised that the construction of built -upon area may not commence until the Stormwater Permit is issued. Best Regards, Tina Burd Administrative Associate it Wilmington Regional Office Division of Environmental Assistance & Customer Service Phone 910-796-7215 NCDEQ Wilmington Regional Office 127 Cardinal Drive Ext. Wilmington, NC 28405 E_r?tail corres!jOncle'?G0 to aim.f1orn this a(ilife SS is stjbject 10 th NortF Carolina PiJbric deco ds L.avv and may be di.3t iose(! to ( ir(1 Verities. Website: httg://deg nc gov/aboutidivisionslener_gy-mineral-land-resources/stormwater Based on the current guidance to minimize the spread of COVID-ig, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQQoffice locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time.