Loading...
HomeMy WebLinkAboutNCC221587_ESC Approval Submitted_20220425r SIM ROY COOPER ~ Governor 'r�n 4 ELIZABETH S. BISER 7 Secretary BRIAN WRENN NORTH CAF OIANA Director fnriranwRial Qawhly April 18, 2022 LETTER OF APPROVAL WITH MODIFICATIONS Duke Energy Carolinas, LLC ATTN: Randy Veltri, Director of Transmission Permitting 526 South Church Street, EC09Q Charlotte, NC 28202 RE: Project Name: Wilkes Tie Acres Approved: 25.2 Project ID: WILKE-2022-013 County: Wilkes City: Wilkesboro Address: River Rd River Basin: Yadkin-PeeDee Stream Classification: C Submitted By: Duke Energy Carolinas, LLC Date Received by LQS: March 22, 2022 Plan Type: New Dear Mr. Veltri: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this Letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. voreh [x�iina [kpr7n.�ne dinrxarw!n[r� Q,..dn, [�mmon of [nr�. I.�m�ral and land R{'�purrNy 1M4ela, Sake, Rao.wl Cffh i 1 450 Harr+ ► S R.-d Seal, Xk) 1 YL —1— 1-kr Vnr 1h 474-Ana TMI ill, 7-h QW Letter of Approval with Modifications Duke Energy Carolinas, LLC April 18, 2022 Page 2 of 3 Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, Digitally signed by Brett Brett Bel I Dalte:2022.04.18 12:00:04 -04'00' Brett Bell, EIT Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NCG01 Fact Sheet cc: Randy Veltri of Duke Energy Carolinas, LLC (via email) Jeffery Goto, P.E. of Duke Energy Carolinas, LLC (via email) WSRO file Letter of Approval with Modifications Duke Energy Carolinas, LLC April 18, 2022 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Wilkes Tie Project ID: WILKE-2022-013 County: Wilkes Modifications pursuant to applicable North Carolina General Statutes and/or Regulations: This ESC plan was approved based on information submitted via E-mail to Brett Bell, EIT on April 13, 2022. For inspection purposes, one hard copy of revised plans reflecting the E- mailed information must be delivered to this office by May 2, 2022, or prior to the beginning of construction, whichever date is earlier. Please reference Project Number WILKE-2022- 013 in your cover memo. [15A NCAC 4B .0107(c)] Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities