Loading...
HomeMy WebLinkAboutNCC221654_Site Plan or Location Map_20220511H G F s // E U A 0 8 17 6 1 5 14 3 1 2 DURING CONSTRUCTION AND UPON COMPLETION OF WORK, CONTRACTOR SHALL REMOVE ALL EVIDENCE OF WORK INCLUDING DIRT, ASPHALT, TIRE TRACKS, ETC. AND LEAVE THE SITE IN A CLEAN AND ORDERLY CONDITION. DURING AND UPON COMPLETION, CONTRACTOR SHALL SWEEP ASPHALT PAVEMENT AND CONCRETE SIDEWALK, AND KEEP THE SITE IN A NEAT AND ORDERLY CONDITION. ALL MUD AND CONSTRUCTION DEBRIS IS TO BE REMOVED IMMEDIATELY FROM ROAD. CONTRACTOR MAY INSTALL STABILIZED CONSTRUCTION ENTRANCE TO SITE AS REQUIRED. ENTRANCE MAY NOT IMPEDE REQUIRED TRAFFIC LANES TO REMAIN OPEN. TREE PROTECTION IS REQUIRED FOR ALL TREES NEAR CONSTRUCTION NOT IDENTIFIED TO BE REMOVED ON THE C-100 DRAWINGS. CONTRACTOR IS RESPONSIBLE FOR REPLACING ANY TREE THAT IS DAMAGED DURING CONSTRUCTION. NO STOCKPILING IS PERMITTING WITHIN THE DRIPLINE OF EXISTING TREES 5. EQUIPMENT UTILIZED DURING THE 'AN bz�v�"Z_/ INIA "ANV ��/ �\� \ I � V � \\ I I � N NAll I I ILF_ THHUST BEE POTEONTERTED AND MAINTINED IN SUCH A LOR ACTUAL POLLUTION OFF THE OUMANNER AS TO R ACE OR GROUNDENT WATERS. FUELS, LUBRICANTS, COOLANTS, AND HYDRAULIC FLUIDS, OR ANY OTHER PETROLEUM PRODUCTS, SHALL NOT BE DISCHARGED ONTO THE GROUND OR INTO SURFACE WATERS. SPENT FLUIDS SHALL BE CLEANED UP AND DISPOSED OF IN A MANNER SO AS NOT TO ENTER THE WATERS, SURFACE, OR GROUND. 6. LOCATE ALL STOCKPILES AT LEAST 50 FEET AWAY FROM STORM DRAIN INLETS AND SURFACE WATERS. 7. CONCRETE MATERIALS ONSITE, INCLUDING EXCESS CONCRETE, MUST BE CONTROLLED AND MANAGED TO AVOID CONTACT WITH SURFACE WATERS, WETLANDS, OR BUFFERS. NO CONCRETE OR CEMENT SLURRY SHALL BE DISCHARGED FROM THE SITE. 8 1 6 1 5 14 ALL DISTURBED AREAS SHALL BE PROVIDED TEMPORARY OR PERMANENT SOIL STABILIZATION WITH GROUND COVER AS SOON AS PRACTICAL AND WITHIN 14 CALENDAR DAYS FROM THE LAST LAND -DISTURBING ACTIVITY, WITH THE EXCEPTION OF THE AREAS MARKED ON THE PLANS THAT REQUIRE SOIL STABILIZATION WITHIN 7 DAYS. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CHECKED AND REPAIRED AS NECESSARY WITHIN 24 HOURS OF ANY STORM EVENT OF GREATER THAN .50 INCHES OF RAIN PER 24 HOUR PERIOD. 10. CONTACT JAKE TERRELL FOR ALL EROSION AND SEDIMENT CONTROL MEASURE MAINTENANCE CONCERNS. EMAIL: jmterrel@ncsu.edu, PHONE: 919-515-2030 11. THE PROJECT SITE IS LOCATED WITHIN THE NEUSE RIVER BASIN. 12. EROSION CONTROL DEVICES MAY NOT BE REMOVED UNTIL AFTER ESTABLISHMENT PERIOD (UP TO ONE YEAR AFTER PROJECT COMPLETION). CONTRACTOR MAY CONTRACT NCSU GROUNDS FOR REMOVING SILT FENCE AFTER ESTABLISHMENT PERIOD, AND SHALL CONTACT GROUNDS FOR PROPOSAL. 13. CONTRACTOR IS RESPONSIBLE FOR DEWATERING TRENCH AT ALL TIMES. CONTRACTOR SHALL DISCHARGE WATER FROM THE TRENCH TO SEDIMENT BAGS PER DETAIL C ON C-513 OR TO SEDIMENT TANKS PER THE SPECIFICATIONS. SEDIMENT BAGS SHALL BE PLACED IN STABILIZED AND VEGETATED AREA DOWNSTREAM OF CONSTRUCTION. 14. CONTRACTOR SHALL LIMIT THE AMOUNT OF OPEN TRENCH PER THE PHASING DRAWINGS. OPEN TRENCH EXCAVATION SHALL NOT EXCEED 200 FT AT ANY TIME WITHOUT WRITTEN APPROVAL FROM EOR. 15. CONTRACTOR SHALL INSTALL AND MAINTAIN APPROPRIATE EROSION AND SEDIMENT CONTROL MEASURES TO ENSURE SEDIMENT DOES NOT LEAVE THE SITE DURING ALL PHASES OF CONSTRUCTION. ANY SEDIMENT DEPOSITED OUTSIDE THE PROJECT WORK AREA, INCLUDING TRACKING OUT, SHALL BE IMMEDIATELY CLEANED UP BY SWEEPING AND/OR REMOVING THE MATERIAL BY HAND. ACCUMULATED SEDIMENT ON HARD SURFACES SHALL NOT BE WASHED INTO STORM DRAINS, GUTTERS OR RECEIVING WATERS. ALL INSTALLED EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED ONCE THE PROJECT AREA IS FULLY STABILIZED. 3 NSLO HALL' #004 16. ALL STORMWATER INLETS LOCATED IN CONNECTING, DOWN GRADIENT, PAVED AREAS SHALL HAVE PROTECTIVE MEASURES INSTALLED TO PREVENT A DISCHARGE OF SEDIMENT TO THE STORM SEWER SYSTEM AND/OR UNIVERSITY OWNED STORMWATER CONTROL MEASURE (SCM) DEVICES. IN THE EVENT THAT SEDIMENT FROM THE CONSTRUCTION SITE IS DISCHARGED TO THE STORM SEWER SYSTEM, THE CONTRACTOR SHALL IMMEDIATELY REMOVE THE SEDIMENT AND CLEAN THE AFFECTED AREAS TO PREVENT A DISCHARGE INTO UNIVERSITY OWNED SCMS. IN THE EVENT THAT SEDIMENT FROM THE SITE IS DISCHARGED INTO A UNIVERSITY OWNED SCM(S), THE CONTRACTOR SHALL IMMEDIATELY REMOVE THE SEDIMENT AND IMPLEMENT ALL ACTIONS NECESSARY TO RESTORE THE SCM(S) TO FUNCTIONING STATUS. CERTIFICATION, FROM A LICENSED NC PE, ATTESTING TO THE FUNCTIONING STATUS OF THE AFFECTED SCM(S) SHALL BE PROVIDED BY THE CONTRACTOR. 17. SHEETS C-509F AND C-51OF NOT INCLUDED IN DRAWING PACKAGE. SHEETS INDICATE SHARED LAYDOWN AND STAGING AREA FOR ALL PACKAGES THAT ARE A PART OF THE "NCSU ELECTRICAL DISTRIBUTION UPGRADE; NCDEQ E&SC PLAN PROJECT NO: WAKE-2022-020" PROJECT. LAYDOWN AREAS WITH PROPER EROSION CONTROL MEASURES WERE REVIEWED AND APPROVED AS PART OF THE PACKAGE 1 DRAWING SET (SCO# 19-21163-01 F). GRAPHIC SCALE 120 60 0 120 240 NSCALE:1"=120'-0" UNIT OF MEASURE: FEET 2 1 rff f RMF ENGINEERING, INC. 8081 ARCO CORPORATE DRIVE SUITE 300 RALEIGH, NC 27617 P: 919-941-9876 F: 919-941-9957 1 ADDENDUM 02 04/12/22 REV DESCRIPTION DATE REVISIONS SUBMISSION TITLE: CONSTRUCTION DOCUMENTS I THIS DRAWING AND ALL COPIES THEREOF IS THE PROPERTY OF RMF I ENGINEERING, INC. THIS DRAWING MAY NOT BE USED OR REPRODUCED WITHIN ANY COMPUTER ENVIRONMENT OR BY ANY PRINT MEDIA FORMAT WITH OUT THE WRITTEN CONSENT OF RMF ENGINEERING, INC. SEAL H 0 F E Al C DRAWN BY: DICK DATE: 03/23/22 B DESIGNED BY: ETL SCALE: 1" = 120'-0" CHECKED BY: MSB RMF JOB NO.: 220173.130 PROJ. MGR.: GAC NCSU JOB #: 201920030 SCO #: 19-21163-01 G CODE #: 41924 ITEM #: 303 PROJECT NAME ELECTRICAL DISTRIBUTION UPGRADE - DISTRIBUTION PACKAGE 2 IQM-11T 101"rr14:5 OVERALL EROSION & SEDIMENT CONTROL PLAN DRAWING NUMBER: C-500-G 1 0