Loading...
HomeMy WebLinkAboutNCG120101_Mayo Monofill Monitoring COC Modification_20140520Fit CD North Carolina Department of Environment and Natural Resources Pat McCrory Governor William J. Thacker Duke Unergy Progress, Inc, Mayo Steam Electric Plant 10660 Boston Road Roxboro, NC 27574 Dear Mr. Thacker - John E. Skvarla, III Secretary May 20, 2014 subject; General Permit: No. NCO120000 Mayo Steam Plant: MAn0ffll CBC NC6120101 Person County We received your request to modify the monitoring provisions in the above permit Certificate of Coverage (COC) on May 15, 2014. You requested to delay the initial sampling period of several of the additional parameters by six months to allow time for the monofill to begin full operation. Your request has been approved, and the modified monitoring schedule is attached. Please replace the second page of your COC with the enclosed revision. This permit does not affect the legal requirements to obtain other permits which may be required by the Division of Energy, Mineral and Land Resources, or permits required by the Division of Water Resources, Coastal Area Management Act, or any other federal or local governmental permit that may be required. If you have any questions concerning this permit modification, please contact Bradley Bennett at telephone (919) 807-6378, or Bethany Georgoulias at telephone (919) 807-6372. Sincerely, for Tracy E. Davis, P.E., CPM cc: Toby Vinson, Land Quality Section Dave Parnell, Raleigh Regional Office Autumn Romanski, DWR Raleigh Regional Office Sergei Chernikov, DWR Water Quality Permitting Section Stormwater Permitting Program Files DWR Central Files enclosure Division of Energy, Mineral, and Land Resources Energy Section • Geological Survey Sectlon - Land Quallty Section 1612 Mail Service Center, Raleigh, North Carolina 27699-1612.919-707-92001 FAX: 919-715-8801 512 North Salisbury Street, Raleigh, North Carolina 27604 • Internet: http:l/portal,ncdenr.ora/web/Ir/ An Equal Opportunity l Affirmative Action Employer — 50% Recycled 110% Post Consumer Paper TAW I Anolytical MonitaringRequirements 9tN v— VIs a Chemical Ox en Demand mgzl semi-annual Grab SDO Fecal Coliform # Per 100 ml semi-annual - Grab SDO Total Sus ended Solids ma/l semi-annual - nnual 'Grab SDO Arsenic LAO mg1I semi-annual Grab SDIO, I Selenium (Se mg/l semi-annual Grab SPO -15 -Boron (8 )5 mg/1 semi-annual G-rab SDO "20' = S.0, semi-annual y Grab SDO Cond uctivity S semi-annual Grab SDO Antimony (Sb)', tqtyl mg/1 Grab SDO Recoverable Barium (Ba), Total mg/1 Grab SDO Recoverable Beryllium (00, Total mg/l Grab SDO Recoverable Cadmium (Cd),, Total mg/l Grab Soo Recoverable Chromium (Cr), T6tal mg/l Grab SDO Recoverable Copper (Cu), Total mg/1 Grab SDO Recoverable- - — Lead (Pb), Total mg/1 Grab SDO Recoverable 'Once during Jul, 1-Dec'31,2014; Mercury (Hg), Total mg/I_ GrabRecoverable SDO Once during Jan 1 -Jun 30, 2017 Molybdenum (M o), Total mg/l Grab SDO Recoverable Nickel (Ni), Total mg/1 Grab . 0 SDf7 Recoverable (Ag), Total mg/l Grab Recoverable _SDO Thallium (TI),'Toial SD© RecoverableGrab Zinc (Zn), Total' mg/1 Grab SDO, Recoverable Total Chloride (CI) m Grab SUO Total Fluoride (F) m Grab Total Sulfate m Grab -sbo 00 Total Hardness In Grab SDO Total RainfaI14 inches semi-annual Rain gauge - Footnotes: 1 Meastifementfrequency: Twice per year,or during the,specified,period, during a measureable storm event 2 1 COC No. NCG120101 effective January 6, 2'014, modified May 20, 2014