HomeMy WebLinkAboutNCC221617_ESC Approval Submitted_20220426ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
BRIAN WRENN
Director
NORTH CAROLINA
Environmenta[ Quality
April 12, 2022
LETTER OF APPROVAL
Mitchell County Board of Education
ATTN: Ms. Kim Hodshon
72 Ledger School Rd.
Bakersville, NC 28705
RE: Project Name: MITCHELL HIGH SCHOOL SYNTHETIC TURF FIELD PROJECT
Acres Approved: 2.4
Project ID: MITCH-2022-002
County: Mitchell
City: Bakersville
Address: Ledger School Rd.
River Basin: French Broad
Stream Classification: Cranberry Branch - Class C, Trout
Submitted By: Mr. Kevin Herring, P.E.
Date Received by LQS: April 11, 2022
Plan Type: Express - Recreation
Dear Ms. Hodshon,
This office has reviewed the subject erosion and sedimentation control plan and hereby
issues this Letter of Approval. This plan approval shall expire three (3) years following the
date of approval, if no land -disturbing activity has been undertaken, as is required by Title
15A NCAC 413.0129. Should the plan not perform adequately, a revised plan will be required
(G.S. 113A-54.1)(b).
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the
NCGO10000 Construction General Permit. After the form is reviewed and found to be
complete, you will receive a link with payment instructions for the $100 annual permit fee.
After the fee is received, you will receive the COC via email. You MUST obtain the COC prior
to commencement of any land disturbing activity. The eNOI form may be accessed at
deq.nc.gov/NCG01. Please direct questions about the eNOI form to Paul Clark at
Paul.clark@ncdenr.gov. If the owner/operator of this project changes in the future, the new
responsible party is required to apply for his/her own COC.
ArD ��� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778
NpI11li GAllGlkryA ~
9eP�Nncnt o1 EnhronmEnlal P91� �� 828.296.4500
Letter of Approval
ATTN: Ms. Kim Hodshon
April 12, 2022
Page 2 of 3
Title 15A NCAC 413.0118(a) and the NCG01 permit require that the following documentation
be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance -oriented,
requiring protection of existing natural resources and adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control
plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of
1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions
to the plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and
State water quality laws, regulations, and rules. In addition, local city or county ordinances
or rules may also apply to this land -disturbing activity. This approval does not supersede
any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided
in the Financial Responsibility Form, which you provided. This permit allows for a land -
disturbance, as called for on the application plan, not to exceed the approved
acres. Exceeding the acreage will be a violation of this permit and would require a revised
plan and additional application fee. You are requested to file an amended form if there is any
change in the information included on the form. In addition, it would be helpful if you notify
this office of the proposed starting date for this project. Please notify us if you plan to have
a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
,)�� ,
�✓
Fred Walker, P.E.
Express Engineer
Land Quality Section
Letter of Approval
ATTN: Ms. Kim Hodshon
April 12, 2022
Page 3 of 3
Enclosures: Certificate of Coverage
NPDES NCGO1 Fact Sheet
ec: Mr. Kevin Herring, P.E. (kevin@kevinherringen ineering.com)
Ms. Shawna Riddle — NCDEQ LQS (shawna.riddle@ncdenr.gav)
Mr. Landon Davidson, P.G. — NCDEQ-DWR (landon.davidson@ncdenr.gov)
Ms. Amy Annino — NCDEQ-DWR (amy.annino@ncdenr.gov)
cc: Regional Office file
CD
rr o ora o
U O oo�
C O O C
A� T� C = n C r c.1 • ,r .
V1 CD m m <D
O ¢
CD CD
01
rD
OW
c� Z
EAT-
7.0
OM
S.
W—d
oCDO *•
7
F4 w+.