Loading...
HomeMy WebLinkAboutSW6220201_Design Calculations (Riprap)_20220510ATE DESIGN PHASE 0-28-21 PRELIM rPROJECT NAME PROJECT NO CONSTR / Xshire Phase 8 1775 REVISIONTION RECORD BY Harnett County, North Carolina UP OTHER (SPECIFY) CHECKED BY CSB Storm Outlet Structure FES No.= FES 24 Pipe Dia= 30 in Q10 = 27.71 cfs Qfull = 115.64 cfs Vfull = 23.53 fps From Fig. 8.06.b.1: From Fig. 8.06.b.2: s Length Storm Outlet Structure FES No.= FES 52 Pipe Dia= 15 in Q10 = 2.19 cfs Qfull = 5.21 cfs Vfull = 4.24 fps From Fig. 8.06.b.1: From Fig. 8.06.b.2: s v 3 Length Zone D50 DMAX Riprap Class Apron Thickness Apron Length Apron Width @ Outlet Apron Width @ End Zone D50 DMAX Riprap Class Apron Thickness Apron Length Apron Width @ Outlet Apron Width @ End Q10/QfuI1 = 0.24 V/Vfu 11 = 0.81 V = 19.0 fps = 2 = 8 in = 12 in = B = 18 in = 15.0 ft = 7.5 ft = 17.5 ft Q10/QfuI1 = 0.42 V/Vfu I = 0.94 V = 4.0 fps = 2 = 8 in = 12 in = B = 18 in = 7.5 ft = 3.75 ft = 8.8 ft 1775 Storm System.xlsx LATEST REVISION: 5/10/2022 6:10 PM PAGE 1 OF 4 ATE DESIGN PHASE PRELIM 0-28-21 rPROJECT NAME PROJECT NO CONSTR / Xshire Phase 8 1775 REVISIONTION RECORD BY Harnett County, North Carolina UP OTHER (SPECIFY) CHECKED BY CSB Storm Outlet Structure FES No.= FES 55 Pipe Dia= 48 in Q10 = 127.00 cfs Qfull = 197.31 cfs Vfull = 15.68 fps From Fig. 8.06.b.1: From Fig. 8.06.b.2: Storm Outlet Structure FES No.= TST 1 SKIMMER Pipe Dia= 2 in Q10 = 0.02 cfs Qfull = 0.02 cfs Vfull = 2.86 fps From Fig. 8.06.b.1: From Fig. 8.06.b.2: s Length Zone D5o DMAX Riprap Class Apron Thickness Apron Length Apron Width @ Outlet Apron Width @ End Zone D5o DMAX Riprap Class Apron Thickness Apron Length Apron Width @ Outlet Apron Width @ End Q1 o/Qfu I = 0.64 V/Vfu11 = 1.06 V = 16.5 fps = 3 = 10 in = 15 in = 1 = 22.5 in = 32.0 ft = 12 ft = 36.0 ft Q10/Qfu11 = 1.00 V/Vfu I = 1.14 V = 3.3 fps = 2 = 8 in = 12 in = B = 18 in = 1.0 ft = 0.5 ft = 1.2 ft 1775 Storm System.xlsx LATEST REVISION: 5/10/2022 6:10 PM PAGE 2 OF 4 ATE DESIGN PHASE PRELIM 0-28-21 rPROJECT NAME PROJECT NO CONSTR / Xshire Phase 8 1775 REVISIONTION RECORD BY Harnett County, North Carolina UP OTHER (SPECIFY) CHECKED BY CSB Storm Outlet Structure FES No.= FES 48 Pipe Dia= 24 in Q10 = 24.69 cfs Qfull = 63.68 cfs Vfull = 20.24 fps From Fig. 8.06.b.1: From Fig. 8.06.b.2: Storm Outlet Structure FES No.= DRIVEWAY DN Pipe Dia= 18 in Q10 = 6.09 cfs Qfull = 19.79 cfs Vfull = 11.19 fps From Fig. 8.06.b.1: From Fig. 8.06.b.2: s Length Zone D5o DMAX Riprap Class Apron Thickness Apron Length Apron Width @ Outlet Apron Width @ End Zone D5o DMAX Riprap Class Apron Thickness Apron Length Apron Width @ Outlet Apron Width @ End Q10/Qfu11 = 0.39 V/Vfu11 = 0.93 V = 18.8 fps = 2 = 8 in = 12 in = B = 18 in = 12.0 ft = 6 ft = 14.0 ft Q1 o/Qfu I = 0.31 V/Vfu11 = 0.87 V = 9.8 fps = 2 = 8 in = 12 in = B = 18 in = 9.0 ft = 4.5 ft = 10.5 ft 1775 Storm System.xlsx LATEST REVISION: 5/10/2022 6:10 PM PAGE 3 OF 4 • ' ' • • DATE DESIGN PHASE PRELIM E10-28-21 PROJECT NAME PROJECT NO CONSTR / X / Woodshire Phase 8 1775 REVISION RECORD / X / / X / LOCATION BY Harnett County, North Carolina UP OTHER (SPECIFY) / X / CHECKED BY CSB Storm Outlet Structure FES No.= Greenbay 7+80 Q10/Qful1 = 0.62 Pipe Dia= 18 in V/Vfull = 1.05 Q10 = 15.49 cfs V = 14.8 fps Qfull = 24.97 cfs Vfull = 14.14 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D50 = 8 in DMAX = 12 in Riprap Class = B v s Apron Thickness = 18 in v 3 Apron Length = 9.0 ft Apron Width @ Outlet = 4.5 ft Length Apron Width @ End = 10.5 ft 1775 Storm System.xlsx LATEST REVISION: 5/10/2022 6:10 PM PAGE 4 OF 4