Loading...
HomeMy WebLinkAboutNCC221563_Site Plan or Location Map_202204220 ui ry H W Q Q J Q U U1 J LL O ry a ob ■ FA a IL (_ ,y 1 % It At a • ? J +T �, • w a Al "-"1►= _-r !:7,f'. '� 11,f''--•'"•_'ti,__ \.�AD UNT Vi, ti'``-_, ti, ,' 1 % ,r-•-r'. f �,_ .td'! i t "�t'iC 1u i7'�'sc,, PROP. STORAGE � I a■ ' '.r a � s '�s` w. rnu ♦ (•_, ? -' , ::gt .sjl- it i!i BUILDING SITE�� {-'- • •= n /( V 4 1 M 11 lS �f s �'� ! • i`[ 1 F' 1 �F y/'r" 1 f19 • \ 1 , I ♦ r S f .=x;:: , is ;! • Clu►� 1f ........ "-`�� t • ' . \ ` i .,. s.. I, r,,w. ■ 111:.r 1 11.3 I `"--,J `'" �� � '`;, '� , • � � ' * -.,_',,;• ■ Via• r �3`��� fNi{ ! i' _ �- 3♦ ''ti\ i• • ■ ■ jj( �,..rI t ttl!lNtt dI { 1 � r,. ` I • M • � � � • / `�, • - -- • •_ .. ,per!'. - f uR Cllti! III+ !1 } ' r--`J•� n �''r�`t� • +` . • ♦•♦ �f '` Drive-in": �, ' , f; ,�aa l ' .f Y_ = l `, ` •� . ; • Th ea ter { 1 f 1 1� ♦i /i w TRACE - ~ • orial i \� i �� • i% ` - ,' i� to ark fl j� ! N.... ,• ILL � y �• i � { � (� �,�^yy � � / ,r� �y il C r, % � l,/ \', A'--'`'/ �r � 1• , "^•"--.d�� _ MINI } _ � ..`w..,, ' w.r✓ r- i -vim � � _ � 7",. S'i y�,�j _ // _may iM t JI- 4 1g ■ filtration Y Ts !!!1 ~~~ r_.... W • ---1 ' f Plant _... ; (� -� f 1 q• �y I •ti r� ", �` 'B M/ two HA Y E11L , 1 a ?^ r- - - - -- - :.. .: ':» .....:... . ::.'•_'r:.:r. • IB' � sty ■ i r,L ■ ..,. II \ •, " � t,:. _,...�, :,: �:.• .; i:'• . L... fit' ��{_ _ , ■ s ti :%i'e.::.:.1•:.:ti ,.' / , f V' n l �:: s,. i ;V.:ci5=•. .. ; ,.. til`1°;,�r.c. : a� :. z is (- lYl1t � `"OUN -A ' 1 ::.:.:.: .... . :... INN!Lilincrliiii • flip �+' 1.......�; �,:•..'::.. :^xr« ,' f •� � .:iii•ix '!per• � _ a iYr' :Z' '=: i'....; t•:.: Iq ti `.i:::'.NR":R , -" f !N 4Kk:, v .� :r:::.: r {t_-=- •H cif ., : ; _ , ...,,a.• . ,. xs uwz�+:.. '. - = psi? L +il °tis .Itt!!.:::,::: , � � _. _ ..� ' . ,, .: ; ? ,. �....,...'..;Y^ y�iU.i:!t• • '^- a' ` i ! 4 1 � !fllln '1 i{ i _ �� .. !IN4�ttir ...;.. .,.::'t. ;., ti.''..''..':tt': �." • fail"'%.":::. `:1 11:Ei11NiEil:H. "`-' � � .. ` v � il'��'I!I' �•I � f{i. r .i - I{II: !a! � �.� r ..'i' � F: Iii' . 4,. : 5.' 111•tn �. nl ' �"� 'r: e'i r :`fix _ I :::: n:i ! •;i' irl n - %� .... ... <: :..».. ;. ., r.,:' .'�•:. .: •.-• .:.:.:>:.,:..,.,.. „•- •. Ili!!!Illifl.r.11.!L n_!:�I Z ti � Y ;..., !t Built! I _311,11 I .. ill S 3:; :. �+'+�*;. .: .• `_r r� ;� ■ • ........... ::.II•:IIIII11111 11.Ly,i!-s sz....; i'- v .::.. ::: ::• ii:::: ' -, 7 �:L. c;;a.: i`_•';. +:-..,••.: -::rlm tx: : I. 11�!i!1 ! e! '. .v PROP. SPOIL AREA SITE Fes-+ -•. .'f.,!r,�.�. :�.' .L •, .:. 'r .. ,.ti (. �;; ••�-e,• 1 r� ',�' jj :.,., �y� r • a. Y� � l ����`'•. f K,• • r • J ; ■ i 1 T dr t11 1' a j� • � 1 1 M J • • . •r •a • �. was Elf I � � GENERAL VICINITY MAP SCALE: 1" = 800' GENERAL CONSTRUCTION NOTES: 1. THESE PLANS HAVE BEEN PREPARED BASED UPON A FIELD SURVEY COMPLETED BY LEWIS N. COX OF MOUNT AIRY, NC. HORIZONTAL AND VERTICAL CONTROL IS BASED UPON NORTH CAROLINA COORDINATE SYSTEMS NORTH AMERICAN DATUM OF 1983 (NC83F). 2. THE EXACT LOCATION AND QUANTITY OF EXISTING UNDERGROUND UTILITIES IS UNKNOWN. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONTACT NORTH CAROLINA 811 AT LEAST 72 HOURS PRIOR TO START OF CONSTRUCTION AND HAVE UTILITIES MARKED IN THE FIELD. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO LOCATE ANY UNDERGROUND UTILITIES, STRUCTURES, OR OTHER IMPROVEMENTS WITHIN THE LIMITS OF THE PROJECT. SHOULD A PREVIOUSLY UNKNOWN UNDERGROUND TANK BE ENCOUNTERED, THE CONTRACTOR SHALL CONTACT THE ENGINEER BEFORE ANY FURTHER EXCAVATION OR OTHER ACTION IS TAKEN. 3. LINEAR FEET DESIGNATIONS FOR UTILITY LINES ARE BASED UPON HORIZONTAL PLANE SURVEY AND ARE FOR LAYOUT AND PAYMENT PURPOSES ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE QUANTITY OF MATERIALS REQUIRED TO CONSTRUCT THE PROPOSED WORK. 4. ALL UNPAVED AND UNGRAVELLED AREAS DISTURBED BY GRADING AND/OR EXCAVATION SHALL BE SEEDED. 5. EXISTING UTILITY LINES SHALL BE KEPT IN SERVICE AT ALL TIMES. 6. ALL AREAS SHALL BE GRADED TO PROVIDE POSITIVE DRAINAGE AND PRECLUDE THE PONDING OF WATER. THE CONTRACTOR SHALL INSTALL AND MAINTAIN EROSION AND SEDIMENT CONTROL MEASURE AS DIRECTED BY THE ENGINEER AND/OR LOCAL BUILDING OFFICIAL. 7. ALL UTILITY PIPING AND RELATED APPURTENANCES SHALL BE INSTALLED PER MATERIAL MANUFACTURER'S SPECIFICATIONS. ALL UTILITY LINES SHALL HAVE A MINIMUM OF 36" PIPE COVER. 8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CORRECTING ANY SETTLEMENT OF BACKFILL OR PAVEMENT FOR A PERIOD OF ONE (1) YEAR AFTER COMPLETION OF WORK. 9. SHOULD EXISTING DRAINAGE PIPES BECOME SILTED AS A RESULT OF CONSTRUCTION OF THIS PROJECT, IT WILL BE THE RESPONSIBILITY OF THE PROJECT CONTRACTOR TO CLEAN THE PIPES TO THE SATISFACTION OF THE CITY OF MOUNT Al RY. 10. THE PROPOSED GRADING PLAN HAS BEEN PREPARED BASED UPON USING A MAXIMUM CUT/ FILL SLOPE OF 2:1. DURING CONSTRUCTION, IF BEDROCK IS ENCOUNTERED, THE CONTRACTOR MAY UTILIZE STEEPER SLOPES TO REDUCE THE GRADING AREA, PROVIDED THAT THE STEEPER SLOPE IS CONFIRMED TO BE STABLE BY A GEOTECHNICAL ENGINEER EMPLOYED BY THE CONTRACTOR. 11. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY ALL SITE AND UTILITY CONDITIONS PRIOR TO SUBMITTING BIDS. 12. THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL ENVIRONMENTAL AND SAFETY REGULATIONS. 13. THE CONTRACTOR SHALL MARK DRAWINGS AND KEEP A RECORD OF PREVIOUSLY UNKNOWN UTILITIES ENCOUNTERED DURING CONSTRUCTION, NOTING WORKING SIZE, TYPE, DEPTH, MATERIALS, AND ANY OTHER PERTINENT INFORMATION. 14. ALL DEMOLITION MATERIAL SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL IMMEDIATELY BE PROPERLY CONTAINERIZED, REMOVED, TRANSPORTED FOR PROPER DISPOSITION. WASTE MATERIALS SHALL BE DISPOSED AT A PROPERLY PERMITTED DISPOSAL SITE. MATERIALS WITH SALVAGE VALUE MAY BE SOLD BY THE CONTRACTOR. TOPSOIL IS NOT CONSIDERED DEMOLITION MATERIAL AND SHALL BE USED ON THE PROJECT OR PROVIDED TO OWNER. 15. THE CONTRACTOR SHALL NOT BURN ANY MATERIALS NOR HAVE FIRES ON THE PROJECT SITE AT ANY TIME. 16. THE CONTRACTOR SHALL OBTAIN, AT ITS SOLE EXPENSE, ALL REQUIRED PERMITS. 17. THE CONTRACTOR SHALL KEEP ALL ADJACENT STREETS, SIDEWALKS, ALLEYS, AND OTHER TRAVEL WAYS OPEN AND SAFE FOR USE BY VEHICULAR AND PEDESTRIAN TRAFFIC DURING THE CONSTRUCTION PERIOD. 18. ANY DAMAGE TO ROADS, STREETS, CURBING, SIDEWALKS, OR OTHER IMPROVEMENTS NOT SHOWN TO BE DEMOLISHED SHALL BE REPAIRED TO ITS PRE-EXISTING CONDITION OR BETTER AT NO EXPENSE TO THE OWNER. 19. BEFORE STORMWATER CONVEYANCE CHANNELS ARE MADE OPERATIONAL, ANY REQUIRED TEMPORARY OR PERMANENT CHANNEL LINING SHALL BE INSTALLED IN BOTH THE CONVEYANCE AND RECEIVING STREAM, AS APPLICABLE. 20. ALL EXCAVATION AND TRENCHING SHALL BE PERFORMED IN ACCORDANCE WITH THE CURRENT OCCUPATIONAL, SAFETY, AND HEALTH ADMINISTRATION (OSHA) REQUIREMENTS AND GUIDELINES. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR PROVIDING ADEQUATE EQUIPMENT AND ASSURING ALL CONSTRUCTION ACTIVITIES ARE IN FULL COMPLIANCE WITH THE OSHA REGULATIONS. 21. THE CONTRACTOR SHALL PROCURE AND PAY FOR ALL REQUIRED TESTING SERVICES. EARTHWORK/GRADING NOTES: 1. ALL EXCAVATION REQUIRED FOR THIS PROJECT IS UNCLASSIFIED. THERE SHALL BE NO ADDITIONAL PAYMENT FOR EXCAVATION OF ROCK, UNSUITABLE MATERIAL, FROZEN GROUND, ETC. IF ENCOUNTERED, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO INSPECT THE SITE AND CONDUCT AT HIS/ HER OWN EXPENSE ANY INVESTIGATIONS DEEMED NECESSARY FOR THE CONTRACTOR TO DETERMINE THE SITE CHARACTERISTICS AND ESTIMATE MATERIAL QUANTITIES PRIOR TO BIDDING. 2. THESE PLANS INCLUDE A PRIMARY GRADING SITE THAT IS BEING DEVELOPED FOR SELF -STORAGE BUILDINGS AND AN APPROVED EXCESS SPOIL DISPOSAL SITE. THE SPOIL SITE IS APPROVED FOR DISPOSAL OF ONLY CLEAN SOIL AND/OR ROCK MATERIAL. ANY TREES, BRUSH, STUMPS, OR OTHER INERT MATERIAL UNSUITABLE FOR COMPACTION SHALL BE DISPOSED BY THE CONTRACTOR OFF -SITE AT A DEQ APPROVED LOCATION. 3. INSTALL PERIMETER EROSION CONTROL TEMPORARY CONSTRUCTION ENTRANCES AND ALL SEDIMENT TRAPPING DEVICES PRIOR TO COMMENCING SITE GRADING. 4. COMPLETE ALL NECESSARY DEMOLITION & UTILITY RELOCATIONS. 5. CLEAR / GRUB AND STRIP TOPSOIL FROM ALL AREAS PROPOSED TO BE GRADED. 6. COMPLETE SITE GRADING CUT / FILL OPERATIONS AS REQUIRED. ALL FILL AREAS SHALL BE PLACED IN 8 INCH MAXIMUM DEPTH LIFTS AND COMPACTED TO AT LEAST 95% OF STANDARD PROCTOR. 7. THE EROSION AND SEDIMENT CONTROL PLAN PREPARED BY THE ENGINEER FOR THE PROJECT HAS BEEN COMPLETED ONLY FOR THOSE AREAS AS INDICATED ON THE PLANS. THE CONTRACTOR SHALL PROVIDE THE EROSION CONTROL BOND REQUIRED BY WASHINGTON COUNTY AND SHALL OBTAIN THE COUNTY'S LAND DISTURBING PERMIT PRIOR TO START OF CONSTRUCTION. 8. DURING THE COURSE OF THE CONSTRUCTION PERIOD, THE CONTRACTOR SHALL MAINTAIN ALL EROSION AND SEDIMENT CONTROL MEASURES AS REQUIRED TO PROTECT THE SITE AND ADJACENT PROPERTIES. 9. REFER TO STORMWATER AND EROSION CONTROL PLAN SHEETS FOR SPECIFIC PROJECT REQUIREMENTS. LEGEND O O PROPOSED STORM SEWER LINE ------------------ml EXISTING WATER METER r � O PROPOSED LIGHT POLE ® EXISTING SEWER CLEANOUT CIL PROPOSED POWER POLE S O EXISTING SEWER MANHOLE PROPOSED MAJOR CONTOUR 0 EXISTING STORM SEWER MANHOLE PROPOSED MINOR CONTOUR pO EXISTING DROP INLET PROPOSED DROP INLET 0 EXISTING FIBER OPTIC MARKER o PROPOSED FENCE © EXISTING GAS STRUCTURE +1184.84 PROPOSED SPOT ELEVATION ] EXISTING AIR RELEASE VALVE PROPOSED CONCRETE -ssss- EXISTING GRAVITY SEWER LINE PROPOSED ASPHALT PAVEMENT FM FM EXISTING FORCE MAIN PROPOSED RIP -RAP --------------- --------------- EXISTING STORM DRAIN --------------- PROPOSED ROOF DRAIN LEADER - - EXISTING PROPERTY LINE SET BUILDING SETBACK LINE - - - - - EXISTING MAJOR CONTOUR • LIMITS OF DISTURBANCE EXISTING MINOR CONTOUR SURVEY BENCHMARK -WWWW- EXISTING WATER LINE - ... - STREAM L,9t ugt EXISTING BURIED TELEPHONE CABLE EXISTING CONCRETE -rararara- EXISTING BURIED FIBER OPTIC CABLE -x x x x- EXISTING FENCE UGE UGE EXISTING BURIED ELECTRIC DIRECTIONAL FLOW ARROW -OHE OHE EXISTING OVERHEAD ELECTRIC EXISTING TREELINE GAS EXISTING BURIED GAS EXISTING VEGETATION a EXISTING GUARDRAIL EXISTING PAVEMENT -3�- EXISTING LIGHT POLE EXISTING GRAVEL ROAD Cc-) EXISTING POWER POLE wV Da EXISTING GATE VALVE C- EXISTING UTILITY GUY WIRE 0 EXISTING WELL SIGN EXISTING SIGN POST EXISTING FIRE HYDRANT EXISTING TELEPHONE PEDESTAL T EL STORMWATER UTILITY NOTES: 1. ALL STORM DRAINAGE STRUCTURES SHALL BE PRECAST REINFORCED CONCRETE UNITS IN COMPLIANCE WITH ALL APPLICABLE SECTIONS OF THE NCDOT 2018 ROADWAY STANDARD DRAWINGS AND SPECIFICATIONS. ALL STRUCTURES SHALL HAVE INVERT SHAPING. CONTRACTORS SHALL FIELD ADJUST ALL STORMWATER STRUCTURE ELEVATIONS AS REQUIRED TO COORDINATE WITH FINAL SITE GRADES. 2. ALL STORM DRAINAGE PIPE IN SIZES 15 AND LARGER SHALL BE CLASS III REINFORCED CONCRETE MATERIAL OR ADS ND12 HDPE PIPE MATERIAL. ALL PIPE MATERIAL FURNISHED AND INSTALLED SHALL COMPLY WITH ALL APPLICABLE SECTIONS OF THE NCDOT 2018 ROADWAY STANDARD DRAWINGS AND SPECIFICATIONS. PIPE SHALL BE BEDDED AND INSTALLED AS REQUIRED BY NCDOT AND THE MANUFACTURER. ALL STORMWATER PIPING SHALL HAVE WATERTIGHT JOINTS. 4. ALL ROOF DRAIN LEADERS SHALL BE EITHER PVC SCH 40 MATERIAL WITH SOLVENT WELDED JOINTS, PVC SDR-35 WITH PUSH -ON GASKETED JOINTS, OR PVC C-900 DR-18 WITH PUSH -ON GASKETED JOINTS. ROOF DRAIN LEADERS SHALL BE SIZED BY THE BUILDING MANUFACTURER BASED UPON ROOF AREA AND LOCATION OF DOWNSPOUTS. 5. UTILITY PIPE TRENCHES INSTALLED IN PAVED AREAS SHALL BE BACKFILLED FULL DEPTH WITH COMPACTED ABC CRUSHED STONE. t I� CNI � N W � •o E Z C4> Z Q 0-- W N U O U � COD c 14111=0 N N • W U) U 7 U O .. J J W I..L L.L Z W Z) Q O O 3: < G / O. J O LL O V ) U L J U rW fit/ z O U) U LLJL W Z z W U O > U 06 0. 1 wa0 z0z W z` V r V ` r1 V / w*`,��1 CARP �•, .'+., ..a .�. jp SEAL � rt t 021204 t (i2 l 22 DATE. 14DEC2021 NO. REVISION DATE 1 08APR2022 2 19APR2022 3 SHEET: cool DRAWN BY MSA CHECKED BY RKH PROJECT NO. TLG-21181 I I -it LHIVt C�KVUF' IIV V.