Loading...
HomeMy WebLinkAboutSW6220501_Design Calculations (Storm Drain)_20220621" ' 1 " ' • gill CT NAME view Park DESIGN PHASE PRELIM CONSTR / X / REVISION ION 7HoeMills, North Carolina RECORD OTHER (SPECIFY) n= 0.013 g= 226 h= 26 STORM DRAINAGE SCHEDULE CONTINUED AREAS INLETS INLET AREA AC INLET Cc RUNOFF COEFF. INLET DISCHARGE CFS) Q (+) UPSTREAM BYPASS (CFS) Q(-) INLET BYPASS (CFS) CAPTURED INLET DISCHARGE (CFS) TOTAL AREAS (AC Tc TIME OF CONC. MIN I INTENSITY IN/HR Cc RUNOFF COEFF. FROM TO 0.35 3.07 0.00 0.00 3.07 0.70 0.95 0.00 0.11 0.84 0.50 0.35 0.11 0.01 0.34 0.90 0.14 0.00 0.00 0.14 0.90 0.11 0.00 0.00 0.11 0.90 0.11 0.00 0.00 0.11 0.55 0.43 0.03 0.02 0.41 DI CI6 DI 2.19 2.19 5.00 7.29 0.35 CI6 CI7 CI6 0.34 2.53 5.37 7.20 0.40 CI7 CI8 CI7 0.12 2.65 5.51 7.17 0.40 CI8 CI CI8 0.04 2.69 5.57 7.16 0.41 CI CI10 CI 0.03 2.72 5.67 7.14 0.41 CI 10 CI11 CI 10 0.03 2.75 5.96 7.07 0.42 CI 11 P012 CI 11 0.18 2.93 6.06 7.05 0.43 0.75 0.40 0.06 0.02 IEEE ClEll] 14 C113 Cl 14 0.47 0.40 0.00 0.69 0.47 5.00 7.29 0.40 Cl 13 CI7 Cl 13 0.20 0.50 0.00 0.38 0.67 5.11 7.27 0.43 0.52 0.03 IEEE ClEEI 15 CI Cl 15 0.21 0.55 0.06 0.49 0.21 5.00 7.29 0.55 0.84 0.00 DI 16 P017 DI 16 0.35 0.60 0.00 0.84 0.35 5.00 7.29 0.60 0.47 0.33 0.03 0.44 0.00 0.33 CI3 CI CI3 0.13 0.90 0.00 0.13 5.00 7.29 0.90 CI 1 PO 2 CI 1 0.07 0.90 0.08 0.20 5.12 7.26 0.90 0.61 EEI 0.05 IEEE CI4 CI CI4 0.17 0.90 0.00 0.56 0.17 5.00 7.29 0.90 3.96 0.00 0.00 R118 P019 R118 1.00 0.99 3.96 1.00 5.00 7.29 0.99 1722 Storm System.xim 10-YEAR Date: 6/21/2022 Time: 7:48 AM Page 1 of 4 • " ■ " ' ■ " ' PROJECT NAME Southview Park DATE 02-11-22 PROJECT NO 1722 DESIGN PHASE PRELIM CONSTR / X / REVISION / / LOCATION Ho a Mills North Carolina BY CJP RECORD / / OTHER CHECKED BY CSB (SPECIFY) n= 0.013 9= 226 h= 26 STORM DRAINAGE SCHEDULE - CONTINUED Q DISCHARGE CFS Q SIDE- STREAM CFS SLOPE DIA.V INFPS *12.9 FULL LENGTH FT SEGMENT TIME MIN UPPER INV. FT LOWER INV. FT UPSTREAM TOP ELEV. FT FROM TO 128 0.37 206.50 210.38 205.32 212.26 204.93 211.43 204.30 211.43 203.60 210.53 203.50 209.89 200.00 209.89 DI CI 5.59 0.00 0.0118 155.7 208.00 206.25 CI CI 7.24 0.00 2.09 0.84 0.00 0.0151 187.3 62 0.14 CI CI 9.73 0.0150 18 7.3 26 0.06 205.32 204.93 CI CI 10.81 0.0147 18 12.7 7.2 43 0.10 CI CI 10 10.98 0.0047 24 15.5 4.9 85 0.29 204.00 203.60 CI 10 CI11 11.10 0.00 0.0038 24 14.0 4.5 26 0.10 CI 11 P012 11.77 0.00 0.0692 24 59.5 18.9 51 0.04 203.50 26 43 211.17 211.17 CI 14 CI 13 1.37 2.09 0.00 0.0062 15 5.1 4.1 0.11 207.67 207.51 CI 13 CI 0.00 0.0152 15 8.0 6.5 0.11 207.51 206.86 0.84 26 211.34 CI 15 CI 0.00 0.0062 15 5.1 4.1 0.11 207.84 207.68 96 209.45 DI 16 P017 1.53 0.00 0.0522 15 14.8 12.0 0.13 205.00 200.00 30 13 208.54 208.20 CI CI 0.85 0.00 1.12 0.0066 15 5.3 4.3 0.12 204.80 204.60 CI 1 PO 2 2.42 0.0461 15 13.9 11.3 0.02 204.60 204.00 1.12 30 El 208.54 CI CI 0.00 0.0066 15 5.3 4.3 0.12 204.80 204.60 111 205.00 RI 18 P019 13.55 0.00 0.0090 24 21.5 6.8 0.27 202.50 201.50 1722 Storm System.xim 10-YEAR Date: 6/21/2022 Time: 7:48 AM Page 2 of 4 n= 0.013 9= 226 h= 26 Cl COVER BOX COVER BELOW SIDESTREAM BEND DEPTH SUBGRADE SUMMATION LOSS 8" CFS K FROM TO DI CI6 2.38 0.00 0.00 0.00 CI6 CI7 6.01 3.38 0.00 0.70 CI7 CI8 6.11 3.49 2.09 0.70 CI8 CI 6.50 3.88 2.93 0.55 CI CI 10 6.53 3.41 2.93 0.55 CI 10 CI 11 6.29 3.16 2.93 0.70 CI 11 PO 12 6.39 3.26 2.93 0.55 Cl 14 Cl 13 3.50 1.13 0.00 0.00 Cl 13 CI7 3.66 1.29 0.00 0.55 Cl 15 CI 3.50 1.13 0.00 0.00 DI 16 PO 17 4.45 2.07 0.00 0.00 CI3 CI 3.74 1.36 0.00 0.00 CI 1 PO 2 3.60 1.22 1.12 0.55 CI4 CI 3.74 1.36 0.00 0.00 RI 18 PO 19 2.50 0.63 0.00 0.00 1722 Storm System.xim 10-YEAR Date: 6/21/2022 Time: 7:48 AM Page 3 of 4 STORM DRAINAGE /HYDRAULIC GRADE LINE DATE ANALYSIS r 02-11-22 PROJECT NAME PROJECT NO Southview Park 1722 LOCATION BY Hope Mills North Carolina CJP CHECKED BY n= 0.013 9= 226 h= 26 HYDRAULIC GRADE LINE - CONTINUED OUTLET W.S. ELEV FT INLET W.S. ELEV. FLOW CONDITION CONTROL FREE- BOARD FT HGL TO CROWN COMMENTS CAPACITY VS DISCHARGE FROM TO OUTLET INLET USE CONTOL CONTROL FT FT FT DI CI6 208.75 209.89 209.52 209.89 OUTLET 0.48 (0.64) OK 1.42 CI6 CI7 208.12 208.75 207.72 208.75 OUTLET 207.38 208.12 OUTLET 207.29 207.29 INLET 3.51 (1.00) OK 5.66 CI7 CI8 207.29 208.12 3.31 (1.30) OK 3.14 CI8 CI9 205.83 206.95 4.14 (0.86) OK 1.94 CI9 Cl 10 205.42 205.83 205.53 Cl 10 Cl 11 205.11 205.42 205.14 Cl 11 PO 12 202.50 202.88 205.11 WSE Cl 14 Cl 13 208.51 208.12 208.53 208.35 Cl 13 CI7 208.22 208.26 208.68 ClEll 15 CI9 208.69 208.49 205.83 F OUTLET 4.70 0.17 OK 4.52 205.42 OUTLET 4.47 0.18 OK 2.93 205.11 INLET 4.78 0.39 OK 47.72 202.50 208.53 OUTLET 2.64 0.39 OK 3.70 208.26 INLET 2.91 0.50 OK 5.87 DI 16 P017 202.50 202.57 205.69 205.69 INLET 3.76 WSE 202.50 205.61 205.39 Cl3 Cl1 205.60 205.61 205.45 OUTLET 2.93 Cl1 P02 205.00 205.09 205.39 INLET 2.81 205.61 Cl4 Cl1 205.63 205.46 205.63 OUTLET 2.91 RI 18 PO 19 203.10 203.67 204.30 204.30 INLET 0.70 0.56 OK 13.23 0.44 OK 4.41 0.46 OK 11.44 0.42 OK 4.15 0.20 OK 7.92 J PHASE 9 R /X/ ON tD FY) - DESIGN CRITERIA: 1. DESIGN FOR THE 10 YR STORM 2. ASSUME TIME OF CONCENTRATION TO AN INDIVIDUAL INLET = 5 MIN. (Unless otherwise noted) 3. INTENSITY = g/(h+T), FOR 10 YR STORM (g and h were derived from Raleigh -Durham Intensity - Duration -Frequency Charts, REF: NC Erosion and Sediment Control Planning and Design Manual) 4. MANNINGS "n" FACTOR= 0.013 5. RUNOFF COEFICIENT Cc=0.50 (Per CR-7107) 1722 Storm System.xim 10-YEAR Date: 6/21/2022 Time: 7:48 AM Page 4 of 4