Loading...
HomeMy WebLinkAboutNCS000528_NOD_20150206Pat McCrory Governor LT w NCDENR North Carolina Department of Environment and Natural Resources February 6, 2015 CERTIFIED MAIL: 7010 3090 0001 3216 0214 RETURN RECEIPT REQUESTED Premiere Fibers Attn: Dewey Fulton PO Box 8930 Bristol, VA 24203 Subject: NOTICE OF DEFICIENCY (NOD-2015-PC-0037) Premiere Fibers NPDES Stormwater Individual Permit-NCS000528 Anson County Dear Mr. Fulton: Donald R. van der Vaart Secretary On January 22, 2015, Mike Lawyer and Lori Britt from the Fayetteville Regional Office along with Julie Ventaloro and Rick Riddle with the Stormwater Permitting Program of the Division of Energy, Mineral and Land Resources, conducted a site inspection at the Premiere Fibers facility located at 10056 US Hwy 52 N, Ansonville, Anson County, North Carolina. A copy of the Compliance Inspection Report is enclosed for your review. Mr. Kevin Bowers, Technical Manager, and Mr. Ted Kalamatas, EHS Manager, were also present during the inspection and their time and assistance is greatly appreciated. The site visit and file review revealed that the subject facility is covered by NPDES Stormwater Individual Permit-NCS000528. Permit coverage authorizes the discharge of stormwater from the facility to receiving waters designated as a UT (unnamed tributary) to Buffalo Creek, a Class C stream in the Yadkin -Pee Dee River Basin. As a result of the site inspection, the following deficiencies are noted: 1) Qualitative Monitoring Qualitative monitoring has not been conducted and recorded in accordance with permit requirements. 2) Analytical Monitoring Analytical monitoring has not been conducted and recorded in accordance with permit requirements. Other Observations: Please refer to the enclosed Compliance Inspection Report for additional comments and observations made during the inspection. Requested Response: A written response is not requested at this time. Division of Energy, Mineral, and Land Resources Land Quality Section Fayetteville Regional Office, 225 Green Street - Suite 714, Fayetteville, North Carolina 28301 Phone: 910-433-3300 / FAX: 910-486-0707 / Internet: http://portal.ncdenr.org/web/Ir/ An Equal Opportunity \ Affirmative Action Employer - 50% Recycled \ 10% Post Consumer Paper Thank you for your attention to this matter. This office requires that the deficiencies, as noted above, be properly resolved. Failure to address these items could result in the issuance of a Notice of Violation, which is subject to a civil penalty assessment of up to $25,000 per day for each violation. Should you have any questions regarding this matter, please contact Mr. Lawyer or myself at (910) 433-3300. Sincerely, Brad Cole, PE Regional Engineer Land Quality Section BC/m I Enclosure cc: Kevin Bowers, Technical Manager — Premiere Fibers (via e-mail) Ted Kalamatas, EHS Manager— Premiere Fibers (via e-mail) Bradley Bennett, Supervisor — Stormwater Permitting Program FRO — Land Quality Section, Stormwater Files-NCS000528 Compliance Inspection Report Permit: NCS000528 Effective: 04/01/09 Expiration: 03/31/14 Owner: Premiere Fibers SOC: Effective: Expiration: Facility: Premiere Fibers County: Anson 10056 US Hwy 52 N Region: Fayetteville Ansonville NC 2$007 Contact Person: Dewey Fulton Title: Phone: 276-645-9719 Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): On -site representative On -site representative Related Permits: Certification: Phone: Kevin Bowers 704-826-8321 Ted Kalamatas 704-826-8321 Inspection Date: 01/22/2015 Entry Time: 01: PM Primary Inspector: Mike LawyeriA��,� Secondary Inspector(s): Julie Ventaloro Lori H Britt Rick L Riddle Reason for Inspection: Routine Permit Inspection Type: Stormwater Discharge, Individual Facility Status: ❑ Compliant 0 Not Compliant Question Areas: ■ Storm Water (See attachment summary) Exit Time: 03:20PM Phone: 910-433-330Q -A-72V Phone Phone Inspection Type: Compliance Evaluation Page: Permit: NCS000528 Owner - Facility: Premiere Fibers Inspection Date: 01/22/2015 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Current permit expired on March 31, 2014. Application for permit renewal has been submitted and is being processed with renewed permit under draft review. Inspection conducted to determine compliance with conditions of current/expired permit. Met with Kevin Bowers, Technical Manager, and Ted Kalamatas, EHS Manager. Reviewed facility's Stormwater Pollution Prevention Plan (SPPP) and available monitoring records. The SPPP contained all permit -required components with the exception of documentation of an annual review/update, which should include all items listed under Part II, Section A, item 7 of the current permit. Available analytical monitoring records showed several exceedances of the benchmark value for TSS (Total Suspended Solids) at several outfalls possibly due to recent/on-going construction activities for a warehouse addition. Although not triggered into monthly monitoring since exceedances of the TSS benchmark value were non-consecutive, some additional sampling was conducted in April 2014 for TSS and pH. This sampling would not count for the April -September 2014 monitoring period because it was conducted less than 60 days from the previous sampling event and not all parameters were tested at all outfalls. Although permit coverage expired on March 31, 2014, the permit contains language that states: "The applicant must continue semi-annual monitoring until the renewed permit is issued." Observations were made of site conditions including the outfalls. Some suggestions were made to provide additional ground cover or other BMPs in drainage areas where solids could be entering the storm drains/outfalls. It was also suggested to verify the outfall numbering with the sampler and revise the site map as necessary. Page: 2 Permit: NCS000528 Owner - Facility: Premiere Fibers Inspection Date: 01/22/2015 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 0 EJ ❑ # Does the Plan include a General Location (USGS) map? 0 El El R # Does the Plan include a "Narrative Description of Practices"? N El El EJ # Does the Plan include a detailed site map including outfall locations and drainage areas? E ❑ 0 El # Does the Plan include a list of significant spills occurring during the past 3 years? ® El # Has the facility evaluated feasible alternatives to current practices? E1:1 El # Does the facility provide all necessary secondary containment? # Does the Plan include a BMP summary? E ❑ El EJ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? M R El El # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 ❑ # Does the facility provide and document Employee Training? 0 El El El # Does the Plan include a list of Responsible Party(s)? 0 # Is the Plan reviewed and updated annually? El 0 El EJ # Does the Plan include a Stormwater Facility Inspection Program? 0 El El ❑ Has the Stormwater Pollution Prevention Plan been implemented? i Comment: Plan needs documentation of an annual review/update to include an updated list of any significant spills over the previous three years or notation that none have occurred and re -certification that the stormwater outfalls have been evaluated for the presence of any non-stormwater discharges. Qualitative Monitorinq Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? Comment: Monitorinq per the conditions of the permit was not conducted for the period of April -September 2014. Analytical Monitorinq Yes No NA NE Has the facility conducted its Analytical monitoring? 0 0 E] # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? Comment: Monitorinq per the conditions of the permit was not conducted for the period of April -September 2014. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ El El N # Were all outfalls observed during the inspection? ■ # If the facility has representative outfall status, is it properly documented by the Division? # Has the facility evaluated all illicit (non stormwater) discharges? ❑ Comment: See comment above regarding annual review/update. Page: 3