Loading...
HomeMy WebLinkAboutNCC222411_ESC Approval Submitted_20220705ROY COOPERaP Governor ELIZABETH S. BISER Secretary „) BRIAN WRENN Director NORTH CAROLINA avUanme►r Quaw October 22, 2021 LETTER OF APPROVAL WITH MODIFICATIONS Taylor Morrison of the Carolinas Attention: Thomas Johnson, VP Land Development 11405 North Community House Road Charlotte, North Carolina 28277 RE: Project Name: Allburn Subdivision Acres Approved: 48.46 Project ID: CABAR-2020-079 County: Cabarrus, City: Harrisburg Address: Lakeland Road River Basin: Yadkin-PeeDee Stream Classification: Other Submitted By: Taylor Morrison of the Carolinas Date Received by LQS: 10/15/2021 Plan Type: Revised, Ownership Transfer Dear Mr. Johnson: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 413 .0129. Please be aware that your project will not be covered by the NPDES Construction Stormwater General Permit NCGO10000 issued with the original Letter of Approval dated December 31, 2020. Please become familiar with all the requirements and conditions of this permit in order to achieve compliance. As of March 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCGO1 permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office in Raleigh. North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources ::fu- Q Mooresville Regional Office 1610 East Center Avenue, Suite 3011 Mooresville, North Carolina 28115 704-663-1699 Letter of Approval Taylor Morrison of the Carolinas October 22, 2021 Page 2 of 3 Please be advised that Title 15A NCAC 4B .0118(a) requires that a copy of the approved erosion control plan be on file at the job site. Also, you should consider this letter to give the Notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you have provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, Christopher Graybeal Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval c: Geoscience Group Attention: Kevin S. Caldwell, PE 500-K Clanton Road Charlotte, North Carolina 28217 Inspection Department Letter of Approval Taylor Morrison of the Carolinas October 22, 2021 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Allburn Subdivision Project ID: CABAR-2020-079 County: Cabarrus Modifications pursuant to applicable North Carolina General Statutes and/or Regulations: As was listed in the original approval letter. Comments and Recommendations: This ESC plan approval is only for the ownership transfer of CABAR-2020-079 to new FRO parry. All conditions or modifications listed in the original Letter of Approval dated December 31, 2020 continue to apply to this plan approval. CERTIFICATE OF PLAN APPROVAL The posting of this certificate certifies that an erosion and sedimentation control plan has been approved for this project by the North Carolina Department of Environment and Natural Resources in accordance with North Carolina General Statute 113A — 57 (4) and 113A — 54 (d) (4) and North Carolina Administrative Code, Title 15A, Chapter 4B.0107 (c). This certificate must be posted at the primary entrance of the job site before construction begins and until establishment of permanent groundcover as required by North Carolina Administrative Code, Title 15A, Chapter 4B.0127 (b). LL 0 L,(KM L4 6 OZ Li��-T�Q 114 Project Name and Location ,L-AeWC -,;2 0 C - 0-?9 Date of Plan Approval Adin .". - NCDENR 1 :_S i Regional Engineer