HomeMy WebLinkAboutNCC221671_Site Plan or Location Map_20220429PROJECT NARRATIVE THE PROPOSED GREENSBORO-RANDOLPH MEGASITE (GRMS) PARKWOOD LAYDOWN PROJECT IS AN APPROXIMATELY 6.9-ACRE LAYDOWN AREA TO BE UTILIZED BY DUKE ENERGY CAROLINAS, LLC (DUKE ENERGY) LOCATED IN RANDOLPH COUNTY, NORTH CAROLINA, WEST OF THE GRMS CONSTRUCTION AND JULIAN AIRPORT ROAD. ALL WORK WILL OCCUR WITHIN A DUKE ENERGY OWNED PARCEL AND NORTH OF DUKE ENERGY'S CURRENT PARKWOOD AND TOYOTA TAP TRANSMISSION LINE CORRIDORS. THIS WORK IS SCHEDULED TO BEGIN IN MAY 2022 AND LASTING THROUGH JUNE 2022. AFTER THE LAYDOWN IS CONSTRUCTED, IT WILL BE UTILIZED TO STORE EQUIPMENT AND MATERIALS FOR THREE (3) DUKE ENERGY PROJECTS RELATED TO THE GRMS PROJECT: PARKWOOD 525 KV RELOCATION, TOYOTA TAP 100 KV BUILD, AND THE TOYOTA SUBSTATION WITHIN THE GRMS SITE. THESE PROJECTS WILL UTILIZE THE LAYDOWN FROM JUNE 2022 THROUGH DECEMBER 2023. CLEARING OF EXISTING BRUSH AND TREES WILL BE NECESSARY TO CONSTRUCT THIS LAYDOWN AREA, WHICH WILL CONSIST OF MINOR GRUBBING, GRADING TO MAINTAIN A FLAT TERRAIN, AND INSTALLATION OF GEOTEXTILE AND STONE. PRIOR TO INITIATING TEMPORARY AND PERMANENT CONSTRUCTION PHASES ASSOCIATED WITH THE TRANSMISSION FACILITIES, INCLUDING THIS LAYDOWN, A DUKE ENERGY CONSTRUCTION CONTRACTOR WILL INSTALL EROSION AND SEDIMENT CONTROL MEASURES TO ENCOMPASS THE ANTICIPATED CONSTRUCTION LIMITS. THE LAYDOWN AREA WILL BE CONSTRUCTED IN THREE PHASES AS FOLLOWS: 1. INSTALLATION OF PERIMETER BMPS PRIOR TO CLEARING AND GRUBBING FOR THE CONSTRUCTION OF THE SEDIMENT BASIN AND DRAINAGE DITCHES 2. CLEARING AND GRUBBING OF THE MAIN LAYDOWN AREA 3. GRADING OF THE MAINLAYDOWN (3A) AND INSTALLATION OF GEOTEXTILE AND STONE (313) THERE WILL BE NO CHANGE IN IMPERVIOUS SURFACE AREA FROM PRE- TO POST- DEVELOPMENT CONDITIONS; THIS PROJECT MEETS THE CRITERIA FOR LOW -DENSITY DEVELOPMENT. HOWEVER, PRE-EXISTING CONTOURS WILL BE MODIFIED TO FACILITATE DRAINAGE FROM THE LAYDOWN, CAPTURE AND DIVERT CLEAN WATER, AND MAINTAIN A FLAT SURFACE FOR STORAGE BY DUKE ENERGY. DISTURBED AREAS WILL BE STABILIZED SEQUENTIALLY AS CONSTRUCTION PROCEEDS IN THE THREE -PHASES DESCRIBED ABOVE. AREAS THAT ARE NOT INTENDED FOR FABRIC AND STONE WIL LBE SEEDED AND STABILIZED AT THE END OF EACH WORKDAY. ANY DISTURBANCE INCURRED BY VEHICLE TRAFFIC SHALL BE STABILIZED WITHIN 48 HOURS OR LESS. A GRAELED CONSTRUCTION ENTRANCE WILL BE PROVIDED AT JULIAN AIRPORT ROAD, WHERE INDICATED ON PLANS. THE GRAVELED ENTRANCE SHALL CONSIST OF 6 INCHES MINIMUM 2-IN - 3-IN DIAMETER WASHED BALLAST GRAVEL AND BE IN ACCORDANCE WITH THE MINIMUM DIMENSIONS AS DESCRIBED ON THE PLAN. THE SURFACE OF THE GRAVELED ENTRANCE WILL BE PERIODICALLY TOP -DRESSED AS NEEDED TO PREVENT OFF -SITE MUD AND SEDIMENT TRANSPORT. ANY TRACKING OF SEDIMENT ONTO PUBLIC OR PRIVATE PAVEMENT WILL BE CLEANED BY A CONTRACTOR DOING THE TRACKING. CONSTRUCTION OF ACCESS TYPICALLY CONSISTS OF THE PLACEMENT OF APPROXIMATELY 6-INCHES OF GRAVEL (12-FT-WIDE) ON THE LAND'S SURFACE. THE PLACEMENT OF GRAVEL FOR TEMPORARY ACCESS, IF NEEDED, IS CONDUCTED WITHOUT LAND DISTURBANCE OR OTHER EARTHWORK AND IS CONSIDERED IMMEDIATE STABILIZATION. BASED ON FIELD CONDITIONS, GEOTEXTILE FABRIC MUST BE INSTALLED PRIOR TO PLACING THE GRAVEL. IN UNEVEN TERRAIN, CONSTRUCTION OF THE TEMPORARY ACCESS MAY REQUIRE LIMITED SPOT-BLADING OF THE SOIL IN ORDER TO PROVIDE LEVEL ACCESS FOR PULLING EQUIPMENT OR OTHER SPECIALIZED EQUIPMENT. WHEN SPOT-BLADING IS REQUIRED, BLADED AREAS WILL BE IMMEDIATELY TOP -DRESSED WITH GRAVEL IN ACCORDANCE WITH THE CLEARING AND EROSION CONTROL SPECIFICATIONS. TEMPORARY BMPS (E.G. COMPOST FILTER SOCKS, SILT FENCE, CHECK DAMS, DRAINAGE SWALE, ETC.) ARE DEPICTED IN THE PLAN DRAWINGS AND ARE INCLUDED WITHIN THE LIMITS OF DISTURBANCE (LOD) TO ACCOUNT FOR POTENTIAL LAND DISTURBANCE RESULTING FROM CONSTRUCTION EQUIPMENT WHILE INSTALLING THE BMPS, GRUBBING, AND GRADING. GENERAL NOTES 1. APPROXIMATE STRUCTURE LOCATIONS WERE PROVIDED TO DUKE ENERGY LINE ENGINEER AND ARE FOR REFERENCE ONLY. THESE DRAWINGS SHALL NOT BE USED FOR LINE CONSTRUCTION. 2. BASE DRAWINGS WERE CREATED BY GIS DATA OBTAINED FROM VARIOUS SOURCES. AERIAL PHOTOGRAPHY WAS OBTAINED FROM STATE AGENCIES. 3. NOT ALL EXISTING UTILITIES ARE SHOWN. LOCATIONS SHOWN ARE APPROXIMATE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ACCURATELY LOCATE, BOTH VERTICAL AND HORIZONTAL, EXISTING UTILITIES PRIOR TO THE START OF CONSTRUCTION. THE CONTRACTOR SHALL NOTIFY NC 811 PRIOR TO EXCAVATION. CONTRACTOR SHALL NOTIFY DUKE ENERGY IMMEDIATELY IN THE EVENT OF ENCOUNTERING ANY UNDERGROUND OBSTACLE REQUIRING DEVIATION FROM THE PLAN. COST TO REPAIR DAMAGED UTILITIES SHALL BE BORNE BY THE CONTRACTOR. 4. ALL UTILITIES SHALL BE PROTECTED AND REMAIN ACTIVE UNLESS OTHERWISE NOTED. CONTRACTOR SHALL NOT DISTURB UTILITY POLES, GUYS WIRES, OR ANCHORS WITHOUT PERMISSION FROM DUKE ENERGY. 5. PROJECT IS LOCATED IN THE CAPE FEAR RIVER BASIN AND THE RANDOLPH COUNTY ZONING ORDINANCE STREAM BUFFER. THE PROJECT IS SUBJECT TO STATE -REGULATED BUFFER REQUIREMENTS. 6. SEE SHEET PEN1 FOR EROSION AND SEDIMENTATION CONTROL SEQUENCE AND SEEDING SCHEDULE. 7. ANY ALTERNATE ACCESS PLANNED BY THE CONTRACTOR SHALL BE APPROVED BY DUKE ENERGY PERMITTING PRIOR TO USE. 8. CONSTRUCTION ENTRANCES ARE SHOWN FOR REFERENCE ONLY. HEAVY MATS MAY BE USED IN LIEU OF ROCK CONSTRUCTION ENTRANCES IF DEEMED SUFFICIENT BY A DUKE ENERGY REPRESENTATIVE. 9. NO OIL/FUEL-FILLED EQUIPMENT SHALL BE STORED OVERNIGHT WITHIN 125 FEET OF WETLANDS OR SURFACE WATER WITHOUT CONTAINMENT. 10. SITE SHOULD BE "STORM READY" AT THE END OF EACH WORK DAY/WEEK. 11. SECURE WRITTEN ACCESS AGREEMENT IS REQUIRED FOR ALL 3RD PARTY ACCESS AND PRIVATE DRIVES NOT INCLUDED IN ROW DOCUMENTATION PRIOR TO BEGINNING CONSTRUCTION. 12. ALL DISTURBED AREAS SHALL BE RESTORED TO SAME OR BETTER CONDITION. PERMANENT GROUND COVER SHALL BE USED FOR STABILIZATION. A 03/31/2022 ISSUE FOR PERMITTING REV FILE NO. DATE REVISION CONTRACTOR SHALL N071FY "NORTH CAROLINA ONE CALL" �S11) OR AT LEAST 48 HOURS PR\OR TO BEG\NN1NG CONSTRUCT\ON OR 'EXCAVATION TO HAKE EXIST\NG UT1U- ES LOCATED. CONTRACTOR SHALL CONTACT ANY LOCAL UT1U-V\ES THAJ PRO\J\DED THE\R OWN LOCATOR SERA\CES \NDEPENDEN­V OR "NORTH CAROLINA ONE CALL". REPORT AN`( DISCREPANC\ES TO THE ENGINEER 1MMEDlATELY. ASC BTA DTB DRAWN CHECKED APPROVED W *%ft ENERGY° -,ROLI"VAS PARKWOOD LAYDOWN RANDOPLH COUNTY, NC i TOYOTA 100 KV TAP SITE LOCATION NEW INTERCHANGE AND ROAD RELOCATIONS . il u SITE LOCATION LATITUDE: 35.89 LONGITUDE: -79.65 OLD HWY 421 START OF RELOCATION HWY 421 IPARKWOOD 525 KVI BROWNS MEADOW ROAD VICINITY MAP SCALE: 1 " = 2000' 161 GRMS SITE BOUNDARY END OF PARKWOOD DEMO SECTION RELOCATION �'� G A RD.. e 4Q " Fes s 032595 T. I,�rr�rrpn ut1t���� 03/31/2022 f 1.Tij i n!Z k:. NORTH & SOUTH CAROLINA STATE MAP SHEET LIST: TITLE SHEET SHEET PTL-01 EROSION & SEDIMENT CONTROL NOTES SHEET PEN-01 EROSION & SEDIMENT CONTROL NOTES SHEET PEN-02 EROSION & SEDIMENT CONTROL NOTES SHEET PEN-03 EROSION & SEDIMENT CONTROL SHEET LAYOUT EROSION & SEDIMENT CONTROL PLAN - PHASE 1 EROSION & SEDIMENT CONTROL PLAN - PHASE 2 EROSION & SEDIMENT CONTROL PLAN - PHASE 3A EROSION & SEDIMENT CONTROL PLAN - PHASE 3B EROSION & SEDIMENT CONTROL DETAILS EROSION & SEDIMENT CONTROL DETAILS EROSION & SEDIMENT CONTROL DETAILS EROSION & SEDIMENT CONTROL DETAILS EROSION & SEDIMENT CONTROL DETAILS EROSION & SEDIMENT CONTROL DETAILS MIGRATORY BIRD HOTLINE SHEET PLA-01 SHEET P1 SHEET P2 SHEET P3A SHEET P3B SHEET PED-1 SHEET PED-2 SHEET PED-3 SHEET PED-4 SHEET PED-5 SHEET PED-6 STATE AND FEDERAL LAWS PROTECT ALL SPECIES OF NATIVE BIRDS FOUND THROUGHOUT THE DUKE ENERGY SERVICE AREA. INTERACTIONS OF BIRDS WITH GENERATING FACILITIES, TRANSMISSION AND DISTRIBUTIONS, SUBSTATIONS, OTHER STRUCTURES AND EQUIPMENT, AND OPERATIONS ARE POTENTIALLY HARMFUL OR FATAL TO BIRDS. DUKE ENERGY OPERATES THESE 24-HOUR MIGRATORY BIRD HOTLINES TO ASSIST EMPLOYEES AND CONTRACTORS WITH RELATED INCIDENTS THAT OCCUR DURING WORK ACTIVITIES. CAROLINAS:800.573.3853 FLORIDA:727.386.3084 MIDWEST:317.430.4497 SPILL REPORTING HOTLINE IN ORDER TO ENSURE THE PROTECTION OF HUMAN HEALTH AND THE ENVIRONMENT, FEDERAL AND STATE LAWS REQUIRE THAT CERTAIN TYPES OF SPILLS AND UNPERMITTED RELEASES BE REPORTED TO THE PROPER REGULATORY AGENCIES AS SOON AS POSSIBLE FOLLOWING IDENTIFICATION. IMMEDIATELY NOTIFY YOUR SUPERVISOR AND THE FIELD ENVIRONMENTAL/EHS PROFESSIONAL WHEN A SPILL OR UNPERMITTED RELEASE IS DISCOVERED. IF YOU ARE UNABLE TO REACH THE FIELD ENVIRONMENTAL/EHS PROFESSIONAL, CONTACT ONE OF THE DUKE ENERGY SPILL REPORTING HOTLINES AT: CAROLINAS & MIDWEST: 800.527.3853 FLORIDA: 866.769.1266 CONTACTS OWNER: DUKE ENERGY CAROLINAS PERMITTING SPECIALIST 526 SOUTH CHURCH ST. CHARLOTTE, NC 28202 PH: (760) 445-3332 Jeffery,Goto@duke-energy.com HDR Engineering Inc. of the Carolinas 440 S. Church St Suite 1000 Charlotte, INC 28202-2075 F)l 704.338.6700 N.C.B.E.L.S. License Number F-0116 ENGINEER: HDR Engineering Inc. David T. Baker 440 South Church St. Suite 1000 Charlotte, NC PH: (704) 338-6724 David.Baker@hdrinc.com DUKE TITLE IV ENERGY. CAROLINAS 526 SOUTH CHURCH STREET CHARLOTTE N.C. 28202 TELEPHONE N0. (704)382-2741 RESPONSIBLE FOR MAINTENANCE: Eric Shook PH: (336) 416-9468 eric.shook@duke-energy.com PARKWOOD LAYDOWN TITLE SHEET DRAWING SHEET PTL-01