Loading...
HomeMy WebLinkAboutSWA000146_Plansheet - Set_20220523LOCATION �\OAK VIEW AT SILE,R CITY 226 CAMPUS DRIVE SILER CITY NC 27344 / IN / / N/F / CHATHAM HOSPITAL INC. / DB/PG: 1292/1094 / PARCEL ID: 0088077 / \ ZONING:01 \\ LAND USE: HOSPITAL % / / \ / i / \ / i \ / i / / / Av \ / N/F \/ ; CHATHAM HOSPITAL INU DB/PG: 1292/1094 PARCEL ID: 0084342�/ ZONING:01 LAND USE: HOSPITAL / / / / / / / / / / / / / / / / / i/ GRAPHIC SCALE / / 40 0 20 40 80 160 / / / / / ( IN FEET ) / / i 1 inch = 40 ft. / / / / / / / / / 0 i Know what's below. Call before you dig. / / / / / / -------------------------------------------------------------------------------------------------------------- SITE DR N/F 130 OF CHATHAM LLC DB/PG: 1803/0492 PARCEL ID: 0090720 ZONING: H—I LAND USE: VACANT N/F TOWN OF SILER CITY DB/PG: 1964/0500 PARCEL ID: 0092878 ZONING: H—I LAND USE: VACANT 10'--REAR--SETBACK EXISTING SURVEY EXISTING CONDITIONS & DEMOLITION PLAN C1.0 OVERALL SITE PLAN C2.0 DETAILED SITE PLAN C2.1 OVERALL UTILITY PLAN C2.2 OFF -SITE UTILITY PLAN C2.3 ON -SITE UTILITY PLAN C2.4 PH. 1 EROSION CONTROL PLAN C3.0 PH. 2 EROSION CONTROL PLAN C3.1 NCG01 STANDARD NOTES C3.2 GRADING PLAN C4.0 STORMWATER SCM PLAN C4.1 STORM SEWER DRAINAGE AREA PLAN C4.2 PRE -DEVELOPMENT DRAINAGE AREA PLAN C4.3 POST -DEVELOPMENT DRAINAGE AREA PLAN C4.4 LANDSCAPE PLAN C5.0 SITE DETAILS C9.0-C9.5 SITE LIGHTING PLAN 2 REZONING OPEN SPACE PLAN JRZ2.0 SHEET INDEX I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I YI UI Q m �I W C/-)I wlI 0l v�l I I O �I I I I I I I I I I I I U J Q I LL Q I z= I U I LL_Uw 0 U I O mQ om WALLICK COMMUNITIES MIKE EKIS MEKIS@WALLICK.COM (614) 957-0676 CONTACT INFO ►�07- CAR996*00 00 %pe<,ESS/* 'AL 606 3/29/22 REVISIONS 2 3/29/22 TOWN COMMENTS REVISIONS CAD FILE: 19-045 BASE.DWG PROJECT NO.: 19-045 DESIGNED BY: JDM SUBMITTAL DATE: FEBRUARY 14, 2022 DEVELOPER: WALLICKASSET MANAGEMENT LLC 16o W MAIN STREET *200 NEW ALBANY, OH 43054 ENGINEERING MCZ ENGINEERING, INC. 2 1 1 ❑ BEN CRAIG DR. SUITE 4❑❑ CHARLOTTE, NC 28262 PHONE 704.51 0.9797 CHATHAM HOSPITAL, INCORPORATED DB 1292, PG. 1094 PB 2010, PG. 22 AKPAR: 88077 CHATHAM HOSPITAL, INCORPORATED DB 1292, PG. 1094 PB 2010, PG. 22 AKPAR: 84342 , THE TOWN OF SILER CITY DB 1964, PG. 500 PB 2017, PG. 431 AKPAR: 92878 TOP=586.46' CTL/ HF INV(E)=569.03' �APUS [)RIVE DUKE/ LR� RNV i C- INOTES: 1. ALL DISTANCES SHOWN ARE HORIZONTAL GROUND DISTANCES IN U.S. SURVEY FEET. (UNLESS OTHERWISE STATED) 2. THERE WERE NO CEMETERIES OBSERVED ON THIS PROPERTY. 3. ALL BEARINGS ARE BASED ON THE NORTH CAROLINA STATE PLANE COORDINATE SYSTEM (NAD 1983\11). 4. THIS PROPERTY IS IN ZONE X, AREAS DETERMINED TO BE IPF OUTSIDE THE ANNUAL 0.2% ANNUAL CHANCE FLOODPLAIN ACCORDING TO FIRM MAP 3710877100J, WITH AN EFFECTIVE DATE OF FEBRUARY 2, 2007. 5. THIS SURVEY HAS BEEN PREPARED WITHOUT THE BENEFIT OF TOP=578.65' A TITLE REPORT AND MAY NOT INDICATE ALL ENCUMBRANCES V(W)F570.94' ON THE PROPERTY AND IS SUBJECT TO ALL EASEMENTS AND RIGHTS -OF -WAY OF RECORD. f'y"o 6. LINES NOT SURVEYED SHOWN AS DASHED. CA S E AL L-4234 LOT A: 0 SU0�'- P��\ 13D B F CHATHAM, H A H A 492LC /////iY � i � i0\00�����\\\\\\ PB 2015, PG. 66 AKPAR: 90720 INSET 99 A 99 540 `Ssj 17 15' 16" SSA LOT A: 545 130 OF CHATHAM, LLC DB 1803, PG. 492 PB 2015, PG. 66 AKPAR: 90720 540 0 S DATE REVISION INITIAL v &CREED i 1730 Varsity Drive Suite 500 Raleigh, North Carolina 27606 Phone: (919)233-8091, Fax: (919)233-8031 NC FIRM # F-1222 I, JEFFREY D. AKER, PLS L-4234, CERTIFY THAT THIS PLAT WAS DRAWN UNDER MY SUPERVISION FROM AN ACTUAL SURVEY MADE UNDER MY SUPERVISION FROM INFORMATION SHOWN IN DEED BOOKS REFERENCED ON MAP AND MAP BOOKS REFERENCED ON MAP; THAT ANY LINES NOT ACTUALLY SURVEYED APPEAR AS BROKEN LINES AND WERE PLOTTED FROM INFORMATION AS NOTED ON THE PLAT; THAT THE RATIO OF PRECISION AS CALCULATED IS BETTER THAN 1:15,000; THAT THE AREA IS COMPUTED BY COORDINATE METHOD; WITNESS MY ORIGINAL SIGNATURE, REGISTRATION NUMBER, AND SEAL THIS THE 3RD DAY OF JANUARY A.D., 2022. Tom. J F0�'AKER L-4234 PROFESSIONAL LAND SURVEYOR V 5Gj5 h0 h 1 POND 2' �O h 0" 9„ 18' / hh h �h Y 0" N 35» � I / o 7 » dam- � a Lf) z 0 CD z O L 1Q SSS TOP= 1.51' TOP=551.59' W)=546.09' INV(W)=545.74' =550.96' INV(E)=546.08' INV(E)=545.67' UNDERGROUND 6 SS -FM TO ELECTRIC cOQ % 8""DIP PUMP STATION INV(SW)=546.54/ �J DIP i S �INV(E)=546.49'TOP=552.49' —� EP INV(W)=545.49' CENTURY LW K GUARDRAIL TOP=552.16' INV(NE)=547.12' TREE LEGEND ja�> MAPLE OAK PINE SWEETGUM f o } POPLAR GUM CEDAR WALNUT BEECH LEGEND wV WATER VALVE FIRE HYDRANT ® IRRIGATION CONTROL VALVE FIRE DEPARTMENT CONNECTION BC BACK OF CURB GL GUTTERLINE EP EDGE OF PAVEMENT CB CATCH BASIN YI YARD INLET INV PIPE INVERT LSA LANDSCAPE AREA Q TREE OHE OVERHEAD ELECTRIC s0 SEWER MANHOLE O PP POWER POLE O LP LIGHTPOLE -v SIGN ❑E ELECTRIC BOX IPF IRON PIPE FOUND IRS IRON ROD SET Q MC CONTROL POINT WOODSLINE —' FENCELINE UNDERGROUND FIBER OPTIC — UNDERGROUND ELECTRIC SCALE: 1" = 60' KEY NOTES: llLMUL111UN N U 1 LN AO INSTALL PROPOSED TREE PROTECTION FENCE AT BEGINNING I' THE CONTRACTOR SHALL OBTAIN NECESSARY DEMOLITION PERMIT PRIOR TO ANY REMOVAL OF STRUCTURES, AP = ABANDONED POLE UTILITIES, ETC. CB = CATCH BASIN OF CONSTRUCTION SEE DETAIL 4/C9.0. 2. SITE DEMOLITION WORK SHALL INCLUDE REMOVAL OF ALL BUILDING STRUCTURES, ASSOCIATE UTILITIES, CLIP CENTER CORRUGATED METAL PIPE SITE FOUNDATIONS, CONCRETE WALKS, CURB AND GUTTER AND SPECIFIED ASPHALT. CV = CONTROL VALVE CAMPUS DR - _� � \ ` � f \ DIP DUCTILE IRON PIPE o \ \ I \ \ 3. THE CONTRACTOR SHALL NOTIFY ALL PERTINENT UTILITY COMPANIES AT LEAST 72 HOURS PRIOR TO ANY DIP = EXISTING IRON PIPE \ \ \ %� \ \ \ �Iss \ \ DEMOLITION WORK. EIR = EXISTING IRON REBAR — � � \ \ % =\ \ \ 4. TRENCHES AND EXCAVATION AREAS SHALL BE RECOMPACTED TO 98% OF STANDARD PROCTOR MAXIMUM EP EDGE OF PAVEMENT EX = EXISTING DRY DENSITY. FES = FLARED END SECTION 4.o \ \ \ \ \ :T�0= _ \ \ FND =FOUND 82 2 \ 5. THE CONTRACTOR SHALL PROVIDE TREE PROTECTION FOR EXISTING TREES WHERE SPECIFIED. GW = GUIDE WIRE \✓ \�\ \ �( )F\\ \\ HW = HEAD WALL NV W =- 71 6. ALL DEBRIS SHALL BE REMOVED FROM THE SITE AND PROPERLY DISPOSED OF AT A PERMITTED FACILITY. INV = INVERT INV(E)<565.67'- \ LP = LIGHT POLE \ 7. REFER TO SHEET C3.0 FOR PLACEMENT OF EROSION CONTROL MEASURES AND RELATED NOTES. MB = MAIL BOX 8. THE REMOVAL OR RELOCATION OF EXISTING LIGHT POLES SHALL BE COORDINATED WITH RESPECTIVE UTILITY PP = POWER POLE : \ \ \ \ \ \ �s \ OR LIGHTING COMPANY. PROP = PROPOSED N / F P. S. D. E = PUBLIC STORM DRAINAGE EASEMENT Z)/A 9. EXISTING PAVEMENT AND CURB SHOWN TO BE REMOVED SHALL BE SAW CUT. TOWN O F S I E R CITY PVC = POLYVINYL CHLORIDE PIPE 4/rTOry \✓/ / i \ \\ \\ \�� \\\\ ���\ ���s R/W = RIGHT OF WAY DB/PG: 1964/0500 SIR = SET IRON REBAR w3?\ _ �\ ass—�f3W_MON SSMH = SANITARY SEWER MAN HOLE 66, _ --____ PARCEL ID: 0092878 WY = WATER METER \\�0`99� _ —5 _=587.44' ---___ DI WA TER VAL = YARD INLET 9g8 _ ZONING: H-I \\\\,�`�\ �9a-'�� 3,9A _ II��(�^�1��--SS_ LAND USE: VACANT LOCATION MAP ;_ _ - �F� _ _-,, ---------__ \\ /; ' ��,,� �� 567.08' -- - _SS _ _ 8°DIP - - _ _ TOP=586.46' SURVEY LEGEND NTS \\ /,� T/ G ps - - �� _�IVAD83/11) - _ S - -SS _ _ 131 ` pe` - �18Z70.8�'---__- - �MPUS -_- SS=_-INV(E)=569:0�'---_-___ DRIVE 1876487.-7b — $ /a _ — Ex s0' p—u�— \ Lic g„Dip ----__ \ \ N/�F I I I I _--- � 24,r 90___/i _ --�-- \ CHATHAM HO�PITALl INC. I I ;I �''---------'/ �8-,--- ___ /'• 1 - - _ _ _ _ �--�--�_-M__--M - --_ / - � _ -� \\ DB/PG: 129X/10041— \\ PARCEL ID: 0388P71 I I i I ----- ///- \ \ \ \ \\ ZONING: \� 582•M---LAND USE: HO PITAh / _—_—_ M ---- - _-�_- PROPOSED 60' R/W x 700.00 2.0% X X X X X ---T----T OE ----G----G— ----w----w— on 1 STANDARD SYMBOLS / _ - -�� _ �7�1 \ 24 - - - - - - - - - --to let, % _ \ loo, NI NI NI \---\ / / / \ 1 I \ _ / / N, / \\ \\\ \\\ \\\ / /// _ g„ 161, // \ / \ I / , v_ \ \ "I/ / 5�K 30�r / / / / / \ \ / / / 4 6rri N/ F \SNATHAM HOSPITAL INC \\ \\ \\ \\ 5/// 1 \\\ // /'- ---- \\ \S>0. / Cj DB/PG: 1292/1094 �i \ \\ \ \ \ // 18 S y�\\ / / // \ \\ PARCEL ID: 008435 / \\ \ \ \\ \ �/ // 38�� CONTRACTOR TO REMOVE / / \ \ 13„ZO IIN 01EXISTING TREES MARKED WITH / /— \ \\ 30',0/1,3" \ / LAND USA,:/ HOZPIT4L „ „ ( ) /// AN X 49 TOTAL / // \\\ \sue\ 18" 22"// / ls" I - 14 Ad --��� /\j-/ \ �/ —\1,3 $411 `---X__ \ /—'/-- -- ------ \\ \\\_ // 1`S,r /1 r / / i/ /' 14,'�-t \ 1"___ /;,_ \_; -x4 4 _---- \\\ \ CONTRACTOR TO /� // / \\\ X---- �I \ REMOVE EXISTING 3' ?4„ 9 20" WIRE FENCE / / `_ 1^ I /---/---_\ \\ \ \\ \\\ �i //� 6 _ / \ / / I \ II I \\ \\—__ //h6 / 18/2 \\\ �// / / X \4,—X_ I / I /�\\ / /' / // // / 1 ,r / I 1$'\ �I I1r—\\\i / / \ \ \ �� ___/ / 0 / \ I \ / / // // 3 111 \ \ / \N, \ \ �\ / 19"1M // /_ _\ X —� X / / / s / \ \ \ xx /_ �X_3 ' \ \ \ \ �� 18„ I ' — / \ \ \ \REj / / / / / I 19" d91 1 1 1 \ I 1 Vic/ CONTRACTOR TO REMOVE /// FE /�\ — / / \-;�.,i 11 (I Aft EXISTING TREES MARKED WITH/� j 1 � AN X (49 TOTAL) - I —�X, / ?0 / 1 3 �� I� /�_ ______---"—_��// \\ `----_ \vim _X\ /—_� // �� I \ _ _ / r „ / \ \ 0 7?„ // / / I 1 �Q/CO .. U W 7 / I I 7�-� z \\\ \\\ \\ \\\ \-----------/// /h�� �� /// / / 1\ \\ \ \�ss — 1// i 1' �0\U N Z pr, x // CONTRACTOR TO I \\ \\ s / 0161, / I 1 I� o Q 26 / REMOVE EXISTING 3 I \ ___ ,� I 416) / WIRE FENCE I \ \� // 1 16' 5 2 / \ \\\____-- \\ s�\ _ U ----- 2" Awl 11 / _ 12" \ / \ CONTRACTOR TO \S / 14, ? _ \ o' \ — 14 --- \\ —__-- \�__—_—_— �5 // _ \ 6" // // \ ' REMOVE EXISTING 3' 4 \ � �---------- /� 1 ----- 54$'--- 1�\\ A '// /// //'/�\\\ \\\\ — WIRE FENCE SQ6 \ '2� sr, 161,0 161___ 4 r,'�4;, //// /�/ i -------------- ---54 / 6 13q / / —_ \S -------------------- #20 12 610, — — — — — — — — — — — — — — — — v i/ // / \ � _ 4 —�—_—__-------- _ _ —------_— I // — — — — — --// \ � - ?__�------- _� \ —_ �2:0 �- -- ---G"1FFli-�-S"�AL�-- -- -------------------------- --------------------- - - -----EA S 1 -------------_---- ------/- ---- ------ -- -- -- -- -- -- _•- -- -- -�- -- -- --- r - -- -- - _ _ -- -- -- -- / -- - - - - - - - - - - 7 7 40 0 20 40 80 160 130 OF CHA_TH_A _LLC s `L__ ----�B - 3/0492- - PARCEL ID: 0090720-_= J� / ---- Know what's below. ( IN FEET) ZONING: H- 1 inch = 40 ft. LAND USE: VACANT all before you dig. rn U O O Z � .NL' V 0/ Z Hu)0) co Igo 0- Z�NO W EpUr W w Z Ul w t9 ZzQwo 0<\ ZU U WZOw wiz L3 M 0 Z O U a W N I �Z �••FESS/O • •� Q � AL • • 29606 ; i c.c\•i •i • kArG D. MCC mess, • O •• FESS/p•i 2•i ��r :• QUO • i • SEAL • ; C-2630 ; •••WItiG/NEER NG THE DESIGNS AND DRAWINGS SHOWN ARE THE PROPERTY OF Mc2 ENGINEERING, INC. REPRODUCTION OR USE FOR ANY PURPOSE OTHER THAN THAT AUTHORIZED BY Mc2 ENGINEERING, INC. IS PROHIBITED. 2021 O ►4 W co � Q Z V Z N 1--1 ) O EXISTING CONDITIONS AND DEMOLITION PLAN REVISIONS CAD FILE: 19-045 BASE.DWG PROJECT NO.: 19-045 DESIGNED BY: JDM REVIEWED BY: JDM DATE: FEBRUARY 14, 2022 C100 N /F i CHATHAM HOSPITAL INC. / DB/PG: 1292/1094 i PARCEL ID: 0088077 ZONING:01 \\\ / LAND USE: HOSPITAL \ / 2 \ / 3 / %,c"o \ / 2 N /F \� CHATHAM HOSPITAL INC/ DB/PG: 1292/1094 % PARCEL ID: 0084342�/ ZONING:01 LAND USE: HOSPITAL / 7 _ EDhRF GENERAL NOTES: 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING ALL ILLUSTRATED KNOWN UNDERGROUND ELEMENTS. ADDITIONALLY, THE CONTRACTOR SHALL BE RESPONSIBLE FOR EXERCISING REASONABLE EFFORTS TO PROTECT ANY UNKNOWN UNDERGROUND ELEMENTS. THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY IF UNKNOWN ELEMENTS ARE DISCOVERED THAT WOULD NECESSITATE MODIFICATION TO THE ILLUSTRATED DESIGN. 2. PROTECT ALL ADJACENT PROPERTIES, THE GENERAL PUBLIC, AND ALL OF THE OWNER'S FACILITIES. SHOULD DAMAGES OCCUR, CONTRACTOR SHALL REPAIR IMMEDIATELY AS F DIRECTED BY THE ENGINEER. 3. CONTRACTOR SHALL HOLD HARMLESS THE OWNER AND THE ENGINEER FOR DAMAGES, INJURIES OR OTHER ACCIDENTS WHICH OCCUR DURING THESE CONSTRUCTION ACTIVITIES. \ 4. TREES AND EXISTING LANDSCAPING NOT DESIGNATED FOR REMOVAL SHALL BE PROTECTED DURING CONSTRUCTION. 6. SAFETY PROVISIONS: THE CONTRACTOR SHALL COMPLY WITH THE "RULES AND 8. CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATION ADJUSTMENTS OF ALL EXISTING REGULATIONS GOVERNING THE CONSTRUCTION INDUSTRY" AS PROMULGATED FOR THE VAULTS (REGARDLESS OF FUNCTION), METER BOXES, FIRE HYDRANTS, CLEAN OUTS, HEALTH, SAFETY AND GENERAL WELFARE OF EMPLOYEES BY THE COMMISSION OF LABOR MANHOLES ETC. TO MATCH FINISHED GRADES AND SITE PLAN. ALL SUCH WORK SHALL BE UNDER GENERAL STATUTES OF NORTH CAROLINA, AND 29CFR PART 1926 AND PART 1910. COORDINATED WITH THE ENGINEER. ARTICULAR REFERENCE IS MADE BUT NOT LIMITED TO THE FOLLOWING RULES AND REGULATIONS: BUILDING CONSTRUCTION WORK, DEMOLITION, EXCAVATION, PERMIT REQUIRED 9. UTILIZE SIGNS BARRICADES FLAGMEN OR GUARDS AS REQUIRED TO ENSURE THE � � � 0 CONFINED SPACES AND TRENCHING. IN ADDITION TO THE FOREGOING SAFETY PROVISIONS, SAFETY OF ALL VEHICULAR AND PEDESTRIAN TRAFFIC DURING ALL CONSTRUCTION THE CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR AND COMPLY WITH THE DEPARTMENT ACTIVITIES. OF LABOR SAFETY REGULATIONS FOR CONSTRUCTION PROMULGATED UNDER THE OCCUPATIONAL SAFETY AND HEALTH ACT OF 1970 (L 91-54). WHERE THE REQUIREMENTS 10. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER AND ADJACENT PROPERTY OF THESE ACTS ARE IN EXCESS OF THOSE REQUIREMENTS SPECIFIED, THE REQUIREMENTS OWNERS AS RE Q REQUIRED FOR WORK OUTSIDE OF PROPERTY LINES. UNDER ABSOLUTELY NO OF THESE ACTS SHALL GOVERN. SHOULD THE PLANS OR SPECIFICATIONS REQUIRE CIRCUMSTANCES SHALL ANY UNMANNED EXCAVATION BE LEFT OPEN OR UNPROTECTED MATERIALS OR METHODS IN CONFLICT WITH THE SAFETY AND HEALTH REGULATIONS, IT DURING NON -WORKING HOURS. SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO REQUEST OF THE ENGINEER ANY CHANGES THAT MAY BE NECESSARY. 11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LAYOUT OF ALL WORK AS ILLUSTRATED ON PLANS. IF EXISTING CONDITIONS DIFFER FROM THOSE ILLUSTRATED ON PLANS, NOTIFY 7. CONTRACTOR IS RESPONSIBLE FOR ALL DAMAGES DURING CONSTRUCTION AND SHALL ENGINEER PRIOR TO CONSTRUCTION. 5. CONTRACTOR SHALL BE RESPONSIBLE FOR SCHEDULING AND COORDINATION OF ALL MAKE REPAIRS AT HIS EXPENSE. 12. VERIFY ALL DIMENSIONS AND GRADES AT THE JOB SITE. IF DIFFERENCES ARE FOUND, \ ILLUSTRATED CONSTRUCTION ACTIVITIES AT THE JOB SITE. NOTIFY ENGINEER SO THAT MODIFICATIONS TO THESE DRAWINGS CAN BE MADE. TOWN OF SILER CITY \\\8\S\S6 w32 IIVMON DB/PG: 1964/0500 s PARCEL ID: 0092878 ZONING: H—I 83/9- _ LAND USE. VACANT G S P -(NAD83/11) _ �WM RN N 718770.88' — ' CAMPUS DRIVE — E 1876487.76' — — _ EX 60' PU _ BLIC = 5'09 E 513.25, 130 OF CHA DB/PG. � I PARCEL ID: 0090720 ( IN FEET ) ZONING: H—I 1 inch = 40 ft. LAND USE: VACANT 13. GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN IS A VIOLATION OF THE TOWNS EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. 14. ALL SIGNAGE AND PAVEMENT MARKINGS SHALL CONFORM TO THE "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES". 15. ANY LAND -DISTURBING ACTIVITY >1 ACRES REQUIRES COMPLIANCE WITH ALL CONDITIONS OF THE GENERAL PERMIT TO DISCHARGE STORM WATER UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (PERMIT No. NCGO10000). ANY PERMIT NONCOMPLIANCE IS A VIOLATION OF THE CLEAN WATER ACT AND MAY REQUIRE ENFORCEMENT ACTION BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT, HEALTH, AND NATURAL RESOURCES. (FOR QUESTIONS CONTACT MOORESVILLE REGIONAL OFFICE WATER QUALITY STAFF AT 704 663-1699) 16. ALL SUBSURFACE DRAINAGE PIPE SHALL BE AS SPECIFIED ON THE PLANS SHEETS C4.0-C4.1. A 18. ALL CONSTRUCTION ACTIVITY AND MATERIALS SHALL CONFORM TO THE STANDARDS AND SPECIFICATIONS OF TOWN OF SILER CITY AND NCDOT. 19. IN AREAS WHERE 2 FEET OF COVER CAN NOT BE MAINTAINED OVER STORM DRAIN PIPES, THE CONTRACTOR IS TO SUBSTITUTE CLASS IV RCP. 20. THE UTILITIES AND THE LOCATIONS THEREOF, SHOWN ON THE DRAWING REPRESENT THE DESIGNERS UNDERSTANDING OF EXISTING UTILITIES IN THE CONSTRUCTION AREA. THE CONTRACTOR SHALL VERIFY THE LOCATION, DEPTH AND EXISTENCE OF ALL UTILITIES (ELECTRICAL, MECHANICAL, WATER, SEWER, TELEPHONE, GAS, ETC.) WITHIN THE CONSTRUCTION AREA WITH THE UTILITY OWNER AND/OR THE APPROPRIATE UTILITY COMPANY PRIOR TO BEGINNING ANY EXCAVATION. THE OMISSION OF OR THE INCLUSION OF UTILITY LOCATIONS ON THE PLANS IS NOT TO BE CONSIDERED AS THE NONEXISTENCE OF, OR A DEFINITE LOCATION OF EXISTING UNDERGROUND UTILITIES. ANY DAMAGE TO EXISTING UTILITIES SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE. CONTRACTOR TO CALL NORTH CAROLINA 1-CALL (FORMERLY ULOCO) AT (800) 632-4949 AND OTHER UTILITY PROVIDERS NOT A MEMBER OF THE 1-CALL SERVICE. 21. THERE SHALL BE NO ON -SITE BURIAL PITS. ALL SOLID WASTE GENERATED FROM THE PROJECT INCLUDING CONSTRUCTION AND LAND CLEARING DEBRIS, ETC. WILL BE PROPERLY DISPOSED OF OFFSITE IN AN APPROVED DISPOSAL FACILITY. 22. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING FEATURES AND TOPOGRAPHY AS NEEDED DURING CONSTRUCTION STAKING. O O _ Q ago _ Q O = �Q O > 00 ..Uw z= ozcn v zD �Jo 0\UNo z o � Q < Know what's below. Call before you dig. O L9 0 Z � .NL' _ Z W0Cl) N L, W L.L _ W Q) N O W Z IQU— Ww Z I!1 W C7 Z Q w a Z z� � 0 U W Z W Wiz U m I 0 Z 0Lla W N ,,��IIIIII��I 900 �� ,••FESS�O Z •� do Q : • AL • • 29606 D. • O••F_SS/3002 Q • • SEAL • ; C-2630 do •• 0 0 c ��.• Z • •. NE i� ;E F 0.•• �Wi /NEER\N�' THE DESIGNS AND DRAWINGS SHOWN ARE THE PROPERTY OF Mc2 ENGINEERING, INC. REPRODUCTION OR USE FOR ANY PURPOSE OTHER 77-IAN THAT AUTHORIZED BY Mc2 ENGINEERING, INC. IS PROHIBITED. 2021 O 11.4 Cq H CA W W ~ Cq N ~ ) W O OVERALL SITE PLAN REVISIONS 2 3/29/22 TOWN COMMENTS 5 5/16/22 TOWN COMMENTS CAD FILE: 19-045 BASE.DWG PROJECT NO.: 19-045 DESIGNED BY: JDM REVIEWED BY: JDM DATE: FEBRUARY 14, 2022 C200 SITE CAMPUS DR 0 m c I r N 0 Rp LOCATION MAP NTS - GRAPHIC SCALE -� 30 0 15 30 60 120 IN FEET ) - _ - 1 inch = 30 ft. CAMPUS 5888 .---___ ---___ Ex ' DRIVE 58840 6 1 _ 588 - \ _ \ 586 _ man"anaftftooft MEN" ftoft 584 - -------- / �---- _ 582 _ �y� 583.58 B 5.26 HP 580 '----_----- � -' DI 1 574.5 i/ Ds.' B 57g a 0 5.26 HP 583.25 583. _ _582- �q� \ 1 576 RIM 582.04 _ DS s B 581.66 7 5 .16 RD 16 S D D 584.16 L ���, \ 574.50 RIM BUIL ING #1 ------ s Ds D 1 _ �581.92 Sg RB 19 <<< e-__ -- 581.55 6 578.8 / / F�<< ` </1 < LD IN G - - - - 580.06 / 4Q, , �`'\ < \�zeo, �o ���� 578 5 D -<<-< /< -&-/<� - TORY ' - 579.9 v� 575.70 574.50 < _ / < < C`�,�� < -TgE 576.00 �'; - 1 _ ----- - 575.57 RIM I 18 s <<< j `< 5 �4.50 <� <` << _ r --- - 5.5 .25 C R575Ds < Ds S '' 4�Q_` 57857-7.91 \ y ' 575. / < I -- 57 5. RD C 117D1 s - _ � Ds 578.33 574.45 _f _ 75.57 75. 7 R E RD D 5• p 57 7 575.26 5 6 75.65 � �1 E-57-4.5O- 577.98 \ 574.44 575.26 HP 5� 575.63 ° B RIM S�8 ' _ _ 575.15 - 575�� .43 � DI 12 576.83 \ - _ _- \\\\��__ ---- 575.15 - �- 575.07 HC , / ����'� - � �, D 575.12 574.55 76.40 6.72 3.98 574.74 G 57 06 _ - -582' _ - 573.39 �HC 575.46 75.6 574.44 6.3a \ \ ^� 573.37 H 75.0 574.91 �j \ v� \ 573.54 573.33 573.31 - - - - 67& 0 _ _ 57j3.36 H 571 - 57 4 sus 575I97 N,_ _ - 572.56 D /b-573.39 HC 573.89 574. / 575.23 / H ' 574.06 575.95 575.98 \ 572.69 572.96 S� 5'75.34 / 574.01 572.8 C 8 RIM HC 4 574.56 573.52 , 574.72 // // � A 573.95 573.97 HC - - \\ � i 572 80 5 / 573.75 -573.52 573.64 ' I I 573.00 3.00 , 573.60 i � / 571.75 572.85 N,\ _ 573.04 , 573. 573.5j / 573.64 RIM 572.7 572.87 72S�4 ' 570 571.76 5.96 Y 573.5 i / 573.33 - - - \, '_6- 573.44 573.08 5 3.9 572.97 \ N, / / 573.63 / CB 11 u 573.25 N, \ / i / \ ' 572.5 572.78 573.11 �73.75 \ i - 572.27 572.5 572.61 572.59 \ \ \ - - 573 44 72.61 F 572.45 \ \ N, \ / i 569.99 572.93 573.00 73.18 572.09 572.13 5j�03 Qao Actual Upstream Downstream From To Total Slope Pipe Actual Length Invert Invert Pipe Rim upstream downstream Discharge Diameter Velocity (From) (To) Material Elevation (cis) (Ft/Ft) (In) (fps) (Ft) (Ft) (Ft) (Ft) CB 8 CB 7 2.99 0.0375 15 8.96 158.06 569.25 56333 HDPE 572.69 CB 7 CB 6 5.88 0.0075 15 5.67 21.00 563.13 562.97 HDPE 566.81 CB 6 CB 5 9.31 0.0200 15 9.25 78.15 562.77 561.20 HDPE 566.91 CB 5 DI 4 23.32 0.0100 24 8.95 38.92 560.45 560.07 HDPE 567.51 DI 4 FES 3 4.84 0.0120 24 0.79 29.38 559.87 559.51 HDPE 567.50 RD 16 DI 15 0.07 0.0100 6 2.15 27.00 573.00 572.73 HDPE/PVC 574.50 DI 15 DI14 0.66 0.0050 15 2.90 79.19 571.00 570.60 HDPE 574.50 DI14 DI13 1.52 0.0050 15 3.52 97.79 570.40 569.92 HDPE 574.50 DI13 DI 12 2.61 0.0050 15 4.04 76.66 569.72 56933 HDPE 574.50 DI 12 CB 11 3.91 0.0110 15 6.01 80.50 569.13 568.25 HDPE 574.50 CB 11 CB 10 6.63 0.0360 15 10.68 147.20 568.05 562.75 HDPE 571.75 CB 10 CB 9 11.26 0.0050 24 5.82 19.98 562.00 56190 HDPE 566.26 CB 9 CB 5 13.56 0.0050 24 6.09 12735 561.70 561.06 HDPE 567.11 RD 19 YI 18 0.07 0.0100 6 2.15 27.00 573.00 572.73 HDPE/PVC 574.50 YI18 YI17 0.20 0.0100 6 2.74 80.00 572.73 571.93 HDPE/PVC 574.50 YI17 DI 12 0.78 0.0100 8 3.87 97.00 571.93 570.96 HDPE/PVC 574.50 RD 22 YI 21 0.14 0.0100 6 2.55 62.00 565.50 564.88 HDPE/PVC 567.00 YI21 YI20 0.72 0.0100 8 3.80 99.00 564.88 563.89 HDPE/PVC 567.00 YI 20 CB 6 1.50 0.0100 10 4.56 16.00 563.89 563.73 HDPE/PVC 567.00 RD 26 RD 25 0.14 0.0100 6 2.55 84.00 565.50 564.66 HDPE/PVC 567.00 RD 25 RD 24 0.50 0.0100 6 3.47 80.00 564.66 563.86 HDPE/PVC 567.00 RD 24 RD 23 A 0.57 0.0100 8 2 3.57 28.00 563.86 563.58 HDPE/PVC 567.00 RD 23 D 4 2 0.65 0.0100 8 3.69 50.99 5 3- 8 6 .0 HDPE/PVC 567.00 RD 36 YI 35 0.07 0.0100 6 2.15 27.00 565.50 565.23 HDPE/PVC 567.00 YI 35 YI20 0.26 0.0100 6 2.94 79.00 565.23 564.44 HDPE/PVC 567.00 RD 29 YI 28 0.14 0.0100 6 2.55 62.00 565.00 56438 HDPE/PVC 566.50 YI28 YI27 0.53 0.0100 6 3.51 99.00 564.38 56339 HDPE/PVC 566.50 YI 27 CB 10 137 0.0100 10 4.46 14.00 563.39 563.25 HDPE/PVC 566.50 RD 32 RD 31 0.14 0.0100 6 2.55 84.00 565.00 564.16 HDPE/PVC 566.50 RD 31 RD 30 0.50 0.0100 6 3.47 84.00 564.16 56332 HDPE/PVC 566.50 RD 30 RD 30A 0.72 0.0100 8 3.79 68.00 563.32 562.64 HDPE/PVC 566.50 RD 30A DI 4 0.72 0.0100 8 3.79 40.00 562.64 562.24 HDPE/PVC 566.50 RD 34 YI 33 0.07 0.0100 6 2.15 36.00 565.00 564.64 HDPE/PVC 566.50 YI33 YI27 0.33 0.0100 6 3.12 90.00 564.64 563.74 HDPE/PVC 566.50 OC 2 FES 1 537 0.0479 24 11.22 64.70 543.10 540.00 HDPE/PVC 562.50 1. HDPE PIPE SHALL BE ADS N-12 SMOOTH SURFACE INTERIOR DOUBLE WALL PIPE OR EQUIVALENT 2. INSTALL CONCRETE FLARED END SECTIONS. 3. ROOF DRAIN "RD" SHALL BE EITHER ADS N-12 OR SDR 35 PVC PIPE WITH CLEANOUTS AT ALL BENDS. 4. HDPE (WT) PIPE SHALL BE ADS N-12 PIPE WITH WATER TIGHT JOINTS ALL OTHER HDPE PIPES SHALL HAVE SOIL TIGHT JOINTS. STORM SEWER PIPE AND STRUCTURE SUMMARY i 572.17 rd 573.13 57247 FFE 573.50 � 572.72 572_.48 572.55 S, �� \ � �gi i 1.95 572.56 572.45- 572.23 ' GRADING NOTES: i i �I \ ? / FT - r570.3 >� 573.0 CLUBHOUSE 572.76 571.68 5.7 572.00 571.97 571 6 1. CONTRACTOR SHALL PROVIDE POSITIVE DRAINAGE IN ALL GRADED AREAS, \ z aY/ 0. `572.85 E�F� 571 5 571.71 - 71. 5� 571.92 ' INCLUDING PAVING, LAWN AND LANDSCAPE AREAS. 5 0. 6 572.15 572.51 5� 57005 �572.59 3 �' 57�.36 71 451.17 4' 53'1.52 // // 572.12 1 (� " 571.63 _ 571.5�\ 571.41 570.84 571.84 II _HC .58 ' 2. THE CONTRACTOR SHALL IMMEDIATELY REPORT TO OWNER ANY DISCREPANCIES FOUND BETWEEN ACTUAL FIELD CONDITIONS AND CONSTRUCTION DOCUMENTS AND 70 7 570.01 RS 571 20 / 570.68 H SHALL WAIT FOR INSTRUCTION PRIOR TO PROCEEDING. CONTRACTOR SHALL VERIFY DISTURBED ACREAGE: / 5 0.16 H S' 573.42 570.84 f5'11.78 5� 15\ O 570.41 6& LOCATION OF ALL UNDERGROUND UTILITIES PRIOR TO BEGINNING WORK, BOTH LP = RELATIVE LOW POINT +7.74 AC 337,022 SF / 570_1� 56 9 2 570.76 �2 571.78 PUBLIC AND PRIVATE. CONTRACTOR IS FULLY RESPONSIBLE FOR ALL UNDERGROUND EC = EDGE OF CONCRETE ( ) / / - - - - 5 570.23 571.04 570. 1 570.51 / 569.28 _ 570.41 _ / G \ 1 UTILITIES AND SHALL REPAIR ANY DAMAGE AS A RESULT OF THIS CONTRACT. RIM = RIM ELEVATION AT 00 570.74 570. A-J 569.78 i / 571.01 570 5 570.12 // 568.98 -, �\ 571.81 56979 5 2.95 .1 570.2 570 6 570. 1 3. CONTRACTOR SHALL BLEND NEW EARTHWORK SMOOTHLY TO TRANSITION BACK GUTTER/FLOW PATH SOIL TYPE: _- `n ��� �`i \ �'18 `"� 5 0. 9 TW = TOP OF WALL GaC - Geor eville Silt Loam 568.84 56888 568.56 / 571.00 1 TO EXISTING GRADE. GaB - Georgeville Silt Loam / 569.36 �. \\ 570.22 _69' 569.2 / 5"l0 g / 67.0 i \ \ / 69.08 _-3 37 568.74 �;' 1 4. THE PROPOSED CONTOURS AND SPOT ELEVATIONS SHOWN IN DRIVES, PARKING BW = BOTTOM OF WALL / 121 568.16 '�� �� TS = TOP OF STAIRS RI \ / \ 569.96 �y ' LOTS, AND SIDEWALKS ARE FINISHED ELEVATIONS INCLUDING ASPHALT. SOIL LEGEND ' \ 69'48 ,/ ,� 568.40 69.98\ �y BS = BOTTOM OF STAIRS / C 568 56gsF7 5BSI_77-HP 56 8 570.36 EC \\ r F; 70. 5. PIPE LENGTHS SHOWN ARE THE ENGINEER'S ESTIMATE USED TO COMPUTE PIPE / .71 � 568.92 _ 568.95 567.87 567.6 56 / 5-68 89 � 568.4 570.17 SLOPES AND INVERTS AND SHALL NOT BE CONSTRUED BY THE CONTRACTOR TO CDs s �R568.2 5 _ _ :�70.18 \ /568.8 568.86 567.84 -567 76 569.9 I REPRESENT THE ACTUAL QUANTITY OF PIPE REQUIRED. SPOT SHOT TERMS \R \567:80 � � _ _ - - - 568 E ° 568.64 567.80 567 HC N, 569.84 I 6. NO DISTURBANCE OR COMPACTION, CONSTRUCTION MATERIALS, TRAFFIC, BURIAL / -�6'$ 19 D Ro 81 A B567.29 567.41 567 60 / k�� 5 .56 HC H �N, 569.58 PITS, TRENCHING, ETC., SHALL BE ALLOWED IN TREE PROTECTION ZONES. NO / ps 566.91 _ 567.80 \ 569. 6 F R q HC 69.09 HP �-- 566.96 566.91 569.24 569.56 ' ON -SITE BURIAL WILL BE ALLOWED. p Ro D B Re i 5 8.76 568.76 566.74 567.28 I - - 568-613 \D D� H 567..` 11 56 61 8.59 567.24 566.97 1 567.29 S 4, \ 7. CALL STORMWATER PROGRAM MANAGER 72 HOURS BEFORE STORMWATER PIPE IS 1 , TO BE INSTALLED FOR SITE INSPECTION. 704 761-2376. g6$ / - - - - 18 567.25 568.24 HP \\5 67 567.11 / HC I / �567.45 YL 569.37 'R 2 /� 567RIM S �\ o A 68.13 568.04 567.566.81566.E CB A CB/ 567.51 K R �88 Ci I J5 7. 0 °S FFE: 568.50 _ I B 5 _ 566.90 _ D 67 1' !- / �(DS 566' KEY NOTES: - - - _ -- o RIM S R M °� 4_ <4516 DS RO 567 8 7 7 D 568.22 566 s'2s� a 567. D < bs / Ds,� �\ ' OA PROPOSED CATCH BASIN "CB" (NCDOT 840.01 - 1 /C9.2), OG PROPOSED SEATING AREA WITH PARK BENCH. SEE B I <�j< < -56- a� <<< v r _ CATCH BASIN FRAME AND GRATE (NCDOT 840.03 ARCHITECTURAL PLANS FOR DETAILS. SEATING / 26 D _ < °� �.I-� G �� 567.93 567.37 E D 67 D Ds °S �< \ << << < o 2-3/C9.2) ALONG WITH DRAINAGE STRUCTURE STEPS AREA SHALL HAVE A SLOPE LESS THAN 2.0% IN 5 o F Rd% - --- z4_JNIT T � - /,4 'DS C f C YI 3a D 7 s < << �k <<<<` E (840.66) SEE DETAILS 4/C9.2. CONTRACTOR MAY USE EITHER ANY DIRECTION. E o DS S 3-S ORY <<< < < DS 5 .00 J 6E5.50 ` <` < IRIM ` << < < S BRICK OR PRECAST STRUCTURE FOR ALL STRUCTURES. / < < M RD 30A568.08 RIP:. o DS < < < << < << \\ HO HANDICAP PARKING AREA (SHADED AREA) SHALL / < D 4 •\ < I \ RD 9 PROPOSED DROP INLET "DI" (NCDOT 840.14 - 5 C9.2 DROP HAVE A MAXIMUM SLOPE OF 2.0% FROM PARKING W R 3 �f59_oa D 34 \<< G \ ��� INLET FRAME AND GRATE (NCDOT 840.16 - 6/C9.2) ALONG SPACES TO ADA RAMPS AT SIDEWALK. / / � \ < WITH DRAINAGE STRUCTURE STEPS (840.66) SEE DETAILS 3-S ORY \ DS \ O PROPOSED FLARED END SECTION WITH RIP RAP RD os/ 566.50 0 \ \ �� � 5/C9.2. CONTRACTOR MAY USE EITHER BRICK OR PRECAST 5 RIO/ Ro - - _ - a IM_- ° \ FFE: 568.00 °S \ 56 .5 ' STRUCTURE. APRON AT PIPE OUTLETS SEE DETAIL 3/C9.5. / --5fi7.00 S 566.50 4S RI D pg s D RD 32 PROPOSED YARD INLET -------- - E Ro RIM RIM YI' (8/C9.5) SHALL BE A J PROPOSED OUTLET CONTROL "OC 2" STRUCTURE � - Ds D�' O O S p 23 ES 3 - - DS D Ro RD- 566.50 NYLOPLAST 6" INLINE DRAIN WITH A 15" STANDARD FRAME FOR SAND FILTER #1 SEE DETAIL 2/C9.5. Ds Ds Ds \� Ds R R F E AND GRATE 9/C9.5). CONTRACTOR SHALL INSTALL SILT K PROPOSED SAND FILTER #1 SCM SEE DETAILS ON D 24 s Rp� RD _31 a FENCE UNDER GRATE UNTIL LANDSCAPE ESTABLISHED. O SHEET C4.1. � � / RIM �o �/ i /----- � - / h '�o`V o --- - �� I�R �D F 566.50 566 / - �o - OD CONTRACTOR SHALL INSTALL DROP INLET/CATCH BASIN INLET I-01y / - - ` 566 � \ RD \ RD 30 11 HDPE PIPE INSTALLATION NOTES: �'C _ _ - - - \\ \ 566 .50 - 1. THE PRODUCT USED SHALL BE CORRUGATED EXTERIOR/SMOOTH INTERIOR PIPE -- - _ \ RIM RIM ` (TYPE S), CONFORMING TO THE REQUIREMENTS OF AASHTO SPECIFICATION M294/ \ (LATEST EDITION) FOR CORRUGATED POLYETHYLENE PIPE. / -' o� I o � N (0 1 2. BELL AND SPIGOT JOINTS SHALL BE REQUIRED ON ALL PIPE INSIDE THE / I (0� RIGHT-OF-WAY. BELL SHALL COVER AT LEAST TWO FULL CORRUGATIONS ON "O"-RING oc>„ / LO 1 / h I s EACH SECTION OF PIPE. THE BELL AND SPIGOT JOINT SHALL HAVE AN RUBBER GASKET MEETING ASTM F477 WITH THE GASKET FACTORY INSTALLED, PLACED ON THE SPIGOT END OF THE PIPE. ALL JOINTS SHALL MEET OR \\ \ EXCEED THE SOIL TIGHTNESS REQUIREMENT OF AASHTO STANDARD 1 / / Qoc SPECIFICATION FOR HIGHWAY BRIDGES, SECTION 23, PARAGRAPH 23.5.4(E). \ \ 560 PIPE JOINTS SHALL ALSO MEET ALL REQUIREMENTS OF AASHTO M294. \ 562 3. BACKFILL MATERIAL USED TO INSTALL RCP PIPE WITHIN THE STREET _ 1 564 RIGHT-OF-WAY SHALL BE SELECT MATERIAL CLASS II -IV, AS DEFINED BY - 564 SECTION 1016-3 OF THE NCDOT STANDARD SPECIFICATIONS FOR ROADS AND 562 STRUCTURES. UPON SUBMITTAL OF WRITTEN CERTIFICATION OF MATERIAL ` 560 SUITABILITY BY A LICENSED GEOTECHNICAL ENGINEER, NCDOT CLASS I SELECT ` 558 _ MATERIAL MAY BE USED. ALL BACKFILL MATERIAL SHALL BE APPROVED BY THE - 556 CITY INSPECTOR PRIOR TO PLACEMENT OF THE MATERIAL WITHIN THE STREET 554 RIGHT-OF-WAY. 552 \ 550 548 4. THE MINIMUM LENGTH OF HDPE PIPE PERMITTED FOR USE SHALL BE FOUR (4) _ 546 FEET. HDPE FLARED END SECTIONS ARE NOT PERMITTED. 544 5. ALL HDPE PIPE INSTALLED SHALL BE THIRD PARTY CERTIFIED AND SHALL / 542 / 540 FES 1 BEAR THE PLASTIC PIPE INSTITUTE'S (PPI) CERTIFICATION STICKER. �••G 1 / -� i i \� 564 0000 S \NI\S PROTECTION ON DI/CB. SEE DETAIL 6/C9.5. 562 _ 0000 \ �\ O CONTRACTOR SHALL CONNECT DOWNSPOUTS FROM BUILDING 560 � � � \\ TO PROPOSED ROOF DRAIN WITH 6" PVC PIPE AT 1.0% MIN. 558 \ DOWNSPOUT LOCATIONS CALLED OUT AS "DS" ON PLANS. SEE DETAIL 7/C9.4. 0-0 000 �� \�S OF PROPOSED ROOF DRAIN "RD" PIPE SHALL BE EITHER SDR 35 PVC PIPE OR DOUBLE WALL SMOOTH INTERIOR HDPE PIPE \ WITH PVC FITTINGS. ROOF DRAINS SHALL INCLUDE CLEANOUTS AT ALL BENDS IN THE ROOF HEADER PIPE. 1 - \ _ �_ _, S48 PER STUDY COMPLETED ON MAY 4 T_ T --- s4 6, 20221 BY SHANNON LANDRUM s • WITH AUGUST MACK ENVIRONMENTAL, THERE ARE NO '-i WETLANDS LOCATED ON -SITE Know what's below. Call before you dig. I N O rn U 0 Z .NL' -00) _ Z - N [11 W LL 00 0) W z�NO �DU- W W z Ln W L9 Z Q w a Z �� z� W Z _j W IJ L9 W I Z U [D I 0 Z �OUa W N ,���IIIIII��I �� III ��,,'� �•� �� �Z ,••FESS/,-I� •� i Q : AL • • • 29606 III ♦x q:••­D *** ♦ O •• FESS/p•i Q • • SEAL • ; C-2630 W O•V •• •0 C \�.• 2 ,IIII�cIf EER\NG;���♦ THE DESIGNS AND DRAWINGS SHOWN ARE THE PROPERTY OF Mc2 ENGINEERING, INC. REPRODUCTION OR USE FOR ANY PURPOSE OTHER 77-IAN THAT AUTHORIZED BY Mc2 ENGINEERING, INC. IS PROHIBITED. 2021 O W o H N W W ~ N ~ ) W GRADING PLAN REVISIONS 2 3/29/22 TOWN COMMENTS 4 5/9/22 WETLANDS STUDY CAD FILE: 19-045 BASE.DWG PROJECT NO.: 19-045 DESIGNED BY: JDM REVIEWED BY: JDM DATE: FEBRUARY 14, 2022 C400