Loading...
HomeMy WebLinkAboutNCC220968_MODIFICATION Supporting Documents_20220506ROY COOKER Governor ELIZABETH S. BISER Secretary BRIAN WRENN Dhector NORTH CAROLINA Environmental Quality May 5, 2022 LETTER OF APPROVAL WITH MODIFICATIONS CRA Home Builders George Armstrong, President 2709 Thorngrove Court, Suite 2 Fayetteville, NC 28303 RE: Project Name: The Hills at Stone Gate Acres Approved: 33.85 Project ID CUMBE-2022- 13 6 County: Cumberland City: Fayetteville - Manchester Address: Edwinstowe Avenue River Basin: Cape Fear Stream Classification: Other Submitted by: Jeffrey Nobles Date Received by LQS: April 22, 2021 Plan Type: Residential Dear Mr. Armstrong: The subject erosion and sedimentation control plan has been approved by default. The Sedimentation Pollution Control Act (hereinafter "Act") states that this plan must be filed a minimum of 30 days (15 days for revised plans) prior to the activity and the approving authority must approve or disapprove the submitted plan within 30 days (15 days for revised plans) of receipt of G. S. 113A-54.1, The Act further states that if the approving authority fails to approve or disapprove the submitted plan within the 30-day (15 days for revised plans) period, the plan will be deemed approved. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire "three (3) years following the date of approval, if no land - disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted and COC issued prior to the commencement of any land disturbing activity on the above -named project. The NOT form may be accessed at degnc.gov/NCGOL Please direct questions about the NOI form to Annette Lucas at Annette. lucas cs,ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCGO1 permit. However, on or after June 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR North Carolina Departtment o Environmental Quality ; Division o Energy, Mineral and Land Resources Faye..m,vilIeRegionaloffice 1225QrenStreet,Su1te714 Fayet:tevllle,„NorthC;aroii.tett2t4iO1 »vm�mc�t en�mn Lai t�rsaty 910,433.3300 Stormwater Central Office staff in Raleigh. Title 15A NCAC 4B .01 1S(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: L The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. Any addition in impervious surface, over that already noted on the approved plan, would also require a revised plan to verify the appropriateness of the erosion control measures and the stormwater retention measures. (GS 113A-54.1(b)). In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, G64 skl-� Chris Baker Assistant Regional Engineer DEMLR - Fayetteville Regional Office Enclosures: Certificate of Approval cc: Jeffrey Nobles, P. E., Larry. King & Associates, P. A. — email copy Michael Naylor, Cumberland County Inspection Office — email copy Fayetteville Regional Office Letter of Approval with Modifications Date: May 5, 2022 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: The Hills at Stone Gate Project ID: Cumbe-2022-007 Counties: Cumberland The modifications required for the project approval are as follows: 1. Provide the registered deed for the additional disturbed acreage. These modifications must be received at the Fayetteville Regional office no later than May 31, 2022 otherwise the permit will be rescinded.