Loading...
HomeMy WebLinkAboutSW3220402_Design Calculations_20220627STORMWATER BMP CALCULATIONS VILLAGE AT GRANITE QUARRY - PHASE 2 Granite Quarry, Rowan County, North Carolina Prepared for LGI HOMES Contact: Jeff Webb 3037 Sherman Drive Lancaster, SC P. 844-566-4300 Prepared by.- DPR Design 919 Berryhill Road, Suite 101 Charlotte, NC 28208 P. 704-332-1204 www.dpr.design DPR Project No.: 17031 August 17, 2018 March 11, 2020 February 19, 2021 May 7, 2021 February 04, 2022 March 16, 2022 \\\�Illllluul nuurrrrrii °CAR 04 / Ess°io°°ti ° * o c-650 Zo DPR Associates, Inc. ����11N41111111111111/� CAR0��%'''. °a SEAL 030523 - fill 1r11`I\\\\��`` 3-i6-2®22 zi[1r. r-,7s = R 0 �Q D SITE LYERLY POND RD ST PAULS CH RD 0 2 � W OCHATHAM LN �Q Z VICINITY MAP - NTS TABLE OF CONTENTS NARRATIVE II. BMP SUMMARY III. BMP EXHIBITS AND CALCULATIONS - Vicinity Map and Aerial Photo - Pre -Development Drainage Map - Post -Development Drainage Map - Pre -Development TOC Map - TOC Calculations - Run -Off Curve Number - Soils Map IV. BMP DESIGN AND CALCULATIONS V. BMP HYDROGRAGH ANALYSIS - Hydrograph Summary Report - Hydrograph Pond Report - Hydrograph Report VI. APPENDIX VILLAGE AT GRANITE QUARRY - PHASE 2 BMP STORMWATER DESIGN NARRATIVE DPR No. 17031 Rev 2-18-2021, 5-7-2021, 2-04-2022, 3-15-2022 The enclosed package shows the results of the stormwater BMP design calculations for Phase 2 of Village at Granite community. The development is in Granite Quarry, Rowan County, North Carolina, at 3040 Faith Road. The net site area is approximately +/-108 acres and the existing conditions consist of covered buildings with pavement, open space and woods. This phase of the project's proposed development will be a 132 lot single-family residential homes. This phase has two (2) proposed stormwater BMP facilities for the site, a wet pond and a sand filter. All were designed per the latest NCDENR Stormwater design manual. Topographic maps and field observations were used to delineate the watershed basins and hydraulic path feeding into the study conveyance system. With this information, hydraulic lengths, time of concentrations (TOC), and basin slopes were determined for the pre -developed conditions. TOC of 5 minutes was used for all post -developed conditions. The total impervious areas of the development were calculated. The composite curve numbers (CN) were calculated based on the hydrologic soil types and groups from the U.S. Department of Agriculture, SCS method for the pre -developed and post -developed conditions. Surface areas for the wet pond was sized to handle the first inch of rainfall based on total impervious area of the watershed using the Schueler simple method and both basins were sized to provide for channel protection using the 1-year, 24-hr storm. Modeling results indicate that 2-year and 10-year (24-hr storm events, using SCS Method) release peak flow rates for the post - development detention routed conditions are less than that of pre -developed conditions. Precast concrete outlet structures are designed with 6" thick top slabs. The weir heights vary to allow the 100-year storm to pass below the bottom of the top slab. This insures that these outlets function as weirs and do not transition into orifices. Refer to the detailed maps, calculations, results, and details as shown in this package and in the civil engineering subdivision plans. C:IDPR Dropboxl ProjectsWctivel20l7ll7O31 Village at Granite (Partial)IPhase 21CALCSIBMPIPhase 2117031- PH2-BMP Narrative.doc Page 1 of 2 Table 1: DRAINAGE AREAS: Basin No. Drainage Area Pre -Developed (+/- Ac.) Drainage Area Post -Developed (+/- Ac.) Phase 2 BMP #7 5.5 22.71 Phase 2 BMP #8 3.0 6.3 Phase 2 Temp BMP #9 2.5 ----- Phase 2 Temp BMP #10 5.0 ----- Phase 2 Temp. BMP #11 7.0 ----- Phase 2 Temp BMP #12 4.5 ----- Phase 2 Undetained Areas* 8.5 5.5 Total 36.0 34.51 TABLE 2: PRE -DEVELOPED DISCHARGES: 1- Year (cfs) 2 - Year (cfs) 10 - Year (cfs) 25 - Year (cfs) 50-Year (cfs) 100-Year (cfs) Phase 2 BMP #7 0.279 0.920 4.164 6.821 9.137 11.64 Phase 2 BMP #8 1.303 2.219 5.116 7.047 8.646 10.32 Phase 2 Temp BMP #9 0.938 1.599 3.709 5.118 6.282 7.496 Phase 2 Temp BMP #10 0.135 0.503 2.725 4.646 6.391 8.289 Phase 2 Temp. BMP #11 3.283 5.963 14.58 20.52 25.50 30.71 Phase 2 Temp BMP #12 1.076 2.050 5.468 7.831 9.811 11.89 Phase 2 Undetained Areas* 3.189 6.917 19.34 27.95 35.18 42.80 Total 7.036 14.31 40.44 59.40 75.57 92.87 TABLE 3: POST -DEVELOPED DISCHARGES: 1- Year (cfs) 2 - Year (cfs) 10 - Year (cfs) 25 - Year (cfs) 50 - Year (cfs) 100 - Year (cfs) Phase 2 BMP #7 41.73 58.01 105.41 134.88 158.40 182.32 Phase 2 BMP #8 12.19 16.78 30.12 38.33 44.87 51.51 Phase 2 Undetained Areas* 1.147 3.133 10.50 15.73 20.18 24.90 Total 54.95 77.92 145.32 188.27 222.83 258.21 TABLE 4: ROUTED -DEVELOPED DISCHARGES: 1- Year (cfs) 2 - Year (cfs) 10 - Year (cfs) 25 - Year (cfs) 50 - Year (cfs) 100 - Year (cfs) Phase 2 BMP #7 0.000 0.000 2.357 3.927 10.85 25.47 Phase 2 BMP #8 0.121 0.281 1.744 8.056 20.04 31.52 Phase 2 Undetained Areas* 1.147 3.133 10.50 15.73 20.18 24.90 Total 1.195 3.233 10.67 17.28 35.07 59.72 TABLE 5: ROUTED -DEVELOPED DISCHARGES EVELATION: 1 - Year 2 - Year 10 - Year 1 25 - Year 1 50 - Year 1 100 -Year Phase 2 BMP #7 724.45' 725.42' 726.39' 727.09' 727.44' 727.74' Phase 2 BMP #8 733.00' 734.15' 734.95' 735.38' 735.68' 735.91' FEMA Elevation BMP #7 724.50' 724.50' 724.50' 725.00' 725.50' 726.00' FEMA Elevation BMP #8 726.30' 726.30' 726.30' 726.80' 727.30' 727.80' *Undetained areas include areas that are disturbed during construction but covered with grass in the final condition. C:IDPR Dropboxl ProjectsWctivel20l7ll7031 Village at Granite (Partial)IPhase 21CALCSIBMPIPhase 2117031- PH2-BMP Narrative.doc Page 2 of 2 III. BMP EXHIBITS AND CALCULATIONS - Vicinity Map and Arial Photo - Pre -Development Drainage Map - Post -Development Drainage Map - Pre -Development TOC Map - TOC Calculations - Run -Off Curve Number - Impervious Calculation - Soils Map PRE -DEVELOPMENT STORMWATER DRAINAGE AREAS PLAN SCALE 1 If = 100' Project Manager HVN Drawn By RJ/LG Checked By HVN Date 8/22/2019 Project Number 17031 C�/ ,A 1 1 IIIIIIII II1I I Ate/ �o�\A� AI��111 V AA 00 \' Z/ A A AAA v A A 11V v vv ��S / A `,\N /lA\\� Vvv ol)o \\ of \`6,/////J/////I I)It'o / Oj ,g\\\ oba� I /!l\r///� "'yad o I, RoE I NN J JuJE,LrJy, a J / I �/� /, / ` 1 NNI\L \ BOj \ \ l\ i \ \ j .1 I I I �R 71v \\ /ES%H P r� /� \ % Crk �p EF�� T �vIE 6011L0, il PRE!A\ oI� \\ 111111 \\ 1 \\ \ / l 0 1 I �r@�40413 I oo I loo 60 PRE -DEVELOPMENT CULVERT DRAINAGE AREAS PLAN SCALE 1 If = 400' REVISIONS: No. Date (M/D/Y) By Description 1 3-11-2020 RT PER TOWN'S AND NCDENR'S WQ FIRST REVIEW COMMENTS 2 6-12-2020 RT REVISION DOES NOT EFFECT THIS SHEET 3 2-19-2021 RT PER TOWN'S SECOND AND NCDENR'S WQ THIRD REVIEW COMMENTS 4 5-7-2021 RT REVISION DOES NOT EFFECT THIS SHEET 5 2-4-2022 RT/TC PER TOWN'S THIRD REVIEW COMMENTS 6 3-16-2022 RT/TC ADDRESS NCDEQ WQ REVIEW COMMENTS `,� ° ... R p� OQ�a °oE ES S ia�°°°,�'� * = C-650 a 0 R P XCI A- \\\\�N\ design III'l­flhi:'- ���� rr�l!il�q"729 • _ - ` • , � 9�',++,,yyqqpp� Ewa e ..Cos 0.04 AC t \16. \ \\ \� I 1 ,��1 S 79 , I N G If / / - -\ :::: POST DA 49 I\% �F .. ± 22.71 AC 0.04 AC� 110 X.WETLAND} '•J - - /// /; I I \\ .\ I 9O� \ \ \ \ TO REMAIN ti o �'6 0.25 AC \� I I I I JNDISTURBE �:}.:: .: Q 1 �• N� \ \ i / � / �::::f •: � � 0.09 AC _ /� ♦ \ \ - \- \�-� b BMP I / .f;;r . 0.12 AC �. \ \ / / / goFFi /:.r;.:... TO 7-304 \ 1; 0.45 AC ------//, ,'/ \ 7 \ 1 3�• GETPTiSETBACK& STREAM / - - - - , / / TO 7-303 0.05 AC \ �'C��,� \ -• �•- TO 7-336A p. Y fi vE -�o TO 7-305 / a 9 \\ 2.95 /A -` - \ \\ / ✓ ..1 , 0.49 AC 1 l\ 1 /� \\ ..'..� �� % \`TO 9-301 EX WETLAND TO 7- 01 COS / . 24a �. - 0.21 AC 10.18 /#EWAINND.ti. ., , : o�,�'` �`'/_-- - TO 7-307 TO 7-306 \ \ - S( Q,QC/9 �`\ FE pr 0:2% NN \\ /./ UN ISTURBED / / / , ` \ \ 9 r / moo`'��. 0.25 AC Cy,� \\ CH CE.F.L'�S D ` 0.24 AC --TO 7-336B \\ O'U_NDA Y \ \ . '� i 0.15 AC 1ETO 7-308 �� de " 247 /' TO 7-201 TO 7-202 sic \ / / I /P - 0.17 AC / �� POST DA / r ao, % ' oti �� ` 170 TO 7-309, 165 0.24 AC \ TO 9-201 0.25 AC CCpS�� 0.09 AC K \ :..�:::::::.. \ . . ;:;;�:;•:; ' TO <none> I �o I BYPASS -- / /, :. ,o, 0.41 AC � TO 7-203 - -- `�^°o \ �-310 � TO 7-311'�'� �\ �q, \ �..:: ��;:• ..: \\\ . ��.<� ±29.3 AC / / ' �' "TO 7-102 3� �`� 1 0.23 AG 1 \ ': :r.:.:;:• 0.09 AC n F / i 1 164 CJ / / " \ 0.36 AC \ �:TO 9-202 - -�, T07-312 45 �0 0.07 AC 171 � - I � 1 - _ ,I3.09 AC TO 7 337 ��.�..'. • TO 7-204 0.63 AC T 7-21,1.- 07-2 5 T D3 \k 0.12 AC -' :� ��/ 0.43 AC 0.05 AC \ h ' TO 7 �k 0.21 AC 1(16 TO 7-212 /73s+ TO 7-206 - ' - 0.35 AC 0.43 AC 73 TO 7-314 0.32 / / T 242 / r / /' '��192 0.22 AC TO 7-208- __ i \ \� ' / s \ / __1 _ \ 0.09 AC TO 7-338 ROP LINE FOLLOWS ) I� \ r /' / /' TO 7-207 "' + T 0\ CTO 7-319 RANE CR)<K \> / i �o `\ i 1 �' j40,;193 1 w\ 0.59 AC ,-- 0.09 AC / TOOK -214 N = - 17' TO 7-315 (60 , TO 7-320 TO 7-213 / ,/ / , 0.08 AC \\ 41 - o _� � 0.32 AC .. \. . . . . . . . \ \ s 1 0.21 AC / 5 \ TO 7-326 PTO 7-339 ':..:.� \\ 1 \\ 0.27 AC \ \ ` . ' 0.45 AC . TO 7-209A - 0.11 AC `\ \ ` TO 7-104 94 / 1�5 \ \ M \ T \ 0.24 AC TO 7-216 - 159 -IgOI 0.10 AC / T D 7-327 \ \ 1 L \ \ / m �i I + - 1 187 i ' = 0.37 AC 0.30 ACC \\ \ / \ . � / /' � l ,- --� �. \\ � ��y`\ �I - ♦ Il I I � \ \ \ 1 � - \ 17� I I / ,, TO 7_325 TO 7-328 \\ `y \ � : • \ti 0.35 AC 0.47 AC ,-/ TO 7-104 0.17 AC 7-1/ / TO 7-322 w TO 7-220 / s 1 7 TO 7-340A ,. . \ �\ \ '\ 0.14 AC 'COS'. +- i / _TO 7-217 0.36 AC \ 8 0.51 AC \ �o /' . q' a'..::: ' ::... ,. a :. •. 4. \�\ \ \ / I 1 / I s� TO 7-210 # II TO 7-330 \ \ m 78 -/ \ TO 7-329 \ \ C �'/ :'`...?�;.`.•.;�jo I -2° .�R2 '...\ \ I !' I 2 I I I � 1/� 1 - ` 1 I ' - - I 2 , \ \\ \ \ \ ♦ ` - - - - - \ v / 24 a -� \ \ - I 0.13 AC , 0.49 AC �\' \ � �. \ :.• I / \ 1 I � 1 r� / r 49 ,z \ � \ , � ♦ ::•. i \ / :k ..::.,.:• 1 0.24 AC %` :• ::: �\\ ° TO 7-221 / 18 ,-TO 7-209B \ 6.34 AC _ 110.25 AC �� \ \ TO 8-201 \. \, `, T 0.32 AC - - �\ , -' - _ _ ` ':: u `), `. 2 7 I 19 / TO 7-317 TO 7-33�� TO 7-334 \ \ POST DA 0.08 AC TO 7-222 - TO BMP #8 TO 8-202 0.21 AC I 155 0.46 AC a 0.54 AC L 0 \ �0 ± 6.30 AC . � m �- r, 1 •:.�� ` \ / ' :� 1 TO 7-1051 1 'I 19 \ 0.37 AC 1 \ \ I \ � /, 'TO 7-323 TO 7-324 \ \ \ . ; TO <r ne> -� - � / / , � , � � 1' \ ♦ ti � I I I TO 7-218' M � o p \ .- - -- - - - _ / I 60 AC 0.26 AC \ >� ). 1\8 1 1 \\ 39 TO 7-340C cn c : I I I I I 7-218 ass/ A TO 8-203 �1� ` I -I'': �5 I 11 200 I I1 TO 7;318'\/ _I� 0.47 AC ` 0.28 AC \ \ - . . . e' TO 7-333' irTO 7-332 !- �r / \ :.i: / 0.47 AC137 \ .... C..�. . o d >' ~ ^ 23 TO 8-101 0.08 AC 0.11 AC j I, TO 7-219 W �N-PV U2;L -,�' / : �' � / / � I \ \ \ 31 AC "" o l o- l 02 `,L00'D? AJN'� _ \ 0, v 22' I 2 TO8-102 TO8-204 i i � 0.11 AC ' ) � � '\ 0-/03 \ \ TO 7-224 7-223 \ r \ 0.21 AC \ \ \ 1 \ N R)y ,- \ \ \ \ ., LI \� 0.50 AC _. 1 I \\ \\ 0.76 AC o0 / o\ " \ n \ TO 10-103 -,TO 10-102 \ \ \ \ \ \ / /' \ ` " ` R\., `'\TO7-107 02 \ I / / k ` ' ,' I 0.08 AC 0.13 AC ` \ T � 0.13 AC \ \ \ 1 \) SD ' \ \ 9 N �W 1 ' \ TO 8-103A TO 8-205 \ TO 7-225A , \ \ \ I / q 1 760 \ \ `-- - \ \I\ 23 \ U.32 AC % / v v I I i) V / \I �� \ \\ e v / / \ I 100 I ( / / / y \ \ \�` / � Q- TO 7-225 B 1 \ \ I 1 12 ENE 4ARNHA01DT \ W-873/ /' /-� 21 \\ 2 8 \ 219 - 11 AC \ \ 0.29 AC 1 \ \ \ 0.12 AC 3 TO 8-2061 405 681, 1 \ I \ \ - D 8-106 TO 8-103B 0.1 8 AC 0.52 AC TO 8-209 0.40 AC / / 0.24 AC 0.09 AC , \ <� , , aT0 8-208 TO 7-226 , / o \ I / I USB ND, IIND EY B M MII LAN\\ \ \ l i TO 8-104 TO 8-206 0.19 AC ' \ \ i h ' \ \ ��Hp \\\ _ 8 0o i i i 4 7. ..:.::;:;:•.• \ \ / / TAX 650-256 \\ \\ \\ \ . . /. '::• ` \� TO 8-207\\ 6 `\ o / / /' T!/n PI 404 hp41 I \ 0.40 AC .8N.7.7.;:.:.. 0 \ / �� ' / / / 1 - 1 \ ................... ::::.:::.::.. ZONE RS 1 I \ 64 \TO 8-210 i:;::::.';::::::';:;:::::: •.. \ \ d / i / \ , _ \ \ :.`. r.L;`. :::..:r.iiiiii•. Ciii:•'•S,Cii:..:: is i?::. \ 1 \ 811 / / , \ POST DA TOTAL ck;;;2;;;::;•.::: \ \ / , / / / / 216 2 �5 I `\:. ;;:_ UNDETAINED AREA}::::::: ' I I 212 21 j I1 10 \ 20� :• ; }:.•. _ >/ :': ' ±5.5 AC ;;;;;: . \\ \\ \ 0.21 AC 0.18 AC ::f:;k :: PEST DA tz TO 8-212 i ' I :;;;;;;• F:•. ;;:. C(Y� , I ......... QFFSITE --- - 61 8-211 = �4 p:..,.:. mo :i:''i? ;': (SHADED AREA) r... ..... ................................................ {... / .... c0 ..... d• :::::: i :: m 1'. TO'R IN ...1.... �-r \ \ \ \ O / to 1,' ...............1: ....... ....... `y1ND ROE61 :•::•%::::.°.5:................................ ............... 01 / f r \Ile, \ I ' /./ / / ,' / �' `. �� -Jr, In 1l.1 Avr�rK1 o POST -DEVELOPMENT STORMWATER DRAINAGE AREAS PLAN SCALE 1 If = 100' � 9 i/%/� %;,;;�I;,�j,PtJ���°, � , 1,'�l� -k; a - • 9 I t \ ; ,IIII \, ;I'\ \ , f1i��i�v>> o� I�1O '\ l \ �i.l''T, P}s\a � o�k�� F/�� 6\; N pE EEK r/Jlrp 'I I\\\ I/tFR/I // \`\0 I lull ; \\ �I 111(750) � o \\ \ '/ i) -��-\ I III\ `1 \ IIII\1\\ P\RE`II��\ \ / / ro / �I I l \ \ I \ _ \ \ \ 1 I �'t\JLVE�lF�1p I\11�\5YO AGE ) -Pt,4oa,E 1 o I POST -DEVELOPMENT CULVERT DRAINAGE AREAS PLAN SCALE 1 If = 400' master planning . civil engineering urban design . landscape architecture 919 berryhill rd. ste 101 . charlotte, nc 28208 704.332.1204 . www.dpr.design NOTE: PAD LOCATIONS ARE APPROXIMATE AND ARE SHOWN ON THIS PLAN FOR DRAINAGE CALCULATION ONLY. STORMWATER DRAINAGE AREA PLAN LEGEND PROPERTY LINE ADJACENT PROPERTY LINE EXISTING 2' CONTOUR - - -60(�- - EXISTING 10' CONTOUR - PROPOSED RIGHT OF WAY - - 100 YR. FLOODLINE (based on 1979 FEMA maps) -•••-•••- EXISTING STREAM GLOT NUMBER PROPOSED STORM DRAINAGE AREA PRE -DEVELOPMENT DRAINAGE AREA POST -DEVELOPMENT DRAINAGE AREA 0 100 200 VILLAGE AT GRANITE - PHASE 2 CLIENT /OWNER: LGI HOMES CONTACT: JEFF WEBB 3037 GRANITE QUARRY NORTH CAROLINA LANCA TER, SO RIVE � LANCASTER, SOUTH CAROLINA 29720 LGI / HOMES SOUTHEAST (844) 566-4300 jeff.webb@Igihomes.com 0) Z _U _U (6 Z (6 (6 Z (6 Cu 0 0) Cu r- U Scale: g AS NOTED 0 Sheet Number x x 0 0- 2L-1 8 Project Manager HVN Drawn By RJ/LG Checked By HVN Date 8/22/2019 Project Number 17031 REVISIONS: „,111'E,, 4 ' ,OAK TREE I I I o I I ` I \ DPLAIN f Y 60_1 ' I 'II I 0. .I .�I Im 719.17 �/ I / ----- ---/ , / I/ /j / / I W T / II I I z u u D I rum /LU.1J Rtm 72D.18' EREAs E” I I ICJ SS( \ Rim 720.97 Rtm 8 ONE .\ 5 SS / <718.78' I I I I• `�'/' - IIIIIII \ 719.45V Inv. Out 714. W 16 I(D COS l P IM z_RTY LINE FOLLOWS l �r/ I i I ii I �ii /- _NTEk OF CRANE CREEK /_ EX. WETLAND- I } :ii•Y•:: ::i:...•m i 17. / a•.......: r?:;§TK O @.... ....Y. Y / - ).:• 1 / / ................. / / AM BUFFER .. .. ... .. .. __. :. ... .. .:•............: :::. .... THE / .. .. .. 'I S / � ... ................. ........ COS .. ......................... " .;:.. ..:: I �o �.... I - ::....•.o :. :;•� 1 0 ................... ... _ o v POST DA ..... TO BMP #7 ,<ANE 0EEK I I �..`..,.. RoF + ♦ ::....::I. i \ �a \ 22.71 AC ,/ ♦ .41 X. WETLAND} 1:: / /♦ I I \ I \90 \ \ TO REMAIN I:ir�'i ? ♦ ''. I , 1 -\ - "f` \ o \` \\ 119 `'•I I �- - I N� � \ \\ / _ Q?O \ � /�\� �\ •- • . • . \ SETBACK & STREAM / ,' \ °� 3 / \ - - - I \� \ �. r,./. ' / 25 ' / �I / —_ iS 11 \� % \\ X WETLAND 219 COS \ // / / / / / \ /•/ l - � - -\ - - - - - / �/ri:{.:.. : `' - 249, --�- �(a7 C�' :;: 2Q 'li,L `\ - - - - - \ io #SWAIN / f? 0 , - 0 :.:;•.. \ UN ISTURBED \ / l.:i / //\♦%�� •�� \ FE ,4 0.2%- NN /co 168 1 DUN DA Y , /PGA � / �r •C•. ./ /. /...' / \ \ \\ `\\ \ h ���' ''.'•::•.. \\ �__— � POST DA - - C ' /:• ... r 6 \ 01 /`L \ �' ( ' 14 \ � � 170 6 r - COS r t BYPASS ±29.3 AC / 45 / 164171 / / ::•z:: 4 0 r63 / /' / � •� / , ter:(^: , / ` / / ' �6' — —�� \ \\ � \ / i �,� \ \ \ � / ,;::•:•`•.:x / - 17 \ (2 �443y 162 242 r r /� / � 7319 � \ ROPERT� LINE FOLLOWS.'\\ ) I \ r I ': + 1 - --- \y> TER Or, CRANE CRE` `> / i .. �� \ i 1 ?` / �i �' /' 193 `. J 18� 1 \ 3, 100 my �s \ 17 \, 240 I J \ \ \ 195147 I 11 v / P ,, v if::...•'i:, v v v V?.' I ' I 771 � ' s�/.1;;i:'�i: �:.1 is i' :i;i� :::.I .(�::': i:.i:':i: �.. v :::::: � ''':? V A A v V A'•:. A � V I 1196 I 1 / — — — _ _ 1 A / / ,' \,, A \ �' V • / 5 � .. .... .•. •:�:•. � \ /COS / 1 1 1 #8 I I a \ ': �:\ \ O/ / .Fi.:`•`��. � d \ \ \ 1' ,'`. 1 I I / Iis 1 i„� 1 I �g 78 \1 �' v m 401- 'POST DA \ �\ r 1 C:... 1-�I n`O� 1 I \ _�\. \ \\ \ \ ♦ / TO BMP #8 \\\ I 'I '' \,' 155 - 150 ` 0 ' / / / ,� ,� —_--- / 1 � \♦ ' �\ �\\ I �� I I I I} 1 199 1 1 O I 1 1 \ 1 �79 1 M .7 ' � O�� \\ \ M � .•:.'�. - - - - - - - - / 154YU.155) 13 20O0 • \ I L I � I • :•.;k. - - - - - - / 1 \ r a. � ' � \ \ \ cn � _ �� :::•S OS ANPVUPcL 223 1\ \ �/ v \ 22 r 1 °\ 228 :` :I r / I`: 2011 tr \ 1 1 10-102 \ 02\ \ \ \ \ \ \ \ \ \ U20 3 / / \ \ \ \ l I I I •.. 06 \a �� l �`•. \ � > �-- I � ) I I I I I I I \ \ I I \ \ =NE 4ARNHAr DT 1 \ \ \ _ 3�0-873 21 \ 21`8 219/'�\ / 1 \ \ \ \ 23 I 2�3 744� , / \ / 405 b81/ / \ \ \ r / I \ 1 I \ \ / I \ co / / / , 1 \ \ \ ` I \ \ ' .Y•: r :: i?::,....... \ \ � \g \ I \ ' / l l 1 I I I I I I / / ,/—F\ \ \ \ 1 \ \ \ �.. '•'.{3\ ::::..f` ii /\ \ \ (1s0) / \ \\ / \ ,'' t/ / �/IARY/B. MIC.I�I I �� & I 8 00 hIUSB ND, I�INDEY B MMII�LAN\\ \ \ / /� 1 ^-cv \ \ /vt 8-105 04 G r— G 74? \ \ \ \ \ \ \ / �\ \ \ ` / l / l I DB 650-25(� ::::. 8-210 , 8— 8-20 — :::::::::::::::::.::.'.. ` 0� / \ \ o o / / , / TAX PI0 404 hp4 I / � , i / /ZONE IRS I I \ \ M / I \ / / I 1 ` \I \ \ ' — — — \ \ \ \ \ z:i::•:ii` r ':::.'ar:::::::::::. r:::.`i �: �':. ��i:i:r:::::r.:::?:• t�..............ax:�'. • \ � � \ / / POST DA TOTAL :k;;;i;;;•:;•.::' / 1 2116 2 5 8214, 213 •::;:;•}.. \ `\:. '...' ;:;;- UNDETAINED AREA :e212 21 210 20� ; _;; ` '� -�, / O� \ / /f? ±5.5 AC PEST DA 1 OFFSITE�--- _ \o X . TµAN �...;...� (SHADED AREA) ....... ::::.:;.;:.\:"'./` ::... ......... ...:... .,.7.... 0.14 AC ^ ..:• • •••. I YJND� RpED y.. rLn \ FE A Ott% AN 1JA\L �—CH NCE `\FL00 LAIN, BOUMDAR POST -DEVELOPMENT WATERSHED AREAS PLAN SCALE 1 If = 100' No. Date (M/D/1) By Description 1 3-11-2020 RT PER TOWN'S AND NCDENR'S WQ FIRST REVIEW COMMENTS 2 6-12-2020 RT REVISION DOES NOT EFFECT THIS SHEET 3 2-19-2021 RT PER TOWN'S SECOND AND NCDENR'S WQ THIRD REVIEW COMMENTS 4 5-7-2021 RT REVISION DOES NOT EFFECT THIS SHEET 5 2-4-2022 RT/TC PER TOWN'S THIRD REVIEW COMMENTS 6 3-16-2022 RT/TC ADDRESS NCDEQ WQ REVIEW COMMENTS \\\\\\� `,� ° CAR 04 * = C-650 a �G &0Cl A_ � \ CARD lOy% �- SEAL < ° 030523 IN N GO" 9 9 9 design master planning . civil engineering urban design . landscape architecture 919 berryhill rd. ste 101 . charlotte, nc 28208 704.332.1204 . www.dpr.design NOTE: PAD LOCATIONS ARE APPROXIMATE AND ARE SHOWN ON THIS PLAN FOR DRAINAGE CALCULATION ONLY. WATERSHED AREA PLAN LEGEND — - - PROPERTY LINE ADJACENT PROPERTY LINE EXISTING 2' CONTOUR - - -60(�- — EXISTING 10' CONTOUR - PROPOSED RIGHT OF WAY - - 100 YR. FLOODLINE (based on 1979 FEMA maps) - — — EXISTING STREAM GLOT NUMBER PROPOSED STORM DRAINAGE AREA PRE -DEVELOPMENT DRAINAGE AREA POST -DEVELOPMENT DRAINAGE AREA 0 100 200 VILLAGE AT GRANITE - PHASE 2 CLIENT /OWNER: LGI HOMES CONTACT: JEFF WEBB 3037 GRANITE QUARRY NORTH CAROLINA LANCA TER, SO RIVE � LANCASTER, SOUTH CAROLINA 29720 LGI / HOMES SOUTHEAST (844) 566-4300 jeff.webb@Igihomes.com Ir— C'7 C) N w U) Q I..L w Vz Q w cD J J co 0 ti ti 0 N N U Scale: g AS NOTED 0 Sheet Number x x 0 0- 2L-1 8A0 Lwk Project: Village at Granite - Phase 2 DPR ASSOCIATES Prepared by: RJ DPR Job No.: 17031 TIME OF CONCENTRATION Checked by: HN Location: Granite Quarry, NC Date: 8-31-2018 Page: 2 of 4 EXISTING CONDITION - TIME OF CONCENTRATION BMP #7 HEET FLOW Surface Description = Manning's Roughness (n) _ Flow Length (ft) _ Slope (%) = P-2yr (in.) = T(t) (min.) = SHALLOW CONCENTRATED FLOW: Surface Description Flow Length (ft) = Water Course Slope Average Velocity (fps) _ T(t) (min.) = NEL FLOW: Average Channel Area (sf) _ Hydraulic Radius = Flow Length (ft) _ Channel Slope Manning's Coefficient (n) _ Velocity (fps) _ T(t) (min.) = grass 0.24 300 3.7 3.12 27.2 unpaved 350 6.60 4.15 1.4 3.00 0.548 260 2 0.048 2.94 1.5 Bottom Width (ft) _ Side Slope (X:1) _ Depth (ft) = t) Sum of Travel Time (min)= 30.1 Time = 30 (min.) Hydraulic Length = 910 ft Basin Slope = 4.3 POST DEVELOPMENT - TIME OF CONCENTRATION BMP #7 Time = 5 (min.) 1 2 TIPROJECTS12017 PROJECTSO7031 The Village At Granit@lott&A8k2AMOCALCSIBMPIPhase 207031-PH2-TOC.xls Sheet: 1 of 6 Project: Village at Granite - Phase 2 DPR ASSOCIATES Prepared by: RJ DPR Job No.: 17031 TIME OF CONCENTRATION Checked by: HN Location: Granite Quarry, NC Date: 8-31-2018 Page: 2 of 4 EXISTING CONDITION - TIME OF CONCENTRATION BMP #8 HEET FLOW Surface Description = Manning's Roughness (n) _ Flow Length (ft) _ Slope (%) = P-2yr (in.) = T(t) (min.) = NEL FLOW: Average Channel Area (sf) _ Hydraulic Radius = Flow Length (ft) _ Channel Slope Manning's Coefficient (n) _ Velocity (fps) _ T(t) (min.) = (t) Sum of Travel Time (min)= 21.3 grass 0.24 290 6.9 3.12 20.6 12.00 1.096 340 6.8 0.048 8.61 0.7 Bottom Width (ft) = 2 Side Slope (X:1) = 2 Depth (ft) = 2 Time = 21 (min.) Hydraulic Length = 630 ft Basin Slope = 6.8 POST DEVELOPMENT - TIME OF CONCENTRATION BMP #8 Time = 5 (min.) TIPROJECTS12017 PROJECTSO7031 The Village At Granit@lott&A8k2AMOCALCSIBMPIPhase 207031-PH2-TOC.xls Sheet: 2 of 6 Project: Village at Granite - Phase 2 DPR ASSOCIATES Prepared by: RJ DPR Job No.: 17031 TIME OF CONCENTRATION Checked by: HN Location: Granite Quarry, NC Date: 8-31-2018 Page: 2 of 4 EXISTING CONDITION - TIME OF CONCENTRATION HEET FLOW Surface Description = grass Manning's Roughness (n) = 0.24 Flow Length (ft) = 470 Slope (%) = 5.1 P-2yr (in.) = 3.12 T(t) (min.) = 34.3 EC #9 t) Sum of Travel Time (min)= 34.3 Time = 34 (min.) Hydraulic Length = 470 ft Basin Slope = 5.1 TIPROJECTS12017 PROJECTSO7031 The Village At Granit@lott&A8k2AMOCALCSIBMPIPhase 207031-PH2-TOC.xls Sheet: 3 of 6 Project: Village at Granite - Phase 2 DPR ASSOCIATES Prepared by: RJ DPR Job No.: 17031 TIME OF CONCENTRATION Checked by: HN Location: Granite Quarry, NC Date: 8-31-2018 Page: 2 of 4 EXISTING CONDITION - TIME OF CONCENTRATION EC #10 HEET FLOW Surface Description = grass Manning's Roughness (n) = 0.24 Flow Length (ft) = 550 Slope (%) = 6.4 P-2yr (in.) = 3.12 T(t) (min.) = 35.6 t) Sum of Travel Time (min)= 35.6 Time = 36 (min.) Hydraulic Length = 550 ft Basin Slope = 6.4 TIPROJECTS12017 PROJECTSO7031 The Village At Granit@lott&A8k2AMOCALCSIBMPIPhase 207031-PH2-TOC.xls Sheet: 4 of 6 Project: Village at Granite - Phase 2 DPR ASSOCIATES Prepared by: RJ DPR Job No.: 17031 TIME OF CONCENTRATION Checked by: HN Location: Granite Quarry, NC Date: 8-31-2018 Page: 2 of 4 EXISTING CONDITION - TIME OF CONCENTRATION EC #11 SHEET FLOW Surface Description = Manning's Roughness (n) _ Flow Length (ft) _ Slope (%) = P-2yr (in.) = T(t) (min.) = SHALLOW CONCENTRATED FLOW: Surface Description Flow Length (ft) _ Water Course Slope Average Velocity (fps) _ T(t) (min.) = CHANNEL FLOW: Average Channel Area (sf) _ Hydraulic Radius = Flow Length (ft) _ Channel Slope Manning's Coefficient (n) _ Velocity (fps) _ T(t) (min.) = grass 0.24 100 3.0 3.12 12.3 unpaved 80 3.33 2.94 0.5 44.00 1.282 680 3.23 0.048 6.58 1.7 Bottom Width (ft) = 10 Side Slope (X:1) = 6 Depth (ft) = 2 T(t) Sum of Travel Time (min)= 14.5 Time = 14 (min.) Hydraulic Length = 860 ft Basin Slope = 3.2 C:0PR Dropboxl_ProjectslActive12017117031 Village at GrarRhD(@a'rt1A2)3P OCALC&BMPIPhase 207031-PH2-BMP TOC.91Iseet: 1 of 1 Project: Village at Granite - Phase 2 DPR ASSOCIATES Prepared by: RJ DPR Job No.: 17031 TIME OF CONCENTRATION Checked by: HN Location: Granite Quarry, NC Date: 8-31-2018 Page: 2 of 4 EXISTING CONDITION - TIME OF CONCENTRATION EC #12 HEET FLOW Surface Description = grass Manning's Roughness (n) = 0.24 Flow Length (ft) = 500 Slope (%) = 5.6 P-2yr (in.) = 3.12 T(t) (min.) = 34.7 t) Sum of Travel Time (min)= 34.7 Time = 35 (min.) Hydraulic Length = 500 ft Basin Slope = 5.6 TIPROJECTS12017 PROJECTSO7031 The Village At Granit@lott&A8k2AMOCALCSIBMPIPhase 207031-PH2-TOC.xls Sheet: 6 of 6 Project: Village at Granite - Phase 1 Impervious Calculation DPR Job #: 17031 Location: Granite Quarry, NC Prepared by: RJ Checked by: HVN 8-22-2019 Rev. 1-25-2021, RT Estimated Impervious Area Breakdown for Phase 2 BMP #7 Proposed 50' Wide Single Family Lots 2,810 sfx 105 lots..................................................................................... 295,050 sq ft = 6.77 ac (avg house pad 40' x 50' + 18' x 201f Driveway + 5' x 20' sidewalk + 150 sf Patio + 200 sf Future Allocated BUA) 2,460 sfx 3 lots......................................................................................... 7,380 sq ft = 0.17 ac (avg house pad 40' x 50' + 18' x 201f Driveway + 5' x 20' sidewalk) 1460 sf...................................................................................................... 1,460 sq ft = 0.03 ac (house pad (40' x 50')/2 + 18' x 201f Driveway + 5' x 20' sidewalk) Proposed Streets: Typical Local Street, B/C-B/C (approx. 26' x 3,655 If) ...................................... 95,030 sq ft = 2.18 ac Cut -De -Sac, B/C-B/C (approx. 5,515sq ftx 1)............................................... 5,515 sq ft = 0.13 ac Sidewalk (approx. 5' x 3,655 If x 2)........................................................... 36,550 sq ft = 0.84 ac Driveway within R/W (109 x 6' x 18 If) .......................................................... 11,772 sq ft = 0.27 ac Proposed Turnaround (1,420 sfx 2)............................................................ 2,840 sq ft = 0.07 ac Total Proposed Streets: 151,707 sq ft = 3.48 ac Undetained Imervious Area....................................................................................... 27,323 sq ft = 0.63 ac Total mpervious Area............ ... 455,597 sq ft = 10.46 ac Total Net Site Area=............................................................................................................... 107.90 ac Phase2 Site Area =............................................................................................................... 58.27 ac BMP#7 Watershed Area =............................................................................................... 22.71 ac Impervious Area Summar % of Imp. Area of Imperv. Area % of Imp. Area of % of Imp. Area of (Ac) Site Area Phase 2 Site Area BMP #7 WS Area Proprosed Lots 6.98 6.47% 11.97% 30.72% Proposed Streets 3.48 3.23% 5.98% 15.34% Total Imp. Areal 1 46.05% 10.46 1 9.69% 1 17.95% C:IDPR Dropboxl_ProjectskActivel20l7ll7O31 Village at Granite (Pg7Mdt) 8Y7&&6 APCSIBMPIPhase 2117031-P142-Impervious.xls Sheet 1 of 1 Project: Village at Granite - Phase 1 Impervious Calculation DPR Job #: 17031 Location: Granite Quarry, NC Proposed 50' Wide Single Family Lots 2,810 sf x 23 lots....................................................................................... (avg house pad 40' x 50' + 18' x 201f Driveway + 5' x 20' sidewalk + 150 sf Patio + 200 sf Future Allocated BUA) 2,000 sf x 0.5 lots........................................................................................ (avg house pad 40' x 50') 350 sf x 4 lots.............................................................................................. (150 sf Patio + 200 sf Future Allocated BUA) Local Road, B/C-B/C (approx. 26' x 1,030 If) ................................................. Cul-De-Sac, B/C-B/C (approx. 5,740sq ft x 1)............................................... Sidewalk (approx. 5' x 1,160 If 2)........................................................... Driveway within R/W (23 x 6' x 18 If)........................................................... Total Proposed Streets: Prepared by: RJ Checked by: HVN 8-22-2019 Rev. 1-25-2021, RT 64,630 sq ft = 1.48 ac 1,000 sq ft = 0.02 ac 1,400 sq ft = 0.03 ac 26,780 sq ft = 0.61 ac 5,740 sq ft = 0.13 ac 11,600 sq ft = 0.27 ac 2,484 sq ft = 0.06 ac 46,604 sg ft = 1.07 ac 113,634 ft = 2.61 sq ac Total Net Site Area=............................................................................................................... 107.90 ac Phase2 Site Area =............................................................................................................... 58.27 ac BMP#8 Watershed Area =............................................................................................. 6.30 ac Impervious Area Summar Imperv. Area % of Imp. Area of % of Imp. Area of % of Imp. Area of (Ac) Site Area Phase 2 Site Area BMP #8 WS Area Proprosed Lots 1.54 1.43% 2.64% 24.43% Proposed Streets 1.07 0.99% 1.84% 16.98% Total Imp. Area 2.61 1 2.42% 1 4.48% 1 41.41% C:IDPR Dropboxl_ProjectslActivel20l7ll7O31 Village at Granite (PWMPPh8fitMOMCSIBMPIPhase 2117031-P142-Impervious.xls Sheet 1 of 1 Project: Village at Granite -Phse 2 DPR ASSOCIATES, INC Prepared by: RJ DPR Job No.: 17031 RUN-OFF CURVE NUMBER Checked by: HN Location: Granite Quarry, NC Date: 8-31-2018 Rev. 1-25-2021, RT xisting Condition Total Drain. Area (Ac.) Site Soil Type CeB2, PcC2 ChA VnB2 Hydrologic Soil Group Used Land Use Wood (Good Cond.) Open Space - Grass and Shurbs (Good Cond.) Impervious Total ro Total Drain. Area (Ac.) Site Soil Type CeB2, PcC2 ChA VnB2 Hydrologic Soil Group Used Land Use Wood (Good Cond.) Pervious - Grass and Shurbs (Good Cond.) Impervious Total rs 5.50 Soil Group Percentage of Basin B 5.5 ac 100.0% B/D 0.0 ac 0.0% C 0.0 ac 0.0% 5.5 ac 100.0% Percent of CN for Group B CN for Group B/D CN for Group C Total Weighted No. Acres Drainage Area Group B Weighted CN Group 8/D Weighted CN Group C Weighted CN Weighted CN CN % 3.30 60.0% 55 55.0 66 0.0 70 0.0 55.0 33.0 2.20 40.0% 61 61.0 71 0.0 74 0.0 61.0 24.4 0.00 0.0% 98 98.0 98 0.0 98 0.0 98.0 0.0 57.4 100% opment Watershe 22.71 Soil Group B B/D C Percentage of Basin 19.4 ac 85.4% 1.4 ac 6.2% 1.9 ac 8.4% 22.7 ac 100.0% Percent of CN for Group B CN for Group B/D CN for Group C Total Weighted No. Acres Drainage Area Group B Weighted CN Group 8/D Weighted CN Group C Weighted CN Weighted CN CN % 0.00 0.0% 55 47.0 66 70 5.9 56.9 0.0 11.69 51.5% 61 52.1 71 74 6.2 62.7 32.3 11.02 48.5% 98 83.7 98 98 8.2 98.0 47.5 79.8 22.7 100% C:IDPR Dropboxl_ProjectslActive12017117031 Village at Granite (Partial)IPhase 21CALCSOMPPhase 2117031-PH2-Runoff CN.xls Sheet: 1 of 1 211812022 Project: Village at Granite -Phse 2 DPR ASSOCIATES, INC Prepared by: RJ DPR Job No.: 17031 RUN-OFF CURVE NUMBER Checked by: HN Location: Granite Quarry, NC Date: 8-31-2018 Rev. 1-25-2021, RT xisting Condition Total Drain. Area (Ac.) Site Soil Type CeB2, PcC2 ChA VnB2 Hydrologic Soil Group Used Land Use Wood (Good Cond.) Open Space - Grass and Shurbs (Good Cond.) Impervious Total ro Total Drain. Area (Ac.) Site Soil Type CeB2, PcC2 ChA VnB2 Hydrologic Soil Group Used Land Use Wood (Good Cond.) Open Space - Grass and Shurbs (Good Cond.) Impervious Total rs 3.00 Soil Group Percentage of Basin B 0.0 ac 0.0% B/D 0.0 ac 0.0% C 3.0 ac 100.0% 3.0 ac 100.0% Percent of CN for Group B CN for Group B/D CN for Group C Total Weighted No. Acres Drainage Area Group B Weighted CN Group 8/D Weighted CN Group C Weighted CN Weighted CN CN % 3.00 100.0% 55 0.0 66 0.0 70 70.0 70.0 70.0 0.00 0.0% 61 0.0 71 0.0 74 74.0 74.0 0.0 0.00 0.0% 98 0.0 98 0.0 98 98.0 98.0 0.0 70.0 3.0 100% opment Watershe 6.30 Soil Group B B/D C Percentage of Basin 2.1 ac 33.3% 0.4 ac 6.3% 3.8 ac 60.3% 6.3 ac 100.0% Percent of CN for Group B CN for Group B/D CN for Group C Total Weighted No. Acres Drainage Area Group B Weighted CN Group 8/D Weighted CN Group C Weighted CN Weighted CN CN % 0.00 0.0% 55 18.3 66 70 64.7 0.0 3.69 58.6% 61 20.3 71 74 69.5 40.7 2.61 41.4% 98 32.7 98 98 59.1 98.0 40.6 81.3 6.3 100% C:IDPR Dropboxl_ProjectslActive12017117031 Village at Granite (Partial)IPhase 21CALCSOMPPhase 2117031-PH2-Runoff CN.xls Sheet: 1 of 1 211812022 Project: Village at Granite -Phse 2 DPR ASSOCIATES, INC Prepared by: RJ DPR Job No.: 17031 RUN-OFF CURVE NUMBER Checked by: HN Location: Granite Quarry, NC Date: 8-31-2018 Rev. 1-25-2021, RT ng Total Drain. Area (Ac.) Site Soil Type CeB2, PcC2 ChA VnB2 Hydrologic Soil Group Used Land Use Wood (Good Cond.) Open Space - Grass and Shurbs (Good Cond.) Impervious n 7.00 Soil Group Percentage of Basin B 8.5 ac 121.4% B/D 0.0 ac 0.0% C 0.0 ac 0.0% 8.5 ac 121.4% Percent of CN for Group B CN for Group B/D CN for Group C Total Weighted No. Acres Drainage Area Group B Weighted CN Group 8/D Weighted CN Group C Weighted CN Weighted CN CN % 7.00 100.0% 55 66.8 66 0.0 70 0.0 66.8 66.8 0.00 0.0% 61 74.1 71 0.0 74 0.0 74.1 0.0 0.00 0.0% 98 119.0 98 0.0 98 0.0 119.0 0.0 66.8 7.0 100% Existing Condition Watershed EC BASIN # 12 Total Drain. Area (Ac.) 4.50 Site Soil Type Soil Group Percentage of Basin CeB2, PcC2 B 3.4 ac 75.6% ChA B/D 0.0 ac 0.0% VnB2 C 1.6 ac 35.6% 5.0 ac 111.1% Hydrologic Soil Group Used Percent of CN for Group B CN for Group B/D CN for Group C Total Weighted Land Use No. Acres Drainage Area Group B Weighted CN Group 8/D Weighted CN Group C Weighted CN Weighted CN CN % Wood (Good Cond.) 4.50 100.0% 55 41.6 66 0.0 70 24.9 66.4 66.4 Open Space - Grass and Shurbs 0.00 0.0% 61 46.1 71 0.0 74 26.3 72.4 0.0 (Good Cond.) Impervious 0.00 0.0% 98 74.0 98 0.0 98 34.8 108.9 0.0 66.4 Total 4.5 100% C:IDPR Dropboxl ProlectsOctive12017117031 Village at Granite (Partial)IPhase 21CALCSOMPIPhase 217031-PH2-Runoff CN.xls Sheet. 1 of 1 112612021 Project: Village at Granite -Phse 2 DPR ASSOCIATES, INC Prepared by: RJ DPR Job No.: 17031 RUN-OFF CURVE NUMBER Checked by: HN Location: Granite Quarry, NC Date: 8-31-2018 Rev. 1-25-2021, RT ng Condition Total Drain. Area (Ac.) Site Soil Type CeB2, PcC2 ChA VnB2 Hydrologic Soil Group Used Land Use Wood (Good Cond.) Open Space - Grass and Shurbs (Good Cond.) Impervious ned Area 8.50 Soil Group Percentage of Basin B 4.0 ac 47.1% B/D 2.8 ac 32.9% C 1.7 ac 20.0% 8.5 ac 100.0% Percent of CN for Group B CN for Group B/D CN for Group C Total Weighted No. Acres Drainage Area Group B Weighted CN Group 8/D Weighted CN Group C Weighted CN Weighted CN CN % 8.50 100.0% 55 25.9 66 21.7 70 14.0 61.6 61.6 0.00 0.0% 61 28.7 71 23.4 74 14.8 66.9 0.0 0.00 0.0% 98 46.1 98 32.3 98 19.6 98.0 0.0 61.6 8.5 100% Proposed Development Watershed Undetained Area Total Drain. Area (Ac.) 5.50 Site Soil Type Soil Group Percentage of Basin CeB2, PcC2 B 1.1 ac 20.0% ChA B/D 2.0 ac 36.4% VnB2 C 1.4 ac 25.5% 4.5 ac 81.8% Hydrologic Soil Group Used Percent of CN for Group B CN for Group B/D CN for Group C Total Weighted Land Use No. Acres Drainage Area Group B Weighted CN Group 8/D Weighted CN Group C Weighted CN Weighted CN CN % Wood (Good Cond.) 0.00 0.0% 55 11.0 66 24.0 70 17.8 52.8 0.0 Open Space - Grass and Shurbs 4.10 74.5% 61 12.2 71 25.8 74 18.8 56.9 42.4 (Good Cond.) Impervious 0.18 3.3% 98 19.6 98 35.6 98 24.9 80.2 2.6 45.0 Total 4.3 78% C:IDPR Dropboxl_ProlectsOctive12017117031 Village at Granite (Partial)Phase 21CALCSOMPIPhase 217031-PH2-Runoff CN.xls Sheet. 1 of 1 112612021 IV. BMP DESIGN AND CALCULATIONS Project: Village at Granite - Phase2 DPR ASSOCIATES Prepared By: RJ Job No.: 17031 Checked By: HN Location: Granite Quarry, NC Date: 8-31-2018 Sheet: 1 of 2 DESIGN CRITERIA PER NCDENR STORMWA TER DESIGN MANUAL DATED 11-23-2020 * BMP WET DETENTION POND 7 * Total Drainage Area (A): 22.71 ac * Total Impervious Area "I" USED = 48.5% (for Design) 11.02 ac (See attached Impervious Calcs) * Total Water Quality Volume To Treat (First 1" of Rainfall): WQv= (P/12) (A) (Rv) (43,560) = 40,121 cf (Simple Method, Schueler) P: Water Quality Design Storm, 1st 1-Inch of Rainfall 1 inch A: Drainage Area 22.C7]ac. Rv., 0.05 + 0.009 (1) = 0.48 1: % of Impervious Area * Main Pool: Pool Average Depth (H)= 5.0 ft Surface Area to Drainage Area Ratio (SA/DA)= (NCDENR Table 1) 1.30 Required Surface Area (SA)= 12,860 sf Provided Surface Area (SA) @ Perm. W.S. Elev.= 17,000 sf Required Pool Volume (V= SA*H)= 64,301 cf Provided Pool Volume (V) @ Perm. W.S. Elev.= 91,800 cf * Forebay: Required Forebay Volume (15% of Pool Volume)= 9,645 cf Provided Forbay Volume @ Perm. W.S. Elev.= 16,750 cf * Estimated Storm Water Volume 1-yr, 24-hr Post-Dev: 90,853 cf Qv = (P-0.2S)12/ (P+0.8S) * A * (43,560/12) _ (SCS Method) P: Design Storm, 1-yr24-hrStorm Rainfall depth 2.80 inch A: Drainage Area 22.71 ac. S = 1000/CN-10 = 2.50 inch CN. Curve Number 80 * Estimated Storm Water Volume 10-yr, 24-hr Post-Dev: Qv = (P-0.2S)12/ (P+0.8S) * A * (43,560/12) = 132,286 cf (SCS Method) P: Design Storm, 10-yr24-hrStorm Rainfall depth 3.46 inch A: Drainage Area 22.71 ac. S = 1000/CN-10 = 2.50 inch CN. Curve Number 80 BMP Pond Storage Volume Provided: Stage Surface Area Incremental Storage Total Storage ft s c c Notes SHWTE and Groundwater @ 717.42' per Summit Geo Report letter dated 11-14-17 Tailwater Elevation (100 YEAR WSE) = 726.00' 713.5 7,749 714.0 8,193 0 0 Bottom of Pond 716.0 11,329 5,665 5,665 Bottom of Forebay 718.0 14,384 10,024 15,689 720.0 17,822 13,923 29,612 721.0 19,680 16,802 46,413 721.5 Perm. W.S. 22,083 19,442 65,856 Top of Perm. Pool 721.5 (Perm. W.S.) 22,083 0 0 Bottom of Temp. Pool 722.0 24,792 11,719 11,719 723.5 29,940 41,049 52,768 724.0 31,663 15,401 68,169 726.0 36,910 68,573 136,742 728.0 42,370 79,280 216,022 728.5 43,804 21,544 237,565 729.5 46,672 45,238 282,803 Top of Embankment Static Water Quality Elevation @ 723.04 ft Static Channel Protection Elevation @ 724.66 ft C:OPR Dropbox4_ProjectsV4ctive42017417031 Village at Granite (Partiag4Phase 24CALCS4BMP4Phase 2417031-PH2-BMP Wet Pond.xls printed 311612022 Project: Village at Granite - Phase2 DPR ASSOCIATES Prepared By: RJ Job No.: 17031 Checked By: HN Location: Granite Quarry, NC Date: 8-31-2018 Sheet: 2 of 2 * BMP POND 7 * Orifice Calculations For Dewatering Time Between 48 hrs to 120 hrs WQv 40,121 cf Average Surface Area 26,089 sf Area of Outlet Orifice (sf), a =(2)(A)h^(1/2))/(c)(t)(2g)1(1/2)) (NCDENR, Orifice Equation) a = 0.093 where: A= ResevoirArea, sf 26,089 Max. Orifice Diameter (inch), d = 4.15 h= Falling Head, ft 1.54 c= Discharge Coefficient 0.5 Orifice Diameter (inch) Used, d = 4.0 t= Time (48 Hrs), sec. 172,800 g= Accelleration, ft/sq.sec 32.2 a= Orifice Area (so d= Orifice Diameter inch Emergency Drain Orifice Calculations For Permanent Pond Within 24 hrs Permanent Pool Volume 65,856 cf Average Surface Area 11,974 sf Area of Outlet Orifice (sf), a =(2)(A)h^(1/2))/(c)(t)(2g)1(1/2)) (NCDENR, Orifice Equation) a = 0.162 where: A= ResevoirArea, sf 11,974 Min. Orifice Diameter (inch), d = 5.47 h= Falling Head, ft 5.50 c= Discharge Coefficient 0.5 Orifice Diameter (inch) Used, d = 6.0 t= Time (24 Hrs), sec. 86,400 g= Accelleration, ft/sq.sec 32.2 a= Orifice Area (so d= Orifice Diameter (inch) * BMP POND 7 Anti -Seep Collar Sizing Outlet Pipe Size (I.D.) = 36 in Outlet Pipe Size (O.D.) = 3.67 ft L, Length of Outlet Pipe = 40 If Min. Flow Length = 46.0 ft Min. Flow Length = 115% of outlet pipe length Total Lengh of Collar offset = 6.0 ft Number of anti -seep collars 2 Offset per collar 3.0 ft Min. Outside dimension of each collar 6.67 ft Designed collars 2 at 7.0' x 7.0' C:0PR Dropboxl_ProjectsV4ctive12017V7031 Village at Granite (PartiagIPhase 21CALCSIBMPIPhase 2117031-PH2-BMP Wet Pond.xls printed 311612022 Pond Report 18 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Pond No. 1 - PH2 BM 7 - WETPOND Pond Data Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 721.50 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 721.50 22,083 0 0 0.50 722.00 24,792 11,719 11,719 2.00 723.50 29,940 41,049 52,768 2.50 724.00 31,663 15,401 68,169 4.50 726.00 36,910 68,573 136,742 6.50 728.00 42,370 79,280 216,022 7.00 728.50 43,804 21,544 237,565 8.00 729.50 46,672 45,238 282,803 Culvert / Orifice Structures [A] [B] [C] [PrfRsr] Rise (in) = 36.00 4.00 8.00 0.00 Span (in) = 36.00 4.00 8.00 0.00 No. Barrels = 1 1 2 0 Invert El. (ft) = 721.00 721.50 723.50 0.00 Length (ft) = 40.00 0.50 0.50 0.00 Slope (%) = 0.74 0.00 0.00 n/a N-Value = .012 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Multi -Stage = n/a Yes Yes No Stage (ft) 8.00 . M 4.00 RIM 0.00 ' ' ' 0.00 10.00 20.00 - Total Q Weir Structures [A] [B] [C] [D] Crest Len (ft) = 16.00 0.00 0.00 10.00 Crest El. (ft) = 727.20 0.00 0.00 728.50 Weir Coeff. = 3.33 3.33 3.33 3.33 Weir Type = 1 --- --- Ciplti Multi -Stage = Yes No No No Exfil.(in/hr) = 0.000 (by Contour) TW Elev. (ft) = 726.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Discharge 30.00 40.00 50.00 60.00 70.00 80.00 Elev (ft) 729.50 727.50 725.50 723.50 721.50 90.00 100.00 Discharge (cfs) Pond Report 17 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 03 / 16 / 2022 Pond No. 1 - PH2 BM 7 - WETPOND Pond Data Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 721.50 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 721.50 22,083 0 0 0.50 722.00 24,792 11,719 11,719 2.00 723.50 29,940 41,049 52,768 2.50 724.00 31,663 15,401 68,169 4.50 726.00 36,910 68,573 136,742 6.50 728.00 42,370 79,280 216,022 7.00 728.50 43,804 21,544 237,565 8.00 729.50 46,672 45,238 282,803 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 36.00 4.00 8.00 0.00 Crest Len (ft) = 16.00 0.00 0.00 10.00 Span (in) = 36.00 4.00 8.00 0.00 Crest El. (ft) = 727.20 0.00 0.00 728.50 No. Barrels = 1 1 2 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 721.00 721.50 723.50 0.00 Weir Type = 1 --- --- Ciplti Length (ft) = 40.00 0.50 0.50 0.00 Multi -Stage = Yes No No No Slope (%) = 0.74 0.00 0.00 n/a N-Value = .012 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi -Stage = n/a Yes Yes No TW Elev. (ft) = 726.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 721.50 0.00 0.00 0.00 --- 0.00 --- --- 0.00 0.05 1,172 721.55 0.00 0.00 0.00 --- 0.00 --- --- 0.00 0.10 2,344 721.60 0.00 0.00 0.00 --- 0.00 --- --- 0.00 0.15 3,516 721.65 0.00 0.00 0.00 --- 0.00 --- --- 0.00 0.20 4,688 721.70 0.00 0.00 0.00 --- 0.00 --- --- 0.00 0.25 5,859 721.75 0.00 0.00 0.00 --- 0.00 --- --- 0.00 0.30 7,031 721.80 0.00 0.00 0.00 --- 0.00 --- --- 0.00 0.35 8,203 721.85 0.00 0.00 0.00 --- 0.00 --- --- 0.00 0.40 9,375 721.90 0.00 0.00 0.00 --- 0.00 --- --- 0.00 0.45 10,547 721.95 0.00 0.00 0.00 --- 0.00 --- --- 0.00 0.50 11,719 722.00 0.00 0.00 0.00 --- 0.00 --- --- 0.00 0.65 15,824 722.15 0.00 0.00 0.00 --- 0.00 --- --- 0.00 0.80 19,929 722.30 0.00 0.00 0.00 --- 0.00 --- --- 0.00 0.95 24,033 722.45 0.00 0.00 0.00 --- 0.00 --- --- 0.00 1.10 28,138 722.60 0.00 0.00 0.00 --- 0.00 --- --- 0.00 1.25 32,243 722.75 0.00 0.00 0.00 --- 0.00 --- --- 0.00 1.40 36,348 722.90 0.00 0.00 0.00 --- 0.00 --- --- 0.00 1.55 40,453 723.05 0.00 0.00 0.00 --- 0.00 --- --- 0.00 1.70 44,558 723.20 0.00 0.00 0.00 --- 0.00 --- --- 0.00 1.85 48,663 723.35 0.00 0.00 0.00 --- 0.00 --- --- 0.00 2.00 52,768 723.50 0.00 0.00 0.00 --- 0.00 --- --- 0.00 2.05 54,308 723.55 0.00 0.00 0.00 --- 0.00 --- --- 0.00 2.10 55,848 723.60 0.00 0.00 0.00 --- 0.00 --- --- 0.00 2.15 57,388 723.65 0.00 0.00 0.00 --- 0.00 --- --- 0.00 2.20 58,928 723.70 0.00 0.00 0.00 --- 0.00 --- --- 0.00 2.25 60,468 723.75 0.00 0.00 0.00 --- 0.00 --- --- 0.00 2.30 62,008 723.80 0.00 0.00 0.00 --- 0.00 --- --- 0.00 2.35 63,548 723.85 0.00 0.00 0.00 --- 0.00 --- --- 0.00 2.40 65,088 723.90 0.00 0.00 0.00 --- 0.00 --- --- 0.00 2.45 66,628 723.95 0.00 0.00 0.00 --- 0.00 --- --- 0.00 2.50 68,169 724.00 0.00 0.00 0.00 --- 0.00 --- --- 0.00 2.70 75,026 724.20 0.00 0.00 0.00 --- 0.00 --- --- 0.00 2.90 81,883 724.40 0.00 0.00 0.00 --- 0.00 --- --- 0.00 3.10 88,740 724.60 0.00 0.00 0.00 --- 0.00 --- --- 0.00 3.30 95,598 724.80 0.00 0.00 0.00 --- 0.00 --- --- 0.00 --- --- 0.000 --- --- 0.000 --- --- 0.000 --- --- 0.000 --- --- 0.000 --- --- 0.000 --- --- 0.000 --- --- 0.000 --- --- 0.000 --- --- 0.000 --- --- 0.000 --- --- 0.000 --- --- 0.000 --- --- 0.000 --- --- 0.000 --- --- 0.000 --- --- 0.000 --- --- 0.000 --- --- 0.000 --- --- 0.000 --- --- 0.000 --- --- 0.000 --- --- 0.000 --- --- 0.000 --- --- 0.000 --- --- 0.000 --- --- 0.000 --- --- 0.000 --- --- 0.000 --- --- 0.000 --- --- 0.000 --- --- 0.000 --- --- 0.000 --- --- 0.000 --- --- 0.000 Continues on next page... 18 PH2 BMP 7 - WETPOND Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 3.50 102,455 725.00 0.00 0.00 0.00 --- 0.00 --- --- 0.00 --- --- 0.000 3.70 109,312 725.20 0.00 0.00 0.00 --- 0.00 --- --- 0.00 --- --- 0.000 3.90 116,170 725.40 0.00 0.00 0.00 --- 0.00 --- --- 0.00 --- --- 0.000 4.10 123,027 725.60 0.00 0.00 0.00 --- 0.00 --- --- 0.00 --- --- 0.000 4.30 129,884 725.80 0.00 0.00 0.00 --- 0.00 --- --- 0.00 --- --- 0.000 4.50 136,742 726.00 0.00 0.00 0.00 --- 0.00 --- --- 0.00 --- --- 0.000 4.70 144,670 726.20 1.71 is 0.19 is 1.49 is --- 0.00 --- --- 0.00 --- --- 1.680 4.90 152,598 726.40 2.39 is 0.26 is 2.11 is --- 0.00 --- --- 0.00 --- --- 2.377 5.10 160,526 726.60 2.91 is 0.32 is 2.59 is --- 0.00 --- --- 0.00 --- --- 2.911 5.30 168,454 726.80 3.37 is 0.37 is 2.99 is --- 0.00 --- --- 0.00 --- --- 3.361 5.50 176,382 727.00 3.76 is 0.42 is 3.34 is --- 0.00 --- --- 0.00 --- --- 3.758 5.70 184,310 727.20 4.12 is 0.46 is 3.66 is --- 0.00 --- --- 0.00 --- --- 4.117 5.90 192,238 727.40 9.13 is 0.48 is 3.87 is --- 4.77 --- --- 0.00 --- --- 9.126 6.10 200,166 727.60 17.84 is 0.48 is 3.87 is --- 13.48 --- --- 0.00 --- --- 17.84 6.30 208,094 727.80 28.71 is 0.44 is 3.51 is --- 24.77 --- --- 0.00 --- --- 28.71 6.50 216,022 728.00 39.74 is 0.34 is 2.68 is --- 36.72 s --- --- 0.00 --- --- 39.74 6.55 218,176 728.05 41.39 is 0.32 is 2.54 is --- 38.53 s --- --- 0.00 --- --- 41.39 6.60 220,330 728.10 42.83 is 0.30 is 2.41 is --- 40.11 s --- --- 0.00 --- --- 42.83 6.65 222,485 728.15 44.12 is 0.29 is 2.30 is --- 41.54 s --- --- 0.00 --- --- 44.12 6.70 224,639 728.20 45.30 is 0.27 is 2.20 is --- 42.83 s --- --- 0.00 --- --- 45.30 6.75 226,793 728.25 46.39 is 0.26 is 2.10 is --- 44.02 s --- --- 0.00 --- --- 46.39 6.80 228,948 728.30 47.40 is 0.25 is 2.02 is --- 45.13 s --- --- 0.00 --- --- 47.40 6.85 231,102 728.35 48.34 is 0.24 is 1.94 is --- 46.16 s --- --- 0.00 --- --- 48.34 6.90 233,256 728.40 49.24 is 0.23 is 1.86 is --- 47.14 s --- --- 0.00 --- --- 49.23 6.95 235,411 728.45 50.08 is 0.22 is 1.79 is --- 48.06 s --- --- 0.00 --- --- 50.08 7.00 237,565 728.50 50.89 is 0.22 is 1.73 is --- 48.94 s --- --- 0.00 --- --- 50.89 7.10 242,089 728.60 52.40 is 0.20 is 1.61 is --- 50.58 s --- --- 1.05 --- --- 53.44 7.20 246,613 728.70 53.79 is 0.19 is 1.51 is --- 52.09 s --- --- 2.98 --- --- 56.77 7.30 251,136 728.80 55.11 is 0.18 is 1.42 is --- 53.51 s --- --- 5.47 --- --- 60.57 7.40 255,660 728.90 56.35 is 0.17 is 1.34 is --- 54.83 s --- --- 8.42 --- --- 64.76 7.50 260,184 729.00 57.53 is 0.16 is 1.27 is --- 56.10 s --- --- 11.77 --- --- 69.29 7.60 264,708 729.10 58.67 is 0.15 is 1.20 is --- 57.30 s --- --- 15.47 --- --- 74.13 7.70 269,232 729.20 59.76 is 0.14 is 1.14 is --- 58.48 s --- --- 19.50 --- --- 79.26 7.80 273,755 729.30 60.82 is 0.14 is 1.09 is --- 59.59 s --- --- 23.82 --- --- 84.64 7.90 278,279 729.40 61.85 is 0.13 is 1.04 is --- 60.67 s --- --- 28.42 --- --- 90.26 8.00 282,803 729.50 62.86 is 0.12 is 1.00 is --- 61.71 s --- --- 33.30 --- --- 96.13 ...End Project: Village at Granite Quarry DPR ASSOCIATES, INC Prepared By: RJ Job No.: 17031 Checked By: HN Location: Granite Quarry, Rowan Co., NC Rev: 1-25-22 IDESIGN CRITERIA PER NCDENR STORMWA TER DESIGN MANUAL DATED 11-23-2020 1 Total Drainage Area (A): Total Impervious Area "I" USED = (See attached Impervious Calcs) otal Water Quality Volume To Treat (First 1" of R WQv = (7591.) (P/12) (A) (Rv) (43,560) _ (Simple Method, Schueler) P. Water Quality Design Storm, 1st Inch of Rainfall A: Drainage Area (Impervious Area Only) Rv. 0.05 + 0.009 (I) = I: % of Impervious Area )NLY 8 6.30 ac 41.41 % (for Design) 1 2.61 Jac 7,250 cf 1 inch 6.30 ac. 0.423 41.4% Qv = (P-0.2S)12/ (P+0.8S)' A' (43560/12) = 26,568 cf (SCS Method) P. Design Storm, 1-yr 24-hr Storm Rainfall depth 2.80 inch A: Drainage Area 6.30 ac. S = 1,000/CN-10 = 2.35 inch CN: Curve Number Qv = (P-0.2S)12/ (P+0.8S)' A' (43560/12) = 38,334 cf (SCS Method) P. Design Storm, 10-yr 24-hr Storm Rainfall depth 3.46 inch A: Drainage Area 6.30 ac. S = 1000/CN-10 = 2.35 inch CN: Curve Number 81 Vol -Pre = (0.2)(WQv) = 1,450 cf adimentation Chamber Volume Provided: 1 1,935 lef Itration Media Surface Area Required: Af=((WQv) (Df)]/((k) (Hf + Df) (Tf)] = 642 sf (From Mecklenburg BMP Manual, Based on Darcy's Law) WQv: Water quality volume 7,250 cf Df.- Filter bed depth (2'.5 for Optimal Efficiency) 2.5 It k: Permeability coefficient of filter media 3.50 ff/day (1.75" per hour, or a 5' per day) Ht Average height of water above filter bed, (half of pond depth, 1' max) 1.30 It Tf = Design filter bed drain time in days, (2 days beyond center 6-hr storm) 2.125 days Depth of Pond Water (24" Max.)= 24 inch Itration Media Surface Area Provided: 1,000 sf P Storage Volume Provided: Elevation Surface Area Storage Total Storage SHWTE and Groundwater @ 718.81 per Summit Geo Report dated 11-14-2017 Tailwater Elevation (100 YEAR WSE) = 727.8' 727.5 1,000 0 0 Bottom of Stone 728.5 1,000 1,000 1,000 Top Stone/Bottom Sand 731.0 1,000 2,500 3,500 Top of Sand Filter 731.0 1,020 0 0 Bottom of Pond 732.0 8,228 4,624 4,624 733.0 9,494 8,861 13,485 734.0 10,816 10,155 23,640 735.0 12,195 11,506 35,146 736.0 13,634 12,915 48,060 737.0 14,818 14,226 62,286 Top of Pond is Water Quality Elevation @ is Channel Protection Elevation @ 732.30 ft 734.34 Ift printed 311612022 C: OPR Dropboxl ProjectslActive12017W7031 Village at Granite (Partial)IPhase 21CALCSIBMPIPhase 2117031-PH2-BMP Sandfilter.xls page 1 of 3 Project: Village at Granite Quarry DPR ASSOCIATES, INC Prepared By: RJ Job No.: 17031 Checked By: HN Location: Granite Quarry, Rowan Co., NC Rev: 1-25-22 - SAND FILTER Qo = WQv/Tf = (Af)(k)(Hf+Df)/Df = 0.0468 cfs (Darcy's Law) k: Permeability coefficient of filter media 3.50 ft/day Af.- Surface area, sf 642 sf Hf.- Average height of water above filter bed 2.00 ft Df.- Depth of soil filter bed 2.5 ft Q o @ Top of Media 731.0 = cfs Q o @ Median of WQv storage 731.6 = [Zlefs cfs Q o @ Top of WQv storage 732.3 = Tf = WQv/Qo 43.03 hrs izing Under Drain Pipes Q: Draw down rate thru sand filter 0.0468 cfs Use [1]-50 If of 6" PVC or Sch 40, Use 1 of w/318" perforations spaced 3" on center, 4 rows w/ 90-deg apart 1 50 LF of 6 inch # of Perforation = (# pipes)(2 rows/ft) (Linear feet/per pipe -2') (2 holes/row) = (1 pipe)(2)(501f)(2) 200 holes Capacity of one hole (3/8") = CA(2gh)1(0.5) (orifice equation) 0.0078 cfs c= Discharge Coefficient 0.6 g= A ccelleration, fb'sq.sec 32.2 a= Orifice Area (sf) of 318" hole 0.0008 h= head above perforation 4.5 Total Capacity = Capacity of 1 hole x # of holes 1.5660 cfs Total Capacity w/ 50% lost to clogging 0.7830 cfs Underdrain Pipe Capacity= 1.49/n(A)(A/P)1(2/3) (S)10.5 (ManningEq) 0.395 cfs n= pipe coefficient 0.013 A= Area (sf) of 6" dia pipe 0.1963 P= Pipe Perimeter, ft 1.57 s= slope, 0.5% 0.005 Underdrain Pipe Capacity w/ 50% lost to clogging 0.1974 cfs Both Flow Rates thru Perforation and Pipe are greater than that of Flow rate of Sand Filter (Sized for the Volume of 1-yr Storm with 50% remained at 36th Hour, 5% remained at 60th Hour, and drained completely at 120th Hour). 1-yr Storm Volume, Less 50% Remain Beyond 36th Hour 13,284 cf Average Surface Area 3,982 sf Area of Outlet Orifice (so, a =(2)(A)h^(1/2))/(c)(t)(2g)1(1/2)) a = 0.023 (NCDENR, Orifice Equation) where: A= ResevoirArea, sf 3,982 Max. Orifice Diameter (inch), d = 2.06 h= Falling Head, ft 3.25 c= Discharge Coefficient 0.6 Orifice Diameter (inch) Used, d = 2.0 t= Time ( 36 hrs), sec. 129,600 g= A ccelleration, fb'sq.sec 32.2 a= Orifice Area (sf) d= Orifice Diameter (inch) Qo = WQv/Tf 0.1230 cfs (Darcy's Law) CPv. 1-yr Storm Volume 26,568 cf Tf.- 2 days beyond center of 24hr-storm, 60 hours 216,000 sec printed 311612022 C: OPR Dropboxl ProjectslActive12017W7031 Village at Granite (Partial)IPhase 21CALCSIBMPIPhase 2117031-PH2-BMP Sandfilter.xls page 2 of 3 Project: Village at Granite Quarry DPR ASSOCIATES, INC Prepared By: RJ Job No.: 17031 Checked By: HN Location: Granite Quarry, Rowan Co., NC Rev: 1-25-22 Collar Sizing Outlet Pipe Size (I.D.) = 24 in Outlet Pipe Size (O.D.) = 2.50 ft L, Length of Outlet Pipe = 56 If Min. Flow Length = 64.4 ft Total Lengh of Collar offset = 8.4 ft Number of anti -seep collars 2 Offset per collar 4.2 ft Min. Outside dimension of each collar 6.70 ft Designed collars 2 at 7.0' x 7.0' Depth of Sand Media = 30 in Sand Infilteration Rate = 2 in/hr WQ Drawdown = 15 hr Min. Flow Length = 115% of outlet pipe printed 311612022 C: OPR Dropboxl ProjectslActive12017W7031 Village at Granite (Partial)IPhase 21CALCSIBMPIPhase 2117031-PH2-BMP Sandfilter.xls page 3 of 3 Pond Report 20 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Pond No. 2 - PH2 BMP 8 - SANDFILTER Pond Data Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 731.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 731.00 1,020 0 0 1.00 732.00 8,228 4,624 4,624 2.00 733.00 9,494 8,861 13,485 3.00 734.00 10,816 10,155 23,640 4.00 735.00 12,195 11,506 35,146 5.00 736.00 13,634 12,915 48,060 6.00 737.00 14,818 14,226 62,286 Culvert / Orifice Structures [A] [B] [C] [PrfRsr] Rise (in) = 24.00 2.00 6.00 0.00 Span (in) = 24.00 2.00 6.00 0.00 No. Barrels = 1 1 2 0 Invert El. (ft) = 723.48 732.50 734.00 0.00 Length (ft) = 50.00 0.50 0.50 0.00 Slope (%) = 0.50 0.00 0.00 n/a N-Value = .012 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Multi -Stage = n/a Yes Yes No Stage (ft) 6.00 41111 4.00 c m ►41I17 M 0.00 r 0.00 9.00 Total Q Weir Structures [A] [B] [C] [D] Crest Len (ft) = 12.00 0.00 0.00 10.00 Crest El. (ft) = 735.10 0.00 0.00 736.00 Weir Coeff. = 3.33 3.33 3.33 3.33 Weir Type = 1 --- --- Ciplti Multi -Stage = Yes No No No Exfil.(in/hr) = 0.000 (by Contour) TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Discharge Elev (ft) 737.00 rig il<11I11l 735.00 734.00 11111115161911I11 732.00 1 1 731.00 18.00 27.00 36.00 45.00 54.00 63.00 72.00 81.00 90.00 Discharge (cfs) Pond Report 20 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 03 / 16 / 2022 Pond No. 2 - PH2 BMP 8 - SANDFILTER Pond Data Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 731.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 731.00 1,020 0 0 1.00 732.00 8,228 4,624 4,624 2.00 733.00 9,494 8,861 13,485 3.00 734.00 10,816 10,155 23,640 4.00 735.00 12,195 11,506 35,146 5.00 736.00 13,634 12,915 48,060 6.00 737.00 14,818 14,226 62,286 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 24.00 2.00 6.00 0.00 Crest Len (ft) = 12.00 0.00 0.00 10.00 Span (in) = 24.00 2.00 6.00 0.00 Crest El. (ft) = 735.10 0.00 0.00 736.00 No. Barrels = 1 1 2 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 723.48 732.50 734.00 0.00 Weir Type = 1 --- --- Ciplti Length (ft) = 50.00 0.50 0.50 0.00 Multi -Stage = Yes No No No Slope (%) = 0.50 0.00 0.00 n/a N-Value = .012 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi -Stage = n/a Yes Yes No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 731.00 0.00 0.00 0.00 --- 0.00 --- --- 0.00 --- --- 0.000 0.10 462 731.10 38.62 is 0.00 0.00 --- 0.00 --- --- 0.00 --- 0.004 0.004 0.20 925 731.20 38.62 is 0.00 0.00 --- 0.00 --- --- 0.00 --- 0.008 0.008 0.30 1,387 731.30 38.62 is 0.00 0.00 --- 0.00 --- --- 0.00 --- 0.013 0.013 0.40 1,850 731.40 38.62 is 0.00 0.00 --- 0.00 --- --- 0.00 --- 0.017 0.017 0.50 2,312 731.50 38.62 is 0.00 0.00 --- 0.00 --- --- 0.00 --- 0.021 0.021 0.60 2,774 731.60 38.62 is 0.00 0.00 --- 0.00 --- --- 0.00 --- 0.025 0.025 0.70 3,237 731.70 38.62 is 0.00 0.00 --- 0.00 --- --- 0.00 --- 0.029 0.029 0.80 3,699 731.80 38.62 is 0.00 0.00 --- 0.00 --- --- 0.00 --- 0.034 0.034 0.90 4,162 731.90 38.62 is 0.00 0.00 --- 0.00 --- --- 0.00 --- 0.038 0.038 1.00 4,624 732.00 38.62 is 0.00 0.00 --- 0.00 --- --- 0.00 --- 0.042 0.042 1.10 5,510 732.10 38.62 is 0.00 0.00 --- 0.00 --- --- 0.00 --- 0.043 0.043 1.20 6,396 732.20 38.62 is 0.00 0.00 --- 0.00 --- --- 0.00 --- 0.044 0.044 1.30 7,282 732.30 38.62 is 0.00 0.00 --- 0.00 --- --- 0.00 --- 0.045 0.045 1.40 8,168 732.40 38.62 is 0.00 0.00 --- 0.00 --- --- 0.00 --- 0.046 0.046 1.50 9,055 732.50 38.62 is 0.00 0.00 --- 0.00 --- --- 0.00 --- 0.047 0.047 1.60 9,941 732.60 38.62 is 0.01 is 0.00 --- 0.00 --- --- 0.00 --- 0.049 0.063 1.70 10,827 732.70 38.62 is 0.04 is 0.00 --- 0.00 --- --- 0.00 --- 0.050 0.086 1.80 11,713 732.80 38.62 is 0.05 is 0.00 --- 0.00 --- --- 0.00 --- 0.051 0.100 1.90 12,599 732.90 38.62 is 0.06 is 0.00 --- 0.00 --- --- 0.00 --- 0.052 0.111 2.00 13,485 733.00 38.62 is 0.07 is 0.00 --- 0.00 --- --- 0.00 --- 0.053 0.121 2.10 14,501 733.10 38.62 is 0.08 is 0.00 --- 0.00 --- --- 0.00 --- --- 0.075 2.20 15,516 733.20 38.62 is 0.08 is 0.00 --- 0.00 --- --- 0.00 --- --- 0.082 2.30 16,532 733.30 38.62 is 0.09 is 0.00 --- 0.00 --- --- 0.00 --- --- 0.089 2.40 17,547 733.40 38.62 is 0.09 is 0.00 --- 0.00 --- --- 0.00 --- --- 0.095 2.50 18,563 733.50 38.62 is 0.10 is 0.00 --- 0.00 --- --- 0.00 --- --- 0.101 2.60 19,578 733.60 38.62 is 0.11 is 0.00 --- 0.00 --- --- 0.00 --- --- 0.106 2.70 20,594 733.70 38.62 is 0.11 is 0.00 --- 0.00 --- --- 0.00 --- --- 0.111 2.80 21,609 733.80 38.62 is 0.12 is 0.00 --- 0.00 --- --- 0.00 --- --- 0.116 2.90 22,625 733.90 38.62 is 0.12 is 0.00 --- 0.00 --- --- 0.00 --- --- 0.121 3.00 23,640 734.00 38.62 is 0.13 is 0.00 --- 0.00 --- --- 0.00 --- --- 0.125 3.10 24,791 734.10 38.62 is 0.13 is 0.06 is --- 0.00 --- --- 0.00 --- --- 0.192 3.20 25,941 734.20 38.62 is 0.13 is 0.23 is --- 0.00 --- --- 0.00 --- --- 0.362 3.30 27,092 734.30 38.62 is 0.14 is 0.46 is --- 0.00 --- --- 0.00 --- --- 0.598 3.40 28,242 734.40 38.62 is 0.14 is 0.73 is --- 0.00 --- --- 0.00 --- --- 0.867 3.50 29,393 734.50 38.62 is 0.15 is 0.95 is --- 0.00 --- --- 0.00 --- --- 1.091 Continues on next page... 21 PH2 BMP 8 - SANDFILTER Stage / Storage / Discharge Table Stage Storage Elevation Clv A ft cuft ft cfs 3.60 30,543 734.60 38.62 is 3.70 31,694 734.70 38.62 is 3.80 32,844 734.80 38.62 is 3.90 33,995 734.90 38.62 is 4.00 35,146 735.00 38.62 is 4.10 36,437 735.10 38.62 is 4.20 37,728 735.20 38.62 is 4.30 39,020 735.30 38.62 is 4.40 40,311 735.40 38.62 is 4.50 41,603 735.50 38.62 is 4.60 42,894 735.60 38.62 is 4.70 44,186 735.70 38.62 is 4.80 45,477 735.80 38.62 is 4.90 46,769 735.90 38.62 is 5.00 48,060 736.00 38.62 is 5.10 49,483 736.10 42.73 is 5.20 50,905 736.20 48.50 is 5.30 52,328 736.30 50.20 is 5.40 53,750 736.40 50.85 is 5.50 55,173 736.50 51.34 is 5.60 56,596 736.60 51.76 is 5.70 58,018 736.70 52.13 is 5.80 59,441 736.80 52.46 is 5.90 60,863 736.90 52.77 is 6.00 62,286 737.00 53.06 is ...End Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.15 is 1.12 is --- 0.00 --- --- 0.00 --- --- 1.268 0.15 is 1.27 is --- 0.00 --- --- 0.00 --- --- 1.421 0.16 is 1.40 is --- 0.00 --- --- 0.00 --- --- 1.558 0.16 is 1.52 is --- 0.00 --- --- 0.00 --- --- 1.684 0.16 is 1.64 is --- 0.00 --- --- 0.00 --- --- 1.801 0.17 is 1.74 is --- 0.00 --- --- 0.00 --- --- 1.910 0.17 is 1.84 is --- 1.26 --- --- 0.00 --- --- 3.277 0.17 is 1.94 is --- 3.57 --- --- 0.00 --- --- 5.683 0.18 is 2.03 is --- 6.56 --- --- 0.00 --- --- 8.767 0.18 is 2.11 is --- 10.11 --- --- 0.00 --- --- 12.40 0.18 is 2.20 is --- 14.13 --- --- 0.00 --- --- 16.50 0.19 is 2.28 is --- 18.56 --- --- 0.00 --- --- 21.03 0.19 is 2.35 is --- 23.39 --- --- 0.00 --- --- 25.94 0.19 is 2.43 is --- 28.58 --- --- 0.00 --- --- 31.20 0.19 is 2.50 is --- 34.12 --- --- 0.00 --- --- 36.82 0.20 is 2.57 is --- 39.96 --- --- 1.05 --- --- 43.78 0.13 is 2.27 is --- 46.10 --- --- 2.98 --- --- 51.48 0.09 is 1.69 is --- 48.41 s --- --- 5.47 --- --- 55.67 0.08 is 1.49 is --- 49.28 s --- --- 8.42 --- --- 59.27 0.07 is 1.33 is --- 49.94 s --- --- 11.77 --- --- 63.11 0.07 is 1.21 is --- 50.49 s --- --- 15.47 --- --- 67.23 0.06 is 1.10 is --- 50.97 s --- --- 19.50 --- --- 71.63 0.06 is 1.01 is --- 51.39 s --- --- 23.82 --- --- 76.28 0.05 is 0.94 is --- 51.78 s --- --- 28.42 --- --- 81.19 0.05 is 0.87 is --- 52.13 s --- --- 33.30 --- --- 86.35 Project: Village at Granite - Phase2 DPR ASSOCIATES Prepared By: RT Job No.: 17031 Checked By: HN Location: Granite Quarry, NC Date: 8-31-2018 Rev: 2-16-22 TAC BUOYANCY BMP Number Structure Number WEIGHT OF DISPLACED WATER BY Volume of riser: BMP #7 7-501 CTURE BMP #8 8-301 Outlet Pipe Diameter (in) = 36 24 Outside Length (ft) = 6.00 5.00 Outside Width (ft) = 6.00 5.00 Wall thickness (ft) = 0.50 0.50 Rim Elev (ft) = 728.37 736.52 Weir Elev (ft) = 727.20 735.10 Invert Out (in) = 721.00 723.48 Height of Riser to Weir (ft) = 7.53 12.87 Riser Volume (cu.ft) = 271.20 321.75 Length (ft) = 7.00 6.00 Width (ft) = 7.00 4.67 Height (ft) = 0.67 0.67 Base Volume (cu.ft) = 32.83 18.77 Total Volume of Structure: 304.03 340.52 Weight of Water (Ibs/cu.ft) = 62.4 62.4 Weight of Water Displaced (Ibs) 18,971 21,249 Volume of Base (cu ft) = 32.83 18.77 Outside area (sf) = 36.00 25.00 Inside area (sf) = 25.00 16.00 Net area (sf) = 11.00 9.00 Height of Riser to Weir (ft) = 8.53 13.87 Volume of Riser (cu ft) = 93.87 124.83 Area Loss for outlet pipe opening (sf): 12.57 8.90 Volume Loss for outlet pipe opening (cu.ft): -6.28 -4.45 Net Volume of Riser (sf) = 87.58 120.38 Volume of Posts (cu.ft) Weir Height (in) = 8.04 11.04 Volume of Posts (cu.ft) = 4.02 5.52 Volume of Top Slab (cu.ft): Length (ft) = 6.00 6.00 Width (ft) = 0.50 6.00 Thickness (in) = 6.00 6.00 Volume of Top slab (cu.ft) = 1.50 18.00 Volume Loss for Opening for Frame/Cover (cu ft) = 1.83 1.83 Volume of Top slab (cu.ft) = -0.33 16.17 Weight of Concrete in Structure (Ibs) = 18,615 24,126 Weight of Ring and Cover (Ibs) = 230 230 Total Weight Structure (Ibs) = 18,845 24,356 C:0PR Dropboxl_ProjectslActive12017117031 Village at Granite (Partial)Phase 21CALCSOMRPhase 247031-PH2 BMP Buoyancy.xls printed 211612022 Project: Village at Granite - Phase2 DPR ASSOCIATES Prepared By: RT Job No.: 17031 Checked By: HN Location: Granite Quarry, NC Date: 8-31-2018 Rev: 2-16-22 TAC Anchor Block: Length (ft) _ Width (ft) _ Height (ft) _ Anchor Block Volume (cu.ft) _ Weight of Concrete (Ibs/cu.ft) Weight of Water Displaced (Ibs/cu.ft) _ Buoyancy of Anchor Block Weight of Anchor Block (Ibs) Weight of Water Displaced (Ibs) Total Weight Structure (Ibs) _ Bouyancy (Ibs) _ Safety Factor = 1*** Includes anchor block, if needed 5.00 5.00 1.00 25.0 3,750.00 1,560.0 2,190 3,750 Anchor Required 20,531 22,595 3,624 1.10 4.00 4.00 1.00 16.0 2,400.00 998.4 1,402 2,400 Anchor Required 22,650 26,756 5,507 1.15 C:0PR Dropboxl_ProjectslActive12017117031 Village at Granite (Partial)Phase 21CALCSOMRPhase 247031-PH2 BMP Buoyancy.xls printed 211612022 V. BMP HYDROGRAGH ANALYSIS - Hydrograph Summary Report - Hydrograph Pond Report - Hydrograph Report Hydrograph Summary Report HydraflowHydrographsExtension for Autodesk®Civil 3D®byAutodesk,Inc. v2021 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 0.279 2 746 3,596 ------ ------ ------ PH2 PRE - BMP 7 2 SCS Runoff 1.303 2 732 6,428 ------ ------ ------ PH2 PRE - BMP 8 3 SCS Runoff 0.938 2 738 5,296 ------ ------ ------ PH2 PRE - EC BASIN 9 4 SCS Runoff 0.135 2 762 2,467 ------ ------ ------ PH2 PRE - EC BASIN 10 5 SCS Runoff 3.283 2 724 11,763 ------ ------ ------ PH2 PRE - EC BASIN 11 6 SCS Runoff 1.076 2 738 7,092 ------ ------ ------ PH2 PRE - EC BASIN 12 7 SCS Runoff 3.189 2 718 8,984 ------ ------ ------ PH2 PRE - UNDET. 9 Combine 3.987 2 726 24,918 1, 4, 5, ------ ------ PH2 PRE BMP 7 Total (+ EC 10, 11 6, 10 Combine 2.208 2 734 11,724 2, 3, ------ ------ PH2 PRE BMP 8 Total (+ EC 9) 11 SCS Runoff 3.189 2 718 8,984 ------ ------ ------ PH2 PRE - UNDET. 12 Combine 7.036 2 720 45,626 9, 10, 11 ------ ------ PH2 PRE - TOTAL 14 SCS Runoff 41.73 2 718 83,489 ------ ------ ------ PH2 POST - BMP 7 15 SCS Runoff 12.19 2 718 24,427 ------ ------ ------ PH2 POST - BMP 8 16 SCS Runoff 1.147 2 720 4,277 ------ ------ ------ PH2 POST- UNDET. 17 Combine 54.95 2 718 112,193 14, 15, 16 ------ ------ PH2 POST - TOTAL 19 Reservoir 0.000 2 n/a 0 14 724.45 83,489 PH2 ROUTED - BMP 7 20 Reservoir 0.121 2 2624 21,074 15 733.00 20,026 PH2 ROUTED - BMP 8 21 SCS Runoff 1.147 2 720 4,277 ------ ------ ------ PH2 POST- UNDET. 22 Combine 1.195 2 720 25,351 19, 20, 21 ------ ------ PH2 ROUTED - TOTAL 17031-PH2-BMP Hydraflow.gpw Return Period: 1 Year Tuesday, 03 / 15 / 2022 2 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 1 PH2 PRE -BMP 7 Hydrograph type = SCS Runoff Peak discharge = 0.279 cfs Storm frequency = 1 yrs Time to peak = 746 min Time interval = 2 min Hyd. volume = 3,596 cuft Drainage area = 5.500 ac Curve number = 57 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 30.00 min Total precip. = 2.77 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 PH2 PRE - BMP 7 Hyd. No. 1 -- 1 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.05 0.00 C 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hydrograph Report 3 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 2 PH2 PRE -BMP 8 Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 3.000 ac Basin Slope = 0.0 % Tc method = User Total precip. = 2.77 in Storm duration = 24 hrs Q (cfs) 2.00 1.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PH2 PRE - BMP 8 Hyd. No. 2 -- 1 Year 120 240 360 480 600 720 840 960 Hyd No. 2 Tuesday, 03 / 15 / 2022 = 1.303 cfs = 732 min = 6,428 cuft = 70 = 0 ft = 29.00 min = Type II = 484 Q (cfs) 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 3 PH2 PRE - EC BASIN 9 Hydrograph type = SCS Runoff Peak discharge = 0.938 cfs Storm frequency = 1 yrs Time to peak = 738 min Time interval = 2 min Hyd. volume = 5,296 cuft Drainage area = 2.500 ac Curve number = 70 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 34.00 min Total precip. = 2.77 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 PH2 PRE - EC BASIN 9 Hyd. No. 3 -- 1 Year Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.10 777 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 5 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 4 PH2 PRE - EC BASIN 10 Hydrograph type = SCS Runoff Peak discharge = 0.135 cfs Storm frequency = 1 yrs Time to peak = 762 min Time interval = 2 min Hyd. volume = 2,467 cuft Drainage area = 5.000 ac Curve number = 55 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 36.00 min Total precip. = 2.77 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 PH2 PRE - EC BASIN 10 Hyd. No. 4 -- 1 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 777����������— 1 0.05 - - 7 L 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hydrograph Report 6 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 5 PH2 PRE - EC BASIN 11 Hydrograph type = SCS Runoff Peak discharge = 3.283 cfs Storm frequency = 1 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 11,763 cuft Drainage area = 7.000 ac Curve number = 67 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 14.00 min Total precip. = 2.77 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PH2 PRE - EC BASIN 11 Q (cfs) Hyd. No. 5 -- 1 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 5 Time (min) Hydrograph Report 7 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 6 PH2 PRE - EC BASIN 12 Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 4.500 ac Basin Slope = 0.0 % Tc method = User Total precip. = 2.77 in Storm duration = 24 hrs Q (cfs) 2.00 1.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PH2 PRE - EC BASIN 12 Hyd. No. 6 -- 1 Year 120 240 360 480 600 720 840 960 Hyd No. 6 Tuesday, 03 / 15 / 2022 = 1.076 cfs = 738 min = 7,092 cuft = 66 = 0 ft = 35.00 min = Type II = 484 Q (cfs) 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 8 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 7 PH2 PRE - UNDET. Hydrograph type = SCS Runoff Peak discharge = 3.189 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 8,984 cuft Drainage area = 8.500 ac Curve number = 62 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.77 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PH2 PRE - UNDET. Q (cfs) Hyd. No. 7 -- 1 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 7 Time (min) 9 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 9 PH2 PRE BMP 7 Total (+ EC 10, 11 & 12) Hydrograph type = Combine Peak discharge = 3.987 cfs Storm frequency = 1 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 24,918 cuft Inflow hyds. = 1, 4, 5, 6 Contrib. drain. area = 22.000 ac PH2 PRE BMP 7 Total (+ EC 10, 11 & 12) Q (cfs) Hyd. No. 9 -- 1 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 9 — Hyd No. 1 Hyd No. 4 Hyd No. 5 Time (min) Hyd No. 6 Hydrograph Report 10 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 10 PH2 PRE BMP 8 Total (+ EC 9) Hydrograph type = Combine Peak discharge = 2.208 cfs Storm frequency = 1 yrs Time to peak = 734 min Time interval = 2 min Hyd. volume = 11,724 cuft Inflow hyds. = 2, 3 Contrib. drain. area = 5.500 ac PH2 PRE BMP 8 Total (+ EC 9) Q (cfs) Hyd. No. 10 -- 1 Year Q (cfs) 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 10 Hyd No. 2 Hyd No. 3 Hydrograph Report 11 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 11 PH2 PRE - UNDET. Hydrograph type = SCS Runoff Peak discharge = 3.189 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 8,984 cuft Drainage area = 8.500 ac Curve number = 62 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.77 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PH2 PRE - UNDET. Q (cfs) Hyd. No. 11 -- 1 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 11 Time (min) Hydrograph Report 12 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 12 PH2 PRE - TOTAL Hydrograph type = Combine Peak discharge = 7.036 cfs Storm frequency = 1 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 45,626 cuft Inflow hyds. = 9, 10, 11 Contrib. drain. area = 8.500 ac Q (cfs) 8.00 M 4.00 I'm 0.00 0 120 240 — Hyd No. 12 PH2 PRE - TOTAL Hyd. No. 12 -- 1 Year 360 480 600 720 840 960 Hyd No. 9 Hyd No. 10 Q (cfs) 8.00 . �� 4.00 r M� 0.00 1080 1200 1320 1440 1560 Time (min) Hyd No. 11 13 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 14 PH2 POST - BMP 7 Hydrograph type = SCS Runoff Peak discharge = 41.73 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 83,489 cuft Drainage area = 22.710 ac Curve number = 80 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.77 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 50.00 40.00 20.00 10.00 PH2 POST - BMP 7 Hyd. No. 14 -- 1 Year Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 14 Time (min) Hydrograph Report 14 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 15 PH2 POST - BMP 8 Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 6.300 ac Basin Slope = 0.0 % Tc method = User Total precip. = 2.77 in Storm duration = 24 hrs Q (cfs) 14.00 12.00 10.00 ItM M 4.00 ItM Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PH2 POST - BMP 8 Hyd. No. 15 -- 1 Year Tuesday, 03 / 15 / 2022 = 12.19 cfs = 718 min = 24,427 cuft = 81 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 14.00 12.00 10.00 M 4.00 of 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 15 Time (min) Hydrograph Report 15 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 16 PH2 POST - UNDET. Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 5.500 ac Basin Slope = 0.0 % Tc method = User Total precip. = 2.77 in Storm duration = 24 hrs Q (cfs) 2.00 1.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PH2 POST - UNDET. Hyd. No. 16 -- 1 Year 120 240 360 480 600 720 840 960 Hyd No. 16 Tuesday, 03 / 15 / 2022 = 1.147 cfs = 720 min = 4,277 cuft = 59 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) 16 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 17 PH2 POST -TOTAL Hydrograph type = Combine Peak discharge = 54.95 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 112,193 cuft Inflow hyds. = 14, 15, 16 Contrib. drain. area = 34.510 ac Q (cfs) 60.00 40.00 20.00 10.00 PH2 POST - TOTAL Hyd. No. 17 -- 1 Year Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 17 — Hyd No. 14 Hyd No. 15 Hyd No. 16 Hydrograph Report 17 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 19 PH2 ROUTED - BMP 7 Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 1 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 14 - PH2 POST - BMP 7 Max. Elevation = 724.45 ft Reservoir name = PH2 BMP 7 - WETPOND Max. Storage = 83,489 cuft Storage Indication method used PH2 ROUTED - BMP 7 Q (cfs) Hyd. No. 19 -- 1 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 19 Hyd No. 14 Total storage used = 83,489 cult 19 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 20 PH2 ROUTED - BMP 8 Hydrograph type = Reservoir Peak discharge = 0.121 cfs Storm frequency = 1 yrs Time to peak = 2624 min Time interval = 2 min Hyd. volume = 21,074 cuft Inflow hyd. No. = 15 - PH2 POST - BMP 8 Max. Elevation = 733.00 ft Reservoir name = PH2 BMP 8 - SANDFILTER Max. Storage = 20,026 cuft Storage Indication method used. Q (cfs) 14.00 12.00 10.00 01 M 4.00 ItX PH2 ROUTED - BMP 8 Hyd. No. 20 -- 1 Year Q (cfs) 14.00 12.00 10.00 H. s@ 4.00 2.00 0.00 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 20 Hyd No. 15 Total storage used = 20,026 cult Hydrograph Report 21 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 21 PH2 POST - UNDET. Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 5.500 ac Basin Slope = 0.0 % Tc method = User Total precip. = 2.77 in Storm duration = 24 hrs Q (cfs) 2.00 1.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PH2 POST - UNDET. Hyd. No. 21 -- 1 Year 120 240 360 480 600 720 840 960 Hyd No. 21 Tuesday, 03 / 15 / 2022 = 1.147 cfs = 720 min = 4,277 cuft = 59 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 22 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 22 PH2 ROUTED - TOTAL Hydrograph type = Combine Peak discharge = 1.195 cfs Storm frequency = 1 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 25,351 cuft Inflow hyds. = 19, 20, 21 Contrib. drain. area = 5.500 ac Q (cfs) 2.00 1.00 e PH2 ROUTED - TOTAL Hyd. No. 22 -- 1 Year Q (cfs) 2.00 1.00 I J . I I I I I I I I 0.00 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 22 Hyd No. 19 Hyd No. 20 Hyd No. 21 Hydrograph Summary Report 23 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 0.920 2 736 7,132 ------ ------ ------ PH2 PRE - BMP 7 2 SCS Runoff 2.219 2 732 9,918 ------ ------ ------ PH2 PRE - BMP 8 3 SCS Runoff 1.599 2 736 8,171 ------ ------ ------ PH2 PRE - EC BASIN 9 4 SCS Runoff 0.503 2 746 5,258 ------ ------ ------ PH2 PRE - EC BASIN 10 5 SCS Runoff 5.963 2 724 18,872 ------ ------ ------ PH2 PRE - EC BASIN 11 6 SCS Runoff 2.050 2 738 11,547 ------ ------ ------ PH2 PRE - EC BASIN 12 7 SCS Runoff 6.917 2 718 15,681 ------ ------ ------ PH2 PRE - UNDET. 9 Combine 7.840 2 726 42,808 1, 4, 5, ------ ------ PH2 PRE BMP 7 Total (+ EC 10, 11 6, 10 Combine 3.759 2 734 18,089 2, 3, ------ ------ PH2 PRE BMP 8 Total (+ EC 9) 11 SCS Runoff 6.917 2 718 15,681 ------ ------ ------ PH2 PRE - UNDET. 12 Combine 14.31 2 720 76,579 9, 10, 11 ------ ------ PH2 PRE - TOTAL 14 SCS Runoff 58.01 2 718 116,732 ------ ------ ------ PH2 POST - BMP 7 15 SCS Runoff 16.78 2 718 33,874 ------ ------ ------ PH2 POST - BMP 8 16 SCS Runoff 3.133 2 718 7,992 ------ ------ ------ PH2 POST- UNDET. 17 Combine 77.92 2 718 158,598 14, 15, 16 ------ ------ PH2 POST - TOTAL 19 Reservoir 0.000 2 n/a 0 14 725.42 116,732 PH2 ROUTED - BMP 7 20 Reservoir 0.281 2 1078 29,126 15 734.15 25,396 PH2 ROUTED - BMP 8 21 SCS Runoff 3.133 2 718 7,992 ------ ------ ------ PH2 POST- UNDET. 22 Combine 3.233 2 718 37,119 19, 20, 21 ------ ------ PH2 ROUTED - TOTAL 17031-PH2-BMP Hydraflow.gpw Return Period: 2 Year Tuesday, 03 / 15 / 2022 24 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 1 PH2 PRE -BMP 7 Hydrograph type = SCS Runoff Peak discharge = 0.920 cfs Storm frequency = 2 yrs Time to peak = 736 min Time interval = 2 min Hyd. volume = 7,132 cuft Drainage area = 5.500 ac Curve number = 57 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 30.00 min Total precip. = 3.34 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 PH2 PRE - BMP 7 Hyd. No. 1 -- 2 Year Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 777 ���� ��� ���� 0.10 ���� I������ 1 11 �� ������� 7U-0.00 0 120 240 360 480 600 720 840 •.1 1080 1200 1320 1440 1560 Hydrograph Report 25 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 2 PH2 PRE -BMP 8 Hydrograph type = SCS Runoff Peak discharge = 2.219 cfs Storm frequency = 2 yrs Time to peak = 732 min Time interval = 2 min Hyd. volume = 9,918 cuft Drainage area = 3.000 ac Curve number = 70 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 29.00 min Total precip. = 3.34 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PH2 PRE - BMP 8 Q (cfs) Hyd. No. 2 -- 2 Year Q (cfs) 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 2 Time (min) Hydrograph Report 26 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 3 PH2 PRE - EC BASIN 9 Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 2.500 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.34 in Storm duration = 24 hrs Q (cfs) 2.00 1.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PH2 PRE - EC BASIN 9 Hyd. No. 3 -- 2 Year 120 240 360 480 600 720 840 960 Hyd No. 3 Tuesday, 03 / 15 / 2022 = 1.599 cfs = 736 min = 8,171 cuft = 70 = Oft = 34.00 min = Type II = 484 Q (cfs) 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) 27 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 4 PH2 PRE - EC BASIN 10 Hydrograph type = SCS Runoff Peak discharge = 0.503 cfs Storm frequency = 2 yrs Time to peak = 746 min Time interval = 2 min Hyd. volume = 5,258 cuft Drainage area = 5.000 ac Curve number = 55 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 36.00 min Total precip. = 3.34 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 PH2 PRE - EC BASIN 10 Hyd. No. 4 -- 2 Year Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.00 C 0.00 0 120 240 360 480 600 720 840 •.1 1080 1200 1320 1440 1560 Hydrograph Report 28 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 5 PH2 PRE - EC BASIN 11 Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 7.000 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.34 in Storm duration = 24 hrs Q (cfs) 6.00 5.00 4.00 3.00 rM 1.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PH2 PRE - EC BASIN 11 Hyd. No. 5 -- 2 Year Tuesday, 03 / 15 / 2022 = 5.963 cfs = 724 min = 18,872 cuft = 67 = 0 ft = 14.00 min = Type II = 484 Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 1 1 1 1 1 1 1 I I I I I I� 1 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 5 Time (min) Hydrograph Report 29 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 6 PH2 PRE - EC BASIN 12 Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 4.500 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.34 in Storm duration = 24 hrs Q (cfs) 3.00 I'm 1.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PH2 PRE - EC BASIN 12 Hyd. No. 6 -- 2 Year 120 240 360 480 600 720 840 960 — Hyd No. 6 Tuesday, 03 / 15 / 2022 = 2.050 cfs = 738 min = 11, 547 cuft = 66 = 0 ft = 35.00 min = Type II = 484 Q (cfs) 3.00 r M� 1.00 0.00 1080 1200 1320 1440 1560 Time (min) 30 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 7 PH2 PRE - UNDET. Hydrograph type = SCS Runoff Peak discharge = 6.917 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 15,681 cuft Drainage area = 8.500 ac Curve number = 62 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.34 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 7.00 5.00 3.00 1.00 PH2 PRE - UNDET. Hyd. No. 7 -- 2 Year Q (cfs) 7.00 . We 5.00 4.00 3.00 2.00 1.00 0.00 ' 1 1 1 1 " ' ' ' ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 7 Time (min) 31 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 9 PH2 PRE BMP 7 Total (+ EC 10, 11 & 12) Hydrograph type = Combine Peak discharge = 7.840 cfs Storm frequency = 2 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 42,808 cuft Inflow hyds. = 1, 4, 5, 6 Contrib. drain. area = 22.000 ac Q (cfs) 8.00 M 4.00 I'm 0.00 0 120 240 — Hyd No. 9 PH2 PRE BMP 7 Total (+ EC 10, 11 & 12) Hyd. No. 9 -- 2 Year 360 480 600 720 - Hyd No. 1 Hyd No. 6 Q (cfs) 8.00 . �� 4.00 r M� 0.00 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Hyd No. 5 Time (min) Hydrograph Report 32 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 10 PH2 PRE BMP 8 Total (+ EC 9) Hydrograph type = Combine Peak discharge = 3.759 cfs Storm frequency = 2 yrs Time to peak = 734 min Time interval = 2 min Hyd. volume = 18,089 cuft Inflow hyds. = 2, 3 Contrib. drain. area = 5.500 ac PH2 PRE BMP 8 Total (+ EC 9) Q (cfs) Hyd. No. 10 -- 2 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 10 Hyd No. 2 Hyd No. 3 33 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 11 PH2 PRE - UNDET. Hydrograph type = SCS Runoff Peak discharge = 6.917 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 15,681 cuft Drainage area = 8.500 ac Curve number = 62 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.34 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 7.00 5.00 3.00 1.00 PH2 PRE - UNDET. Hyd. No. 11 -- 2 Year Q (cfs) 7.00 . We 5.00 4.00 3.00 2.00 1.00 0.00 ' 1 1 1 1 " ' ' ' ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 11 Time (min) Hydrograph Report 34 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 12 PH2 PRE - TOTAL Hydrograph type = Combine Peak discharge = 14.31 cfs Storm frequency = 2 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 76,579 cuft Inflow hyds. = 9, 10, 11 Contrib. drain. area = 8.500 ac PH2 PRE - TOTAL Q (cfs) Hyd. No. 12 -- 2 Year Q (cfs) 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 12 Hyd No. 9 Hyd No. 10 Hyd No. 11 Hydrograph Report 35 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 14 PH2 POST - BMP 7 Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 22.710 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.34 in Storm duration = 24 hrs Q (cfs) 60.00 40.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PH2 POST - BMP 7 Hyd. No. 14 -- 2 Year Tuesday, 03 / 15 / 2022 = 58.01 cfs = 718 min = 116,732 cuft = 80 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 ' 1 1 1— — ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 14 Time (min) Hydrograph Report 36 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 15 PH2 POST - BMP 8 Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 6.300 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.34 in Storm duration = 24 hrs Q (cfs) 18.00 15.00 12.00 M M 3.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PH2 POST - BMP 8 Hyd. No. 15 -- 2 Year Tuesday, 03 / 15 / 2022 = 16.78 cfs = 718 min = 33,874 cuft = 81 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 18.00 15.00 12.00 M M 3.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 15 Time (min) Hydrograph Report 37 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 16 PH2 POST - UNDET. Hydrograph type = SCS Runoff Peak discharge = 3.133 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 7,992 cuft Drainage area = 5.500 ac Curve number = 59 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.34 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PH2 POST - UNDET. Q (cfs) Hyd. No. 16 -- 2 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 16 Time (min) 38 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 17 PH2 POST -TOTAL Hydrograph type = Combine Peak discharge = 77.92 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 158,598 cuft Inflow hyds. = 14, 15, 16 Contrib. drain. area = 34.510 ac Q (cfs) 80.00 70.00 40.00 20.00 10.00 Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 17 — Hyd No. 14 Hyd No. 15 Hyd No. 16 39 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 19 PH2 ROUTED - BMP 7 Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 2 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 14 - PH2 POST - BMP 7 Max. Elevation = 725.42 ft Reservoir name = PH2 BMP 7 - WETPOND Max. Storage = 116,732 cuft Storage Indication method used. Q (cfs) 60.00 40.00 20.00 10.00 PH2 ROUTED - BMP 7 Hyd. No. 19 -- 2 Year Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 19 Hyd No. 14 Total storage used = 116,732 cult 40 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 20 PH2 ROUTED - BMP 8 Hydrograph type = Reservoir Peak discharge = 0.281 cfs Storm frequency = 2 yrs Time to peak = 1078 min Time interval = 2 min Hyd. volume = 29,126 cuft Inflow hyd. No. = 15 - PH2 POST - BMP 8 Max. Elevation = 734.15 ft Reservoir name = PH2 BMP 8 - SANDFILTER Max. Storage = 25,396 cuft Storage Indication method used. Q (cfs) 18.00 15.00 12.00 M M 3.00 600 Hyd No. 20 PH2 ROUTED - BMP 8 Hyd. No. 20 -- 2 Year Q (cfs) 18.00 15.00 12.00 3.00 0.00 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) — Hyd No. 15 Total storage used = 25,396 cult Hydrograph Report 41 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 21 PH2 POST - UNDET. Hydrograph type = SCS Runoff Peak discharge = 3.133 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 7,992 cuft Drainage area = 5.500 ac Curve number = 59 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.34 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PH2 POST - UNDET. Q (cfs) Hyd. No. 21 -- 2 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 21 Time (min) Hydrograph Report 42 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 22 PH2 ROUTED - TOTAL Hydrograph type = Combine Peak discharge = 3.233 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 37,119 cuft Inflow hyds. = 19, 20, 21 Contrib. drain. area = 5.500 ac Q (cfs) 4.00 3.00 rM 1.00 PH2 ROUTED - TOTAL Hyd. No. 22 -- 2 Year Q (cfs) 4.00 3.00 2.00 1.00 0.00 ' ' -A I a I I I I ' 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) — Hyd No. 22 Hyd No. 19 Hyd No. 20 Hyd No. 21 Hydrograph Summary Report 43 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 2.520 2 734 14,035 ------ ------ ------ PH2 PRE - BMP 7 2 SCS Runoff 3.775 2 732 15,878 ------ ------ ------ PH2 PRE - BMP 8 3 SCS Runoff 2.732 2 736 13,081 ------ ------ ------ PH2 PRE - EC BASIN 9 4 SCS Runoff 1.561 2 738 10,896 ------ ------ ------ PH2 PRE - EC BASIN 10 5 SCS Runoff 10.57 2 724 31,300 ------ ------ ------ PH2 PRE - EC BASIN 11 6 SCS Runoff 3.858 2 736 19,399 ------ ------ ------ PH2 PRE - EC BASIN 12 7 SCS Runoff 13.50 2 718 27,950 ------ ------ ------ PH2 PRE - UNDET. 9 Combine 15.50 2 726 75,630 1, 4, 5, ------ ------ PH2 PRE BMP 7 Total (+ EC 10, 11 6, 10 Combine 6.399 2 734 28,959 2, 3, ------ ------ PH2 PRE BMP 8 Total (+ EC 9) 11 SCS Runoff 13.50 2 718 27,950 ------ ------ ------ PH2 PRE - UNDET. 12 Combine 27.91 2 720 132,539 9, 10, 11 ------ ------ PH2 PRE - TOTAL 14 SCS Runoff 84.06 2 716 170,003 ------ ------ ------ PH2 POST - BMP 7 15 SCS Runoff 24.15 2 716 48,929 ------ ------ ------ PH2 POST - BMP 8 16 SCS Runoff 6.998 2 718 15,053 ------ ------ ------ PH2 POST- UNDET. 17 Combine 114.51 2 716 233,985 14, 15, 16 ------ ------ PH2 POST - TOTAL 19 Reservoir 1.221 2 1118 33,257 14 726.15 142,504 PH2 ROUTED - BMP 7 20 Reservoir 1.054 2 800 44,096 15 734.48 29,206 PH2 ROUTED - BMP 8 21 SCS Runoff 6.998 2 718 15,053 ------ ------ ------ PH2 POST- UNDET. 22 Combine 7.099 2 718 92,405 19, 20, 21 ------ ------ PH2 ROUTED - TOTAL 17031-PH2-BMP Hydraflow.gpw Return Period: 5 Year Tuesday, 03 / 15 / 2022 Hydrograph Report 44 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 1 PH2 PRE -BMP 7 Hydrograph type = SCS Runoff Storm frequency = 5 yrs Time interval = 2 min Drainage area = 5.500 ac Basin Slope = 0.0 % Tc method = User Total precip. = 4.19 in Storm duration = 24 hrs Q (cfs) 3.00 I'm 1.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PH2 PRE - BMP 7 Hyd. No. 1 -- 5 Year 120 240 360 480 600 720 840 960 — Hyd No. 1 Tuesday, 03 / 15 / 2022 = 2.520 cfs = 734 min = 14,035 cuft = 57 = 0 ft = 30.00 min = Type II = 484 Q (cfs) 3.00 r M� 1.00 0.00 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 45 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 2 PH2 PRE -BMP 8 Hydrograph type = SCS Runoff Peak discharge = 3.775 cfs Storm frequency = 5 yrs Time to peak = 732 min Time interval = 2 min Hyd. volume = 15,878 cuft Drainage area = 3.000 ac Curve number = 70 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 29.00 min Total precip. = 4.19 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PH2 PRE - BMP 8 Q (cfs) Hyd. No. 2 -- 5 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 2 Time (min) Hydrograph Report 46 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 3 PH2 PRE - EC BASIN 9 Hydrograph type = SCS Runoff Peak discharge = 2.732 cfs Storm frequency = 5 yrs Time to peak = 736 min Time interval = 2 min Hyd. volume = 13,081 cuft Drainage area = 2.500 ac Curve number = 70 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 34.00 min Total precip. = 4.19 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PH2 PRE - EC BASIN 9 Q (cfs) Hyd. No. 3 -- 5 Year Q (cfs) 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 3 Time (min) Hydrograph Report 47 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 4 PH2 PRE - EC BASIN 10 Hydrograph type = SCS Runoff Storm frequency = 5 yrs Time interval = 2 min Drainage area = 5.000 ac Basin Slope = 0.0 % Tc method = User Total precip. = 4.19 in Storm duration = 24 hrs Q (cfs) 2.00 1.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PH2 PRE - EC BASIN 10 Hyd. No. 4 -- 5 Year 120 240 360 480 600 720 840 960 Hyd No. 4 Tuesday, 03 / 15 / 2022 = 1.561 cfs = 738 min = 10,896 cuft = 55 = 0 ft = 36.00 min = Type II = 484 Q (cfs) 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 48 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 5 PH2 PRE - EC BASIN 11 Hydrograph type = SCS Runoff Storm frequency = 5 yrs Time interval = 2 min Drainage area = 7.000 ac Basin Slope = 0.0 % Tc method = User Total precip. = 4.19 in Storm duration = 24 hrs Q (cfs) 12.00 10.00 M M 4.00 r M� Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PH2 PRE - EC BASIN 11 Hyd. No. 5 -- 5 Year Tuesday, 03 / 15 / 2022 = 10.57 cfs = 724 min = 31,300 cuft = 67 = 0 ft = 14.00 min = Type II = 484 Q (cfs) 12.00 10.00 M . �� 4.00 r M� 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 5 Time (min) Hydrograph Report 49 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 6 PH2 PRE - EC BASIN 12 Hydrograph type = SCS Runoff Peak discharge = 3.858 cfs Storm frequency = 5 yrs Time to peak = 736 min Time interval = 2 min Hyd. volume = 19,399 cuft Drainage area = 4.500 ac Curve number = 66 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 35.00 min Total precip. = 4.19 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PH2 PRE - EC BASIN 12 Q (cfs) Hyd. No. 6 -- 5 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 6 Time (min) Hydrograph Report 50 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 7 PH2 PRE - UNDET. Hydrograph type = SCS Runoff Storm frequency = 5 yrs Time interval = 2 min Drainage area = 8.500 ac Basin Slope = 0.0 % Tc method = User Total precip. = 4.19 in Storm duration = 24 hrs Q (cfs) 14.00 12.00 10.00 ItM M 4.00 ItM Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PH2 PRE - UNDET. Hyd. No. 7 -- 5 Year Tuesday, 03 / 15 / 2022 = 13.50 cfs = 718 min = 27,950 cuft = 62 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 14.00 12.00 10.00 . �� 4.00 of 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 7 Time (min) 51 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 9 PH2 PRE BMP 7 Total (+ EC 10, 11 & 12) Hydrograph type = Combine Peak discharge = 15.50 cfs Storm frequency = 5 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 75,630 cuft Inflow hyds. = 1, 4, 5, 6 Contrib. drain. area = 22.000 ac Q (cfs) 18.00 15.00 12.00 M M 3.00 PH2 PRE BMP 7 Total (+ EC 10, 11 & 12) Hyd. No. 9 -- 5 Year Q (cfs) 18.00 15.00 12.00 M . �� 3.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 9 Hyd No. 1 Hyd No. 4 Hyd No. 5 Time (min) Hyd No. 6 52 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 10 PH2 PRE BMP 8 Total (+ EC 9) Hydrograph type = Combine Peak discharge = 6.399 cfs Storm frequency = 5 yrs Time to peak = 734 min Time interval = 2 min Hyd. volume = 28,959 cuft Inflow hyds. = 2, 3 Contrib. drain. area = 5.500 ac Q (cfs) 7.00 . Me 5.00 3.00 1.00 Q (cfs) 7.00 . We 5.00 4.00 3.00 2.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 10 Hyd No. 2 Hyd No. 3 Hydrograph Report 53 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 11 PH2 PRE - UNDET. Hydrograph type = SCS Runoff Storm frequency = 5 yrs Time interval = 2 min Drainage area = 8.500 ac Basin Slope = 0.0 % Tc method = User Total precip. = 4.19 in Storm duration = 24 hrs Q (cfs) 14.00 12.00 10.00 ItM M 4.00 ItM Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PH2 PRE - UNDET. Hyd. No. 11 -- 5 Year Tuesday, 03 / 15 / 2022 = 13.50 cfs = 718 min = 27,950 cuft = 62 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 14.00 12.00 10.00 . �� 4.00 of 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 11 Time (min) 54 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 12 PH2 PRE - TOTAL Hydrograph type = Combine Peak discharge = 27.91 cfs Storm frequency = 5 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 132,539 cuft Inflow hyds. = 9, 10, 11 Contrib. drain. area = 8.500 ac Q (cfs) 28.00 24.00 20.00 16.00 12.00 Q (cfs) 28.00 24.00 20.00 16.00 12.00 4.00 0.00 1 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 12 Hyd No. 9 Hyd No. 10 Hyd No. 11 55 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 14 PH2 POST - BMP 7 Hydrograph type = SCS Runoff Peak discharge = 84.06 cfs Storm frequency = 5 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 170,003 cuft Drainage area = 22.710 ac Curve number = 80 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.19 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 1 1 �1 •1 �:1 •11 1 :�1 •.1 1:1 11 1 ��1 Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 56 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 15 PH2 POST - BMP 8 Hydrograph type = SCS Runoff Peak discharge = 24.15 cfs Storm frequency = 5 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 48,929 cuft Drainage area = 6.300 ac Curve number = 81 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.19 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 28.00 24.00 20.00 16.00 12.00 PH2 POST - BMP 8 Hyd. No. 15 -- 5 Year 0.00 1---J— ' ' ' ' ' 0 120 240 360 480 600 720 840 — Hyd No. 15 Q (cfs) 28.00 24.00 20.00 16.00 12.00 4.00 0.00 960 1080 1200 1320 1440 Time (min) Hydrograph Report 57 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 16 PH2 POST - UNDET. Hydrograph type = SCS Runoff Storm frequency = 5 yrs Time interval = 2 min Drainage area = 5.500 ac Basin Slope = 0.0 % Tc method = User Total precip. = 4.19 in Storm duration = 24 hrs Q (cfs) 7.00 5.00 3.00 1.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PH2 POST - UNDET. Hyd. No. 16 -- 5 Year Tuesday, 03 / 15 / 2022 = 6.998 cfs = 718 min = 15,053 cuft = 59 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 7.00 . We 5.00 4.00 3.00 2.00 1.00 0.00 ' 1 1 1 1' ' ' ' ' ' ' IL ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 16 Time (min) 58 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 17 PH2 POST -TOTAL Hydrograph type = Combine Peak discharge = 114.51 cfs Storm frequency = 5 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 233,985 cuft Inflow hyds. = 14, 15, 16 Contrib. drain. area = 34.510 ac Q (cfs) 120.00 100.00 40.00 20.00 PH2 POST - TOTAL Hyd. No. 17 -- 5 Year Q (cfs) 120.00 100.00 40.00 20.00 0.00 — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 17 — Hyd No. 14 Hyd No. 15 Hyd No. 16 59 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 19 PH2 ROUTED - BMP 7 Hydrograph type = Reservoir Peak discharge = 1.221 cfs Storm frequency = 5 yrs Time to peak = 1118 min Time interval = 2 min Hyd. volume = 33,257 cuft Inflow hyd. No. = 14 - PH2 POST - BMP 7 Max. Elevation = 726.15 ft Reservoir name = PH2 BMP 7 - WETPOND Max. Storage = 142,504 cuft Storage Indication method used. Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 JL 1 240 480 720 Hyd No. 14 960 1200 1440 1680 Total storage used = 142,504 cuft Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 1920 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 20 PH2 ROUTED - BMP 8 Hydrograph type = Reservoir Peak discharge = 1.054 cfs Storm frequency = 5 yrs Time to peak = 800 min Time interval = 2 min Hyd. volume = 44,096 cuft Inflow hyd. No. = 15 - PH2 POST - BMP 8 Max. Elevation = 734.48 ft Reservoir name = PH2 BMP 8 - SANDFILTER Max. Storage = 29,206 cuft Storage Indication method used. PH2 ROUTED - BMP 8 Q (cfs) Hyd. No. 20 -- 5 Year Q (cfs) 28.00 28.00 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) — Hyd No. 20 — Hyd No. 15 Total storage used = 29,206 cult Hydrograph Report 61 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 21 PH2 POST - UNDET. Hydrograph type = SCS Runoff Storm frequency = 5 yrs Time interval = 2 min Drainage area = 5.500 ac Basin Slope = 0.0 % Tc method = User Total precip. = 4.19 in Storm duration = 24 hrs Q (cfs) 7.00 5.00 3.00 1.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PH2 POST - UNDET. Hyd. No. 21 -- 5 Year Tuesday, 03 / 15 / 2022 = 6.998 cfs = 718 min = 15,053 cuft = 59 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 7.00 . We 5.00 4.00 3.00 2.00 1.00 0.00 ' 1 1 1 1' ' ' ' ' ' ' IL ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 21 Time (min) Hydrograph Report 62 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 22 PH2 ROUTED - TOTAL Hydrograph type = Combine Peak discharge = 7.099 cfs Storm frequency = 5 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 92,405 cuft Inflow hyds. = 19, 20, 21 Contrib. drain. area = 5.500 ac Q (cfs) 8.00 .M 4.00 rM e PH2 ROUTED - TOTAL Hyd. No. 22 -- 5 Year Q (cfs) 8.00 M 4.00 2.00 ■ I -- --r 1 0.00 360 720 1080 1440 1800 2160 2520 2880 3240 3600 3960 Time (min) Hyd No. 22 Hyd No. 19 Hyd No. 20 Hyd No. 21 Hydrograph Summary Report 63 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 4.164 2 732 20,579 ------ ------ ------ PH2 PRE - BMP 7 2 SCS Runoff 5.116 2 732 21,052 ------ ------ ------ PH2 PRE - BMP 8 3 SCS Runoff 3.709 2 736 17,344 ------ ------ ------ PH2 PRE - EC BASIN 9 4 SCS Runoff 2.725 2 738 16,349 ------ ------ ------ PH2 PRE - EC BASIN 10 5 SCS Runoff 14.58 2 724 42,271 ------ ------ ------ PH2 PRE - EC BASIN 11 6 SCS Runoff 5.468 2 736 26,372 ------ ------ ------ PH2 PRE - EC BASIN 12 7 SCS Runoff 19.34 2 718 39,131 ------ ------ ------ PH2 PRE - UNDET. 9 Combine 22.79 2 726 105,571 1, 4, 5, ------ ------ PH2 PRE BMP 7 Total (+ EC 10, 11 6, 10 Combine 8.685 2 732 38,396 2, 3, ------ ------ PH2 PRE BMP 8 Total (+ EC 9) 11 SCS Runoff 19.34 2 718 39,131 ------ ------ ------ PH2 PRE - UNDET. 12 Combine 40.44 2 720 183,098 9, 10, 11 ------ ------ PH2 PRE - TOTAL 14 SCS Runoff 105.41 2 716 214,163 ------ ------ ------ PH2 POST - BMP 7 15 SCS Runoff 30.12 2 716 61,359 ------ ------ ------ PH2 POST- BMP 8 16 SCS Runoff 10.50 2 718 21,632 ------ ------ ------ PH2 POST- UNDET. 17 Combine 145.32 2 716 297,154 14, 15, 16 ------ ------ PH2 POST - TOTAL 19 Reservoir 2.357 2 930 77,417 14 726.39 152,371 PH2 ROUTED - BMP 7 20 Reservoir 1.744 2 770 56,476 15 734.95 34,588 PH2 ROUTED - BMP 8 21 SCS Runoff 10.50 2 718 21,632 ------ ------ ------ PH2 POST- UNDET. 22 Combine 10.67 2 718 155,525 19, 20, 21 ------ ------ PH2 ROUTED - TOTAL 17031-PH2-BMP Hydraflow.gpw Return Period: 10 Year Tuesday, 03 / 15 / 2022 64 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 1 PH2 PRE -BMP 7 Hydrograph type = SCS Runoff Peak discharge = 4.164 cfs Storm frequency = 10 yrs Time to peak = 732 min Time interval = 2 min Hyd. volume = 20,579 cuft Drainage area = 5.500 ac Curve number = 57 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 30.00 min Total precip. = 4.86 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 5.00 4.00 3.00 1.00 PH2 PRE - BMP 7 Hyd. No. 1 -- 10 Year Q (cfs) 5.00 4.00 3.00 2.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 1 Time (min) 65 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 2 PH2 PRE -BMP 8 Hydrograph type = SCS Runoff Peak discharge = 5.116 cfs Storm frequency = 10 yrs Time to peak = 732 min Time interval = 2 min Hyd. volume = 21,052 cuft Drainage area = 3.000 ac Curve number = 70 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 29.00 min Total precip. = 4.86 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 6.00 5.00 4.00 3.00 rM 1.00 PH2 PRE - BMP 8 Hyd. No. 2 -- 10 Year Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 ' 1 1 11 ' ' ' ' ' ' ' � ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 2 Time (min) Hydrograph Report 66 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 3 PH2 PRE - EC BASIN 9 Hydrograph type = SCS Runoff Peak discharge = 3.709 cfs Storm frequency = 10 yrs Time to peak = 736 min Time interval = 2 min Hyd. volume = 17,344 cuft Drainage area = 2.500 ac Curve number = 70 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 34.00 min Total precip. = 4.86 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PH2 PRE - EC BASIN 9 Q (cfs) Hyd. No. 3 -- 10 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 3 Time (min) Hydrograph Report 67 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 4 PH2 PRE - EC BASIN 10 Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 5.000 ac Basin Slope = 0.0 % Tc method = User Total precip. = 4.86 in Storm duration = 24 hrs Q (cfs) 3.00 I'm 1.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PH2 PRE - EC BASIN 10 Hyd. No. 4 -- 10 Year 120 240 360 480 600 720 840 960 — Hyd No. 4 Tuesday, 03 / 15 / 2022 = 2.725 cfs = 738 min = 16,349 cuft = 55 = 0 ft = 36.00 min = Type II = 484 Q (cfs) 3.00 r M� 1.00 0.00 1080 1200 1320 1440 1560 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 5 PH2 PRE - EC BASIN 11 Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 7.000 ac Basin Slope = 0.0 % Tc method = User Total precip. = 4.86 in Storm duration = 24 hrs Q (cfs) 15.00 12.00 • 11 . Me 3.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PH2 PRE - EC BASIN 11 Hyd. No. 5 -- 10 Year Tuesday, 03 / 15 / 2022 = 14.58 cfs = 724 min = 42,271 cuft = 67 = 0 ft = 14.00 min = Type II = 484 Q (cfs) 15.00 12.00 . We 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 5 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 6 PH2 PRE - EC BASIN 12 Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 4.500 ac Basin Slope = 0.0 % Tc method = User Total precip. = 4.86 in Storm duration = 24 hrs Q (cfs) 6.00 5.00 4.00 3.00 rM 1.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PH2 PRE - EC BASIN 12 Hyd. No. 6 -- 10 Year Tuesday, 03 / 15 / 2022 = 5.468 cfs = 736 min = 26,372 cuft = 66 = 0 ft = 35.00 min = Type II = 484 Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 ' 1 1 1 1-.0' ' ' ' ' ' ' ' � ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 6 Time (min) 70 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 7 PH2 PRE - UNDET. Hydrograph type = SCS Runoff Peak discharge = 19.34 cfs Storm frequency = 10 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 39,131 cuft Drainage area = 8.500 ac Curve number = 62 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.86 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 21.00 18.00 15.00 12.00 3.00 PH2 PRE - UNDET. Hyd. No. 7 -- 10 Year Q (cfs) 21.00 18.00 15.00 12.00 M 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 7 Time (min) 71 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 9 PH2 PRE BMP 7 Total (+ EC 10, 11 & 12) Hydrograph type = Combine Peak discharge = 22.79 cfs Storm frequency = 10 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 105,571 cuft Inflow hyds. = 1, 4, 5, 6 Contrib. drain. area = 22.000 ac Q (cfs) 24.00 20.00 16.00 12.00 m 4.00 PH2 PRE BMP 7 Total (+ EC 10, 11 & 12) Hyd. No. 9 -- 10 Year Q (cfs) 24.00 20.00 16.00 12.00 M 4.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 9 — Hyd No. 1 Hyd No. 4 Hyd No. 5 Time (min) Hyd No. 6 Hydrograph Report 72 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 10 PH2 PRE BMP 8 Total (+ EC 9) Hydrograph type = Combine Peak discharge = 8.685 cfs Storm frequency = 10 yrs Time to peak = 732 min Time interval = 2 min Hyd. volume = 38,396 cuft Inflow hyds. = 2, 3 Contrib. drain. area = 5.500 ac Q (cfs) 10.00 UR . 0M 4.00 r M PH2 PRE BMP 8 Total (+ EC 9) Hyd. No. 10 -- 10 Year 120 240 360 480 600 720 Hyd No. 10 Hyd No. 2 Q (cfs) 10.00 H. We 4.00 r M 0.00 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) 73 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 11 PH2 PRE - UNDET. Hydrograph type = SCS Runoff Peak discharge = 19.34 cfs Storm frequency = 10 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 39,131 cuft Drainage area = 8.500 ac Curve number = 62 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.86 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 21.00 18.00 15.00 12.00 3.00 PH2 PRE - UNDET. Hyd. No. 11 -- 10 Year Q (cfs) 21.00 18.00 15.00 12.00 M 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 11 Time (min) Hydrograph Report 74 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 12 PH2 PRE - TOTAL Hydrograph type = Combine Peak discharge = 40.44 cfs Storm frequency = 10 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 183,098 cuft Inflow hyds. = 9, 10, 11 Contrib. drain. area = 8.500 ac PH2 PRE - TOTAL Q (cfs) Hyd. No. 12 -- 10 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 12 Hyd No. 9 Hyd No. 10 Hyd No. 11 Hydrograph Report 75 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 14 PH2 POST - BMP 7 Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 22.710 ac Basin Slope = 0.0 % Tc method = User Total precip. = 4.86 in Storm duration = 24 hrs Q (cfs) 120.00 100.00 40.00 20.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PH2 POST - BMP 7 Hyd. No. 14 -- 10 Year 0.00 '1 1 1 1 ' ' 0 120 240 360 480 600 720 840 — Hyd No. 14 Tuesday, 03 / 15 / 2022 = 105.41 cfs = 716 min = 214,163 cuft = 80 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 120.00 100.00 40.00 20.00 0.00 960 1080 1200 1320 1440 Time (min) Hydrograph Report 76 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 15 PH2 POST - BMP 8 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 6.300 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 4.86 in Distribution Storm duration = 24 hrs Shape factor Tuesday, 03 / 15 / 2022 = 30.12 cfs = 716 min = 61,359 cuft = 81 = 0 ft = 5.00 min = Type II = 484 Q (cfs) PH2 POST - BMP 8 Hyd. No. 15 -- 10 Year Q (cfs) 35.00 35.00 30.00 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 5.00 5.00 0.00 0 120 — Hyd No. 240 360 480 15 600 720 840 960 1080 0.00 1200 1320 1440 Time (min) Hydrograph Report 77 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 16 PH2 POST - UNDET. Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 5.500 ac Basin Slope = 0.0 % Tc method = User Total precip. = 4.86 in Storm duration = 24 hrs Q (cfs) 12.00 10.00 M M 4.00 r M� Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PH2 POST - UNDET. Hyd. No. 16 -- 10 Year Tuesday, 03 / 15 / 2022 = 10.50 cfs = 718 min = 21,632 cuft = 59 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 12.00 10.00 M . �� 4.00 r M� 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 16 Time (min) 78 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 17 PH2 POST -TOTAL Hydrograph type = Combine Peak discharge = 145.32 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 297,154 cuft Inflow hyds. = 14, 15, 16 Contrib. drain. area = 34.510 ac Q (cfs) 160.00 140.00 120.00 100.00 40.00 20.00 Q (cfs) 160.00 140.00 120.00 100.00 40.00 20.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Time (min) — Hyd No. 17 Hyd No. 14 Hyd No. 15 Hyd No. 16 79 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 19 PH2 ROUTED - BMP 7 Hydrograph type = Reservoir Peak discharge = 2.357 cfs Storm frequency = 10 yrs Time to peak = 930 min Time interval = 2 min Hyd. volume = 77,417 cuft Inflow hyd. No. = 14 - PH2 POST - BMP 7 Max. Elevation = 726.39 ft Reservoir name = PH2 BMP 7 - WETPOND Max. Storage = 152,371 cuft Storage Indication method used. PH2 ROUTED - BMP 7 Q (cfs) Hyd. No. 19 -- 10 Year Q (cfs) 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 0.00 0 240 480 720 960 1200 1440 1680 1920 Time (min) — Hyd No. 19 Hyd No. 14 Total storage used = 152,371 cult Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 20 PH2 ROUTED - BMP 8 Hydrograph type = Reservoir Peak discharge = 1.744 cfs Storm frequency = 10 yrs Time to peak = 770 min Time interval = 2 min Hyd. volume = 56,476 cuft Inflow hyd. No. = 15 - PH2 POST - BMP 8 Max. Elevation = 734.95 ft Reservoir name = PH2 BMP 8 - SANDFILTER Max. Storage = 34,588 cuft Storage Indication method used. Q (cfs) 35.00 25.00 20.00 15.00 10.00 5.00 0.00 0 600 — Hyd No. 20 PH2 ROUTED - BMP 8 Hyd. No. 20 -- 10 Year Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) — Hyd No. 15 Total storage used = 34,588 cult Hydrograph Report 81 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 21 PH2 POST - UNDET. Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 5.500 ac Basin Slope = 0.0 % Tc method = User Total precip. = 4.86 in Storm duration = 24 hrs Q (cfs) 12.00 10.00 M M 4.00 r M� Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PH2 POST - UNDET. Hyd. No. 21 -- 10 Year Tuesday, 03 / 15 / 2022 = 10.50 cfs = 718 min = 21,632 cuft = 59 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 12.00 10.00 M . �� 4.00 r M� 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 21 Time (min) 82 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 22 PH2 ROUTED - TOTAL Hydrograph type = Combine Peak discharge = 10.67 cfs Storm frequency = 10 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 155,525 cuft Inflow hyds. = 19, 20, 21 Contrib. drain. area = 5.500 ac Q (cfs) 12.00 10.00 M M 4.00 r M� PH2 ROUTED - TOTAL Hyd. No. 22 -- 10 Year 360 720 1080 1440 Hyd No. 22 Hyd No. 19 Q (cfs) 12.00 10.00 M . �� 4.00 r M� 0.00 1800 2160 2520 2880 3240 3600 Hyd No. 20 Hyd No. 21 Time (min) Hydrograph Summary Report 83 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 6.821 2 732 30,709 ------ ------ ------ PH2 PRE - BMP 7 2 SCS Runoff 7.047 2 732 28,574 ------ ------ ------ PH2 PRE - BMP 8 3 SCS Runoff 5.118 2 736 23,541 ------ ------ ------ PH2 PRE - EC BASIN 9 4 SCS Runoff 4.646 2 736 24,896 ------ ------ ------ PH2 PRE - EC BASIN 10 5 SCS Runoff 20.52 2 722 58,415 ------ ------ ------ PH2 PRE - EC BASIN 11 6 SCS Runoff 7.831 2 736 36,678 ------ ------ ------ PH2 PRE - EC BASIN 12 7 SCS Runoff 27.95 2 718 55,965 ------ ------ ------ PH2 PRE - UNDET. 9 Combine 33.98 2 726 150,699 1, 4, 5, ------ ------ PH2 PRE BMP 7 Total (+ EC 10, 11 6, 10 Combine 12.01 2 732 52,116 2, 3, ------ ------ PH2 PRE BMP 8 Total (+ EC 9) 11 SCS Runoff 27.95 2 718 55,965 ------ ------ ------ PH2 PRE - UNDET. 12 Combine 59.40 2 720 258,779 9, 10, 11 ------ ------ PH2 PRE - TOTAL 14 SCS Runoff 134.88 2 716 276,246 ------ ------ ------ PH2 POST - BMP 7 15 SCS Runoff 38.33 2 716 78,786 ------ ------ ------ PH2 POST - BMP 8 16 SCS Runoff 15.73 2 718 31,697 ------ ------ ------ PH2 POST- UNDET. 17 Combine 188.27 2 716 386,728 14, 15, 16 ------ ------ PH2 POST - TOTAL 19 Reservoir 3.927 2 846 139,499 14 727.09 180,112 PH2 ROUTED - BMP 7 20 Reservoir 8.056 2 726 73,853 15 735.38 40,013 PH2 ROUTED - BMP 8 21 SCS Runoff 15.73 2 718 31,697 ------ ------ ------ PH2 POST- UNDET. 22 Combine 17.28 2 718 245,050 19, 20, 21 ------ ------ PH2 ROUTED - TOTAL 17031-PH2-BMP Hydraflow.gpw Return Period: 25 Year Tuesday, 03 / 15 / 2022 84 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 1 PH2 PRE -BMP 7 Hydrograph type = SCS Runoff Peak discharge = 6.821 cfs Storm frequency = 25 yrs Time to peak = 732 min Time interval = 2 min Hyd. volume = 30,709 cuft Drainage area = 5.500 ac Curve number = 57 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 30.00 min Total precip. = 5.77 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 7.00 5.00 3.00 1.00 PH2 PRE - BMP 7 Hyd. No. 1 -- 25 Year Q (cfs) 7.00 . We 5.00 4.00 3.00 2.00 1.00 0.00 ' 1 1 1 1' ' ' ' ' ' ' ' %� ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 1 Time (min) Hydrograph Report 85 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 2 PH2 PRE -BMP 8 Hydrograph type = SCS Runoff Peak discharge = 7.047 cfs Storm frequency = 25 yrs Time to peak = 732 min Time interval = 2 min Hyd. volume = 28,574 cuft Drainage area = 3.000 ac Curve number = 70 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 29.00 min Total precip. = 5.77 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PH2 PRE - BMP 8 Q (cfs) Hyd. No. 2 -- 25 Year Q (cfs) 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 2 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 3 PH2 PRE - EC BASIN 9 Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 2 min Drainage area = 2.500 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.77 in Storm duration = 24 hrs Q (cfs) 6.00 5.00 4.00 3.00 rM 1.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PH2 PRE - EC BASIN 9 Hyd. No. 3 -- 25 Year Tuesday, 03 / 15 / 2022 = 5.118 cfs = 736 min = 23,541 cuft = 70 = 0 ft = 34.00 min = Type II = 484 Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 '1 1 1 s.— ' ' ' ' ' ' ' � ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 3 Time (min) Hydrograph Report 87 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 4 PH2 PRE - EC BASIN 10 Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 2 min Drainage area = 5.000 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.77 in Storm duration = 24 hrs Q (cfs) 5.00 4.00 3.00 1.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PH2 PRE - EC BASIN 10 Hyd. No. 4 -- 25 Year Tuesday, 03 / 15 / 2022 = 4.646 cfs = 736 min = 24,896 cuft = 55 = 0 ft = 36.00 min = Type II = 484 Q (cfs) 5.00 4.00 3.00 2.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 4 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 5 PH2 PRE - EC BASIN 11 Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 2 min Drainage area = 7.000 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.77 in Storm duration = 24 hrs Q (cfs) 21.00 18.00 15.00 12.00 3.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PH2 PRE - EC BASIN 11 Hyd. No. 5 -- 25 Year Tuesday, 03 / 15 / 2022 = 20.52 cfs = 722 min = 58,415 cuft = 67 = 0 ft = 14.00 min = Type II = 484 Q (cfs) 21.00 18.00 15.00 12.00 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 5 Time (min) Hydrograph Report 89 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 6 PH2 PRE - EC BASIN 12 Hydrograph type = SCS Runoff Peak discharge = 7.831 cfs Storm frequency = 25 yrs Time to peak = 736 min Time interval = 2 min Hyd. volume = 36,678 cuft Drainage area = 4.500 ac Curve number = 66 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 35.00 min Total precip. = 5.77 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PH2 PRE - EC BASIN 12 Q (cfs) Hyd. No. 6 -- 25 Year Q (cfs) 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 6 Time (min) 9 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 7 PH2 PRE - UNDET. Hydrograph type = SCS Runoff Peak discharge = 27.95 cfs Storm frequency = 25 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 55,965 cuft Drainage area = 8.500 ac Curve number = 62 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.77 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 28.00 24.00 20.00 16.00 12.00 PH2 PRE - UNDET. Hyd. No. 7 -- 25 Year Q (cfs) 28.00 24.00 20.00 16.00 12.00 4.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 7 Time (min) 91 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 9 PH2 PRE BMP 7 Total (+ EC 10, 11 & 12) Hydrograph type = Combine Peak discharge = 33.98 cfs Storm frequency = 25 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 150,699 cuft Inflow hyds. = 1, 4, 5, 6 Contrib. drain. area = 22.000 ac Q (cfs) 35.00 c M It It 25.00 20.00 15.00 10.00 5.00 Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 9 — Hyd No. 1 Hyd No. 4 Hyd No. 5 Time (min) Hyd No. 6 92 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 10 PH2 PRE BMP 8 Total (+ EC 9) Hydrograph type = Combine Peak discharge = 12.01 cfs Storm frequency = 25 yrs Time to peak = 732 min Time interval = 2 min Hyd. volume = 52,116 cuft Inflow hyds. = 2, 3 Contrib. drain. area = 5.500 ac Q (cfs) 14.00 12.00 10.00 ItM M 4.00 ItM PH2 PRE BMP 8 Total (+ EC 9) Hyd. No. 10 -- 25 Year Q (cfs) 14.00 12.00 10.00 . �� 4.00 of 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 10 Hyd No. 2 Hyd No. 3 Time (min) 93 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 11 PH2 PRE - UNDET. Hydrograph type = SCS Runoff Peak discharge = 27.95 cfs Storm frequency = 25 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 55,965 cuft Drainage area = 8.500 ac Curve number = 62 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.77 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 28.00 24.00 20.00 16.00 12.00 PH2 PRE - UNDET. Hyd. No. 11 -- 25 Year Q (cfs) 28.00 24.00 20.00 16.00 12.00 4.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 11 Time (min) 94 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 12 PH2 PRE - TOTAL Hydrograph type = Combine Peak discharge = 59.40 cfs Storm frequency = 25 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 258,779 cuft Inflow hyds. = 9, 10, 11 Contrib. drain. area = 8.500 ac Q (cfs) 60.00 40.00 20.00 10.00 PH2 PRE - TOTAL Hyd. No. 12 -- 25 Year Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 ' - ' �J ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 12 Hyd No. 9 Hyd No. 10 Hyd No. 11 95 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 14 PH2 POST - BMP 7 Hydrograph type = SCS Runoff Peak discharge = 134.88 cfs Storm frequency = 25 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 276,246 cuft Drainage area = 22.710 ac Curve number = 80 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.77 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 140.00 120.00 100.00 40.00 20.00 Q (cfs) 140.00 120.00 100.00 40.00 20.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 — Hyd No. 14 Time (min) Hydrograph Report 96 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 15 PH2 POST - BMP 8 Hydrograph type = SCS Runoff Peak discharge = Storm frequency = 25 yrs Time to peak = Time interval = 2 min Hyd. volume = Drainage area = 6.300 ac Curve number = Basin Slope = 0.0 % Hydraulic length = Tc method = User Time of conc. (Tc) = Total precip. = 5.77 in Distribution = Storm duration = 24 hrs Shape factor = Tuesday, 03 / 15 / 2022 38.33 cfs 716 min 78,786 cuft 81 0 ft 5.00 min Type II 484 Q (cfs) 40.00 PH2 POST - BMP 8 Hyd. No. 15 -- 25 Year Q (cfs) 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0 120 240 360 480 600 720 840 960 1080 — Hyd No. 15 0.00 1200 1320 Time (min) Hydrograph Report 97 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 16 PH2 POST - UNDET. Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 2 min Drainage area = 5.500 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.77 in Storm duration = 24 hrs Q (cfs) 18.00 15.00 12.00 M M 3.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PH2 POST - UNDET. Hyd. No. 16 -- 25 Year Tuesday, 03 / 15 / 2022 = 15.73 cfs = 718 min = 31,697 cuft = 59 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 18.00 15.00 12.00 M . �� 3.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 16 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 17 PH2 POST -TOTAL Hydrograph type = Combine Peak discharge = 188.27 cfs Storm frequency = 25 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 386,728 cuft Inflow hyds. = 14, 15, 16 Contrib. drain. area = 34.510 ac PH2 POST - TOTAL Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 19 PH2 ROUTED - BMP 7 Hydrograph type = Reservoir Peak discharge = 3.927 cfs Storm frequency = 25 yrs Time to peak = 846 min Time interval = 2 min Hyd. volume = 139,499 cuft Inflow hyd. No. = 14 - PH2 POST - BMP 7 Max. Elevation = 727.09 ft Reservoir name = PH2 BMP 7 - WETPOND Max. Storage = 180,112 cuft Storage Indication method used. PH2 ROUTED - BMP 7 Q (cfs) Hyd. No. 19 -- 25 Year Q (cfs) 140.00 140.00 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 - 0.00 0 240 480 720 960 1200 1440 1680 1920 Time (min) — Hyd No. 19 Hyd No. 14 Total storage used = 180,112 cult Hydrograph Report 100 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 20 PH2 ROUTED - BMP 8 Hydrograph type = Reservoir Peak discharge = 8.056 cfs Storm frequency = 25 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 73,853 cuft Inflow hyd. No. = 15 - PH2 POST - BMP 8 Max. Elevation = 735.38 ft Reservoir name = PH2 BMP 8 - SANDFILTER Max. Storage = 40,013 cuft Storage Indication method used Q (cfs) 40.00 20.00 10.00 e PH2 ROUTED - BMP 8 Hyd. No. 20 -- 25 Year 360 720 1080 1440 1800 2160 2520 2880 3240 3600 Hyd No. 20 Hyd No. 15 Total storage used = 40,013 cuft Q (cfs) 40.00 30.00 20.00 10.00 ■ '- 0.00 3960 Time (min) Hydrograph Report 101 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 21 PH2 POST - UNDET. Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 2 min Drainage area = 5.500 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.77 in Storm duration = 24 hrs Q (cfs) 18.00 15.00 12.00 M M 3.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PH2 POST - UNDET. Hyd. No. 21 -- 25 Year Tuesday, 03 / 15 / 2022 = 15.73 cfs = 718 min = 31,697 cuft = 59 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 18.00 15.00 12.00 M . �� 3.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 21 Time (min) 102 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 22 PH2 ROUTED - TOTAL Hydrograph type = Combine Peak discharge = 17.28 cfs Storm frequency = 25 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 245,050 cuft Inflow hyds. = 19, 20, 21 Contrib. drain. area = 5.500 ac Q (cfs) 18.00 15.00 12.00 am 3.00 e 240 Hyd No. 22 PH2 ROUTED - TOTAL Hyd. No. 22 -- 25 Year 480 720 Hyd No. 19 960 1200 Hyd No. 20 1440 1680 Hyd No. 21 Q (cfs) 18.00 15.00 12.00 M M 3.00 0.00 1920 Time (min) Hydrograph Summary Report 103 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 9.137 2 732 39,551 ------ ------ ------ PH2 PRE - BMP 7 2 SCS Runoff 8.646 2 730 34,837 ------ ------ ------ PH2 PRE - BMP 8 3 SCS Runoff 6.282 2 736 28,701 ------ ------ ------ PH2 PRE - EC BASIN 9 4 SCS Runoff 6.391 2 736 32,428 ------ ------ ------ PH2 PRE - EC BASIN 10 5 SCS Runoff 25.50 2 722 71,981 ------ ------ ------ PH2 PRE - EC BASIN 11 6 SCS Runoff 9.811 2 736 45,366 ------ ------ ------ PH2 PRE - EC BASIN 12 7 SCS Runoff 35.18 2 718 70,358 ------ ------ ------ PH2 PRE - UNDET. 9 Combine 43.59 2 726 189,326 1, 4, 5, ------ ------ PH2 PRE BMP 7 Total (+ EC 10, 11 6, 10 Combine 14.76 2 732 63,537 2, 3, ------ ------ PH2 PRE BMP 8 Total (+ EC 9) 11 SCS Runoff 35.18 2 718 70,358 ------ ------ ------ PH2 PRE - UNDET. 12 Combine 75.57 2 720 323,221 9, 10, 11 ------ ------ PH2 PRE - TOTAL 14 SCS Runoff 158.40 2 716 326,619 ------ ------ ------ PH2 POST - BMP 7 15 SCS Runoff 44.87 2 716 92,894 ------ ------ ------ PH2 POST - BMP 8 16 SCS Runoff 20.18 2 718 40,406 ------ ------ ------ PH2 POST- UNDET. 17 Combine 222.83 2 716 459,919 14, 15, 16 ------ ------ PH2 POST - TOTAL 19 Reservoir 10.85 2 754 189,873 14 727.44 193,806 PH2 ROUTED - BMP 7 20 Reservoir 20.04 2 722 87,935 15 735.68 43,904 PH2 ROUTED - BMP 8 21 SCS Runoff 20.18 2 718 40,406 ------ ------ ------ PH2 POST- UNDET. 22 Combine 35.07 2 720 318,213 19, 20, 21 ------ ------ PH2 ROUTED - TOTAL 17031-PH2-BMP Hydraflow.gpw Return Period: 50 Year Tuesday, 03 / 15 / 2022 Hydrograph Report 104 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 1 PH2 PRE -BMP 7 Hydrograph type = SCS Runoff Storm frequency = 50 yrs Time interval = 2 min Drainage area = 5.500 ac Basin Slope = 0.0 % Tc method = User Total precip. = 6.49 in Storm duration = 24 hrs Q (cfs) 10.00 Were . OM 4.00 r w Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PH2 PRE - BMP 7 Hyd. No. 1 -- 50 Year Tuesday, 03 / 15 / 2022 = 9.137 cfs = 732 min = 39,551 cuft = 57 = 0 ft = 30.00 min = Type II = 484 Q (cfs) 10.00 N. We 4.00 r w 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph Report 105 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 2 PH2 PRE -BMP 8 Hydrograph type = SCS Runoff Storm frequency = 50 yrs Time interval = 2 min Drainage area = 3.000 ac Basin Slope = 0.0 % Tc method = User Total precip. = 6.49 in Storm duration = 24 hrs Q (cfs) 10.00 Were . OM 4.00 r w Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PH2 PRE - BMP 8 Hyd. No. 2 -- 50 Year Tuesday, 03 / 15 / 2022 = 8.646 cfs = 730 min = 34,837 cuft = 70 = 0 ft = 29.00 min = Type II = 484 Q (cfs) 10.00 N. We 4.00 r w 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) Hydrograph Report 106 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 3 PH2 PRE - EC BASIN 9 Hydrograph type = SCS Runoff Storm frequency = 50 yrs Time interval = 2 min Drainage area = 2.500 ac Basin Slope = 0.0 % Tc method = User Total precip. = 6.49 in Storm duration = 24 hrs Q (cfs) 7.00 5.00 3.00 1.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PH2 PRE - EC BASIN 9 Hyd. No. 3 -- 50 Year Tuesday, 03 / 15 / 2022 = 6.282 cfs = 736 min = 28,701 cuft = 70 = 0 ft = 34.00 min = Type II = 484 Q (cfs) 7.00 . We 5.00 4.00 3.00 2.00 1.00 0.00 '1 1 1 ' ' ' ' ' ' ' � ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 3 Time (min) Hydrograph Report 107 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 4 PH2 PRE - EC BASIN 10 Hydrograph type = SCS Runoff Storm frequency = 50 yrs Time interval = 2 min Drainage area = 5.000 ac Basin Slope = 0.0 % Tc method = User Total precip. = 6.49 in Storm duration = 24 hrs Q (cfs) 7.00 5.00 3.00 1.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PH2 PRE - EC BASIN 10 Hyd. No. 4 -- 50 Year Tuesday, 03 / 15 / 2022 = 6.391 cfs = 736 min = 32,428 cuft = 55 = 0 ft = 36.00 min = Type II = 484 Q (cfs) 7.00 . We 5.00 4.00 3.00 2.00 1.00 0.00 1 1 1 1 1 / I I I I I I I` 1 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 4 Time (min) Hydrograph Report 108 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 5 PH2 PRE - EC BASIN 11 Hydrograph type = SCS Runoff Storm frequency = 50 yrs Time interval = 2 min Drainage area = 7.000 ac Basin Slope = 0.0 % Tc method = User Total precip. = 6.49 in Storm duration = 24 hrs Q (cfs) 28.00 24.00 20.00 16.00 12.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PH2 PRE - EC BASIN 11 Hyd. No. 5 -- 50 Year Tuesday, 03 / 15 / 2022 = 25.50 cfs = 722 min = 71,981 cuft = 67 = 0 ft = 14.00 min = Type II = 484 Q (cfs) 28.00 24.00 20.00 16.00 12.00 4.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 5 Time (min) Hydrograph Report 109 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 6 PH2 PRE - EC BASIN 12 Hydrograph type = SCS Runoff Storm frequency = 50 yrs Time interval = 2 min Drainage area = 4.500 ac Basin Slope = 0.0 % Tc method = User Total precip. = 6.49 in Storm duration = 24 hrs Q (cfs) 10.00 Were . OM 4.00 r w Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PH2 PRE - EC BASIN 12 Hyd. No. 6 -- 50 Year Tuesday, 03 / 15 / 2022 = 9.811 cfs = 736 min = 45,366 cuft = 66 = 0 ft = 35.00 min = Type II = 484 Q (cfs) 10.00 N. We 4.00 r w 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 6 Time (min) Hydrograph Report 110 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 7 PH2 PRE - UNDET. Hydrograph type = SCS Runoff Peak discharge = 35.18 cfs Storm frequency = 50 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 70,358 cuft Drainage area = 8.500 ac Curve number = 62 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.49 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PH2 PRE - UNDET. Q (cfs) Hyd. No. 7 -- 50 Year Q (cfs) 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 7 Time (min) 111 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 9 PH2 PRE BMP 7 Total (+ EC 10, 11 & 12) Hydrograph type = Combine Peak discharge = 43.59 cfs Storm frequency = 50 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 189,326 cuft Inflow hyds. = 1, 4, 5, 6 Contrib. drain. area = 22.000 ac PH2 PRE BMP 7 Total (+ EC 10, 11 & 12) Q (cfs) Hyd. No. 9 -- 50 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - — - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 9 — Hyd No. 1 Hyd No. 4 Hyd No. 5 Time (min) Hyd No. 6 Hydrograph Report 112 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 10 PH2 PRE BMP 8 Total (+ EC 9) Hydrograph type = Combine Peak discharge = 14.76 cfs Storm frequency = 50 yrs Time to peak = 732 min Time interval = 2 min Hyd. volume = 63,537 cuft Inflow hyds. = 2, 3 Contrib. drain. area = 5.500 ac PH2 PRE BMP 8 Total (+ EC 9) Q (cfs) Hyd. No. 10 -- 50 Year Q (cfs) 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 10 Hyd No. 2 Hyd No. 3 Hydrograph Report 113 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 11 PH2 PRE - UNDET. Hydrograph type = SCS Runoff Peak discharge = 35.18 cfs Storm frequency = 50 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 70,358 cuft Drainage area = 8.500 ac Curve number = 62 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.49 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PH2 PRE - UNDET. Q (cfs) Hyd. No. 11 -- 50 Year Q (cfs) 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 11 Time (min) 114 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 12 PH2 PRE - TOTAL Hydrograph type = Combine Peak discharge = 75.57 cfs Storm frequency = 50 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 323,221 cuft Inflow hyds. = 9, 10, 11 Contrib. drain. area = 8.500 ac Q (cfs) 80.00 70.00 40.00 20.00 10.00 Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 12 Hyd No. 9 Hyd No. 10 Hyd No. 11 115 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 14 PH2 POST - BMP 7 Hydrograph type = SCS Runoff Peak discharge = 158.40 cfs Storm frequency = 50 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 326,619 cuft Drainage area = 22.710 ac Curve number = 80 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.49 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 160.00 140.00 120.00 100.00 40.00 20.00 Q (cfs) 160.00 140.00 120.00 100.00 40.00 20.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 — Hyd No. 14 Time (min) 116 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 15 PH2 POST - BMP 8 Hydrograph type = SCS Runoff Peak discharge = 44.87 cfs Storm frequency = 50 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 92,894 cuft Drainage area = 6.300 ac Curve number = 81 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.49 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PH2 POST - BMP 8 Q (cfs) Hyd. No. 15 -- 50 Year Q (cfs) 50.00 1 1 1 50.00 4111II)r.�■ `1111111c�� Z 0.00 ' T 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 — Hyd No. 15 Time (min) Hydrograph Report 117 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 16 PH2 POST - UNDET. Hydrograph type = SCS Runoff Storm frequency = 50 yrs Time interval = 2 min Drainage area = 5.500 ac Basin Slope = 0.0 % Tc method = User Total precip. = 6.49 in Storm duration = 24 hrs Q (cfs) 21.00 18.00 15.00 12.00 3.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PH2 POST - UNDET. Hyd. No. 16 -- 50 Year Tuesday, 03 / 15 / 2022 = 20.18 cfs = 718 min = 40,406 cuft = 59 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 21.00 18.00 15.00 12.00 M 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 16 Time (min) 118 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 17 PH2 POST -TOTAL Hydrograph type = Combine Peak discharge = 222.83 cfs Storm frequency = 50 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 459,919 cuft Inflow hyds. = 14, 15, 16 Contrib. drain. area = 34.510 ac Q (cfs) 240.00 210.00 180.00 150.00 120.00 Q (cfs) 240.00 210.00 180.00 150.00 120.00 30.00 0.00 10.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Time (min) — Hyd No. 17 Hyd No. 14 Hyd No. 15 Hyd No. 16 119 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 19 PH2 ROUTED - BMP 7 Hydrograph type = Reservoir Peak discharge = 10.85 cfs Storm frequency = 50 yrs Time to peak = 754 min Time interval = 2 min Hyd. volume = 189,873 cuft Inflow hyd. No. = 14 - PH2 POST - BMP 7 Max. Elevation = 727.44 ft Reservoir name = PH2 BMP 7 - WETPOND Max. Storage = 193,806 cuft Storage Indication method used. Q (cfs) 160.00 140.00 120.00 100.00 40.00 20.00 Q (cfs) 160.00 140.00 120.00 100.00 40.00 20.00 0.00 q 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 1680 1800 Time (min) — Hyd No. 19 Hyd No. 14 Total storage used = 193,806 cult 120 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 20 PH2 ROUTED - BMP 8 Hydrograph type = Reservoir Peak discharge = 20.04 cfs Storm frequency = 50 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 87,935 cuft Inflow hyd. No. = 15 - PH2 POST - BMP 8 Max. Elevation = 735.68 ft Reservoir name = PH2 BMP 8 - SANDFILTER Max. Storage = 43,904 cuft Storage Indication method used. Q (cfs) 50.00 40.00 20.00 10.00 PH2 ROUTED - BMP 8 Hyd. No. 20 -- 50 Year Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 20 — Hyd No. 15 Total storage used = 43,904 cult Hydrograph Report 121 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 21 PH2 POST - UNDET. Hydrograph type = SCS Runoff Storm frequency = 50 yrs Time interval = 2 min Drainage area = 5.500 ac Basin Slope = 0.0 % Tc method = User Total precip. = 6.49 in Storm duration = 24 hrs Q (cfs) 21.00 18.00 15.00 12.00 3.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PH2 POST - UNDET. Hyd. No. 21 -- 50 Year Tuesday, 03 / 15 / 2022 = 20.18 cfs = 718 min = 40,406 cuft = 59 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 21.00 18.00 15.00 12.00 M 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 21 Time (min) Hydrograph Report 122 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 22 PH2 ROUTED - TOTAL Hydrograph type = Combine Peak discharge = 35.07 cfs Storm frequency = 50 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 318,213 cuft Inflow hyds. = 19, 20, 21 Contrib. drain. area = 5.500 ac Q (cfs) 40.00 20.00 10.00 PH2 ROUTED - TOTAL Hyd. No. 22 -- 50 Year Q (cfs) 40.00 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 1680 Time (min) — Hyd No. 22 Hyd No. 19 Hyd No. 20 Hyd No. 21 Hydrograph Summary Report 123 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 11.64 2 732 49,130 ------ ------ ------ PH2 PRE - BMP 7 2 SCS Runoff 10.32 2 730 41,404 ------ ------ ------ PH2 PRE - BMP 8 3 SCS Runoff 7.496 2 734 34,111 ------ ------ ------ PH2 PRE - EC BASIN 9 4 SCS Runoff 8.289 2 736 40,640 ------ ------ ------ PH2 PRE - EC BASIN 10 5 SCS Runoff 30.71 2 722 86,297 ------ ------ ------ PH2 PRE - EC BASIN 11 6 SCS Runoff 11.89 2 736 54,555 ------ ------ ------ PH2 PRE - EC BASIN 12 7 SCS Runoff 42.80 2 718 85,731 ------ ------ ------ PH2 PRE - UNDET. 9 Combine 53.81 2 726 230,622 1, 4, 5, ------ ------ PH2 PRE BMP 7 Total (+ EC 10, 11 6, 10 Combine 17.62 2 732 75,515 2, 3, ------ ------ PH2 PRE BMP 8 Total (+ EC 9) 11 SCS Runoff 42.80 2 718 85,731 ------ ------ ------ PH2 PRE - UNDET. 12 Combine 92.87 2 718 391,869 9, 10, 11 ------ ------ PH2 PRE - TOTAL 14 SCS Runoff 182.32 2 716 378,532 ------ ------ ------ PH2 POST - BMP 7 15 SCS Runoff 51.51 2 716 107,414 ------ ------ ------ PH2 POST - BMP 8 16 SCS Runoff 24.90 2 718 49,785 ------ ------ ------ PH2 POST- UNDET. 17 Combine 258.21 2 716 535,730 14, 15, 16 ------ ------ PH2 POST - TOTAL 19 Reservoir 25.47 2 728 241,786 14 727.74 205,729 PH2 ROUTED - BMP 7 20 Reservoir 31.52 2 722 102,429 15 735.91 46,841 PH2 ROUTED - BMP 8 21 SCS Runoff 24.90 2 718 49,785 ------ ------ ------ PH2 POST- UNDET. 22 Combine 59.72 2 722 393,999 19, 20, 21 ------ ------ PH2 ROUTED - TOTAL 17031-PH2-BMP Hydraflow.gpw Return Period: 100 Year Tuesday, 03 / 15 / 2022 Hydrograph Report 124 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 1 PH2 PRE -BMP 7 Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 5.500 ac Basin Slope = 0.0 % Tc method = User Total precip. = 7.22 in Storm duration = 24 hrs Q (cfs) 12.00 10.00 M M 4.00 r M� Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PH2 PRE - BMP 7 Hyd. No. 1 -- 100 Year Tuesday, 03 / 15 / 2022 = 11.64 cfs = 732 min = 49,130 cuft = 57 = 0 ft = 30.00 min = Type II = 484 Q (cfs) 12.00 10.00 M . �� 4.00 r M� 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 125 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 2 PH2 PRE -BMP 8 Hydrograph type = SCS Runoff Peak discharge = 10.32 cfs Storm frequency = 100 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 41,404 cuft Drainage area = 3.000 ac Curve number = 70 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 29.00 min Total precip. = 7.22 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 12.00 10.00 :1M .M 4.00 rM PH2 PRE - BMP 8 Hyd. No. 2 -- 100 Year Q (cfs) 12.00 10.00 M M 4.00 2.00 I I i i _ T I I I I I I I_ 1 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) Hydrograph Report 126 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 3 PH2 PRE - EC BASIN 9 Hydrograph type = SCS Runoff Peak discharge = 7.496 cfs Storm frequency = 100 yrs Time to peak = 734 min Time interval = 2 min Hyd. volume = 34,111 cuft Drainage area = 2.500 ac Curve number = 70 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 34.00 min Total precip. = 7.22 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PH2 PRE - EC BASIN 9 Q (cfs) Hyd. No. 3 -- 100 Year Q (cfs) 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 3 Time (min) Hydrograph Report 127 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 4 PH2 PRE - EC BASIN 10 Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 5.000 ac Basin Slope = 0.0 % Tc method = User Total precip. = 7.22 in Storm duration = 24 hrs Q (cfs) 10.00 Were . OM 4.00 r w Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PH2 PRE - EC BASIN 10 Hyd. No. 4 -- 100 Year Tuesday, 03 / 15 / 2022 = 8.289 cfs = 736 min = 40,640 cuft = 55 = 0 ft = 36.00 min = Type II = 484 Q (cfs) 10.00 N. We 4.00 r w 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) Hydrograph Report 128 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 5 PH2 PRE - EC BASIN 11 Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 7.000 ac Basin Slope = 0.0 % Tc method = User Total precip. = 7.22 in Storm duration = 24 hrs Q (cfs) 35.00 25.00 20.00 15.00 10.00 5.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PH2 PRE - EC BASIN 11 Hyd. No. 5 -- 100 Year Tuesday, 03 / 15 / 2022 = 30.71 cfs = 722 min = 86,297 cuft = 67 = 0 ft = 14.00 min = Type II = 484 Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 ' ' ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 5 Time (min) Hydrograph Report 129 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 6 PH2 PRE - EC BASIN 12 Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 4.500 ac Basin Slope = 0.0 % Tc method = User Total precip. = 7.22 in Storm duration = 24 hrs Q (cfs) 12.00 10.00 M M 4.00 r M� Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PH2 PRE - EC BASIN 12 Hyd. No. 6 -- 100 Year Tuesday, 03 / 15 / 2022 = 11.89 cfs = 736 min = 54,555 cuft = 66 = 0 ft = 35.00 min = Type II = 484 Q (cfs) 12.00 10.00 M . �� 4.00 r M� 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 6 Time (min) 130 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 7 PH2 PRE - UNDET. Hydrograph type = SCS Runoff Peak discharge = 42.80 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 85,731 cuft Drainage area = 8.500 ac Curve number = 62 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.22 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 50.00 40.00 20.00 10.00 PH2 PRE - UNDET. Hyd. No. 7 -- 100 Year Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 7 Time (min) 131 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 9 PH2 PRE BMP 7 Total (+ EC 10, 11 & 12) Hydrograph type = Combine Peak discharge = 53.81 cfs Storm frequency = 100 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 230,622 cuft Inflow hyds. = 1, 4, 5, 6 Contrib. drain. area = 22.000 ac Q (cfs) 60.00 40.00 20.00 10.00 PH2 PRE BMP 7 Total (+ EC 10, 11 & 12) Hyd. No. 9 -- 100 Year Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 ' — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 9 — Hyd No. 1 Hyd No. 4 Hyd No. 5 Time (min) Hyd No. 6 132 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 10 PH2 PRE BMP 8 Total (+ EC 9) Hydrograph type = Combine Peak discharge = 17.62 cfs Storm frequency = 100 yrs Time to peak = 732 min Time interval = 2 min Hyd. volume = 75,515 cuft Inflow hyds. = 2, 3 Contrib. drain. area = 5.500 ac PH2 PRE BMP 8 Total (+ EC 9) Q (cfs) Hyd. No. 10 -- 100 Year Q (cfs) 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 10 Hyd No. 2 Hyd No. 3 133 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 11 PH2 PRE - UNDET. Hydrograph type = SCS Runoff Peak discharge = 42.80 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 85,731 cuft Drainage area = 8.500 ac Curve number = 62 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.22 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 50.00 40.00 20.00 10.00 PH2 PRE - UNDET. Hyd. No. 11 -- 100 Year Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 11 Time (min) 134 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 12 PH2 PRE - TOTAL Hydrograph type = Combine Peak discharge = 92.87 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 391,869 cuft Inflow hyds. = 9, 10, 11 Contrib. drain. area = 8.500 ac Q (cfs) 100.00 90.00 80.00 70.00 60.00 50.00 40.00 it 11 20.00 PH2 PRE - TOTAL Hyd. No. 12 -- 100 Year 1 1 1 •1 :1 •11 1 1 •.1 1:1 11M INKOW01 •1 Q (cfs) 100.00 90.00 80.00 70.00 60.00 50.00 40.00 30.00 rl 11 135 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 14 PH2 POST - BMP 7 Hydrograph type = SCS Runoff Peak discharge = 182.32 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 378,532 cuft Drainage area = 22.710 ac Curve number = 80 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.22 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 210.00 180.00 150.00 120.00 Q (cfs) 210.00 180.00 150.00 120.00 30.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 — Hyd No. 14 Time (min) 136 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 15 PH2 POST - BMP 8 Hydrograph type = SCS Runoff Peak discharge = 51.51 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 107,414 cuft Drainage area = 6.300 ac Curve number = 81 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.22 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 60.00 40.00 20.00 10.00 PH2 POST - BMP 8 Hyd. No. 15 -- 100 Year Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 — Hyd No. 15 Time (min) Hydrograph Report 137 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 16 PH2 POST - UNDET. Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 5.500 ac Basin Slope = 0.0 % Tc method = User Total precip. = 7.22 in Storm duration = 24 hrs Q (cfs) 28.00 24.00 20.00 16.00 12.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PH2 POST - UNDET. Hyd. No. 16 -- 100 Year Tuesday, 03 / 15 / 2022 = 24.90 cfs = 718 min = 49,785 cuft = 59 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 28.00 24.00 20.00 16.00 12.00 4.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 16 Time (min) 138 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 17 PH2 POST -TOTAL Hydrograph type = Combine Peak discharge = 258.21 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 535,730 cuft Inflow hyds. = 14, 15, 16 Contrib. drain. area = 34.510 ac Q (cfs) 280.00 240.00 200.00 160.00 120.00 40.00 PH2 POST - TOTAL Hyd. No. 17 -- 100 Year Q (cfs) 280.00 240.00 200.00 160.00 120.00 40.00 0.00 ' 1 1 1 10.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Time (min) — Hyd No. 17 Hyd No. 14 Hyd No. 15 Hyd No. 16 Hydrograph Report 139 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 19 PH2 ROUTED - BMP 7 Hydrograph type = Reservoir Peak discharge = 25.47 cfs Storm frequency = 100 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 241,786 cuft Inflow hyd. No. = 14 - PH2 POST - BMP 7 Max. Elevation = 727.74 ft Reservoir name = PH2 BMP 7 - WETPOND Max. Storage = 205,729 cuft Storage Indication method used Q (cfs) 210.00 180.00 150.00 120.00 Q (cfs) 210.00 180.00 150.00 120.00 30.00 J 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 1680 Time (min) Hyd No. 19 Hyd No. 14 Total storage used = 205,729 cult 140 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 20 PH2 ROUTED - BMP 8 Hydrograph type = Reservoir Peak discharge = 31.52 cfs Storm frequency = 100 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 102,429 cuft Inflow hyd. No. = 15 - PH2 POST - BMP 8 Max. Elevation = 735.91 ft Reservoir name = PH2 BMP 8 - SANDFILTER Max. Storage = 46,841 cuft Storage Indication method used. Q (cfs) 60.00 40.00 20.00 10.00 PH2 ROUTED - BMP 8 Hyd. No. 20 -- 100 Year Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 20 — Hyd No. 15 Total storage used = 46,841 cult Hydrograph Report 141 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 21 PH2 POST - UNDET. Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 5.500 ac Basin Slope = 0.0 % Tc method = User Total precip. = 7.22 in Storm duration = 24 hrs Q (cfs) 28.00 24.00 20.00 16.00 12.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PH2 POST - UNDET. Hyd. No. 21 -- 100 Year Tuesday, 03 / 15 / 2022 = 24.90 cfs = 718 min = 49,785 cuft = 59 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 28.00 24.00 20.00 16.00 12.00 4.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 21 Time (min) Hydrograph Report 142 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 15 / 2022 Hyd. No. 22 PH2 ROUTED - TOTAL Hydrograph type = Combine Peak discharge = 59.72 cfs Storm frequency = 100 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 393,999 cuft Inflow hyds. = 19, 20, 21 Contrib. drain. area = 5.500 ac Q (cfs) 60.00 40.00 20.00 10.00 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 1680 Time (min) — Hyd No. 22 Hyd No. 19 Hyd No. 20 Hyd No. 21 VI. APPENDIX - WA* �rt a bur `{ South Yadkin Rover ( oolemee vwr if -I V �ql op EEDMOf E R Q Cr V5� RARY RD 10,PO T Q Yadkin l River Fri li bury i. o a+dki (Salisbury vwr. .i. � HEEN -1 11! LEGEND C.' - ' RIDGE RD,, Class _ �R I�ILD EFL '. + w- I I� r' r— 1111 -III ` N Hif I D it � T � � WS_ Ill IN E F0/%CRA-WFC) • +� yy - F ITI ALAF EA ' RILL S F0RD ' MUNICIPAL LIMITSy- VA '_� IN ��-� � - ETJ GOO .Rowan Roads Y ? � LAKE F � �I FT _ DE INTERSTATE fff V i7 y�'� '1 - tp Nl� 'o `',RD 4 [ -A`" Q �.. {- ,� - L ��� - NORTH AR LINA HIGHWAY r - U2 c N1FF RAMPS STATE f 1AINTAIN ED R AD .� C o �� _ T F Bark reeklloarn eek w-II __.+ ;.. ' -� Cr X x1. r UNITED STATES HIGHWAY BRADS, ,� ,, IT, Al L ND %4 e 4 RD � ;� Q r' , ' TAD L .. F _ 0 p - �t " ,' Sp)'INGS RD CHURCH RD _ Branch e ri RFF-N. NOS .�No A. ' D qQ oaBrP ��ti _I E x p Tu kerto n Reservoir ,. ri h Buffaloreek iI' an " — c ' �, t-1 1 - �.� 111fB-III { �' . RD toddle creeks Qku wB-II .' ot4 �' Ids 3 r creek ke 1=i E , I -; + RD TO c R s Moir 1J11 IIB-IV IV + i Dutch Buffalo Creek D ' \C -11I Milesr ` � 1 2ouVEIR RD Creaked b - olu mbus Hawks 412000 _97 3t .. 1/29/2021 Precipitation Frequency Data Server NOAA Atlas 14, Volume 2, Version 3 Location name: Salisbury, North Carolina, USA* 1 Latitude: 35.6046*, Longitude:-80.4736* Elevation: 750.6 ft** *source: ESRI Maps 'w,�w, t source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Duration Average recurrence interval (years) 1 2 5 10 25 50 1 100 100 200 500 1000 0.388 0.459 0.535 0.588 0.647 0.687 0.722 0.752 0.784 0.804 5-min (0.358-0.421) (0.423-0.499) (0.492-0.582) (0.540-0.638) (0.592-0.701) (0.625-0.744) (0.653-0.782) (0.676-0.816) (0.698-0.852) (0.710-0.877) 0.620 0.733 0.857 0.941 1.03 1.09 1.15 1.19 1.24 1.27 10-min (0.571-0.673) (0.677-0.798) (0.789-0.931) (0.863-1.02) (0.943-1.12) (0.995-1.19) 1 (1.04-1.24) 1 (1.07-1.29) 1 (1.10-1.35) 1 (1.12-1.38) 0.775 0.922 1.08 1.19 1.31 1.39 1.45 1.50 1.56 1.59 15-min (0.714-0.841) (0.851-1.00) (0.998-1.18) (1.09-1.29) 11 (1.20-1.42) 1 (1.26-1.50) 1 (1.31-1.57) 1 (1.35-1.63) 1 (1.39-1.70) 1 (1.40-1.73) 1.06 1.27 1.54 1.72 1.94 2.09 2.22 2.34 2.48 2.57 30-min (0.979-1.15) 1 1 (1.42-1.67) 1 1 (1.77-2.10) 1 (1.90-2.26) 1 (2.01-2.41) 1 (2.11-2.54) 1 (2.21-2.70) 1 (2.27-2.81) 1.32 1.60 1.98 2.25 2.58 2.83 3.06 3.28 3.56 3.76 60-min (1.22-1.44) (1.48-1.74) (1.82-2.15) (2.06-2.43) (2.36-2.79) (2.57-3.06) (2.77-3.32) (2.95-3.56) (3.17-3.87) (3.32-4.10) 1.53 1.85 2.30 2.64 3.07 3.39 3.71 4.01 4.41 4.70 2-hr (1.41-1.67) (1.70-2.02) (2.11-2.51) (2.41-2.87) (2.79-3.34) (3.07-3.68) (3.33-4.03) (3.58-4.37) (3.89-4.81) (4.10-5.14) 1.63 1.97 2.46 2.82 3.31 3.69 4.06 4.44 4.93 5.31 3-hr (1.50-1.78) 1 1 (2.25-2.68) 11 (2.58-3.07) 11 (3.01-3.60) 1 (3.34-4.01) 1 (3.65-4.41) 1 (3.95-4.82) 1 (4.33-5.37) 1 (4.61-5.79) 1.97 2.38 2.97 3.42 4.03 4.51 5.00 5.48 6.14 6.64 6-hr (1.82-2.15)1 (2.19-2.60) 1 1 (3.13-3.73) 11 (3.67-4.38) 1 (4.08-4.90) 1 (4.47-5.42) 1 (4.86-5.95) 1 (5.37-6.67) 1 (5.73-7.22) 2.33 2.80 3.51 4.08 4.84 5.45 6.07 6.72 7.60 8.29 12-hr (2.14-2.54) 11 (2.58-3.07) 1 1 (3.73-4.44) 11 (4.40-5.25) 1 (4.91-5.90) 1 (5.43-6.56) 1 (5.93-7.25) 1 (6.60-8.19) 1 (7.09-8.94) 2.77 3.34 4.19 4.86 5.77 6.49 7.22 7.98 9.00 9.81 24-hr (2.58-2.97) (3.12-3.59) (3.91-4.51) (4.53-5.22) 11 (5.36-6.19) 1 (6.02-6.96) 1 (6.68-7.75) 1 (7.35-8.56) 1 (8.26-9.68) 1 (8.97-10.6) 3.22 3.88 4.83 5.57 6.57 7.37 8.17 9.00 10.1 11.0 2-day (3.01-3.44) (3.62-4.15) (4.51-5.16) 1 (6.12-7.02) 1 (6.84-7.88) 1 (7.57-8.73) 1 (8.30-9.63) 1 (9.30-10.8) 1 (10.1-11.8) 3.43 4.11 5.10 5.87 6.92 7.74 8.59 9.45 10.6 11.5 3-day (3.21-3.66) 1 (4.77-5.44) 11 (5.48-6.26) 11 (6.44-7.38) 1 (7.19-8.27) 1 (7.96-9.1 7) 1 (8.73-10.1) 1 (9.77-11.4) 1 (10.6-12.4) 3.63 4.35 5.37 6.17 7.26 8.12 9.00 9.90 11.1 12.1 4-day (3.41-3.87) 11 (4.09-4.64) 1 1 (6.76-7.74) (7.55-8.66) 1 (8.34-9.61) 1 (9.15-10.6) 1 (10.2-11.9) 1 (11.1-12.9) 4.19 5.00 6.07 6.93 8.10 9.03 9.98 10.9 12.3 13.3 7-day (3.95-4.45) 11 (4.71-5.31) 11 (5.72-6.46) (6.52-7.37) 11 (7.60-8.61) 1 (8.45-9.60) 1 (9.31-10.6) 1 (10.2-11.7) 1 (11.3-13.1) 1 (12.3-14.2) 4.78 5.68 6.82 7.72 8.91 9.86 10.8 11.8 13.1 14.1 10-day (4.53-5.06) 11 (5.38-6.01) 11 (6.45-7.22) 1 (8.40-9.43) 1 (9.27-10.4) 1 (10.1-11.4) 1 (11.0-12.5) 1 (12.2-13.9) 1 (13.1-14.9) 6.42 7.58 8.95 10.0 11.5 12.6 13.8 14.9 16.5 17.7 20-day (6.11-6.75) 11 (7.21-7.96) 11 (8.51-9.39) 11 (9.52-10.5) 11 (10.9-12.1) 1 (11.9-13.3) 1 (13.0-14.5) 1 (14.0-15.7) 1 (15.4-17.4) 1 (16.5-18.7) 7.94 9.34 10.8 12.0 13.6 14.7 15.9 17.0 18.6 19.7 30-day (7.58-8.32) 11 (8.91-9.77) 11 (10.3-11.3) 11 (11.4-12.6) 11 (12.9-14.2) 1 (14.0-15.4) 1 (15.0-16.6) 1 (16.1-17.9) 1 (17.5-19.5) 1 (18.5-20.8) 10.00 11.7 13.4 14.6 16.3 17.5 18.8 19.9 21.5 22.7 45-day (9.60-10.4) (11.2-12.2) (12.8-13.9) (14.0-15.2) 11 (15.6-17.0) 1 (16.7-18.3) 1 (17.9-19.6) 1 (19.0-20.8) 1 (20.4-22.5) 1 (21.4-23.7) 11.9 13.9 15.7 17.0 18.8 20.1 21.4 22.7 24.3 25.4 60-day (11.5-12.4) (13.4-14.4) J (16.4-17.7) (18.1-19.5) (19.3-20.9) (20.5-22.3) (21.6-23.6) (23.1-25.3) (24.2-26.6) Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?Iat=35.6046&Ion=-80.4736&data=depth&units=english&series=pds 1 /4 1/29/2021 Precipitation Frequency Data Server NOAA Atlas 14, Volume 2, Version 3 Location name: Salisbury, North Carolina, USA* 1 Latitude: 35.6046*, Longitude:-80.4736* Elevation: 750.6 ft** *source: ESRI Maps 'w,�w, t source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/hourp Duration Average recurrence interval (years) 1 2 5 10 25 50 1 100 100 200 500 1000 5-min 4.66 (4.30-5.05) 5.51 6.42 1 (5.90-6.98) 11 7.06 (6.48-7.66) 11 7.76 (7.10-8.41) 8.24 1 (7.50-8.93) 8.66 1 (7.84-9.38) 9.02 1 (8.11-9.79) 9.41 1 (8.38-10.2) 9.65 1 (8.52-10.5) 3.72 4.40 5.14 5.65 6.19 6.56 6.89 7.15 7.44 7.60 10-min (3.43-4.04) (4.06-4.79) 1 (5.18-6.12) 11 (5.66-6.70) 1 (5.97-7.11) 1 (6.23-7.46) 1 (6.43-7.76) 1 (6.62-8.09) 1 (6.71-8.28) 3.10 3.69 4.34 4.76 5.23 5.54 5.80 6.02 6.24 6.36 15-min (2.86-3.36) 11 (3.40-4.01) 11 (3.99-4.71) 11 (4.37-5.16) 11 (4.78-5.66) 1 (5.04-6.00) 1 (5.25-6.28) 1 (5.41-6.53) 1 (5.56-6.79) 1 (5.62-6.93) 2.12 2.55 3.08 3.45 3.87 4.17 4.44 4.68 4.97 5.15 30-min (1.96-2.30) (2.35-2.77) (2.83-3.35) (3.16-3.74) 11 (3.54-4.20) 1 (3.79-4.52) 1 (4.02-4.81) 1 (4.21-5.08) 1 (4.42-5.40) 1 (4.55-5.61) 1.32 1.60 1.98 2.25 2.58 2.83 3.06 3.28 3.56 3.76 60-min (1.22-1.44) (1.48-1.74) (1.82-2.15) 1 (2.36-2.79) 1 (2.57-3.06) 1 (2.77-3.32) 1 (2.95-3.56) 1 (3.17-3.87) 1 (3.32-4.10) 0.764 F 0.926 1.15 1.32 1.53 1.70 1.85 2.01 2.20 2.35 2-hr (0.702-0.834) (0.850-1.01) 1 1 (1.39-1.67) (1.53-1.84) 1 (1.67-2.02) 1 (1.79-2.19) 1 (1.94-2.41) 1 (2.05-2.57) 0.542 0.655 0.818 0.940 1.10 113 1.35 1.48 1.64 1.77 3-hr (0.499-0.592) (0.602-0.716) (0.750-0.893) (0.860-1.02) (1.00-1.20) 1 (1.11-1.34) 1 (1.21-1.47) 1 (1.31-1.61) 1 (1.44-1.79) 1 (1.53-1.93) 0.329 0.397 0.495 0.572 0.674 0.754 F 0.834 F 0.915 1.02 1.11 6-hr (0.303-0.360) (0.365-0.434) (0.455-0.541) (0.523-0.623) (0.612-0.732) (0.681-0.818) (0.747-0.905) (0.812-0.993) (0.896-1.11) (0.957-1.21) 0.193 0.233 0.291 0.338 0.402 0.452 0.504 0.558 0.631 0.688 12-hr (0.178-0.210) (0.214-0.255) (0.268-0.318) (0.310-0.369) (0.365-0.436) (0.408-0.490) (0.450-0.545) (0.493-0.602) (0.548-0.680) (0.589-0.742) 0.115 0.139 0.175 0.203 0.240 0.270 0.301 0.332 0.375 0.409 24-hr (0.108-0.124) (0.130-0.150) (0.163-0.188) (0.189-0.218) (0.223-0.258) (0.251-0.290) (0.278-0.323) (0.306-0.357) (0.344-0.403) (0.374-0.440) 0.067 0.081 0.101 0.116 0.137 0.153 0.170 0.187 0.211 0.229 2-day (0.063-0.072) (0.075-0.086) (0.094-0.108) (0.108-0.124) (0.127-0.146) (0.142-0.164) (0.158-0.182) (0.173-0.201) (0.194-0.226) (0.210-0.245) 0.048 0.057 0.071 0.082 0.096 0.108 0.119 0.131 0.148 0.160 3-day (0.045-0.051) (0.054-0.061) (0.066-0.076) (0.076-0.087) (0.089-0.103) (0.100-0.115) (0.110-0.127) (0.121-0.140) (0.136-0.158) (0.147-0.172) 0.038 0.045 0.056 0.064 0.076 0.085 0.094 0.103 0.116 0.126 4-day (0.035-0.040) (0.043-0.048) (0.052-0.060) (0.060-0.068) (0.070-0.081) (0.079-0.090) (0.087-0.100) (0.095-0.110) (0.107-0.124) (0.116-0.135) 0.025 0.030 0.036 0.041 0.048 0.054 0.059 0.065 0.073 0.079 7-day (0.024-0.027) (0.028-0.032) (0.034-0.038) (0.039-0.044) (0.045-0.051) (0.050-0.057) (0.055-0.063) (0.061-0.069) (0.068-0.078) (0.073-0.085) 0.020 0.024 0.028 0.032 0.037 0.041 0.045 0.049 0.054 0.059 10-day (0.019-0.021) (0.022-0.025) (0.027-0.030) (0.030-0.034) (0.035-0.039) (0.039-0.043) (0.042-0.048) (0.046-0.052) (0.051-0.058) (0.054-0.062) 0.013 0.016 0.019 0.021 0.024 0.026 0.029 0.031 0.034 0.037 20-day (0.013-0.014) (0.015-0.017) (0.018-0.020) (0.020-0.022) (0.023-0.025) (0.025-0.028) (0.027-0.030) (0.029-0.033) (0.032-0.036) (0.034-0.039) 0.011 0.013 0.015 0.017 0.019 0.020 0.022 0.024 0.026 0.027 30-day (0.011-0.012) (0.012-0.014) (0.014-0.016) (0.016-0.017) (0.018-0.020) (0.019-0.021) (0.021-0.023) (0.022-0.025) (0.024-0.027) (0.026-0.029) 0.009 0.011 0.012 0.014 0.015 0.016 0.017 0.018 0.020 0.021 45-day (0.009-0.010) (0.010-0.011) (0.012-0.013) (0.013-0.014) (0.014-0.016) (0.016-0.017) (0.017-0.018) (0.018-0.019) (0.019-0.021) (0.020-0.022) 0.008 0.010 0.011 0.012 0.013 0.014 0.015 0.016 0.017 0.018 60-day (0.008-0.009) (0.009-0.010) (0.010-0.011) (0.011-0.012) (0.013-0.014) (0.013-0.015) (0.014-0.015) (0.015-0.016) (0.016-0.018) (0.017-0.018) Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?Iat=35.6046&Ion=-80.4736&data=intensity&units=english&series=pds 1 /4 1/29/2021 Precipitation Frequency Data Server 25 c t 20 C a di U 15 49 10 a 5 n M 25 c s 20 a m a 15 A, 49 a 10 CL a 5 n Pas -based depth -duration -frequency (DDF) curves Latitude: 35.6046°, Longitude:-80-4736' --------------------- t t Jr t L N N O r{4 N rq rq rq N rq N f1�5 lb N rV A q O O O Ln O ,1 r-I rn w � N rn v Ln Duration 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAA Atlas 14, VoIume 2, Version 3 Created (GMT): Fri Jan 29 17:30:31 2021 Back to Top Maps & aerials Small scale terrain Average recurrence mlerva I f years} — 1 2 — 5 — 14 — 25 54 100 200 500 1000 Duration — 6-min — 2-day — 10-min — 3-day 15-min — d-dmy — 30-min — 7-day — 6 Wain — 10-day — 2fir — 20-day — 3-fir — 30-day — Sfir — 45-day — 12-hr — 60-day - 24-hr https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.htmI?Iat=35.6046&Ion=-80.4736&data=depth&units=engIish&series=pds 2/4 1/29/2021 Precipitation Frequency Data Server nd Granite 85 Quarry Rd *Faith 3km I z: 16 Large scale terrain Bristol City' 4 4Winston-Salem Co Durham[ -.-It Mitchell Greensboro qp Raleic NORTH IC AROL INA Charlotte Fayetteville "Greenville M& 100km Mi 1, R 0 L I N A Wilrni Large scale map B 55'1 Jenson Gfty Liem Gree sboro drh.. Raleig Aril M1 II North Carolina arlotte ill 1 00krr Large scale aerial https://hdsc.nws.noaa.gov/hdsc/pfds/pfds—printpage.htmI?Iat=35.6046&Ion=-80.4736&data=depth&units=english&series=pds 3/4 MUMMA Precipitation Frequency Data Server Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Questions noaa.gov Disclaimer https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.htmI?Iat=35.6046&Ion=-80.4736&data=depth&units=english&series=pds 4/4 �EnC\EnB CeB2 CeB2 WkB CeB2 VaC 05B BYtq CcB VnB2 CeC^2 ChA CcC VaC eeK Oe � CeB2 C� WkB EnC- = nB2 n B2 CeB2 EnB PcC^2 _ CeB2 VaC nB2 ai 2000 MP my wog [bc W&Doll'IR WO wEh. t. i -- 547200 547300 547400 547500 547600 547700 547800 547900 548000 548100 548200 548300 548400 548500 548600 548700 548800 548900 - v Map Scale: 1:8,390 if printed on A landscape (11" x 8.5") sheet. Meters $ N 0 100 200 400 E00 $ Feet 0 400 800 1600 2400 Map projection: Web Mercator Conermordinates: WGS84 Edge tics: lfrM Zone 17N WGS84 usoA Natural Resources Web Soil Survey 2/7/2018 Conservation Service National Cooperative Soil Survey Pagel of 4 Hydrologic Soil Group —Rowan County, North Carolina (17031-Site Soils Map) MAP LEGEND Area of Interest (AOI) 0 Area of Interest (AOI) Soils Soil Rating Polygons 0 A 0 A/D 0 B 0 B/D C 0 C/D 0 D 0 Not rated or not available Soil Rating Lines r 0 A r 0 A/D B B/D N 0 C r 0 C/D r 0 D r 0 Not rated or not available Soil Rating Points 0 A 0 A/D ■ B S B/D ❑ C 0 C/D 0 D ❑ Not rated or not available Water Features Streams and Canals Transportation — Rails ­0 Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography MAP INFORMATION The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Rowan County, North Carolina Survey Area Data: Version 14, Oct 3, 2017 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Jun 14, 2015—Mar 15, 2017 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. usoA Natural Resources Web Soil Survey 2/7/2018 Conservation Service National Cooperative Soil Survey Page 2 of 4 Hydrologic Soil Group —Rowan County, North Carolina 17031-Site Soils Map Hydrologic Soil Group Map unit symbol Map unit name Rating CcB Cecil sandy loam, 2 to 8 B percent slopes CcC Cecil sandy loam, 8 to A 15 percent slopes CeB2 Cecil sandy clay loam, 2 B to 8 percent slopes, moderately eroded CeC2 Cecil sandy clay loam, 8 B to 15 percent slopes, moderately eroded ChA Chewacla loam, 0 to 2 B/D percent slopes, frequently flooded DoB Dorian fine sandy loam, C 2 to 6 percent slopes, rarely flooded EnB Enon fine sandy loam, 2 C to 8 percent slopes EnC Enon fine sandy loam, 8 C to 15 percent slopes PcC2 Pacolet sandy clay B loam, 8 to 15 percent slopes, moderately eroded RvA Riverview loam, 0 to 2 B percent slopes, occasionally flooded VaB Vance sandy loam, 2 to C 8 percent slopes VaC Vance sandy loam, 8 to C 15 percent slopes VnB2 Vance sandy clay loam, C 2 to 8 percent slopes, moderately eroded VnC2 Vance sandy clay loam, C 8 to 15 percent slopes, moderately eroded WkB Wickham fine sandy B loam, 2 to 8 percent slopes Totals for Area of Interest USDA Natural Resources Web Soil Survey 2/7/2018 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group —Rowan County, North Carolina 17031-Site Soils Map Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.- None Specified Tie -break Rule: Higher USDA Natural Resources Web Soil Survey 2/7/2018 Conservation Service National Cooperative Soil Survey Page 4 of 4