Loading...
HomeMy WebLinkAboutNCC222350_Site Plan or Location Map_20220628DocuSign Envelope ID: 528AF400-D614-439F-B1A1-DCA68110534E EROSION AND SEDIMENT CONTROL APPROVED PLAN DATE PERMIT NO. S- Wake County Environmental Services Sedimentation & Erosion Control 919-956-7400 EIP — EXISTING IRON PIPE EIB — EXISTING IRON BAR EPK — EXISTING PK NAIL NIP — NEW IRON PIPE SET R/W — RIGHT OF WAY CATV — CABLE TV BOX EB — ELECTRIC BOX TEL — TELEPHONE PEDESTAL PP — POWER POLE OHL — OVERHEAD LINE LP — LIGHT POLE WM — WATER METER WV — WATER VALVE CO — SEWER CLEAN —OUT CB — CATCH BASIN \ / MILL INVrvErSTMENTS INC D.B. D.B. 7583, PAGE 1 O \ PIN# 1821.04-73-4130 �1' PROPOSED DISTURBED , , 'Q'L,26' I AREA 37,y30 S.F./ i I 5 I SALT FENCE' O , I OUTLET / Y CONSTRUCTION ENTRANCE ' �-+!•/ , , ' , , , , , , ,� //, ' , / , / 47,724 sq.ft.,'�' ,�� ��� ;'65,681 sq.ft.','dddl��,',','%; 265' o ' a�S �N 1.508 \ADUKE PROGRESS •Q9,6 AC �S UTILITY R/W /' N , �/ , , ' �' , ' ' . O0OR50�O , ' ' 20' PUBLIC/ DRAINAGE EASE ENT '/, / O PRO�OSED DISTUR ED, / i2Al W -� i�J�' , ' , ' , ' ' . AREA 24,564 S.F. ' ' ' ', ,oU G , , 16k3�` , , , , , , ' , , z �� / ' �/ CONSTRUCTION,' ' 20' PUBLIC ' ',',' ' ' , `SILT FENCE 7 2Qj6 ENTRANCE ' 'DRAINAGE & ' , OUTLET WITH, N/F S17E—DM TABLE ZONING DISTRICT R-BOW RIVER BASIN NEUSE COUNTY WATERSHED MUD BRANCH WATERBODY INDEX 27-17-1 3 LOT NUMBER LATITUDE LONGITUDE 75 35.981694-78.571442 77 35.981008-78.570562 78 35.981390-78.570251 79 35.981942 78.569945 80 35.982163-78.570514 VICINITY MAP \ \ , , / , �`L / , , ' HORSESHOE ' unu�q, 4 , / , / , , SCM ACCESS, , , , , , UNITED STATES OF AMERICA o ' EAS E T ., , , PROTECTION � , / , D.B. 5104, PG. 381 i \ / , , CN i 61.23'-� N,,�`7 i , ' / PIN# 1800.03-10-2847 `���� �N CARO ,,, 75 ,aT� 90 , ' ' ' ' , ' ' ' /'' • . ..xt"ESsi• , , LT FENCE / / S � Ai✓� '9Z• / 10 , o [ o 9 / i 54103 s ft. 16X30 4q = OUTLET \ , q• CONSTRUCTION / / / i Cpy 76 ' I I ' / M / 8 \ \ 1.242 AC. ENTRANCE I F ST X3p I I , I , I f , PERMANENT I = = , ' ' , , , I ti� v� I SILT �ENOE r STORMWATER DEVICE ) / SEAL ' n I ' ' qYC �0 I OUTLET ' c9 ACCESS & / I - ? L-4685 TRANSMISSION , . _ ' , `a , ' , / ' ' �� >I I I �I I I ' I ' ' ' 0\' MAINTENANCE / TOWER \ , �� ' ' �� `� I I ' I I I ' I ' ' ' ' �r EASEMENT / ' k C' ' l I `? PROPOSED DISTURBE 1 1, / --" VO �'••gySV•R a•`�' �� �• PROPOSED DISTURBED , , , / �F p , AREA 24,�51 S.F. , I / / " \ ` \ AREA 38,000 S.F. / Z / / I I ' I , ,� I I / �/���i� �����`��� 2/8/2022 � �' DocuSig ned SILT'FtNCE' `OUTLET WITH \ G,` - - - - ,h , , / �j , ` S1 HORSESHOE ' PROTECTION `// 1 ` AF5DC1951AA8410... \ \ 'SILT FENCE _ _ _ _ _ /, •'�{ \�\, I 1 �` �` SOIL AND EROSION PLAN FOR OUTLET WITH - `i `obi � gORSESHOE 76 � - - _PROPOSED DISTURBED /I � \� \� ` ` `/ � � 1' II 4 ` 1 \ PROTECTION'r/ , ' - ` AREA 26`40iF. 5 �� w�N q• LOTS ?'S, 7?', ?'8, 79, �c 80 P cE 57 399 s ft.1y CAMBERLY SUBDIVISION OWNER: EXETER BUILDING COMPANY 20' PUBLIC 75,208 3q.ft.' , ' , / /I 30' PERIMETER DOVER HILLS DRIVE / DRAINAGE & / ' BUILDING SETBACK \SCM ACCESS 1.727 AC ' ' , ,'' D.B. 18882, PAGE 2598 \EASEMENT B.M. 2021, PAGE 2226 \ ` NEW LIGHT TOWNSHIP 3 pa\ WAKE COUNTY, NORTH CAROLINA '�'r 3p1•�9 FEBRUARY 7' 2022 MOSS \ \ \ J P.C. \ \ - LINE TYPE LEGEND 100 50 0 100 200 eyors \ \ / PROPERTY UNE - LINE SURVEYED ` --- RIGHT-OF-WAY \y/ —ADJOINING LINE -UNE NOT SURVEYED \ 25' TREE & VEGETATION - BUILDING LINE SCALE 1 "=100' / PROTECTION ZONE -BUILDING SETBACK — EASEMENT 3 / — BUFFER ,88 / FLOOD HAZARD SOILS SHEET 1 OF 4 ' k C' ' l I `? PROPOSED DISTURBE 1 1, / --" VO �'••gySV•R a•`�' �� �• PROPOSED DISTURBED , , , / �F p , AREA 24,�51 S.F. , I / / " \ ` \ AREA 38,000 S.F. / Z / / I I ' I , ,� I I / �/���i� �����`��� 2/8/2022 � �' DocuSig ned SILT'FtNCE' `OUTLET WITH \ G,` - - - - ,h , , / �j , ` S1 HORSESHOE ' PROTECTION `// 1 ` AF5DC1951AA8410... \ \ 'SILT FENCE _ _ _ _ _ /, •'�{ \�\, I 1 �` �` SOIL AND EROSION PLAN FOR OUTLET WITH - `i `obi � gORSESHOE 76 � - - _PROPOSED DISTURBED /I � \� \� ` ` `/ � � 1' II 4 ` 1 \ PROTECTION'r/ , ' - ` AREA 26`40iF. 5 �� w�N q• LOTS ?'S, 7?', ?'8, 79, �c 80 P cE 57 399 s ft.1y CAMBERLY SUBDIVISION OWNER: EXETER BUILDING COMPANY 20' PUBLIC 75,208 3q.ft.' , ' , / /I 30' PERIMETER DOVER HILLS DRIVE / DRAINAGE & / ' BUILDING SETBACK \SCM ACCESS 1.727 AC ' ' , ,'' D.B. 18882, PAGE 2598 \EASEMENT B.M. 2021, PAGE 2226 \ ` NEW LIGHT TOWNSHIP 3 pa\ WAKE COUNTY, NORTH CAROLINA '�'r 3p1•�9 FEBRUARY 7' 2022 MOSS \ \ \ J P.C. \ \ - LINE TYPE LEGEND 100 50 0 100 200 eyors \ \ / PROPERTY UNE - LINE SURVEYED ` --- RIGHT-OF-WAY \y/ —ADJOINING LINE -UNE NOT SURVEYED \ 25' TREE & VEGETATION - BUILDING LINE SCALE 1 "=100' / PROTECTION ZONE -BUILDING SETBACK — EASEMENT 3 / — BUFFER ,88 / FLOOD HAZARD SOILS SHEET 1 OF 4 DocuSign Envelope ID: 528AF400-D614-439F-B1A1-DCA68110534E 1 7 75 7�-� CO I 'I EHISIING T111A 1­t.hlk'NTE lr x T Rc II Ir TYPES eI RO NaEKtJ:. r Ir,.s TYPICAL INDIVIDUAL LOT SEDIMENT & EROSION CONTROL MEASURES DETAIL NOTES: 1. REMOVE SEDIMENT WHEN HALF OF STONE OUTLET IS COVERED. 2 REPLACE STONE AS NEEDED TO ENSURE DEWATERING. PPS' 3" SIONf '0 5 L (Sl13GE STDNE OR RAILROAC ®AI1A"�S I PLAN VIEW N�Ex 1. I.NMl sill fce or vea prolecnpn f ce "P.., ro dve In I driee g O 2 Ifm d d, h' 1 ImgD Ne duo rb fth ro 1 h ¢id ba l,f.. bDDnrn Rd. g 6 p bl d M1 t e p-Tr MINIMUM OR us bel v[h d p o W ly rfm�d Hack d MflAt,, — p bli roads " E V. PROPOSED -tivfs Y. WHICHEVER 3 MerC - hppl - tl1=1 mME mud di Gomi g b E CmlMM' GREATER. I requ Pell, d at t eduveDt ladenetone and re lee lh fies6 s Umn metelY remove eil Ij mud/scdrmmMrock imckM fF hel r. NEW CONSTRUCTION EXISTNG ROADWAY 1 1 II III —III —III —III—' LIER TmaR.. TNTIR s aNI W CROSS SECT -ON COUNTY STANDARD RESIDENTIAL CONSTRUCTION ENTRANCE DETAIL MINIMUM 10 LNE WRES NOTE: 1. USE SILT FENCE ONLY WHEN DRAINAGE AREA DOES NOT EXCEED 1/4 ACRE AND NEVER IN AREAS OF CONCENTRATED ROW. Z. REMOVE SEDIMENT DEPOSITED AS NEEDED TO PROVIDE STORAGE VOLUME FOR THE NEXT RAIN AND TO REMOVE PRESSURE ON THE SILT FENCE. wXr wXc fcxrF AND xAXDX.N: ClWlx / II `WXK a• ar IN wmrrf aF I AIER IAWF 1RFM]I II u SECTION VIEW COUN STANDARD SILT FENCE OUTLET CO f %a�M�P CAWTHORNE, MOSS & PANCIERA, P.C. Professional Land Surveyors C-1525 333 S. White Street Post Office Box 1253 Wake Forest, N.C. 27588 (919)556-3148 STEEL POST WOVEN WIRE FABRIC SILT FENCE FABRIC .I FILL SLOPE 14 F,�N. 4' GRADE 6" MINIMUM COVER OVER SKIRT 'I ANCHOR SKIRT AS DIRECTED BY ENGINEER SIDE VIEW STANDARD TEMPORARY SILT FENCE A-6 � UTAJS l KIY KPY 1Stt �tUIIUN IHKU IxW RIP RAP HEADWALL w alpE /5 WASH/ STONE. 1'-0' THICK X i I...,..: / l /. / PERSPECTIVE VIEW NO SCALE SEDIMENT STORAGE AREAS TO BE DISTURBED (CUT, FILL, ETC.) � ` FLOOD STORAGE ZONE RIP RAP HEADWALL \ F(ON, PIPE INVERT NATURAL GROUND \� 7.5' 3 _____________ FLOW _— CLASS 1 RIP —RAP MAXIMUM SEDIMENT (CLEAN OUT POINT) DEPTH WASHED STONE SECTION THRU CATCH BASIN FILTER AND CULVERT PIPE NO SCALE STANDARD HORSESHOE INLET PROTECTION CARC'�-.,,, O"€SS SEAL '�\ =9 - r L-4665 c J��Ors4L .� 2/ 12022 �,/1111111111� DocuSigned by: , 6r)Avu AFSDC1951 AA8410... SOIL AND EROSION PLAN FOR LOTS 75, 77, 78, 79, & 80 CAMBERLY SUBDIVISION OWNER: EXETER BUILDING COMPANY DOVER HILLS DRIVE D.B. 18882, PAGE 2598 B.M. 2021, PAGE 2226 NEW LIGHT TOWNSHIP WAKE COUNTY, NORTH CAROLINA FEBRUARY 7, 2022 100 50 0 100 200 SCALE 1 "=100' SHEET 2 OF 4 DocuSign Envelope ID: 528AF400-D614-439F-B1A1-DCA68110534E CMF I P. ��JJJ CAWTHORNE, MOSS & PANCIERA, P.C. Professional Land Surveyors C-1525 333 S. White Street Post Office Box 1253 Wake Forest, N.C. 27588 (919)556-3148 SECTION A: SELFINSPECTION Self-Inspections are required during normal business hours in accordance vaith the table below. when adverse weather Or site conditions would pause the safe[ ofth, e insPc personnel Iobe In jeopardy,, Inspection mays delayedu [[M1e nextbusinessday on which It ih-1.to perform the inspeRlon. In addition, when a storm event of equal to or er than 1.d inch occurs outside of normal business Hours the selt-inspection shall be perform,dupon th,comt,d in th, t ofth, nextbusiness day. Any [line when Inspections were dais ed shall be noted n tb I t Record. NOTE: The min Insp-bn resell the r,q,,,,d 2 calentlar Day inspection requirement. SELF INSPECTION, RECORDKEEPING AND REPORTING SECTION B: RECORDKEEPING 1. E&SC Plan Documentation The approved [RSC plan es well as any approved devlation shall be kept on the site. The oved [&SC Ian must be ke t -lo-date throu hput the covers , u,d,, this e . Thor p pup g g p rm The following items pertaining to the plan shall be kept on site and available far nspection at all ti es during normal bus,,m ss hou 1.11 _ (b)AIF- g g sheen complete ( G sane, wmthe approves Fast (d) T mbbl,dawan g n-P-11-rePnrt (e)eC sM1ave been taken Ie 'he e 2. Additional Documentation to be Kept on Site n addition toth, E&SC pia, dowme d, a bove, the[.Mowing items s 11 be kept on the and ovailable fpr'mspectors at all times during normal business hours, unless the olvi- provides a it, lb-th, exemption based on unique site-Ifitlons that make this rag--nt not pm¢iczl, (a) Ih is General Permit aswelI as the Certlflcate of Coverage, after it is received. (bl Rmrdsof In Ad,ionsmade during[M1eprevioustwelve months. The permlltee she I cod Mo r,qu- obsI-atmns on th, Inspection Romrd Form prpvltlotl by th, Diviso'ors dills' lnspettlpn form that Includes all the required elements. use of FlFdtally-available records in lieu of lha mqulretl papercopies will be allowed it It. -otoprovide equal access and utility - the IF- .py records_ 3. Documentation to be Retained for Three Years All data used to complete the e-N01 and aftall inspection records shall be ma'mtained far a period of three Veers er project completion and made available upon request. )40 CFR 122 411 PART II, SECTION G. ITEM (1) DRAW DOWN OF SEDIMENT BASINS FOR MAINTENANCE OR CLOSE OUT 5ed'M ant b a sin s a n d tra s I- receive runoff from mains e s of one acre or ore It, l use outl11Itructuresthanvifndram water from th a surface when these J-1-1neeatobI,drawndt- foe ma'mtenance or close out unless thls Is Infeasible. ThegClrcumstances In which It A not feasible to withdraw water from the surface shall be rare (for example, times with e,,,d,d cold weather). N. dace wl[ndrawals from sediment basins shall b, allowed only when all Of th, following a,t,d have been met: lal The wit E&SC planautbority has been provided veith documentation pf the non -surface veimdraveal and the specific Fi pedoazorcpndihons in which iI.,It occur. The non -surface wimdrawal ;Hall not_ ot commence until the EAST plan aumnritI has approved mete Heinz, (b) The L.,s ace hdrawal has been reported as a n a ,bitted bvpess l n accodance with Part III, Section C, Itam(2)(c) and(d)of this permit, (d Dewatering di,charges are treated -1, --it, t0 minimize dbcharg,s of pbllutants f-Odb waterthat1, removed from th, sediment basin. Examples Of appropriate controls Include prop, IV ,t,d, d„Ign,d and maintained dewetering bnks welrt- , ana filtration ,,stems, (d) Vegeta d,upland areas of th, sites or a properly d,,igned stone pad is used to th, extent feasible at the outlet of the d--mg treatment devices described l n Mein(,) above, (el Velodty dissipation d icessuch a,-- dams sediment craps, a na clomp are provided at - discharge points of all dewatering devices, and (f) Sediment removed from the dF.111-C treatment devices detailed nitem(c)ahoveiz disposed of in a man Her that doe, not cause deposition of sediment into veaters of the IF,. -States. PART SELF INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. Occurrences that Must be Reported esshall iepoi L the following occurrences. (a) Visible sediment dePosltl0n in a stream or wetland, () OF P llf y Sgalnnsnr Wore. Thy less than 25 gallons butcannot I, Cleanedu 1th'n 24 hours, Th , sheen on surface water,(regardless of volume) O Thy elEd,10Of„t of surface waters(regardl,s, of volume). (c) Rel-, of M1azartlouss.IN-.ces In excess of reportable quantities under Section 311 At the Clean Water All (Ref. 4C CFR 110.3 and 40 CFR 11].3) or Section 102 of CERCIA ( f: 40 CFR 302.) G.S 3-21585 (d) Ant 'pared byp d nticipated bypasses (0) vnonpl-ti, with the conditions of IF,,erm ls pit I- may ondangor health enor [he 2. Reporting Ti-,-, and Other Requirements After a permit[,, becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office witM1ln the tmeframes and in accordance with the other requlremen[;listed below. Occu« ,neat outside normal business hour; may oI,, be rted to th, Department's Environmental Emerg,nry Center personnel at (ROO) 858-0368. (a) vl es (Art ery)an plact IF IF (b)oa spills ana 1(b)(c)ab k ,haau ncldde nnofthes ill orrelease. edate ume na-,Volume ana (, n roseette,dofthe bypa4sls(m,(3 CFR Ae m ease one luauon ofm nucpated qualiNand (bd)Zuna Iclpa 14, MR 41(m)(3)I or elett the hypa.atmdudesan evaluauon of the e)to R 1zz4t(i)in) te and the euwo e44i�(s)to Ide, IF ethe by NCGO1 SELF -INSPECTION, RECORDKEEPING AND REPORTING EFFECTIVE: 04/01/19 ;,O.,U��;��;,O,N AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH g the details and specifications on this plan skeet will result in the cd-r-it. tpi. , bet�ng considered compha it with the Gmu nd Stabih-t-and Matena is Handling t s of the NCGOl Construction General Permit (S-Ld., E and F respectively). The snail comply vdTh the Erosion antl Sediment Control approved bythe permittee plan delegated authority nevi ngj,b,dicton All detallsand specdf ns show nthisshee ppl, aependmg nn rite .ndainnt anathe delegated a ohndty ha.�nA jurisdictmn. SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Site Area Description Stabilize within this many[alendar days b- -id ng land disturbance Timeframe variations (a) P er dikes, es, dltchet,And 'slopes ] None (id H lgh Qualify Water None (NOW)Zones 7 (d Slope[neepertnan 5 Ifslpe a 10'or lessin tengths ndare p ,per than 2.1. 14 dasare ndl allowed (d) Slopes 3:1 to 4:1 14 -] tlays for slopes greater [Han 50In length ana with slope, steeper Man 4.1 -2 tlays for perimeter dikes, ,wale,, ditches, perimeter slopes a nd HOW z1. tlays for Fall, Lake wbter,n,d -] days for perimeter dikes, ,wales, (e) Ares, with slopes ditches, perimeterslopes and HQW Zones flatter[han 4:1 14 -lo days for Falls Lake watershed unless there is zero slope :After the permanent cessation of construe es, an a reds with temporary stabilization shall be converted to peon u�n�d snbllicatipn as soon as pLund racticeble but In n0 Case longertltan 90 celentlarr daYds aker[he (art land tllrtuding actNity. Temporary ground stab) lizatlonshall be maintained In a ma nnerto rentlerthe surface noble against acceleratetl erosion until ---ground sAttizalion Is a ieved. GROUND STABILIZATION SPECIFICATION Stabilize the ground sufficiently so that sin will not dislodge the soil. Use one fthe techniques In the table below'. POLYACRYLAMIDES(PAMS) AND FLOCCULANTS 1. Select flocculan[sthatareappr0prlateforthe s.iI,b,InX exp dd,ing oselecting III,,III,, th, . VC DOUR List ofA,pi d➢AM51Flocculdi Apply floccu isms at or before the inlets to Erosion and Sediment Control Measure,. 3. Apply noccvlantsat the mncentmtlonss tdh,dlnth, NCOWEListofAPpd- PAMS/Fbx Idnts and In accodance with the manufacturer's instmct,.ns. 4. Provide pI,nd,ng area for containment of treated Stormwater before dKIT, IS— offstte. 5. Store flocculan[, in leak -proof containers[nat are kept under storm -resistant cover tied b,ternndary,wtainmem EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain v,hide, and ,g p-tro preven[discharge ofilld, ovide drip pans under any stored equipment. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from [M1e project. 4 Collect all spent fluids store in separatec tamers and properly dispose as haaardous waste (recycle when ppssible).nn s. R move leak( rig vehides and construction e q ant From service until the problem hat been Corrected. 6_ used fuels lubricants coolants hydraulic fluids a rid other petroleum products ,a ecvding or d,,pb,,lCenter mat handles Ines, material,. er bury or burn waste, IN... titter and debris in approved waste containers. 2. ovideasuf0cient numberand size of waste containers leg dumprteF trash ecepbcle) on site to contain c.n,tmctlon and domestic wastes. 3. at least 501eetaveav from storm drain inlet; and surface other alternatives ere reasonably avails ble 4 ,that do not receive suhstantial a mounts of runoff f b. upland a easaand doesanot drain directly to a storm drain, stream or veetiand. S. e at the end of each workday and before storm events or nvine;econaarvcontainment Repair nr replace damaged watt, cnntamert. Anchor Al IllItems In wale, containers during times of high winds. 2. Empty wastecontainers as --it to prevent overflow. Clean up lm metl-lb, if ertmw. 8. Di,pasewa"dd. IT'it, at an approved di,p-If-lity. 3. On business days, clean up and dispose of wart, in designated waste containers. PAINT AND OTHER LIQUID WASTE of dump paint and other liquid waste Into storm dohs, Areams orwetlands_ to paint washouts 2 at least SO At aveav from storm drain inlets and surface nl s other site ve a reasonably available. 3. Cantainuliquid wastes In a controlled a red 4. Contain. -nest be OF,'d, AI ana d-d appropriately forth, needs ofsite. 5. Pr event the discharge ofsoaps,solvents,detergent, and otherllgbid wanes fmm TS PORTABLE I bll portable toilets on level grountl, at least 50 feet away from storm tlralns, .,eland, unless th-Is no altern ', reasons bly available. If 50 foot offsetattainable, provide relocation of portable toilet hFh.nd silt lance or place vet pad and su«ound with IF d bags ovide staking or anchoring of portable toilets during periods of h,gh.lnds or in high foot [raffle areal. 3. or Atabl,tt, - for l,aking a nd properlydispose of a It, l,ak,d mat,di 1. e a licensed sanitary wane hauler to remove leaking portable toilets and replace CONCRETE WASHOUTS of discharge conc*ece or cement slurry from cM1e site. 2. Dispose of, Or recyce settled­­d I- residue In accordancewith lorzl a nd sIat Aidwaste regulatlons a nd at an approved-lity. 3. Manage washout from mortar mixers In accodance with the aboveltem antl in addition place the mixer and a,soClaled materials on Impervious barrier and wlthln o[ perimeter ,It fence. 4. Install temppmry concrete washouts per local requirements, where applicable. It an method or produR iz to be used, contact your approval authorlty tar and approval. Iflocal standard details a re not a .lk,hle, use one At - I,, two s bF temporary Concrete washouts provided on mil detail. 5. eashouts for de. dng or rtoring def b-curb or sidewalk cow "`thin th, may not be pumped Into or d-ha ,dwm„roan drain system or mC,Ning,,,a,prlaCe waters_ oquin waste mu,t A, pumped out end removed from project. 6. seashouts at least 501-firgmstorm drain inlets and surface veaters Unless it o be shown that no other alternatives are reasonabiv evallable. At a mjn-nn, in,tbll protection of stone tlmin lnIeN,) Closest to the wash- hi,h could receive spills or overflow. 2. lnrate washout, In an easilyaad bleared, on level ground and Installs stone e ce pad in front ofth,washout. Addlonal controls may be required by the a pprovl rig a utM1orlty. 8. Install at least one sign directing -drete tracks to the washout wlthln the project s. Postslgnage O,it, washout itself to ldentlfy[M1ls location. 9. Remove leavings fmm the washy ,hen at approximately 75% Ipb,ty to ll colt verflow events. Replace the tars, s rid bags or other tempOmrystruc[uml Omponenls when no longer func[IOnal. 1Nhen utilising alternative or proprietary products, follow manufaI.-'. instructions. 10. At th, completion of the concrete work, remove remaining leavings and dispose of n approved disposal facility. Fill pit, If applicable, and stabillae any d lsturbance caused by removal of veashout. venh pmpedy nperat rig unm HERBICIDES, PESTICIDES AND RODENTICIDES AGEMELT 1. Sttand Ipply herbicidespesticdes and rodenticides in-brdance with label EARTHEN1.Show.rtockp,l, loceCKPILE ltre 1-- plans. locate ea rthen-material stockpile areas at least 2. Store h-dikes, pesticides a nd rpdenticides in thelrorig,n,l containers Ith the SO feet away from storm drain inlets, sediment basins, perlmecer sediment wncrols label which fists dlrectlons for use Ingredients and first old step, in rase of and surface veaters unless it can be sh..nno other alternatives are reazonablV ccidental poisoning. available' 3. Do not rtore herbldae,, IF, rid„and rodentlddes in areas where flOodlog is ckpile .,th bit fence Installed along toe olslope wltM1a minimum offset of possible or wheretli pill or may sleak Into wells, sc b-ter drains, ground water 2 mnvefeet from [beta, of p '"1l[e_whsurface water_Ifa spill occurs clean area immediately_ ovide stable none access oinen feasible. 4. tockplle these materials Onslte. 4. St, bll A,st.,kp,l,.[thin the tlmehames provided on this sheetand In accordance withthe approved plan a rid a ny additional requirements. Soil stabilization Is d m,d vegetative physical or chemical coverage techniques that will restrain accelerated HAZARDOUS AND TOXIC WASTE r non disturbed soils for temporary m n n c ntrol needs to des dnazardouz waste collettion n- gnate 2. Place M1a;ard0us waste containers underc Ontlary containment. 3. Do not store haudousChemlcals, drums or baggetl materials dlreRly on the ground. NCGO1 GROUND STABILIZATION AND MATERIALS HANDLING EFFECTIVE: 04/01/19 ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER A 0DOR«pL�gIp1T 110 TEIDC T IINND g �=r•) O 0 A gFNEY NAN ED Ell SEC'"ON A -A NDTND DEVICE tYX2Y 1f1 ` NQg1C�� ) 1. T1K ILGTpN DED]UfiD IN FIELD 2. THE CDNCRETE WAD 11CINICl11rER BEALL BE MAINTAINED YEW THE UDUD ANTI SON IErnHes - aP THE TTNOTNm CAPADTY. PLAN JUDIILTEIE WASHOUT SIINCIUE NEEDS TO BE C EARY YARNED EUTH SSHAIE NUTYD DEVICE. Ha DIAL ARES 0 O O D T p S C LYYD DW R RaTp 0 0 I .191E YlRwI M. ) 0 D n� 0 0 O O SECTON R-N SNpA48 (IYP.) tlOgS OR STARES 1�AD AL LOCATION OEINNINEO N CDTING YNUQD CXW"NA11 2 TIE CDNDEIE WARNYIT NDTND DEVICE (1B'1Q1' 1WL) STRUCTURES SHI BE NNNTAND �OQ JSMI6 �E CA➢ACITY ro PROVIDE ADECU M _ I A YNYUY 12 ELMaDaNCIETE WAS OUT STRUCTURE NEEDS TO BE tlEARY' NIJUED YTI 91DNAGE NDIID DEVICE ABOVE GRADE WASHOUT STRUCTURE NDT ro S:AIE N CA R 4S S l �i��,qL, "Y ��= �N19<Y�,9 SEAL - L-4665 c S 0 COO! %1�N PAR ,$Mfe ����, 2/8/2022 DocuSigned by: ( y , 60,av, Pay tom, �v. AFSDC 1951AA8410... SOIL AND EROSION PLAN FOR LOTS 75, Ill 78, 79, & 80 CAMBERLY SUBDIVISION OWNER: EXETER BUILDING COMPANY DOVER HILLS DRIVE D.B. 18882, PAGE 2598 B.M. 2021, PAGE 2226 NEW LIGHT TOWNSHIP WAKE COUNTY, NORTH CAROLINA FEBRUARY 7, 2022 100 50 0 100 200 SCALE 1 "=100' SHEET 3 OF 4 DocuSign Envelope ID: 528AF400-D614-439F-B1A1-DCA68110534E PERMANENT SEEDBED PREPARATION 1. INSTALL NECESSARY MECHANICAL EROSION AND SEDIMENTATION CONTROL PRACTICES BEFORE SEEDING, AND COMPLETE GRADING ACCORDING TO THE APPROVED PLAN. 2. UME AND FERTIUZER NEEDS SHOULD BE DETERMINED BY SOIL TESTS SOIL TESTING IS PERFORMED FREE OF CHARGE BY THE NO DEPT. OF AGRICULTURE. SOIL TESTING LABORATORY. DIRECTIONS SAMPLE CARTONS, AND INFORMATION ARE AVAILABLE THROUGH COUNTY AGRICULTURAL EXTENSION OFFICES OR FROM NCDA. BECAUSE THE NCDA SOIL TESTING LAB REQUIRES 1-6 WEEKS FOR SAMPLE TURN -AROUND, SAMPLING MUST BE PLANNED WELL IN ADVANCE OF FINAL GRADING. TESTING IS ALSO DONE BY COMMERCIAL LABORATORIES. 3. WHEN SOIL TESTS ARE NOT AVAILABLE FOLLOW RATES SUGGESTED IN THE PERMANENT SEEDING SCHEDULE ON THIS SHEET. APPLICATION RATES USUALLY FALL INTO THE FOLLOWING RANGES GROUND AGRICULTURAL LIMESTONE: UGHT TEXTURED, SANDY SOILS 1 - 1.5 TONS/ACRE HEAVY TEXTURED, CLAYEY SOILS 2 - 3 TONS/ACRE FERTIUZER: GRASSES: 600 - 1200 LB/ACRE OF 10-10-10 (OR EQUIVALENT) GRASS -LEGUME MIXTURES BOO - 1200 LB/ACRE OF 5-1G-10 (OR EQUIVALENT) 4. APPLY UME AND FERTIUZER EVENLY AND INCORPORATE INTO THE TOP 4-6 INCHES OF SOIL BY DISKING OR OTHER SUITABLE MEANS. OPERATE MACHINERY ON THE CONTOUR. 5, ROUGHEN SURFACES IN ACCORDANCE WITH THE NOTES ON SURFACE ROUGHENING ON THIS SHEET. 6. COMPLETE SEEDBED PREPARATION BY BREAKING UP LARGE CLODS AND RAKING INTO A SMOOTH, UNIFORM SURFACE (SLOPES LESS THAN 311.) FILL IN OR LEVEL DEPRESSIONS THAT CAN COLLECT WATER. BROADCAST SEED INTO A FRESHLY LOOSENED SEEDBED THAT HAS NOT BEEN SEALED BY RAINFALL. TEMPORARY SEEDBED PREPARATION 1.A GOOD SEEDBED IS WELL PULVERIZED, LOOSE, AND UNIFORM. 2.UMING - APPLY UME ACCORDING TO SOIL TEST RECOMMENDATIONS. IF THE PH (ACIDITY) OF THE SOIL IS NOT KNOW. AN APPLICATION OF GROUND AGRICULTURAL UMESTONE AT THE RATE OF 1 - 1.5 TONS/ACRE ON FINE TEXTURED SOILS AND 2-3 TONS/ACRE ON COARSE TEXTURED SOILS IS USUALLY SUFFICIENT. APPLY UMESTONE UNIFORMLY AND INCORPORATE INTO THE TOP 4-6 INCHES OF THE SOIL SOILS WITH A PH OF 6 OR HIGHER NEED NOT BE LIMED. 3.FERTILIZER - BASE APPLICATION RATES ON SOIL TESTS WHEN THESE ARE NOT POSSIBLE APPLY A 10-10-10 GRADE FERTILIZER AT 700 - HOOT LB/ACRE BOTH FERTILIZER AND LIME SHOULD BE INCORPORATED INTO THE TOP 4-6 INCHES OF IF A HYDRAUUC SEEDER IS USED, DO NOT MIX SEED AND FERTILIZER MORE THAN 30 MINUTES BEFORE APPLICATION. 4.SURFAGE ROUGHENING - IF RECENT TILLAGE OPERATIONS HAVE RESULTED IN A LOOSE SURFACE ADDITIONAL ROUGHENING MAY NOT BE REWIRED, EXCEPT TO BREAK UP LARGE CLODS IF RAINFALL CAUSES THE SURFACE TO BECOME SEALED OR CRUSTED, LOOSEN IT JUST PRIOR TO SEEDING BY DISKING, RAKING, HARROWING, OR OTHER SUITABLE METHODS GROOVE OR FURROW SLOPES STEEPER THAN 3:1 ON THE CONTOUR BEFORE SEEDING. SEE OTHER REQUIREMENTS FOR SURFACE ROUGHENING ON THIS SHEET. TEMPORARY SEEDING SCHEDULE (TO TEMPORARILY STABIUZE DENUDED AREAS THAT WILL NOT BE BROUGHT TO FINAL GRADE FOR A PERIOD OF 15 WORKING DAYS) SEEDING DATES DECEMBER 1 THRU APRIL 15 SEEDING MIXTURE SPECIES RATE RATE (LBS/AC) RYE (GRAIN) 120 ANNUAL LESPEDEZA (KOBE) 50 OMIT ANNUAL LESPEDEZA WHEN DURATION OF TEMPORARY COVER IS NOT TO EXTEND BEYOND JUNE SOIL AMENDMENTS: FOLLOW SOIL TESTS OR APPLY: 2,0DO LBS/AC UMESTONE AND 750 LEI 10-10-10 FERTILIZER MULCH: 4.000 LBS/AC — ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL MAINTENANCE REFERTIUZE IF GROWTH IS NOT FULLY ADEQUATE RESEED, REFERTIUZE AND MULCH IMMEDIATELY FOLLOWNG EROSION OR OTHER DAMAGE SEEDING DATES APRIL 15 — AUGUST 15 SEEDING MIXTURE SPECIES RATE (LBS/AC) GERMAN MILLET 40 SOIL AMENDMENTS: FOLLOW SOIL TESTS OR APPLY. 2,000 LBS/AC UMESTONE AND 750 LEI 10-10-10 FERTILIZER MULCH: 4.000 LBS/AC — ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OF A MULCH ANCHORING TOOL A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL MAINTENANCE REFERTIUZE IF GROWTH IS NOT FULLY ADEQUATE RESEED, REFERTIUZE AND MULCH IMMEDIATELY FOLLOYANG EROSION OR OTHER DAMAGE SEEDING DATES AUGUST 15 THRU DECEMBER 15 SEEDING MIXTURE SPECIES RYE (GRAIN) RATE (LBS/AC) 120 SOIL AMENDMENTS: FOLLOW SOIL TESTS OR APPLY. 2,000 LBS/AC UMESTONE AND 1000 LB AC 1G-1G-10 FERTIUZER MULCH: 4,OD0 LBS/AC — ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OF A MULCH ANCHORING TOOL A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL MAINTENANCE REPAIR AND REFERTIUZE DAMAGED AREAS IMMEDIATELY. TOPDRESS WITH 50 LEI OF NITROGEN IN MARCHAF IT IS NECESSARY TO EXTEND TEMPORARY COVER BEYOND JUNE 15, OVERSEED WITH 50 LEI KOBE IN LATE FE13RUARY OR EARLY MARCH NEW STABILIZATION TIME FRAMES Seceding Schedule For Sholders, Side Ditches, Slopes (Max 3:1) Date Type Planting Rate Aug 15-Nov 1 Tall Fescue 3001bs/acre Nov 1-Mar 1 Tall Fescue & Abruzzi Rye 3001bs/acre Mar 1-Apr 15 Tall Fescue 3001bs/acre Apr 15-Jun 30 Hulled Common Bermudagrass 251bs/acre 125 Ibs/acre (Tall Fescue); 35 Tall Fescue AND Browntop Ibs%acre (Browntop Millet); 30 Jul 1-Aug 15 Millet or Sorghum -Sudan Hybrids— Ibs%acre (Sorghum -Sudan Hybrids) For Sholders, Side Ditches, Slope (3:1 to 2:1) Date Type Planting Rate Sericea Lespedeza (scarified) Mar 1-Jun 1 and use the following 50lbs/acre (Sericea Lespedeza); combinations: Mar l-Apr15 Add Tall Fescue 1201bs/acre Marl -Jun 30 Or add Weeping Love grass 101bs/acre Marl -Jun 30 Or add Hulled Common 25lbsfacre Bermudagrass 120Ibs/acre (Tall Fescue); 35 Tall Fescue AND Browntop Ibs/acre (Browntop Mullet); 30 Jun 1-Sept1 Mullet or Sorghum -Sudan Hybrids— Ibs%acre (Sorghum -Sudan Hybrids) Sericea Lespedeza(unhulled- 70lbs/acre(Sericea Lespedeza); Sept 1-Mar 1 unscarified) ANDTaII Fescue 120lbsjacre (Tall Fescue) Nov 1-Marl AND Abruzzi Rye 1 25I bsJacre Consult S&EC Environmental Engineers for additional information concerning other alternatives for vegetation of denuded areas. The above vegetation rates are those that do well under local conditions; other seeding rate combinations are possible. ***TEMPORARY: Reseed accordi ng to optimum season for desi red permanent vegetation. Do not allow temporary cover to grow more than 12" in height before mowing; otherwise, fescue may be shaded out. SITE AREA DESCRIPTION STABILAZATION TIME FRAME EXCEPTIONS PERIMETER DIKES SWALES DITCHES & SLOPES 7 DAYS NONE HIGH QUALITY WATER (HOW) 7 DAYS NONE SLOPES STEEPER THAN 3:1 7 DAYS IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED. SLOPES 3:1 OF FLATTER 14 DAYS 7 DAYS FOR SLOPES GREATER THAN 50' IN LENGTH. ALL OTHER AREAS WITH SLOPES WITH SLOPES FLATTER THAN 4:1 14 DAYS NONE, EXCEPT FOR PERIMTER HOW ZONES NOTIFICATION OF LAND RESOURCES SEDIMENT AND EROSION CONTROL SELF —INSPECTION PROGRAM: THE SEDIMENT POLLUTION CONTROL ACT WAS AMENDED IN 2006 TO REQUIRE THAT PERSONS RESPONSIBLE FOR LAND DISTURBING ACTIVITIES INSPECT A PROJECT AFTER EACH PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENT CONTROL PLAN IS BEING FOLLOWED. RULES DETAILING THE DOCUMENTATION OF THESE INSPECTIONS TOOK EFFECT OCTOBER 1, 2010. THE SELF INSPECTION PROGRAM IS SEPARATE FROM THE WEEKLY SELF MONITORING PROGRAM OF THE NPDES PERMIT FOR CONSTRUCTION ACTIVITIES. THE FOCUS OF THE SELF INSPECTION REPORT IS THE INSTALLATION AND MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES ACCORDING TO THE APPROVED PLAN. THE SELF INSPECTION REPORT FORM IS AVAILABLE AS AN EXCEL SPREAD SHEET FROM IF YOU HAVE ANY QUESTIONS OR CANNOT ACCESS THE FORM PLEASE CONTACT THIS OFFICE AT (919) 791-4200. i SEAL S L-4685ir i Si Q�Z `sti l;' v �O�p SU'Rv,,,� \� \\\',,,, 2/8/2022 DocuSigned by: AF5DC1951AA8410... SOIL AND EROSION PLAN FOR LOTS 75, 77, 78, 79, & 80 CAMBERLY SUBDIVISION OWNER: EXETER BUILDING COMPANY DOVER HILLS DRIVE D.B. 18882, PAGE 2598 B.M. 2021, PAGE 2226 NEW LIGHT TOWNSHIP WAKE COUNTY, NORTH CAROLINA FEBRUARY 7, 2022 50 25 0 50 100 SCALE 1 "=50' SHEET 4 OF 4