Loading...
HomeMy WebLinkAboutNCC221734_Site Plan or Location Map_20220504MIGRATORY BIRD HOTLINE STATE AND FEDERAL LAWS PROTECT ALL SPECIES OF NATIVE BIRDS FOUND THROUGHOUT THE DUKE ENERGY SERVICE AREA. INTERACTIONS OF BIRDS WITH GENERATING FACILITIES, TRANSMISSION AND DISTRIBUTIONS, SUBSTATIONS, OTHER STRUCTURES AND EQUIPMENT, AND OPERATIONS ARE POTENTIALLY HARMFUL OR FATAL TO BIRDS. DUKE ENERGY OPERATES THESE 24-HOUR MIGRATORY BIRD HOTLINES TO ASSIST EMPLOYEES AND CONTRACTORS WITH RELATED INCIDENTS THAT OCCUR DURING WORK ACTIVITIES. CAROLINAS:800.573.3853 FLORIDA:727.3B6.3084 MIDWEST:317.430.4497 SPILL REPORTING HOTLINE IN ORDER TO ENSURE THE PROTECTION OF HUMAN HEALTH AND THE ENVIRONMENT, FEDERAL AND STATE LAWS REQUIRE THAT CERTAIN TYPES OF SPILLS AND UNPERMITTED RELEASES BE REPORTED TO THE PROPER REGULATORY AGENCIES AS SOON AS POSSIBLE FOLLOWING IDENTIFICATION. IMMEDIATELY NOTIFY YOUR SUPERVISOR AND THE FIELD ENVIRONMENTAL/EHS PROFESSIONAL WHEN A SPILL OR UNPERMITTED RELEASE IS DISCOVERED. IF YOU ARE UNABLE TO REACH THE FIELD ENVIRONMENTAUEHS PROFESSIONAL, CONTACT ONE OF THE DUKE ENERGY SPILL REPORTING HOTLINES AT: CAROLINAS & MIDWEST: 800.527.3853 FLORIDA: 866.769.1266 SITE DATA TABLE OWNER/ DEVELOPER DUKE ENERGY PROGRESS 410 S. WILMINGTON STREET RALEIGH, NC 27601 PARCEL PIN NO. 1704730092, 1704731304 DEED BOOK DB. 15289, PG. 2437 PARCEL ACREAGE 1.98 ACRES ZONING DISTRICT DX-7-UG RIVER BASIN NEUSE EXISTING USE DOWNTOWN MIXED USE DX-7-UG PROPOSED USE DOWNTOWN MIXED USE DX-7-UG PROJECT NARRATIVE THE. PROPOSED MORDECAI 111511V SUBSTATION PROJECT IS LOCATED IN WAKE COUNTY, NORTH CAROLINA. THE PROJECT INCLUDES AN EXPANSION TO THE EXISTING MORDECAI SUBSTATION. THE PROJECT IS LOCATED WITHIN DUKE ENERGY'S MOWED AND MAINTAINED RIGHT OF WAY. THE DISTURBED AREA IS 2.69 ACRES. THE PRIOR USE OF THE SITE IS TRANSMISSION INFRASTRUCTURE AND THE PROJECT WILL NOT CHANGE THE EXISTING LAND USE. PRIOR TO CONSTRUCTION, A DUKE ENERGY CONSTRUCTION CONTRACTOR WILL INSTALL EROSION CONTROL MEASURES TO ENCOMPASS THE ANTICIPATED CONSTRUCTION LIMITS. PREDEVELOPMENT CONDITIONS WILL BE RESTORED AND THE AREA WILL BE STABILIZED PRIOR TO COMPLETION OF CONSTRUCTION. AN AVOIDANCE AND MINIMIZATION OF DISTURBANCE APPROACH HAS BEEN INCORPORATED INTO THE DESIGN OF THE EROSION CONTROL MEASURES BY UTILIZING EXISTING ACCESS POINTS AND STABILIZED RIGHT-OF-WAY ACCESS ROUTES, WHENEVER POSSIBLE EROSION CONTROL MEASURES ARE INDICATED HEREIN FOR PERMITTING USE ONLY BY NCDEQ. THE INITIAL PROJECT DURATION IS ANTICIPATED TO START IN DATE AND BE COMPLETED IN DATE. Protect Data Sheet Primro; arno Dvvvicmmw+t VumrPrnvP I6enntn C ntw • C" Esu:,rt3 p* Fein Saar Af399 a raA . NC 21601 I *110- 2NO ThJr.fLvmmuffttmr.oqRsplet l „Ind appwsrl ba Vie wyer shoot_ of drawings submitted W Lh a Non-Residied4Ual Wilting pen:r ut assocralsd wilts a Site Permit Review. or peffiwN for fan Wartmosat, 'office, anrilcw sammemial uses. GIEKEIRAt. dlaJiF03t111lATte7;`N pa `- e.�.sh a �w�+.+�aiMs� s...aa, �:4�5 -i�er _v��prrierit Nelrlu Pry l:icse �hicai 5utyei�4as°o __ PTDp" Aldl slesi:fl.=wt"N Ix S1parei.Aah*.gro. M"' Ar4xoa4 54a fin aT SubdiveAon caw -w- WaCconly PrWarN lalanfiffcatian Ndmt sq%) (PIN) for each parpall W which these gwidellnesMll apply PIN I -MO W_2 PIAJ YTSJ4r rfit3" PiN#_ 17 7m PIN i "1i 2"5S`i3s what `la Ihtl pl �u t P 2 ❑ A,parlmea:it E Caan ►.3ai>a rare Haapitial 0 k n dtalrstei E] lr clrrs7rrai I:idAdI irg N6istted r lentai I'� on-maidwfm1 llWD � CtfI� —� L r] Rall irm iltwOo''i El Re%idsnhal Ganda 'Moil 17 sch*N El yh oppdng elf Single-famlly €rsald�-illaf ICI �I Tp 9 rlrre n iirarc ,Ic�hW�r Towftouse Chris use, Park, coimmmly centiar..miiaar3'uM grx�+±arrrrrbFiirit: �tiit�' 1rMltter Some of Duke Eery Pr r ,�t is propa;�;i g am Oxpansti 1, of 1114 ekl1illltV Mordecal Subsiation: FOR APARTMEW, S, C 0 : AND TOWN00MES ONLY 1, TOM nkirrihdr wt iomitimiti , I0113. ifto q,:9'od I 2.TOW rrumbwcif rtinnarikratcrandomirmirn�units. 3. Tic W number of, Congrewilipe Cam tax Life Caste DWelfing mits: 4- overwilolo nurnw ui owalu g unft 4VQffl T-3 a1l,'. . ni��r„k, a'! lre�droxim �drie3 YIBi . IAR 46R ur rimm: 6. iOveratl l nigs} paw aary densib as pw zixting da&r:€ts I OEWLOPM l NT TYPfE AND WIT DATA TAO(ftatlla to a# dleve >! es4s ) �ra+tlrl Ilef'�rrf°isrhtl�� 6+ukldlPag tn1`�rtrcl�Iltkra Zonlrg distnrt$ usa in4bl AdIrog(s': If mars Itum orie distract. prwde acreage a[ eaLhr Proposed eq. ft, cd hulidin&t gross. C kedta ttl § s Existing sq, fL of bwildingls) gnme. i Total site saeaw3 2' � ToLd sqft. gm as (exlsllg and p a Fed; Off r0reel perking: Retivired N?A Provided, I`4!.A Proll height ofibuRdIng(s)l GOB% (Ceitfil or Apperaprwbrisss) cam #: BOA (8awrct of Az*ustr nl) case * A -, CI It3 j dbi Use [}*rlgt) e --�E FAR (floor ;aMa aatiplli W. ElwId'png i0. uaim age I ftwe edy Um ? 'yrtS N� •tMroru [Y ICIV Existing impervious surface: STORMWATER INFORMATION acres/square feet Proposed impervious surface: acreslsquare feet Neuse River buffer_ Yes No ❑ I Wetlands: Yes T No Flood Hazard Area: YesE Nol If yes, Alluvial soils: Flood Study_ I FEMA Map Panel #: Total disturbed area: acres/square feet Traffic Control and Pedestrian Plan [TCPED) Notes: • Prior to any work that impacts the right-of-way, closing or detouring of any street, lane, or sidewalk, the contractor must apply for a permit with Right -of -Way Services. Please direct any questions to rightofwayservices@rateighnc.gov. • The street, lane, sidewalk, closure permit is required for any closure on city streets and all NCDOT streets within Raleigh's Jurisdiction. • A permit request with a TCPED Plan shall be submitted to Right -of -Way Services through the City of Raleigh Permit and Development Portal. • Prior to the start of work, the Client shall schedule a Pre -Construction meeting with the Engineering Inspections Coordinator to review the specific components of the approved plan, and ensure all permits are issued. • All TCPED Plans shall comply with all Local, State, and Federal requirements and standards, including but not limited to: o Manual on Uniform Traffic Control (MUTCD); o Public Rights -of -Way Accessibility Guidelines (PROWAG); o American Disability Act (ADA) requirements; o Raleigh Street Design Manual (RSDM). • All public sidewalks must be accessible to pedestrians who are visually impaired and/or people with mobility concerns. Existing and alternative pedestrian routes during construction shall be required to be compliant with the Public Rights of Way Accessibility Guidelines (PROWAG), the ADA Standards for Accessible Design and the Manual on Uniform Traffic Control Devices (MUTCD). • All permits must be available and visible on site during the operation. PROGRESS MORDECAI 115 KV SUBSTATION ENERGY RELIABILITY IMPROVEMENT RALEIGH NORTH CAROLINA LATITUDE: 35.7919 LONGITUDE:-78.6389 ISSUE FOR PERMIT t? i s MORDECAI SITE �'' ,�,. ,��Ii�:�i� Pork 0 hme Ln s� �. eL + d141k. ��� ��q�#"c� sal w•1 �.f - � Pill 9µ012gle _0 --ill r, �. -Pas t . , w a.17P 407�2S, 4 � Cj]NTRACTOR SHALL 1AU711 ( 'NURTH CARIMLINA BNE CALL' (811) OR (1-800-632-4949) AT LEAST 4S HOURS PRIER 'M BEGINNING CaNSTRUCTI[3N OR EXCAV ATIUN Tfl HAVE EXISTING UTILITIES LUCATED, CC�iNTRACTaR SHALL CENT ACT ANY L13CAL UTILITIES THAT PRUIV /BED THEIR OWN LUCATUR SERVICES INDEPENDENT ❑R "NORTH CARULINA ONE CALL`, REPURT MAX DISCREP ANCES T❑ THE ENGINEER IMMEDIATELY , r REV FILE NO. DATE REVISION DRAWN CHECKED APPROVED VICINITY MAP SCALE: NTS ,7 Lukelft. �,, i�.j /ill t Avv, S4~° lir St UJI TraA fraw�n r M ■N1'rA 1T NORTH & JS'OUTH C14ROLLVA ST14 J 1Y14P SHEET LIST: COVER SHEET SHEET 1 EXISTING CONDITIONS PLAN SHEET 2 DEMOLITION PLAN SHEET 3 SITE PLAN SHEET 4 GRADING AND STORM DRAINAGE FLAN SHEET 5 INITIAL EROSION CONTROL PLAN SHEET 6 EROSION CONTROL PHASE 2 PLAN SHEET 7 EROSION CONTROL PHASE 3 PLAN SHEET 8 EROSION CONTROL PHASE 4 PLAN SHEET 9 STORM DRAINAGE PLAN AND PROFILE SHEET 10 ACCESS DRIVES PLAN AND PROFILE SHEET 11 BASELINE PLAN AND PROFILE SHEET 12 SITE DETAILS SHEET 13 SITE DETAILS SHEET 14 STORM DRAINAGE DETAILS SHEET 15 EROSION & SEDIMENT CONTROL DETAILS SHEET 16 EROSION & SEDIMENT CONTROL DETAILS SHEET 17 EROSION & SEDIMENT CONTROL DETAILS SHEET 18 GENERAL NOTES 1. APPROXIMATE STRUCTURE LOCATIONS WERE PROVIDED TO DUKE ENERGY LINE ENGINEER AND ARE FOR REFERENCE ONLY. THESE DRAWINGS SHALL NOT BE USED FOR LINE CONSTRUCTION. 2, BASE DRAWINGS WERE CREATED BY GIS DATA OBTAINED FROM VARIOUS SOURCES, TOPOGRAPHIC SURVEY DATED DATE. AERIAL PHOTOGRAPHY WAS OBTAINED FROM STATE AGENCIES. 3. NOT ALL EXISTING UTILITIES ARE SHOWN. LOCATIONS SHOWN ARE APPROXIMATE, IT IS THE CONTRACTOR'S RESPONSIBILITY TO ACCURATELY LOCATE, BOTH VERTICAL AND HORIZONTAL, EXISTING UTILITIES PRIOR TO THE START OF CONSTRUCTION. THE CONTRACTOR SHALL NOTIFY NC 811 PRIOR TO EXCAVATION. CONTRACTOR SHALL NOTIFY DUKE ENERGY IMMEDIATELY IN THE EVENT OF ENCOUNTERING ANY UNDERGROUND OBSTACLE REQUIRING DEVIATION FROM THE PLAN. COST TO REPAIR DAMAGED UTILITIES SHALL BE BORNE BY THE CONTRACTOR. 4. ALL UTILITIES SHALL BE PROTECTED AND REMAIN ACTIVE UNLESS OTHERWISE NOTED. CONTRACTOR SHALL NOT DISTURB UTILITY POLES, GUYS WIRES, OR ANCHORS WITHOUT PERMISSION FROM DUKE ENERGY. 5. PROJECT IS LOCATED IN THE NEUSE RIVER BASIN. THE PROJECT IS SUBJECT TO STATE -REGULATED BUFFER REQUIREMENTS. 6. SEE SHEET PEN1 FOR EROSION AND SEDIMENTATION CONTROL SEQUENCE AND SEEDING SCHEDULE. 7, STREAMS EXTEND BEYOND THE RIGHT-OF-WAY. APPROPRIATE BRIDGING AND MATTING OF THESE FEATURES IS REQUIRED SHOULD THE CONTRACTOR USE ANY ACCESS ROUTES LOCATED OUTSIDE OF THE RIGHT-OF-WAY. 8. ANY ALTERNATE ACCESS PLANNED BY THE CONTRACTOR SHALL BE APPROVED BY DUKE ENERGY PERMITTING PRIOR TO USE. 9. CONSTRUCTION ENTRANCES ARE SHOWN FOR REFERENCE ONLY. HEAVY MATS MAY BE USED IN LIEU OF ROCK CONSTRUCTION ENTRANCES IF DEEMED SUFFICIENT BY A DUKE ENERGY REPRESENTATIVE. 10. WETLAND MATTING SHALL BE COMPOSITE AND/OR HEAVY DUTY TIMBER/"CRANE" MATS. NO LATTICE OR TWO-PLY MATTING SHALL BE USED IN JURISDICTIONAL WETLANDS AND/OR STREAMS. 11. NO OIL/FUEL-FILLED EQUIPMENT SHALL BE STORED OVERNIGHT WITHIN 125 FEET OF WETLANDS OR SURFACE WATER WITHOUT CONTAINMENT. 12. SITE SHOULD BE "STORM READY" AT THE END OF EACH WORK DAYIWEEK. 13. ANY DAMAGE TO THE TOWN'S PARKING LOT AND GREENWAY TRAIL SHALL BE REPAIRED OR RESTORED TO EQUAL OR BETTER CONDITION. 14. SECURE WRITTEN ACCESS AGREEMENT IS REQUIRED FOR ALL 3RD PARTY ACCESS AND PRIVATE DRIVES NOT INCLUDED IN ROW DOCUMENTATION PRIOR TO BEGINNING CONSTRUCTION. 15. ALL DISTURBED AREAS SHALL BE RESTORED TO SAME OR BETTER CONDITION. PERMANENT GROUND COVER SHALL BE USED FOR STABILIZATION. SITE PERMITTING APPROVAL Water and Sewer Permits (If applicable) The City of Raleigh consents to the connection and extension of the City's Public Sewer System as shown on this plan: The material and Construction methods used for this project shall conform to the standards and specifications of the City's Public Utilities Handbook. City of Raleigh Public Utilities Department Permit # The City of Raleigh consents to the connection and extension of the City's Public Water System as shown on this plan. The material and Construction methods used for this project shall conform to the standards and specifications of the City's Public Utilities Handbook. City of Raleigh Public Utilities Department Permit The City of Raleigh consents to the connection to its public sewer system and extension of the private sewer collection system as shown on this plan. The material and constructions methods used for this project shall conform to the standards and specifications of the City's Public Utilities Handbook. City of Raleigh Public Utilities Department Permit CITY OF RALEIGH — PLANS AUTHORIZED FOR CONSTRUCTION Plans for the proposed use hove been reviewed for general compliance with applicable codes. This {united review, and authorization for construction is not to be considered to represent total compliance with all legal requirements for development and construction. The property owner, design consultants, and contractors are each responsible for compliance with all applicable City, State and Federal laws. This specific authorization below is not a permit, nor shall it be construed to permit any violation of City, State or Federal Law. All Construction must be in accordance with all Local, State, and Federal Rules and Regulations. Electronic Approval: This approval is being issued electronically. This approval is valid only upon the signature of e City of Raleigh Review Officer below. The City will retain a copy of the approved plans. Any work authorized by this approval must proceed in accordance with the plans kept on file with the City. This electronic approval may not be edited once issued. Any modification to this approval once issued will invalidate this approval. City of Raleigh Development Approval City of Raleigh Review officer CITY OF RALEIGH -- PLANS AUTHORIZED FOR CONSTRUCTION Plans for the proposed use have been reviewed for general compliance with applicable codes. This limited review, and authorization for construction is not to be considered to represent total compliance with all legal requirements for development and construction. The property owner, design consultants, and contractors are each responsible for compliance with all applicable City, State and Federal laws. This specific authorization below is not a permit, nor shall it be construed to permit any violation of City, State or Federal Law. Alt Construction must be in accordance with all Local, State, and Federal Rules and Regulations. This opproval of this electronic document is only valid if the document has not been modified and the d;gital signature below is valid: City of Raleigh Development Approval ' SEAL �� 034365 /CK U r1l111111111/1 CONTACTS OWNER: DUKE ENERGY PROGRESS REUBENJONES 401 S. WILMINGTON ST. RALEIGH, NC 27601 PH: (919) 210-2532 FAX: (704) 382-6542 reuben.jones@duke-energy.com The John R. McAdams Company, Inc. 2905 Meridian Parkway Durham, NC 27713 phone 919. 361. 5000 fax 919. 361. 2269 license number: C-0293, C-187 www.mcadamsco.com ENGINEER: MCADAMS PATRICK L. COVIL 2905 MERIDIAN PARKWAY DURHAM, NC 27713 PH: (919) 361-5000 FAX: (919) 361-2269 COVIL@MCADAMSCO.COM (' DUKE ENERGY: PROGRESS 411 FAYETTEMLLE STREET RALEIGH N.C. 27601 TELEPHONE NO. (919) 546-2090 RESPONSIBLE FOR MAINTENANCE REUBEN JONES PH: (919) 210-2532 FAX: (704)382-6542 reuben.jones@duke-energy.com T"r`E MORDECAI 115 KV SUBSTATION ENERGY RELIABILITY IMPROVEMENT 80646S DV 1 Z W 2 W 0 �C G MJ W Q J LLI V LLI Z UJ Z _O F_ Q co Z) CI) L� t-- Q CU W 0 2i