HomeMy WebLinkAboutNCC222215_ESC Approval Submitted_20220615tee. SPATE 4 ROYCOOPER$� MYm i Governor y ELIZABETH S. BISER a Secretary BRIAN WRENN NORTH CAROLNA Director Environmental Quality June 10, 2022 LETTER OF APPROVAL WITH MODIFICATIONS Vannoy Construction, Inc. ATTN: Mark Vannoy, President PO Box 635 Jefferson, NC 28640 RE: Project Name: Parkway Waste/Borrow Site Acres Approved: 6.1 Project ID: ASHE-2022-005 County: Ashe City: Laurel Springs Address: Blue Ridge Parkway River Basin: New Stream Classification: B ; Tr Submitted By: BREC, PA Date Complete Application Received by LQS: June 9, 2022 Plan Type: New -Express Dear Sir or Madam: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this Letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. om..mre�imi�.wD n Q !� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Winston-Salem Regional Office 1 450 Hanes Mill Road, Suite 3001 Winston-Salem, North Carolina 27t03 336.776.9800 Letter of Approval with Modifications Vannoy Construction, Inc. June 10, 2022 Page 2 of 3 Title 15A NCAC 413.0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, Digitally signed by Zachary Zachary Lentz Lentz Da te: 2022.06.10 13 20:56 -04'00' Zachary Lentz, PE Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NCG01 Fact Sheet cc: Justin Church, PE of BREC, PA (via e-mail) WSRO file Letter of Approval with Modifications Vannoy Construction, Inc. June 10, 2022 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Parkway Waste/Borrow Site Project ID: ASHE-2022-005 County: Ashe Modifications pursuant to applicable North Carolina General Statutes and/or Regulations: 1. This plan only covers land -disturbing activity associated with installation of measures and grading of soil materials brought to the site. Construction activities not specified on this plan, including borrow from this site, are not approved per this review and may require a separate approval. Please communicate with staff from this office prior to removing materials from the site. [15A NCAC 413, G.S. 113A-57(3,5)] 2. This approval is for erosion and sediment control and associated construction stormwater associated with the borrow pit only. It is the duty of the Financially Responsible Party to assure that land -disturbing activity is conducted in compliance with other applicable regulations, including, but not limited to, the Mining Act of 1971. Please note that removing materials from the property requires a mining permit. [15A NCAC 413, G.S. 113A-57(3), G.S. 74, Article 7] Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities CERTIFICATE OF PLAN APPROVAL The posting of this certificate certifies that an erosion and sedimentation control plan has been approved for this project by the North Carolina Department of Environmental Quality in accordance with North Carolina General Statute 113A — 57 (4) and 113A — 54 (d) (4) and North Carolina Administrative Code, Title 15A, Chapter 413.0107 (c). This certificate must be posted at the primary entrance of the job site before construction begins and until establishment of permanent groundcover as required by North Carolina Administrative Code, Title 15A, Chapter 413.0127 (b). Parkway Waste/Borrow Site - Ashe County - ASHE-2022-005 Project Name and Location Digitally signed by Zachary Zachary Lentz Lentz Date:2022.06.10 June 10, 2022 -Express Review 13:18:53-04'00' Date of Plan Approval with Modifications Certificate of Coverage Number E Q Assistant Regional Engineer