HomeMy WebLinkAboutNCC221549_ESC Approval Submitted_20220421 \ i
(to ' :*
.), p � G01N coG
:3: ..:4 -L. lik
�� , .�; _� �� S N andN SEDIMENTATION CD TRH Linc0i0
R�''�R�� ounty Natural Resources Department
115 West Main Street Lincolnton NC 28092 704-7368501 Fax 704-736"85p4
Project Name : Lots LETTER OF APPROVAL
ifroject ID ## . 22 - ML . O9
� Shelton Land Submitted By : Logan Riddle
Date received b LCNRD : 4/ 18/22
Location : 6283 E . NC 27 Hwy, Iron Station NC 28080 •
Plan Type : Residential ____
atershed : Catawba River Basin
.Covers Lots 1 -4 ( rarc � ls • 1 ; 47 53575 and 10442 8
Date : 4/ 18/22
Riddle Custom Homes , LLC
c/o Logan Riddle
P . O . Box 601
Denver, NC 28037
Dear Mr. Logan Riddle , to beThis office has reviewed the subject Soil Erosion and Sedimentation Cntrol Plan . We find the plan , a liacceptable and hereby issue this Letter of Plan Approval . If any modifications or recommendations are applicab1e
is enclosed and incorporated as a part of this letter of approval . If any modifications are not incorporated into the plan
and implemented in the field , the site will be in violation of the Soil Erosion and Sedimentation Control Ordinance activity
Lincoln County . This plan approval shall expire two (2) years following the date of approval , if no landdiSt9.has been undertaken , as is required by Lincoln County Soil Erosion and Sedimentation Control Ordinance Secton 9 (b) .
As of April 1 , 2019 , all new construction activities are required to complete and submit an electronic Notice of
Intent (eNOl ) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit.
After the form is reviewed and found to be complete , you will receive a link with payment instructions for the $ 100
annual permit fee . After the fee is processed , you will receive the COC via email . As the Financially Responsible Party
shown on the FRO form submitted for this project , you MUST obtain the COC prior to commencement of any land
disturbing activity. The eNOl form may be accessed at deq . nc . goVtNCGQt Please direct questions about the eN01
form to the Stormwater Program staff in the Raleigh central office . If the owner/operator of this project changes in the
future , the new responsible party must obtain a new COC .
Title 15A NCAC 4B . 0118 (a) and the NCGOI permit require that the following documentation be kept on file at
the job site :
1 . The approved E& SC plan as well as any approved deviation .
2 . The NCGOI permit and the COC , once it is received .
3 . Records of inspections made during the previous 12 months .
Also , this letter gives the notice required by G . S . I 13A-61 . 1 (a) and Lincoln County Soil Erosion and Sedimentation
Control Ordinance Section 11 (0 of our right of periodic inspection to insure compliance with the approved plan .
Lincoln County's Soil Erosion and Sedimentation Control Ordinance is performance-oriented , requiring protection of
existing natural resources and adjoining properties . If, following the commencement of this project , the Soil Erosion and
Sedimentation Control Plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973
(North Carolina General Statute 113A--51 through 66) and Lincoln County Soil Erosion and Sedimentation Control
Ordinance Section 9 (d) , this office may require revisions to the plan and implementation of the revisions to insure
compliance with the Act .
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality
laws , regulations , and rules . In addition , local city or county ordinances or rules may also apply to this land-disturbing
activity . This approval does not supersede any other permit or approval .
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form , which you provided . You are requested to file an amended form if there is any change in the
information included on the form .
Your cooperation is appreciated and we look forward to working with you on this project . If there are any questions ,
please do not hesitate to contact this office at the above number .
inc : rely ,
/ ' l
1 - nielle T. Rudisill , CPESC
Erosion and Sedimentation Control Administrator
Lincoln County Soil and Water Conservation District
Natural Resources: Soil Erosion and Sedimentation Control
1/
F1
G01;N C06:ta
** 1
AI"V \r; SOIL
_ _ _ , � , _,1110
� S � � N and SEDIM ION coNTh0L
NATURq� Lincol ENTAT
Rrsou RC�S - % County Natural Resources Departmt
� . 115 West Main Street Lincionton NC 28092 704 -736-8501 Fax: 704-736-85p4
Project Name : Lots LATTER OF APPROVAL
Project I
D # ; 22 . 1\4L
Shelton Land Submitted By : Logan Riddle
- 09 4/ 18/22
Location : 6283 EDate received b LCNRD :
NHwyIron Station NC 28080 Plan Type : Residential
Watershed : Catawba Ri ver Basin
This Letter Covers Lots 1 - 4 Parcels . 17835Acres A 9 II rov ed :1044270 . 9 acre
411411
53575 and 104428
Date : 4/ 18/22
Riddle Custom Homes , LLC
c/o Logan Riddle
P . O . Box 601 1
Denver , NC 28037 71
11
Dear Mr . Logan Riddle , plan to be
This office has reviewed the subject Soil Erosion and Sedimentation Control Plan . We fid the �i�ble , a list
.11
acceptable and hereby issue this Letter of Plan Approval . If any modifications or recommendations are app
is enclosed and incorporated as a part of this letter of approval . If any modifications are not incorporated into the plan
and implemented in the field , the site will be in violation of the Soil Erosion and Sedimentation Control Ordinance
Lincoln County . This plan approval shall expire two (2) years following the date of approval , if no land-disturbing
has been undertaken , as is required by Lincoln County Soil Erosion and Sedimentation submitControl andelectrOniC inance eNotice ction 9 (b) .
of
As of April 1 , 2019 , all new construction activities are required to complete
Intent (eNOl ) form requesting a Certificate of Coverage (COC) under theNCGOI0000 ntruct ons for the $ 100it.
fter the form is reviewed and found to be complete , you will receive a I payment le
annual permit fee . After the fee is processed , you will receive the COC via l . As toe of anyband Party
shown on the FRO form submitted for this project , you MUST obtain the COC priorabout
disturbing activity . The eN01 form may be accessed at cieq .nc . gov/NC3Oidirect
ofthistproject changes the NOhe
form to the Stormwater Program staff in the Raleigh central office . If the owner/operator
future , the new responsible party must obtain a new COC .
Title 15A NCAC 4B . 0118 (a) and the NCGOI permit require that the following documentation be kept on file at
the job site : deviation .
1 . The approved E& SC plan as well as any approved
2 . The NCGOI permit and the COC , once it is received .
3 . Records of inspections made during the previous 12 months . roon and
Also , this letter gives the notice required by G . S . 113A-61 . 1 (a) and insure compliance with oln County SoilErosion
he p oved plan .
Control Ordinance Section 11 (f) of our right of periodic inspection to
ented ,
n of
Lincoln County' s Soil Erosion and Sedimentation Control Ordinance is performance-or of thisl projectr the lSo9 Eotsonoexisting natural resources and adjoinin9properties . If, following the commencement
and
on
Act of
3
Sedimentation Control Plan is inadequate to meet the requirements of e dErosionl and Sedimentation Pollution lControl 97
( North Carolina General Statute 113A-•51 through 66) and LincolnCounty Soil
Ordinance Section 9 (d) , this office may require revisions to the plan and implementation of the revisions to insure
compliance with the Act .
State water
ty
Acceptance and approval of this plan is conditioned upon your compliance with Federal andto this land-distutbifl9'
laws , regulations , and rules . In addition , local city or county ordinancesor rules may also apply
activity. This approval does not supersede any other permit or approval .
Please note that this approval is based in part on the accuracy of the information provided
there is change in the
Responsibility Form , which you provided . You are requested to file an amended form
information included on the form .
is appreciated and we look foard to working with you on this project . If there are any questions ,
Your cooperation
please do not hesitate to contact this office at the above number .
Inc :• rely ,
, ,
1 . nielle T . Rudisili , CPESC
Erosion and Sedimentation Control Administrator
Lincoln County Soil and Water Conservation District
Natural Resources: Soil Erosion and Sedimentation Control