Loading...
HomeMy WebLinkAboutCape Fear Steam Station (15)ecipi`tion Frequency Data Server http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.huin ?lat--35.6153&... NOAA Atlas 14, Volume 2, Version 3 i Y. Location name: Sanford, North Carolina, US" , Coordinates: 35.6153, -79.0955 Elevation: 237 ft* yrs _ 'source Google Maps POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T Paaybok, MYekta, and D. Riley NOAH, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS -based point precipitation frequency estimates with 90% confidence intervals (in inches)' uratiorr Average recurrence interval (years) 1 �2 10 �25 50 100 200 500 1000-I __ I 0.420 0A95--'[--0-.574---[ 0.632 0.696 0� 0.781 0.816 0.856 0.885 I 5 -min 0.384-0.461)1(0 453.0.544)1(0.524-0.630) (0.576-0.692) (0.631-0.762)x(0.669-0.810) (0.702-0.854) (0.730 0.893) (0.758-0.937) (0.779-0.970) Fi 0-min 0.671 0.792 0.919 1.01 7.11 1.18 1.24 129 1.35 1.39 (0.613-0.736) (0.724-0.871) (0.839-1.01)' (0.921-1.11) (1.01-1.22) (1.06-1.29) (1.11-1.36) (1.11 6-1.42) (1.20.1.48) (1.23-1.53) 15 -min 0.838 0.996 116 F 1.28 1.41 1.49 1.57 1.63 1.70 1.75 1(0.766-0.920)110-1.09) (0.91 10-1.09) , (LI 06-1.28) (1.16-1.40) (1.27-1.54) (1.35-1.63) 1 (1.41-1.72) (146-1.79) (1.51-1.86) (1.54-1 92) 30 -min 1.158 1.65 1.85 2.08 1.31.26-1.51) f 2.25 2.40 2.54 2.71 2.83 (1.05-1.26) ( (1.51-1.81) (1.69-2.03) (1.89-2.28) (2.03-2.46) (2.16-2.63) (2.27-2.78) (2.4D-2.97) (2.49-311) 60 -min 1.43 (1.31-1.57) 1.73 F 2.12 F 2.41 2.77 (1.58-1.90) (1.93-2.33) (2.20-2.64) (2.52-3.04) F 3.05 (2.75-3.33) 3 31 (2.97-3.62) 3.56 (3.19-3.90) 3.89 (3.45-4.26) 4.14 (3.644.53) 1.68 2 2.04 2.53 2.80 3.38 3.76 4.13 4.50 4.88 5.36 -hr (1.53-1.87) (1.85-2.25) (2.30-2.80) (2.63-3.21) (3.04-3.74) (3.374.16) (3.67-4.56) (3� (4.36-5.50) (4.65-5.92) 1.79 3 -hr (1.63-1.98) 2.16 2.69 3.12 3.67 1 (1.97-2.40) (2.45-2.98) (2.82-3.44) (3.31-4.05) 4.11 (3.684.54) 4.56 (4.05-5.03) 5.02 (4.42-5.53) 5.64 (4.91-6.22) 6.14 (5.29-6.77) 22.14 2.59 3.23 3.74 4.43 4.98 5.55 6.14 6.95 7.60 FG -hr (t" 96-2.36) F(2.32759 5) (291 5-355) (3.40-4.11) (4.00-4.85) ) (4.47-5.46) (4.94-6.07) (5.41 6.71) (6.04-7.59) (6.52-8.31) 12-hr 2.54 (2.32-2.79) 3.07 3.85 4.48 .35 1(2.81-3.38) 1 (3.514.24) (4.074.93) [(41"2-5,86) 6.06 (5.42-6.63) ; 6.80 (6.02-7.42) 7.58 (6.64-8.27) --- 8.68 (747-9.46) 9.57 (8.12-10.4) 2.95 24 -hr (276-3.16) - 3.56 4.47 5.19 . (3.3443.82) F(4.18-4.79)()4.84-5.55 (5.73-0.59) 6.93 1 (6.44-7.41) 7.72 1 (7.15-8.26) 8.53 (7.88-9.13) 9.65 (8.87-10.3) 10.5 (9.65-11.3) 2 -day 3.43 (3.20.3.68) 4.145.16 F 5.96 7.04 (3.81 7-4.44) (4.81-5.54) (5.54-6.38) (6.5' 3-7.54) F 7.88 (7.30.8.46) F 8.76 (8.09-9.40) 9.66 (8.89-10.4) 10.9 (9.97-11.7) 11.9 (10.8-12.8) �- 3.64 3 -day (3.39-3.90) 4.37 5.42 6.25 7.37 (4.084.68) (5.05-5.81) (5.81-6.69) (6.83-7.89) 28 6 (7.63-8.84 . - 9.16 (8.44-9.82) 10.1 (9.28 10 8) 11.4 (10.4-12.2) 12.4 -1 (11.3-13.3) 4 -day 3.84 4.61 5.68 6.54 7.70 I ( 8.62 9.57 10.5 11.9 12.9 (3.584.11) (4.304.93) (5.30-6.08)(6.0".99) (7.13-8.24) (7.95-9.23) (8.80-10 2) (9.67-11.3) (10 8-- (11.7-13 9) 4.42 ff 5.27 6.42 7.33 8.58 9.58 10.6 11 6 1 13.1 4 2 [(13'0-;5.2) 7 -day 1(4.144.72) (4 93-5.63) (6.00-6.85) (6.85-7.82) 1(8.00-9.15) (8.90-10.2) (9.81-11.3) (10.8-12.4) (12.0-14.0) 10 -da 5.04 y (4.74-5.37) 6.00 7.21 8.16 9.44 (5.64 6.39) (6.77-7.67) (7.66-8.69) (8.83-10,1) 10.5 F(9 .74-11.1) 11.5 (10.7-12.2) 12.b (11.6 13.3) 13.9 (12.8-14.9) S. F(13'8 16.0) I 20 -day 677 (6.31 8-7.19) ,1(7.53-8.48) 7.99 9.44 10.6 12.1 (8.88-10.0) (9.95-11.2) (11.4-12.9) 13.3 I (12.5-14.2) 14.6 (13.6-15.5) --15.8 (14.7-16.8) 17.5 (16.2-18.6) 18.8 (17.320.0) 8.40 30 9.88 11.5 1 14.4 15.6 I 16.9 18.2 19.8 F--21.1 -day (793-890) (9.32-10.5) (10.8-12.2) (12.0-13.5) I (13.5-15.3) (14.7-16.6) (15.8-18.0) (17.0-19.3) (18.4-21.1) 19.622.5) 45 -day 10.7 12.6 14.4 15.8 17.6 18.9 20.3 21.6 23.3 24.6 1 (10.2-11.3) (11.9-13.2) (13.6-15.1) (14.9-16.6) (16.6-18 5) I (17.9-20.0) i (19.1-21.4) (20.3-22.8) (21.8-24.7) (23.0-26.1) 60 -da 12.8 y (12.2-13.5) 14.9 16.9 18.4 20.3 (14.2-15.7) (16.1-17.8) (17.5-19.3) 1 (19.3-21.4) 21.8 1 (20.6-23.0) 23.2 1 (21.9-24.5) 24.6 (23.2-25.9) 26.3 1 (24.B-27.8) 27.7 (26.0-29.3) I I 1 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable mabmum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical of4 9/27/2011 11:49 AM TABLE OF CONTENTS STORMWATER MANAGEMENT NARRATIVE 'SOILS INFORMATION COMPOSITE RUNOFF CURVE NUMBERS RAINFALL DATA SITE RUNOFF HYDROGRAPHS BIO -CELL, DESIGN AND ROUTING SUPPLEMENTAL DATA NCDWQ FORMS } DRAINAGE AREA EXHIBITS SITE PLAN AND SWM DETAILS SHEETZ KING,, NC STOKES COUNTY, NC Project # 10-139 ecipitahorj Frequency Data Server http //hdsc nws noxa gov/hdsc/pfds/pfds_printpage html?lat=35 61'53& PDS -based depth -duration -frequency (DDF) curves Coordinates 35 6153, -79 0955 30 25 c 5 0 30 25 S r 20 a - v 0 15 Gj 10 0 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval(years) NOAANNWS/OHD)HDSC Created (GMT) Tue Sep 27 15 48 16 2011 Back to Top Maps & aerials of 4 Average recurrence interval (years) — 1 2 — 5 — 10 25 50 100 200 500 1000 Duration — 5 -min — 2 -day — 10 -min — 3 -day — 15 -min — 4 -day — 30 -min — ?-day — 60 -min E E E = E L L L L fp (0 ry "O -O N rp -O "� N f0 '9'Y-9 rp ,IO U1 6 LA p 6 NL A k6 N ,� V N N N1 V t` O O O U Vr-4 0, rn rn Duration 30 25 S r 20 a - v 0 15 Gj 10 0 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval(years) NOAANNWS/OHD)HDSC Created (GMT) Tue Sep 27 15 48 16 2011 Back to Top Maps & aerials of 4 Average recurrence interval (years) — 1 2 — 5 — 10 25 50 100 200 500 1000 Duration — 5 -min — 2 -day — 10 -min — 3 -day — 15 -min — 4 -day — 30 -min — ?-day — 60 -min — 10 -day — 2 -hr — 20 -day — 3-411 — 30 -day — "I — 45 -day, — 12 -hr — 60 -day — 24 -hr 9/27/2011 11'49 AM -1, 3'AI1VUUVN 1N3W3`:JV'NVIN U-31MMOTS ecipitat>olo Frequency Data Server 1 arna crala man http //h6c nws°noaa gov/hdsc/pfds/pfds_printpage html9lat=35 6153& "' of 9/27/201°l 11 49 AM `INTRODUCTION This project is the,construction of an approximately 6,000 square foot Sheetz convenience store and gas station `in the Northeast•quadrant of the intersection of King Street (;Old U S Highway 52) and Mountain View Road', within the City Limits of King, NO The site is 2 087 acres Land disturbance will be limited to the areas of the building / parking area and an off-site bioretention facility 'The Stdrmwater Management system will receive runoff from all impervious areas of the site plus the area of the biocell itself (2 27 acres) All off-site runoff will be diverted around `the site and the bioretention area The existing site is about' 20% impervious cover consisting of a building with associated asphalt parking areas Runoff from this -,site is not currently being managed for quality or quantity The proposed stormwater management,system consists of one 6000 square foot bioretention cell This cell is designed provide quality treatment of runoff,forthe first one inch of rainfall and to remove 85% of TSS and also provide retention for the peak attenuation of the one year, 24 hour storm METHODOLOGY Existing and proposed hydrologic computations were performed using the Soil Conservation - Service's Technical Release No 55 (TR -55)' Time of concentration and runoff curve numbers (CN) were developed by the methodology in TR -55 A time of concentration of 5 minutes was used in the calculations since the, calculated time of concentrations are unrealistic for small travel paths which result from this small project site The USDA Soil Conservation Service's website (Soil Survey) 2 was, used to determine the existing'soil group classifications Soils present on this site have a hydrologic soils group classification of -'B' The'soil types present on the site and a brief description are as follows Soil Name and Map Symbol, Hydrologic Soil Group CeB2 —Clifford sandy clay loam, 2-8% slopes "B" FpC2 — Fairview -Poplar Forest complex; 8-15% slopes "B" The existing site is commercial in nature Open, fair conditions were used to classify pervious areas in determining the composite runoff Curve Numbers for both the existing and proposed site The existing site drains to the east to a small tributary of'Muddy Creek The assumed drainage area for the existing condition is not an actual drainage area for the existing site but rather the area that matches,the post-development'drainage area in, order to allow for direct comparison of the pre and post -development water quality conditions All off-site runoff will be diverted around the bioretention cell Rainfall data used in the hydrologic analysis for the project was taken from Point Precipitation Frequency Estimates From NOAA ATLAS 14 4, provided by the NOAA website Hydrograp'hs follow the SCS Unit Hydrograph Method as outlined in National Engineennng, Handbook3, (NEH-4) Hydrographs were calculated based on a shape factor of 484; using the computer modeling system in the software Hydraflow Hydrographs originally produced by Intellisolve and, now distributed through Autocad`Civil, 3D Pipe flow from the stormwater management system was calculated under both inlet and outlet control,'with the lesser ofrthe two,outflows taken as,the control A weir coefficient of 3 0 was used Storm h,ydrograph routing through the Bioretention system was performed using the Storage Indication Method as outlined in NEH-4 A brief summary of the routing results are included at the end of'this narrative Detailed routing calculations are included in the appendices fj. �