Loading...
HomeMy WebLinkAboutNCC221915_Site Plan or Location Map_20220526CRU EN PCSO ER OF TREE CC NOTE INCLI INFOF OR VI NOTE INCLI PERM OBTAI ENFOI 704-3 NOTE AT LE DISTI FORM Q _ Z 37 m U (V i� M N N 0 N N w Uj U Sheet List Table ►■// 3HEE P H ISSUE DATE REV. DATE C000 PROJECT NUMBERCO ���� UEO21-00055 2021.08.24 5-2022.02.22 JECT NOTES 2021.08.24 -- IGI EXIST NG CONDITIONS 2022.01.06 4-2022.01.10 / DET"IOPC�VWURAI AROBILON AND SEDIN ENT CONTROL P, N - PHASE 1 2022.01.10 -- hrm D SEDjjj3jj7eS - SIN 3s o n22.01.10 -- ENT CONTROL- kSINS 2 & 4 2022.01.10 -- B SION C P 21.08.24 -- ORDIIQAPICE C105 EROSION CONTROL PLAN - PHj >E 3 2021.08.24 -- 1 0000 EROSION AND SEDWNT COAITRO BASI 5 2022.01.10 2022.01.10 -- 5-2022.02.22 C107 EROSION AND SE THI0LAN DE MATI IT hTlp: ,AM DV DcFE9CW'PN AND SHDIMENT CONTRO BASIN 7 2022.01.10 2021.08.24 5-2022.02.22 4-2022.01.10 PL CA OVE L 704-336-5499 ALL SITE PLAN t1ch@r�gi tewz ter.org &fCROVA DOES NOT 4FRC.TAI ZONING; Al BUILDIN ZONIGN APPROVALS CAN BE BURG COUNTY CODE PL E CALL CTAC AT OR 4URE INFORMATI SITE PLAN 2021.08.24 5-2022.02.22 THI§,PLAN DE COM S AIMS) E ,CEMA1. 1.4-C7776MO SITE PLAN 2021.08.24 5-2022.02.22 SITE PLAN 2021.08.24 5-2022.02.22 EITE INSET 2021.08.24 5-2022.02.22 LL UTILITY PLAN 2021.08.24 2021.08.24 2021.08.24 4-2022.01.10 5-2022.02.22 3-2021.12.30 S ST 48FRS. RBIrICg FOUND 9 OR TD EETI ANY LAND ILITY PLAN CTIIUSI T http• C304 G THE ONLINE ILITY PLAN 'LAN AND PROFILE UTILITY PLAN AND PROFILE 2021.08.24 3-2021.12.30 21 2021.08.24 3-2021.12.30 22 C400 OVERALL GRADING AND DRAINAGE PLAN 2021.08.24 3-2021.12.30 23 C401 GRADING & DRAINAGE PLAN 2021.08.24 4-2022.01.10 24 C402 GRADING & DRAINAGE PLAN 2021.08.24 3-2021.12.30 25 C403 GRADING & DRAINAGE PLAN 2021.08.24 3-2021.12.30 26 C404 DETAIL GRADING 2021.09.22 3-2021.12.30 27 C405 DRAINAGE CHARTS 2021.09.22 4-2022.01.10 28 C406 GRADING & DRAINAGE PROFILE 2021.08.24 5-2022.02.22 29 C407 GRADING & DRAINAGE PROFILE 2021.08.24 5-2022.02.22 30 C501 STORMWATER MANAGEMENT - NORTH POND 2021.08.24 5-2022.02.22 31 C502 STORMWATER MANAGEMENT - NORTH PLANTING 2021.08.24 4-2022.01.10 32 C503 STORMWATER MANAGEMENT - EAST POND 2021.08.24 5-2022.02.22 33 C504 STORMWATER MANAGEMENT - EAST PLANTING 2021.08.24 4-2022.01.10 34 C505 STORMWATER MANAGEMENT - SAND FILTER 2021.08.24 5-2022.02.22 35 C600 TREE SAVE PLAN 2021.08.24 3-2021.12.30 36 C601 LP notes 2021.08.24 5-2022.02.22 37 C602 OVERALL LANDSCAPE PLAN 2021.08.24 5-2022.02.22 38 C603 LANDSCAPE PLAN - WEST 2021.08.24 5-2022.02.22 39 C604 LANDSCAPE PLAN - EAST 2021.08.24 4-2022.01.10 40 C605 LANDSCAPE PLAN - NORTH 2O21.08.24 5-2022.02.22 41 C700 SITE DETAILS 2021.08.24 4-2022.01.10 42 C701 TENANT DETAILS 2021.08.24 -- 43 C702 CONCRETE SPECS 2021.09.22 -- 44 C703 CONCRETE DETAILS 2021.08.24 -- 45 C704 UTILITY DETAILS 2021.08.24 -- 46 C705 UTILITY DETAILS 2021.08.24 1-2021.09.22 47 C706 EROSION CONTROL DETAILS 2021.08.24 -- 48 C707 NCG01 NOTES 2021.08.24 -- 49 C708 SIGHT DISTANCE PROFILES 2021.09.22 -- BROWNFIELDS NOTES THIS SITE IS AN ACTIVE BROWNFIELDS SITE (PROJECT #18038-14-060). REFER TO AQUAIR H BROWNFIELDS ENVIRONMENTAL MANAGEMENT PLAN PRODUCED BY HART & HICKMAN, PC FOR SPECIFIC CONSTRUCTION REQUIREMENTS. CONTACT BRIAN MCCANN (704-586-0007) TO COORDINATE CONSTRUCTION. CONTRACTOR'S CIVIL CLOSEOUT CHECKLIST NOTIFY CIVIL ENGINEER 48-HR IN ADVANCE OF ANY REQUIRED TESTING OR WITNESSED INSTALLATION. CONTRACTOR SHALL HAVE TESTS PREPARED AND READY TO EXECUTE PRIOR TO SCHEDULED TESTING TIME.. TREE SAVE PLAT H STORM SEWER CERTIFICATION STORM SEWER AS-BUILTS BUA AS -BUILT BMP AS -BUILT STORM PIPE AS -BUILT INSTALLATION OF PIPE COLLARS WITNESSED SANITARY SEWER CERTIFICATION PRIVATE SEWER AS-BUILTS GRAVITY SEWER AIR PRESSURE TEST MANDRELTEST WATER CERTIFICATION HYDROSTATIC TEST ALLOWABLE LEAKAGE TEST WATER MAIN AS-BUILTS GEOTECHNICAL TEST REPORT PCSO SUMMARY ORIGINAL PARCEL ID NUMBER(S): 201-411-01 DEVELOPMENT TYPE: INDUSTRIAL SUBJECT TO PCSO? YIN YES IF NO, WHY? POST CONSTRUCTION WATERSHED DISTRICT: CENTRAL CATAWBA DISTURBED AREA (AC): 47.0 ACRES SITE AREA (AC): 79.825 ACRES (55.85 AC LOT 1) DA #1 TOTAL ON -SITE DRAINAGE AREA (AC): EXISTING BUILT -UPON -AREA (SF): 0 SF EXISTING BUA TO BE REMOVED (SF): 0 SF EXISTING BUA TO REMAIN (SF): 0 SF PROPOSED NEW BUA (SF): 1,614,079 SF PROPOSED % BUA: 66.34% (37.05 ac.155.85 ac.) DENSITY (HIGH/LOW) HIGH TOTAL POST -PROJECT BUA FOR SITE: DEVELOPMENT OR REDEVELOPMENT: DEVELOPMENT NATURAL AREA REQUIRED (AC): NIA NATURAL AREA PROVIDED, TOTAL (AC): NIA UNDISTURBED TREED NATURAL AREA PRESERVED (AC): 0 ACRE TOTAL STREAM BUFFER PROTECTED ON -SITE (AC): NIA TRANSIT STATION AREA? YIN NO BUSINESS CORRIDOR REVITALIZATION DISTRICT? YIN NO MITIGATION TYPE (IF APPLICABLE) NIA NATURAL AREA MITIGATION? NIA BUFFER MITIGATION? YIN NO TOTAL PHOSPHOROUS MITIGATION? YIN NO CONSTRUCTION DRAWING PACKAGE FOR 13005 SAM NEELY ROAD, CHARLOTTE, NORTH CAROLINA / rVERITAS VI NCITT . 4.0 / 1 1 � 1 I I THE KEITHCORPORATION Real Estate Develpment/ Brokerage/Property Management ' I 1 / 1 , I \ - I , I / x — ` I -J ✓ r I i I 1 I I I , J WESTINGHOUSE LOGISTICS PARK NORTH z>� T 0 tip C - opos - .h 1 , ✓� � / qR Foe � ------ - ------ -, ; F � o / 403?0o S rrF ,- 6333bk ?�i C OC --- `- ---------------- --------------- ----------------- -_- - _ l / / / \� r ® 3$-F 960 ---" --_ Jl II �� JLJ//�_j \ \\ <,/� ///,/////�/ Q PERM/TT C o %` ('VO),or 4 P q/889gySCOpC?0/8Op/ `\ WESTINGHOUSE LOGISTICS PARK\ y` \ SOUTH _ . — • — • CLASS "A" ZONING BUFFER — — — —�_ ----- ------\- - — • — • — • — 75' (100' REDUCED W/ BERM) _ _ — — —_ — — — __ '-- ---�-- -- -- j I I VIRKLER DR I l r T \ k- -4-1 SCALE: 1 " = 200' / / �----------------- I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I a I I I I I I I I I I I I I I I I I I I I I I I I b I I I I I I I I I I I I I I I I I I I I I I I I VICINITYMAP NOT TO SCALE IWESTINGHOUSE LOGISTICS PARK NORTH W40- PROJECT CONTACT INFORMATION ENGINEER: BOUNDARY & TOPO SURVEY: Burton Engineering Associates Burton Engineering Associates Carlton Burton; Bryan Linton Cary H. Watts 5950 Fairview Road, Suite 100 5950 Fairview Road, Suite 100 Charlotte, NC 28210 Charlotte, NC 28210 P: (704) 553-8881 P: (704) 553-8881 blinton@burtoneng.com cwatts@burtoneng.com DEVELOPER: CONTRACTOR: TKC Land Development II, LLC Choate Construction, Co Alan Lewis Brent Long 4500 Cameron Valley Pkwy, Suite 400 2907 Providence Rd, Suite 400 Charlotte, NC 28211 Charlotte, NC 28211 P: (704) 365-6000 P: (704) 556-0550 blong@choateco.com BROWNFIELD ENGINEER: GEOTECHNICAL ENGINEER: Hart & Hickman, PC Ecs Southeast, LLC Brian McCann Eric Freeburg 2923 South Tryon Street, Suite 100 1812 Center Park Dr, Suite D Charlotte, NC 28203 Charlotte, NC 28217 P: (704) 586-0007 P: (704) 525-5152 bmccann@harthickman.com efreeburg@ecslimited.com MUNICIPALITY CONTACT INFORMATION ZONING: URBAN FORESTRY: City of Charlotte City of Charlotte Jennifer Frixen Jonathan Wilson 600 E. 4th Street 600 E. 4th Street Charlotte, NC 28202 Charlotte, NC 28202 P: (704) 336-8328 FIELD INSPECTOR: ENGINEERING: City of Charlotte City of Charlotte John LaMarre Emily Chien 600 E. 4th Street 600 E. 4th Street Charlotte, NC 28202 Charlotte, NC 28202 P: (704) 517-5601 P: (704) 336-6749 CDOT: UTILITIES (WATER/SEWER): City of Charlotte Charlotte Water Kevin Parker 600 E. 4th Street 600 E. 4th Street Charlotte, NC 28202 Charlotte, NC 28202 P: (704) 336-7600 P: (704) 432-6511 STORMWATER NCDOT: MANAGEMENT: District 2 City of Charlotte Doug Sossamon Robbey Zink 7605 District Drive 600 E. 4th Street Charlotte, NC 28213 Charlotte, NC 28202 P: (980) 523-0000 P: (704) 336-5385 dsossamon@ncdot.gov EROSION CONTROL: City of Charlotte Peter Rodriguez 600 E. 4th Street Charlotte, NC 28202 P: (980) 572-0114 PROJECT SUMMARY PROJECT NAME: WESTINGHOUSE LOGISTICS PARK SOUTH LOT 1 DEVELOPER: TKC LAND DEVELOPMENT 11, LLC ZONING: 1-2 APPROVED PETITION NO: N/A TAX PARCEL NO: 201-411-01 JURISDICTION: CITY OF CHARLOTTE WATERSHED DISTRICT: STEELE CREEK (CENTRAL CATAWBA) FEMA INFORMATION: MAP NO: 3710451000K MAP DATE: 09/02/2015 FLOOD ZONE: ZONE X PARCEL SIZE: 79.83 ± ACRES LOT SIZE: 55.85 ± ACRES START/END DATES: 08/01/2018 - 08/01/2019 DENUDED AREA: 47.0 ACRES SETBACK REQUIREMENTS: FRONT SETBACK: 20' SIDE YARD: 5' BUFFER REQUIREMENTS: ZONING BUFFER: CLASS A 1 00'(REDUCED 25% WITH BERM) PRIOR TO ANY CERTIFICATE OF OCCUPANCY ON THIS PROPERTY, SAM NEELY ROAD R/W DEDICATION AND IMPROVEMENTS MUST BE COMPLETE AND PLATTED. BUFFER WILL BE PROVIDED AT A FUTURE PHASE FOR THE SOUTHERN SIDE OF THE SITE. PROPOSED USE: WAREHOUSE/DISTRIBUTION BUILDING HEIGHT: 41' (36' CLEAR HEIGHT) MAXIMUM BUILDING HEIGHT ALLOWED: 40' WITH AN ALLOWABLE INCREASE PER 9.1105(1)(G)(FOOTNOTE 2) STORIES: 1 BUILDING COVERAGE: 403,200-SF GROSS FLOOR AREA: 403,200-SF FLOOR AREA RATIO (ALLOW. / PROP.): 1.00 / 0.17 ALL SIGNAGE WILL BE APPROVED AND PERMITTED SEPARATELY. RELATED SITE DEVELOPMENT PROJECTS WESTINGHOUSE LOGISTICS PARK SOUTH MASS GRADING LDC-2018-00034 WESTINGHOUSE LOGISTICS PARK SOUTH LOT 2 LDC-2018-00138 WESTINGHOUSE LOGISTICS PARK SOUTH SUBDIVISION SDRC-2018-00060 SANITARY SEWER RELOCATION - WESTINGHOUSE LOGISTICS PARK SOUTH CLTWATER JOB# 100-18-550 WATER MAIN SYSTEM IMPROVEMENTS -WESTINGHOUSE LOGISTICS PARK SOUTH CLTWATER JOB# B U R T 4 N N' G I N E F 0 1 1\1 r 5950 FAIRVIEW RD STE 100 CHARLOTTE NC 28210 (T) 704.553.8881 www.burtoneng.com FIRM #C-1 157 `,%rrrr .•'� CA • s 2 .7 •4 • SEAL 12557 :• gip. '•,ACT ' ••'•��`;� ti� ON T Z Z 0 OU �C z �LU Uwe z o LV J MOM%<Q 0Ln oU O M U W W W i 0 U 0m cV Cal Cal O Z O cV U UU `°w �0 a- w 0 J Z Q Z Z O OU OU Z U w Q Q U U af af O w w w w w w w w 0 w 0 0 0 w D w w w N w cn cn V) >www�c w N W��� 71- o 0 0, Z cV cV M — O 0 N 0•--09 — cV — cV o - N — cV cV N N cV o O O O O 17C cV M 71- Ln THIS DRAWING IS THE PROPERTY OF BURTON ENGINEERING ASSOCIATES AND IS NOT TO BE REPRODUCED OR COPIED IN WHOLE OR IN PART. IT IS NOT TO BE USED ON ANY OTHER PROJECT AND IS TO BE RETURNED UPON REQUEST. PROJECT NUMBER 021.554.097 C000 Sheet I of 49