Loading...
HomeMy WebLinkAboutSW8050547_Historical File_20130208 (2)Nrc D F. R R North Carolina Department of Environment and Natural Resources Division of Water Quality Pat McCrory Charles Wakild, P, E. Governor February 8, 2013 Director John E. Skvarla, III Secretary Jon W. Rosborough, Director New Hanover County Airport Authority 1740 Airport Boulevard Wilmington, NC 28405 Subject: Approved Plan Revision Wilmington International Airport Consolidated Rental Car Facility (CONRAC) Stormwater Project No. SW8 050547 New Hanover County Dear Mr. Rosborough: On January 24, 2013, the Wilmington Regional Office received a plan revision for Stormwater Management Permit Number SW8 050547. The revisions include the following specific changes: 1. The development of a Rental Car Facility within the Phase I & II drainage area of the previously permitted dry detention facility. The project is also within the grassed swale pre-treatment area approved under the November 29, 2012 permit modification, therefore, no additional on -site pre-treatment devices are required for the Consolidated Rental Car Facility. 2. Per the Notice to Proceed dated February 6, 2013, the date of substantial completion of the pre-treatment swales is targeted for April 8, 2013. Construction of the built -upon areas associated with the Consolidated Rental Car Facility may not commence prior to April 8, 2013, or prior to receipt of the Designer's Certification that the swales have been constructed in compliance with the November 29, 2012 approval. Construction of any built -upon area associated with the Consolidated Rental Car Facility prior to April 8, 2013, and/or failure to submit a copy of the certification to the Division of Water Quality are violations of the permit and subject to enforcement action as indicated in the permit. 3. A total of 205,202 square feet of built -upon area is currently proposed, leaving 3,173,667 square feet for future development within the Phase I & II drainage area. Development of the future areas shown on the approved Consolidated Rental Car Facility plans will require the submission and approval of those specific development plans. It has been determined that a formal permit modification is not required for the proposed changes. We are forwarding you an approved copy of the revised plans for your files. Please add the attached plans to the previously approved plan set. Please be aware that all terms and conditions of the modified permit issued on November 29, 2012, remain in full force and effect. Please also understand that the approval of this revision to the approved plans for the subject State Stormwater Permit is done on a case - by -case basis. Any other changes to this project must be approved through this Office prior to construction. The issuance of this plan revision does not preclude the permittee from complying with all other applicable statutes, rules, regulations or ordinances which may have jurisdiction over the proposed activity, and obtaining a permit or approval prior to construction. Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 Phone: 910-796-72151 FAX 910-350-20041 DENR Assistance:1-877-623.6748 Intemet: www.ncwaterquality.org An FouAl Onnnrhinity 1 Affinnatim Ac*nn Fmnlnvar ne � R'itffrall f/ State Stormwater Management Systems Permit No. SW8 050547 If you have any questions concerning this matter, please do not hesitate to call me at (910) 796- 7301. Sincerely, , Linda Lewis Environmental Engineer III GDS1arl: S:IWQSIStormwateAPermits & Projects120051050547 HD12013 02 permit -PR 050547 cc: Justin Dewey, P.E., RS&H Architects -Engineers -Planners, Inc. Julie Wilsey, Deputy Director, New Hanover County Airport Authority New Hanover County Building Inspections Wilmington Regional Office Stormwater File Page 2 of 3 State Stormwater Management Systems Permit No. SW8 050547 The master permit tables for Phase I and II were added to the permit on September 20, 2010, as part of the review for the modification to SW8 060515. Phase III was added on October 26, 2011. A modification to the tables was added on November 27, 2012. Master Permit No. SW8 050547 Phase I & II Basin Startin New BUA balance = 8 520,835-4,552,087 = 3,968 748 Mod/Offsite Permit No. Date Issued Offsite Project Name Proposed BUA Remaining BUA SW8 050801 General Aviation Apron Expansion 151,589 3,817,159 SW8 060326 Air Wilmington FBO Building 196,725 3,620,434 SW8 060515 Credit Card Parking Lot 225,722 3,394,712 SW8 050547 10/28/2009 ILM Phase I and Phase II for gravel roads 15,843 3,378,869 SW8 050547 11/27/2012 Delineate a new overall DA, increase the max BUA allowed. 0 3,378,869 SW8 050547 2/8/2013 Consolidated Rental Car Facility (CON RAC) 205,202 3,173,667 Master Permit No. SW8 050547 Overall Basin Offsite Permit No. Date Issued Offsite Project Name Proposed BUA Remaining BUA Page 3 of 3 Date o-lff,� DWQ USE ONLY Fee Paid (express only) I -A&/rJ/U Permit Number State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT PLAN REVISION APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Stormwater Management Permit Number: SW8 050547 2. Project Name: Consolidated Rental Car Facility (CONRAC) at Wilmington International Airport 3. Permit Holder's name (specify the name of the corporation, individual, etc.): New Hanover County Airport Authority 4. Print Owner/Signing Official's name and title (person legally responsible for permit): Ton W. Rosborough, Airport Director 5. Mailing Address for person listed in item 2 above: 1740 Airport Boulevard City:Wilmington State:NC 8405 Phone: (910 ) 341-4333 Fax: (910 ) 341- 5 Email:Trosborough@flyihn.com II. PLAN REVISION INFORMATION 1. Summarize the plan revision prosed (attach additional pages if needed): master stormwater manaizement system covered under permit SW8-050547. III. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the DWQ Office that issued the permit. 1. Please indicate that you have provided the following required information by initialing in the space provided next to each item. als o Original & 1 copy of the Plan Revision Application Form o Two (2) copies of revised plans (must be revisions of original approved plan sheet(s)) If applying for Express review (only available in 20 coastal counties): o Application fee of $500.00 (made payable to NCDENR)Q,)I VI. APPLICANT'S CERTIFICATION I, (print or type name of person listed in General Information, item 3) Ion W. Rosborough certify that I have authorized these plan revisions and that the information included on this plan revision application is, t e best of wle ge, cor ect and complete. Signature: Date: 01J 9 f 3 Plan Revision Form Rev l Muly2010 age 1 o JAN 2 4 204 Lewis,Linda From: Julie Wilsey [JWilsey@flyilm.com] Sent: Thursday, February 07, 2013 3:02 PM To: Lewis,Linda Cc: 'Tim Clinkscales'; 'Crespi, Roberto'; Whitney Prease Subject: RE: Consolidated Car Rental Facility SW8 050547 Plan Revision Attachments: image001.jpg; SCAN 20130207091948.PDF; SCAN_20130207092557.PDF Importance: High Linda, Attached you will find the notice of award and NTP for our project. The Airport Authority awarded the contract to Thomson, Corder & Company. The project has 60 days allocated in the contract. Please let me know if you need anything else. Respectfully, Julie A. Wilsey AAE Deputy Airport Director Wilmington International Airport (ILM) (910) 341-4333 ext 1002 From: Lewis,Linda [mailto:linda.lewis@ncdenr.gov] Sent: Friday, February 01, 2013 11:24 AM To: Julie Wilsey Cc: Whitney Prease; 'Crespi, Roberto' Subject: RE: Consolidated Car Rental Facility SW8 050547 Plan Revision Julie: Via email attachment will be fine. Thanks and I hope you have a great weekend, too. Linda Lewis NC Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Julie Wilsey [mailto:JWilsey@flyilm.com] Sent: Friday, February 01, 2013 11:14 AM To: Lewis,Linda Cc: Whitney Prease; 'Crespi, Roberto' Subject: RE: Consolidated Car Rental Facility SW8 050547 Plan Revision Linda, That sounds like a good arrangement. How do you want the information? We can provide a copy of the award letter and proposed schedule via email. We appreciate your cooperation and understanding. Have a great weekend! Julie A. Wilsey AAE Deputy Airport Director Wilmington International Airport (ILM) (910) 341-4333 ext 1002 From: Lewis,Linda rmailto:linda.lewisCa-Dncdenr aov] Sent: Thursday, January 31, 2013 10:20 AM To: Julie Wilsey Cc: Whitney Prease; 'Crespi, Roberto' Subject: RE: Consolidated Car Rental Facility SW8 050547 Plan Revision Julie Georgette indicated that we could issue the permit contingent upon receipt of a copy of the awarded swale construction contract and a construction schedule. In addition to the previously mentioned requirement for the swales to be complete, stable and certified before commending construction on the car rental facility, the swale construction schedule will be added to the permit as a compliance condition. So, we're on hold at least until Feb. 6, 2013, when you can send over the contract and schedule. Glad we could help out. Linda Lewis NC Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Julie Wilsey rma!Ito:JWilsgWfly!Im.com] Sent: Wednesday, January 30, 2013 1:36 PM To: Lewis,Linda Cc: Whitney Prease; 'Crespi, Roberto' Subject: RE: Consolidated Car Rental Facility SW8 050547 Plan Revision Linda, MEMORY TRANSMISSION REPORT TIME :02-11-'13 10:49 FAX NO.1 :910-350-2004 NAME :DENR Wilmington FILE NO. 028 DATE 02.11 10:49 TO : 8 93414365 DOCUMENT PAGES 4 START TIME 02.11 10:49 END TIME 02.11 10:49 PAGES SENT 4 STATUS OK *** SUCCESSFUL TX NOTICE *** State o=1HortL Carolina bepartmsnt of Eavrroanaeat wad r4ataral besoorcas oVOmiaston >4amia-1 orrice Bsvarh� Sat�t Perdtra Doveraor FAX COVF i SYIEET �tw ]oi+ssri.dn� Seerotary '1'0: �••/Cr .ram /� 4S ,dAiC o u 6-st From_ to Casmer Fait: j910] 350-2004 1Yn: C�Ao � s � G i o ..v-rwr'-� ���✓ �./ G Cry .� �i9c� . - G i ' s �/ .�-r .G!/i _G'�r9i"� a.,- moo.+-! �N �-�iw��a-y �o �✓ .yG � "G�® ��T' 127 Cardinal Drive Extension, Wilmingtolt, 14C 2840s a (910) 796-727 S e An Equal 'Opport—ily r,native Actiaa Employer State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Beverly Eaves Perdue, Governor FAX COVER SHEET Dee Freeman, Secretary Date: — //— / -5 To: Fax: Re: AI rsG �L� 91 No. Pages (excl. cover): From: Jo Casmer Phone: (910) 796-7336___.._.__... Fax: (910) 350-2004 127 Cardinal Drive Extension, Wilmington, NC 28405 a (910) 796-7215 o An Equal Opportunity Affirmative Action Employer MEMORY TRANSMISSION REPORT TIME :02-11-'13 10:44 FAX NO.1 :910-350-2004 NAME :DENR Wilmington FILE NO. 027 DATE 02.11 10:42 TO : S 919042562501 DOCUMENT PAGES 4 START TIME 02.11 10:43 END TIME 02.11 10:44 PAGES SENT 4 STATUS OR *** SUCCESSFUL TX NOTICE *** stata orrTtrth cawuuno Department or En%-Z o ant and Natural Raov.. e— WlAstnmton RCat-nat ckma Ar"mww s Sevw w Cwveroor FAX COVER 038MET Drs F7r�. 8aoretaty W.D. Pages (wccl_ covpr�: To. . ✓ � �`-' y�^�✓ //��sy E �i ®� From: ]o Casmar Fax:, f91W 350.2004 R,,e: o �.s� G .:� .�- �E� /���✓ T. � G C,,.�r i�f3 c� - C � - r �l 127 Cardmp1 Drjv E]ctcnsjo , Wilminaten. NC 29405 a (910) 796-721 5 e An 8qual Opportunity AtTlrmative Action Employer State of North Carolina (Department of Environment and Natural Resources Wilmington Regional Office Beverly Eaves Perdue, Governor FAX COVER SHEET Date: To: Fax: Re: Dee Freeman, Seeretary No. Pages (excl. cover): — From: Jo Casmer Phone: (910) 796-7336 _.__... Fax: (910) 350-2004 127 Cardin! Drive Extension, Wilmington, NC 28405 e (910) 796-7215 o An Equal Opportunity Affirmative Action Employer lw I 71" I 71" m o z m m j5 Cn Z Z 80 z ECEIVE FEB 0 i &U w BY:--56UF050 S4'? Project: Pre -Treatment Swale Construction OM 1 Notice of Award Date: February 6, 2013 Owner: New Hanover County Airport Authority vmer'r. Contract No.. - Contract: Engineer's Project No.: 12212.PE Bidder: Thomson, Corder & Co., Inc. Bidder's Address: P.O. Box 12167 W11MIngt0n, NU 28405 You are notified that your Bid dated February 4.2013 for the above Contract has been considered. You are the Successful Bidder and are awarded a Contract for Pre -Treatment Swale Construction The Contract Price of your Contract is Two Hundred and Ten Thousand Forty Dollars and 001100 Dollars ($ 205.040). Item No. Description 1 Mobili2ation 2 72" RCP Flared End Section 3 Removal of 72" RCP SD Pipe 4 Clearing and Grubbing 5 Net Cut 6 As -built Survey 7 Seeding and Mulching 8 Rip Rap Apron 9 Stockpile Transport Suitable Fill Material (Includes Shaping and stabilization) 10 Removal of 24" RCP SD Pipe 11 Removal of Drop Inlet Total of all Bid Prices (Unit Price Work) UNIT PRICE W Estimated Bid Unit unit Ouantity Price Bid Price LS 1 28,650.00 28,650.00 LS 4 6,600.00 26,400.00 LF 370 57.00 21,090.00 AC 2.5 10.00 25.00 CY 14,500 3.75 54,375.00 LS 1 2,000.00 2,000.00 AC 4 3,500.00 14,000.00 EA 5 5,500.00 27,500.00 EA 1 12,000.00 12,000.00 LF 100 10.00 11000.00 EA 1 500.00 500.00 Note: All prices for items 1-11 above include any and all testing required by the contract documents $187,540.00 EJCDC C-5I0 Notice of Award Prepared by the Engineers Joint Contract Documents Committee and endorsed by the Construction specifications Institute. Page t of 2 ADD ALTERNATE WORK Item Estimated Bid Unit No Description Unit Quanti Price Bid Price 12 Add: Haul of Unsuitable Material CY 3000 7.50 22,500.00 i3 Deduct: 72" RCP Cuts EA 4-1250.00-5000.00 Total of all Bid Prices (Add Alternate Work) $17.500.00 3 copies of the proposed Contract Documents (except Drawings) accompany this Notice of Award. 2 sets of the Drawings will be delivered separately or otherwise made available to you immediately. You must provide shop drawings to the Engineer for review within 12 days of the date you receive this Notice of Award. You must comply with the following conditions precedent within 10 days of the date you receive this Notice of Award. 1. Deliver to the Owner 3 fully executed counterparts of the Contract Documents. 2. Deliver with the executed Contract Documents the Contract security Bonds as specified in the Instructions to Bidders (Article 20), General Conditions (Paragraph 5.01), and Supplementary Conditions (Paragraph SC-5.01). with these conditions within the time specified will entitle Owner to consider you in Notice of Award. w1iten�da�\f'�� fir to f the onrac c°,.- :>40 Copy to Engineer You comply with the above conditions, Owner will return to you one fully executed t Documents. tiue ECEIVG FEB 0 7 2013 BY: 5cw3050s42 P/Qn r'evr'sl`cn Thin InstFumot Has Been IftAuda d In The Manner Required By The local tsovemment Budget And Fiscal Control Aai EJCDC C-510 Notice of Award Prepared by the Engineers Joint Contract Documents Commithse and endorsed by the Construction Specifications Institute. Page 2 of 2 ECEIVE FEB 0 7 200 BY: S�i 70so4- p p. ra,s,c-, Project: Pre -Treatment Swale Construction Notice to Proceed Date: February 6, 2013 uwner: New Hanover County Airport Authority (Owner's Contract No.: Contract: nginneer's Project No.: 12212.PE contractor: Thomson, Corder & Co, Inc. Contractor's Address: P.O. Box 12167 Wilmington, NC 28405 You are notified that the Contract Times under the above Contract will commence to run on February 7, 2013. On or before that date, you are to start performing your obligations under the Contract Documents. In accordance with Article 2 of the Agreement, the date of Substantial Completion is April 8, 2013, and the date of readiness for final payment is [(or) the number of days to achieve Substantial Completion is b0, and the number of days to achieve readiness for final payment is 751. Before you may start any Work at the Site, Paragraph 2.01.B of the General Conditions provides that you and Owner must each deliver to the other (with copies to Engineer and other identified additional insureds and loss payees) certificates of insurance which each is required to purchase and maintain in accordance with, the Contract Documents. Owner Give y: . �y A nzed Signature Title T tt � n l W98.:�3tF,t Date — Copy to Engineer � � This tieliiiment Has Been P Manner Required By The local Goyemment Budget An Fiscal Control Act. EJCDC C-550 Notice to Proceed Prepared by the Engineers Joint Contract Documents Committee and endorsed by the Construction Specitications Institute. Page 1 of 1 New Hanover County Airport Authority WI LM I NGTON INTERNATIONAL AIRPORT CONSOLIDATED RENTAL CAR FACILITY StormWater Management Permit New Hanover County Wilmington, North Carolina RS&H No. 203-2575-000 January 2013 R*JW.'" IMPROVING YOUR WORLD RS&H Architects -Engineers -Planners, Inc 8008 Corporate Center Drive Suite 410 Charlotte, NC 28226-4489 704-752-0610 www.rsandh.com C� 's; Q- E r. 6 =CEIVE ///! IAI 111�\\ JAN 14 2013 Wilmington International Airport Consolidated Rental Car Facility Stormwater Management Permit TABLE OF CONTENTS GENERAL INFORMATION......................................................................................... ProjectDescription.................................................................................................. Site Description and Adjacent Property.................................................................. PermittingRequirements......................................................................................... EXISTINGCONDITIONS............................................................................................ Groundwater............................................................................................................ Basin Delineation and Drainage Patterns............................................................... NRCSSoils............................................................................................................. PROPOSEDCONDITIONS........................................................................................ Basin Delineation and Drainage Patterns............................................................... NRCSSoils............................................................................................................. Treatment and Attenuation Requirement Summary ............................................... Proposed Conditions Discharge.............................................................................. Environmental Impacts............................................................................................ Operation and Maintenance.................................................................................... CONCLUSION............................................................................................................ LIST OF FIGURES -.dli ; r /MPROWNG YOUR WORLD Reynolds, Smith and Hilts,:no. .....................1 .....................1 ..................... 2 ..................... 2 ..................... 3 ..................... 3 ..................... 3 ..................... 3 ..................... 4 ..................... 4 ..................... 4 ..................... 4 ..................... 5 ..................... 5 ..................... 5 ..................... 5 Figure1 — Project Location Map......................................................................................................1 Figure2 — NRCS Soils Map............................................................................................................. II Figure3 — USGS Quad Map........................................................................................................... III LIST OF APPENDICES AppendixA — Permit Exhibits............................................................................................................ Appendix B — DWQ Operation and Maintenance Agreements.......................................................IV Appendix C — New Hanover County Stormwater Operation and Maintenance Plan/Schedule & Agreement........................................................................................................................................ V Appendix D — SUPPORTING CALCULATIONS.............................................................................VI Appendix E — GEOTECHNICAL REPORT....................................................................................VII New Hanover County Airport Authority Wilmington International Airport RSK Consolidated Rental Car Facility /MP"WNGYOUR WORLD Stormwater Management Permit Reynotds,Smhhand HiRs,Inc. GENERAL INFORMATION Project Description Wilmington International Airport is located in New Hanover County, North Carolina, approximately three (3) miles northeast of the City of Wilmington, North Carolina, at the intersection of North 22nd Street and Airport Blvd. See Figure 1 — Project Location Map. Figure 1 — Project Location Map '.InHD4 'OT LOCATIO ' Air !4 WILMINGTON INTERNATIONAL AIRPORT resrmug a Osh'�p MAIN TERMINAL �, p oV4gJia 'b AIRPORT RLV . G}P•Cn E�•,v W ."L'fiR0A0RPL''t E9;i,:M1 nay o ° sau r 47ope1 YYO Rough O A•ye.: o ' ' North o aws! M s 500, -r--, 500' °K` eco�cfx'a Faf1m:•1c "y fA 4:n. .If J#J.'ptW iG$U Sow h' i.Mv i CW' .J 'iuY.Y,'4 aOJ14ti,RIG � J.� •.,N s{n • The New Hanover County Airport Authority, owner and operator of Wilmington International (ILM) has retained RS&H Architects -Engineers -Planners, Inc. (RS&H) to provide engineering and architectural design services for the construction of a new offsite consolidated rental car storage and turnover facility (CONRAC). The project is located on the northwest side of the airport property at the corner of Blue Clay Road and Hall Drive. Construction is estimated to begin in February 2012. Refer to Figure o, above for the Project Location Map and Figure 3 in Appendix A for the USGS Quad Map. New Hanover County Airport Authority Wilmington International Airport RSH Consolidated Rental Car Facility IMPROVING YOUR WORLD Stormwater Management Permit Reynold., 9mhh■nd H111s, Inc. Site Description and Adjacent Property The existing site of the proposed CONRAC facility is bound by Hall Drive to the south and a CSX railway corridor to the west. The north and east sides of the site are bound by wooded lots that are currently owned by the Airport Authority. The lots are being reserved for future expansion of the currently proposed facility along with other industrial development. A portion of the offsite wooded lots to the north and east drain through the proposed site via drainage ditches that will be re -aligned as part of this project and ultimately will be conveyed and treated in the permitted facility authorized by permit number SW8-050547. The site is a cleared field of generally level grade with minimal slopes gently sloping from the northern side of the site to the southern side toward the Hall Drive roadside conveyances. The disturbed area of the project will be 7.5 acres and will include the building footprints, access road, storage lots, and grass drainage channels. Permitting Requirements The proposed project will require the following environmental permits associated with stormwater management and erosion and sedimentation control. The purpose of this application is to obtain a permit for the development and associated stormwater conveyances within the project area of the CONRAC facility. A separate project designed by Talbert & Bright, Inc. proposes a conveyance system that will connect the CONRAC facility system to an existing 72-inch pipe. The 72-inch pipe will convey water to the proposed pre-treatment facility permitted by Paramounte Engineering under permit number SW8-050547Mod. This proposed conveyance system, designed by Talbert & Bright, Inc., will be permitted separately. ■ Stormwater Permit, Authorization -to -Construct (ATC): This permit is required by New Hanover County Engineering Department prior to any land disturbing activity in unincorporated areas of the County. ■ State Stormwater Management Permit: This permit is required by North Carolina Department of Environment and Natural Resources (NCDENR) Division of Water Quality (DWQ). The proposed project is within the area permitted for future development in Stormwater permit SW8-050547 High Density Dry Detention Basin Project for Wilmington International Airport. This application intends to be a plan revision for SW8-050547. ■ Sedimentation/Erosion Control Plan: This permit, also applied for concurrently with the stormwater permit, is required by NCDENR Division of Land Resources for projects that disturb more than 1 acre. Refer to sheets C101-C112 in the enclosed plan set for erosion and sediment control plans, notes, and details. Also refer to the Erosion and Sediment Control Plan for more information. ■ NPDES Stormwater General Permit for Construction Activities: Upon receiving permit approval for the Sedimentation/Erosion Control Plan, the project will automatically be covered by a state NPDES Stormwater General Permit NCG01000 from DWQ. New Hanover County Airport Authority 2 Wilmington International AirportsT Consolidated Rental Car Facility IMPROVING YOUR WORLD Stormwater Management Permit ftnama, amUh and wfa, Inc. EXISTING CONDITIONS The entire project site is located within one drainage basin. Refer to sheet C120 in the enclosed plan set for the Existing Drainage Basin Map. The existing site is located within the Smith Creek Watershed located in the Cape Fear Basin. Smith Creek is classified as Class C Swamp waters (C;Sw). Class C is a primary freshwater classification described by DWQ as "waters protected for uses such as secondary recreation, fishing, wildlife, fish consumption, aquatic life including propagation, survival and maintenance of biological integrity, and agriculture. Secondary recreation includes, "wading, boating, and other uses involving human body contact with water where such activities take place in an infrequent, unorganized, or incidental manner". Swamp waters is a supplemental classification described by DWQ as "waters which have low velocities and other natural characteristics which are different from adjacent streams". Groundwater Geotechnical reports for the project show groundwater measurements of 5 feet below existing ground and an estimated seasonal high groundwater table of 13 to 18 inches below existing ground. Refer to Appendix E for the geotechnical report. Basin Delineation and Drainage Patterns The existing area proposed for the CONRAC facility is approximately 7.5 acres and is currently served by a series of open conveyance ditches to an open Swale for discharge into the Smith Creek Watershed. There are no impervious areas on the existing site. Refer to sheet C120 in the enclosed plan set for the Existing Drainage Basin Map. NRCS Soils The U.S. Department of Agriculture, Natural Resources Conservation Service (NRCS) maps for New Hanover County, North Carolina (Refer to Figure 2 in Appendix A for the Soils Map) indicate the following mapping units underlie the development area: Leon sand (Le) and Lynchburg fine sandy loam (Ls). Leon sand consists of about 80% poorly drained Leon soils. Slopes are 0 to 2 percent, and the shrink -swell potential is low. Lynchburg fine sandy loam consists of about 85% drained Lynchburg soils and 5% undrained Lynchburg soils. Minor components make up the rest of the soil composition. The natural drainage class of both types of Lynchburg soils is somewhat poorly drained. Slopes range from 0 to 2 percent and the shrink - swell potential is low. New Hanover County Airport Authority 3 Wilmington International Airport Consolidated Rental Car Facility IMPROWNO 44( i iaRiv Stormwater Management Permit Reynolds, Smith and 1110s, Inc. PROPOSED CONDITIONS The CONRAC facility project includes the construction of three administrative/maintenance buildings with an overall total square footage of 3,400 sq.-ft and three vehicle storage lots with a total area of approximately 4 acres to accommodate the storage of 435 vehicles with considerations for a future expansion of the lot to accommodate an additional 240 vehicles. The project will be constructed in phases. This permit plan revision will include BUA for the ultimate buildout but will construct only the first phase. The first phase will construct 205,202 sq-ft of impervious area and will later be expanded to a total of 341,213 sq-ft of impervious area. Basin Delineation and Drainage Patterns The proposed design for CONRAC facility combines the existing drainage patterns with the new impervious areas. The proposed site will be graded to facilitate positive drainage along existing and proposed open and piped conveyances. The existing ditches will be re -aligned and re-routed into a pipe conveyance system that will ultimately make its way to the Airport's on -site storm water management facility. The existing roadside ditch system along Hall Drive will be re -graded in the area of the proposed site to connect hvdraulic gradient lines and maintain existina drainage patterns from the offsite storm water runoff on either side of the project limits. Effectively all of the new impervious area will be drained to the re -aligned ditches to be treated in the Airport's storm water management facility, while minimal amounts of new impervious area (<0.1 acre) will contribute to the re -graded roadside ditch. See sheet C121 in the enclosed plan set for the Proposed Drainage Basin Map. NRCS Soils The majority of the proposed soil strata for this site will be composed of the re -graded existing soil material or soil of like characteristics. Therefore, proposed soils will be taken as equivalent with the existing. Treatment and Attenuation Requirement Summary All runoff from the site is being rotated to the Airport's master stormwater management facility which includes two grassed swales for pre-treatment and a dry detention basin for attenuation. These facilities are permitted under DENR stormwater permit SW8-050547. Permit SW8-050547, recently modified by Paramounte Engineering, permits future development within the airport business park which will be treated and attenuated by the existing facilities. This application will be a plan revision to use permitted future Built Upon Area (BUA) allocated in permit SW8-050547. The proposed project lies within the permitted area known as "Pre -Treatment Area #2" which is routed to Pre -Treatment Swale #2 before entering the dry detention basin. New Hanover County Airport Authority 4 Wilmington International Airport Consolidated Rental Car Facility Stormwater Management Permit IMPROVIN47 VVUR WORLO Reynolds, Smith and Hills, Inc. Proposed BUA is 205,202 sq-ft in the first phase of CONRAC construction and will be expanded to a total of 341,213 sq-ft in the full buildout. Proposed Conditions Discharge Proposed conveyance systems have been designed for the 10-year storm event, based on precipitation data from the New Hanover County Stormwater Design Manual. Refer to Appendix D for supporting calculations. RS&H provided the site post -development discharge rate to Talbert & Bright, Inc. who designed the downstream conveyance system, as part of a separate project, to route runoff to the Airport's master stormwater management facilities. All stormwater calculations assume the future conditions (i.e. ultimate buildout). Environmental Impacts Wetlands - No wetlands will be impacted by the project. Floodplains - According to FEMA Flood Insurance Rate Maps (FIRM), the proposed project will not encroach on any FEMA floodplains. Operation and Maintenance The dry detention basin and grassed swales of the Airport's master stormwater management facility will be maintained according to the DWQ Operation and Maintenance Agreements (refer to Appendix B). The on -site conveyance ditches within the CONRAC facility will be maintained according to the New Hanover County Stormwater Operation and Maintenance Plan/Schedule & Agreement (refer to Appendix C). CONCLUSION Runoff from the CONRAC site will be conveyed to the Airport's treatment facility by existing onsite conveyance system that is being modified by Talbert and Bright. Treatment and attenuation for the project is included in the master treatment facility, recently modified by Paramounte Engineering. DENR stormwater permit SW8-050547 will be revised to include the proposed project BUA of 341,213 sq-ft. New Hanover County Airport Authority 5 Wilmington International Airport Consolidated Rental Car Facility Stormwater Management Permit Figure 2 — NRCS Soils Map IMPROVING YOUR WORLD Reynolds, Smith end Hills, Inc. .s: An—%' 6 n Wilmington International Airport Consolidated Rental Car Facility Stormwater Management Permit Figure 3 — USGS Quad Map R*K. IMPROVING YOUR WORLD Reynolds, Smiftl and Hills, Inc, Lo nd Property Lne A ,r ppA r.✓ �• r 7r� + y..�-.+.-... � � ji i • k j *`` - . 4^ 0 ISO I�epY ";Y }N 5 • ,,. """.# `..+� sY' `ttj',1 "t' • ; s�` � P . fitr t #` A1._4 - • .. y �+`r�,{ i�_.e•{} �' S a _...�,o-"#mod- E t�i_. k ._ ..I �F �+., ? . - • • ##'„'Pita et��ERkaNi�' ��rr1,* f •gam �'r. ... - qw �, r .. ! t• �.a'+4' e l.I r, P .. � - 1. ' fir: , t'ff� 1 � ; „ Tf`• .��� ' �g. �.. � � " � � •��*+tiMi*,y'T �:''a`•"t.�eiy �'� "O ,�" r`+= fc 7�?+f� 1.;•,`':. ,ra'?. f • �i + s, x,l `" •°� °s' y ''} ; rf t :r'a ..4 y,.. 1'^+L 'y 1 ♦iA 1�r t r,.1 i }'�'„y yam. .r .` .. . fit. 12.1 • i"F':i"'N!i.'4 y .s + r 't .-i �'`� if..--Y 'f.. �'•� ��r 'fir. h._�- -�„ "'�.;.3,r z g::.• � r- i ;i- � s ^+.,w }":fir l/•. E ,�..._��# � R•5 <.� � 4.. +v'7. . r .i-'' :r. i:j _tii titTt`i c+' ° t ; fop io s 'i i� �� .r'i r iG°< /•. sl�� _ x 'f'i{���+rr� % fiw, ��iK MI ° .�� ;�e� �T�7d .^• "—' �"?�•-� t^ `•r.' ��� fit -� wY x .� y1 .�. , •,F ,'C. °. �. M i.' _ f Ali *7'' -rrYYtt. r) its - wy �7F � !t'.•r€,W .. jr . + .w a°+ 'i*".."T'_. r k .e •\4,5F } s , y � fi" ,l r��\1 r1- "'. �. IK :e-` - ..Y ��•a(�{�tR.'~ ''<•� rx -�� Y a•«r ••,�,; < e� t y l�if � > � 3 � v 'a' S,� �•4 � /,/� II ,...� �+ ice= �� t Ala �• s.. . f•. ` y.'•ir,! �S. i,� Y - r y a 3 \r. ,r^• r � ! :'� �a �'• .R.V Z GT C a _ � O 3 e� ZU I � i I o f m �o 4 0 0 a 0 0 a 0 °m I0 E I F of vi i c a ! ui Id ' ed rr I: 0 I r` o 0 0 n 10 W o O N t0 I O N a O O jry N a i� ' N a G G 6 6 O 6 C5 O O cm c�cO c 9 S 9 9 9 S o 25 d o 0 o a a o d o •- W N m en co m m m m C 8 LL 07 en of en cn a u002 N CJ 00 C {V�n d o c c d O o c o cNn o n ufOi lii ry o m c ed ed Id vi Id Ippn�� Id v $ O Q! m ao m ~ C O eV 6 ei V u) W td o 0 0 0 0 0 0 0 0 a 'o a p d o o o d o 0 o c 9 C () �N OfN OfN TN O�fN W i W N Odic- ONiIc ci o 6 6 o d d o d d d o d d d ,b 7 7 H0Hdc 0 o o o Pi do as ad ad do do cd I � o eon eon c� o4i o egi uoi � g o 0 0 0 0 0 o d d o c d d d o �EI!EL Ir.IrrrIE J�E� I I o ~ 8 } + N c+n m V v 1 f O O+ O O Ip�} O O O. O O It cmN m m 4 4 �C O y E � C Y LL m m tl yII II c > co IL m m C N U Ca Cu 0 0 a— 0 0 i CA yC0 .73 Cv T �vad — I cc 0 y c >, m N Q CD 0 s 0 <r- CD C 0o JA mO N nl I Qa mL: EN 7 O f0 Zz s u] -6m O U O a` a.. o IC �a Im I Ic U .c c c c c c i°c c IVV i1= "g5qm n a Ir n cl Em n �w E'0 ni I vi vi im i N m m I m m m umi u�i r° O O I r` O cq O N f^O v o m o n c m o rn 0 rn o o I' Ir umi d 0 0 0 0 0 0 0 0 co N of N m m co M N ELI ID m r: CS of 0 n w q tC W N n ill N �q 10 N0 W Iff N N impp O C [V @] Of IA w e m w m m m m m m m 6 0 0 0 6 6 o nz N O 0 0 1(1 O OiN 6 0 I A O qN cc N O qN cc N O W N do N NN O al mN N O 0 0 N O N a?a? cc m N O Ea IO NN R C mo f oTo� �Ivl 0�r� Co 0W 0o 00 0 0�0 00 0 di O 0 O 0 O 0 0 0 c 0 io- FF0 0 4 0 NN 0 0 tpJ 0 p0p V 0 7 0 11 0 H+1 rE O 1+ pN 8 O O i O N + N W N 4 a A YI-'�I a T m m N m O/ m N m pU T Cid cn cc U N m � i i f I ' o C o to �o C io IC o io o C 1�IOO IF 0 od a pp W5 V) CC? N YS m E O L(�v� 00 n n (0 I N 0 i G 10 I Ill tn0 f� OHO Of � O N O O d G 0 O O O c g S g S g g o g o d o d d d d d d M M M M M M M M M t N N N N N N N N M M M M E.- N 0 OJ sf le m n aD a ' O OQi O � O w G N m O ONO 0 OR O n tM+1 OMO yO N m m 0 In IN Ippn�� Ilpol Ipl�) O O IIf�0) 01 10 N �" O N OJ tC V N 10 m O m f0 t0 f0 t0 t0 d ml 10 f0 U V IN0 p Of N 1N0 Of p N 110O pp OfN 0 0 i O-fN 0 0 TN 0 0 W N 0 0 0�1N 0 0 SNO0 co y mo �o �o �o �� �� �o Imp �m dd d d do 0 o 0o d o 00 00 00 O o o 0 8i 0 � 0 o4i 0 �i 0 chi 0 c� 0 0 fil o d d d d d N Q Q Fd I2 Fd ¢ Fd ¢ Jr. t I ! I o p I m V }} V b .y N L U 0 CO ry0+ L.L 0 i-+ a) a) 0 CO ad v! Et M T CD J U 2s m d d m m m m �m d �, C C C C I� C C C 0 C C C g C C @ C C C C g C C C I N N N m -j m n !c� LQ I� n N CV O) Oi In IN m pW F �{ I I N N N I N N N F F CC pp O m A W 'ef ye C C (mV. 00 m (q O m m O m O m C m C m m m m IIn V] m 4 d i O ry^O O iG Y'1 fV •Ol m m m W N N T m Co W m fO Ql OO N N N N N C7 N 9g O O O " N M 7 1� M m m m 10 m W W N W co W m W f� W O O N O M O u1 O h O W O C O G O G O C O O O O O O s o 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 O O O O O O O C OO O OO OO OO OO OO OO C G OO M M M co M M M M M M M M M M M co M M M m- N N N N N N N N N N N N N N N N N N LL 2 M M M M M M M M M M M M M m h m O N M to m m O N M M M N O a a t7 a a N UI vi fD f0 f0 fA I� r m m 6 6 - C O O N O O O o O O o O o O O O O G Jp Lo P% W N m W N rn N Iq m M LO N V O O W m 1� m m m V "m N m C rc w m w ui m ui vi ui v v v v v O m m N M N m m m W N v m m m m a N O N N (V W m N W i0 N Oq N �b t i vs .p4 Ld `1 w ^ w d m N N N N N `Q^ G O G C G C O G G 1i 0 N O m 0 m 0 m 0 m 0 N O m 0 N O m 0 m 0 m 0 m 0 m 0 m 0 m 0 m 0 N O V �N W N W N m W N N W N mN OfN W N W N qN 4iN W N W N 0!N N'm qN 4?N 4?N W N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O G O 0 0 cc cc O O 0 0 0 0 o 0 O O O O O O O O O O O O O M O O O O O M O O O O O O O O O O O O O O C G O G G C O fV 0 0 G O C G 0 0 O G cc cc cc cc cc cc C C G G G O C C 0 0 0 0 0 0 00n 0 25 25 o 0 0 0 0 0 0 o c o c c d d d d d d d d 6 c c d d �� Fd � IG[ � OF[ OF[ I2 2 2 OF[ I� IOFC IQ 2 R OFC R R OF[ I2 O O o O O O O O O O O O O O O O I. o o o + o r N N M M V -T Y off m m m 1� 1� m m m W r r 8U9 N N m m M M t b 1f1 t0 t0 !� f� 0 m LM co N L U fz O O N N v! 0 co Z ad co cc as 0 0 � O G G N N N B 'B I -8 0 C C I@ I w IB r l r m im j o a v a v jp v v v d o 0 0 0 0 0 o i m N I!n I IN IN m m /0 m m m m m f0 If0 m m CD {I m + CD I In I O D O O O ! I m O O O O O O O O Ci cs O O O d O 16 O 6 O mN N N N N N N N N N N ro n 2 1�2 ai N i Ico F c� o m m O N O O N O O N o o O m O as m o om O o fq Op m o a a a N v N v mC R a q v qq v N a N a O a 1-Z m N N W m N N N N N N N o 0 0 0 IR O o o c! 2 p �a v vo do dd ov do dd do dd dd oa dd dd [io 06 a R N N rfm O d O C oo 0 0 C C e�m O 0 O 0 c7m So C C rim O O 0 0 aim O 0 O 0 oo O O C C e'�m O C O C rim 0 G C oo C C rim C C G m O i o o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O o o 0 O o c c df d o 0 o c rl c o Ir 0 I- I- {{{II CL m FE Q + 8 T N ++ ++ ++ }} 2 �Q�" Z Z Z pO + !O 16 r +d O N O N pO} yO O a d N O a O N yO� O rN oO f7 !7 LLo wo t ro E y0 g C Em LL 0 m m 3 W LL m m 9 p Co a) 0 >1>1 mm N m c T m O7 L p U I iI C, d id c Ic I� v I� c �c m m c C c d �+d c id c E I� Q' t o m m j Ci a a F T W W N W Q N O ! IW W W I O U G G 10 O O O O O ...: n O N G o C O O N W N N I� N M EV G N o O fW0 OCm O O O O O C N O N O Y O a CG g G Cm O C N O O O C O O N N tJ F a Co m Co Co m m m m Co m N N N N N N N N N t? LL Z m M m Co Co Co 0 F 0 Q m N N �2 6 li'i M V' a V V m ui . W In O O N O M W] O O m G m Q C n Q G W Q G N Q G M Q O N a O N a O ... n tG N f0 O m n Iff N N � IA N IN O 0 V ENO, Q IN-, Q G EV M l7 V L6 �6 �6 DO 0 0 0 0 0 0 0 0 0 0 0 o 0 d 0 o 0 c o o o o ow g o EQ m0 N cc W EnN 0 O 0 100 mN 0 0 0 lq NNOqO100qNqNqNmW N 0 OiN O O W 0 N 0 ON 0 0 OfN 0 0 EAN 0 0 TN 0 0 mN 0 0 EE b 7 � N N m � 0 0 0 m 0 � 0 0 m � 0 0 0 W 0 0 0 c m 0 0 cc a 0 0 0 0 m 0 0 0 0 0 q 0 0 0 i t tgo.q c c ow � o o o 0 0 0 0 0 0 0 0 0 o O d Fd F0 Fc F0 F0 F0 F0 O W c N IN N o w O V lw V o 11 w + o fG O O+ O + O N O N O 1OO pO} tOO pO} 1(O}/ O ad cc Q � 0 0 U¢Q oC n N I : `m O Z Z 52 U 'u J N CDO EL a- 0 I I I 0 C C IC iC is �c C C C C io c c c c c c E P n r` 0 jN i' M V V N tU (O tU Id F� m ol 0 0 to •o I I 0 0 0 o o 0 0 w o 0 R t0 n N N OWi O A N fD 222 C O O O O O N J O O O O O O O C O ® M M M M M M M M M N N N N N N N N N N ✓ m � LL z In 1. r CWO a; � O Yf W M U O m0 Ll CY Of m n Y N n w V cq N O O le F' E o o ci vs m v v m w 0 6 0 0 0 0 6 6 6 0 0 E $' Q Q w a!N O N W N a?N NO W N MO W N NO q N NO W N �fIO W N NO Of N �[lO W N cc o 0 0 0 0 0 0 0 0 o o o o 6 o o C C 0 0 7 7 W O W O � O T O O O O O M O M O W O W O O O G O G G O G 0 0 C 0 0 G 0 0 66 0 0 0 G lV G i o 0 0 0 0 0 0 0 0 0 0 0 0 0 c 0 0 0 0 0 0 0 0 F0 I0 0 0 0 0 0 0 0 0 0 0 o i ci o+i c+o M a + + g} W + + N N M A V 4 9 LA A C i U U) 0 I..L 0 4— CD 0 N Y 0 x ad U � I U as o in I O C V C C C C C C c c c c c R I.a o 0 C 0 0 C 0 C 0 C 0 C 0 C 0 C 0 C 0 0 tl{ C 0 C 0 o C N E f [V to •f 7 N IG tD 1� n n n I� 1- C •yQ O Eno n n Imo m I S f00 N 1{pp 10 S G O O O O O iO I O O O O O I n n N m n o m n�, n°�, I rai• o°Di, 7 � a S 7 o c o 0 0 0 o I c c S g o c c 0 d o o c o 0 0 0 0 0 m M N @•1 m N m m m @] m m c� N fV N N N N N N N N M m M 1 m co N ro n m a M n m p d ; I.- o fV Imo co `C Iq o m w 1l Lq m m O O m N m S GD m IO w It m N ao O m m n n n N n o o c o 0 o 0 0 0 o 0 0 n IN+) o m Imo Lq M cmv S v e0 ,_. Id Ic Ic Iri Iri vi ui Ili Iri vi v v o o m n r G CV C'i O O o 0 E e N N t0 N t0 10 ID N t0 tD t0 t0 c o 0 o c c o c o 0 0 0 o O 2 E _a oc o0 00 06 co 00 00 0o co 00 0o co .6.6 > > fp N dN N r 0 N N O IO N O m N O f0 N O f0 7 N O f0 N r 0 f0 N O IO N O t0 N O IO N O t0 N O d o C o C o OO o 0 o o C o n . o 0 G O 0 0 0 0 0 0 o Om O O O O O O O O O o O 0 0 0 0 0 o O o O O o 0 O O O O O O O O O O O O Ir. I rc rr rc jr. Jr. 1� O S O} O+ N} ® ~ ILl + N N N A 10 A 10+0 A V V N ID ID O O O O O O O} O{ O} O O N N W m 2) Co L 0 �F+ 0 CO Co 0 0 4— i f 0 0 0 0 `lII0 0 .0 0 0 0 0 p� 0 0 0 0 0 0 N N N N I(q N W OWI iW �i N I� {^ W I� m T n IPO') Oi IN H O ItD p m I(G N N N N N �(m0 (-R I(ND. tD I(OD. N N I� �� S 1 O i0 O i0 O o ,o ' O j0 0 �O o O O IIs O N N N N i N N I m N M a a v voi, IINi, rs O O O 14 !tI W N O W m O W a C O n G W Im 1l O W o -R o N W O A W C N Ql o m m C i(I W o Il T 0 N O �(I O Of O N W IW S 0 S 0 S 0 0 S 0 S 0 S 0 S 0 $ 0 S 0 S 0 S 0 S o S c S o S 0 S 0 S o S c a m m m m m m m m m m m m m m m m m m m N N N N N N N N N N N N N N N N N N N LL i m m m m m m m m m m m m m m m m m f. O ri N (ND v W a Ol a (W9 IN n vi W m N (O tGa cm q r r n r N m m ao 7 of O o 8 0 O O N O O O O O v O O O N O m O fD O OD O S O N O N O N O • (o (C �i ui 166 I� ami vi cN 0 6 S ui m v n S ow in A R N m oi (uii M N In (G I` 6 Oi T N O N cm N o o 0 0 0 0 0 0 0 0 0 0 0 0 6 cc O o cc O o 0 0 yo'� 0 0 yob 66 N cc N N N cc N cc N R N cc W cc N N N cc N cc N cW N cc N cc N N N cc N cc N m N cc O 00 (O 0 G O N O O oO (V 0 0 0 O 0 o 0 00 o 00 0 O m 0 0 O O OO o N .- O O o O I�F 1�' OOO O o 0 .-00 0 0 0 0 0 0 0 0 0 0 0 O O 0 O O O O O O 0 (a O O 0 a O O O O O 0 (off O O (a O O o O O O O O O O O O 0 O O O 0 O O O O m S O O O O O O 0 O O O c O 0 FF0 F0 FF0 I.O.. FFc FFo FFo Fc FFo F0 ~ Q 0 0 N 0 N 0 l7 0 }} m o Y 0 'Q 0 o 1] o p} t0 O 1[� m o p} 1� o n a pp o 1� + CD 0 Oy 0 ant O o O € LL S + a + o N N N S m H O 7 S V O w S w O (D (on+ t0 S g S (� o W a0 o m N m S}} O C0 cc Uco d d 0 p � Z Pvad _ I i i0 0 � �o 0 0 0 yo o o E I� IN N N cNi vj r O N N W fO p (�C m O p1 Q Oi I' N NO q Im m r A Ip IWp ,O O 0 O O O W n N IN N O O O O a a v1°i m CR n � n w m 0 6 o O o o O O O O o 0 N Na N} (m N N N N C d yNy O O O O QNQ O S S aNa O cs cs O O G G C G G O C G C M M M M rn v Ili m � � o a FF ,S o uNi, ai ai of v a V+ t o v a a a a li M m O O 0 O O O O 0 pO N t0pp O 4 (OBI m V 0 LNG w I[j In In ON N W W n N p^i 1pp O N 19 pl V Iri fC IG 0 3 O O O O O O O O O pp O m O C 0 U C G O O O O O O O O O ° y a E In �� InN p II�p p RN AN pp oo 2R I� 9@ p p RR I� SO W N W N Q O v 00 Oc 00 00 00 00 00 60 00 00 00 b� MM IRON aDN 11w 0 0 qIRmNh O O O O NOPNqNq O 00 OO 0 0 NRIRmNOO O O -- N CG O Oa Oa CO O Oa 00 00 O O O G O o O o O o co,� O d 0 d ® I.O. FO 2 2 F0 it F0 it F0 F0 CC FO s= 2 2 I¢ IOC o o}} o o 00 ° IQi IQi Ion} Ion to O O O O O O O O O O O O I A V I Linda From: Lewis,Linda Sent: Wednesday, January 30, 2013 3:33 PM To: 'Julie Wilsey' Subject: RE: Consolidated Car Rental Facility SW8 050547 Plan Revision It doesn't make any sense for the Division to issue a permit for a proposed project to utilize a facility that hasn't been built yet as part of the stormwater treatment train. What happens if the bids come back too high and the project has to be re -bid? What about unforeseen construction problems? These pretreatment swales are VERY deep and groundwater may be an issue. What about potential funding delays? There appear to be a lot of unknowns at this point which preclude issuing a permit. IT check with my supervisor if anything else can be done. Linda Lewis NC Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Julie Wilsey [mailto:JWIIsey(&flyilm.coml Sent: Wednesday, January 30, 2013 1:36 PM To: Lewis,Linda Cc: Whitney Prease; 'Crespi, Roberto' Subject: RE: Consolidated Car Rental Facility SW8 050547 Plan Revision Linda, I have been trying to catch you at your desk for a few days, but in the essence of time email will have to do. ILM has several projects funded and ready to bid. The Swale project will be awarded next Wednesday, 2/6/13, with a very short lag for construction NTP. It is a 60 day project. The rental car facility project is much more complex and will take several months due to public bid laws and procurement regulations. I cannot understand why the swales need to be substantially complete before you can approve a permit. Is there a way to approve the plans and conditionally permit so we can release documents and set a bid date for the rental car project? Perhaps you can call me at your convenience so we can discuss the timeline. Temporary measures will not be necessary given the amount of time needed to actually advertise, bid, award, and start the rental car project. I am under some pressure to get the drawings out for local contractors --this is a big project for area contractors. Also, our tenants need new facilities sooner than later to improve service to their customers. I look forward to talking with you. Sincerely, Lewis,Linda From: Lewis,Linda Sent: Friday, January 25, 2013 4:28 PM To: 'Dewey, Justin' Cc: Julie Wilsey Subject: Consolidated Car Rental Facility SW8 050547 Plan Revision rM This facility relies on the use of the pre-treatment grassed swales that were permitted last November. It is my understanding (per the email below) that those swales will not be constructed until sometime in late February, with completion date unknown. I am not able to approve the plan revision for the Car Rental Facility until the pre-treatment swales are constructed, stabilized and certified. Alternatively, you could provide temporary on -site pre-treatment to be utilized until such time as the approved grassed swales are constructed, stabilized and certified. Please let me know how you wish to proceed. Linda Lewis NC Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Tim Clinkscales [mailto:tclinkscales(dtparamounte-eng coml Sent: Friday, January 25, 2013 4:15 PM To: Lewis,Linda Cc: Julie Wilsey Subject: RE: Airport We are bidding next week with award early February with construction to soon follow Thanks Tim Tim Clinkscales PE PLS DARAMOUNTE r N O 1 N ! [: ii i N O t N 6 PARAMOUNTE ENGINEERING, INC 5911 Oleander Drive, Suite 201 Wilmington, NC 28403 OFFICE: (910) 791-6707 CELL: (910) 520 1991 FAX: (910) 791-6760 Frdm: Lewis,Linda[mailto:linda.lewis(&ncdenr.govl Sent: Friday, January 25, 2013 4:12 PM To: Tim Clinkscales Cc: Julie Wilsey Subject: Airport Tim- what is the status of the construction of those 2 pre-treatment grassed swales that we approved last November? The Airport has a new car rental facility within that drainage area, and as a condition of the plan revision approval, I am requiring that the permitted grassed swale pre-treatment devices be constructed, stabilized and certified before construction can begin on the new car rental facility. Thanks. Linda Lewis NC Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. RS!ff Transmittal Letter `�� RS&H Architects -Engineers -Planners, Inc. Arch ctu , Engineering, Planning and Environmental Services To: Janet Russell Date: January 15, 2013 NCDENR - Wilmington Office 127 Cardinal Extension Wilmington, NC 28405 Project: Wilmington International Airport ProjDu2575-000 Consolidated Renr Car (CONRAC) PemmiW8050547 Plan RevisionWe Transmit: For ❑ Herewith ❑ Via Fax ❑ Under Separate Cover Via ❑ Under Separate Cover Via: ® Review and Comment ® In Accordance with Your Request ® Use ❑ Regular Mail ® Overnight Mail ❑ Courier ❑ Signature The Following: rl JAN 2 4 2013 Copies Date Description BY. 4 1/15/2013 Revised Plan Sheets C101, C110, C301, C401, C1 Remarks: I am enclosing the revised plan sheets C101, C110, C301, C401, and C1 for replacement in the Wilmington International Airport Consolidated Rental Car Facility (CONRAC) permit plan revision plan set. Please provide 2 copies of these sheets to the stormwater reviewer and 2 copies to the erosion and sedimentation control reviewer. Copies To: File RS&H Architects -Engineers -Planners, Inc. 10748 Deerwood Park Blvd South Jacksonville, FL 32256-0597 Phone: 904-256-2149 / Fax: 904-256-2501 By. tJ 4/1 Justin Dewey, PE, C F M Russell, Janet From: Russell, Janet Sent: Thursday, December 20, 2012 3:28 PM To: 'Killian, Lindsey' Subject: RE: Wilmington Airport Lindsey, The proposed action might be a "plan revision" instead of a minor modification. If the drainage area is not changing and the proposed bua is accounted for as "future" in the current permit, it sounds like a plan revision. If it is, the stormwater reviewer would need 2 plan sets, a Plan Revision application Sheet (on line), an updated page 3 of the existing stormwater application form and a project narrative. If you need the most current page 3 of the application so that it can be updated, let me know and I will forward it to you. If you can't find the Plan Revision form on line, let me know and I should be able to help you. It is not really my job to make a determination for stormwater about the type of permit action a proposal will be but it does sound like a plan revision. The fee for that review in Express is $500.00. It would probably be best not to cut a check until Linda comes back on the 7th and I can get her thoughts on it. If that doesn't leave enough time to get a check, you may just want to bring 2 checks (one for $500 and one for $2,000) and take one back to be voided once all of the factors are discussed. Just a thought. Janet From: Killian, Lindsey[mailto: Lindsey. Killian@rsand h.com] Sent: Thursday, December 20, 2012 3:07 PM To: Russell, Janet Subject: RE: Wilmington Airport No. The drainage area to the BMP is not changing. The proposed project is within the drainage area permitted by SW8- 050547. Lindsey Killian, El, CFM Aviation Drainage Engineering 10748 Deerwood Park Blvd South Jacksonville, FL 32256-0597 Phone: 904-256-2149 / Fax: 904-256-2501 www.rsandh.com From: Russell, Janet fmailto:janet.russeliencdenr.00v] Sent: Thursday, December 20, 2012 3:03 PM To: Killian, Lindsey Subject: RE: Wilmington Airport Lindsay, is the drainage area going to the (existing master stormwater mgt. facility) bmp changing at all? Janet From: Killian, Lindsey IrmaiIto: Lindsey.Killian(drsandh.cons Sent: Thursday, December 20, 2012 1:20 PM To: Russell, Janet Subject: RE: Wilmington Airport Janet, Thank you for the information. Please see the attached site plan and project location map which shows where on the airport the project is located. Please let me know if you need anything else. I will coordinate with Julie Wilsey and let you know asap our preferred day and time for the Express meeting. This will not be a scoping meeting; we will be submitting the application that day. Thanks! Lindsey Killian, El, CFM Aviation Drainage Engineering 10748 Deerwood Park Blvd South Jacksonville, FL 32256-0597 Phone: 904-256-2149 / Fax: 904-256-2501 www.rsandh.com From: Russell, Janet fmailto:janet.russell(&ncdenr.govl Sent: Thursday, December 20, 2012 11:29 AM To: Killian, Lindsey Subject: Wilmington Airport Lindsey, Thank you for the Express Request. We will also need a pdf site plan (just one sheet) to go with the Express Request. Please email me that when you can. Your email below pretty well covers the project narrative, which is the other item we normally require with the Express Request. You are correct on the erosion control fee (regular review program) - $520.00. The check should be made payable to NC DENR. The erosion control package (non -express) can be mailed in at any time or handed in on the day of the Stormwater Express Meeting if you prefer. I will need to get back with you on the stormwater Express review fee. We will need to pull the permit and read it. Linda Lewis with Surface Water does most of the stormwater reviews for the Wilmington Airport. She is on vacation until January 7th. Linda has authorized me to schedule an Express Meeting for her on January loth or 11th. Normally, we schedule meetings at 10:00, 11:00, 2:30, or 3:00. Please let me know the date and time you and your client prefer. Unless you are requesting a SCOPE meeting only, you will need to brine all of the application materials including the check with you to the meeting. Also, your client must be represented at the meeting. Normally, Julie Wilsey attends with the engineers. I will be back in touch with the correct stormwater review fee. Janet Janet M. Russell, NC DENR Environmental Assistance Express Permitting Coordinator 910 796-7302 Emails to and from this address are subject to the public records law and may be disclosed to a third party. From: Killian, Lindsey fmailto:Lindsgy.Killian(&rsandh.com] Sent: Thursday, December 20, 2012 10:29 AM To: Russell, Janet; Wgaver, Cameron Subject: Request for Express - Wilmington Region Hello, I am inquiring about a state stormwater permit express review for a proposed project at Wilmington International Airport (see attached Request for Express). RS&H is providing engineering and architectural design services for the construction of a new consolidated rental car storage and turnover facility (CONRAC) located on the northeast side of the airport property at the corner of Blue Clay Road and Hall Drive. The existing site is a cleared field. The project will result in a disturbed area of 7.5 acres and a proposed BUA of approximately 341,000 sq-ft. We anticipate this to be a modification to permit SW8-050547, a high density permit that covers future development in the Airport's business park. Runoff from the proposed project will be routed to the existing master stormwater management facility for the airport which is included in permit SW8-050547. We would like to schedule a submittal meeting with you and are anticipating a submittal date of January 11, 2013. We will also be submitting an Erosion and Sedimentation Control application at the same time. See below for the permit applications to be submitted and please verify the fees and review times. (1) State Stormwater— Minor Mod for High Density (permit SW8-050547) Review type: Express (30 days) Fee: $2000 Note: The proposed project is not increasing the permitted BUA or the size of the permitted stormwater management facility so the modification is anticipated to be minor. Please confirm. (1) Erosion and Sedimentation Control Review type: Regular (30 days) Fee: $520 Note: 8 disturbed acres x $65 = $520 Thank you, Lindsey Killian, El, CFM Aviation Drainage Engineering 10748 Deerwood Park Blvd South Jacksonville, Fl- 32256-0597 Phone: 904-256-2149 / Fax: 904-256-2501 www.rsandh.com «� O 06 Please consider the environment before printing this e-mail. O!S'0 "54 '� For DENR Ilse ONLL Reviewer North Carolina Department of Environment and 1— 1 [ Natural Resources submn: NCDENR Request for Express Permit Review The: O o Corm: - FILL-IN all the informaton below and CHECK the Permit(s) you are requesting for express review. Call and Email the completed form to the Permit Coordinator along with a completed DETAILED narrative. site Plan IPDF file) and vicinity map !same items expected In the applicaton Package of tie project locaton. Reiss Indus der's form in the application package. • Asheville Region Alison Davidson 828.296.4698;alison.dav/dson�ncdenraov • Fayetteville or Raleigh Region -David Lee 919-791.4203, david leeeftncdenr aov • Mooresville & Winston Salem Region - Patrick Grogan 704-235-2107 orpahick.gmaniftncdenr - • Washington Region -Lyn Hardison 252-948-3842 orIyn hardisonft-cdenraov • Wilmington Region -Janet Russell 910-796.7302 or lanetrussellOncdenrgov, • Wilmington Region -Cameron Weaver 910 796-7303 or cameron.weaveri tncdenr aov SW 8050547 SW SW SW SW NOTE. Project application received after 12 noon will be stamped in the following work day. Project Name: WILMINGTON INTERNATIONAL AIRPORT County: NEW HANOVER OCJ94� Applicant: JULIE WILSEY, Company: DEPUTY DIRECTOR - WILMINGTON INTERNATIONAL AIRPORT Address:1740 AIRPORT BOULEVARD City: WILMINGTON, State: NC Zip: 28405 Phone: 910-341-4333, Fax: 910-341-3465, Email: JWilsgy@pAlm.com DEC 2 C 2012 Physical Locadon:LOCATED SOUTH OF THE INTERSECTION OF GARDNER DRIVE AND AIRPORT BLVD AT THE WILMINGTON INTERNATIONAL AIRPORT Project Drains into SURFACE waters - Water classification C.SW (for classification see-httw//h2o.enr.state.nc us/bimslrenorts/reDortsWB html) Project Located in CAPE FEAR River Basin. Is project draining to class ORIN waters? NO mile and draining to class HQW waters? NO within'A mile and draining to class SA waters NO or within 1 Engineer/Consultant JUSTIN DEWEY, PE, CFM Company: RS&H Address:10748 DEERWOOD PARK BOULEVARD City. JACKSONVILLE. State: FL Zip: 32�-_ Phone: 954-256-2137. Fax: 2L4-256-2502. Email: 'u ' .dews Qrsandh.com SECTION ONE: REQUESTING A SCOPING MEETING ONLY ❑ Scoping Meeting ONLY ❑ DWQ, ❑ DCM, ❑ DLR, ❑ OTHER: SECTION TWO: CHECK ONLY THE PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑ 401 Unit ❑ Stream Origin Determination: _ # of stream calls - Please attach TOPO map marking the areas in questions ❑ Intermittent/Perennial Determination: _ # of stream calls - Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Wetland (___linear ft or _acres) ❑ Riparian Buffer Authorization ❑ MinorVadance ❑ Major General Variance ® State Stomlwater ❑ General ❑ SFR, ❑ SFR < 1 ac. ❑ Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Other ❑ Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ❑ Off -site [SW (Provide permit #)] ® High Density -Detention Pond _ # Treatment Systems ❑ High Density -Infiltration _ #Treatment Systems ❑ High Density -Bio-Retention _ # Treatment Systems ❑ High Density -SW Wetlands _ # Treatment Systems ElHigh Density -Other _ # Treatment Systems /® MOD:❑ Major ® Minor ElPlan Revision ❑ Redev. Exclusion SW 8050547 (Provide Permit #) ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ❑ Land Quality ❑ Erosion and Sedimentation Control Plan with _ acres to be disturbed.(CK # (for DENR use)) SECTION THREE - PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scoping and express meeting request) Wetlands on Site ❑ Yes ® No Wetlands Delineation has been completed: ❑ Yes ® No US ACOE Approval of Delineation completed: ❑ Yes ® No Received from US ALOE ❑ Yes El No DENR use Fees lit for multi lepermits: IBeck# Buffer impacts:19 No ❑ YES: —acre(s) Isolated wetland on Property ❑ Yes ® No 404 Application In Process w/ US ACOE: ❑ Yes ® No Permit Total Fee Amount S SUBMITTAL DATES Fee SUBMITTAL DATES Fee CAMA $ Variance ( Ma); Ll Min) $ SW ( HD, LD, Gen) $ 401: $ LQS $ Stream Deter,_ $ NCDENR EXPRESS June 2014 ' k.1 tt. r-A-A-; Q C- f4fw Fii r^ t,utt r rc,fOsa e*AC [-1 A 8-0It 0.00 Russell, Janet From: Killian, Lindsey [Lindsey. Killian@rsandh.com] Sent: Thursday, December 20, 2012 10:29 AM To: Russell, Janet; Weaver, Cameron Subject: Request for Express - Wilmington Region Attachments: REQUEST—FOR—EXPRESS.pdf Hello, I am inquiring about a state stormwater permit express review for a proposed project at Wilmington International Airport (see attached Request for Express). RS&H is providing engineering and architectural design services for the construction of a new consolidated rental car storage and turnover facility (CONRAC) located on the northeast side of the airport property at the corner of Blue Clay Road and Hall Drive. The existing site is a cleared field. The project will result in a disturbed area of 7.5 acres and a proposed BUA of approximately 341,000 sq-ft. We anticipate this to be a modification to permit SW8-050547, a high density permit that covers future development in the Airport's business park. Runoff from the proposed project will be routed to the existing master stormwater management facility for the airport which is included in permit SW8-050547. We would like to schedule a submittal meeting with you and are anticipating a submittal date of January 11, 2013. We will also be submitting an Erosion and Sedimentation Control application at the same time. See below for the permit applications to be submitted and please verify the fees and review times. (1) State Stormwater — Minor Mod for High Density (permit SW8-050547) Review type: Express (30 days) Fee: $2000 Note: The proposed project is not increasing the permitted BUA or the size of the permitted stormwater management facility so the modification is anticipated to be minor. Please confirm. (1) Erosion and Sedimentation Control Review type: Regular (30 days) Fee: $520 Note: 8 disturbed acres x $65 = $520 Thank you, Lindsey Killian, el, CFM Aviation Drainage Engineering 10748 Deerwood Park Blvd South Jacksonville, FL 32256-0597 Phone: 904-256-2149 / Fax: 904-256-2501 www.rsandh.com R*H, �n►�ua�ow�o t�taxnlr rrburt� Please consider the environment before printing this e-mail. o co i. ww.'t - VW OF 140V%Wvk� "W