Loading...
HomeMy WebLinkAboutNCS000588_Renewal Application_20210927Raleigh -Durham Airport Authority RDU Michael J. Landguth, A.A.E. President & CEO 1000 Trade Drive • P.O. Box 80001 • RDU Airport, NC 27623 tel: (919) 840-7700 • fax: (919) 840-0715 • w .rdu.com CERTIFIED MAIL & via email to Brianna.Young((a,ncdenr.eov September 20, 2021 SW Individual Permit Coverage Renewal Stormwater Permitting Program NCDEQ — DEMLR 1612 Mail Service Center Raleigh, NC 27699-1612 Re: Raleigh -Durham Airport Authority NPDES Permit No. NCS000588 Application for Permit Renewal To Whom It May Concern: RECEIVED SEP 2 7 2021 DEDIR-LAND Q U: u.ITY STQOIWAT ER FERivl IT11 IG The Raleigh -Durham Airport Authority (Authority) requests renewal of NPDES Permit No. NCS000588 (Permit), which authorizes discharges to surface waters at the Raleigh -Durham International Airport (Airport). Per Part III Section B.1 of the Permit, this application is being submitted with more than 180 days left in permit cycle. In addition to this cover letter, this permit renewal application includes an updated list of Co- Permittees, a completed Renewal Application Form, site maps, analytical data, visual monitoring data, summaries of Best Management Practices (BMPs) and significant changes since issuance of the previous NPDES Permit, certification of the development and implementation of a Stormwater Pollution Prevention Plan (SWPPP), and a Certification of Non-Stormwater Discharge from all Co-Permittees. An original and one copy of the application are enclosed. Additionally, the Authority would like to update the Co-Permittee list. The current listing of Co- Permittees is as follows: Air Canada Alamo Rent-A-Car Alaska Airlines Allegiant Airlines American Airlines Aviation Management Group Avis Rent A Car System, Inc. Raleigh -Durham Airport Authority Board Members DURHAM COUNTY Patrick Hannah, Chairman David Morgan CITY OF RALEIGH Sepideh Saidi, Vice Chair Dickie Thompson Budget Rent A Car System, LLC Charter Express, Inc. Delta Airlines DGS/Unifi Service Dollar/Thrifty Rent-A-Car Endeavor Air Enterprise Holdings WAKECOUNTY David Kushner, secretary Ellis Hankins CITY OF DURHAM Tammie Hall, Treasurer Yesenia Polanco-Galdamez Authority NPDES Renewal September 20, 2021 Page 2 of 2 Enterprise Rent-A-Car Envoy Air Inc. Federal Express Frontier Airlines FSM Group Hertz Rent-A-Car JetBlue Airways LSG Sky Chefs Martin Marietta National Rent-A-Car NC Dept. of Transportation, Div. of Aviation Raleigh -Durham Airport Authority SAS Institute, Inc. Signature Flight Support Sheetz, Inc. Spirit Airlines Southwest Airlines, Co. Sun Country Airlines TAC Air United Univ. of NC Air Operations United Parcel Service UPS Cartage Services, Inc. If you have any questions about this permit renewal application or need additional information, please do not hesitate to contact Gina Danison at 919-840-7741 or gina.danisonaa,rdu.com. Sincerely, Michael J. Landguth, A.A.E. President and Chief Executive Officer Raleigh -Durham Airport Authority Enclosures: NPDES Renewal Permit Application Attachment 1— Site Maps Attachment 2 — Effluent Data Attachment 3 — Visual Monitoring results Attachment 4 — Summary of BMPs Attachment 5 — Summary of significant changes Attachment 6 — Stormwater Pollution Prevention Plan certification Attachment 7 — Co-Permittees Certifications of Non-Stormwater Discharges Cc: Bill Sandifer, RDUAA, Senior VP and Chief Operating Officer Erin Locklear, RDUAA, General Counsel Gina Danison, RDUAA, Director of Environmental Programs Raleigh -Durham Airport Authority Board Members DURHAM COUNTY Patrick Hannah, Chairman David Morgan CITY OF RALEIGH Sepideh Saidi, Vice Chair Dickie Thompson WAKECOUNTY David Kushner, secretary Ellis Hankins CITY OF DURHAM Tammie Hall, Treasurer Yesenia Polanco-Galdamez Permit Coverage ©7_ Renewal Application Form NCDENR National Pollutant Discharge Elimination System NPDES Permit Number Stormwater Individual Permit I NCS 000sas Please provide your permit number in box in the upper right hand corner, complete the information in the space provided Mow and return the completed renewal form along with the required supplemental information to the address indicated. Owner Information *Address to whIch permltmrrespondence wl//be ma1/ed Owner / Organization Name: Raleigh -Durham Airport Authority Owner Contact; Michael J. Landguth, AA.E, President and Chief Executive Officer Mailing Address: PO Box80001 RDU Airport, NC 27623 Phone Number: 919640-7002 Fax Number: 9`19-640-0176 E-mail address: michael.landguthiiilrda.eom Facility Information Facility Name: Raleigh -Durham International Airport Facility Physical Address: John Brantley Blvd at Aviation Parkway Facility Contact: Michael J. Landgulh, A.A.E, President and Chief Executive officer Mailing Address: PC Box Bogor RDU Airport, NC 27623 Phone Number: 919-e40-7002 Fax Number: 919a0-0175 E-mail address: michael.landguth@rdu.cum Permit Information Permit Contact: Gina Danison, ENV SP Mailing Address: Po Box 80001 RDU Aepon, NC 27623 Phone Number: 919-840a741 Fax Number: 919-840-0175 E-mail address: gina.danison@rdu.com Discharge Information Receiving Stream: Brier Creek Reservoir, Naleys Branch, sycamore Creek Stream Class: C:Nsw, B;Nsw, and C:NSw Basin: Neuae River Sub -Basin: Crabtree creek Number of Outfalls: 6 Facility/Activity Changes Please describe below any changes to your facility or activities since issuance of your permit. Attached a separate sheet if necessary. Please see attached documents. CERTIFICATION I certify that I am familiar with the information contained in the application and that to the best of my knowledge and belief such information is true, complete and accurate. Signature i Michael J. Landguth, A.A.E Print or type name of person signing above Date 4/w/z0L/ President and CEO Title Please return this completed application form SW Individual Permit Coverage Renewal Stormwater Permitting Program and requested supplemental information to: 1612 Mail Service Center Raleigh, North Carolina 27699-1612 Stream Body of Water Impervious Surfaces 0 R'. �C41 i I Lake Crabtic-e 0 1,300 2,600 1 inch = 2,671 feet N Site Map 1a: Waterways & Impervious Surfaces /RDU Map Document: \\g is-app01\e$\GIS_Files\Cure nt_Projects\ENV_NO\2021\0324_NPDES_M aps\Site_Map_t a.mxd 9/20/2021 OIndustrial Activities* & Storage Areas ® Outfalls - Major - Stream Body of Water County Boundary -- RDU Property Note: Colored Areas on Map are Drainage Basins +' Briar C .. Re_c IIII� *Note: Industrial Activitie: Fueling, Deicing & Mainte, 003 `w Lake Crabtree OU N Site Map 1 b: Industrial Activities & Storage Areas RDU Map Document: \tgisapp0l\e$\GIS_Files\Current_Projects\ENV_NO\2021\0324 NPDES_Maps\Site_Map_lb.mud 9/21/2021 Attachment 2: Analytical Results for Outfalls 001, 002, 003, 004, 007, and 016 Raleigh -Durham International Airport NPDES Permit #NCS000588 Notes: 1. N/A indicates Not Applicable; parameter is not required to be analyzed for that Outfall per NPDES Permit #NCS000588 2. None indicates no limit listed in NDPES Permit #NCS000588 Di5solved Propylene Date Outfall pH Oxygen Glycol Toxicity 03/16/21 001 7.16 11.26 <MDL >100% 03/16/21 002 6.94 13.97 N/A >100% 03/16/21 003 7.12 9.56 <MDL >100% 03/16/21 004 7.32 13.63 <MDL >100% 03/16/21 007 7.47 10.61 <MDL >100% 03/16/21 016 7.61 13.31 N/A >100% Notes: 1. N/A indicates Not Applicable; parameter is not required to be analyzed for that Outfall per NPDES Permit #NCS000588 2. pH monthly average & daily max must be z 6.0 and 5 9.0 standard units 3. No glycol limits in permit 4. No DO limits in permit Date 03/16/21 Outfall 001 Acute Toxicity >100% 03/16/21 002 >100% 03/16/21 003 >100% 03/16/21 004 >100% 03/16/21 007 >100% 03/16/21 016 >100% Notes: 1. No limit listed in permit #NCS000588 for Acute Toxity Attachment 3 Visual Monitoring Reports for CY 2020 Raleigh -Durham International Airport NPDES Permit: NCS000588 Spring 2020 - Qutiall ; ` D* Color, Odor Clarity; �g -Floatirt Soiids�' ` Sus nded' Ps:. _ ' Sts[lds� foam t Oil , ` Sheen inccars, _of SVI Commt3rits 001 06/10/20 Light brown None 2 2 2 N N downstream _ erosion _ 0022 06/10/20 Light brown None 1 1 1 , N N v 003 06/10/20 Clear/Brown None 2 1 1 N N Riser barrel failed pond dry 004 06/10/20 Clear/Brown None 5 1 _ 1 Y N _ 007 06/10/20 Clear/Brown None 1 1 _ 1 N N Trash 016 06/10/20 Clear/Brown None 2 3 1 N N fish 035 06/10/20 Clear/Brown None 2 1 _ 1 N N frogs H 06/10/20 Brown None 3 1 1 N N erosion at inlet 1 06/10/20 Brown None 3 1 1 N N P 06/10/20 Brown -red None 3 1 1 N N riser barrel failed, _� and mostlydry S 06/10/20 Clear _ None 5 1 - _ 1 ----- N - - — N -- fish _ — _ Trash, strong Pollen & algae Y 06/10/20 Yellow -brown None 4 5 1 N N garbage crust on water _odor f UU 06/10/20 Light brown None 5 1 1 N N KK 06/10/20 Clear/Brown None 2 1 i 1 N N JJ 06/10/20 Yellow -brown None 2 1 1 _ N N II 06/10/20 Clear None 1 1 _ 1 N N Fall 2020 i Out fa l ; Oc or Clarit Fioa#iitg ; Sottds ;Suspendedy Sofids ;Foarta od Sheen hdto�^s ofSW ', Conl�men s Date _ Color 001 11/17/20 Green/Brown None 3 2 M1 N _ N Red brown algae 0022 11/18/20 Clear None 2 1 1 N N Trash in ditch _ Lots of pine needles 003 11/17/20 _ Clear/Brown None 1 1 1 N N Trash-� fish, birds, water in pond 004 11/17/20 Clear/Brown None 1 1 _ 1 _ N N N 007 11/18/20 GreyNone _ -1 f_ 2 1 N Vegetative decay 016 11/17/20 Clear/Brown None _ 3 1 1 1 _ Y N _ 0353 11/17/20 Clear/Brown None 1 1_ N N H 11/17/20 Clear/Brown None 1 1 1 3 N N N � Fallen trees I 11/18/19 Orange None 4 3 N Small sinkhole, no flow, ea ese P 11/18/19 Brown None 3 3 2 N N ducks — S 11/17/20 Clear None 1 1 1 N N Bottles _T Y 11/17/20 Brown None 3 1 1 1_ N N Trash bottles UU 11/17/20 Greenish None 3 1 _ N N wood ducks _ KK 11/17/20 Orange/Brown None 2 1 1 N Y Trash Chanel erosion, ve . decay JJ 11/17/20 Clear/Brown None 2 1 1 Y Y yellow foam II 11/17/20 Clear/Brown _ I None 1 1 1 1 Y I N Trash lErosion at outfall 1 Number rankings based on DWQ "Stormwater Discharge Outfall Qualitative Monitoring Report" where 1 = clear, no solids and 5 = very 2 SDO 002 visually monitored at sampling location per NCDENR DWQ approval on 5/15/2013. 3 Outfall 035 added in Fall 2017 due to anticipated growth in the drainage basin. NA = Not applicable Addendum to Renewal Application for RDU Airport, Permit No. NCS000588 ATTACHMENT 4 — Summary of Best Management Practices (BMPs) BMPs conducted by Co-permittees at Raleigh -Durham International Airport (Airport or RDU) include but are not limited to: use of drip pans/spill pads when conducting maintenance activities, limiting outdoor maintenance activities, maintaining a good housekeeping and preventative maintenance plan, conducting semi-annual inspections of the facilities, maintaining secondary containment drainage logs, training staff on spill prevention and spill cleanup protocols, conducting inspections of other Co-Permittees by Authority staff, storing materials inside or under cover when possible, minimizing use of hazardous materials, keeping stormwater drains and conveyances clear of debris, and maintaining an open dialogue between the Authority and other Co-Permittees. Please note that this listing is not conclusive nor is it completed by all Co-Permittees. It is provided as an example of the types of BMPs implemented at RDU. Structural controls include a series of pipes, culverts, and ditches that collect and convey stormwater off the developed areas of the Airport to waters of the State. Structural controls also include several retention ponds, as seen on Site Map #1, located on the airport's periphery. Except for Outfall 002, drainage from the west side of the Airport, including Runway 5L-23R, enters one of several retention ponds before discharging into the Brier Creek Reservoir. Drainage from the northeastern portion of the Airport (Runway 5R-23L) either enters into natural ditches that flow into Sycamore Creek or enters a retention basin before discharging into streams that flow into Big Lake located within Umstead State Park. Drainage from the east side flows into Haleys Branch, which is a tributary of Crabtree Creek. Drainage from the south end of Runway 5R-23L flows into a retention pond which then discharges into Brier Creek south of I-40. The Brier Creek Reservoir, located immediately southwest of Runway 5L-23R collects runoff from most of the western half of the Airport plus off -site development. All discharges eventually flow to Crabtree Creek and then into the Neuse River basin. The Table on the following page summarizes the noted retention ponds with respect to drainage areas in which industrial activities occur. All the noted ponds are subject to engineering inspection by Authority facilities personnel and are maintained accordingly. Within SDO 004 there is an entirely structural control in that it is a concrete secondary containment structure at the General Aviation fuel farm. Structural controls also include an oil/water separator (OWS) through which stormwater is routed. TAC Air owns and in turn leases a portion of this small fuel farm to Landmark Aviation. TAC Air, as owner of the fuel farm, is responsible for maintaining this OWS as well as the secondary containment. Addendum to Renewal Application for RDU Airport, Permit No. NCS000588 RDU Outfalls and Ponds Outfall Treatment and Comments 001 This retention pond does not discharge from below the water surface. Some retention does occur however and allows settling of some pollutants and biological uptake of other pollutants to occur. No studies have been conducted to measure the water quality benefits of this pond. The majority of fueling activities for aircraft operating out of Terminal 1 occur in this drainage basin. There is also deicing activity in this drainage basin, for aircraft operating out of Terminal 1 as well as aircraft that are parked overnight near Terminal 1. 002 A portion of this drainage basin passes through an Oil/Water separator prior to discharging into Brier Creek Reservoir. 003 There is a retention pond with an inverted siphon (weir) at this Outfall that discharges from below the water surface, thereby trapping oil on the water surface. This feature reduces oil pollution in the receiving streams by providing spill response crews the opportunity to collect and remove spilled oil. Retention also allows settling of some pollutants and biological uptake of other pollutants to occur. An Acute Toxicity study was completed in 2006. The majority of aircraft fueling and deicing at this airport occurs in this drainage basin. 004 There is a retention pond at this Outfall that discharges from below the water surface, thereby trapping oil on the water surface. It utilizes an underdrain design versus an inverted siphon design that Outfall 003 and Outfall 007 use. The ability to open and close the size of the underdrains exist, thereby enabling spills to be held in the pond during rain events. However in significant rain events, overflow could occur which would move oil out of the pond and further downstream. 007 There is a retention pond with an inverted siphon (weir) at this outfall that discharges from below the water surface. This pond traps oil on the pond's water surface and provides similar treatment as the pond at Outfall 003. 016 There is a small retention pond with an inverted siphon (weir) at this outfall that discharges from below the water surface. This pond traps oil on the pond's water surface and provides similar treatment as the pond at Outfall 003. ATTACHMENT 5 — Significant Changes in Industrial Activities While the activities at RDU have remained the same since the last permit renewal, the volume of activities has fluctuated. This was initially due to an increasing demand by travelers on the Airport which led to over 14.5 Million passengers in 2019. In 2020, the global pandemic saw the demand for travel drop 96% from April 2019 to April 2020. In 2021, traffic is rebounding and construction projects that had been put on hold during 2020 are slowly coming back online. ATTACHMENT 6 STORMWATER POLLUTION PREVENTION PLAN DEVELOPMENT AND IMPLEMENTATION CERTIFICATION STORMWATER POLLUTION PREVENTION PLAN DEVELOPMENT AND IMPLEMENTATION CERTIFICATION North Carolina Division of Energy, Mineral, and Land Resources - Storm water Permitting Facility Name: Permit Number: Location Address: County: InlemaUonal Airport NCSOD0588 PO Box 80D01, 1000 Trede Ddva, RDU Airport, NC 27623 "I certify, under penalty of law, that the Stormwater Pollution Prevention Plan (SPPP) document and all attachments were developed and Implemented under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information required by the SPPP. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information gathered is, to the best of my knowledge and belief, true, accurate and complete." And "I certify that the SPPP has been developed, signed and retained at the named facility location, and the SPPP has been fully implemented at this facility location in accordance with the terms and conditions of the stormwater discharge permit." And "I am aware that there are significant penalties for falsifying information, including the possibility of fines and imprisonment for knowing violations." Sign (according to permit signatory requirements) and return this Certification. DO NOT SEND STORMWATER POLLUTION PREVENTION PLAN WITH THIS CERTIFICATION. Signature Michael J. Landgulh. AAE. Print or type name of person signing above Date '1/2olloZf President and CEO Title SPPP Certification 10/13 ATTACHMENT 7 CO-PERMITTEE CERTIFICATIONS OF NON-STORMWATER DISCHARGE .Rul�ikh-1)�t�•ttu7rllnlc�r�u�tinr��(I:�ir�)nrt i ,%'PDkS Pennil.)VO. fiv000#586 CPOTIR .ON.OF-MON-SMRMWATER,DISCHARGES Methods of Evaluation Used.A. jrheckall thdtopp pr Oyl4eV&Pfis (pions reviewed, autfaftbasin-, etc.)] ._ 0 Review of building and site plans ❑ Visual inspectio of stormwater drAinag.e.systern. ❑ Dye -or smoke flow testino ❑ interviews with Tacility.personnel' Anal .yticail tests closed circu'ItTV taping of storm drains, other: Its, AAC Of ArAAAS. k) Actionstaken to elimin te unauthorized discharges:- I certify,, under penal law, that this document and all -attachments were,preppred under -my direct , ion in accordance or supervision 6ordance with a' 's stem designed to fissure that nce in accordance ys- qualified, personnel pro eily gather 'd evaluate n an 'the-InforMation submitted. Based on my inquiryof,th6 o6rsbn who Marriage the systerrijorthose persons directly responsible pr.person , for 9-'athering.the info( M I ation, the information- -submitted is, to the best of my knowledge and _ belief, trueaccurate and on p'leie.There were no non -permitted discharges -,of non-stbrmWa ter entering the storm drain because of,acii.viiies occurring at myfacilit . I,anj aware that there a re significant penalties. for surNtting b false information, including the possibility of fines and 9 . imprisonmentfo-'r knowing violiations. 9 Co-Prermitt6e Company Name: Co-Perm-Ittee Kesponsible Person: \4 Title; Signature: Date Signed. Rvi. 09/20/7 L (.I-[) ti(vs fir 7; 11/ "N'o 11 -Slorm I I-, I;( r 01s, i ►Anal Ar�nrt ! ER 'IFlCATIt)N � I +pIV= TORMW .,TFR... C�IARGES Methb-c s. of Evaluation Used: fche�k alithat apply, providedetoils (plans reviewed, out�all bosinretc..)] i Reviewof building and site plan ❑ Visual inspection of stormwater drainage system ❑ Dye or,smoke flow testing (] ,ntervlews with -facility personne ❑ f �nalytical tests l ❑ ; Iosed circuit TV taping of storm drain., ( i �I � v o tAJC,� thee: � d0 V1D4 ho, w � # �. Actions aken,10 eliminate unauthoriNd discharge • - - a certify, under penaltyof law, thatthis document and all -attachments were prepared under my directio I in accordance or supervision in accordance with .-a system designed to assure that ualifie ersonnel ro rl ather and evaluate the it ormation su miffed. Based q P on my p y g b ... , if. , . inquiry g the'petson or persons who manage the system, or those persons directly responsi bie for gathfring the information, the information submitted is, to the best of my knowledge and .belief, true accurate and complete.'There were no non -permitted. -discharges of non-stormwater entering'the stor'-m drain because of activities occurring at myfacility. I am aware that there are significaht penalties for submitting `false information, including the possibility of fines and im.prisor mentfor knowing violations. ii Co-Permittee Company Name: ,C Q S ,C CU Co-Permittee Responsible Person: Title: S� �' :(� V-1 Imo` C cx- - alpt_ Signature: Date Signed: bo tezc? w. 0912017 Ceti tration oJNon-Storin►var&Dischargav Raleigh -Di rliam 1plergallopoil Airporl XPD& P_erinfi:No. NC5000588 CERTIFICATION OF NON-STORMUVATER QiSCHARGES Methods of Evaluation Used:. [check all that apply, provide details (plans reviewed, o4afll basin, etc.)] 0 Review of building and site plans [] Visual inspection of stormwater drainage system ❑ Dye :or smoke flow testing_ Interviews with facility personnel ❑ Analytical tests ❑ Closed circuit TV taping of storm drain 0 Other; Actions taken to eliminate unauthorized discharges: I certify, under penalty of law, that this document.and all .attachments were prepared under my direction in accordance or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true accurate and complete. There were no non -permitted discharges of non-stormwater entering'the, storm drain because of activities occurring at my facility, I am aware that there are signiflcant penalties for submitting false information, including the possibility of fines and imprisonment.for knowing violations. Co-Permittee Company Dame: Allegiant Cc-Permltte I Responsible Person: Terence Brown i Title: Station Manager 1 Signature: Date Signed: /08/16/21021 ou Re►. 0912017 ` Certification of Non,Storonvater Disdiarges Raleigh -Durham International Airport NPDES Permit No. NCS000588 CERTIFICATION OF NON-STORMINATE,R DISCHARGES Methods of Evaluation Used: [check all that apply, provide details (plans reviewed, outfall basin, etc.)] ❑ Review of building and site plans Z visual inspection of .stormwater drainage system ❑ Dye or smoke flow testing ❑ Interviews with facility personnel ❑ Analytical tests ❑ Closed circuit TV taping of storm drain ❑ Other: Actions taken to eliminate unauthorized discharges: &A ege Aa Aviw I certify, under penalty of law, that this document and all attachments were prepared under my direction in accordance or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true accurate and complete. There were no non -permitted discharges of non-stormwater entering the storm drain because of activities occurring at my facility. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Co-Permittee Company Name: MEOCA4 AiLide5 Co-Permittee Responsible Person:STAB Title: d5M 4&:C Signature: Date Signed: Rev. 0912017 Certification of No i-Stormirater Discharges 'rrr�r uko leas Raleigh-Durhain lnterncuional Airport NPDES Permit No. NCS000588 CERTIFICATION OF NON-STORMWATER DISCHARGES Methods of Evaluation Used: [check all that apply, provide details (plans reviewed, outfall basin, etc.)] ® Review of building and site plans ® visual inspection of stormwater drainage system ❑ Dye or smoke flow testing ® Interviews with facility personnel ❑ Analytical tests ❑ Closed circuit TV taping of storm drain ❑ Other: Actions taken to eliminate unauthorized discharges: I certify, under penalty of law, that this document and all attachments were prepared under my direction in accordance or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true accurate and complete. There were no non -permitted discharges of non-stormwater entering the storm drain because of activities occurring at my facility. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Co-Permittee Company Name: Avis Rent A Car System, Inc. Co-Permittee Responsible Person: Angelica Bass Title: Operations Support Manager Signature: � gadd Date Signed: 05/26/21 Rom, Rev. 0912017 Certification qt Non-Stornmrater Discharges Raleigh-Duncann Inte►-nalional Airport t NPDES Permit No. NCS000588 CERTIFICATION OF NON-STORMWATER DISCHARGES FthZods of Evaluation Used: [check all that apply, provide details (plans reviewed, outfall basin, etc.)] Review of building and site plans Visual inspection of stormwater drainage system ❑ Dye or smoke flow testing ® Interviews with facility personnel ❑ Analytical tests ❑ Closed circuit TV taping of storm drainss ❑ Other: Actions taken to eliminate unauthorized discharges: I certify, under penalty of law, that this document and all attachments were prepared under my direction in accordance or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true accurate and complete. There were no non -permitted discharges of non-stormwater entering the storm drain because of activities occurring at my facility. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Co-Permittee Company Name: Budget Rent A Car System, LLC. Co-Permittee Responsible Person: Angelica Bass Title: Operations Support Manager Signature: aQ Date Signed: 05/26/21 ou Res,. 09.Q017 Cerlilication ol-Non-Storrrni•alei- Disehargc.v Rnli�l�f!-1)!lrltruu ItJlc'rjilltlalrll,li,lx�r! Al)IIA S I'emli! 1i10. VC'S000 88 CERTIFICATION OF NON-VORMWATER DI$CHARGES Methods of Evaluation Used: jcheck all that apply, provide details (plans reviewed, outfall basin, etc.)] ❑ Review of building and site plans Visual inspection of stormwater drainage system ❑ Dye or smoke flow testing ❑ Interviews with facility personnel ❑ Analytical tests ❑ Closed circuit TV taping of storm drain ❑ Other: Actions taken to eliminate unauthorized discharges: I certify, under penalty of law, that this document and all attachments were prepared under my direction In accordance or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true accurate and complete. There were no non -permitted discharges of non-stormwater entering the storm drain because of activities occurring at my facility. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Co-Permittee Company Name: Charter Express Inc. Co-Permittee Responsible Person: Wendy Hudson Title: General Manager Signature: Date Signed: 04/20/2021 Itc v. 09, 201 (-erti1<c.•,4licut oJ:�'un-.S7�,r,»nv,lrr IJi�rlra�;g�s Raleigh -Durham hrte raatiortal Air port NPDES Permit No. MCS000588 CERTIFICATION OF NON-STORMWATER DISCHARGES Methods of Evaluation Used: [check all that apply, provide details (plans reviewed, outfall basin, etc.)] ® Review of building and site plans ® visual inspection of stormwater drainage system ❑ Dye or smoke flow testing ® Interviews with facility personnel ❑ Analytical tests ❑ Closed circuit TV taping of storm drain ❑ Other: Actions taken to eliminate unauthorized discharges: certify, under penalty of law, that this document and all attachments were prepared under my direction in accordance or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true accurate and complete. There were no non -permitted discharges of non-stormwater entering the storm drain because of activities occurring at my facility. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Co-Permittee Company Name: Delta Air Lines Co-Permittee Responsible Person: Donald Lowman Title: Operations Service Manager Signature: P&M4" /_O'Wouzoi Date Signed: 02 Aug 2021 Rou Rev. 09/201 7 Cert{lieation gl'Norr-Stormwater Discharges Raleigh -Durham Interna1iwtal.1irport NPDESPerm it No. NCS000568 CERTIFICATION OF NON-STORMWATER DISCHARGES Methods of Evaluation Used: [check all that apply, provide details (plans reviewed, outj`al/ bosh, etc.)] ❑ Review of building and site plans Z Visual inspection of stormwater drainage system ❑ Dye or smoke flow testing ❑ Interviews with facility personnel ❑ Analytical tests ❑ Closed circuit TV taping of storm drain ❑ :Other: Actions taken to eliminate unauthorized discharges: • p . rtl h-vI �. r%)"„V I ou S co :ems I certify, under penalty of law, that this document and all attachments were prepared under my direction in accordance or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true accurate and complete. There were no non -permitted discharges of non-stormwater entering the storm drain because of activities .occurring at my facility. I am aware that there are significant penalties for submitting false information, including the possibility of fines and Imprisonment for knowing violations. Co-Permittee Company Name., Endeavor Air Co-Permittee Responsible Person: Samuel J. Moretti Title: .Base Manager Signature: "-�a C Date Signed: 0412912 1 Rer. 092017 Certification of -Yon Storsnrater Discharges Re, 1"{614ahn,,, l„ l,,n,,fru„ ol.III/." I CERTIFICATION OF NON-STORMWATER DISCHARGES Methods of Evaluation Used: (check all that apply, provide details (plans reviewed, outjall bosin, etc.)] Review of building and site plans ® visual inspection of stormwater drainage system ❑ Dye or smoke flow testing ❑ Interviews with facility personnel ❑ Analytical tests ® Closed circuit TV taping of storm drain ❑ Other: Actions taken to eliminate unauthorized discharge : I certify, under penalty of law, that this document and all attachments were prepared under my direction in accordance or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true accurate and complete. There were no non -permitted discharges of non-stormwater entering the storm drain because of activities occurring at my facility. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Co-Permittee Company Name: Enterprise Holdings Maint Facility Co-Permittee Responsible Person: Eric Elliott Title: Fac & Const. Mgr. 14 Signature: CJ Date Signed: 4/15/21 1i,11, , If 'II, ; l!• 11i«•I1;4111 Irrl,v rt,rlrrrn,rl . l rtj;• v 1 11'I )1.'i I 'rrrnit A,.• Vr CERTIFICATION OF NON-STORMWATER DISCHARGES Methods of Evaluation Used: [check all that apply, provide details (plans reviewed, outfall basin, etc.)] ® Review of building and site plans ® Visual inspection of stormwater drainage system ❑ Dye or smoke flow testing ❑ interviews with facility personnel ❑ Analytical tests ® Closed circuit TV taping of storm drain ❑ Other: Actions taken to eliminate unauthorized discharges: I certify, under penalty of law, that this document and all attachments were prepared under my direction in accordance or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true accurate and complete. There were no non -permitted discharges of non-stormwater entering the storm drain because of activities occurring at my facility. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Co-Permittee Company Name: Enterprise Rent -a -Car Co-Permittee Responsible Person: Eric Elliott Title: Fac & Const. Mgr. Signature:Z__ Date Signed: 4/15/21 Raleigh -Durham International Airport NPDES Permit No. NCS000588 CERTIFICATION OF NON-STORMWATER DISCHARGES Methods of Evaluation Used: [check all that apply, provide details (plans reviewed, outfoll basin, etc.)] ® Review of building and site plans ❑ visual inspection of stormwater drainage system ❑ Dye or smoke flow testing ❑ Interviews with facility personnel ❑ Analytical tests ❑ Closed circuit TV taping of storm drain ❑ Other: Actions, taken to eliminate unauthorized discharges: I certify, under penalty of law, that this document and all attachments were prepared under my direction in accordance or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true accurate and complete. There were no non -permitted discharges of non-stormwater entering the storm drain because of activities occurring at my facility. I am aware that there are significant penalties for submitting false information, including the possibility of fines and Imprisonment for knowing violations. Co-Permittee Company Name: Envoy Air inc Co-Permittee Responsible Person: Edward Morales Title: General Manager Signature: IL <f:::� IV Date Signed: 04/27/2021 Rev. 0912017 Certification of Non-Stonmvater Discharges "c-IRri, .w+ 1'i '.�000 SX CERTIFICATION OF NON-STORMWATER DISCHARGES Methods of Evaluation Used: [check oil that apply, provide details (plans reviewed, outfall basin, etcX ❑ Review of building and site plans ® Visual inspection of stormwater drainage system ❑ Dye or smoke flow testing ❑ Interviews with facility personnel ❑ Analytical tests ❑ Closed circuit TV taping of storm drain ❑ Other: Actions taken to eliminate unauthorized discharges: I certify, under penalty of law, that this document and all attachments were prepared under my direction in accordance or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my Inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true accurate and complete. There were no non -permitted discharges of non-stormwater entering the storm drain because of activities occurring at my facility. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Co-Permittee Company Name: Federal Express Co-Permittee Responsible Person: A. Oriel Elder Title: Ramp Operations Manager Signature: Date Signed: 2� (;;�Ili. tvnu,.+/ %1111,ti&%'faII,il.•r 1}#..,..:;•r- Raleigh -Durham International Airport NPDES Permit A"o. AUS000588 CERTIFICATION OF NON-STORMWATER DISCHARGES Methods of Evaluation Used: [check all that apply, provide details (plans reviewed, autfall basin, etc.)] ❑ Review of building and site plans ❑ Visual inspection of stormwater drainage system ❑ Dye or smoke flow testing ❑ Interviews with facility personnel ❑ Analytical tests ❑ Closed circuit TV taping of storm drain ❑ Other: Actions taken to eliminate unauthorized discharge I certify, under penalty of law, that this document and all attachments were prepared under my direction in accordance or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true accurate and complete. There were no non -permitted discharges of non-stormwater entering the storm drain because of activities occurring at my facility. I am aware that there are significant penalties for submitting false information.. Including the possibility of fines and imprisonment for knowing violations. Co-Permittee Company Name: Flight Group Corporatino Co-Permittee Responsible Person: Dan Bishop Title: Line Manager Signature: ad 0 )26�� Date Signed: 8/10/2021 Rev. 09.2017 C'enijication of Discharges IZc�lt^rgh-Uurltirrn lrrlerr�atnrrtrJrfirporl ,1 J'D1:S i'emjt Na: Al'S00050 CERTlF� 1 ION OF N. RM�II/ T R DISCI ARGES Methods of Evaluation Used: [check all that apply; provide detoils (plains reviewed, outfdii bosln, etc.)] ❑ Review of building and site plans 0 Visual inspection of stormwater drainage_ system Dye or smoke flow testing y E Interviews with facility. personnel 0 Analytical tests [] Closed circuit TV taping:of storm drains Other: There are no drains: n our area- Our Business- Partner Charter Express handles our operation. in RDU Actio_.ns taken to .ejlminate unauthorized dls hharges: N ..A i certify, under penalty:of .law, that .this document and, all attachments were prepared under rtiy direction in accordance or supervision in accordance,; with .a system -designed to fissure at ,qualified personnel; properly gather and evaluate the. informa� on submitted. Based. on my. .inquiry of the person or persons'who -manage the.system,. or those persons directly responsible fd,r .gathering the inforrnation the information submitted is, to. the best of my knowledge :and belief, true accurate and complete. There 'Were.no non --permitted discharges of non-stormwater entering the storm drain because Of, activities :occurring at my facility. I am aware that there are significant penalties for submitting false information, including the possibility of fines and ;imprisonment for kn. owing violations: Co-Permittee Company Name: Frontier Airlines Co-Permittee Responsible Person: Diego Alvarez Title: General Manager Signature: Date Signed:. 8=04 2021 'ter. 09 201' Certiflean n 1`ou-.tirr�rrrnrcrrrr Uisrfwrves R(d,-#; -1rujllrlgr Art-frillrrirrdl.ltrlrrrrt CERTIFICATION OF NON•STORMWATER DISCHARGES Methods of Evaluation Used: [check all that apply, provide details (p/ans reviewed, autfoll basin, etc.)] ❑ Review of building and site plans 1:3 Visual inspection of stormwater drainage system 13 Dye or smoke flow testing 13 Interviews with facility personnel Analytical tests Closed circuit TV taping of storm drains. 13 Other: Actions taken to eliminate unauthorized discharges: I certify, under penalty of law, that this document and all attachments were prepared under my direction in accordance or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true accurate and complete. There were no non -permitted discharges of non stormwater entering the storm drain because of activities occurring at my facility. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Co-Permittee Company Name: - � M Grro it Co-Permittee Responsible Person: -I-rc vl� vcj\ d ems C. f% Title: Gin {ram, r M00% Signature: Date Signed: Rn rl'L'2017 C'.7liliruAun W 1pu• Shu7Nlu7ilrr Ali ir:a;;0 Rah rah hul llurn hat rlumunul tropart W'DI-S Arind No. %( S0008k CERTIFICATION OF NON-STORMWATER DISCHARGES rtEhods of Evaluation Used: [check all that apply, provide details (plans reviewed, outjall basin, etc.)] Inj Review of building and site plans Visual inspection of stormwater drainage system Dye orsmoke flow testing ® Interviews with facility personne ❑ Analytical tests ❑ Closed circuit TV taping of storm drain ❑ Other: Actions taken to eliminate unauthorized discharges: carelc I ve-01n nCi absedia4l'on endpar+ners, I certify, under penalty of law, that this document and all attachments were prepared under my direction in accordance or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true accurate and complete. There were no non -permitted discharges of non-stormwater entering the storm drain because of activities occurring at my facility. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Co-Permittee Company Name: Co-Permittee Responsible Person: Jesse Horsham Title: General Manager Signature: A4K 4W.00 Date Signed: 04/29/21 1'v0r `inu,rrn: r, ; v, Raleigh -Durham Internadonal.4irport NPDFS Permit No. NCS000588 :CERTJFICATION QFN��11 STOR M�JUATERDtSCHARM ?r �' ,�••1• .S':�: err •.i: •r� ..„•. ..r .) .e n..�'�Sr•:'�••'". ,..:'•'• ''i:.i;.: ��R�.•f.r..;t :.iJ�':•.(`•' Cinj:Y,l• Y•�''\.'!r•• '1 •...•.1%•!rr..:ii'• ' .... ,!•• ':'tt a. \};..•.•,',tlk�:}.tit^ .t{:.t.•' :ta.ti Methods of Evaluation used: [check all that apply, provide details (plans reviewed, outfall basin, etc.)J ❑ Review of building and site plans ® visual inspection of stormwater drainage system ❑ Dye or smoke flow testing ❑ interviews with facility personnel ❑ Analytical tests ❑ Closed circuit Tv taping of storm drain ❑ Other: Actions taken to eliminate unauthorized discharges: I certify, under penalty of law, that this document and all attachments were prepared under my direction in accordance or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true accurate and complete. There were no non -permitted discharges of non-stormwater entering the storm drain because of activities occurring at my facility. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Co-Permittee Company Name: JetBlue Airways Co-Permittee Responsible Person: Matthew Detcher Title: General Manager Signature: Date Signed: 04/28/2021 Rev. 0912017 Cerel=don ofNon,Stornnvater Discharges Raleigh -Durham lnlernalloual Airporl NPDES Permit No. N0000588 CERTIFICATION OF NON-STORMWATER DISCHARGES Methods of Evaluation Used: [check all that apply, provide details (plans reviewed, outfall basin, etc.)] ® Review of building and site plans ROView AL%. PAS ® Visual inspection of stormwater drainage system S9E'C-T 1Q4 LOM PLEr'f ❑ Dye or smoke flow testing ® Interviews with facility personnel EV t eXJ W CTi-t MPh 13-TE- J Ply && ❑ Analytical tests ❑ Closed circuit TV taping of storm drain ❑ Other: Actions taken to eliminate unauthorized discharges: 112AW106 Ar'00 I certify, under penalty of law, that this document and all attachments were prepared under my direction in accordance or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my Inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true accurate and complete. There were no non -permitted discharges of non-stormwater entering the storm drain because of activities occurring at my facility. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Co-Permittee Company Name: LSG / SkyChefs Co-Permittee Responsible Person: Franklyn Luna Title: Unit Manager Signature: Date Signed: 4-28-21 Rer 0912017 Cerlificalion of Non-Slorruiraier Discharges Rakigh-Durham International Airport NPDES Permit No. NCS000588 CERTIFICATION OF NON-STORMWATER DISCHARGES Methods of Evaluation Used: [check all that apply, provide details (plans reviewed, outfall basin, etc.)] ❑ Review of building and site plans ® visual inspection of stormwater drainage system ❑ Dye or smoke flow testing ❑ Interviews with facility personnel ❑ Analytical tests ❑ Closed circuit TV taping of storm drain ❑ Other: Actions taken to eliminate unauthorized discharges: I certify, under penalty of law, that this document and all attachments were prepared under my direction in accordance or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true accurate and complete. There were no non -permitted discharges of non-stormwater entering the storm drain because of activities occurring at my facility. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Co-Permittee Company Name: Martin Marietta Co-Permittee Responsible Person: william M Harris Title: Maintnenance Supervisor Signature: Date Signed: 4/15/2021 Rev. 0912017 Certification of Non-Stormwater Discharges liul, i� i1 I )ur11rrut /IIlwl),11 r:n,11. CERTIFICATION OF NON-STORMVUATER DISCHARGES Methods of Evaluation Used: (check all that apply, provide details (plans reviewed, outfoll basin, etc.)] ® Review of building and site plans ® visual inspection of stormwater drainage system ❑ Dye or smoke flow testing ❑ Interviews with facility personnel ❑ Analytical tests ® Closed circuit TV taping of storm drain ❑ Other: Actions taken to eliminate unauthorized discharge : certify, under penalty of law, that this document and all attachments were prepared under my direction in accordance or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true accurate and complete. There were no non -permitted discharges of non-stormwater entering the storm drain because of activities occurring at my facility. I am aware that there are significant penalties for submitting false information, including the possibility of fines and Imprisonment for knowing violations. Co-Permittee Company Name: National/Alamo Co-Permittee Responsible Person: Eric Elliott Title: Fac & Const. Mgr. Signature: Date Signed: 4/15/21 Raleigh-Durha►u haernallonal.4hpor7 NPDES Permit No. NC'S000588 CERTIFICATION OF NON-STORMWATER DISCHARGES Methods of Evaluation Used: [check all that apply, provide details (plans reviewed, outfoll basin, etc.)] ® Review of building and site plans ® Visual inspection of stormwater drainage system ❑ Dye or smoke flow testing ❑ Interviews with facility personnel ❑ Analytical tests ❑ Closed circuit TV taping of storm drain ❑ Other: Actions taken to eliminate unauthorized discharges: I certify, under penalty of law, that this document and all attachments were prepared under my direction in accordance or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true accurate and complete. There were no non -permitted discharges of non-stormwater entering the storm drain because of activities occurring at my facility. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Co-Permittee Company Name: NC Dept. of Transportation Co-Permittee Responsible Person: Steve Martin Title: Aircraft Mechanic Signature: 4/23/21 Date Signed: ou Re r. 09,2017 Cerlrlicalion ofAan-SJurnnrater Discharges Raleigh-Dia-ham Internalional:lill)orl NPDCS Perdu! No. AICS0005S8 RDl Rer. 0912017 Cerlificalion ofWon-Slornararer Discharges N��l�t,�h-Uurltun/w, nal,omd:lopn'i V'PUP:S' Prrmil A'u C ('S'OOgi,Ph' CERTIFICATION OF NON-STORMWATER DISCHARGES Methods of Evaluation Used: [check all that apply, provide details (plans reviewed, outfall basin, etc.)] ® Review of building and site plans ® Visual inspection of stormwater drainage system ❑ Dye or smoke flow testing ® Interviews with facility personnel ® Analytical tests ❑ Closed circuit TV taping of storm drain ❑ Other: Actions taken to eliminate unauthorized discharges: Annual spill revention and stormwater pollution prevention training, escorting for fuel deliveries, monthly inspections of equipment. I certify, under penalty of law, that this document and all attachments were prepared under my direction in accordance or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true accurate and complete. There were no non -permitted discharges of non-stormwater entering the storm drain because of activities occurring at my facility. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Co-Permittee Company Name: Raleigh -Durham Airport Authority Co-Permittee Responsible Person: Michael J. Landguth, A.A.E. Title: President & CEO Signature: Date Signed: 9 20 z wou Rer. 09-10/7 ("Ii(enlinn o(Non-slurnnrun°r 0i"h"' "', - h(tl 1ph l.rt►rhapi; haviiianonal:ftrpoit AI'PhS Powlrt \r,. A'CSUllWA,� CERTIFICATION OF NON-STORMWATER DISCHARGES Methods of Evaluation Used: [check aft that apply, provide details (plans reviewed, outfoll basin, etc.)] ® Review of building and site plans ® Visual inspection of stormwater drainage system ❑ Dye or smoke flow testing Interviews with facility personnel ❑ Analytical tests ❑ Closed circuit TV taping of storm drain ❑ Other: Actions taken to eliminate unauthorized discharges: I certify, under penalty of law, that this document and all attachments were prepared under my direction in accordance or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true accurate and complete. There were no non -permitted discharges of non-stormwater entering the storm drain because of activities occurring at my facility. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Co-Permittee Company Name: SAS Institute, Inc. Co-Permittee Responsible Person: Kenneth R. Conner Title: Director, Aviation Services Signature: Date Signed: 16 April 2021 !fi 4 t)v 210 t' ( crhlt, gamn n%.\ oti Cn►rimi �tl, i Ut\cltin-g •., Raleigh-Durhao, Iaternallotwl Airport AMES Pernut .\'a A0000588 CERTIFICATION OF NON-STORMWATER DISCHARGES Methods of Evaluation Used: (check all that apply, provide details (plans reviewed, outfall basin, etc.)) ❑ Review of building and site plans ® Visual inspection of stormwater drainage system ❑ Dye or smoke flow testing ❑ Interviews with facility personnel ❑ Analytical tests ❑ Closed circuit TV taping of storm drain ❑ Other: Actions taken to eliminate unauthorized discharges: I certify, under penalty of law, that this document and all attachments were prepared under my direction in accordance or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the Information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the Information submitted is, to the best of my knowledge and belief, true accurate and complete. There were no non -permitted discharges of non-stormwater entering the storm drain because of activities occurring at my facility, I am aware that there are significant penalties for submitting false Information, including the possibility of fines and Imprisonment for knowing violations. Co-Permittee Company Name: Sheetz, Inc. Co-Permittee Responsible Person: MatthewJ. Cutshall Title: Environmental Compliance Manager Signature: Date Signed: 4/23/2021 aou (j,) 'I,i - f'etvjlia aon of Nat-5lonnmater Virclwrges Ralcigh-Durham International:Iitpon NPDES Permit Ao. NGS000588 CERTIFICATION OF NON-STORMWATER DISCHARGES Methods of Evaluation Used: [check all that apply, provide details (plans reviewed, outfoll basin, etc.)] ® Review of building and site plans ® Visual inspection of stormwater drainage system ❑ Dye or smoke flow testing ❑ Interviews with facility personnel ❑ Analytical tests ❑ Closed circuit TV taping of storm drains ❑ Other: Actions taken to eliminate unauthorized discharges: I certify, under penalty of law, that this document and all attachments were prepared under my direction in accordance or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true accurate and complete. There were no non -permitted discharges of non-stormwater entering the storm drain because of activities occurring at my facility. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Co-Permittee Company Name: Signature Flight Support Co-Permittee Responsible Person: Tosha Szabo Title: General Manager Signature: Date Signed: April 29, 2021 Rey. 092017 Cerlilicutiwt ul'Non-Slormirater Discharges Raleigh -Durham International Airport NPDES Permit No. NCS000588 CERTIFICATION OF NON-STORMWATER DISCHARGES Methods of Evaluation Used: [check all that apply, provide details (plans reviewed, outfall basin, etc.)] Review of building and site plans ® Visual inspection of stormwater drainage system ❑ Dye or smoke flow testing ❑ Interviews with facility personnel ❑ Analytical tests ❑ Closed circuit TV taping of storm drain _-Other: Southwest Airlines operates at RDU with Best Management Practices (BMP) that that help reduce or eliminate pollutants from entering storm drains and/or local waterways. Actions taken to eliminate unauthorized discharges: I certify, under penalty of law, that this document and all attachments were prepared under my direction in accordance or supervision in accordance with a -system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my Inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true accurate and complete. There were no non -permitted discharges of non-stormwater entering the storm drain because of activities occurring at my facility. I am aware that there are significant penalties for submitting false information, including the possibility_ of fines and imprisonment for knowing violations. Co-Permittee Company Name: Southwest Airlines, Co. Co-Permittee Responsible Person: Donald Cosip Title: Assistant Station Nanager Signature: Date Signed: April 30, 2021 Rev. 09.12017 Cert y1cation of Non-Sionnivater Discharges Raleigh-Durhaminternationd Airport CERTIFICATION OF NON-STORMWATER DISCHARGES 'i j Methods of Evaluation Used: [check all that apply, provide details (plans revieiwd, outfal ® Review of building and site plan : ❑ visual inspection of stormwater drainage syste �► ❑ Dye or smoke flow testin ❑ interviews with facility personnel+ ❑ Analytical tests ' ❑ Closed circuit TV taping of storm drat ❑ other: ;i oasin, et.-.)] # f Actions taken to eliminate unauthorized discharge • I certify, under penalty of law, that this document and all attachments were prepared under direction in accordance or supervision in accordance with a system designed to ; ssure qualified personnel properly gather and evaluate the information submitted. Ba ed on Inquiry of the person or persons who manage the system, or those persons directly re�ponsi for gathering the information, the information submitted is, to the best of my kno' ledge belief, true accurate and complete. There were no non -permitted discharges of non- rmwa entering the storm drain because of activities occurring at my facility. I am aware thathere significant penalties for submitting false information, including the possibility of fines an Imprisonment for knowing violations. ,I Co-Permittee Company Name: SP iritAirlines Co-Permittee Responsible Person: 1 J 61Ccn C C7 ► Title: M Signature: Date Signed: t 'y I o n1.d er r f Rev. 0912017 Certification ofNon-Stm7n4wter Raleigh -Durham International Airport NPDE'SPertttti No, NCSOOO588 CERTI ICATION OF NON-�STQRMWATER DISCHARGES Methods of EvaluationFUsed: [check alithat apply, provide details (plans reviewed, outfall basin, etc.)] ❑ Review of building and site plans ❑ Visual inspection of stormwater drainage system ❑ Dye or smoke 'low testin ❑ Interviews with facility personnel ❑ Analytical tests ❑ Closed circuit' V taping of storm drain ❑ Other: Actions taken to eliminate unauthorized discharges:. 1 cerEify, under penalty pf law, that this .document and all attachments were prepared under my direction in accordance or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the Information submitted. Based on my Inquiry of the person or persons who manage the system, or -those persons directly responsible for gathering the information, the information submitted is, to the. best of my knowledge and belief, true accurate anal complete. There were no non -permitted discharges of non-siormwater entering the storm drain because of activities occurring at my facility. l am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Co-Permittee Company Name: Sun Country Co-Permittee Responsible person: Terence Brown Title: Station Manager Signature: Date Sign A08/16/22021 Rev. 0912017 Certification of Non-Storunrater Discharges Raleigh Durham International d irport WD S Permit No. NCS000588 CERTIFICATION OF NON-STORMWATER DISCHARGES Methods of Evaluation Used: [check all that apply, provide details (plans reviewed, outfall basin, etc.)] ® Review of building and site plans ® visual inspection of stormwater drainage system ❑ Dye or smoke flow testing ❑ Interviews with facility personnel ❑ Analytical tests ❑ Closed circuit TV taping of storm drain ❑ Other: Actions taken to eliminate unauthorized discharges:discharges:&&6 a Arerss i i h 6k, e._- 1 +'Ke, I certify, under penalty of law, that this document and all attachments were prepared under my direction in accordance or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the. information, the information submitted is, to the best of my knowledge and belief, true accurate and complete. There were no non -permitted discharges of non-stormwater entering the storm drain because of activities occurring at my facility. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Co-Permittee Company Name: TAC Air Co-Permittee Responsible Person: Dillon Piotrkowski Title: Safety and Training Manager Signature: �._.- Date Signed: 041 21 U Rev. 0912017 Cerifflcation of Nor-Stonntt ater Discharges l�l,lc r /r 11ur/rvn111h,01111101hil.li,l-on 1 Nl)l:S PerartI A"; NC :Stl►1fiMS CERTIFICATION OF NON-STORMWATER DISCHARGES Methods of Evaluation Used: [check all that apply, provide details (plans reviewed, outfall basin, etc.)] ❑ Review of building and site plans ❑ Visual inspection of stormwater drainage system ❑ Dye or smoke flow testing ❑ Interviews with facility personnel ❑ Analytical tests ❑ Closed circuit TV taping of storm drain ® Other: All services impactful to stormwater are performed by a vendor company (Unifi) for United Airlines. Actions taken to eliminate unauthorized discharges: I certify, under penalty of law, that this document and all attachments were prepared under my direction in accordance or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true accurate and complete. There were no non -permitted discharges of non-stormwater entering the storm drain because of activities occurring at my facility. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Co-Permittee Company Name: United Airlines Co-Permittee Responsible Person: Garrett Bock Title: Supervisor - Airport Operations Signature: Date Signed: 4/22/2021 aou 1•:a-'. !1`/ �►if- l'li?i. .:?!•:i: I,• .,.r;-,.it;r'irli.,l(t:' 1!Iac:i;.it_ . Milei.410ho-hairs but ln/nnall/l Ai lnut NPOES Permit Nit. NCS000588 CERTIFICATION OF NON-STORMWATER DISCHARGES Methods of Evaluation Used: [check all that apply, provide details (plans reviewed, outfall basin, etc.)] ® Review of building and site plans ® visual inspection of stormwater drainage system ❑ Dye or smoke flow testis ® Interviews with facility personnel ❑ Analytical tests ❑ Closed circuit TV taping of storm drain ❑ Other: Actions taken to eliminate unauthorized discharges: certify, under penalty of law, that this document and all attachments were prepared under my direction in accordance or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true accurate and complete. There were no non -permitted discharges of non-stormwater entering the storm drain because of activities occurring at my facility. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Co-Permittee Company Name: UNC Air Operations Co-Permittee Responsible Person: Lotta Peltola-Nelms Title: Air Transportation Coordinator Signature: A . �3 Date Signed: 4/29/2021 Rau ( 1'Ill1l(tl/101) "j \'�w-.`It !/I11, Ili I /)/1t 11, 1IQ, � Raleigh -Durham International Airport CERTIFICATION OF NON-STORMWATER DISCHARGES Methods of Evaluation Used: [check all that apply, provide details (plats reviewed, outfafJ ti I I ❑ Review of building and site plans ❑ Visual inspection of stormwater drainage system Dye or smoke flow testing ❑ Interviews with facility personnel i ❑ Analytical tests , ❑ Closed circuit TV taping of storm drains ® Other: //4 Actions taken to eliminate unauthorized d1scharge4• I certify, under penalty of law, that this document and all attachments were preparei under jy direction in accordance or supervision in accordance with a system designed to ssure t lat qualified personnel properly gather and evaluate the information submitted, Be ed on ,y persons direct) ;es ons e inquiry of the person or persons who manage the system, or thosep y ; P for gathering the information, the information submitted is, to the best of my kn+' ledge rid belief, true accurate and complete. There were no non -permitted discharges of,non , ormw ter • • • facility. aware t � there re entering the storm drain because of activities occurring at my facility. I am a h, significant penalties for submitting false information, including the possibility of fines rid imprisonment for knowing violations. jI �I Co-Permittee Company Name: UNIFI SERVICE !� Co-Permittee Responsible Person: LENNY POLANCO Title: STATION MANAGER NK/AC Signatur • Date Signed: 9/ 3/21 Rev. 09/2017 Certification of Non-Stor mrater Dis h4 Raleigh -Durham International Airport NPDES Permit No. NCSM588 ...:..::..:.:.:.: .... . ......:..... . -- .....::.. r .:....::.... Methods of Evaluation Used: [check all that apply, provide details (plans reviewed, outaJJ basin, etc.)] ❑ Review of building and site plans ® Visual inspection of stormwater drainage system ❑ Dye or smoke flow testin ❑ Interviews with facility personnel ❑ Analytical tests ❑ Closed circuit TV taping of storm drain ❑ Other: Actions taken to eliminate unauthorized discharge : I certify, under penalty of law, that this document and all attachments were prepared under my direction in accordance or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true accurate and complete. There were no non -permitted discharges of non-stormwater entering the storm drain because of activities occurring at my facility. I am aware that there are significant penalties for submitting false information, including the possibility of fines and Imprisonment for knowing violations. Co-Permittee Company Name: UPS Cartage Services, Inc. Co-Permittee Responsible Person: Joe Costine Title: General Manager Signature: Date Signed: 04/30/2021 Rev. W.017 Cerifflcation ofNon-Stornavater Discharges Raleigh-Dterbam 7ntartta#osrrtri:4i pyn XPMI� 1'' Crinu 117(`.�OC14.�AY CERTI.FICi4 ION OF NO-N-STORMWATER DISCHARGES Fethod;scort'Evaltqation Used (check all that -apply, provide details (Plans- reviewed, outfall basin, etc)] ® Review of building a d. site plans ® Visual inspection of tormwater drainage syste ❑ .Dye or smoke flow -testing ® Interviews with fadil ty personnel ❑ Analytical tests ❑ Closed circuit TV toping of storm drains. ❑ Other: Actions taken to eltimtnate unauthorized I certify,. under penalty of lamp, that this document and all attachments were prepared under my direction in accordance or supervision in accordance with -a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or pets ns who manage the system, or those persons directly responsible for gathering the Information, the information submitted is, to the best of my knowledge and belief, true accurate and co & plete. There were no -non-permitted discharges of non-stormwater entering the storm drain bec use -.of activities. occurring at my facility. I am -aware that there are significant penalties for sub t itting false information;: including tlhe possibility .of fines and imprisonment for knowing vi lations. Co-Permittee Company Name: United parcel Sexvice- Co-Perrnittee Responsible Person: David Daubenmire Title:- Gateway Manager Signature: Date Signed: 04/19/202.1 Req.. W-207 - ( 'en corivn tal', int 9eirinstwiur L+rxcljcjrgcs