Loading...
HomeMy WebLinkAboutNCC220606_MODIFICATION Supporting Documents_20220516 (2)ROY COOPER Governor ELIZABETH S. BISER Secretary BRIAN WRENN Director NORTH CAROLINA Environmental Quality May 13, 2022 LETTER OF APPROVAL WITH MODIFICATIONS GM & JDW, LLC Attn: Mr. George Wolfe, Managing Member 276 Leslie Road Goldsboro, NC 27530 RE: Project: Name: Aaron's Place, Section Six Project iD: Wayne-2022-035 County: Wayne City: Mork Township Address: Aaron's Place River Basin: Neuse Date Received by LQS: April 14, 2022 Submitted By: B.R. Kornegay, Inc. Plan Type: New Dear Sir, Acres Approved: 4.7 This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land - disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form maybe accessed atdeq.nc.gov/NCGO1. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. if the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 413 .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: ��� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources EWashington Regional Office 1 943 Washington Square Mall I Washington, North Carolina 27889 n�oan+cnr�oun�n �" ticpnbnv� of Env4onmevMl qua�N� 252.946.648E 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. if, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land - disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition., it would be helpful if you notify this office of the proposed starting date for this project. Please be advised that a rule to protect and maintain existing buffers along watercourses in the Neuse River Basin became effective on July 22, 1997. The Neuse River Riparian Area Protection and Maintenance Rule (15A NCAC 213.0233) applies to the 50-foot wide zone directly adjacent to surface waters (intermittent streams, perennial streams, lakes, ponds, and estuaries) in the Neuse River Basin. For more information about this riparian area rule, please contact the Division of Water Resources Wetland/401 Unit at 919-807-6300, or DWR in our regional office at 252-946-6481. Sincerely, Samir Dumpor, PE Regional Engineer Land Quality Section cc w/o enc: George Wolfe, GM & JDW, LLC (email) Jeffrey Kornegay, PE, B.R. Kornegay, Inc. (email) WaRO Division of Water Resources (email) The developer is responsible for the control of sediment on -site. If the approved erosion and sedimentation control measures prove insufficient, the developer must take those additional steps necessary to stop sediment from leaving this site (NCGS 113A-57(3)). Each sediment storage device must be inspected after each storm event (NCGS 113A- 54.1(e)). Maintenance and/or clean out is necessary anytime the device is at 50% capacity. All sudirnent storage measures will remain on site and functional until all grading and final landscaping oi' the project is compicte -,'-I 5A NCAC 04B .0113). 2. The developer is responsible for obtaining all permits and approvals necessary for the development of this project prior to the commencement of this land disturbing activity. "his could induce our agency's Stormwater regulations and the Division of Water rv�)Lrcesenforcement requirements «,ithin Section 401 of the Clean Water Act, the U.S. Army Corps of Engineers' jurisdiction of Section 404 of the Clean Water Act, the Division of Coastal Management's CAMA requirements, the Division of Solid Waste Managernerit's landfill regulations, the Environmental Protection Agency and/or The U.S. Anny ores of Engineers jurisdiction of the Clean Water Act, local County or MLAii1cipalities' ordinances, or others that may be required. This approval cannot supersede any other permit or approval. 3. A"10CIUa1c and appropria-�. measures must be properly installed downstream, within the ;iri-.As o ':: st a uance, o anv laird distur ing activity to prevent sediment from leaving the dis�ur, uance. cr,,,ering existing drainage systems, impacting an on -site natural ,v'�tercor.I'Sc o adjoiriirl( property. (NCGS 113A-57) PROJECT INFORIMATION SHEET APPROVAL DATE: May 13, 2022 RESPONSIBLE PARTY: GM & IDW, LLC PROJECT NAME COUNTY: OFF -SITE BORROW AND/OR DISPOSAL SITE - START -UP DATE: CONTRACTOR: ON -SITE CONTACT: ON -SITE PHONE NO.: OFFICE PHONE NO.: Aaron's Place, Section Six W NO.: Wavne-2022-035 COMPLETE & RETURN THIS FORM PRIOR TO THE START OF CQNST.RtT±' TON TO: N.C.D.E.Q. LAND QUALITY SECTION ATTN: James Edwards 943 WASHINGTON SQUARE MALL WASHINGTON, NORTJI CAROLINA. 27889 james.edwards@ncdenr.gov