HomeMy WebLinkAboutNCC222089_ESC Approval Submitted_20220604ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
BRIAN WRENN
Director
NORTH CAROLINA
Environmental Quality
March 24, 2022
LETTER OF APPROVAL WITH MODIFICATIONS
Jay's Lawn Service & Landscape Co.
Attn: Mr. James Harden, III
P.O. Box 248
Columbus, NC 28722
RE: Project Name: HARRY ROBPRSON
Acres Approved: 0.7
Project ID: POLK-2022-009
County: Polk
City: Mills Spring
Address: South Pointe
River Basin: Broad
Stream Classification: Green River - Class WS-IV; CA
Submitted By: Jay's Lawn Service & Landscape Co.
Date Received by LQS: February 22
,2022
Plan Type: Residential
Dear Mr. Harden,
This office has reviewed the subject erosion and sedimentation control plan. We find the
plan to be acceptable with modifications and hereby issue this letter of Approval with
Modifications. The Modifications Required for Approval are listed on the attached page.
This plan approval shall expire three (3) years following the date of approval, if no land -
disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under
the NCGO10000 Construction General Permit. After the form is reviewed and found to be
complete, you will receive a link with payment instructions for the $100 annual permit fee.
After the fee is received, you will receive the COC via email. You MUST obtain the COC prior
to commencement of any land disturbing activity. The eNOI form may be accessed at
deq.nc.gov/NCG01. Please direct questions about the eNOi form to Paul Clark at
DE Q North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
` Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778
828.296.4500
Letter of Approval with Modifications
Attn: Mr. James Harden, III
Date: March 24, 2022
Page 2 of 4
Paul.clark@ncdenr.gov. If the owner/operator of this project changes in the future, the
new responsible party is required to apply for his/her own COC.
Title 15A NCAC 413.0118(a) and the NCG01 permit require that the following
documentation be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance -oriented,
requiring protection of existing natural resources and adjoining properties. If, following
the commencement of this project, it is determined that the erosion and sedimentation
control plan is inadequate to meet the requirements of the Sedimentation Pollution Control
Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require
revisions to the plan and implementation of the revisions to ensure compliance with the
Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal
and State water quality laws, regulations, and rules. In addition, local city or county
ordinances or rules may also apply to this land -disturbing activity. This approval does not
supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided
in the Financial Responsibility Form, which you provided. This permit allows for a land -
disturbance, as called for on the application plan, not to exceed the approved acres.
Exceeding the acreage will be a violation of this permit and would require a revised plan
and additional application fee. You are requested to file an amended form if there is any
change in the information included on the form. In addition, it would be helpful if you
notify this office of the proposed starting date for this project.
Your cooperation is appreciated.
Sincerely,
67V ml/ji,
Fred Walker, P.E.
Express Engineer
Division of Energy, Mineral, and Land Resources
Letter of Approval with Modifications
Attn: Mr. James Harden, III
Date: March 24, 2022
Page 3 of 4
Enclosures: Certificate of Coverage
NPDES NCGO1 Fact Sheet
Modifications
ec: Mr. Bryan Shamblin- NCDEQ LQS (byran.shamblin@ncdenr.gov)
Mr. Landon Davidson, P.G. - NCDEQ DWR (landon.davidson@ncdenr.gov)
Mr. Andrew Moore, P.G. - NCDEQ DWR (andrew.w.moore@ncdenr.gov)
cc: Regional Office file
Letter of Approval with Modifications
Attn: Mr. James Harden, III
Date: March 24, 2022
Page 4 of 4
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: HARRY ROBERSON
Project ID: POLK-2022-009
County: Polk
For final approval submit the required documents to the Asheville Regional Office Land
Quality Section.
1. Submit a revised original notarized Financial Responsibility/Ownership Form with
Part A.2 completed, Part A.9 with both landowners' information, Part B.1 with
information matching business filing with N.C. Secretary of State, and Part B.2.a with
registered agent's information. Also provide written consent from both landowners
to the Financially Responsible Party to conduct land disturbing activities on county
parcel ID no. property and to obtain an approved Erosion & Sediment Control Plan
on their behalf.
2. Add note to plan to contact NCDEQ LQS inspector Bryan Shamblin when property is
permanently vegetated and ready for a close-out inspection. {15A NCAC
04B .0106(a)(3)}
3. Provide temporary and permanent seeding details. {G.S. 113A-57.(3))
4. Clearly identify the Limits of Disturbance on the plan sheet. {G.S. 113A-57.(4))
5. Clearly identify the stream buffer for Lake Adger on the plan sheet. {15A NCAC
04B .0106(a)(1)}
6. Provide construction details for all proposed E&SC measures. {G.S. 113A-57.(3))
7. Provide specific maintenance instructions for each E&SC measure. {G.S. 113A-
57.(3)1
Ref: G.S. 113A-54.1 through G.S. 113A-57
Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504
General Permit NCG 010000 NPDES for Construction Activities