Loading...
HomeMy WebLinkAboutNCC221796_ESC Approval Submitted_20220518HE1DERSON COUNW SOIL EROSION AND SEDIMENT CONTROL DEFACE March 14, 2022 LETTER OF APPROVAL WITH CONDITIONS Jackson Family Developers, LLC ATTN: Ken Jackson P.O. Bx 1157 Arden, NC 28704 RE: Project Name: Acres Approved: Project ID: Heritage Park 18.61 SESC 2021-10-01 County: Henderson City: Town of Fletcher Address: 82 Rutledge Rd River Basin: French Broad River Basin Stream Classification: Unnamed tributary of Frady Lake Kimsey Creek, C, 6-57-22 Submitted By: Michael Cain, PE Date Received by HC: March 11, 2022 Plan Type: New Dear Mr. Jackson, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan shall expire three (3) years following the date of approval, if no land disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. 100 NORTH KING STREET, SUITE 118 HENDERSONVILLE, NC 28792 TELEPHONE: (828) 694-6521 LETTER OF APPROVAL HERITAGE PARK MARCH 14, 2022 PAGE 2 OF 3 Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, Assistant Engineer Soil Erosion & Sedimentation Control Office Enclosures: Certificate of Approval NCGO1 Fact Sheet ec: Michael Cain, P.E., Civil Design Concepts, P.A. Stan Aiken PE, DEQ — Asheville LETTER OF APPROVAL HERITAGE PARK MARCH 14, 2022 PAGE 3 OF 3 CONDITIONS • ZONING APPROVAL FROM THE JURISDICTION HAVING AUTHORITY. PROJECT CANNOT BEGIN UNTIL THIS DOCUMENT IS RECEIVED IN THIS OFFICE. • AN ENCROACHMENT AGREEMENT FOR WORK PROPOSED IN THE RIGHT OF WAY, SUCH AS SIDEWALK, UTILITIES, ETC (IF REQUIRED). NO WORK TO BEGIN IN THIS AREA PRIOR TO OBTAINING THIS DOCUMENT AND SUBMITTING TO OUR OFFICE FOR THE FILE. • A DRIVEWAY PERMIT REQUIRED FRO THE JURISDICTION HAVING AUTHORITY (IF REQUIRED). NO WORK TO BEGIN IN THIS AREA PRIOR TO OBTAINING THIS PERMIT AND SUBMITTING TO OUR OFFICE FOR THE FILE. • USACE AND DEQ PERMITS REQUIRED PRIOR TO ANY WORK BEGINNING IN THE AREAS DESIGNATED ON THE APPROVED PLAN AS STREAM CROSSINGS AND WETLANDS, ETC. (IF REQUIRED) • OBTAIN NOI FROM NC DEQ AS INSTRUCTED IN THIS LETTER. • FOLLOW THE SELF -INSPECTION, RECORDKEEPING AND REPORTING REQUIREMENTS DESCRIBED ON SHEET C998 OF THE APPROVED DRAWING "HERITAGE PARK" AND DATED MARCH 11, 2022, WHICH IS INCORPORATED INTO THIS LETTER OF APPROVAL. • THE APPROVED SOIL EROSION AND SEDIMENTATION CONTROL PLAN TITLED "HERITAGE PARK" AND DATED MARCH 11, 2022, IS REFERENCED HERE AND INCORPORTED INTO THIS LETTER OF APPROVAL. • PRE -CONSTRUCTION MEETING REQUIRED PRIOR TO LAND DISTURBANCE. CONTACT DEB JOHNSTON AT (828) 694-6521 TO SCHEDULE. Financial Responsible Ownership Signature: Print Name and Title: Date: 100 NORTH KING STREET, SUITE 118 HENDERSONVILLE, NC 28792 TELEPHONE: (828) 694-6521