Loading...
HomeMy WebLinkAboutNCC221612_Site Plan or Location Map_20220426SURVEY LEGEND Q IPF --- IRON PIPE FOUND p CMF - - - CONCRETE MONUMENT FOUND X CP - - - COMPUTED POINT DIST - - - DISTURBED R/W - - - RIGHT-OF-WAY SN --- SIGN S❑ ELP - - - ELECTRICAL PEDESTAL ❑ FOV - - - FIBEROPTICS VAULT s SIG - - - SIGNAL BOX ❑F FOM - - - FIBEROPTICS MARKER ❑ TEV - - - TELECOMMUNICATION VAULT RCP - - - REINFORCED CONC. PIPE PVC --- POLYVINYL CHLORIDA PIPE C+G - - - CURB & GUTTER EP - - - EDGE OF PAVEMENT HC - - - HANDICAP LP - - - LIGHT POLE ® GV - - - GAS VALVE SELF INSPECTION NOTICE: EX SEWER MANHOLE EX STORM MANHOLE EX STORM INLET EX WATER MANHOLE EX WATER VALVE EX FIRE HYDRANT NOTIFICATION OF LAND RESOURCES SEDIMENT AND EROSION CONTROL SELF -INSPECTION PROGRAM: THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN 2006 TO REQUIRE THAT PERSONS RESPONSIBLE FOR LAND -DISTURBING ACTIVITIES INSPECT A PROJECT AFTER EACH STAGE OF THE PROJECT TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. RULES DETAILING THE DOCUMENTATION OF THESE INSPECTIONS TOOK EFFECT OCTOBER 1, 2010. THE SELF -INSPECTION PROGRAM IS SEPARATE FROM THE WEEKLY SELF -MONITORING PROGRAM OF THE NPDES STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES. THE FOCUS OF THE SELF -INSPECTION REPORT IS THE INSTALLATION AND MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES ACCORDING TO THE STAGE OF THE PROJECT. AND CONTINUED UNTIL PERMANENT GROUND COVER IS ESTABLISHED IN ACCORDANCE WITH NCGS 113A-54.1 AND 15A NCAC 4B.0131. THE SELF -INSPECTION REPORT FORM IS AVAILABLE AS A PDF FORM FROM http://deg.nc.gov/about/divisions/energy-mineral-land-resources/erosion-sediment-control/forms IF YOU HAVE QUESTIONS OR CANNOT ACCESS THE FORM, PLEASE CONTACT THE EMLR OFFICE AT (919)707-9200 FOR ASSISTANCE. jr i ® 3' TOWN OF DRIVEWAY #2 CARY UTILITY l e EASEMENT \® B.M. 2012 P�D36�� 3 S 45 h � SO � ®�- ' 34g ,O]\ CP ni '347-15R 346 NPDES Stormwater Discharge Permit for Construction Activities (NCG01) 1 C�'►CA11'1 - - - - - LOD - TOTAL LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE AND - - - - - LOD/LOC - CONSTRUCTION - LOC LIMITS OF CONSTRUCTION - - - - WETL LIMITS OF WETLANDS ...... - - EXISTING PUBLIC EASEMENT PROPOSED PUBLIC EASEMENT -� EXISTING TREE LINE - - - - -SS EXISTING SANITARY SEWER - - - - -w EXISTING WATER LINE - -SD EXISTING STORM DRAIN EROSION CONTROL LEGEND SF SF TPF TEMPORARY SILT FENCE TEMPORARY DIVERSION DITCH TREE PROTECTION FENCE GRAVEL BAG INLET PROTECTION SILT FENCE OUTLET GRADING NOTES 1. ESTABLISHMENT OF PERMANENT GROUND COVER WILL BE ESTABLISHED IN 15 WORKING DAYS OR 90 CALENDAR DAYS, WHICHEVER IS SHORTER. 2. CUT AND FILL SLOPES (2:1) OR GREATER SHALL BE STABILIZED WITH PERMANENT SLOPE RETENTION DEVICES OR A SUITABLE COMBINATION OF PLANTINGS AND RETENTION DEVICES. SLOPES GREATER THAN (3:1) SHALL BE STABILIZED WITH VEGETATION THAT REQUIRES MINIMAL MAINTENANCE, NOT INCLUDING TURF GRASS. WEEPING LOVE GRASS, RED FESCUE OR OTHER APPROVED VARIETY. 3. TREE PROTECTION FENCING SHALL BE INSTALLED AND INSPECTED BEFORE GRADING PERMIT IS ISSUED. 4. GRADING PERMIT WILL NOT BE ISSUED UNTIL THE TOWN OF CARY HAS RECEIVED NOTIFICATION FROM THE ECOSYSTEM ENHANCEMENT PROGRAM OR AN APPROVED NUTRIENT OFFSET BANK THAT A RECEIPT HAS BEEN ISSUED TO THE DEVELOPER AND THE LOCAL GOVERNMENT STATING THE NITROGEN BUY DOWN HAS BEEN COMPLETED. ISSUED FOR CONSTRUCTION NOTES: 1. ALL CONSTRUCTION SHALL BE DONE IN ACCORDANCE WITH ALL TOWN OF CARY, WAKE CO., NCDOT, MUTCD STANDARDS AND SPECIFICATIONS. 2. ABSOLUTELY NO CONSTRUCTION/WORK OF ANY KIND TO BE PERFORMED IN THE MORRISVILLE PKWY RIGHT-OF-WAY UNTIL NCDOT 2-PARTY ENCROACHMENT & NCDOT DRIVEWAY PERMITS HAVE BEEN ISSUED, EXCEPT FOR PROVIDING A TEMPORARY CONSTRUCTION ENTRANCE AT DRIVEWAYS #1 & #3 INTO THE DEVELOPMENT. REFER TO PLAN SHEETS C-5.4 AND C-5.5 FOR NUMBERED DRIVEWAYS. LIMITS OF � EROSION CONTROL MAINTENANCE SCHEDULE 1. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY RUN-OFF PRODUCING RAINFALL, BUT IN NO CASE LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED. 2. SEDIMENT WILL BE REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN IT REACHES HALF CAPACITY OF THE FENCE. THE SEDIMENT FENCE WILL BE REPAIRED AS NECESSARY TO MAINTAIN A BARRIER. 3. ALL SEEDED ARES WILL BE FERTILIZED, RE -SEEDED AS NECESSARY, AND MULCHED ACCORDING TO SPECIFICATIONS IN THE VEGETATIVE PLAN TO MAINTAIN A VIGOROUS, DENSE VEGETATIVE COVER. 4. AFTER CONSTRUCTION, THE DEVELOPER WILL MAINTAIN ALL PERMANENT EROSION CONTROL DEVICES IN ORDER TO PREVENT ACCELERATED EROSION. 5. SILT FENCE OUTLETS WILL BE ADDED ALONG THE SILT FENCE AT ALL LOW POINTS AS NEEDED BASED ON FIELD CONDITIONS. 6. TREE PROTECTION FENCE SHALL BE MAINTAINED ON THE SITE UNTIL ALL SITE WORK IS COMPLETED AND THE FINAL SITE INSPECTION IS SCHEDULED PRIOR TO THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY (CO). THE FENCING SHALL BE REMOVED IMMEDIATELY PRIOR TO THE FINAL SITE INSPECTION FOR THE SITE. 7. TREE PROTECTION FENCING SHALL NOT BE MOVED AND THERE SHALL BE NO ENCROACHMENT INTO SUCH PROTECTED AREA(S) WITHOUT WRITTEN AUTHORIZATION OF THE TOWN'S ZONING COMPLIANCE STAFF. ANY ACTIVITY (LANDSCAPING, FENCING, OR UTILITY INSTALLATION) SHOWN ON THE APPROVED PLANS IN A TREE PROTECTION AREA, SHALL ALSO NOT OCCUR WITHOUT WRITTEN AUTHORIZATION FROM THE TOWN'S ZONING COMPLIANCE STAFF. ANY UNAUTHORIZED ENCROACHMENT OR DISTURBANCE WITHIN THE BOUNDARIES OF A TREE PROTECTION AREA SHALL AUTOMATICALLY RESULT IN FINES AND THE REPLACEMENT OF ANY DAMAGED VEGETATION N ACCORDANCE WITH THE LAND DEVELOPMENT ORDINANCE. 8. A TURBIDITY CURTAIN MAY BE REQUIRED TO BE INSTALLED BY THE DEVELOPER IF WARRANTED BY DOWNSTREAM IMPACTS. TOTAL DISTURBED AREA = ±7.759 AC. - CONSTRUCTION (� - L �- 4� - = rn� i00�1IG01W NCDENR/Division of Energy, Mineral and Land Resources STABILIZATION TIMEFRAMES (Effective Aug. 3, 2011) SITE AREA DESCRIPTION STABILIZATION TIMEFRAME EXCEPTIONS Perimeter dikes, swales, ditches, slopes 7 days None High Quality Water (HQW) Zones 7 days None Slopes steeper than 3:1 7 days If slopes are 10' or less in length and are not steeper than 2:1, 14 days are allowed. �\ Slopes 3:1 or flatter 14 days 7 days for slopes greater than 50' in length. !� All other areas with slopes flatter than 4:1 14 days None, except for perimeters and HQW Zones. W /�(TYP.) - I - - - - - - LOB RK/�� LOC -j \ \ LIMITS OF RR�SV W pLE RIW = DRIVEWAY #3 PUBLIC25' - DISTURBANCE O v eR1ABLE- - _ a�ioo� �- - 00-ilao� - - - \ - - - - OD ® \ (TYP.) ,,., .... LINE TABLE LINE LENGTH DIRECTION L5A 28.26 N 89002'48" E L10 59.87' N53024'08"E L11 100.08' S83048'01 "E L12 10.22' S89015'54"E L13 85.02' S89015'54"E L14 25.98' S84022'13"E L15 108.23' S89026'23"E L16 50.21' S47043'33"E CURVE TABLE CURVE LENGTH RADIUS BEARING CHORD C8 126.04' 1423.35' N69043'01 "E 126.00 C9 111.47' 13699.50' N89019'59"E 111.47 EX. RIPARIAN BUFFER - ZONE 2 (TYP.) EX. RIPARIAN BUFFER - TOWN OF CARY URBAN TRANSITION BUFFER (TYP.) TOWN OF CARY URBAN TRANSITION BUFFER (TYP.) Ll- �\ \ 1-� TABLE 04100 SHOULDERS, SIDE DITCHES. SLOPES for Slo es Between 2:1 and 3:1 Date TVpe Planting Rate Mar 1 - June 1 Sericea Lespedeza (scarified) and 50 Ibs.facre Mar 1 - Apr 15 Add Tall Fescue or 120 lbs./acre Mar 1 - June 30 Add Weeping Lovegrass or 10 Ibs.facre Mar 1 - June 30 Add Hulled Common Bermuda rass 25 Ibs.facre June 1 - Sept 1 "'Tall Fescue and ***Browntop Millet or ***So humSudan H brids 120 lbs./acre 35 lbs./acre 30 Ibs./acre Sept 1 -Mar 1 Sericea Lespedeza (unhulledfunscarified) and Tall Fescue 70 lbs./acre 120 lbs./acre Nov 1 -Mar 1 Add Abruzzi Rye 25 lbs./acre TABLE 04200 SHOULDERS, SIDE DITCHES, SLOPES For Slo es 3:1 and Flatter Date Tvoe Plantina Rate Aug15 - Nov 1 Tall Fescue 300 lbs./acre Nov 1 -Mar 1 Tall Fescue and Abruzzi Rye 300 Ibs.facre Mar 1 - Apr 15 Tall Fescue 300 IbsJacre Apr 15 - June 30 Hulled Common Bermuda rass 25 lbs./acre July 15 -Aug 15 Tall Fescue and ***Browntop Millet or ***Sorghum- udan Hybrids 35 Ibs.facre Notes: Consult Stormwater Management Engineer or Natural Resources Conservation Service (NRCS) for additional information concerning other alternatives for vegetation of denuded areas. The above vegetation rates are those which do well under local conditions; other seeding rate combinations may be possible, but must be approved by the Engineer. ***Temporary - Reseed according to optimum season for desired permanent vegetation. Do not allow temporary cover to grow over 12 inches in height before mowing to keep fescue from being shaded out. 50 CM 00 0 a Z CONSTRUCTION SEQUENCE PHASE 3 1. REFER TO SHEET C-5.2 AND C-5.3 IN THIS PLAN SET FOR PHASE 2 E&S OPERATIONS PRIOR TO BEGINNING THIS CONSTRUCTION SEQUENCE AND INSTALLATION OF MEASURES ON THIS PLAN SHEET. 2. CONTRACTOR TO RE-ESTABLISH TEMPORARY DIVERSION DITCHES, IF NEEDED, TO ENSURE POSITIVE DRAINAGE AT THE END OF EACH WORKING DAY PER THE DETAIL E7 ON SHEET D-4.0. 3. CONTINUE BRINGING THE SITE TO FINAL GRADES, INSTALLING REMAINING UTILITIES AND RETAINING WALLS AT THE SAME TIME AS NECESSARY. INSTALL CURB AND GUTTER, CABC STONE, AND SIDEWALK IN ALL HARDSCAPE AREAS PER C-2.0 WITHOUT IMPACTING THE SKIMMER BASIN. 4. SKIMMER BASIN 1 MUST REMAIN IN OPERATION UNTIL SUCH TIME THAT THE SITE UPSTREAM OF THE DEVICE IS STABILIZED AND THE NEW STORMWATER CONVEYANCE SYSTEM IS INSTALLED AND OPERATIONAL. 5. AS PERMANENT STORMWATER PIPES AND STRUCTURES ARE INSTALLED, INSTALL INLET PROTECTION AND PLUG THE PIPES AT CB-E1 AND CB-131 UPSTREAM OF THE UNDERGROUND DEVICE UNTIL SUCH TIME THAT SKIMMER BASIN 1 IS REMOVED AND THE MAJORITY OF THE SITE IS STABILIZED. PERIODICALLY OR AFTER LARGE RAIN EVENTS, PUMP OUT WATER AND SEDIMENT INTO SILT BAG AND DISPOSE OF APPROPRIATELY. 6. CONTACT TOWN OF CARY INSPECTOR FOR INSPECTION AND APPROVAL TO REMOVE SKIMMER BASINS.ONCE BASIN REMOVAL HAS BEEN APPROVED AND TEMPORARY PLUGS HAVE BEEN INSTALLED IN STRUCTURES UPSTREAM, INSTALL THE UNDERGROUND STORM DEVICES PER THE DETAILS AND SPECIFICATIONS WITHIN THESE PLANS. CONTRACTOR TO FOLLOW MANUFACTURER RECOMMENDATIONS FOR TRANSPORT AND INSTALLATION OF DEVICE. DURING INSTALLATION THE CONTRACTOR SHALL ALSO COORDINATE THE FOLLOWING: • SCHEDULE GEOTECHNICAL TESTING FOR SUBGRADE TESTING BEFORE PLACING THE DEVICE. • SCHEDULE SURVEYOR TO BE PRESENT TO VERIFY AND CAPTURE THE ELEVATIONS FOR BOTTOM OF THE DEVICE, TOP OF DEVICE, AND INVERTS AS SHOWN IN THESE PLANS. • DOCUMENT INSTALLATION STEPS WITH PHOTOS FROM START TO FINISH. • PROVIDE THE ABOVE INFORMATION TO THE ENGINEER (PABST DESIGN GROUP) FOR THE PURPOSE OF RECORD DRAWINGS AND VERIFICATION OF COMPLIANCE WITH DESIGN. 8. ONCE WESTERN SHARED ACCESS DRIVE ENTRANCE IS CONSTRUCTED, CONTRACTOR SHALL MAINTAIN EROSION CONTROL ACROSS THE WESTERN SHARED ACCESS ENTRANCE USING COMPOST SOCK OR EQUIVALENT UNTIL SITE IS COMPLETELY STABILIZED. 9. CUT AND FILL SLOPES WILL BE STABILIZED WITHIN 14 DAYS OF ANY PHASE OF GRADING. (SEE STABILIZATION CRITERIA ON THIS SHEET). 10. INSTALL CURB AND GUTTER, CABC STONE, PAVEMENT AND SIDEWALK IN ALL HARDSCAPE AREAS THAT HAVEN'T BEEN COMPLETED YET. 11. STABILIZE SITE AS AREAS ARE BROUGHT UP TO FINISH GRADE WITH VEGETATION AND PAVING. ESTABLISH GROUND COVER ON DENUDED AREAS WITHIN FOURTEEN DAYS (14) DAYS OF COMPLETION OF PROJECT. 12. IF IT IS DETERMINED DURING CONSTRUCTION THAT SIGNIFICANT SEDIMENT IS LEAVING THE SITE, DESPITE PROPER IMPLEMENTATION AND MAINTENANCE, THE CONTRACTOR IS OBLIGATED TO TAKE ADDITIONAL CORRECTIVE ACTION. 13. THE CONTRACTOR SHALL INSPECT AND MAINTAIN THE EROSION CONTROL DEVICES SO THEY CONTINUE TO FUNCTION PROPERLY. 14. BEFORE REMOVAL OF PLUGS TO ALLOW FOR THE NEW STORM CONVEYANCE SYSTEM TO FLOW DOWNSTREAM, THE NEW SYSTEM SHOULD BE FLUSHED AND SEDIMENT PUMPED OUT AND PROPERLY DISPOSED OF. SCHEDULE FINAL INSPECTION OF DEVICES FOR COMPLIANCE 15. INSTALL PLUNGE POOL PER THE DETAILS AND SPECIFICATIONS WITHIN THESE PLANS AND STORMWATER DESIGN MANUAL. 16. FINE GRADE THE FINAL PORTION OF THE SITE. SEED OR OTHERWISE STABILIZE ANY RESULTING BARE AREAS. 17. MAINTAIN ALL REMAINING SOIL AND EROSION CONTROL MEASURES UNTIL PERMANENT GROUND COVER IS ESTABLISHED. 18. REQUEST FINAL APPROVAL BY TOWN OF CARY EROSION CONTROL OFFICER. IF APPROVED, CONTRACTOR MAY REMOVE ALL REMAINING TEMPORARY EROSION/SEDIMENT CONTROL DEVICES AND STABILIZE THESE AREAS. GENERAL NOTES 1. ALL DRAINAGE EASEMENTS SHALL REMAIN CLEAR FROM ANY CONSTRUCTION. 2. DISTURBANCE LIMITS SHALL NOT ENCROACH IN TREE COVERAGE AREAS AND ARE AT LIMITS OF GRADING. 3. ANY AREAS ON SITE THAT ARE SLOPED AT 2:1 OR STEEPER, CONTRACTOR IS TO USE APPROVED GEOTEXTILE FABRIC MATTING TO STABILIZE SLOPE. OTHER APPROVED METHODS MAY BE ACCEPTABLE UPON APPROVAL OF ENGINEER 4. UNLESS OTHERWISE NOTED, ALL EXISTING TREES TO REMAIN AND BE UNDISTURBED. SHOULD DAMAGES OCCUR TO EXISTING TREE OR SHRUB, PLANT WILL BE REPLACED IN KIND. 5. STREETS IN FRONT OF THE PROJECT WILL BE KEPT CLEAN AT ALL TIMES OR A WASH STATION WILL BE REQUIRED. 6. CONSTRUCTION ENTRANCES MUST BE MODIFIED TO ACHIEVE ADA COMPLIANCE WHERE APPLICABLE. NOTE(s): REFER TO THE TOWN OF CARY SEEDING SCHEDULE ON THIS SHEET AND D-4.2. GRAPHIC SCALE 0 25 50 100 ( IN FEET) 1 inch = 50 ft. 200 Application Approved by. Development Review Committee 20OP-10255 09/21/2021 Town of Cary Development Services In LO N O r r ry a m 0 rT - U r N m N cn `- O C 2 z u w N +L W `o u lin Z u O LM Z U en m o V cn It C 00 rV l` 4 y X InT I C a LL 1� .& C v LU Co a� ;___4 o+ M� o °i 0 o r a I� U J z o 00 00� F_ N O U N Z Li ofw N w CD > z�¢ Cn w of 0Cn O N Z N W r U O U O � O N Z w O Z ��.> z Q �Q z 'n �c w U Cn w w 0 U U U 0 a- Q 00 = W U U Q J a_m n Cn �� a_ a_ �CD a_d o'w Z M Q Z W H cc V Q J 2 cc Z Z ZZa W J LU Y OJ J O cc W >: W 0 Z O Q U LU P-� cc ccO In W N &Ar �y • ar :9 � :t uz{11 U 'Col: u1 S W (/) (32: C.9� �r .0 J O� a'••...... 9 w N _ C< �rn�v°D U H H H O cn Z Z Z t > Lu 2 2 2 O LJ 2 2 2 a O O O U U U U Z U U U C9 O O O o n = w w w w a a a a 0 0 0 0 w w w w rn T T > > > > w w w w DRAWING SHEET C-5.4 PROJECT NUMBER 490-19