Loading...
HomeMy WebLinkAboutSW8050547_Historical File_20170822ROY COOPER Governor :.a MICHAEL S. REGAN Secretary Energy, Min .era I & TRACY DAVIS Land Resources Director ENVIRONMENTAL QUALITY August 22, 2017 Julie Wilsey, Director New Hanover County Airport Authority 1740 Airport Boulevard Wilmington, NC 28405 Subject: Approved Plan Revision Wilmington International Airport Adding next phase of CONRAC for Avis Stormwater Permit No. SW8 050547 New Hanover County Dear Ms. Wilsey: On June 22, 2017, the Wilmington Regional Office received a complete plan revision for Stormwater Management Permit Number SW8 050547. The revisions include the following specific changes: 1. The addition of 75,596 square feet of built -upon area for the second phase of the Consolidated Rental Car Facility for Avis located off Hall Drive near Blue Clay Road. Runoff from this built - upon area is permitted to be treated in the previously permitted Extended Dry Detention Basin (EDDB). The pre-treatment will occur in the previously approved Grassed Swale Pretreatment Area 42. 2. Runoff from the CONRAC facility will be conveyed to the permitted pre-treatment device and EDDB by an existing 72" pipe. 3. After this project, a total of 2,789,354 square feet remains available for future development within the Phase I & II EDDB drainage area. Pre-treatment for the project will be provided in one of the grassed Swale pre-treatment areas added to the permit on November 29, 2012. It has been determined that a formal permit modification is not required for the proposed changes. We are forwarding you an approved copy of the revised plans for your files. Please add the attached plans to the previously approved plan set. Please be aware that all terms and conditions of the modified permit issued on November 29, 2012, remain in full force and effect. Please also understand that the approval of this revision to the approved plans for the subject State Stormwater Permit is done on a case -by -case basis. Any other changes to this project must be approved through this Office prior to construction. The issuance of this plan revision does not preclude the permittee from complying with all other applicable statutes, rules, regulations or ordinances which may have jurisdiction over the proposed activity, and obtaining a permit or approval prior to construction. If you have any questions concerning this matter, please do not hesitate to call me at (910) 796-7215. Sincerely, ���/�� Linda Lewis, E.I. Environmental Engineer 10 GDS\arl: G:\\\Stormwater\Permits & Projects\2005\050547 HD\2017 08 permit PR 050547 cc: Michael Blackmore, P.E., RS&H (8008 Corporate Center Dr. Ste. 41(TCharlotte 28226-4489) New Hanover County Building Inspections Wilmington Regional Office Stormwater File State of North Carolina I Environmental Quality I. Energy. Mineral and Land Resources Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington, NC 25405 910 796 7215 State Stormwater Management Systems Permit No. SW8 050547 The master permit tables for Phase I and II were added to the permit on September 20, 2010, as part of the review for the modification to SW8 060515. Phase III was added on October 26, 2011. Phasing refers to the phases of the extended dry detention basin, not to the airport BUA. A modification to the tables was added on November 27, 2012. Master Permit No. SW8 050547 Phase 1 & 11 Basin Starting New BUA balance = &520835-4,552;087 = 3;968;748 Mod/Offsite Permit No. Date Issued Offsite Project Name Proposed BUA Remaining BUA SW8 050801 8/12/2005 General Aviation Apron Expansion 151,589 3,817,159 SW8 060326 4/7/2006 Air Wilmington FBO Building 196,725 3,620,434 SW8 060515 5/14/2008 Credit Card Parking Lot 225,722 3,394,712 SW8 050547 10/28/2009 ILM Phase I and Phase II for gravel roads 15,843 3,378,869 SW8 050547 11/27/2012 Delineate a new overall DA, increase the max BUA allowed. 0 3,378,869 SW8 050547 2/8/2013 Consolidated Rental Car Facility Phase 1 (CONRAC) 205,202 3,173,667 SW8 050547 8/4/2015 North General Aviation Apron Rehab & Expansion 32,453 3,141,214 SW8 050547 9/9/2015 ILM Flex Space (Lot 9 Business Park) and Business Park access road. 129,082 3,012,132 SW8 150723 9/15/2015 Air Wilmington Hangar 4 24,190 2,987,942 SW8 050547 6/29/2016 GA Hanger Taxiline and Corporate Hanger Complex 122,992 2,864,950 SW8 050547 8/22/2017 Phase 2 of CONRAC — Avis Car Rental Facility 75,596 2,789,354 Master Permit No. SW8 050547 Overall Basin Offsite Permit No. Date Issued Offsite Project Name Proposed BUA Remaining BUA Page 2 of 2 DEMLF USE ONLY Date Freceived Fee Paid ex ress only, Permit Number ®�.<Aa eYe25c-2 State of North Carolina L� Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources STORMWATER MANAGEMENT PERMIT PLAN REVISION APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Stormwater Management Permit Number: SW8 050547 2. Project Name: Wilmington International Airport Avis Rental Car Service Center 3. Permit Holders name (specify the name of the corporation, individual, etc.): New Hanover County 4. Print Owner/Signing Official's name and title (person legally responsible for permit): Julie Wilsey, Wilmington International Airport Director 5. Mailing Address for person listed in item 2 above: 1740 Airport Boulevard City:Wilrnington State:NC Zip:28405 Phone: (910 ) 341-4333 Fax: EmaiLTWilsey2flyILM.com II. PLAN REVISION INFORMATION 1. Summarize the plan revision proposed (attach additional pages if needed): The proposed project is a consolidated rental car facility building, parking lot and access driveway. The project is adding 75,596 ft2 (1.74 acres) of BUA of the overall permitted BUA at the airport III. SUBMITTAL REQUIREMENTS Only complete application packages will be acc+ed and reviewed by the Division of Energy, Mineral and Land Resources (DEMLR). A complete package includes all of the items listed below. The complete application package should be submitted to the DEMLR Office that issued the permit. 1. Please indicate that you have provided the following required information by initialing in the space provided next to each item. Initials • Original & I copy of the Plan Revision Application Form • Two (2) copies of revised plans (must be revisions of original approved plan sheet(s)) If applying for Express review (only available in 20 coastal counties): • Application fee of $500.00 (made payable to NCDENR) VI. APPLICAN'T'S CERTIFICATION I, ("print or type name of person listed in General Information, item 3) ✓ul ie N'i lseY certify that I ve authorized these plan revisions and that the information included on this plan revision application ' , t th best o y w edge, correct and complete. p ((�� Signature: _ Date: l 0 ( -7 Plan Revision orm IMECEI Rev. Oct. 31, 2013 JUN2220V Casmer, Jo From: Casmer, Jo Sent: Friday, July 07, 2017 9:55 AM To: 'jwilsey@flyilm.com'; 'michael.blackmore@rsandh.com' Subject: Wilmington International Airport; Stormwater Permit SW8 050547 The Wilmington Regional Office of the Division of Energy, Mineral, and Land Resources (Stormwater Section) accepted the Stormwater Permit Application and $505.00 fee on July 7, 2017. The project has been assigned to Linda Lewis and you will be notified if additional information is needed. Please be advised that no construction activities may commence until the Stormwater Permit is issued. Jo Casmer Administrative Assistant for DEMLR/Stormwater Section North Carolina Department of Environmental Quality Department of Environmental Assistance & Customer Service 910 796-7336 office 910 350-2004 fax a o.casmer(a7ncden r. cLov 127 Cardinal Drive Extension Wilmington, NC 28405 c � ""'" othing Compares.,.--,,,._ Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Completeness Review Checklist Project Fume: 01, ' Received Date:AZZ 2 ,( Project Location: A �� �-- Accepted Date: /' I 1 Rules) �2008 Coastal 1995 Coastal Phase II (WiRO.) ®Universal 1988 C astaI Type of Permit: New or Mod Nor PR Existing Permit # (Mod or PR): bs'$S�� E]PE Cert on File? Density: HD or LD Type: Commercial or Residential ®NCG: %: I! �(% OK?) I Stream Class: Map Offsite to SW8 Subdivided?: Subdivision or Single Lot F—JORW Map I r7Exempt Paperwork Emailed Engineer on: L_JSupplement(s) (1 original per BMP) BMP Type(s): DEO&M with correct/original signatures (1 original per BMP except LS/VFS and swales) 2A-pplication with correct/original signatures Deed M'1 Corp or LLC: Sig. Auth. per SoS or letter Email Address: Design Engineer 5 (within 6mo) F ,```� �1 rlJl Email Address: Owner Soils Report with SHWT�J ,� ote to Reviewer: j Calculations (signed/sealed) c3 Lj No obvious errors Density includes common areas, etc 0 r�lDeed Restrictions, if subdivided: ed & Notarized r Dec. Covenants & Plans L.�12 Sets Details (roads, cul-de-sacs, curbs, sidewalks, BMPs, Buildings, etc) �i Grading �Wetiands: Delineated or No Wetlands "Vicinity Map ®Layout (proposed BUA dimensions) 11 Legend �DA Maps ®Project Boundaries Infiltration Soils Report SHWT: Bottom: Additional Information: BUA (sf) DA (sf) PP (el) SHWT (el) Depth (ft) SA (sf) Wet Pond ®Soils Report SHWT: PP: Offsite MPE Cert for Master ®Deed Rest for Master BUA Permitted (Master): BUA Proposed (Offsite): Lot #: ®Lot # Matches Master sf sf Permitted Proposed: Proposed: Proposed: Scott, Georgette From: Blackmore, Michael <Michael.Blackmore@rsandh.com> Sent: Wednesday, June 14, 2017 4:32 PM To: Lewis,Linda Cc: Scott, Georgette Subject: RE: Avis SW application Attachments: SSW -Plan Rev-App-DEMLR-SPU-Oct 2013.pdf Good Afternoon Linda, I hope this email finds you well. I am finally making some progress on this request. I am attaching the application, without Julie's signature; however, I have sent it to her signature and a check request for $505.00. The good news I guess is the project has been postponed and the anticipated construction start date is now 12/4/2017 due to the return of high bids. I hope the get the requested information to you this week, next week at the latest. Thanks for the understanding. Mike Michael Blacki-riaro, P22 michael.blackmore@rsandh.com Stay up-to-date with our latest news and insights RS&H From: Lewis,Linda [mailto:linda.lewis@ncdenr.gov] Sent: Tuesday, June 13, 2017 1:28 PM To: Blackmore, Michael <Michael.Blackmore@rsandh.com> Cc: Scott, Georgette <georgette.scott@ncdenr.gov> Subject: FW: Avis SW application Mr. Blackmore: To date the Division has not received the necessary information to process this application. This incomplete application will be returned on June 20, 2017 unless you submit the information that was previously requested. Thanks, Linda From: Blackmore, Michael fmailto:Michael. Blackmore@rsandh.coml Sent: Friday, May 12, 2017 3:31 PM To: Lewis,Linda <linda.lewis@ncdenr.gov> Cc: Scott, Georgette <georgette.scott@ncdenr.gov> Subject: RE: Avis SW application Good Afternoon Mrs. Lewis, I hope this email finds you well. The new way of revising the permits is definitely different. I will complete the plan revision application form and get that to you. I have also put in the request for the Check in the amount of $505.00. Just as a side bar, the stormwater detention facility was sized and has been previously approved for this additional site. With the modification to permit, I am revising the new impervious amount to draining to the facility. Exactly the same way we have been handling Albert J. Ellis Airport in Jacksonville, NC. I will get the requested items to you as quickly as possible. I look forward to working with you on this project. Have a great weekend. Thanks, Mike Nflc:haei Biackrinore, PE Charfol.te Aviation Engineer 1.520 SoLit h 6l.a c( Suite 00, Charlotte, r michael.blackmore@rsandh.com rsandh.com Facebook � Twitter. Linkedln ; Bloa Stay tip -to -date tvitb our latest nelms and insighI RS&H From: Lewis,Linda[mailto:linda.lewisCA@ncdenr.govl Sent: Tuesday, May 2, 2017 8:54 AM To: Blackmore, Michael <Michael,Blackmore rsandh.com> Cc: Scott, Georgette <georgette.scott@ncdenr.eov> Subject: Avis SW application Michael: We received a stormwater permit application for the subject project at the Wilmington Airport. The package appears to be missing the completed and signed Plan Revision application form. Please note that as of January 1, 2017, certain plan revisions and minor modifications also require a $505.00 review fee. Since the Division will be reviewing the design of the pre-treatment device for the runoff from the car rental facility, the fee is required. The application is incomplete until the required application and fee are submitted. If you have any questions, please advise. Linda Lewis, E.I. Environmental Engineer III Division of Energy, Mineral and Land Resources Department of Environmental Quality 910-796-7215 Office linda.lewis(ZD_ncdenr.gov Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 28405 -- Nothing Compares,, E'mair correspondence i , .'.:idfrom this address is subject to the North Caropiria F't hjr: R; d`; Law and may be disclosed to fi7±rCI pa, 1'63. Completeness Review Checklist Project Name: Received Date: Project Location: Accepted Date: Rule(s) �2008 Coastal � 11995 Coastal �Pha_e it (WiRO �_�UrIversa! El1988 Coastal Type of Permit: New or Mod or PR Existing Permit # (Mod or PR): 1),,�5c-/'7 [7PE Cert on File? 'Density: HD or LD %: __❑(% OK?) SubdhAded?: Subdivision Type: Commercial Strearn Ckass: or Singie Lot or Residentia! EDSA Map ; MORW Map FINCG: FlOffsite MExempt to SW8 Paperwork Emailed Engineer on: ®Supplement(s) (1 original per BIAP) B M P Type(s): ®O&M with correct/original signatures (1 original Per BMP excepr LSIVFS and swales) ®Application with correct/original signatures Deed Corp or LLC: Sig. Auth. per SoS or letter Email Address: Design Engineer M$505 (within 6mo) MErnail Address: Owner ❑Soils Report with SHWT Note to Reviewer Calculations (signed/sealed) �No obvious errors Density includes common areas, etc Deed Restrictions, if subdivided: 11 Signed & Notarized nCorrect Temolate (Comm/Re,,& HD/'_DI or Dec. Covenants & Rest. Plans Q Sets ®Grading Vicinity Map Legend Infiltration Soils Report SHWT: Bottom: isited: Additional Information: BUA (sf) DA (sf) PP (el) SHWT (el) Depth (ft) SA (sf) Details (roads, cul-de-sacs, curbs, sidewalks, BMPs, Buildings, etc) Wetlands: Delineated or _ No Wetlands Layout (proposed BUA dimensions) E3DA Maps El Project Boundaries Wet Pond Soils Report SHWT: PP: Offsite MPE Cert for Master Deed Rest for master BUA Permitted (Master): BUA Proposed (Offsite): Lot #: riLot # Matches Master sf sf RS&H 1520 South Boulevard Suite 200 Charlotte, North Carolina 28203 TRANSMITTAL LETTER: O 704-940-4782 nandh.com Date: April 13, 2017 To: Christine Hall North Carolina Department of Environmental Quality r� 127 Cardinal Drive Ext. C ,1� Wilmington, NC 28405 APR From: Michael Blackmore, PE BY Sender's Phone: 704.940.4782 '--� Project Name: Avis Consolidated Rental Car Facility Project Number: 203-2575-001 We Transmit: For Your: ❑ Herewith ❑ Via Fax ❑ Under Separate Cover Via: ❑ Under Separate Cover Via: ® Review and Comment ❑ In Accordance with Your Request ❑ Use ❑ Regular Mail ❑ Overnight Mail ® Courier ❑ Signature The Following: Copies Date Description 1 4/18/2017 Full Size Plan Set (22x34) 3 4/18/2017 Half Size Plan Set (11x17) 2 4/18/2017 Revised Stormwater Permit Application Remarks: Copies To: RS&H Office By. Ao,— Michael Blackmore, PE New Hanover County Airport Authority; .'J I LM pfF �tit?l t WILMINGTON INTERNATIONAL AIRPORT AVIS RENTAL CAR SERVICE CENTER Stormwater Management Permit New Hanover County Wilmington, North Carolina RS&H No. 203-2575-001 April 2017 RS&H RS&H Architects -Engineers -Planners, Inc. 8008 Corporate Center Drive Suite 410 CharioUe, NC 28226-4489 704-940-4782 www.rsandh.com �� '��• •• 0 "41' SS4 _ Q7 SEAL -)- 9 1 = �n E`,yG ���.•• p�� BL APR 2 2017 0�¢� ��2�1 Wilmington International Airport RS&H ' Avis Rental Car Service Center Stormwater Management Permit TABLE OF CONTENTS GENERALINFORMATION ............................................................................................................. 1 ProjectDescription....................................................................................................................... 1 Site Description and Adjacent Property....................................................................................... 2 PermittingRequirements............................................................................................................. 2 EXISTING CONDITIONS Groundwater................................................................................................................................ 3 Basin Delineation and Drainage Patterns.................................................................................... 3 NRCSSoils.................................................................................................................................. 3 PROPOSEDCONDITIONS ............................................................................................................. 5 Basin Delineation and Drainage Patterns.................................................................................... 6 NRCSSoils.................................................................................................................................. 7 Treatment and Attenuation Requirement Summary .................................................................... 7 Proposed Conditions Discharge.................................................................................................. 7 EnvironmentalImpacts................................................................................................................ 7 Operationand Maintenance......................................................................................................... 8 CONCLUSION................................................................................................................................. 8 LIST OF FIGURES Figure 1 — Project Location Map....................................................................... .................... 1 Figure2 — NRCS Soils Map............................................................................................................ II Figure3 — USGS Quad Map.......................................................................................................... III LIST OF APPENDICES AppendixA — Permit Exhibits........................................................................................................... Appendix B — NCDEQ Operation and Maintenance Agreements .................................................. IV Appendix C — New Hanover County Stormwater Operation and Maintenance Plan/Schedule & Agreement....................................................................................................................................... V Appendix D — SUPPORTING CALCULATIONS ............................................... :............................ VI Appendix E — GEOTECHNICAL REPORT.................................................................................... VII New Hanover County Airport Authority Wilmington International Airport RS&H Avis Rental Car Service Center Stormwater Management Permit GENERAL INFORMATION Project Description Wilmington International Airport is located in New Hanover County, North Carolina, approximately three (3) miles northeast of the City of Wilmington, North Carolina, at the intersection of North 22"d Street and Airport Blvd. See Figure 1— Project Location Map. Figure 1 — Project Location Map $#6dEC'r LOCATION K. tk R { ' •WILMINGTON *_. INTERNATIONAL AIRPORT M44N TERMINAL 'F_ aueoxr as.vn rdre: o C.�:r S7:.ib�rrict�Se:ab n:xsT r.�we te�eyh a•.rr.:: .. North .� ;AIaIRAI M� ° _ F�yfWuila O u swr».H qM.. r•.w�ra M m LOCATION acot 0 CVIATAN : — a a seucl :r+apICp'Oa r. r: • the ° ;�a a arr�►,.i �..--wCa•. "�IA 'Gc7t..s:V re s._y �JI+Yrcw The New Hanover County Airport Authority, owner and operator of Wilmington International (ILM) has retained RS&H Architects -Engineers -Planners, Inc. (RS&H) to provide engineering and architectural design services for the construction of a new offsite consolidated rental car storage and turnover facility (CONRAC). The project is located on the northwest side of the airport property at the corner of Blue Clay Road and Hall Drive. Construction is estimated to begin in May 201"1. Refer to Figure 1, above for the Project Location Map and Figure 3 in Appendix A for the USGS Quad Map. New Hanover County Airport Authority 1 Wilmington International Airport RS&H ! Avis Rental Car Service Center Stormwater Management Permit Site Description and Adjacent Property The existing site of the proposed Avis Rental Car Service Center is bound by the existing Consolidated Rental Car Facility (CONRAC) and Hall Drive to the south. The north and east sides of the site are bound by wooded lots that are currently owned by the Airport Authority. The lots are being reserved for future expansion of the currently proposed facility along with other industrial development. A portion of the offsite wooded lots to the north and east drain through the proposed site via drainage ditches that will be re -aligned as part of this project and ultimately will be conveyed and treated in the permitted facility authorized by permit number SW8-050547. Drainage from these two areas will be maintained throughout the duration of the project. The site is a wooded field of generally level grade with minimal slopes gently sloping from the northern side of the site to the southern side toward the Hall Drive roadside conveyances. The disturbed area of the project will be 3.9 acres and will include the building footprints access road, storage parking lot, and grass drainage channels. Currently, there are no physical signs of severe erosion under present use conditions. Permitting Requirements The proposed project will require the following environmental permits associated with stormwater management and erosion and sedimentation control. The purpose of this application is to obtain n permit for the development and associated stormwater conveyances within the project area of the Avis Rental Car Facility. A separate project designed by Talbert & Bright, Inc. proposes a conveyance system that will connect the existing CONRAC facility and the Proposed Avis Rental Car Facility system to an existing 72-inch pipe. The 72-inch pipe will convey water to the proposed pre-treatment facility permitted by Paramounte Engineering under permit number SW8- 050547Mod. This proposed conveyance system project, designed by Talbert & Bright, Inc., will be permitted separately. Stormwater Permit, Authorization -to -Construct (ATC): This permit is required by New Hanover County Engineering Department prior to any land disturbing activity in unincorporated areas of the County. ■ State Stormwater Management Permit: This permit is required by North Carolina Department of Environmental Quality (NCDEQ). The proposed project is within the area permitted for future development in stormwater permit SW8-050547 High Density Dry Detention Basin Project for Wilmington International Airport. This application intends to be a plan revision for SW8-050547. ■ Sedimentation/Erosion Control Plan: This permit, also applied for concurrently with the Stormwater permit, is required by North Carolina Department of Environmental Quality (NCDEQ) for projects that disturb more than 1 acre. Refer to sheets C100-C112 in the enclosed plan set for erosion and sediment control plans, notes, and details. New Hanover County Airport Authority 2 Wilmington International Airport Avis Rental Car Service Center Stormwater Management Permit RS&H ■ NPDES Stormwater General Permit for Construction Activities: Upon receiving permit approval for the Sedimentation/Erosion Control Plan, the project will automatically be covered by a state NPDES Stormwater General Permit NCG01000 from NCDEQ. EXISTING CONDITIONS The entire project site is located within one drainage basin. The existing site is located within the Smith Creek Watershed located in the Cape Fear Basin. Smith Creek is classified as Class C Swamp waters (C;Sw). Class C is a primary freshwater classification described by NCDEQ as "waters protected for uses such as secondary recreation, fishing, wildlife, fish consumption, aquatic life including propagation, survival and maintenance of biological integrity, and agriculture. Secondary recreation includes, "wading, boating, and other uses involving human body contact with water where such activities take place in an infrequent, unorganized, or incidental manner". Swamp waters is a supplemental classification described by NCDEQ as "waters which have low velocities and other natural characteristics which are different from adjacent streams". Groundwater Geotechnical reports for the project show groundwater measurements between four (4) and five and one half (5'/) feet below existing ground. Basin Delineation and Drainage Patterns The existing area proposed for the Avis Rental Car Facility is approximately 3.9 acres and is currently served by a series of open conveyance ditches to an open swale for discharge into the Smith Creek Watershed. These ditches will be re -aligned and directed into a new conveyance pipe which will be treated in the Airport's on -site stormwater management facility. A small portion of the drainage ditch along Hall drive will be re -graded to connect existing grade lines on either side of the proposed site so that existing drainage patterns from offsite are maintained at the completion of the project. NRCS Soils The U.S. Department of Agriculture, Natural Resources Conservation Service (NRCS) maps for New Hanover County, North Carolina (Refer to Figure 2 in Appendix A for the Soils Map) indicate the following mapping units underlie the development area: Leon sand (Le) and Lynchburg fine sandy loam (Ls). Leon sand consists of about 80% poorly drained Leon soils. Slopes are 0 to 2 percent, and the shrink -swell potential is low. Lynchburg fine sandy loam consists of about 85% drained Lynchburg soils and 5% undrained Lynchburg soils. Minor components make up the rest of the soil composition. The natural drainage class of both types of New Hanover - County Airport Authority K Wilmington International Airport Avis Rental Car Service Center Stormwater Management Permit RS&H Lynchburg soils is somewhat poorly drained. Slopes range from 0 to 2 percent and the shrink - swell potential is low. Permit Information The master permit tables for Phase I and II were added to the permit on September 20, 2010, as part of the review for the modification to SW8 060515. Phase III was added on October 26, 2011. A modification to the tables was added on November 27, 2012. A modification to the tables was added by RS&H Inc. on April 14, 2017. Phasing refers to the extended dry detention basin, not to the airport BUA. Master Permit No. SW8 050547 Phase I & II Basin Starting New BUA balance = 8,520,835-4,552,087 = 3,968,748 Mod/Offsite Permit No. Date Issued Offsite Project Name Proposed BUA Remaining BUA SW8 050801 8/12/2005 General Aviation Apron Expansion 151,589 3,817,159 SW8 060326 4/7/2006 Air Wilmington FBO Building 196,725 3,620,434 SW8 060515 5/14/2008 Credit Card Parking Lot 225,722 3,394,712 SW8 050547 10/28/2009 ILM Phase I and Phase II (for 15,843 3,378,869 gravel roads) SW8 050547 11/27/2012 Delineate a new overall DA, 0 3,378,869 increase the max BUA allowed. SW8 050547 2/8/2013 Consolidated Rental Car 205,202 3,173,667 Facility (CONRAC) SW8 050547 8/4/2015 North General Aviation Apron 32,453 3,141,214 Rehab & Expansion ILM Flex Space (Lot 9 Business SW8 050547 9/9/2015 Park) and Business Parts 129,082 3,012,132 access road. SW8 150723 9/15/2015 Air Wilmington Hangar 4 24,190 2,987,942 SW8 050547 6/29/2016 i GA Hanger Taxiline and Corporate Hanger Complex 122,992 2,864,950* " Mathematical error revised for permit submittal. A,- New Hanover County Airport Authority 4 Wilmington International Airport RS&H1 Avis Rental Car Service Center Stormwater Management Permit PROPOSED CONDITIONS The Avis Rental Car Facility project includes the construction of one administrativelmaintenance building with an overall total square footage of 1,200 sq.-ft and a vehicle storage lot with a total area of approximately 1.61 acres to accommodate the storage of 174 vehicles with considerations for a future expansion of the lot to accommodate an additional 126 vehicles. This permit plan revision will include BUA for the ultimate buildout but will construct only the first phase. The first phase will construct 205,202 sq-ft of impervious area and will later be expanded to a total of 341,213 sq-ft of impervious area. Existing BUA from Phase 1 was 205,202 sq-ft in the first phase of CONRAC construction and will be expanded to a total of 341,213 sq-ft in the full buildout. The second phase has a proposed BUA of 75,596 sq-ft, which. now totals 280,798 sq-ft from the total build -out of 341,213 sq-ft. New Hanover County Airport Authority 5 Wilmington International Airport Avis Rental Car Service Center Stormwater Management Permit Permit Information A modification to the tables was added by RS&H Inc. on April 14, 2017. Phasing refers to the extended dry detention basin, not to the airport BUA. RSM Master Permit No. SW8 050547 Phase I & II Basin Starting New BUA balance = 8,520,835-4,552,087 = 3,968,748 Mod/Offsite Permit No. Date Issued Offsite Project Name Proposed BUA Remaining BUA SW8 050801 8/12/2005 General Aviation Apron Expansion 151,589 3,817,159 SW8 060326 4/7/2006 Air Wilmington FBO Building 196,725 3,620,434 SW8 060515 5/14/2008 Credit Card Parking Lot 225,722 3,394,712 SW8 050547 10/28/2009 ILM Phase I and Phase II (for 15,843 3,378,869 gravel roads) SW8 050547 11/27/2012 Delineate a new overall DA, 0 3,378,869 increase the max BUA allowed. Consolidated Rental Car 205,202 3,173,667 SW8 050547 2/8/2013 Facility (CONRAC) SW8 050547 8/4/2015 North General Aviation Apron 32,453 3,141,214 Rehab & Expansion ILM Flex Space (Lot 9 Business SW8 050547 9/9/2015 Park) and Business Park 129,082 3,012,132 access road. SW8 150723 9/15/2015 Air Wilmington Hangar 4 24,190 2,987,942 SW8 050547 6/29/2016 GA Hanger Taxiline and Corporate Hanger Complex 122,992 2,864,950 SW8 050547 i 411412017 Avis Consolidated Rental Car i 76,596 2,789,364 Fac ilq L " Mathematical error revised for permit submittal. Basin Delineation and Drainage Patterns The proposed design for CONRAC facility combines the existing drainage patterns with the new impervious areas. The proposed site will be graded to facilitate positive drainage along existing and proposed open and piped conveyances. The existing ditches will be re -aligned and re-routed into a pipe conveyance system that will ultimately make its way to the Airport's on -site storm water management facility. The existing roadside ditch system along Hall Drive will be re -graded in the area of the proposed site to connect hydraulic gradient lines and maintain existing drainage New Hanover County Airport Authority A Wilmington International Airport RS&H I Avis Rental Car Service Center Stormwater Management Permit patterns from the offsite storm water runoff on either side of the project limits. Effectively all of the new impervious area will be drained to the re -aligned ditches to be treated in the Airport's storm water management facility, while minimal amounts of new impervious area (<0. i acre) will contribute to the re -graded roadside ditch. See sheet C121 in the enclosed plan set for the Proposed Drainage Basin Map. NRCS Soils The majority of the proposed soil strata for this site will be composed of the re -graded existing soil material or soil of like characteristics_ Therefore. proposed soils will be taken as equivalent with the existing. Treatment and Attenuation Requirement Summary All runoff from the site is being routed to the Airport's master stormwater management facility which includes two grassed swales for pre-treatment and a dry detention basin for attenuation. These facilities are permitted under DENR stormwater permit SW8-050547. Permit SW8-050547, recently modified by Paramounte Engineering, permits future development within the airport business park which will be treated and attenuated by the existing facilities. This application will be a plan revision to use permitted future Built Upon Area (BUA) allocated in permit SW8-050547. The proposed project lies within the permitted area known as "Pre -Treatment Area #2" which is routed to Pre -Treatment Swale #2 before entering the dry detention basin. Existing BUA from Phase 1 was 205,202 sq-ft in the first phase of CONRAC construction and will be expanded to a total of 341,213 sq-ft in the full buildout. The second phase has a proposed BUA of 75,596 sq-ft, which now totals 280,798 sq-ft from the total build -out of 341,213 sq-ft. Proposed Conditions Discharge Proposed conveyance systems have been designed for the 25-year storm event, based on precipitation data from the New Hanover County Stormwater Design Manual. Refer to Appendix D for supporting calculations. RS&H provided the site post -development discharge rate to Talbert & Bright, Inc. who designed the downstream conveyance system, as part of a separate project, to route runoff to the Airport's master stormwater management facilities. All stormwater calculations assume the future conditions (i.e. ultimate buildout). Environmental Impacts Wetlands - No wetlands will be impacted by the project. Fioodoiains - According to FEMA Flood Insurance Rate Maps (FIRM), the proposed project will not encroach on any FEMA floodplains. l.New Hanover County Airport Authority 7 Wilmington International Airport RS&H Avis Rental Car Service Center Stormwater Management Permit Operation and Maintenance The dry detention basin and grassed swales of the Airport's master stormwater management facility will be maintained according to the NCDEQ Operation and Maintenance Agreements (refer to Appendix 13). The on -site conveyance ditches within the CONRAC facility will be maintained according to the New Hanover County Stormwater Operation and Maintenance Plan/Schedule & Agreement (refer to Appendix C). CONCLUSION Runoff from the CONRAC site will be conveyed to the Airport's treatment facility by existing onsite conveyance system that is being modified by Talbert and Bright. Treatment and attenuation for the project is included in the master treatment facility, recently modified by Paramounte Engineering. DENR stormwater permit SW8-050547 will be revised to include the proposed project BUA of 341,213 sq-ft. New Hanover County Airport Authority 8 Wilmington International Airport Avis Rental Car Service Center Stormwater Management Permit APPENDIX A - PERMIT EXHIBITS RSUf Wilmington International Airport Avis Rental Car Service Center Stormwater Management Permit Figure 2 — NRCS Solis Map I Z;qf.? �d a 14 .9't ii.0 Wilmington International Airport RS&H Avis Rental Car Service Center Stormwater Management Permit Figure 3 — USGS Quad Map r'..,0 Zfr- VG JR PICWY _ '.•^ ..�„ i �'�r`�., ?s��' ,'�-z-'t } r 1rlf mil' -' Na �:, �'�•, --/ .!'`� '.`� {� ,., J t . �> Wilmington International Airport Avis Rental Car Service Center Stormwater Management Permit RS&H APPENDIX B - NCDEQ OPERATION AND MAINTENANCE AGREEMENTS Iv Pennit Number: (to be provided by D O Drainage Area Number: Dry Extended Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The dry extended detention basin system is defined as the dry detention basin, outlet structure, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): 4rdoes (WN does not incorporate a vegetated filter at the outlet. � This system (check one): to ❑ does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: - The drainage area will be managed to reduce the sediment load to the dry extended detention basin. - Immediately after the dry extended detention basin is established, the vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). - No portion of the dry extended detention pond will be fertilized after the first initial fertilization that is required to establish the vegetation. - I will maintain the vegetation in and around the basin at a height of approximately six inches. - Once a year, a dam safety expert will inspect the embankment. After the dry extended detention basin is established, it will be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate the roblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the dry Areas of bare soil and/or Regrade the soil if necessary to extended detention erosive gullies have formed. remove the gully, and then plant a basin ground cover and water until it is established. Provide lime and a one-time fertilizer application. Pone SW40i-Dry Detention O&M-Rev.3 Page 1 of 4 BMP element: Potentialproblem: How I will remediate the roblem: The embankment Shrubs or trees have started Remove shrubs or trees to grow on the emban:�cment. immediately. Grass cover is unhealthy or eroding. Restore the health of the grass cover — consult a professional if necessary. Signs of seepage on the Consult a professional. downstream face. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the basin depth reads4,17-feet in the main pond, the sediment shall be removed. When the basin depth reads 2.7 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM ill in the blanks) Temporary Pool Elevation 13.30 Sediment Removal E 11.a0 Te porar Pool emporar} ----------------- olume Sediment Removal Elevation-14-RA ?.SIB Volume Bottom Elevatio 8.25 259'0-------------------------------------- ------ ---urn Sediment Bottom Elevation 7.00 25% Ve( Storage Stc F'OREBAY MAIN POND Form SW401-Dry Detention O&M-Rev.3 Page 3 of 4 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible parry. Project name:Wilmington International Airport Stormwater Management - Phase III BMP drainage area number:1 Print name:Julie Wilsey Title:Deputy Director Address:1740 Aimort Boulevard, Wilmington, NC 28405 Signature: Date: 'I io 560"( j Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, S"oP.A• 5 . P-60--t V , a Notary Public for the State of /V02V4 C 20 e.t N A , County of v�r s� �c , do hereby certify that TaLls A • (. ioi Eel personally appeared before me this 511` day of Occzab_2,. ,Corr , and acknowledge the due execution of the forgoing dry detention basin maintenance requirements. Witness my hand and official seal, /lq rAlgr off` s. �oG Co IqOTARY g pUBI.IC of rr�unrunnut�Na� SEAL My commission expires 061.19 L';ta/(. Form SW401-Dry Detention O&M-Rev.3 Page 4 of 4 Pemut Number: 5 o 5cz(- :...:.._..........:::.: (to be provided b DIM Drainage Area Number: $ OV Dry Extended Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The dry extended detention basin system is defined as the dry detention basin, outlet structure, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ® does ❑ does not incorporate a vegetated filter at the outlet. This system (check one): ❑ does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: The drainage area will be managed to reduce the sediment load to the dry extended detention basin. Immediately after the dry extended detention basin is established, the vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). No portion of the dry extended detention pond will be fertilized after the first initial fertilization that is required to establish the vegetation. I will maintain the vegetation in and around the basin at.a height of approximately six inches. - Once a year, a dam safety expert will inspect the embankment. After the dry extended detention basin is established, it will be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I wilI remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the dry Areas of bare soil and/or Regrade the soil if necessary to extended detention erosive gullies have formed, remove the gully, and then plant a basin ground cover and water until it is established. Provide lime and a one-time fertilizer application. Form SW401-Dry Detention O&M-Rev.3 Page 1 of 4 BMP element: Potentialproblem: How I will remediate the roblem: The inlet device: pipe or swale The pipe is clogged (if applicable). Unclog the pipe. Dispose of the sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable) - Erosion is occurring in the Regrade the swale if necessary to swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated Search for the source of the and reduced the depth to 75% sediment and remedy the problem if of the original design depth possible. Remove the sediment and (see diagram below). dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred or Provide additional erosion riprap is displaced. protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticides are used, wipe them on the plants rather than spraying. The main treatment area Sediment has accumulated Search for the source of the and reduced the depth to 75% sediment and remedy the problem if of the original design depth possible. Remove the sediment and (see diagram below). dispose of it in a location where it will not cause impacts to streams or the BMP. Revegetate disturbed areas immediately with sod (preferred) or seed protected with securely staked erosion mat. Water is standing more than Check outlet structure for clogging. 5 days after a storm event. If it is a design issue, consult an appropriate rofessional. Weeds and noxious plants are Remove the plants by hand or by growing in the main wiping them with pesticide (do not treatment area. spray). Form SW401-Dry Detention O&M-Rev.3 Page 2 of 4 BMP element: The embankment Potentialproblem: y Shrubs or trees have started How I will remediate theProblem: Remove shrubs or trees to grow on the embankment. immediately. Grass cover is unhealthy or eroding. Restore the health of the grass cover - consult a professional if necessary. Signs of seepage m the downstream face. Consult a professional. Evidence of muskrat or beaver activity is present. Use traps to remove muskrats and consult a professional to remove beavers. An annual inspection by an appropriate professional Make all needed repairs. shows that the embankment needs repair. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the out1et. 1 Quality 401 Oversight Unit at 919- 733-1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the basin depth reads 9.51 feet in the main pond, the sediment shall be removed. When the basin depth reads 8.97 feet in the forebay, the sediment shall be removed. (BASIN DIAGRAM (fill in the blanks) Sediment Removal ----------------- Volume Bottom Elevatio 8.25 25% Sediment Storage FOREBAY Temporary Pool Elevation 12.35 Pool Temporar Sediment Removal Elevation 10.49---- ----- Volume Bottom Elevation Elevation 6.13 25°/u MAIN POND Form SW401-Dry Detention O&M-Rev.3 Page 3 of 4 r . PermitNumber: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. p ze.1— 'IC —IV, Project name:Wilmington International Airport Stormwater Manaizement - Phase II BILL drainage area number: Print name:Jon W. Rosborough Title:Airport Director _- Address:1740 Airport Boulevard Wilmington NC 28405 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I,-JArvDPLA S . P-OC-7-A( a Notary Public for the State of Holem C at rn[ , County of %V ovE,e , do hereby certify that Tc)N %.) . -Ro5.6e oaam personally appeared before me this 7t day of 6txO Lg,. , t2062 and acknowledge the due execution of the forgoing dry detention basin maintenance requirements. Witness my hand and official seal, �LJL- 'I, • a �°3:a9ul�ey �0TA T , `OUS1_IC SEAL My commission expires 0 f .120'zaol! Form SW401-D1 y Detention O&M-Rev.3 Page 4 of 4 PennitNumber:�C�, (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: Wilmington International AiMort Stormwater Mann ement - Phase II BAO drainage area number:1 Print name:Jon W. Rosborouah Title:Airoort Director Address:1740 Airport Boulevard Wilmington NC 28405 Note: The Iegally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, . -:5AigD A S • �6 -� t , a Notary Public for the State of iVoRrH ►eacr04A , County of. // ouE4_ , do hereby certify that ��� �l a56aP. duGH personally appeared before me this 7""` day of Au��� aO6 and acknowledge the due execution of the forgoing dry detention basin maintenance requirements. Witness my hand and official seal, k, X_ n Jr—) t, y�r,;�:aoaoae�� g�0 Til�y� 'Z)Q8LIC SEAL My commission expires_ Form SW401-Dry Detention O&M-Rev.3 Page 4 of 4 Permit Name: -1 t.;7 SW2� (to be provided by DWQ) •Draia Number:` Grassed Swale Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — The drainage area of the grassed swale will be carefully managed to reduce the sediment load to the grassed swale. — After the first-time fertilization to establish the grass in the swale, fertilizer will not be applied to the grassed swale. The grassed swale will be inspected once a quarter. Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: The entire length of the swale Potentialproblem: Trash/debris is present. How I will remediate theproblem: Remove the trash/debris. Areas of bare soil and/or erosive gullies have formed. Regrade the soil if necessary to remove the gully, and then re -sod (or plant with other appropriate species) and water until established. Provide lime and a one-time fertilizer application. Sediment covers the grass at the bottom of the Swale I Remove sediment and dispose in an area that will not impact streams or BMPs. Re -sod if necessary. Vegetation is too short or too 1011 . Maintain vegetation at a height of approximately six inches. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the outlet. 1 Quality 401 Oversight Unit at 919- 733-1786. Form SW401-Grassed Swale O&M-Rev.3 Page 1 of 2 Permit Number: FLU f 0—':�O 54'—? _ , , (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Wihrnington International Airport - Pretreatment Swales _ BMP drainage area number:Pre Treatment Swale #1 Print name:Julie Wilsev Title:De ut Director - New Hanover County Airport Authorit Address:1740 Aimort Blvd Wilmington NC 28405 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I,� /U1 • '-` ��'► , a Notary Public for the State of 14t��' b� _t:. ;�►r�c: , County of bsk N' �c— , do hereby certify that `` J, e A v2i' s �: " personally appeared before me this t day of tsC-h �Iyt— , , €� f , and acknowledge the due execution of the forgoing grassed swale maintenance requirements. Witness my hand and official seal, ',Nytl INN11r1ergt/"" 4 �p T'I VA���� SEAL 1bly commission expires Form SW401-Grassed Swale O&M-Rev.3 Page 2 of 2 Permit Name: W�2(P_ (to be provide p DWQ) -Brun tge-Atea Number: '!- Grassed Swale Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — The drainage area of the grassed swale will be carefully managed to reduce the sediment load to the grassed swale. — After the first-time fertilization to establish the grass in the swale, fertilizer will not be applied to the grassed swale. The grassed swale will be inspected once a quarter. Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate the roblem: The entire length of the swale Trash/debris is present. Remove the trash/debris. Areas of bare soil and/or erosive gullies have formed. Regrade the soil if necessary to remove the gully, and then re -sod (or plant with other appropriate species) and water until established. Provide lime and a one-time fertilizer application. Sediment covers the grass at the bottom of the swale. Remove sediment and dispose in an area that will not impact streams or BMPs. Resod if necessary. Vegetation is too short or too long. Maintain vegetation at a height of approximately six inches. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the outlet. Quality 401 Oversight Unit at 919- 733-1786. Form SW401-Grassed Swale O&M-Rev.3 Page 1 of 2 Permit Number: -S"'V 10 So S (1- % .,, .. (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Wilmington International Airport - Pretreatment Swales _ BMP drainage area number:Pre Treatment Swale #2 Print namejulie Wilsey Title:Deputy Director - New Hanover County Airport Authority Address:1740 Aimort Blvd Wilmington NC 28405 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. a Notary Public for the State of County of kl f do hereby certify that 14, i c— A • personally appeared before me this �.. day of Ct:f' ? a-e'— , LA D- , and acknowledge the due execution of the forgoing grassed swale maintenance requirements. Witness my hand and official seal, ��„N/NNN/flpM 465E M. O Tq Ly. =m Leo R 00Z /*MfN11f11Ntri�N SEAL My r_.ommission expires IlLf P,e,& m � f� e,.snn Form SW401-Grassed Swale O&M-Rev.3 Page 2 of 2 Permit Number: SGv ,? G so S¢7 (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Wilmington International Airport - Pretreatment Swales BMP drainage area number:Pre Treatment Swale #2 Print name:Julie Wilsey Title:Denuty Director - New Hanover County Airport Authority Address:1740 Airport Blvd Wilmington NC 28405 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, - ` ! � • 1� V"'5 , a Notary Public for the State of In , County of Altfu,; 4P­)bvC�' , do hereby certify that A. personally appeared before me this day of CC+O6e'(" , Ul D- , and acknowledge the due execution of the forgoing grassed swale maintenance requirements. Witness my hand and official seal, �Iffi „euenwrrarp�i' OSE M. 0 T,q,Q9y°.. 3,s% 0 " JIR6 SEAL My commission expires ' �1� b, M , •J rLrlt/? Form SW401-Grassed Swale O&M-Rev,3 Page 2 of 2 Wilmington International Airport Avis Rental Car Service Center Stormwater Management Permit RS&Jf APPENDIX C - NEW HANOVER COUNTY STORMWATER OPERATION AND MAINTENANCE PLAN/SCHEDULE & AGREEMENT v New Hanover County Stormwater Operation and Maintenance Plan/Schedule & Agreement Detention / Retention / Infiltration / Pipe / Swale Facilities As a minimum the following maintenance items shall be performed: 2 - 1. Grassing around any detention/retention facility shall be maintained to prevent the erosion of these areas. The areas shall be periodically, approximately once every _ months, mowed to maintain the aesthetic quality of the site and to prevent erosion and a reduction in capacity of the stormwater system. Grass on slopes shall not exceed a height of 15 inches. 2. Open ditches and swales, approximately once every _ months, shall be kept free of undesirable growth and mowed or maintained to the design cross-section and area as shown on the Stormwater Management Plan acceptable to the County and on file in the office of the County Engineer. Growth on the slopes and bottom shall not exceed a height of 8 inches. V3. Landscaping of the area around the detention/retention facility shall not reduce the capacity or hinder operation and maintenance of the stormwater system. Landscaping shall be maintained. 4. Storm drainage pipes and culverts shall be periodically, approximately once every months, inspected for debris and sand build-up. They shall be cleaned as necessary to provide for the free conveyance of stormwater as designed. fhy� 5. The detention/retention facility shall be maintained at the design depth as shown on the Stormwater Management Plan accepted by the County and on file in the office of the County Engineer. The detention/retention facility shall be routinely checked, approximately once every _ months, for and cleared of all accumulation of debris and sediment/sand build-up. The facility shall be inspected on a regular basis, but at least once every six months. Debris and sedimentation shall be removed if: a. The primary outlet capacity is impaired or clogged and/or b. The depth of the facility is more than one foot above the original facility depth or the facility volume is reduced by 25% of the design impoundment volume. 6. Pipe installed to provide detention shall be kept free of sediment build-up. The detention facility shall be maintained in accordance with the Stormwater Management Plan accepted by the County and on file in the office of the County Engineer. The storm drainage pipes and structures shall be periodically, approximately once every _ months, inspected for debris and sediment build-up. The. pipe shall be inspected on a regular basis, but at least once every six months. Debris and sedimentation shall be removed if: a. The storage volume is reduced by 2.5% or more, a.nd/or; b. The sediment and/or debris restricts the free flow of stormwater. 1TI,A/ 7. The pipes and stone installed to provide infiltration shall be kept free of sediment build-up. The infiltration system shall be maintained in accordance with the Stormwater Management Plan accepted by the County and on file in the office of the County Engineer. The infiltration facility shall be routinely, approximately once every months, inspected for and cleared of all accumulation of debris and the detention facility outlet structure cleared of any blockage. The facility shall be inspected on a regular basis, but at least once every six months. Debris and sedimentation shall be removed if: a. The infiltration capacity is impaired, and/or; b. The sediment and/or debris restricts the free flow of stormwater into the infiltration �A,, i system and surrounding soils. A! 8. The infiltration system shall be removed and replaced with new material when the system no longer permits the stormwater to freely infiltrate into the surrounding soils by proper maintenance. I acknowledge and agree by my signature belo,r that I am responsible for the performance and maintenance procedures listed above. I agree to notify New Hanover Count of any problems with the system and prior to any changes to the system, or the change of responsible party. I� /� PIL Print Name: �J J - e, A.. �J Title: -Arpor+ I r e.ck r Address: & 00( Phone: Date: Signature: e I, ROVE Ni (✓)0.JIS , a Notary Public for the State of Nor`h- Cuero it rv. , County of WQW t "s ei do hereby certify that --Q,e Se�j personally appeared before me this L q day of r1 , 20 � % , and acknowledge the due execution of the foregoing maintenance agreement requirements. Witness my hand and official seal, TA 11 rr -V SEA¢' My commission expires: "L 0 18 L% �.. ER CO Wilmington International Airport Avis Rental Car Service Center Stormwater Management Permit RS&H APPENDIX D - SUPPORTING CALCULATIONS a LM . � 6 @ a 70 cz 0 � � 2 @ CA 0 cz 0 � 2 § f g ! ) § � ! kf B § ; B0 § | § - 4 7§{ \ | �5 � § § § [ [ § § i % : 7 C4 ; ; ) } C11§ § § 2 ! § [ .§ § ` k k / 2 2 § § k 2 m , � Io § o«m q m 9 - { [ § S § § § § § § ,R§§Lo m _ d • 2 � ; ; ; 2 � 2 . f } ° §§ §§ §) §§ §§ §§ §§ §§ §§ �� • fk§) §§ §§ P.G. §] §S §§ §§ §S ci k k k k k ( k k ( % » \ 2 �E » § § § § 7 u. § as 3/ 2 0 a.it B 2 § ! | E ! | § § § ; | § | e ! a \ § § § § § § § § o 26 § §. § § § ) q § § K K . rn co . . loam qR 0 ] ) § § ) q § § J {§ / ) § [ § ! i § �R;§ R ■ § • A ] { ] ] / { § § § k k !� ° 2§ §§ §§ §§ §§ §§ §§ §§ cc a� /#f§ ]§ {§ §§ §S 32 §§ §§ §§ §§ ° k \ k ) k § § k § e o a cFc- £■m U a ab U) cc m 2 C O v O� c m 0 m 0 m 0 m 0 m 0 m 0 m 0 m -° ° e 0 E F C S m h N W 0 N n mri W SE r N c9 t+1 e1 N �() In Ifs m E F m � y o p `o m m o f0 E c 0 o a o a o o c o d a 0 f° R o m a b O R 6 of O In Z p o o c o c c c5 o c 0 o c o 0 0 o c c m fi m IL N N N cLi O LL = cD A c7 o tQ a O O S S m S h r S <J f!s Ol a N f/] ri fD O O q W o m O m C C m S o = n N r N n N V Inon N t2 N tp i0 In In I[j Im In pw ~ E cm o N 6 m a N I[s E m U o 6 6 0 0 6 o c a a () I1�n pp T N Obi. N N N Owl N W N yIn� f1 N S N T N nai N 00 Oo an Oo Oo 0o OO o0 as �,yS N N m� 0 � � O @@ i Q¢ G C o o C o 0 0 6 0 o C o 0 0 a o o C j^Q I= o O o' O 0 S 0 O m0 O 0 S S 0 S 0 O , O LL o 0 a 6 o c o a o i ° H Ion # S N voi N S}} M Ion t] + < Io o O E o O+ 0 o 0 a m S Io 00 LL N N C7 + + C .N 0 U rt+ CD .N Ca 0 I..L Y� ^W W V) 0 Ca fta— Ca Cn Ct O O Uo <n N CO N O O o0 aa` o d E L D! p d d d d d d d d d d d d d d d d d d d C C p C O C O C O C O C O C O G O C O C O C O C O C I C O C O C O G O C O C O C_ N N N OMf tN0 N 0! t0 N n N A A N CWO N o N o N N N l7 N N [V CV E F O W N N �OO m N O ^ O ; O (n0 C o td0 O f0 o fMO O tM0 o fNp O t0 o d O t00 O O N O O �dfJ, O C p W li ci m � C � V oq O C 11 Eq a 7 L E $LL N W M o 10 n W n M d �p d 10 d d d N W M N n O N M 1p n W Z o d d o 0 o 0 W 0 W W 0 o 0 0 0 0 0 c g o o c co o c0 o o 0 0 0 o c 0 0 25 o c o d o c $ o $ o c $ c o d C O mIL N N N N N N L p O IL = Y O C1 n N O1 O 5 a tpp7 � d V d V 7 M N n � © In N 40 fC d n C] (f0 N N N O o O (V o o O o O C o G O O cq O ci O U CJ =10 n W d N �� W d W O M d W N Z d N tG W N Iff to In Iri IL) a v v v a v M a N a N v v O N N fp N m N a n N N _C ~ E O N N L9 c?(q c2 `Q N o p�f o ri n 6] INcl Cd r r r r r r r t2 r r r r r 01 r W r O N N N N N N U W N WHc OfN �0O O]N p WH O�IN ,N Nry ONi,N W N0w1N W N N mN W N N N W O C o O N cc 0 0 o cc cc cc cc cc cc N C CI cc do pNiN cc cc cc O1N cc m n� Wr Nood 0o go Mo Wrro o0 nnnrnnnroo000 NG 0 0 o Hl N 00 o G O o G G 00 o 0 oM 0 0 o0 0 0 c 0 o C C O o 00 0 o 00 6.6 0 0 00 0 0 o0 66 O o ;gO{ o g g o 0 o o $ o o c 0 o o 0 0 0 0 o O O o o o o o a o o o 0 o G G O o o rF !i o 0 o o 0�p 0 0 $ o}} 0 0 0 0 0 0 $}} o $ o ~ + N N m m v V m N w m f� 1� m O! a 0 E o w ouoi o 0 o voi o uo}}i o $ o 0 0 0 0 11 + N N f7 (+7 V+1+ a+0 W W m + C N L U ❑ a) m cz MO I..L _0 A teA`+ ^W W O .5 W 70 ■■ Z ad O U O � 0 0 ¢ , 0 a_ Lo cm W 01 N r Ln m n. a E E c O 01 7 ftl Z Z o J W N L O O d d 0 m E E E E m 5 5 5 c J C C C N w w y y N fA .m E F c F E r In m W .mzs W o m i N N N N N N N cci H W_ m ~ C m- m (WO 100 v v a V V E c 0 0 0 0 0 0 0 0 0 0 a 0 � CV L E W S S a n n m O LL zo C C C V V N 0 N 0 N 0 N 0 0 o O a a O o O 0 2 c m m co N P 0) O' f/J m LL L i N m .� a q � C G O O C m C C L0 2 N W S W VV N a i � a a 7 a cD h 0 m W N W N N m O o N N N m N m N J. a o 0 0 a o 0 0 0 0 o 0 Ey A (� ICI O 01 N 0 0 00 W C N C I c) O W N C C ) O W O O N C s O W N C C I A W C O N C h 0 W N C C IO Of o O N 0 IO O f N 0 0 1OO O 1 0 N 0 Obi N 0 0 m 0 N 0 A N 0 0 � C N O N O C O« 7 7 N N G I 8 pppp 0 0 0 0 0 O OO S 0o Q 00 00 00 lo� 00 00 00 00 00 00 00 do _ LL o S 0 O O 00cyy O O 0 O 0 S 0 S 0 S 0 O 0 S c60y p W U C O O O C 0 O G U O C U O o ¢ ¢ ¢ ¢ rr ¢ o �E ¢ o m ir I CC) ¢~ a~c 3 o c~ 0 t N N cti, co a 't vti an m 0 U. Z 0O Z 2 E o �oO is � S Io o} IQi S a voi Fs voi �a N N M A41 4 ut1 1� rDt 7 O � Cl) CD v 5 @ � -0 e. 0 � 0 m @ � � 0 75 : CIS � 2 X ad W cc Cl) \k� 00 / z � \/ E k § , r �• 8 ! e § | § j§ § ; § ; § i k f ® �cd ) | § S & § § q 2 q q ; ) § ! § § 2 § § § § § § ` § § § k 2 §■E � , m : ) � En LL 2°a§ f § \ a § § § § 3 § \ 2 2 S § -im(i N 9m k ; 2] � 2 ° §§ §§ t§ §§ §§ §§ §§ 2§ §§ §§ ■a m§ m 8 9§ �e ■§ /k§§ 15� 616 06 6C; d'i co @ @ k ) k k § § § Is ! » » »N E / I.,- / § 9 cm co v ) 3 2 § \ C CO L U 4.+ CO �ry0+ 0 �H y-+ a) a) CO 0 Cd u p� U Z 2 _O C L m e C C C C C C C C C C C a O U o � C C O C O C C C C C N m E F H E cti vi 6 v vi Id cd I� cd of m F- N m 00 ^ O O O N q 0 N 6 LL N V IL N w S n n OND O S N Z O C O O C O G O G O c g 0 g 0 o 0 c�OII 3 0 0 0 0 o 0 0 g 0 0 o 0 N N N m m W N m c7 W o'i O L U C] mLL N N N N N N N N N N N c LL? 2 O th m m 00 W N H O G N c1l Pi M 4 v a Id Ci Is CO .I O O O C O O z� 2 s o m c E S o c�i o of c�q cn a ci vi cd a m o o o 0 0 0 0 0 0 0 o c o o c o c o 6 o Z o ma Ed (] O N Ol N cq N Of N OI LV N T O N N O N L. W O N 10 O O N N O1 O N a O Zq N 0 0 0 0 0 0 0 0 0 6 cc . 0 0 cc C O O a cc 7 7 W fA m m 0 O 0 0 C O O 6r 0 0 o's O O Sa O O W O O p� 0 0 W 0 0 N.- O O mr O O O O Q GIB Oj I Q O O 0 0 0 0 C C 0 0 G O O G 0 0 6 0 0 0 O OO O O N M mO K M t0] CO] N 0 0 o c m 2 - Q Irc Q R 0~G I¢ Q I¢ O If1 O O Y01 pO} S N ~ 0 + N N fh C+] V 7 1I }1 1!1 m f0 ca F O C O O O LL N N }} M P+] + 7 N 1n (O C-J N C LM N L U 5 a) O CD CD C0 O :3 0 L 2 Q O � O J U O Q Ln o g NCD 0 = CO N d r Gi I I Q 7 So c E E _ N � i0 Z W o J ccN m 1 O O O aa` o b 2 O aci u U C C C C C C C C C C C C � O c O c O O O c O c O c O c O c . E F H � r tV [7 P] ItY l0 IC IC n C m m C ~ m E , c r N O > n O O W O o O N N ry cq N N Gr G s Z O O V C � I j C tM0 C tW0 r r GND m m c g c o c�OI 0 0 0 0 o c c o c o C W N oo N W W m W t+7 N co O L m{yI N N N N N N N N N N U 0 co W 0 N co m C' - Ci N � Pl OJ a V� 1l1 Q w N U� �Yy U G - U fJ O O C CI O O O Z n Cl o n `uDi N N o m m E o ni co ci ui �R <R r m ;E w C Q O O O O O O O O O O .2 C.� o c o 0 0 0 0 0 O 0 0 o C E m _a V N O W N C C 1 n W 60 C N c 0 0 O N 0 0 T 06 N m N 0 0 Off 0 N 0 N 0 0 N O N C N N C O W C N C N C O $$ S 1 b ,p 7 7 N Uf m Q 0 0 O O O O O O O O 0 0 O O O O W r O O W O O W O O I W r� 0 r o0 00 oc o0 0o co 00 00 oc cc o0 00 m LL O O C IR C G O O dO C O F O 100+ O O O If1 S 100 O N 1-9 C 0 N N m ? V+ N N 10 'O O LL N N C+! m 7 V + I(J f0 s 3 0 � O m Y O` O N LL m m II 0 co ro LL m m J CD U Q N 70 (a O O v-- N L Y O Cli O1 E 0 _zp C C r 0 °CCCO O OW O H"G NO N 6M V 7 N <O tC f0 F= N y F- E E a m IN. m m m V E c o o o o c o Lq o uni 0 Lq 0 q 0 0 s m m � N c2 V a N N m � v t N W O N f0 � I 0 o d o 0 o d d o d c m= M M M M M M M M M M m t mIL N N N N N N N N V 0 m b� G am `i m 'n n n I`' lop Iq c�i of a vi (d I: m of o �ul FF c N m E m _� c a m m m m m m m m m m m cc m U o 0 o d o o a Z - �n � (� �1mm W N Gmi, N Owl W N N N W N c. N N N N N 11�� T N m � 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o a s N N ! V W N W N W N W N W N W N W N W N m N Q o G O C 0 0 0 0 o C O C .66 0 0 0 0 C C o G C V O 1 7 mm 6 IL m tSs N O m W O M P09 co LL G O O o G O o C C. C 'u co ~ 0 0 c i 0 c i 0 M 0 of 0 v o + S o 0 o i .4 In jg 5 y P o N c lo+n o o 0 0 $}} 6 1L N N M M + V 1 j f0 F 03 0 55 o r_n C A V 298 II II II :0 U) Lmm Z y c 5. �a ZU a c o m U O(DC W U tm O 'O A U Z U "C m m O O O J U o C Q m Im cm d J C m N M W L .0 C O ((a m a Z Z o U U 0 W N L a. a. o Q0 U C C C = c C = c C C C O ' O O O O O O O O O O O O m E F F F E 5 LD E c a o 0 0 0 0 0 0 0 Lq 0 Iq 0 o 0 o " n o m o o tO ry N c, ci, v v a g ui E r E n� ci o `tb n m m o 0 0 Z p 0 0 6 0 o o 0 = o d o 0 6 o d d o o d o o a d g d d c m= M M M M M M M M M M InM a t m IL N N N N N N A U w a00 n fn0 IU[l O M OI f� l0 N O N m a w 1G tt1 r m m O Q O m M W N W W m m t0 m V M N m O m m r n n N n M N O W Ep � to co cc tri ui vi tri ui vi vi v � ttpp pp c E c c� ai v a tri td tti t: t. c m E c m w C Q N T N tp t0 t0 t0 (D tp t0 t0 W O � V o c o 6 0 0 0 0 6 0 0 o y aZ - �a l.i W N fA O N [] q N o o W O N o Of N O O W 0 N 0 W N t] Co0 Owl N UNl N O o Of 00 N Off N 00y I Tci > > Q1 N C OTN O ^N O tDN O t0N O tf1N O W N O t0N O f0N O t0N O t0N O (ON O ^N O �� � Q¢ O O a O 0 0 O o 0 0 O o 0 0 0 0 O C 0 0 0 0 0 0 O t 7 LL o g o 0 0 0 0 0 0 0 0 0 O G O C G O t7 O C o G O c C 0] N L 0 a) cz /0� LL ^0 W U) V, 0 cz Cab C cc 0 V) Za C >. ca =#40 N r Z U o m U m W U Q U Z b e C O O O O O 0 J C C C C C C C C a N S N N N W (R N m tD N m r M1 mmC �tO m F E r N C2 fI G Iz O m N N N N N N H � C F E c tmx o m n m m m m m �i uni, umi L N N N N N ci ci N A N a ? N o i�- O O o �- � r T- e- '- r r 7 N a S N pmj N n W n M m I(l N W N M n N N m N m W Z p6 o 0 0 0 0 0 m 0 m 0 m 0 m 0 a,W 0 9 0 0 o 0 0 c cm o o d 0 0 0 o g o 0 0 0 6 o c o 0 o c o 6 o c o o c o M M M M M M M M M M M M M M M M M M M C .Q mIL N N N N N N N N N N N N N N N N V 0 LL= M M M M M M M M M M M M M Q N � M H U O CJ O a a 7 o ul N lNl1 m n n n N O Oi Q1 d (+j m V N 2 w M O 7 M N a N m O V N OJ f0 N O C] f(NyV o C o O o O U O o 1� o G O TT - n N Of n h N yO� N r O CWO N WO f0 fO0 N N N N C C tpC to N In m ui u! ui Lff a 'C 'Q <F N a a C a V t1 c_ S N N N OMf tN0 N ONE t0 N N N r n V ci o o N O IQ N N N N N N N E 0 0 0 0 0 0 0 0 6 0 0 o d o 0 6 6W N yyO�� W NN N N N qN N N p ON1N �NW N NN ONE N mN N �R N � N �N 0 0 O o o o 0 0 O o O o O o 0 0 0 0 O o IsIR 0 o O O 0 0 ONE 0 o O O 1-1 0 0 6 6 6 ONEN 0 0 0 m� o 0 0 0 0 o g o 0 0 0 0 0 o g d o aoi o 0 0 0 o o o � o �o� O C o oN 0 0 0 0 o G O o 0 0 6 0 G o cQi 0 0 0 O o G NEI 66 oO O O G o 0 6 LL g o o O g o 0 o o O o g 2 -a 0 p 0 y O O o 6 0 G o O o o O C o o G o O C o a 2 I� 2 2 2 {C- ¢ 2 2 2 Q Fo ft 2 S 2 I¢ IS I¢ F o + o}♦i o o o o N N M M V o o u� c C N If1 m m n n m m W a rt N C O O LL O t w 3g o � s� mm mCD m I Y N C T oa C2 o a) ZU Q o (D rna U ) W U Q O O N `o m _ Cl) U -0 Z cz L 0 s a) 4) O YI�I :3 m m as 4) m of N r p U o m 09 0 U LO �tl N J O J IN lf) 0 I E E e w m m m ♦/, zz o J N N r_ a a` 0 N a 0 I m i � � C � � aA 3 �° z0 � »_— D v 0) 3 / 0 � f 2 k cz 0 rr 0 % 0 U) � � \cu g .... � £» P LL 2 <6 kc ccr ■c �§ §� �k Q! $& � c= .. & )\ j // k ! ■ � k ( _ E! 2. e r ! r 2 - m q m @ J| § q � { |q § § § § [ [ \ M m - a ) § 2 2 § S § § § [ § § ` § K 2 k § k 2 2 § k 2 §■E . co F § § § § § § § § 7 § ° « § § § ! / / 2 3 § § § —{r § tEQ � k fk ° §§ §§ H,�l §§ 2§ 2f S§ C; §§ §§ §§ §§ §§ §§ §R §§ §§ §§ §§ \ 1,.,-6 d� ,$ E ■ § R 7 R § !cm _ C CD L U a) CO 0 0 ^W W O Cd Z ad Co cc YI❑I T T in m m d � L J p U m LL LL O (d W N m O O U O N ❑ N O Cn w ' Cl) LLp N m ca W L E o� m E E m � Z Z O J m N L O O IL a. o E 0 o c m m c � t tm m C m C m C m c m C m C m c m C m C m c m C U o ❑ C C m C C C O C C C m E F e E N C] 16 V N tG tD f,: E H m m N o m m n n<q m m E U C o O - O O o o O O O >,x wcs "" 6 � 6 o � m 7 O O O O t E a c°S v a uNi so n P m '� Z p o 0 0 6 0 0 0 0 0 0 o c c o 0 0 0 6 0 o o c o i C In O U m11 N N LL = h m m ^Q Cy N INf1 W m N t�D O V H O (V (V C7 PJ .7 Y a p o O o U w w w ui u1 N ui N w O Ld T ONp I� O N NN N .�- W n N N r� t0 co 2 C m E c o ni of ci v vi ro o ad C £ c m U .w w 0 0 0 0 0 0 0 0 0 0 o o E a Ea V N OlN Q N TN wN NN 1��-9 O)N oN W N Hcc O O o o O o 00 0 0 0 0 0 o O o 00 0o C y O N N O 12 I--! O O�186 �p OOO OO O m ry Q0C C OO C O o 0 0 0 o G G O G 0 0 O o O C C 2 0 � O fOq pp W M M O PO9 op Cl M N O g Z O 8 7 m o o G o O o G O O O co Q Q 2 Q 2 0~C I2 I2 o o voi o o++ o voi g n c ~ + N N [+7 + tl+) V + N I++ O+ t+ L a m 12 Y N pp O p LL O 1� N N + C+) O uO1 U L_ S m E.2 Sm m ` nm 3m mm c 0 m _U m U in O F- cW C J Q z _O F- Q cc z N D J J a LL O O F- LL LL O z n cc J F- O F- cr- LL V) z O F- D U J LL LL. O z M z vi Q m W Q z Q ix M O N r a m� ❑ Uj `i c>. 0a = d1 N � U c L VFW +U+ U AQ co W 2 N U � Z L A0 AW ^W i (nl�l U m ao ,013 cc N N -a RMN � mU O U � � c m ZO C O O m N W Cal Q O W N d J LE O C E 'EQ O W � Z Z 0 J aO s a E m [e a a2 C g o� c g o to o O o 0 o v o o Ci W O N tV Ly N m N N N N N f F F CO � COD m r S m m 0 m ti E o 0 0 6 0 0 0 0 0 0 00 0 0 0 0 c p m 9 m o $ o O V W m m oQ L L I E 6LL N N M A m A O N O Q m N O m W O m O O t7 O Q O N O m m A A A m m m Q T m Z D O O O O O O O O O O c N N N No Q o O O O O o O d 0 Q 0 0 0 0 0 0 0 0 i 0 0 0 0 0 0 0 0 m x Q Q a Q Q Q Q Q Q Q Q Q Q Q Q c 0 L7 in N N 0 LL Q Q Q Q Q Q Q Q Q Q Q Q Q (J mN A N a COO N m N r N O v h O O CJ LV tV M Ci V 7 N f0 Lei w (J O O Q N N N N O f�l O Q O In l+1 A m N Q O N O O Ci G Ci 0 O 0 Q G Q U Q 0 Q O Q 0 O O O O N I() m 0] A Q N a O O N t0 CCpp m 1L1 m N N CO 0 P1 0 0IQQN m A O �L). Q �C1 LV N O 1pL1 W R W Q m V� O �fp0 p� {1Lpp) C O Q O n f0 10 CO+I r W m Q N E r of M v ui W— r of ci ai o r C N N N o F C0 0 0 0 M O O o A W 0 W m m m O m m m U 0 0 0 0 0 0 o 0 O 0 0 O 0 O 0 o 0 o O o o 0 6 CL m _d O O w O O O O h O �L] O c L.1 d 0 m 00 00 N 0 N 0 00 0 N 0 N 0 m N WO 0 pdmNH- Cq aw00 � _Q 06 000000O 0000 10i 00 0Li 0o i 00 00 00 Lio 00 00 00 00 0a 5 e 2 pp m O n N N N N N O .LL1- o O O O C O f. Lmp Z iy O O O O O G O O S O O O O s O O O O 0 O J O O O O O O O O O V r M v � t w I Iz [C lY [Y I[Y ¢ I m + N N M t+0 O v n �i n A W C O co !+O m C+O L W E o 0 o O 0 o O o N S 3 LL + + N N +0+ +S w ♦S voi o U Z 00 U c m Zo Q O U r C C m N W ¢oWG Nl m J_1r m C E E ° m 7 m Z Z 0 m m r w as o E 0 x e o C u C I L V o o 'o 'o 0 0 0 0 0 0 0 0 o v p j w w w w w w w w w w m w w Si m E F '3 E o rm�, o Leo uoi m m m v v v F E ni L•i L7 V ui Ld n W ai d d �i EN N N N r a� C I� 1� m m N m V t� L� Of Cif Kf M m O m m ti Lp a i+ N W O f0 F C O O O O O O O d d d O d n d N (] ti d N d O m O N m S m d O d CV LV L FF N th M Q N C d LL o Z d d O d d LO d m d n d n O ci O m d m O m d v O m d L L 0 0 o B 6 d o o g B S O O O O d O O O O O O O d O O c 0 m 2 v v v o o a v v v v v v v m to 2 - Q' CND N r m S < ? GmLi fmd CD LmV n N 6 (t{; O r O CV CV CV L•i M v a i[I 6d d Jq �.f d V O N if1 LV d N d O m CJ O : O W7 d 0I� Vt sY l:i f0 d if1 a O d O O O M V (] W C'1 TT N ((d;� 1� N 0'1 pd Of to C N O W ryLd C _ n m 0 0 t0 m N ui d. i0 0 wi W CD _ Ce- o r- m i. m ofCiW m v v C M Y iC) m r m C0 Ol N N N- (NV r E E w a o 0 o g o 0 0 0 0 0 o S o o d d Is 6 d d d d d d d d d 6 d mg5 d d d d g 5 m c. N Idl I 1,-l N W YN W I- LO fO N WO ¢¢ �m '00 d dd d dd dd d dW d dd dd dd dd dN dO diCd dd dN dN as ❑ fq Lq E uO O O O O O O O O O O O O W O O O O 0 0 O O O O 0 S O O OO m (V NO 00 d0 d 1E; 00 O d dd dd d0 ad dd Od dd Od d dd ad O d0 C! C x O O O O O O C C 0 N LL d O O O d O C C O d O O O d O O O O O O O d O d � v r r r r r r r [C Ir r r ir r w r Ix Ir Ir t � O O N O pp 1♦A O h S N p N O r O + N N m Ch v C Y+ N }S +u L+0 N n }O Q] C+0 ++ i� W r +� s E mpp I-- y 3 Z (aa cc V p O L J a u l0 W c� ¢CT E EEL Q� C O Ea a €Or eJ g aCC 0 5 e c 0 V C p � N N S c c La C O m O I^0 YM1 O ��yy N O N N ti qqF N y~ E Cl O) O N N N N N N N N N E f- m I- E F O cs c O O O 0 O O O O O pf09, C M m m GND, (^G O N M N M 7 C4 I() N (0 .0 m LL <p O1 m OMD f0 f[N3, (MO, Z0 ❑ G O O N O C � G e� O O aa O O O O O G � G � O p O N O p C m= 25 f{qin S O N Y LL M M M M W M M V fN0 In M C V (J ' O t7 m M N N N [J N S N N N N S N N O N O x - 2 _ V M It1 N N 11 it O �l S h W � m NN uOj M � 20 O m off N YI m m 0 f0 f0 a ` U O O O O O O O O d d d d d d d d d d d Is I gG ,N O1N Cif N 1�N OMIN W N W N W N mN a N W N�00 No 0) N O N NONO11 -- T NO GO 0 0 0 0 OGcc 0 0 00 c; 66 0 0 od 06 6 O 0 0 C O M VJ 1 Q 0 0 S S {� 0 0 O N 0 0 0 0 pp 0 0 S O 0 0 IR 0 0 S s m 0 0 0:1 N C 00 00 GO fV O G O G O OG 00 C]O �C OG 00 NN OCl 00 G C41 a _ o O o O pM 8 - W m o O o O f9 S o boy N w .9 O O z O N LL O to O O G w 0 O G O O O q O x LU co Cl G w O LL Oui O p F 17 I: rn Uw x m W Ux F- m F a 1- F- O LU m lu of Z e r_m ❑a pw F❑ a¢ �w O�+y mr v� Fx p Fa oZ x I_V-O a O o o o 0 0.1 0 C~ aF ? W o N I}n N �y a� O w m o v Ig+i O o N H w N o m O LE on � 4 3 ¢ w cn Z S '� + a +a S N z_ w S uoi S voi +v O S a +� z_ S +j LL o W N t++J t+v va LL m p 2 z +O. a ] 0 -. N 0 m c J ti r O CO M ate+ W GOD O GDO 0 G7 CD N C N co co N N ca Q Gf G dp � N CD CD CD J r fV T T T O O O O O O Z O O O O Q U CM U N O J W U U mCD c G � o CD co N N co X L m m GO d C N C Z I - Q' �_ 0 GOD. SOD 0) U) _ _ N N N N crr N 0 O C O O O O O J M C c m Q Lq o^ C. rn M _ C W N N N N N Ec 0 0 0 O O E 1= E L6 L6 o 0 0 N ti O O O 7 0 O O O O O LL c {0 _ v CD CD O O O O Q Q O O O O C O O Gn M M O O V: CM � 3 3 3 .• d w m O rn O rn o 0 y 59 o E 2 0 0 O 0 0 0 a l t o o r-� O O E r O ui r J N y .-1 and T ` y N N G J Z W T N N N N LL U N ° T N M 'et in O J Z n 0 m c J n r O m CD CD 0 CRq CORN N N N M N N L CD co 000 e Oco 000 C 7 0 N N N N N coop Ov (Dvoaco 0. N N N N N d W J N CD 0) CA CA � COCl) OQ)0 _ N N N N ui N o 0000 LOCL tlJ mao�nvn � CV N N ! N N N O m W d r o 0 0 0 0 CD C�Of 0 a E C9 C p Up Z NNNNN C'4 co O cli CO O N a O O O O r Q' of cDNtYNco IL N C vCDN;ir d> CO - Cl) N X N ry � COMNW V X c000NO O m MNOCC! -: LO II CO n100-CCOKO L ci w V a co v o o t- CD CDMM L O LO Co CNO ram- N 0 C_ L r000 II �v a .6W000 U 0 T e M 0 Cl 0 0 N rn E L6Wioo6 ? u ~ m o000o u v 0 ai _ E {p N0000 C M M O o 0 V O O O O O x co N 0 0 0 0 co m V O CM O 0 0 p e CD < 0 0 m N n o 0 0 co r- 0 f: OOOOO N 0 l� O O O O O o � O O O y 10- C700o0 0 � Q c Q o000o Cn s o a E o 0 c Vo 0 0000 w Lo 00000 � o000o a ,- � n J uj CDD L a C-4 vC N C N o E- W r N N N LL Cl) p O W O Vi J r N M v l0 n, Z Wilmington International Airport Avis Rental Car Service Center Stormwater Management Permit R-S&H APPENDIX E - GEOTECHNICAL REPORT w REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING ANALYSIS ILM AVIS RENTAL CAR CENTER WILMINGTON, NEW HANOVER COUNT`', NORTH CAROLINA TM PREPARED FOR: MR. MICHAEL BLACKMORE RS&H 1620 SOUTH BLVD SUITE 200 CHARLOTTE, NORTH CAROLINA 28203 ECS SOUTHEAST, LLP PROJECT NO.: 22.24984 JANUARY 17, 2017 EC3ECS SOUTHEAST, 3f Setting the Standard for Service" GeateCf irU4al • uonstructian Materia!s ' EnllifOnn^enta! • FisCt!iElGc � =yet;:- _:ed En- -. - r:rm F-tti�3 Regisier:,a Geo �i.,x2ts Firm a,Ld Er. n —ng Firm 3282 January 17, 2017 Mr. Michael Blackmore, P.E. RS&H 1520 South Blvd. Suite 200 Charlotte, North Carolina 28203 Re: Report of Subsurface Exploration and Geotechnical Engineering Analysis ILM Avis Rental Car Center Wilmington, New Hanover County, North Carolina ECS Project No.: 22.24984 Dear Mr. Blackmore: As authorized by your acceptance of our proposal number 22.21314, dated January 4, 2016, ECS Southeast, LLP (ECS) has completed a subsurface exploration for the subject project. This report presents the results of the field exploration and engineering analysis, along with our recommendations for design of geotechnical related items. We appreciate the opportunity to be of service to you during the design phase of this project and look forward to our continued involvement during the construction phase. If you have any questions concerning the information and recommendations presented in this report, please contact us at (910) 686-9114 for further assistance. Respectfully submitted, ECS SOUTHEAST, LLP Mike Ellis, E.I. Winslow E. Goins, P.E Project Manager Project Engineer North Carolina License No. 033571 6714 Netherlands Drive, Wilmington, NC 28405 • T: 910-686-9114 • F: 910-686-9666 • wway.ecslimited.com ECS Capitol Seiivi es.. PLLC • ECS Ronda, LLC • ECS Mid -Atlantic, LLC • ECS Midwest. LLC • ECS Southeast. LLP • ECS Texas. LLP EnZE C S S 0UT H, E A S i, L L P "Setting the Standard for Service" •-m._.,.._1- Geotechnica! - Construction Materials - Environmental - Facilities tvc .=,eos:cr=.•a �! ,iEcc::,p r:rm F-!. ,:; K+: Rep!sW. *o 3_ _'.ts Firm ,:,•:C!� S- Re---',-, j Fr.�paer,%i Frrr,':":? January17, 2017 Mr. Michael Blackmore, P.E. RS&H 1520 South Blvd. Suite 200 Charlotte, North Carolina 28203 Re: Report of Subsurface Exploration and Geotechnical Engineering Analysis ILM Avis Rental Car Center Wilmington, New Hanover County, North Carolina ECS Project No.: 22.24984 Dear Mr. Blackmore: As authorized by your acceptance of our proposal number 22.21314, dated January 4, 2016, ECS Southeast, LLP (ECS) has completed a subsurface exploration for the subject project. This report presents the results of the field exploration and engineering analysis, along with our recommendations for design of geotechnical related items. We appreciate the opportunity to be of service to you during the design phase of this project and look forward to our continued involvement during the construction phase. If you have any questions concerning the information and recommendations presented in this report, please contact us at (910) 686-9114 for further assistance. Respectfully submitted, ECS SOUTHEAST, LLP Mike Ellis, E.I. Winslow E. Goins, P.E Project Manager Project Engineer North Carolina License No. 033571 6714 Netherlands Drive, Wilmington, NC 28405 - T. 910-686-9114 - F: 910-686-96666 - www.ecslimited.com ECS Capitol Services. PLLC - ECS Florida, LLC - ECS M1id-Atlantic, LLC - ECS i liid,. ast, LLC - ECS Southeast, LLP - ECS Texas, LLP REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING ANALYSIS ILM AVIS RENTAL CAR CENTER . WILMINGTON, NEW HANOVER COUNTY, NORTH CAROLINA PREPARED FOR: MR. MICHAEL BLACKMORE RS&H 1620 SOUTH BLVD SUITE 200 CHARLOTTE, NORTH CAROLINA 28203 PREPARED BY: ECS SOUTHEAST, LLP 6714 NETHERLANDS DRIVE WILMINGTON, NORTH CAROLINA 28406 ECS SOUTHEAST, LLP PROJECT NO.: 22.24984 FIRM NO. F-1078 WINSLOW E. GOINS, P.E. ro IV NC LICENSE NO. 033761 JANUARY 17, 2017 TABLE OF CONTENTS 1.0 EXECUTIVE SUMMARY.......................................................................................................1 2.0 PROJECT OVERVIEW.........................................................................................................2 2.1 Project Information...........................................................................................................2 2.2 Scope of Work.................................................................................................................2 2.3 Purpose of Exploration.....................................................................................................2 3.0 EXPLORATION PROCEDURES..........................................................................................3 3.1 Subsurface Exploration Procedures.................................................................................3 3.1.1 Cone Penetration Tests...........................................................................................3 3.1.2 Kessler Dynamic Cone Penetrometer Tests............................................................3 4.0 EXPLORATION RESULTS...................................................................................................4 4.1 Site Conditions.................................................................................................................4 4.2 Regional Geology............................................................................................................4 4.3 Soil Conditions.................................................................................................................4 4.4 Groundwater Conditions..................................................................................................5 6.0 ANALYSIS AND RECOMMENDATIONS..............................................................................6 5.1 Subgrade Preparation......................................................................................................6 5.2 Engineered Fill Placement...............................................................................................7 5.3 Permanent Site Slopes....................................................................................................8 5.4 Foundation Recommendations........................................................................................9 5.5 Floor Slab Design..........................................................................................................10 5.6 Pavement Design Considerations.................................................................................10 5.7 Site Drainage.................................................................................................................11 5.8 Construction Considerations..........................................................................................12 6.0 CLOSING...........................................................................................................................13 APPENDICES APPENDIX A -FIGURES APPENDIX B-CPT SOUNDING LOGS APPENDIX C-KESSLER DCP TEST RESULTS AND HAND AUGER BORING LOGS APPENDIX D-GENERAL CONDITIONS Report of Subsurface Exploration and Geotechnical Engineering Analysis ILM Avis Rental Car Service Center ECS Project No.: 22.24984 1.0 EXECUTIVE SUMMARY The site is located at 1701 Hall Drive in Wilmington, New Hanover County, North Carolina. The proposed construction will consist of rental car service center with associated drive and parking areas. Three existing Avis Rental Car Services are west of the proposed structure. The south portion of the site is open with a drainage system. North or the drainage system, two roadways covered by topsoil exist on the site. One of the roadways runs north to south along the west portion of the site and branches off to a separate roadway which runs east to west. The existing roadways are bordered by relatively young pine trees. Drainage ditches associated with the roadways are present with elevation differences ranging from minimal to 3 feet. Additional project information was not available at the time of this report. Beneath the surface materials to a depth of about 10 feet, the CPT soundings (S-1 through S- 3) typically encountered intermittent layers of loose to dense, silty, slightly silty, and clean sands (SM, SP-SM, SP) and soft to stiff, sandy silts, clayey silts, and fat clays (ML, CL-ML, CH). From 10 feet to a termination depth of approximately 22 feet, sounding S-3 encountered medium dense, slightly silty and clean sands (SP-SM, SP). From 22 to a termination depth of 25 feet, Sounding S-3 encountered soft to stiff, sandy silt, clayey silt, and fat clay (ML, CL-ML, CH). The on -site sandy soils (SM, SM-SP, SP) are suitable for reuse as long as they are used in compliance with section 5.2 of this report. The natural fine-grained soils, classified as clays or silts (CH, CL-ML, ML), should generally not be considered for use as engineered fill, but may be evaluated by the geotechnical engineer to determine their suitability at the contractor's request. It is important to note that the natural geology at the site has been modified in the past. Therefore, potential fill and unsuitable materials may be present at the site. Provided the subgrade preparation and earthwork operations are completed in strict accordance with the recommendations of this report, the proposed structure can be supported on conventional shallow foundations bearing on approved natural materials and/or properly compacted fill with a preliminary net allowable bearing pressure of up to 2,000 psf. Once site grades and structural loads are finalized, ECS requests that this information be provided to us for our review and to revise our recommendations, if necessary. Specific information regarding the subsurface exploration procedures used, the site and subsurface conditions at the time of our exploration, and our conclusions and recommendations concerning the geotechnical design and construction aspects of the project are discussed in detail in the subsequent sections of this report. Please note this Executive Summary is an important part of this report and should be considered a "summary" only. The subsequent sections of this report constitute our findings, conclusions, and recommendations in their entirety. Report of Subsurface Exploration and Geotechnical Engineering Analysis ILM Avis Rental Car Service Center ECS Project No.: 22.24984 2.0 PROJECT OVERVIEW 2.1 Project Information ECS' understanding of the proposed construction is based upon information provided by Mr. Michael Blackmore, P.E. of RS&H. The site is located at 1701 Hall Drive in Wilmington, New Hanover County, North Carolina. The proposed construction will consist of rental car service center with associated drive and parking areas. Three existing Avis Rental Car Services are west of the proposed structure. The south portion of the site is open with a drainage system. North or the drainage system, two roadways covered by topsoil exist on the site. One of the roadways run north to south along the west portion of the site and branches off to a separate roadway which runs east to west. The existing roadways are bordered by relatively young pine trees. Drainage ditches associated with the roadways are present with elevation differences ranging from minimal to 3 feet. 2.2 Scope of Work The conclusions and recommendations contained in this report are based on the results of the following: • Two electronic cone penetration test (CPT) soundings advanced to termination depths of approximately 10 feet, • One electronic cone penetration test (CPT) sounding, advanced to a termination depth of approximately 25 feet, with shear wave velocity measurements, • Two Kessler dynamic cone penetrometer (DCP) tests with hand augers, and • Engineering analyses of the field findings with respect to the provided project information. 2.3 Purposes of Exploration The purpose of this exploration program was to determine the soil and groundwater conditions at the site and to develop engineering recommendations to assist in the design and construction of the proposed project. We accomplished these objectives as follows: • Performing a site reconnaissance to evaluate the existing site conditions, • Performing soundings to explore the subsurface soil and groundwater conditions, • Performing eight Kessler DCP tests to correlate a CBR to provide pavement recommendations, and • Analyzing the field data to develop appropriate geotechnical engineering design and construction recommendations regarding soil suitability for reuse. 2 Report of Subsurface Exploration and Geotechnical Engineering Analysis ILM Avis Rental Car Service Center ECS Project No.: 22.24984 3.0 EXPLORATION PROCEDURES 3.1 Subsurface Exploration Procedures 3.1.1 Cone Penetration Tests Three electronic cone penetration test (CPT) soundings (S-1 through S-3) were performed during our field exploration. The CPT soundings were performed in general conformance with ASTM D 5778 with a track mounted rig. An ECS representative staked the CPT sounding locations using existing site features and a hand held GPS device. Approximate locations of the CPT soundings are indicated on the Exploration Location Diagram in Appendix A of this report. The cone used in the soundings has a tip area of 10 .cm2 and a sleeve area of 150 cm2. The CPT soundings recorded tip resistance and sleeve friction measurements to assist in determining pertinent index and engineering properties of the site soils. The ratio of the sleeve friction to tip resistance is then used to aid in assessing the soil types through which the tip is advanced. The results of the CPT soundings are presented in Appendix B. 3.1.2 Kessler Dynamic Cone Penetrometer Tests Two Kessler Dynamic Cone Penetrometer (DCP) tests were performed in the location of the proposed parking lot areas. The Kessler DCP is used to estimate the strength characteristics of soils. The Kessler DCP was continuously driven approximately 2 feet below the existing ground surface. The Kessler DCP is driven into the soil by dropping a Dual -Mass 17.6 lb Hammer from a height of 22.6 in. The depth of cone penetration is measured at selected penetration or hammer drop intervals and the soil shear strength is reported in terms of Kessler DCP index. The Kessler DCP index is based on the average penetration depth resulting from one blow of the 17.6 lb hammer. The Kessler DCP index can be correlated to CBR and modulus of rigidity. The individual results of the Kessler DCP tests are presented in Appendix C. Report of Subsurface Exploration and Geotechnical Engineering Analysis ILM Avis Rental Car Service Center ECS Project No.: 22.24984 4.0 EXPLORATION RESULTS 4.1 Site Conditions The site is located at 1701 Hall Drive in Wilmington, New Hanover County, North Carolina. Three existing Avis Rental Car Services are west of the proposed structure. The south portion of the site is open with a drainage system. North or the drainage system, two roadways covered by topsoil exist on the site. One of the roadways runs north to south along the west portion of the site and branches off to a separate roadway which runs east to west. The existing roadways are bordered by relatively young pine trees. Drainage ditches associated with the roadways are present with elevation differences ranging from minimal to 3 feet. 4.2 Regional Geology The site is located in the Coastal Plain Physiographic Province of North Carolina. The Coastal Plain is composed of seven terraces, each representing a former level of the Atlantic Ocean. Soils in this area generally consist of sedimentary materials transported from other areas by the ocean or rivers. These deposits vary in thickness from a thin veneer along the western edge of the region to more than 10,000 feet near the coast. The sedimentary deposits of the Coastal Plain rest upon consolidated rocks similar to those underlying the Piedmont and Mountain Physiographic Provinces. In general, shallow unconfined groundwater movement within the overlying soils is largely controlled by topographic gradients. Recharge occurs primarily by infiltration along higher elevations and typically discharges into streams or other surface water bodies. The elevation of the shallow water table is transient and can vary greatly with seasonal fluctuations in precipitation. 4.3 Soil Conditions Approximately 4 to 6 inches of organic topsoil and rootmat were reported by the drillers at the test locations. It should be noted that the depths and thicknesses of organic topsoil and rootmat are expected to vary across the site. CPT Soundings (S-1 through S-3): Beneath the surface materials to a depth of about 10 feet, the CPT soundings (S-1 through S-3) typically encountered intermittent layers of loose to dense, silty, slightly silty, and clean sands (SM, SP-SM, SP) and soft to stiff, sandy silts, clayey silts, and fat clays (ML, CL-ML, CH). The equivalent corrected standard penetration test resistances (N*-values) in these soils generally ranged from 3 to 44 bpf. From 10 feet to a termination depth of approximately 22 feet, sounding S-3 encountered medium dense, slightly silty and c!ean sands (SP-SM, SP) with N*-values generally ranging from 14 to 22 bpf . From 22 to a termination depth of 25 feet, Sounding S-3 encountered soft to stiff, sandy silt, clayey silt, and fat clay (ML, CL-ML, CH) with N*-values generally ranging from 3 to 14 bpf. 4 Report of Subsurface Exploration and Geotechnical Engineering Analysis ILM Avis Rental Car Service Center ECS Project No.: 22.24984 Kessler DCP Tests and Hand Auger Borings: Beneath the surface materials to a depth of about 4 feet, the Kessler DCP and hand auger borings (K-1 through K-2) typically encountered silty and clean sands (SM, SP). The descriptions provided in this section are a general summary of the subsurface conditions encountered within the CPT test soundings and the Kessler DCP borings. The CPT Sounding Logs in Appendix B contain detailed information recorded at each of the sounding locations. Findings from the Kessler DCP tests and the hand auger borings (K-1 through K-8) are shown in Appendix C. 4.4 Groundwater Conditions Porewater pressure measurements were made at the sounding locations during exploration. The apparent groundwater depths were observed to be approximately 4.0 to 5.5 feet below the existing grade in the CPT soundings. The highest groundwater observations are normally encountered in the late winter and early spring. Variations in the location of the long-term water table may occur as a result of changes in precipitation, evaporation, surface water runoff, and other factors not immediately apparent at the time of this exploration. If long term water levels are crucial to the development of this site, it would be prudent to verify water levels with the use of perforated pipes or piezometers. 5 Report of Subsurface Exploration and Geotechnical Engineering Analysis ILM Avis Rental Car Service Center ECS Project No.: 22.24984 5.0 ANALYSIS AND RECOMMENDATIONS The recommendations provided in this report are based upon our understanding of the proposed construction, the information provided to us during this exploration and our past experience with similar conditions. Should any of the information provided to us be changed prior to final design, ECS should be notified to review these recommendations and make appropriate revisions, if necessary. 5.1 Subgrade Preparation The first step in preparing the site for the proposed construction should be to remove vegetation, rootmat, topsoil, existing footings, existing utilities, deleterious materials, and other soft or unsuitable materials from the existing ground surface. These operations should extend at least 10 feet, where possible, beyond the planned limits of the proposed building and pavements. It is important to note that the natural geology at the site has been modified in the past. Therefore, potential fill and unsuitable materials may be present at the site. After proper clearing, stripping, grubbing, further evaluation of the site soil and prior to fill placement, foundation, slab, or pavement construction, the exposed subgrade soils should be evaluated by an experienced geotechnical engineer to identify localized unstable or otherwise unsuitable materials. After evaluating the exposed soils, proofrolling using a heavy vibratory smooth drum roller, having a weight of at least 10 tons, is suggested to be used at this time to aid in identifying localized soft or unsuitable material which should be removed. The proofrolling will also help densify the upper exposed subgrade soils. Soft or unsuitable materials identified during proofrolling operations should be either repaired in -place or removed and replaced with an approved backfill placed and compacted in accordance with recommendations of this report. In -place densification or undercutting should be anticipated in the drive and parking areas in the vicinity of boring location K-2 due to the presence of loose sands in the upper one foot. Site subgrade conditions will be significantly influenced by weather conditions. Subgrades that are evaluated after periods of rainfall will not respond as well to proofrolling as subgrades that are evaluated after periods of more favorable weather. We strongly recommend that rubber tire equipment not be used if subgrade conditions exhibit elevated moisture conditions. The contractor should use tracked equipment to minimize the degradation of marginally stable subgrades. The preparation of fill subgrades, as well as proposed building subgrades, should be observed on a full-time basis by ECS personnel. These observations should be performed by an experienced geotechnical engineer or qualified person to ensure that unsuitable materials have been removed and that the prepared subgrade meets project requirements for support of the proposed construction and/or fills. Report of Subsurface Exploration and Geotechnical Engineering Analysis ILM Avis Rental Car Service Center ECS Project No.: 22.24984 5.2 Engineered Fill Placement Following the removal of deleterious surface and subsurface materials; and after achieving a stable subgrade, engineered fills can be placed and compacted to achieve the desired site grades. Fill for support of the proposed construction and for backfill of utility lines within expanded building and pavement limits should consist of an approved material, free of organic matter and debris and cobbles greater than 3 inches, less than 35 percent fines passing the #200 sieve, and have a Liquid Limit (LL) and Plasticity Index (PI) less than 35 and 9, respectively. We also recommend that fills within structural areas have a standard Proctor (ASTM D 698) maximum dry density of at least 100 pounds per cubic foot (pcf). Materials that should not be used as engineered fill include topsoil, organic materials (OH, OL), and high plasticity clays and silts (CH, MH). Such materials removed during grading operations should be either stockpiled for later use in landscape fills, or placed in approved on or off -site disposal areas. The on -site sandy soils (SM, SM-SP, SP) are suitable for reuse as long as they are used in compliance with section 5.2 of this report. The natural fine-grained soils, classified as clays or silts (CH, CL-ML, ML), should generally not be considered for use as engineered fill, but may be evaluated by the geotechnical engineer to determine their suitability at the contractor's request. Existing soils containing significant amounts of organic matter will not be adequate for re -use as engineered fill. As such, the organic content of the near surface soils should be evaluated to determine if some of these soils will be adequate for re -use as engineered fill. Natural fine- grained soils classified as clays or silts (CL, ML) should generally not be considered for use as engineered fill, but may be evaluated by the geotechnical engineer to determine their suitability at the contractor's request. Moisture conditioning may be required for the re -use of excavated material for use as engineered fill. Prior to the commencement of fill operations and/or utilization of off -site borrow materials, the contractor should provide representative samples of the proposed fill soils to the geotechnical engineer. The geotechnical engineer can determine the material's suitability for use as an engineered fill and develop moisture -density relationships in accordance with the recommendations provided herein. Samples should be provided to the geotechnical engineer at least 3 to 5 days prior to their use in the field to allow for the appropriate laboratory testing to be performed. Fill materials placed within the building and pavement areas should be placed in lifts not exceeding 8 inches. in loose lift thickness and moisture conditioned to within their working range of optimum moisture content. The fills should then be compacted to a minimum of 98 percent of the soil's standard Proctor (ASTM D 698) maximum dry density. The typical working range of optimum moisture for the natural Coastal Plain soils at the site is expected to be within approximately 3 percent of the optimum moisture content. Care should also be taken to provide a smooth, gently sloping ground surface at the end of each day's earthwork activitics to help reduce the potential for ponding and absorption of surface water. Report of Subsurface Exploration and Geotechnical Engineering Analysis ILM Avis Rental Car Service Center ECS Project No.: 22.24984 Grade controls should also be maintained throughout the filling operations. Filling operations should be observed on a full-time basis by qualified ECS personnel to determine that the required degrees of compaction are being achieved. We recommend that a minimum of one compaction test per 2,500-square-foot area be performed for each lift of controlled fill. The elevation and location of the tests should be clearly identified at the time of fill placement. Areas which fail to achieve the required degree of compaction should be re -worked until the specified degree of compaction is achieved. Failing test areas may require moisture adjustments or other remedial activities in order to achieve the required compaction. Fill materials should not be placed on frozen, frost -heaved, and/or soils which have been recently subjected to precipitation. Wet or frozen soils should be removed prior to the continuation of site grading and fill placement. Borrow fill materials, if required, should not contain excessively wet or frozen materials at the time of placement. Additionally, if grading operations occur during the winter months, frost -heaved soils should be removed prior to placement of engineered fill, granular sub -base materials, foundation or slab concrete, and asphalt pavement materials. If problems are encountered during the site grading operations, or if the actual site conditions differ from those encountered during our subsurface exploration, the geotechnical engineer should be notified immediately. 5.3 Permanent Site Slopes We recommend that permanent cut slopes less than 10 feet tall through undisturbed natural soils be constructed at 2.5:1 (horizontal: vertical) or flatter. Permanent fill slopes less than 20 feet tall may be constructed using controlled fill at a slope of 3:1 or flatter. Depending upon the soil used for construction and assuming proper compaction, face construction and vegetation, 3:1 (horizontal to vertical) fill slopes of up to 31 feet should be globally stable. A slope of 3:1 or flatter may be desirable to permit establishment of vegetation, safe mowing, and maintenance. The surface of all cut and fill slopes should be adequately compacted. All permanent slopes should be protected using vegetation or other means to prevent erosion. The outside face of building foundations and the edges of pavements placed near slopes should be located an appropriate distance from the slope. The North Carolina Building Code lists the following requirements: • Pavements placed at the top of fill slopes should be placed at distance equal to at least 1/3 of the height of the slope behind the crest of the slope, but that distance need not be more than 40 feet. • Pavements near the bottom of a slope should be located at least %2 of the height of the slope from the toe of the slope, but the distance need not be more than 15 feet. • Slopes with pavements located closer than these iimits or slopes taller than the height limits indicated, should be specifically evaluated by the geotechnical engineer and may require approval from the building code official. Report of Subsurface Exploration and Geotechnical Engineering Analysis ILM Avis Rental Car Service Center ECS Project No.: 22.24984 Fill slopes should be constructed by placing controlled fill in horizontal lifts which extend to or slightly beyond the slope face. Each lift of fill should be compacted to the specified minimum density before placing the subsequent lift. The compaction equipment should travel parallel to the slope face to ensure that fill at the face of the slope is compacted to the same level as the fill farther back from the face. If needed, tracked equipment or compaction equipment can roll up and down the slope face to compact loose surficial soils to reduce erosion, but this method should not be used to construct the slope. In some cases it may be advantageous to overbuild the fill slope (place fill beyond the limits of the slope face) and then cut back into the fill to leave a clean, compacted slope face exposed. Fill slopes and fill pads should not be constructed by placing fill against berms. If not prohibited by plan and specification, the grading contractor will sometimes construct berms out of site strippings or unsuitable soil along the limits of fill slopes and then will place controlled fill in horizontal lifts against the berms. This practice will produce a slope constructed of uncompacted materials adjacent to a zone of compacted fill with a nearly vertical interface between the two zones of fill. Over time, sometimes after appreciable rainfall, the uncompacted slope material will settle or slough away which removes the confining pressure holding the compacted fill in place. Without the confining pressure from the slope material, the compacted fill will become unstable and will slough, slide, or push out laterally. This can create problems for pavements and structures located close to the crest of the slope. 6.4 Floor Slab Design Provided a suitable subgrade will be prepared as recommended herein, ground level slabs can be designed as slabs -on -grade. Our findings indicate that a modulus of subgrade reaction (kJ of 125 pci is appropriate for design provided that the upper 12 inches of the slab subgrade soils have been uniformly compacted to at least 98 percent of their standard Proctor maximum dry density and are unyielding during proofrolling. We recommend a friction resistance coefficient of 0.40 for the floor slab and soil interface. We recommend that slabs -on -grade be isolated from the foundations so that potential differential settlement of the structure will not induce shear stresses in the floor slab. Also, to minimize the crack width of shrinkage cracks that may develop near the surface of the slab, wire mesh reinforcement may be included in the slab design. The mesh should be located in the top third of the slab to be effective. We also recommend that slabs -on -grade be underlain by a minimum of 6 inches of open graded aggregate to help prevent the capillary rise of subsurface moisture from adversely affecting the slab. If open graded aggregate is not available, clean sand with less than 3 percent fines can be used provided the placement and compaction of the sand complies with the above recommendations. If floor covering such as tile or carpet will be utilized for interior finishes, a polyethylene vapor barrier may be used beneath the floor slab for moisture control considerations. W Report of Subsurface Exploration and Geotechnical Engineering Analysis ILM Avis Rental Car Service Center ECS Project No.: 22.24984 5.6 Foundation Recommendations Provided the subgrade preparation and earthwork operations are completed in strict accordance with the recommendations of this report, the proposed structure can be supported on conventional shallow foundations bearing on approved natural materials and/or properly compacted fill. We recommended a net allowable design soil bearing pressure of up to 2,000 psf for proportioning continuous and isolated column footings. To reduce the possibility of foundation bearing failure and excessive settlement due to local shear or "punching" failures, we recommend that continuous footings have a minimum width of 18 inches and that isolated column footings have a minimum lateral dimension of 30 inches. Furthermore, footings should bear at a depth to provide adequate frost cover protection. For this region, we recommend the bearing elevation be a minimum depth of 12 inches below the finished exterior grade or in accordance with the local building code requirements. We recommend a friction. resistance coefficient of 0.40 for the footings and soil interface. Once structural loads and site grades are established, we request that they be provided to us to review our recommendations and make any necessary changes. The net allowable soil bearing pressure refers to that pressure which may be transmitted to the foundation bearing soils in excess of the final minimum surrounding overburden pressure. The final footing elevation should be evaluated by ECS personnel to verify that the bearing soils are capable of supporting the recommended net allowable bearing pressure and are adequate for foundation construction. These evaluations should include visual observations, hand rod probing, and dynamic cone penetrometer (ASTM STP 399) testing, or other methods deemed appropriate by the geotechnical engineer at the time of construction, in each column footing excavation and at intervals not greater than 50 feet in continuous footing excavations. The settlement of a structure is a function of the compressibility of the bearing materials, bearing pressure, actual structural loads, fill depths, and the bearing elevation of footings with respect to the final ground surface elevation. Estimates of settlement for foundations bearing on engineered or non -engineered fills are strongly dependent on the quality of fill placed. Factors which may affect the quality of fill include maximum loose lift thickness of the fills placed and the amount of compactive effort placed on each lift. Provided that the recommendations outlined in this report are strictly adhered to, we expect that total settlements for the proposed construction are expected to be in the range of 1 inch or less, while the differential settlement will be approximately 1/2 of the anticipated total settlement. This analysis is based on our engineering experience and assumed structural loadings for this type of structure, and is intended to aid the structural engineer with his design. 5.6 Pavement Design Considerations For the design and construction of exterior pavements, the subgrades should be prepared in strict accordance with the recommendations in the "Subgrade Preparation" and "Engineered Fill Placement" sections of this report. An important consideration with the design and construction of pavements is surface and subsurface drainage. Where standing water develops, either on the pavement surface or within the base course layer, softening of the subgrade and other problems related to the deterioration of the pavement can be expected. Furthermore, good drainage should minimize the possibility of the subgrade materials becoming saturated during the normal service period of the pavement. 10 Report of Subsurface Exploration and Geotechnical Engineering Analysis ILM Avis Rental Car Service Center ECS Project No.: 22.24984 Actual traffic conditions were not provided to ECS. However, based on our experience for light duty traffic for similar projects, a light duty flexible pavement section may consist of 2 inches of surface SF9.5 mix overlying at least 6 inches of compacted ABC stone in the parking and drive aisle areas. Similarly, a heavy duty flexible pavement section may consist of 3 inches of surface SF9.5 mix overlying at least 8 inches of compacted graded aggregate base in the roadway areas. For a rigid pavement section, we recommend 6 inches of 450 psi flexible strength concrete overlying at least 6 inches of compacted ABC stone in the roadway areas. Regardless of the section and type of construction utilized, saturation of the subgrade materials and asphalt pavement areas results in a softening of the subgrade material and shortened life span for the pavement. Therefore, we recommend that both the surface and subsurface materials for the pavement be properly graded to enhance surface and subgrade drainage. By quickly removing surface and subsurface water, softening of the subgrade can be reduced and the performance of the parking area can be improved. Site preparation for the parking areas should be similar to that for the building area including stripping, proofrolling, and the placement of compacted structural fill. Please note that large, front -loading trash dumpsters frequently impose concentrated front - wheel loads on pavements during loading. This type of loading typically results in rutting of bituminous pavements and ultimately pavement failures and costly repairs. Consequently, we recommend the use of an 8 inch thick, mesh reinforced concrete slab that extends the entire length of the truck. Concrete pavements should be properly jointed and reinforced as needed to help reduce the potential for cracking and to permit proper load transfer. 6.7 Site Drainage Positive drainage should be provided around the perimeter of the structure to help minimize the potential for moisture infiltration into the foundation and slab subgrade soils. We recommend that landscaped areas adjacent to these structures be sloped away from the construction and maintain a fall of at least 6 inches for the first 10 feet outward from the structures. Roof water should be discharged directly into below -grade stormwater piping or be directed a sufficient distance away from the building with downspouts. The parking lots, sidewalks, and other paved areas should also be sloped to divert surface water away from the proposed building. The proper diversion of surface water during site grading and construction will help reduce the potential for delays associated with periods of inclement weather. The proper diversion of surface water is especially critical since portions of the site soils are expected to be moisture sensitive. Based upon our past experience, the use of "crowning" large areas of exposed soils should be useful to help divert surface water from the prepared subgrades. 11 Report of Subsurface Exploration and Geotechnical Engineering Analysis ILM Avis Rental Car Service Center ECS Project No.: 22,24984 5.8 Construction Considerations Exposure to the environment may weaken the soils at the foundation bearing elevation if the foundation excavations remain exposed during periods of inclement weather. Therefore, foundation concrete should be placed the same day that proper excavation is achieved and the design bearing pressure verified. If the bearing soils area softened by surface water absorption or exposure to the environment, the softened soils must be removed from the foundation excavation bottom immediately prior to placement of concrete. If the excavation must remain open overnight, or if inclement weather becomes imminent while the bearing soils are exposed, we recommend that a 2 to 3 inch thick "mud -mat" of "lean" concrete be placed over the exposed bearing soils before the placement of reinforcing steel. It is imperative to maintain good site drainage during earthwork operations to help maintain the integrity of the surface soils. The surface of the site should be kept properly graded to enhance drainage of surface water away from the proposed construction areas during the earthwork phase of this project. We recommend that surface drainage be diverted away from the proposed building and pavements areas without significantly interrupting its flow. Other practices would involve sealing the exposed soils daily with a smooth -drum roller at the end of the day's work to reduce the potential for infiltration of surface water into the exposed soils. 12 Report of Subsurface Exploration and Geotechnical Engineering Analysis ILM Avis Rental Car Service Center ECS Project No.: 22.24984 The key to minimizing disturbance problems with the soils is to have a proper earthwork operations plan. Specifically, it should be the earthwork contractor's responsibility to maintain the site soils within a workable moisture content range to obtain the required in -place density and maintain a durable subgrade. Scarifying and drying operations should be included in the contractor's price and not be considered an extra to the contract. In addition, construction equipment cannot be permitted to travel across the site, especially once the desired final grades have been established. Construction equipment should be limited to designated lanes and areas, especially during wet periods to minimize disturbance of the site subgrades. It will likely be necessary to utilize tracked equipment during grading operations particularly if the subgrade soils exhibit elevated moisture conditions. 13 Report of Subsurface Exploration and Geotechnical Engineering Analysis ILM Avis Rental Car Service Center ECS Project No.: 22.24984 6.0 CLOSING Our geotechnical analysis of the site has been based on our understanding of the site, the project information provided to us, and the data obtained during our exploration. The general subsurface conditions utilized in our analysis have been based on interpolation of subsurface data between the soundings and borings. If the project information provided to us is changed, please contact us so that our recommendations can be reviewed and appropriate revisions provided, if necessary. The discovery of site or subsurface conditions during construction which deviate from the data outlined in this exploration should be reported to us for our review, evaluation and revision of our recommendations, if necessary. The assessment of site environmental conditions for the presence of pollutants in the soil and groundwater of the site is beyond the scope of this geotechnical exploration. 14 APPENDICES APPENDIX A FIGURES e CredRs:rw EsPIERE, myfnd e ar MAL� AI s _ •- • R IL W E r s ( T'. 4w f +� - - R •If Alk . ,'0A zoo ' ■ s 0 370 740 1,480 2,2202.960 ft A F SITE LOCATION DIAGRAM (ENGINEER WEG SCALE ILM RENTAL CAR SERVICE CENTER 1 " = 1,500' ` PROJECT NO. SHEET 1 OF 2 7 ©ATE WILMINGTON, NC I 1/17,2017 7 I i• is 0 co _LU !L O. O O0 aw J O W W Y Q = M Z a= ao Nm W M W 00 wa EM] EXPLORATION ILM Avis. Rental Car Service Center m x L Q a Q Z o) N O " O LOCATION DIAGRAM � N N W Wilmington, North Carolina a�w[ w z W z 3 w CD Q z w aT -' o[ w a w o APPENDIX B CPT SOUNDING LOGS REFERENCE NOTES FOR CONE PENETRATION TEST (CPT) SOUNDINGS In the CPT sounding procedure (ASTM-D-5778), an electronically instrumented cone penetrometer is hydraulically advanced through soil to measure point resistance (Q, pore water pressure M), and sleeve friction (%). These values are recorded continuously as the cone is pushed to the desired depth. CPT data is corrected for depth and used to estimate soil classifications and intrinsic soil parameters such as angle of internal friction, preconsolidation pressure, and undrained shear strength. The graphs below represent one of the accepted methods of CPT soil behavior classification (Robertson, 1990). 1000 (5 1051 U C co N y 0 ir m 10 c 0 U 1 0.1 1 10 Friction Ratio, Fr N 1. Sensitive, Fine Grained 2. Organic Soils-Peats 3. Clays; Clay to Silty Clay 4. Clayey Silt to Silty Clay 5. Silty Sand to Sandy Silt s A •0.4 0 0.4 0.8 1.2 Pore Pressure Ratio, Bq 6. Clean Sands to Silty Sands 7. Gravelly Sand to Sand 8. Very Stiff Sand to Clayey Sand 9. Very Stiff Fine Grained The following table presents a correlation of corrected cone tip resistance (Q to soil consistency or relative density: SAND SILT/CLAY Corrected Cone Tip Resistance is Relative Density Corrected Cone Tip Resistance tsf Relative Density <20 Very Loose <5 Very Soft 20-40 Loose 5-10 Soft 40-120 Medium Dense 10-15 Medium Stiff 15-30 Stiff 120-200 Dense 30-45 Very Stiff >200 Very Dense 45-60 Hard >60 Very Hard CO Y oc Q z W c cr T c� c E w c m 3 w 'L _......- -- ...................-----.... y C tm z' BIOS m O a N 0 CM T T JNV L Z R - - - *� w = — f Cco .............. Qm VN M - — ---- —� — — T—--------�I� -- �. C W ico OT C + fA ic O v 'w a M C �+ !0 Co N r Cc CL aE a r Z c a Cr a r� 0. {a Cy L C 0 c J V C C YC C � C1 C co 1 N FLLN l _ CN LL w I 1 ] 1 1 c 'RA y ffl id LL �' 05 a O I tll {TO c J I f v w 13 Ma c :31 ILI! L I I I -I- a � I I - t i v a m � :c o G N ? w m C N m (u) r r H1d3l(l r N M t t CO Y rr w ir 3dAi LIOIAVH39 Ilos zE— . . ..... ..... . . . .... ............. . . . .......... . dl co LL LL (4 U. o Cl) (14) HidgG C;) LV �qr w co -0 *C !;- C C C3 Z, , 0 5 E co 5. IA (ED cc cm r 0 0 m 'i C� C; Cl) Y Q � W � t7C .2 Mcc "� _ Cc H C HOIAVH38_ H 9 m z' lIOS — m C CO 2 :5 ?-- - I O r CM r r r y7 N L a1 Z E _ A, .F+W 0 a y N a crmj a I C N .� CDn c' c N a � i Co N w+� W l� vI Co C y L w E— � I c S. I 1 I p� ii V 0 a U) E > � r a CL y I O LNO N LL .VN U. LL_ {0 N 6! a a c I co U- a 0 cv _a >s AN L ILI o co 0 o a L O to O cm N OD w H1d30 N "' APPENDIX C KESSLER DCP TEST RESULTS AND HAND AUGER BORING LOGS a DCP TEST DATA Project: iLM, Avis Rental Car Service Center Date: 9-Jan-16 Location: K-1 Soil Type(s): clean sand Hammer - Soil Type -� Q MiIts. Q CH Q 17.6Its. Q CL 0 Both hammers used ! 0 All other soils No. of Cumulative Type of Blows Penetration Hammer 0.1 (mm) 0 0 1 0 5 10 15 c 3= 20 a W p 25 30 35 40 5 86 1 5 150 1 5 198 1 5 249 1 5 292 1 5 320 1 5 343 1 5 389 1 5 445 1 5 511 1 5 589 1 5 650 1 5 699 1 1 1 1 1 1 1 0.1 1 0 0 5 10 15 C I=- 20 D- W � 25 30 35 40 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2000 14 Ti 1.0 10.0 100.0 0 127 254 381 E E 508 3 a W 635 762 889 1016 1.0 10.0 100.0 BEARING CAPACITY, psf 4000 6000 8000 10000 12000 0 127 254 381 E E 608 3 a W 635 13 Based on approximate interrelationships 762 of CBR and Bearing values (Design of concrete Airport Pavement, Portland Cement Association, page 8,190) 889 1016 28 42 56 69 83 BEARING CAPACITY, psi DCP TEST DATA Project: MM Avis Rental Car Service Center Da W; 9-.;an-16 Location: K-2 Soil Type(s): clean Sand Hammer Q 10.1lbs. Soil Type Q CH� Q 17.6lbs. j Q CL i 0 Both hammers used I Q All other soils I No. of Blows Cumulative Penetration (mm) Type of Hammer 0 0 1 5 295 1 5 386 1 5 635 1 1 671 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0.1 0 5 10 15 c 20 0. W C 25 30 35 40 6. 0.1 0 0 5 10 15 c H=- 20 0. W O 26 30 35 40 0 CBR 1.0 10.0 1.0 10.0 BEARING CAPACITY, psf 2000 4000 6000 8000 100.0 0 127 264 381 E E 508 3 I- 0. W 635 93 762 889 1016 100.0 10000 12000 0 127 254 381 E E 508 3: a W 636 G 762 Based on approximate interrelationships of CBR and Bearing values (Design of Concrete Airport Pavement, Portland 889 Cement Association, page 8,1955) 1016 14 28 42 66 69 83 BEARING CAPACITY, psi CLIENT JOB# BORING# SHEET RS & H 24984 K-1 1 OF 1 PROJECT NAME ARCHITECT -ENGINEER ILM Avis Rental Car Service Center r �d SITE LOCATION Hall Drive and Blue Clay Rd, Wilmington, New Hanover County, North CALIBRATED PENETROMETERTONS1W Carolina ROCK QUALITY DESIGNATION & RECOVERY NORTHING EASTING STATION RQD% - — - REC% PLASTIC WATER LIQUID z DESCRIPTION OF MATERIAL ENGLISH UNITS w F Z LIMIT% CONTENT% LIMIT% O z o ¢ BOTTOM OF CASING LOSS OF CIRCULATION LU w z v ^ J J J � 2 a 2 g g SURFACE ELEVATION W ® STANDARD PENETRATION ocl¢ LU w 9 ca BLOWS/FT Topsoil/Rootmat Depth [4"1 (SP) FINE SAND, Brown/Gray/Tan, Moist 1 2 ee 3 eke ii? 4 END OF BORING 5 6— THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN -SITU THE TRANSITION MAY BE GRADUAL. WL WS❑ WD❑ BORING STARTED 1/9/2017 CAVE IN DEPTH WL(SHW) WL(ACR) BORING COMPLETED 1/9/2017 HAMMER TYPE WL RIG FOREMAN DRILLING METHOD Hand Auger CLIENT JOB # BORING # SHEET RS & H 249EN K-2 1-1 OF 1 PROJECT NAME ARCHITECT -ENGINEER ILM Avis Rental Car Service Center SITE LOCATION Hall Drive and Blue Clay Rd, Wilmington, New Hanover County, North CALIBRATED PENETROMETER TONS/FT2 Carolina ROCK QUALITY DESIGNATION $ RECOVERY NORTHING EASTING STATION RQD% - — - REC% PLASTIC WATER LIQUID Z DESCRIPTION OF MATERIAL ENGLISH UNITS a " z9 E LIMIT% CONTENT% LIMIT% z o ¢ BOTTOM OF CASING LOSS OF CIRCULATION w w X n w > Q m ~a g SURFACE ELEVATION F ®STANDARD PENETRATION a ¢ 3 w m BLOWS/FT Topsoil/Rootmat Depth [4"] (SP) FINE SAND, Brown/Tan, Moist 1 (SM) SILTY FINE SAND, Dark Gray, Moist END OF BORING DUE TO AUGER REFUSAL 2- 3- 4- 5 6— I I THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN -SITU THE TRANSITION MAY BE GRADUAL WL WS❑ WD❑ BORING STARTED 1/9/2017 CAVE IN DEPTH WL(SHW) 1 WL(ACR) BORING COMPLETED 1/9/2017. HAMMER TYPE WL RIG FOREMAN DRILLING METHOD Hand Auger APPENDIX D GENERAL CONDITIONS General Conditions The analysis, conclusions, and recommendations submitted in this report are based on the exploration previously outlined and the data collected at the points' shown on the attached location plan. This report does not reflect specific variations that may occur between test locations. The soundings and borings were located where site conditions permitted and where it is believed representative conditions occur, but the full nature and extent of variations between soundings and of subsurface conditions not encountered by any sounding may not become evident until the course of construction. If variations become evident at any time before or during the course of construction, it will be necessary to make a re-evaluation of the conclusions and recommendations of this report and further exploration, observation, and/or testing may be required. This report has been prepared in accordance with generally accepted soil and foundation engineering practices and makes no other warranties, either expressed or implied, as to the professional advice under the terms of our agreement and included in this report. The recommendations contained herein are made with the understanding that the contract documents between the owner and foundation or earthwork contractor or between the owner and the general contractor and the foundation, excavating and earthwork subcontractors, if any, shall require that the contractor certify that all work in connection with foundations, compacted fills and other elements of the foundation or other support components are in place at the locations, with proper dimensions and plumb, as shown on the plans and specifications for the project. Further, it is understood the contract documents will specify that the contractor will, upon becoming aware of apparent or latent subsurface conditions differing from those disclosed by the original soil exploration work, promptly notify the owner, both verbally to permit immediate verification of the change, and in writing, as to the nature and extent of the differing conditions and that no claim by the contractor for any conditions differing from those anticipated in the plans and specifications and disclosed by the soil studies will be allowed under the contract unless the contractor has so notified the owner both verbally and in writing, as required above, of such changed conditions. The owner will, in turn, promptly notify this firm of the existence of such unanticipated conditions and will authorize such further exploration as may be required to properly evaluate these conditions. Further, it is understood that any specific recommendations made in this report as to on -site l construction review by this firm will be authorized and funds and facilities for such review will be provided at the times recommended if we are to be held responsible for the design recommendations. r- Geolechnicel Engineering Report ---) Geotechnical Services Are Performed for Specific Purposes, Persons, and Projects Geotechnical engineers structure their services to meet the specific needs of their clients. A geotechnical engineering study conducted for a civil engineer may not fulfill the needs of a construction contractor or even another civil engineer. Because each geotechnical engineering study is unique, each geo- technical engineering report is unique, prepared solelyfor the client. No one except you should rely on your geotechnical engineering report without first conferring with the geotechnical engineer who prepared it. And no one - not even you - should apply the report for any purpose or project except the one originally contemplated. Read the Full Report Serious problems have occurred because those relying on a geotechnical engineering report did not read it all. Do not rely on an executive summary. Do not read selected elements only. A 6eotechnlcal Engineering Re ort Is Based on A Unique Set of Project -Specific Factors Geotechnical engineers consider a number of unique, project -specific factors when establishing the scope of a study. Typical factors include: the client's goals, objectives, and risk management preferences; the general nature of the structure involved, its size, and configuration; the location of the structure on the site; and other planned or existing site improvements, such as access roads, parking lots, and underground utilities. Unless the geotechnical engi- neer who conducted the study specifically indicates otherwise, do not rely on a geotechnical engineering report that was: • not prepared for you, • not prepared for your project, • not prepared for the specific site explored, or • completed before important project changes were made. Typical changes that can erode the reliability of an existing geotechnical engineering report include those that affect. - the function of the proposed structure, as when it's changed from a parking garage to an office building, or from alight industrial plant to a.refrigerated warehouse, elevation, configuration, location, orientation, or weight of the proposed structure, composition of the design team, or project ownership. As a general rule, always inform your geotechnical engineer of project changes - even minor ones - and request an assessment of their impact. Geotechnical engineers cannot accept responsibility or liability for problems that occur because their reports do not consider developments of which they were not informed. Subsurface Conditions Can Change A geotechnical engineering report is based on conditions that existed at the time the study was performed. Do not rely on a geotechnical engineering reportwhose adequacy may have been affected by: the passage of time; by man-made events, such as construction on or adjacent to the site; or by natu- ral events, such as floods, earthquakes, or groundwater fluctuations. Always contact the geotechnical engineer before applying the report to determine if it is still reliable. A minor amount of additional testing or analysis could prevent major problems. Most Geotechnical Findings Are Professional Opinions Site exploration identifies subsurface conditions only at those points where subsurface tests are conducted or samples are taken. Geotechnical engineers review field and laboratory data and then apply their professional judgment to render an opinion about subsurface conditions throughout the site. Actual subsurface conditions may differ -sometimes significantly from those indi- cated in your report. Retaining the geotechnical engineer who developed your report to provide construction observation is the most effective method of managing the risks associated with unanticipated conditions. A Report's Recommendations Are AW Final Do not overrely on the construction recommendations included in your rc- port. Those recommendations are not final, because geotechnical engineers develop them principally from judgment and opinion. Geotechnical engineers can finalize their recommendations only by observing actual subsurface conditions revealed during construction. The geotechnical engi- neer who developed your report cannot assume responsibility or liability for the report's recommendations if that engineer does not perform construction observation. A Geotechnical Engineering Report Is Subject to Misinterpretation Other design team members' misinterpretation of geotechnical engineer- ing reports has resulted in costly problems. Lower that risk by having your geotechnical engineer confer with appropriate members of the design team after submitting the report. Also retain your geotechnical engineer to review pertinent elements of the design team's plans and specifications. Contractors can also misinterpret a geotechnical engineering report. Reduce that risk by having your geotechnical engineer participate in prebid and preconstruction conferences, and by providing construction observation. Do Not Redraw flm Engineers Logs Geotechnical engineers prepare final boring and testing logs based upon their interpretation of field logs and laboratory data. To prevent errors or omissions, the logs included in a geotechnical engineering report should never be redrawn for inclusion in architectural or other design drawings. Only photographic or electronic reproduction is acceptable, but recognize that separating logs from the report can elevate risk Give Contractors a Complete Report and Guidance Some owners and design professionals mistakenly believe they can make contractors liable for unanticipated subsurface conditions by limiting what they provide for bid preparation. To help prevent costly problems, give con- tractors the complete geotechnical engineering report, but preface it with a clearly written letter of transmittal. In that letter, advise contractors that the report was not prepared for purposes of bid development and that the report's accuracy is limited; encourage them to confer with the geotechnical engineer who prepared the report (a modest fee may be required) and/or to conduct ad- ditional study to obtain the specific types of information they need or prefer. A prebid conference can also be valuable. Be sure contractors have sufficient time to perform additional study. Only then might you be in a position to give contractors the best information available to you, while requiring them to at least share some of the financial responsibilities stemming from unantici- pated conditions. Read Responsibility Provisions Closely Some clients,.design professionals, and contractors do not recognize that geotechnical engineering is far less exact than other engineering disciplines. This lack of understanding has created unrealistic expectations that have led to disappointments, claims, and disputes. To help reduce the risk of such outcomes, geotechnical engineers commonly include a variety of explanatory provisions in their reports. Sometimes labeled "limitations" many of these provisions indicate where geotechnical engineers' responsibilities begin and end, to help others recognize their own responsibilities and risks. Read these provisions closely. Ask questions. Your geotechnical engineer should respond fully and frankly. Geoenvironmental Concerns Are Not Covered The equipment, techniques, and personnel used to perform a geoenviron- mental study differ significantly from those used to perform a geotechnical study. For that reason, a geotechnical engineering report does not usually re- late any geoenvironmental findings, conclusions, or recommendations; e.g., about the likelihood of encountering underground storage tanks or regulated contaminants. Unanticipated environmental problems have led to numerous project failures. If you have not yet obtained your own geoenvironmental in- formation, ask your geotechnical consultant for risk management guidance. Do not rely on an environmental report prepared far someone else. Obtain Professional Assistance To Deal with Mold Diverse strategies can be applied during building design, construction, op- eration, and maintenance to prevent significant amounts of mold from grow- ing on indoor surfaces. To be effective, all such strategies should be devised for the express purpose of mold prevention, integrated into a comprehensive plan, and executed with diligent oversight by a professional mold prevention consultant. Because just a small amount of water or moisture can lead to the development of severe mold infestations, a number of mold prevention strategies focus on keeping building surfaces dry. While groundwater, wa- ter infiltration, and similar issues may have been addressed as part of the geotechnical engineering study whose findings are conveyed in -this report, the geotechnical engineer in charge of this project is not a mold prevention consultant; nose of 0 sarllrh es parOYM N cei necdn wtth Me wteehafcalon9eerV sb* were des4ed alp conducted IN, the PUP" of mold prellrenMR Prager A"Mtsfim of dw rscomma MUM conveyed in thts ivwt WM not of itself bo sadllclont to PfflV nt mold from drowhy in or on no Saw;- mm hivmwd Rely on Your ASFE-Member Geotechnical Engineer For Additional Assistance Membership in ASFE/The Best People on Earth exposes geotechnical engi- neers to a wide array of risk management techniques that can be of genuine benefit for everyone involved with a construction project. Confer with your ASFE-member geotechnical engineer for more information. FE The Boat Passla as Earth 8811 Colesville Road/Suite G106, Silver Spring, M7 20910 Telephone:' 301/565-2733 Facsimile: 301/589-201 e-mail: info@asfe.org www.asfe.org Copyright 2004 by ASFE, Inc. Duplication, reproduction, or copying of this document, in whole or in part by any means whatsoever, is strictly prohibited, except with ASFE§ specific written permission. Excerpting, quoting, or otherwise extracting wording from this document fs permitted only with the express written permission of ASFE, and only for purposes of scholarly research or book review. Only members ofASFEmay use this documentas a complement to oras an element of geotechnical engineering report. Any other firm, individual, or other entity that so uses this document without being anASFE member could be committing negligent or intentional (fraudulent) misrepresentation. IIGER06045.0M Hall, Christine From: Hall, Christine Sent: Monday, April 17, 2017 1:19 PM To: Johnson, Kelly, Blackmore, Michael Subject: RE: SW8 050547 - State Stormwater Permit Mike, It does look like a typo in the math. Please use the correct number with your submission. Thanks for catching that! Christine Christine Hall Environmental Engineer Division of Energy, Mineral and Land Resources - State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct christine.hall@ncdenr.gov 127 Cardinal Drive Ext. Wilmington, NC 28405 —Nothing Compares - Email ci>,-rrnpondence to and hom this is to the .r iVf ;"'!! �_•`u�'% .:lr [� Pclrj.l. RFj{,lf{,Yv 11_RiA' affd fira�v b�' to third parties. From: Johnson, Kelly Sent: Wednesday, April 12, 2017 2:30 PM To: Blackmore, Michael <Michael.Blackmore@rsandh.com>; Hall, Christine <Christine.Hall@ncdenr.gov> Subject: RE: SW8 050547 State Stormwater Permit Mike, I don't have any personal knowledge of this file. If the data is essentially counting down removing impervious area from the column on the right by subtracting the data that is in the 2"d column to the right, then there may be a typo. But, since this is an unusual approach to allocating I will refer you to Christine. She wrote the latest version of the permit and will be most familiar with it. She will be back in the office on Monday. Thanks, Kelly From: Blackmore, Michael[mailto:Michael.Blackmore@rsandh.com] Sent: Tuesday, April 11, 2017 3:06 PM To: Johnson, Kelly <kelly.p.iohnson@ncdenr.gov> Subject: RE: SW8 050547 - State Stormwater Permit Good Afternoon Mrs. Johnson, Thanks for sending the information across. I am completing the permit submission and noticed a possible error in the table math. Within the 200E C16 master table 050547.doc file, the BUA remaining was 2,865,020. Facility (COIyRAG) SW8 050547 8(4d2015 North General Aviation Apron Rehab & Expansion 32,453 3,141214 ILA! Flex Space i1ot 9 SW8 050547 9:191015 Business Pa�� ar�d 129,082 3.012-132 Business Pa* access roars. SW'8 150723 91512015 ,Air WUHnaton Hart5at 4 24,190 2.987 9#2 W, Uq+ b:°, :2 anger Tjj� a and Corporate Hanget Com :ex As I was inserting my information into the table, my number is 2,864,950. ,A FAir ;='-ri.;^r ington Hangar v ,- n SW` ^O 1 _0,14. 9 1 '?C 1 # 24 1 _, 2 90 1 ,�42 K r.20-'201r 1COTorate Hanger 122 992 2 864 9f is it ok. to show the corrected number within my submission? Thanks, Mike WO'chael Blackmore, PE c-h-arlotte Aviation Engineer 5w South Blvd, Suice 200, C harlctto, N, 8 203 7 4-9419-41U ( M 704'-408-7156 michael.blackmore@rsandh.com rsandh.com Facebook I Twitter J LinkedIn RS&H From: Johnson, Kelly[mailto:kelly.p.iohnson@ncdenr.gov] Sent: Thursday, April 6, 2017 1:48 PM To: Blackmore, Michael <Michael,Blackmore@rsandh.com> Subject: SW8 050547 - State Stormwater Permit 2 Michaef, The files are attached per your request. Thanks, Kelly P,"6 ,t jOkVUSDIA, Kelly Johnson Environmental Engineer NC Division of Energy, Mineral and Land Resources Stormwater Permitting 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Office: 910.796.7331 Fax: 910.350.2004