Loading...
HomeMy WebLinkAboutNCC221974_NOI Application_20220526Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 5/24/2022 11:50:00 AM (NCG01 NOI Submission) Approve by Broussard, Brooklyn C 5/25/2022 7:05:35 AM (Review - NOI 91936 Dollar General - Church Street) • The task was assigned to Broussard, Brooklyn C by round robin distribution 5/24/2022 11:50 AM • The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: May 27, 2022 5:00 PM 5/24/2022 11:50 AM by Workflow 5/25/2022 7:05:40 AM (Workflow Start Event) Submit by Selkane, Aziza 5/26/2022 9:03:42 AM (Payment Verification for NCC221974) * Teramore Development • Selkane, Aziza assigned the task to Selkane, Aziza 5/26/2022 9:02 AM The task was assigned to DEMLR NCG01 Payment Team. The due date is: July 6, 2022 5:00 PM 5/25/2022 7:05 AM NORTH CAROLINA Rrf Omrlm&tral Qualrly A. Project Information Part A. Project Location and Waterbody Information Are you submitting No an NOI that was Yes rejected before? la. Project Name* Dollar General - Church Street 1 b. Specific Lot This field may be used to list specifc lot numbers. Numbers 1 c. Parcel ID List all PINs associated with this project. Number(s) (PIN) 230989 2. County* Guilford 3. Highway or Street 5904 Church Street Address* Street name only is acceptable if no address number assigned yet 4. City or Township* Greensboro 5. State* NC 6. Zip Code* 27402 7. Latitude* Enter the latitude in decimal degrees 36.2192 8. Longitude* Enter the longitude in decimal degrees (MUST be negative) -79.7875 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 05/27/2022 Estimated Construction Project Start Date 10. Date to End* 08/05/2022 Estimated Construction Project End Date 11. SIC (Primary)* Commercial (1542) Standard Industrial Classification for Development 12. Acres to be 1.23 disturbed * (including off -site borrow and waste areas) 13. Total site area 1.77 (acres)* 14. Post -construction 0.70 impervious area (Estimated) (acres) * Project Tracking ID NCC-GUILF-2022-Dollar General - Church Street Assigned automatically (not used) Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Mears Fork Creek Waterbody * Name of waterbody into which stormwater runoff will discharge 15b. Waterbody Index 16-3 No. * NC Waterbody Index Number Stormwater No discharges will flow Yes to additional waters* 16a. Is this project Yes subject to the NC No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. Permittee Information - Legally Responsible Entity and Individual ........................................................................................................................................................................ Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form must be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCGO10000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Permittee* Legally Responsible Entity Teramore Construction, LLC If permittee is an individual, enter first and last name in this field. Otherwise, enter organization/business name. Note: If the permittee is a business, the business must be registered with the NC Secretary of State. You can verify the registration here. Permittee must be the same entity that is responsible for the land -disturbing activity as listed on the NC SPCA Financial Responsibility/Ownership (FRO) Form. 2. First Name* Zach If Corporation, enter Registered Agent First Name 3. Last Name* Crumley If Corporation, enter Registered Agent Last Name 3b. Title Senior Vice President 4. Permitee E-mail tglass@teramore.net Address* 5. Permittee 229-516-4289 Telephone No.* 6. Permittee Mailing Street Address Address* PO Box6460 Address Line 2 City State / Province / Region Thomasville GA Postal / Zip Code Country 31758 us Check box if the Yes street address the same as mailing address 7. Permittee Street Street Address Address * 165 Big Star Drive Address Line 2 City State / Province / Region Thomasville GA Postal / Zip Code Country 31757-7708 US 8. Type of Ownership is only individual if an individual is named in B.1. above. Ownership* Non -Government C. Site Contact Information Part C. Project Site Contact Information ................................................................................................................................................................................................................................................................................................................................................................................................. 1. Primary Site Robert Contact - First Name* 2. Primary Site Caldwell Contact - Last Name* 3. Title Project Manager 4. Site Contact E-mail tglass@teramore.net Address* 5. Site Contact 704-614-1763 Telephone No.* 6. Organization Name Teramore Construction, LLC 7. Site Contact Street Address Mailing Address* PO Box 6460 Address Line 2 City Thomasville Postal / Zip Code 31758 8. Consultant Name (optional) Jennifer Edwards First and Last name 9. Consultant E-mail jennifer@brec.biz This person will be copied on all correspondence. 10. Consultant 336-844-4088 Telephone No. 11. Billing E-mail (For Annual Fee correspondence) tglass@teramore.net Default is legally responsible person e-mail 12. Billing Telephone (For Annual Fee correspondence) 229-516-4289 Default is legally responsible person telephone State / Province / Region GA Country us D. E&SC Plan Part D. Erosion & Sediment Control (E&SC) Plan Approval Information 1. Date E&SC Plan 05/20/2022 Approved * 2. E&SC Plan Project 22-02-GCCP-01255 Number/ID* Assigned by agency or local program 3. E&SC Plan State DEQ Office Approved by* Local Program 4. Local Program* Guilford County Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. Please also upload a site map showing the overall extent of the project (for linear projects, can include the beginning point and end point coordinates in the "Notes" box below). 5. E&SC Plan APPROVED _ESC_PERMIT.pdf 63.02KB Approval letter or Must be PDF format Grading Permit 6. Signed FRO Financial Responsibility/Ownership Form SIGN ED_ESC_GRADING.pdf 1.44MB Must be PDF format 7. Site Location Map Must be PDF format (limit 20 MB) SITE_LOCATION.pdf 42.67KB Please do not upload entire set of E&SC plans. 8. Notes (Optional) Provide any additional information that might help the reviewer better understand how uploaded documents support the application. Include additional waterbodies if necessary. 9. NOI Certification SIGNED_NOI.pdf 419.11KB Form Must be PDF format This is an Express • No Review Project* Yes E. Certification North Carolina General Statute 143-215.613 (i) provides that: Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: * I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. * The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * If the Erosion and Sediment Control Plan approved by the delegated program is not compliant with Part II (Stormwater Pollution Prevention Plan) of the NCG010000 General Permit, I will nonetheless ensure that all conditions of Part II of the permit are met on the project at all times. * I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* The Legally Responsible Person named on this Notice of Intent Authorized Responsible Person* (signing on behalf of Legally Responsible Person named in Part B) Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature �tf��r Type Name* Zach Crumley Title Senior Vice President Organization Legally Responsible Entity Teramore Construction, LLC Date * 05/24/2022 F. Tracking and COC Info NOI Tracking No. 91936 NC Reference No. NCG01-2022-1974 Indicates NCG01 or NCG25. Uses NOI number until approved, then uses NUMBER incremented by SP (passed from workflow if eNOI approved) Certificate of NCC221974 Coverage (COC) No.* Uses NOI number until approved, then uses NUMBER incremented by SIP (formatted and passed from workflow if eNOI approved) Initial Invoice No. NCC221974-2022 Invoice Due Date 6/24/2022 Initial Fee $ 100.00 Invoice Status OPEN