Loading...
HomeMy WebLinkAboutNCC222267_Certificate of Coverage_20220624Certificate of Coverage STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES GENERAL PERMIT NO. NCG010000 NC Reference No. NCG01-2022-2267 Certificate of Coverage No. NCC222267 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Toyota Battery Manufacturing, Inc. is hereby authorized to discharge stormwater associated with CONSTRUCTION ACTIVITIES to surface waters of North Carolina from a site located at: Greensboro -Randolph Megasite Phase 2B Old US-421 Rd Liberty Randolph County in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in N.C. General Permit No. NCG010000. This Certificate of Coverage is affiliated with E&SC Plan Project No. RANDO-2022-030 This Certificate of Coverage shall become effective 6/24/2022. This Certificate of Coverage shall remain in effect until rescinded or expired. This Certificate of Coverage will expire on the anniversary of its effective date unless it is renewed by payment of the annual administration and compliance fee. for Brian Wrenn Director, Division of Energy, Mineral, and Land Resources By the Authority of the Environmental Management Commission