HomeMy WebLinkAboutNCS000590_Renewal Application_20220418�•� DUKE ENERGY. PROGRESS ,EEB 2 3 . Mr. Brian Wrenn, Director NC DEQ Division of Energy, Minerals and Land Resources 217 West Jones Street Raleigh, NC 27603 Subject: Duke Energy Progress, LLC Brunswick Steam Electric Plant Industrial Stormwater Permit NCS000590 Industrial Stormwater Permit Renewal Package Brunswick County Dear Mr. Wrenn: Jay Ratliff Plant Manager Brunswick Steam Electric Plant 8470 River Road SE Southport, NC 28461 REcEivEED APR 181on DEMLR &V ftM Duke Energy Progress, LLC, Brunswick Steam Electric Plant (BSEP) submits the following NPDES permit renewal package for industrial stormwater activities covered by NPDES Permit Number NCS000590, which expires August 31, 2022. The attached permit renewal application package consists of the following documentation: Enclosure 1 -- NC DEQ DEMLR Individual Stormwater NPDES Permit Renewal Form Enclosure 2 — NC DEQ DEMLR Individual Stormwater NPDES Permit Renewal Supplemental Information Form Enclosure 3 — NC DEQ DEMLR Individual Stormwater NPDES Permit SPPP Certification Form Enclosure 4 — US EPA Form 1 — General Information Enclosure 5 — US EPA Form 2F — Stormwater Discharges Associated with Industrial Activity The permit renewal application package is also being transmitted to Ms. Brianna Young in accordance with instructions contained on the NC DEQ DEMLR website. The permit application package is being submitted at least 180 days prior to the permit expiration date as required by NC GS 143-215.1 (C) and Part III, Section B, General Condition No. 1 of NPDES Permit No. NCS000590. Should you have questions concerning this permit application please contact Mr. Jerry Johnson, BSEP Site Environmental Field Support, by phone at 901-832-2264, or via e-mail at Jerry.Johnsonp,duke-energy.com. Mr. Brian Wrenn, Director NC DEQ DEMLR Page 2 I certify, under penalty of taw, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. 1 am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Sincerely, Jay Ratliff Plant Manager Duke Energy Progress, LLC Brunswick Steam Electric Plant Enclosures & Attachments cc: Ms. Brianna Young, 1612 MSC, Raleigh, NC 27699-1612 Mr. Dan Sams, DEMLR Regional Engineer, Wilmington Regional Office Mr. Jerry Johnson, Duke Energy BSEP Site Environmental Field Support Mr. Don Safrit, Duke Energy Carolinas Permitting & Compliance Duke Energy Progress, LLC Brunswick Steam Electric Plant National Pollutant Discharge Elimination System Individual Industrial Stormwater Permit Application Enclosure 1 NC DEQ DEMLR SW NPDES-Individual-Permit-Renewal-Form-20171026 Permit Coverage Renewal Application Form KC_ National Pollutant Discharge Elimination System NPDESNC Permit Number Emtronmental Stormwater Individual Permit S 000590 Quality Please provide your permit number in box in the upper right hand corner, complete the information in the space provided below and return the completed renewal form along with the required supplemental information to the address indicated. Owner information * Address to which permit correspondence will be mailed Owner / Organization Name; Duke Energy Progress. LLC Owner Contact: Jay Ratliff, Plant Manager Mailing Address: 8470 River Rd. SE Southport, NC 28461 8470 River Rd, SE Soul]ipwt, NC 26401 Phone Number: 91D-a32-3o59 Fax Number: E-mail address: Jay. Ratliff@duke-energy.com Facilily Information Facility Name: Brunswick Nuclear Plant Facility Physical Address: 8470 River Rd. SE Southport, NC 28451 Facility Contact: Jerry Johnson, Lead Environmental Field Support Professional Mailing Address: 8470 River Rd. SE Southport, NC28461 Phone Number: 910-832-2264 Fax Number: E-mail address: Jerry.Johnson@duke-energy.com Permit Information Permit Contact: Jerry Johnson, Lead Environmental Field Support Professional Mailing Address: 8470 River Rd. SE Southport, NC 28461 Phone Number: 910-832-2264 Fax Number: E-mail address: Jerry.Johnson@duke-energy.com Discharge Information Receiving Stream: Nancys Creek Stream Class: SC;Sw;HQw Basin: Cape Fear River Basin Sub -Basin: CPF17 Number of Outfalls: Three (3) Facilit /Activity Changes Please describe below any changes to your facility or activities since issuance of your permit. Attached a separate sheet if necessary. Industrial Stormwater aspects previously covered under NPDES Permit NCS000590 issued August 11, 2017. No significant site modifications or stermwater drainage modifications since the August 11. 2017 NPDES permit issuance. CERTIFICATION I certify that I am familiar with the information contained in the application and that to the best of my knowledge and belief such information is truce, complete and accurate. Signature Date Jay Ratliff Print or type name of person signing above Please return this completed application form and requested supplemental information to: Plant Manager Title DEMLR - Stormwater Program Dept, of Environmental Quality 1612 Mail Service Center Raleigh, North Carolina 27699-1612 Duke Energy Progress, LLC Brunswick Steam Electric Plant National Pollutant Discharge Elimination System Individual Industrial Stormwater Permit Application Enclosure 2 NC DEQ DEMLR SW NPDES-Individual-Permit-Renewal-Supplement-Info-Form- 20171011 SUPPLEMENTAL INFORMATION REQUIRED FOR RENEWAL OF INDIVIDUAL NPDES STORMWATER PERMIT Two copies of each of the following shall accompany this submittal in order for the application to be considered complete: Initials (Do not submit the site Stormwater Pollution Prevention Plan) 1. A current Site Map from the Stormwater Pollution Prevention Plan. The location of industrial activities (including storage of materials, disposal areas, process areas and loading and unloading areas), drainage structures, drainage areas for each outfall, building locations and impervious surfaces should be clearly noted. (See Attachment 1) -113 2. A summary of Analytical Monitoring results during the tern of the existing permit (if your permit required analytical sampling). Do not submit individual lab reports. The summary can consist of a table including such items as outfall number, parameters sampled, lab results, date sampled, and storm event data. (See Attachment 2) jW3 3. A summary of the Visual Monitoring results. Do not submit individual monitoring reports. The summary can consist of a table including such items as outfall number, parameters surveyed, observations, and date monitoring conducted. (See Attachment 2) Jv4"N 4. A summary of the Best Management Practices utilized at the permitted facility. Summary should consist of a short narrative description of each BMP's in place at the facility. If the implementation of any BMP's is planned, please include information on these BMP's. (See Attachment 3) Jam) 5. A short narrative describing any significant changes in industrial activities at the permitted facility. Significant changes could include the addition or deletion of work processes, changes in material handling practices, changes in material storage practices, and/or changes in the raw materials used by the facility. (See Attachment 4) Ova 6. Certification of the development and implementation of a Stormwater Pollution Prevention Plan for the permitted facility (Sign and return attached form). (See Enclosure 3) If the final year analytical monitoring of the existing permit term has not been completed prior to filing the renewal submittal, then the last years monitoring results should be submitted within 30 days of receipt of the laboratory reports. (i.e. do not withhold. renewal submittal waiting on lab results) Duke Energy Progress, LLC Brunswick Steam Electric Plant National Pollutant Discharge Elimination System Individual Industrial Stormwater Permit Application Enclosure 3 NC DEQ DEMLR SW NPDES-Individual-Permit-Renewal-SPPP-Certification-Form- 20171011 STbRMWATER POLLUTIdN PREVENTION PLAN DEVELOPMENT .AND IlVIPLEMENTATION CERTiFICATION North Carolina Division of Energy, Mineral, and Land Resources — Stormwater Program Facility Name: Permit Number: Location Address: County: Duke Energy Progress, LLC - Brunswick Nuclear Plant NGS000590 8470 River Rd. SE Southport, NC 28461 Brunswick "I certify, under penalty of law, that the Stormwater Pollution Prevention Plan (SPPP) document and all attachments were developed and implemented under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information required by the SPPP. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information gathered is, to the best of my knowledge and belief, true, accurate and complete." And "I certify that the SPPP has been developed, signed and retained at the named facility location, and the SPPP has been fully implemented at this facility location in accordance with the terms and conditions of the stormwater discharge permit." And "I am aware that there are significant penalties for falsifying information, including the possibility of fines and imprisonment for knowing violations." Sign (according ta: pewit signatory requirements) And return this Certification.:DO NOT AND STORTMWATER POLLUTION PREVENTION PLAN WITH THIS CERTIFICATION. Signature Jay Ratliff Print or type name of person signing above Date LZ3zzgzz— Plant Manager Title SPPP Certification 10/13 Duke Energy Progress, LLC Brunswick Steam Electric Plant National Pollutant Discharge Elimination System Individual Industrial Stormwater Permit Application Enclosure 4 Form 1 - General Information EPA Identification Number NPDES Permit Number Facility Name Form Approved 03/05/19 NCD091570960 NCS000590 Duke EnegyProgress,LLC-9mmwkkNudcerPlant OMB No. 2040.0004 Form U.S. Environmental Protection Agency 1 in Application Application for NPDES Permit to Discharge Wastewater NPDES GENERAL INFORMATION 1.1 Applicants Not Required to Submit Form 1 1.1.1 Is the facility a new or existing publicly owned 1.1.2 Is the facility a new or existing treatment works treatmentworks? treating domestic sewage? If yes, STOP, Do NOT complete No If yes, STOP. Do NOT E✓ No Form 1. Complete Form 2A. complete Form 1. Complete Form 2S. 1.2 Applicants Required to Submit Form 1 1.2.1 Is the facility a concentrated animal feeding 1.2.2 Is the facility an existing manufacturing, operation or a concentrated aquatic animal commercial, mining, or silvicultural facility that is a production facility? currently discharging process wastewater? Yes 4 Complete Form 1 M✓ No Yes 4 Complete Form ❑ No and Form 2B. 1 and Form 2C. C 1.2.3 Is the facility a new manufacturing, commercial, 1.2.4 Is the facility a new or existing manufacturing, mining, or silvicultural facility that has not yet commercial, mining, or silvicultural facility that commenced to discharge? discharges only nonprocess wastewater? Cr F1 Yes 4 Complete Form 1 No Yes 4 Complete Form No and Form 2D. 1 and Form 2E. 1.2.5 Is the facility a new or existing facility whose discharge is composed entirely of stormwater a associated with industrial activity or whose discharge is composed of both stormwater and non-stormwater? n Yes 4 Complete Form 1 rl No and Form 2F unless exempted by 40 CFR 122.26(b)(14)(x) or b 15 . e 911 e • • ► 2.1 Facility Name Brunswick Nuclear Plant o 2.2 EPA Identification Number w NCDO91570960 2.3 Facility Contact Name (first and last) Title Phone number Q Jay Ratliff Plant Manager (910) 832-3059 Email address Jay.Ratliff@duke-energy.com 2.4 Facility Mailing Address z Street or P.O. box 8470 River Rd. SE City or town State ZIP code Southport North Carolina 28461 EPA Form 3510-1 (revised 3.19) Page 1 EPA Ideniificaiion Number NPDES Permit Number Facility Name Form Approved 03/05/19 NCD091570960 NCS000590 OukeEnergyProgmss.LLC-BrunswiekNuclearPant OMB No.2040-0004 2.5 Facility Location a Street, route number, or other specific identifier Q 0 8470 River Rd. 5E County name County code (if known) g Brunswick _j City or town State ZIP code z Southport North Carolina 28461 3.1 SIC Code(s)' Descripfion (optional) 4911 Electric Power Service ca rh 3.2 NAICS Code(s) Description (optional) c, 22113 Electric Power Generation, Nuclear e e• •- e• • ,r 4.1 Name of Operator Duke Energy Progress, LLC 0 4.2 Is the name you listed in Item 4.1 also the owner? o ❑✓ Yes El No L 4.3 Operator Status ❑ Public —federal ❑ Public —state ❑ Other public (specify) p❑ Private ❑✓ Other Public utility (specify) 4.4 Phone Number of Operator (910) 832-3059 4.5 Operator Address ° Street or P,O. Box E d 8470 River Rd. SE City or town State P code o 0 Southport North Carolina J28461 Q Email address of operator O Jay.Ratliff@duke-energy.com 1 7f-35. 5.1 Is the facility located on Indian Land? ❑Yes ID No EPA Form 3510-1 (revised 3.19) Page 2 EPA Identification Number NPDES Permit Number Facility Name Form Approved 03/05/19 NCD091570960 NCS000590 Duke Energy Progress,LLC-8=sWckNudewFnant OMB No.2040-0004 EM^•Jill Mif 6.1 Existing Environmental Permits (check all that apply and print or type the corresponding permit number for each) Q� NPDES (discharges to surface ❑ RCRA (hazardous wastes) ❑ UIC (underground injection of o water) fluids) - See Attachment 5 c U f� ❑ PSD (air emissions) ❑ Nonattainment program (CAA) ❑ NESHAPs (CAA) ❑ Ocean dumping (MPRSA) ❑ Dredge or fill (CWA Section 404) ❑ Other (specify) s •f 7.1 Have you attached a topographic map containing all required information to this application? (See instructions for specific requirements.) (See Attachment 6) ❑✓ Yes ❑ No ❑ CAFOI Applicable (See requirements in Form 2B•) • o .f 8.1 Describe the nature of your business. The Brunswick Nuclear Plant consists of two boiling water reactor units capable of producing 1,870 megawatts. vqi n 3 an a m m z • •a •f 9.1 Does your facility use cooling water? ❑ Yes ❑ No 4 SKIP to Item 10.1. 9.2 Identify the source of cooling water. (Note that facilities that use a cooling water intake structure as described at 40 CFR 125, Subparts I and J may have additional application requirements at 40 CFR 122.21(r). Consult with your NPDES permitting authority to determine what specific information needs to be submitted and when.) ci; ra Cape Fear River • 1 !� • f f 10.1 Do you intend to request or renew one or more of the variances authorized at 40 CFR 122.21(m)? (Check all that y apply. Consult with your NPDES permitting authority to determine what information needs to be submitted and to when.) C ❑ Fundamentally different factors (CWA ❑ Water quality related effluent limitations (CWA Section Section 301(n)) 302(b)(2)) ❑ Non -conventional pollutants (CWA ❑ Thermal discharges (CWA Section 316(a)) Section 301(c) and (g)) ❑✓ Not applicable EPA Form 3510-1 (revised 3-19) Page 3 EPA Identification Number NPDES Permit Number Facility Name Form Approved 03105119 NCDO91570960 NCS000590 Duke EnergyProgress,LLC- BrunsvhckNuclearPlant OMB No.2040-0004 0 am I / 0 • 1 . 0 i 11.1 In Column 1 below, mark the sections of Form 1 that you have completed and are submitting with your application, For each section, specify in Column 2 any attachments that you are enclosing to alert the permitting authority. Note . that not all applicants are required to provide attachments. Column 4 Column 2 Section 1: Activities Requiring an NPDES Permit ❑ w/ attachments Section 2: Name, Mailing Address, and Location ❑ wl attachments ❑✓ Section 3: SIC Codes ❑ wl attachments ❑� Section 4: operator Information ❑ vd attachments j ]✓ Section 5: Indian Land ❑ w/ attachments ❑✓ Section 6: Existing Environmental Permits ❑✓ w/ attachments (See Attachment 5) tw -1 0 Section 7: Map ❑✓ map/topographic Owl' additional attachments v, o a Section 8: Nature of Business ❑ wl attachments ❑✓ Section 9: Cooling Water Intake Structures ❑ wl attachments (']✓ Section 10: Variance Requests ❑ wl attachments ❑✓ Section 11: Checklist and Certification Statement ❑ w/ attachments Y 11.2 Certification Statement c.� l certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly resp onsible forgathering the information, the information sub miffed is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Name (print or type first and last name) Official title Jay Ratliff Plant Manager Signature Date signed * - See Attachment 6 EPA Form 3510-1 (revised 3-19) Page 4 Duke Energy Progress, LLC Brunswick Steam Electric Plant National Pollutant Discharge Elimination System Individual Industrial Stormwater Permit ApOication Enclosure 5 Form 2F - Stormwater Discharges Associated with Industrial Activity EPA Identification Number NPDES Permit Number Facility Name Form Approved 03105/19 NCD091570960 NC5000590 Duke Energy Progress, LLC - Bruns OMB No. 2040-0004 Form U.S Environmental Protection Agency 2F I O Cb/\ Application for NPDES Permit to Discharge Wastewater NPDES ERA STORMWATER DISCHARGES ASSOCIATED WITH INDUSTRIAL ACTIVITY • • • e91 11i 1.1 Provide information on each of the facilities outfalls in the table below outfall Number Receiving Water Name Latitude Longitude ... 007 Nancys Creek 33' 57 56' N 78° 00' 29" W a >S 008 NancysCreek 33` 57' 38" N 78' 00' 40" W 0 009 Nancys Creek 33° 57' 46" N 78' 00' 37 W a o o 2.1 Are you presently required by any federal, state, or local authority to meet an implementation schedule for constructing, upgrading, or operating wastewater treatment equipment or practices or any other environmental programs that could affect the discharges described in this application? ❑ Yes ❑✓ No 4 SKIP to Section 3. 2.2 Briefly identify each applicable project in the table below. Brief Identification and Affected Outfalls Source(s) of Discharge Final Compliance Dates Description of Project (list outfall numbers) Required Projected NA w' a� y 0 CL E 2.3 Have you attached sheets describing any additional water pollution control programs (or other environmental projects that may affect your discharges) that you now have underway or planned? (Optional Item) ❑ Yes [ZI No EPA Form 3510.2F (Revised 3-19) Page 11 EPA Identification Number NPDES Permit Number Facility Name Form Approved 03105119 NCD091570960 NCS000590 Duke Energy Progress, LLC - Bruns OMB No.2040-0004 AD 3.1 Have you attached a site drainage map containing all required information to this application? (See instructions for a; specific guidance.) Yes (See Attachment 7) ❑ No • •• a t 4.1 Provide information on the facility's pollutant sources in the table below. Ouffall Impervious Surface Area Total Surface Area Drained Number (within a mile radius of the faciliityc) (within a mile ral of the facility)' specify units specify units 007 3.1 Acres 27.5 Acres specify units specify units 008 2.1 Acres 4.1 Acres specify units specify units 009 43 Acres 22.0 Acres specify units specify units specify units specify units See Figure 2 in Attachment 1 specify rnufs spedly units 4.2 Provide a narrative description of the facility's significant material in the space below. (See instructions for content requirements.) See Attachment 4 Q NC DEQ DEMLR SW NPDES Individual Permit Supplement Information Enclosure 2 Item 5 — Narrative of Industrial Activities sR c rt 4.3 Provide the location and a description of existing structural and non-structural control measures to reduce pollutants in stormwater runoff. See instructions for specificguidance.) Stormwater Treatment Codes Outfall from Number Control Measures and Treatment Exhibit 2F-1 list See Attachment 8 EPA Form 3510-2F (Revised 3-19) Page 2 EPA Idenb6calion Number NPDES Permit Number Facility Name Form Approved 03/05/19 NCDO91570960 NC5000590 Duke Energy Progress, LLC- Bruns OMB No.2040.0004 5.1 1 certify under penalty of taw that the outfall(s) covered by this application have been tested or evaluated for the presence of non-stormwater discharges. Moreover, 1 certify that the outfalls identified as having non-stormwater discharges are described in either an accompanying NPDES Form 2C, 2D, or 2E application. Name (print or type first and last name) Official title Jay Ratliff Plant Manager Signature Date signed 5.2 Provide the testing information requested in the table below. Outfall Onsite Drainage Points n Number Description of Testing Method Used Dates) of Testing Directly Observed During Test apt 007 See Attachment 2 - 0 W oSummary of Analytical & Visual Monitoring Results 2; 6.1 Describe any significant leaks or spills of toxic or hazardous pollutants in the last three years. m Not Applicable 0 iv e 'c as n See the instructions to determine the pollutants and parameters you are required to monitor and, in turn, the tables you must o com fete. Not all applicants need to complete each table. 7.1 Is this a new source or new discharge? Yes 3 See instructions regarding submission of ❑ No 4 See instructions regarding submission of estimated data. actual data. Tables A, B, C, and D 7.2 Have you completed Table A for each outfall? ca ❑ Yes (] No EPA Form 3510-2F (Revised 3-19) Page 3 EPA Identification Number NPDES Permit Number Facility Name Form Approved 03I06/19 NCD091570960 NCS000590 Duke Energy Progress, LLC - Bruns OMB No. 2040 0004 7.3 Is the facility subject to an effluent limitation guideline (ELG) or effluent limitations in an NPDES permit for its process wastewater? Q Yes ❑ No 4 SKIP to Item 7.5. 7.4 Have you completed Table B by providing quantitative data for those pollutants that are (1) limited either directly or indirectly in an ELG and/or (2) subject to effluent limitations in an NPDES permit for the facility's process wastewater? ❑✓ Yes ❑ No 7.5 Do you know or have reason to believe any pollutants in Exhibit 2F-2 are present in the discharge? 0 Yes ❑ No 4 SKIP to Item 7.7. 7.6 Have you listed all pollutants in Exhibit 217-2 that you know or have reason to believe are present in the discharge and provided quantitative data or an explanation for those pollutants in Table C? ❑✓ Yes ❑ No 7.7 Do you qualify for a small business exemption under the criteria specified in the Instructions? ❑ Yes 4SKIPto Item 7.18. ❑✓ No 7.8 Do you know or have reason to believe any pollutants in Exhibit 217-3 are present in the discharge? ❑✓ Yes ❑ No 4 SKIP to Item 7.10. 7.9 Have you listed all pollutants in Exhibit 2F-3 that you know or have reason to believe are present in the discharge in c Table C? ❑✓ Yes ❑ No 0 7.10 Do you expect any of the pollutants in Exhibit 2F-3 to be discharged in concentrations of 10 ppb or greater? o ❑ Yes ❑ No 4 SKIP to Item 7.12. 7.11 Have you provided quantitative data in Table C for those pollutants in Exhibit 2F-3 that you expect to be discharged in— EM concentrations of 10 ppb or greater? M [.✓,] Yes ❑ No 7.12 Do you expect acrolein, acrylonitrile, 2,4-dinitrophenol, or 2-methyl4,6-dinitrophenol to be discharged in concentrations of 100 ppb or greater? ❑ Yes No 4 SKIP to Item 7.14. 7.13 Have you provided quantitative data in Table C for the pollutants identified in Item 7.12 that you expect to be discharged in concentrations of 100 ppb or greater? ❑✓ Yes ❑ No 7.14 Have you provided quantitative data or an explanation in Table C for pollutants you expect to be present in the discharge at concentrations less than 10 ppb (or less than 100 ppb for the pollutants identified in Item 7.12)? ❑✓ Yes ❑ No 7.15 Do you know or have reason to believe any pollutants in Exhibit 2F-4 are present in the discharge? ❑ Yes ❑✓ No 4 SKIP to Item 7.17. 7,16 Have you listed pollutants in Exhibit 217--4 that you know or believe to be present in the discharge and provided an explanation in Table C? ❑✓ Yes ❑ No 7.17 Have you provided information for the storm event(s) sampled in Table D? ❑✓ Yes ❑ No EPA Form 3510-2F (Revised 3-19) Page 4 EPA Identification Number NPDES Permit Number Facility Name Form Approved 03105/19 NCDO91570960 NCS000590 Duke Energy Progress, LLC - Bruns OMB No. 2040-0004 .a Used or Manufactured Toxics 7.18 Is any pollutant listed on Exhibits 217-2 through 2F-4 a substance or a component of a substance used or o manufactured as an intermediate or final product or byproduct? ,O ❑ Yes ❑ No 4 SKIP to Section 8. 7.19 List the pollutants below, including TCDD if applicable. 1. 4. 7. IM 2, 5. 8. 3. 6. 9, 0 Do you have any knowledge or reason to believe that any biological test for acute or chronic toxicity has been made on any of your discharges or on a receiving water in relation to your discharge within the last three years? C178.1 1 ❑ Yes ❑✓ No 4 SKIP to Section 9. 8.2 Identify the tests and their purposes below. Test(s) Purpose of Test(s) Submitted to NPDES Date Submitted PermittingAuthority? ❑ Yes ❑ No w ❑ Yes ❑ No _ o m ❑ Yes ❑ No • • •• • i o 9.1 Were any of the analyses reported in Section 7 (on Tables A through C) performed by a contract laboratory or consulting firm? ❑✓ Yes ❑ No 4 SKIP to Section 10. 9.2 Provide information for each contract laboratory or consulting firm below. Laboratory Number 1 Laboratory Number 2 Laboratory Number 3 Name of laboratorylfirm Environmental Chemists, Inc. 0 Laboratory address 6602 Windmill Way, Wilmington, NC 28405 aC c> Phone number o (910) 392-0223 Pollutant(s) analyzed Iron, Copper, TSS, Tofia! Phosphorous, BOD, COD, Total Kjeldahl Nitrogen (TKN), Nitrate +Nitrite -Nitrogen, Total Nitrogen EPA Form 3510-2F (Revised 3.19) Page 5 EPA Identification Number NPDES Permit Number Facility Name Form Approved 03105/19 NCD091570960 NC5000590 Duke Energy Progress, LLC - Bruns OMB No. 2040-0004 10.1 In Column 1 below, mark the sections of Form 2F that you have completed and are submitting with your application. For each section, specify in Column 2 any attachments that you are enclosing to alert the permitting authority. Note that not all applicants are required to com fete all sections or provide attachments. Column i Column 2 ❑� Section 1 ❑ wl attachments (e.g., responses for additional outfalls) ❑✓ Section 2 ❑ wl attachments Section 3 ❑ wi site drainage map (See Attachment 7) ❑✓ Section 4 ❑ wi attachments (See Attachments 8 & 9) IZI Section 5 ❑ wl attachments IZI Section 6 ❑✓ wl attachments d ❑ Section 7 0 Table A ❑ wl small business exemption request A rr va ElTable B ❑ w/ analytical results as an attachment s0 ❑✓ Table C Q Table D ❑✓ Section 8 ❑ wlattachments ❑ Section 9 ❑ wlattachments (e.g., responses for additional contact laboratories or firms) ❑ Section 10 ❑ 10.2 Certification Statement I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete, I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Name (print or type first and last name) Official title Jay Ratliff Plant Manager Signature Date signed EPA Form 3510-2F (Revised 3-19) Page 6 �o � �o c, p z 3..2).5 < C 0 V.00 W it g U a d C m w Q co •O .Q "' is � � C 0 � O a d< o' CD a z o c oU N H iL O 2 3 Q S N m N lII C! Q LL.3 E'.=+� ti0 O I� 7 a- N to '� O m (�4 '. m J O @ N Q� z d N to CL YS . iL C0 Al r� cm p Q � � E ODE E � E a0 E ttp N C O - N LU V O C,) N m O N N .,0.. tll vbel d EI-- y CL Qi n\0 a Q In V e O � p M d Q N co y Lu Z EL Z @ G3 C in O Q • m p ttt Q O a w -O U CO o E C ~ F- ca -a E -oo c a cn • IL L a> .a p tD cm O ID i z a O c m X O C rn O rn -r-S I j m yam+ V Xcu O O_ y Q 0 p Q. OT 006 N cti U rn rOn O N .2 9 •X CQ Z . O co_ w E O m U tom- t� a n. C-j er L6 <6 r co O N N E 2 ca O_ O Q to lCf O O_ O m m `o cn cn O N M3 70 O Q Q R3 y M O � EN GV ^N N T• IL V O O -p ¢1• U � O O Ca Q � O O O V) N ? U) C d CU F O Z O Q c -c U 2-0 O O v 0cz = a? c -0 U c Of U V -0 O co W c _ c � Q2 Co '=3 C a rn �a Z�io 8 9 zwi o Q NCD o o 2Z J 6'.Q am o o e.G b {J.. as w L CL N + _ o tu U) 0 E W d O •_ Z N m O Of N N c _ co .V 40 Q. as CL E 3 42 ' m O � U p Co N iS c w ar '— CL c N V):30 m _ `0 0 J o C9 z .v LL L :y O CL a) «° i4 c 30 v W C7 R tC (10 c E Q Ecm Clin OcOU _a W O Z P a) CZ z 5 CO m Q o IL�S c z > m C) d C E m E C) ® ui `N z �_ =O :4c; a C% LO li CA co •O C O R b V _� O.. C Z O W CU a7 CL Ll o O Q i E0. _ `c E� C `0 Lo v f3 c 0 U L LL C E u N g G 0 0 c 45 N � _ Z O Q CO NLL- 0 �, c m +�_ N O m L _ N m +� SL 0, E C .c CL CD m N C M fl J co 0 .G,' ? O cn H e-1 O V O .Y Q LL �H N t0 C �- to O z Ui = t�l1 • ll N 0 a m 0 z a Li z N N _ � � LL N } N N � L X � s LU C 0n W 9 = N Z Ol • = N = E v Ln W rncu0 o d R oN • a o O R C? a z cad m C W t!J0 � , N 0. •B O _1 U 0 N N E P co n. G CII Q d c m 0 n. 0 y T cu W r lL U 0 u EL m v qO- ai oa C O o am VI N n L c N ma's y m L a$ Y E m 3 E E0 Eo �°' N 0 'n -,0 ar fl = -Caj E o y co O E -= Y m N bo m F.C. y Q al LT al IL elru Y a7 Y by Y C VI O 47 V Y N rIV.. .0 m Q O atU ; c O .-1 m m m m .��, p 'i 3 w a L I'd .0 o b t7 I a) v .Q C] m w C �.:�p�.. s -Q m as.c yi,. • �' a Y o 3 L a� a) C Y Qi m o aS Y 3 q- o OA ,a a O C ai LO m T +0+ a' 7 m ° m c +5 c E v c m E o c E :. Z Y O F m c L -6 i m m E C) C O_ — 0 N lL O rf L o o C .W as as a� o a a, �m w V a ° a°� m nNi a t6 v N O m a`r C _0 c m o 'n 3 12 Q m N Y m QT Y O E ca O O m ❑, F to f6 v i O Y a, m Q$: a► m tw o a o v Q $ .� N E s o u> c o .� a E m U p 0 W m u v w p M OV m e m a ..: •- I- C m m t n- U O a a � D m N O aVl .wv.. CI L Y v ti O Z aS O a ° aJ N .a A m i cu 7 Q m I7.,I -0 N Lo Y W N 'O O c c ° E Q W - - alb O c N 01 C O y E i da E m O 0 W O w -O O 'O c m W � � ,,;, 4 ?- o t °- fa o Y 0 0 W 41 OV we C N 0 .0 -ms am+ O ya W �_ Qt "''"� '6 E N o '^ f0 a)'� >, ' v_' m N 0 v m c O O Q5 fl -0� m f? 3 L a w a°o N) E E W aJ m v a Y _ m m22 c 3 Q E ,"' D Y � � Y Z GS (6 O 00 ', .N-1 C m � a) a m m o = di s ' O E N CL m O N j +V+ N a"Cd O E _ c O C C3 O CD_ O t aLa C ?r 0 h O Y m QA .4+ Q 61 Y m E o Y s Y + v Q ar a W 2 W m ,v �? M o E° d z _ a3 m 3 v o v o 0 w p E Q E m _ O m on " O a, ° a v W w .Oc Ul b s°+ vmi O. o O E ° +L+ U al cu O ,C 4— o 0 L E 3 m ea 3 °° (U N W N gv -o � Y a o � - • `" o c LD m E oL m L Q a� ° v --- o w > w v E m *d > a> E w +� m w 3 +md m -o a > v m c ° Vi a m° O° z rn O10Oa�1 C) m0 c O Ouua0 Q N r E E U Q 0. v W ocWNmC U�aj _40-_. • L� U E W cYC VTcu �S.+. -a N LD m E IV `m - a 0 Zv w o O V a s° O E v V ) E ° c m m o a O E W N 0 W Q Q •0 m F a 7 m N ^'i M v7 O to cn m a Duke Energy Progress, LLC Brunswick Stearn Electric Plant National Pollutant Discharge Elimination System Individual Industrial Stormwater Permit Application Attachment 1 NC DEQ DEMLR SW NPDES Individual Permit Supplement Information - Enclosure 2 Item 1 — Current Site Maps from Stormwater Pollution Prevention Site Plan Form 2F — Section 4.1 — Impervious Surface Areas - Figure 2 Attachment 2 NC DEQ DEMLR SW NPDES Individual Permit Supplement Information - Enclosure 2 Items 2 & 3 - Summary of Analytical & Visual Monitoring Results Form 2F — Section 5.2 — Testing Method Information Attachment 3 NC DEQ DEMLR SW NPDES Individual Permit Supplement Information - Enclosure 2 Item 4 - Summary of Best Management Practices Section 2.2.3 Best Management Practices (BMPs) Summary BSEP Storm Water Pollution Prevention Plan (SWPPP) Attachment 4 NC DEQ DEMLR SW NPDES Individual Permit Supplement Information - Enclosure 2 Item 5 — Narrative of Industrial Activities Form 2F — Section 4.2 — Narrative Description of Pollutant Sources Section 2.2 Stormwater Management Strategy BSEP Storm Water Pollution Prevention Plan (SWPPP) Attachment 5 Form 1 — Section 6.1 — Existing Environmental Permits Attachment 6 Form 1 — Section 7.1 — Maps Attachment 7 Form 2F — Section 3.1 — Site Drainage Map Attachment 8 Form 2F — Section 4.3 — Outfall Locations and Descriptions Appendix B - Stormwater Outfall Summaries - BSEP Storm Water Pollution Prevention Plan (SWPPP) Duke Energy Progress, LLC Brunswick Steam Electric Plant National Pollutant Discharge Elimination System Individual Industrial Stormwater Permit Application Attachment 1 NC DEQ DEMLR SW NPDES Individual Permit Supplement Information Enclosure 2 Item 1 - Current Site Maps from Stormwater Pollution Prevention Site Plan Form 2F - Section 4.1 - Impervious Surface Areas Figure 2 VNIIOEVDH1aON'AlNno:I>IDIMSNnd ndodH1f1O5 NOIIVIS bV3i:)nN YDIMSNnme Q c° o c w4 iuN z w rn till N ra io 0 ti rI lr°t rfll+�+E t,.,3irA�.'V•--.1tt�n''��-��`--�l-.t.. .. .1 ``,`,��.;``� � ��...}i It a eat 1 � �.� � rtMv i�t j , / 1 v f � �?,•� _ - �\v �•��� �� � 'T p � It Ln 15 92rCr n t b eoE S *•'' + g r LU CL co Cl un.., hy(prl I �+ O O l9 Y •a d 00 °� et•,s #'�,. ,_.,wl # �. '� �rvrti.. , ..L E n i . ..- -�i• ' - .'f � n - - YI • z� �z'�. '� --1/0 [. L Sl � 1`� i € o i '� ? "o bAv- fi p b .�. i N ''� �. •.+! 1.�} o <!J a !n u �a r� F- to J1 3- 0 z 1O `ro ,• `.- �t� t ! c °ate emu'$ n y,r° Ali, VNIIO D H1210N'A1NnO7 )IDIMSNn)JS 1ifOdH1f105 NOUViS 2fVIlDnN NJIMSNma - AOU3N3 DIM � 9 _ g ¢ 7 N • yi N V clew SVauv 3f)V IIVHU cn j1 O LLJ = z tL to 4 x Y 4, Q n E � ar Y m v�i n g a~� z� z ryi.�y w < O [il O A R O O E O d O4 d r m E O� 5 m g O / _. w d a •'Iw. � c a`a"gip i�; a a 9 3 � 4 J�• . V ggr� �'... as p c Z A no o D n _ u a �• E o v � 0 o"o qp� N ;; ,• ,k N � i V f VN11021V HIAION'A1.Nno:)A3lMSNMS'l8OdHinOS NOI1V1S'dV31:)nN JIO1MSNnHs "� 9 dVW N31VMWbOIS o i #„�f vVi �N M U �p / raXV paPa;otcI tuaRPON o d LL a v �•�_ v �` lee q o «21, - . Ys lji '6 FZ m n E ro �o t G E N ce co CO C co 2 76, ® v i1 ",iv'— + F ! ' 1 - o� o' o c. m Z ' VNIIO'dVD HlaON ',11NnOD )171MSNndg 'lilOdHlfIOS w NOIlV1SaV3'1D(JNJI]IMSNftt19 dVW )J31VMWMOlS g W Z 7 eaid papaaoia uiaq}nog LL 1.� 1 tRs 'i Duke Energy Progress, LLC Brunswick Steam Electric Plant National Pollutant Discharge Elimination System Individual Industrial Stormwater Permit Application Attachment 2 NC DEQ DEMLR SW NPDES Individual Permit Supplement Information Enclosure 2 Items 2 & 3 - Summary of Analytical & Visual Monitoring Results Form 2F — Section 5.2 -- Testing Method Information Brunswick Steam Electric Plant NPDES Permit No. NCS000590 Industrial Stormwater Representative Outfall Analytical Summary October 29, 2017 < 5 7.3 7.83 2.54 May 21, 2018 < 5 < 2.5 7.02 3.06 July 21, 2018 < 5 < 2.5 7.30 3.00 June 10, 2019 < 5 < 2.5 7.20 3.90 September 6, 2019 < 5 < 2.5 7.00 4.90 April 30, 2020 < 5 10.6 6.90 1.00 November 6, 2020 < 5 65.9 8.03 0.87 March 17, 2021 < 5 14.1 7.30 0.70 September 7, 2021 < 5 25.3 7.64 1.40 January 16, 2022 < 5 23.7 7.70 1.93 Notes: Analyses conducted by Environmental Chemists, Inc. - NC Certified Lab No. 94 b b v b V ~ 4 u e . 'o a m ° d d . . a a zzz°z°z°zzz°z°z°z°z°�cz��z8ez8Eaz°z°zz°z° 3 z° z° z° z z z° o E E E C E £� o EE EE 2` .2 2 s` c°hb d3w 0 z z z z r z z a z z z i z z z z z z a z z z z r z r r z r r z r r z z z z z z s Z Z Z Z Z Z Z Z Z x a Z x x x 2 2 z z z z z z a Z Z z Z Z z Z z Z z Z z Z Z Z Z Z 2 E X Z 2 2 Z x 2 2 Z 2 2 2 Z z 2 Z x x 2 Z 2 2 Y z z - - - n b O c c c Z z z O O C Z 2 2 4 c Z z ter° c Q Q z z ~` c c c a Z Z c e C 2 z z c C C z z z c c c Z Z z c c d z z z c c z z z c c Z �°._' z c c z 2 z c c c z 2 z V O 0 y r R v .. u u u v.. u O B a 0 0 u O'G 'u G G1. O nmanmmn..mgmn�gg$o�$o08000ncao$0000ffi°os�g g z z 3 3 3 3 3 3 3 3 3 3 3 Duke Energy Progress, LLC Brunswick Steam Electric Plant National Pollutant Discharge Elimination System Individual Industrial Stormwater Permit Application Attachment 3 NC DEQ DEMLR SW NPDES Individual Permit Supplement Information Enclosure 2 Item 4 - Summary of Best Management Practices Section 2.2.3 Best Management Practices (BMPs) Summary BEEP Storm Water Pollution Prevention Plan (SWPPP) and Reauthorization Act (SARA) water priority chemicals, and storage in any amount of hazardous substances, in order to prevent spills and leaks from contaminating storm water runoff. Secondary containments shall be sized to contain the full capacity of the single largest container within the containment structure. Secondary containments exposed to precipitation shall also have additional capacity to contain the 25-year, 24-hour storm event. This additional capacity requirement shall take into consideration any storm water runoff entering the containment structure from upland areas if applicable. Secondary containments draining into storm water conveyance systems or onto the ground surface shall be equipped with manually - operated, lockable or otherwise secured drain valves or dewatering pumps. Flapper -type valves shall not be used. Accumulated storm water within secondary containments shall be visually inspected for color, foam, outfall staining, presence of sheen, oils or chemicals prior to release in accordance with the frequencies specified in the plant SPCC Plan. Inspections will include observation for leaks, condition of containment, valve drain closure and locking, and presence of excessive debris and sediment. Inspection records shall be maintained at the facility. Exterior containments exposed to precipitation shall be inspected promptly after any significant rainfall event, and collected water within containments shall be drained to maintain adequate spill storage capacity within the containment. A current list of all liquids and chemicals and their associated secondary containment provisions is maintained in eTrac and is also provided in Appendix F. Documentation for periodic inspections for leaks and recordation of accumulated storm water releases are documented in Appendix I. 2.2.3 Best Management Practices (BMPs) Summary 1SW Permit Reference: Part It, Section A.2 (c) A number of best management practices are currently in place at the station. These BMPs were instituted over a number of years'as a result of various regulatory drivers and good housekeeping objectives. While a chosen practice provides some level of pollution prevention as it relates to the management of storm water discharges under this permit, the historic rationale behind implementing such a practice is comprehensive of a number of contributing factors. To document the ongoing implementation of these practices as part of the SWPPP, Table 2 from the Industrial Storm Water Fact Sheet for Steam Electric Power Generating Facilities (EPA-833-F-06-030) was reviewed and evaluated, and is provided in Appendix 0. A high-level review of the BMPs is provided below along with a rationale for implementation. The detailed listing of these BMPs for each drainage area is provided in the outfall descriptions in Appendix B where information regarding the industrial activities and significant sources of pollutants are also compiled. The compiled information in the appendix captures an ongoing assessment process for BMP selection and implementation. 12 The Site Environmental Coordinator(s) shall rely on Table 2 from EPA-833-F-06-030 for the improvement, installation and implementation of BMPs to address data collected through monitoring of storm water discharges. The Site Environmental Coordinator(s) may also rely on other sources of information to develop and implement appropriate BMPs not specifically listed in Table 2. This list of BMPs shall be reviewed and updated annually as new practices are incorporated in the plan or warranted as a result of exceedances of analytical monitoring benchmarks detailed in the permit. FUGITIVE DUST EMISSIONS The potential for fugitive dust to impact storm water runoff drives the need for emission management practices. The station maintains an air permit with NCDEQ that includes the control of fugitive dust emissions as a programmatic requirement. Fugitive dust emissions are managed as necessary through a variety of BMPs that include restricting frequent traffic to paved roadways, periodic wetting of haul roads, and permanent stabilization of dust generating surfaces. Fugitive dust control is typically a contractual requirement of any contractors brought on -site to perform services that may involve the creation of fugitive dust. Fugitive dust generation is typically insignificant at the facility. LOADING AND UNLOADING OF FUELS, OILS AND NON -OIL LIQUIDS AND CHEMICALS The station maintains numerous locations for the loading and unloading of fuels, oils and non -oil liquids and chemicals. The potential for spills and leaks to release to storm drains or overland drainage pathways to receiving waters presents a source of unauthorized discharges and potential storm water contamination. Loading and unloading operations follow plant procedures, the requirements specified in the plant SPCC Plan, and the requirements specified in the DOT unloading/loading procedures 49 CFR Part 177, Subpart B. BMPs utilized during loading and unloading operations include constant attendance by qualified plant personnel, appropriate training, verification of container levels prior to filling, and the close proximity of appropriate spill response materials and resources. BMPs also include dedicated containment unloading platforms at the 7-Day Diesel Fuel Storage Tank, the 14-Day Diesel Fuel Storage Tank, the Security Emergency Diesel Generator, the Equipment Fuel Oil Storage Tank, and the Equipment Gasoline Storage Tank. Any spill occurring during loading or unloading operations within the protected area of the plant that cannot be contained in the immediate area by active measures will flow through the storm drain system and be contained in the Storm Drain Collection Basin. ABOVEGROUND LIQUID STORAGE TANKS AND PIPING The plant maintains numerous aboveground storage tanks for fuels, oils and non -oil liquids and chemicals. Aboveground piping is present at certain locations, and is primarily associated with the transfer of diesel fuel for operation of emergency diesel generators. The potential for spills and leaks to release to storm drains or overland drainage pathways to receiving waters exists, and presents a source for an unauthorized discharge and contamination of storm water. The plant relies on a variety of BMPs to reduce the potential for leaks or spills to impact storm water. 13 BMPs utilized for the larger bulk storage tanks include either dedicated secondary containments with secured manually -operated drain valves or pumps, dedicated secondary containments equipped with integral oil skimmers that gravity drain into the Storm Drain Collection Basin, or integral double -walled containment shells. BMPs utilized for smaller containers and drums include maintaining the containers inside various buildings, on spill pallets or within containment shelters. BMPs utilized for aboveground piping includes double -walling or protective coating and wrapping for certain high risk fuel transfer piping. Additional BMPs utilized include bollards and barriers to prevent vehicular impacts, tank level indicators to prevent overfilling and detect leaks, routine inspections and maintenance of tanks, piping, valves and connections. Routine inspection and integrity testing requirements for bulk oil tanks are specified in the plant SPCC Plan. OIL -FILLED ELECTRICAL EQUIPMENT The plant maintains oil -filled electrical equipment at numerous locations. The potential for spills and leaks to release to storm drains or overland drainage pathways to receiving waters exists, and presents a source for an unauthorized discharge and contamination of storm water. The plant relies on a variety of BMPs to reduce the potential for leaks or spills from this equipment to impact storm water. The plant utilizes gravel -filled concrete containment pits equipped with oil trap weirs that gravity drain into the Storm Drain Collection Basin as BMPs for the largest transformers located in the Transformer Yard within the protected area. A lined, concrete containment basin equipped with an oleophilic discharge valve is used for two large spare transformers in the Switchyard area. BMPs utilized for uncontained electrical equipment located within the plant Switchyard includes the spill retaining ability of the level, gravel -surfaced yard. BMPs utilized for large transformers at the Caswell Beach Discharge Structure include a partially -covered concrete containment structure equipped with an oil trap weir that gravity drains into the Discharge Canal. Storm water runoff from the numerous oil -filled electrical equipment locations outside of the protected area will discharge into either Nancy's Creek, the Intake Canal, or the Discharge Canal. BMPs for all transformers at the facility include routine inspections performed in accordance with the requirements specified in the plant SPCC Plan, and system monitoring to detect any adverse conditions associated with the equipment. CLEAN MATERIAL PROCESSING FACILITY The plant maintains a Clean Material Processing Facility used for waste handling, monitoring and storage. The facility is comprised of two buildings and surrounding laydown areas located outside of the protected area. The first building is a central processing area used for monitoring waste materials for low level radioactivity prior to leaving the site. A trash compactor is located adjacent to the main building and is used for compacting routine trash generated at the plant. The second building is used for segregating and storing chemical wastes, hazardous wastes, waste oil, used fluorescent bulbs, batteries, paints, oily wastes, and other materials for disposition. The potential for spills and leaks to release to storm drains or overland drainage pathways to receiving waters exists, and presents a source for an unauthorized discharge and contamination of storm water. Storm water runoff from this area eventually discharges into Nancy's Creek via Outfall 007. BMPs utilized include maintaining most wastes and chemicals 14 inside the buildings that could potentially impact storm water, and interior curbed concrete floors with dead-end sumps to retain any spills within the buildings. Additional BMPs utilized within this area include the use of containment pallets for materials stored outside the buildings, and when practical covering of exterior containers used for the collection of recycling materials such as aluminum drink cans, copper, steel, wood and paper. SANDBLASTING AND PAINTING AREA The plant maintains a designated area for sandblasting and painting of large components and structures. The area also includes a satellite hazardous waste storage area and a recycle operation for paint thinners. The potential for spills and leaks to release to storm drains or overland drainage pathways to receiving waters exists, and presents a source for an unauthorized discharge and contamination of storm water. BMPs utilized include perimeter silt fencing to retain grit within the sandblast area, and buildings to store the hazardous wastes, paints and thinners. The blast grit is routinely collected and containerized. Storm water runoff from this area enters a drainage channel that flows easterly, eventually into the Intake Canal via outfall SW 013. VEHICLE AND EQUIPMENT MAINTENANCE The plant maintains a Garage facility for maintenance of plant vehicles and equipment located north of the Turbine Building outside of the protected area. Vehicles and equipment have the potential to leak or spill significant quantities of fuel, hydraulic fluids, and oils if not properly maintained and operated. Maintenance is performed on a routine basis to keep vehicles and equipment operational thereby reducing the potential for spills and leaks from mechanical failure. Some maintenance may be performed offsite at commercial facilities that are subject to local laws and regulations regarding the disposal of used materials. BMPs utilized include performing all maintenance inside the Garage, utilizing temporary containment devices for the capture of fluids, and proper labeling, handling and disposal of used materials, parts and fluids. BMPs also include readily available spill response materials. Storm water runoff from the Garage and surrounding area enters a drainage channel that flows easterly, eventually into the Intake Canal via outfall SW 013. SECURITY TRAINING AND FIRING RANGE The plant maintains a designated facility for security training purposes that includes an external firing range. Lead -based ammunition is routinely fired into earthen embankments at the range. Storm water runoff from this area flows northerly overland eventually into Nancy's Creek. BMPs utilized include tracking the amount of ammunition fired into the embankments, routine monitoring of soil pH levels, and periodic removal and replacement of lead -impacted soils. BOAT STORAGE AREA The plant maintains a boat storage area located on the Intake Canal near the Biolab. The boats contain fuel tanks and are maintained under a shelter. BMPs utilized include maintaining the boats under the shelter while not in use to prevent direct exposure to rainfall. 15 A list of all currently utilized BMPs within the contributing drainage area for each storm water outfall is provided on the fact sheets in Appendix B. 2.3 Spill Prevention and Response Procedure ISW Permit Reference: Part It, Section A, 3 The station maintains Spill Prevention and Response Procedures (SPRP) to control and minimize contamination of storm water resulting from spills and exposure to materials associated with facility operations. These procedures incorporate an assessment of potential pollutant sources based on a materials inventory of the plant. The materials inventory is primarily compiled and maintained through two efforts; first for development and compliance with the plant SPCC Plan, and secondly for the management of hazardous materials. The Brunswick Nuclear Plant is required to develop and maintain an SPCC Plan in accordance with 40 CFR Part 112 because the oil storage capacity at the facility exceeds 1,320 gallons and the proximity to waters of the United States. The SPCC Plan provides an assessment of spill potential, measures for spill prevention, and a spill response protocol for oil -based liquids. A similar approach has been adopted for non -oil based liquids and chemicals representing the balance of materials at the plant. However, the plant will likely maintain the same general spill response protocol from the SPCC Plan regardless of the types of materials except where hazardous materials regulations and notifications deviate from SPCC requirements. This is recognized in the response procedures. The Site Environmental Coordinator(s) shall maintain a figure depicting locations for all oils, liquids, chemicals and materials that have the potential to impact storm water. The Site Environmental Coordinator(s) shall routinely review the SPRP procedures for applicability with current plant operations and practices, shall amend/update the SPRP as necessary, and shall communicate changes to responsible plant personnel. Facility personnel responsible for implementing the SPRP shall be identified in a written list incorporated into the SPRP and signed and dated by each individual acknowledging their responsibilities for the plan. A responsible person shall be on -site at all times during facility operations that have increased potential to contaminate storm water runoff through spills or exposure of materials associated with facility operations. Spill Prevention and Response Procedures in -place at the Brunswick Nuclear Plant are listed in Appendix G. M. Duke Energy Progress, LLC Brunswick Steam Electric Plant National Pollutant Discharge Elimination System Individual Industrial Stormwater Permit Apolication Attachment 4 NC DEQ DEMLR SW NPDES Individual Permit Supplement Information Enclosure 2 Item 5 — Narrative of Industrial Activities Form 2F — Section 4.2 — Narrative Description of Pollutant Sources Section 2.2 Stormwater Management Strategy BSEP Storm Water Pollution Prevention Plan (SWPPP) details of the spill and any corrective actions taken to mitigate spill impacts. All environmental incidences at the plant are stored for review in the station's eTrac or similar record retention system. The Site Environmental Coordinator(s) shall update the list of significant spills and leaks for the previous three years by May 15 of every permit year and place a copy in Appendix D of this plan. 2.1.5 Non -Storm Water Discharge Certification iSW Permit Reference: Part li, Section A, 1. (e) An evaluation for non -storm water discharges shall be performed annually by the Site Environmental Coordinator(s). The evaluation shall determine if a non -storm water discharge is present or otherwise how that discharge is permitted or otherwise authorized. Once the evaluation is complete, documentation shall be provided to the Plant Manager for the purposes of submitting a certification pursuant to Part HI, Standard Conditions, Section B, Paragraph 3 of the permit to NCDEQ's Storm water Permitting Program Central Office by May 15 of every permit year. Supporting evaluation information and a copy of the certification shall be included in Appendix E. 2.2 Storm Water Management Strategy 2.2.1 Feasibility Study iSW Permit Reference: Part ll, Section A.2 (a) This section provides a review of the technical feasibility of changing the methods of operations and/or storage practices to eliminate or reduce exposure of materials and processes to rainfall and storm water runoff. Below are descriptions of the existing operations at the plant that present the potential for negative impacts to storm water runoff. These descriptions demonstrate the current practices in use to prevent exposure of storage areas, material handling operations and fueling operations. DIESEL FUEL AND GASOLINE STORAGE Diesel fuel is stored at the plant in several different tanks and containers. The diesel fuel is primarily used as fuel for several emergency diesel generators at various locations at the plant. The largest diesel fuel containers are the 225,000 gallon capacity Emergency Diesel Generator 7-Day Diesel Fuel Storage Tank, four 23,300 gallon capacity Emergency Diesel Generator Diesel Fuel 4-Day Tanks, the 10,000 gallon capacity 14-Day Auxiliary Emergency Diesel Generator Tank, the 2,000 gallon capacity Equipment Fuel Oil Storage Tank, and the 4,000 gallon capacity Emergency Diesel Generator Tank at the EOF/TSC. Gasoline is stored in the 5,000 gallon capacity Equipment Gasoline Storage Tank. A complete listing of these containers, including inspection and testing requirements, secondary containment descriptions and inspection requirements, and tanker loading and unloading operation requirements are described in detail in the Brunswick Nuclear Plant SPCC Plan. C All diesel fuel and gasoline storage tanks are provided with some means of passive secondary containment or are integral double -walled containers. The gasoline tank is an integral double - walled container. With the exception of the secondary containment for the Emergency Diesel Generator Tank at the EOF/TSC, all drainages from secondary containments discharge into the Storm Drain Collection Basin (SDCB). Drainages from the secondary containment for the Emergency Diesel Generator Tank at the EOF/TSC discharges into the Discharge Canal. Refueling operations for all diesel fuel containers and the gasoline tank are conducted with constant attendance in accordance with facility procedures and the facility SPCC Plan. Tanker trucks are brought on -site to refill the 7-Day Diesel Fuel Storage Tank, the 14-Day Diesel Fuel Storage Tank, the Equipment Fuel Oil Storage Tank, the Emergency Diesel Generator Tank at EOF/TSC, and the Equipment Gasoline Storage Tank. Transfer operations are conducted adjacent to the tanks. Passive secondary containment for tanker unloading at the 7-Day and 14-Day Diesel Fuel Storage Tanks, the Security Emergency Diesel Generator, the Equipment Fuel Oil Storage Tank, and the Equipment Gasoline Storage Tank is provided by dedicated curbed concrete unloading platforms. The containment for unloading into the 7-Day Diesel Fuel Storage Tank discharges into the SDCB. The containment for unloading into the 14-Day Diesel Fuel Storage Tank is equipped with an open drain and valve that normally directs collected rainwater to the SDCB, During unloading operations, station personnel change the valve position to direct any release into an oil collector pit. The containment for unloading into the Security Emergency Diesel Generator is equipped with a manually operated drain valve that discharges into SDCB. The containment for unloading into the Equipment Fuel Oil Storage Tank and the Equipment Gasoline Storage Tank is equipped with a lockable double isolation ball valve. Drainage from this containment will flow into drainage ditches that direct runoff easterly and eventually into the Intake Canal. Smaller bulk storage diesel and gasoline containers and mobile equipment is refilled using the on -site Mobile Fuel Truck. Tanker unloading operations are conducted adjacent to these containers. Prior to filling any container, tank levels are verified by electronic high-level and low- level annunciators, visual sight glasses, or are otherwise verified as described in the facility SPCC Plan. The four 23,300 gallon capacity Emergency Diesel Generator Diesel Fuel 4-Day Tanks are located inside the Four Day Tank Rooms and are manually refilled by gravity feed via underground piping from the 7-Day Diesel Fuel Storage Tank. The piping is double -walled stainless steel. These four Emergency Diesel Generator Diesel Fuel 4-Day Tanks are not exposed to rainfall or storm water runoff. There are no changes warranted to reduce the potential for impacts to storm water runoff associated with diesel fuel and gasoline storage practices or unloading operations at the facility. All diesel fuel and gasoline containers are in compliance with the facility SPCC Plan. 7 LURE OIL STORAGE The plant has two large lobe oil storage tanks designated as the 18,000 gallon capacity Turbine Clean Lube Oil Tank and the 12,000 gallon capacity Turbine Dirty Lube Oil Tank. Both tanks are located within a 56,000 gallon capacity concrete containment pit equipped with an oil trap weir that discharges via gravity flow into the SDCB. There is also a 250 gallon capacity used oil tote equipped with an oil skimmer located adjacent to these tanks that drains into the pit. Water from the tote can be decanted back into the adjacent pit. There are no changes warranted to reduce the potential for impacts to storm water runoff associated with these lube oil tanks. OIL IN USE CONTAINERS AND SYSTEMS Oil in use at the plant includes lubrication oils, mineral oils and hydraulic oils maintained within closed conduit systems. These oils are used in hydraulic systems, lubricating systems, gear boxes, machining coolant systems, heat transfer systems, transformers and circuit breakers. Oil in use containers are described in detail in the Brunswick Nuclear Plant SPCC Plan. The facility contains several lube oil and hydraulic oil reservoirs located inside the various plant buildings and consequently not exposed to rainfall or storm water runoff. The largest interior oil in use containers are the two 9,250 gallon capacity Lube Oil Reservoirs located inside the Turbine Building. The largest oil in use containers exposed to rainfall or storm water runoff are six 12,930 gallon capacity Main Transformers, two 10,400 gallon capacity Startup Auxiliary Transformers, two 6,588 gallon capacity Unit Auxiliary Transformers, two 11,840 gallon capacity Caswell Beach Transformers, and one 12,930 gallon capacity spare Main Transformer. These large transformers contain mineral oil and are located in the Transformer Yard immediately west of the Turbine Building within the protected area. All of these transformers are provided secondary containment by gravel -filled concrete containment pits equipped with oil trap weirs that gravity drain into the SDCB. There is also one spare 10,400 gallon capacity Startup Auxiliary Transformer and one spare 6,588 gallon capacity Unit Auxiliary Transformer located in the northern area of the Switchyard outside of the protected area. These transformers are located within a single, lined concrete containment basin equipped with an olephilic discharge valve. The valve freely drains clean rainwater onto the Switchyard, but will close automatically in contact with oil. There are two 539 gallon capacity SY transformers exposed to rainfall and storm water runoff located in the Switchyard area west of the Turbine Building. These two SY transformers are not provided with any means of passive secondary containment. There are also three replacement transformers that contain approximately 11,000 gallons of oil each, staged in temporary containments in the northern area of the Switchyard outside the protected area. The Auxiliary Operators perform inspection rounds of the switchyard each shift. Storm water runoff from the Switchyard flows overland and eventually into Nancy's Creek via Outfall 008. There are no changes warranted to reduce the potential for impacts to storm water runoff associated with the large transformers. The potential for storm water impacts associated with mineral oil releases from these two SY transformers could be reduced by the installation of R. dedicated secondary containments. Covering all electrical equipment in the Switchyard to prevent direct exposure to rainfall is cost prohibitive. There are two large transformers and two small circuit breakers located at the Caswell Beach Discharge Structure. These containers are provided passive secondary containment by a partially -covered, concrete containment equipped with an oil trap weir that gravity drain into the Discharge Canal. These containers are not directly exposed to rainfall or storm water runoff. Smaller oil in use containers exposed to rainfal[ or storm water runoff include numerous pad - mounted service transformers containing mineral oil and ranging in size from 24 gallons to 667 gallon capacity. These service transformers are located at various locations around the facility. Four of these pad -mounted transformers are located within the protected area of the plant and are provided secondary containment by yard drains to the SDCB. Two of these pad -mounted transformers are provided secondary containment by a French -drain system that discharges into the SDSF. None of the remaining pad -mounted transformers are provided with any means of passive secondary containment. A mineral oil release occurring from four of these transformers would flow into the Intake Canal. A mineral oil release occurring from the Groundwater Extraction System Compressor Building service transformer would flow overland eventually entering Nancy's Creek. A mineral oil release occurring from any of the remaining pad -mounted transformers would eventually enter the Intake Canal. The facility relies on system monitoring, frequent inspections, preventative maintenance, and active containment measures as described in the plant SPCC Plan to contain any potential release occurring from these transformers. With the exception of the service transformer located at the Diversion Structure, a mineral oil release from these units will typically discharge vertically into the underlying conduit penetrations which will provide some degree of containment. The potential for storm water impacts associated with mineral oil releases from any of these uncontained pad -mounted transformers could be reduced by the installation of dedicated secondary containments. The Diversion Structure service transformer is located on a concrete platform directly over the intake canal. Consequently, a release occurring from this unit has a high likelihood to directly impact surface waters. Sized passive secondary containment has been installed for the Diversion Structure transformer. Work is performed on the Diversion structure five to seven days per week with the transformer containment being inspected every day workers access the structure. CLEAN MATERIAL PROCESSING FACILITY The Clean Material Processing Facility is the plant waste handling, monitoring and storage area. The facility is comprised of two buildings and surrounding laydown areas located outside of the protected area. The first building is a central processing area used for monitoring waste materials for low level radioactivity prior to leaving the site. A trash compactor is located E adjacent to the this building and is used for compacting routine trash generated at the plant. The second building is used for segregating and processing chemical wastes, hazardous wastes, waste oil, used fluorescent bulbs, batteries, paints, oily wastes, and other materials for disposition. The second building is equipped with a curbed concrete floor and dead-end sump designed to collect and contain any spills within the building. The laydown/storage areas and areas around the Clean Material Processing Facility are comprised of approximately 50% paved surfaces and approximately 50% gravel -surfaced areas. All wastes and chemicals that could potentially impact storm water are maintained inside the buildings or on exterior containment pallets. The facility has exterior containers used for the collection of recycling materials such as aluminum drink cans, copper, steel, wood and paper. No significant materials that could potentially impact storm water are stored in the exterior laydown areas. A 40 X 50 foot curbed containment with lockable drain valves in located in the area for storage of mobile equipment. Tractors and mowers are stored in a building adjacent to this containment. Storm water runoff from this area discharges into Nancy's Creek via Outfall 007. There are no changes warranted to reduce the potential for impacts to storm water runoff associated with the Clean Material Processing Facility. SANDBLASTING AND FAINTING AREA The plant maintains a designated area for sandblasting and painting of large components and structures. The sandblasting yard is surrounded by a silt fence to prevent sandblast grit from entering a nearby storm water drainage ditch. Located within this area are buildings used for painting plant components and equipment, and for storing hazardous waste, paints and thinners. Storm water runoff from this area enters a drainage channel that flows easterly, eventually into the Intake Canal via outfall SW 013. The potential for storm water impacts associated with the sandblasting operation could be reduced by installing curtains around the sandblast area to prevent drift of the sandblast material, and by improved management and disposal of the sandblast residuals. Processes are being developed for controlling and containerizing the blast grit, and for enhancing sediment and erosion control measures. EXTERNAL STORAGE AND LAYDOWN AREAS The plant does not maintain extensive external storage areas. Inert materials such as soil, sand, gravel, compost, concrete, asphalt, metal and wood may be stockpiled at certain locations on a temporary basis until the material can be recycled, reused or properly disposed of off -site. Stockpiled material such as soil that could potentially result in the mobilization of sediments when exposed to rainfall are covered, stabilized by temporary or permanent seeding or are otherwise provided with necessary sediment control measures. Storm water runoff from these exterior storage areas either discharges into Nancy's Creek via Outfalls 007 or 009, or into the Intake Canal. The potential for storm water impacts associated with these external storage areas could be reduced by covering soil, gravel, treated lumber, flaking painted surfaces and other materials that represent the greatest potential for such impacts. Constructing permanent shelters over these external storage and laydown areas is cost prohibitive. IE SECURITY TRAINING AND FIRING RANGE The plant maintains a designated facility for security training purposes that includes an external firing range. The range is constructed on the top of the former inert debris landfill. Lead -based ammunition is routinely fired into earthen embankments at the range. Storm water runoff from this area flows northerly overland eventually into Nancy's Creek. Security personnel maintain an inventory of expended rounds fired and routinely monitor soil pH levels in the embankments to determine schedules for lead harvesting of the soil. Constructing permanent shelters over the embankments to eliminate exposure to rainfall is cost prohibitive. BOAT STORAGE AREA The plant maintains a boat storage area located on the Intake Canal near the Biolab. Boats are stored under shelter. Storm water runoff from this area enters the recovery pond located behind the Biolab. There are no changes warranted to reduce the potential for impacts to storm water runoff associated with this area. Duke Energy continuously pursues strategies to holistically manage the exposure of storm water to power generation, waste disposal, and facility management operations. These efforts consider the technical and economic feasibility of changing the methods of operations and/or storage practices. The details from the planning, design, and construction of such improvements shall be incorporated into the SWPPP upon completion. 2.2.2 Secondary Containment Requirements and Records fSW Permit Reference: Part ff, Section A.2 (,b) The plant manages numerous oil -based liquids and non -oil based liquids and chemicals which are critical to power generation and transmission, waste handling and treatment, and operation of vehicles and equipment used at the facility. The Brunswick Nuclear Plant is subject to the requirements of U.S. Environmental Protection Agency (EPA) Oil Pollution Prevention Regulation 40 CFR Part 112 because the oil storage capacity at the facility exceeds 1,320 gallons and the proximity to waters of the United States. As a result, the facility maintains a Spill Prevention, Control, and Countermeasures (SPCC) Plan pursuant to, 40 CFR Part 112. This plan addresses secondary containment, inspections and record keeping requirements for all oil containers of 55 gallon capacity and greater, A copy of the SPCC is not included in the SWPPP as the document is actively managed at all times for evolving site conditions; however, a current version is maintained in the Nuclear Fusion document data base and a version with mark-ups is maintained in the office of the Site Environmental Coordinator(s) and referenced herein. Pursuant to this section of the permit, secondary containment is required for the bulk storage of liquid materials, storage in any amount of Section 313 of Title III of the Superfund Amendments 11 and Reauthorization Act (SARA) water priority chemicals, and storage in any amount of hazardous substances, in order to prevent spills and leaks from contaminating storm water runoff. Secondary containments shall be sized to contain the full capacity of the single largest container within the containment structure. Secondary containments exposed to precipitation shall also have additional capacity to contain the 25-year, 24-hour storm event. This additional capacity requirement shall take into consideration any storm water runoff entering the containment structure from upland areas if applicable. Secondary containments draining into storm water conveyance systems or onto the ground surface shall be equipped with manually - operated, lockable or otherwise secured drain valves or dewatering pumps. Flapper -type valves shall not be used. Accumulated storm water within secondary containments shall be visually inspected for color, foam, outfall staining, presence of sheen, oils or chemicals prior to release in accordance with the frequencies specified in the plant SPCC Plan. Inspections will include observation for leaks, condition of containment, valve drain closure and locking, and presence of excessive debris and sediment. Inspection records shall be maintained at the facility. Exterior containments exposed to precipitation shall be inspected promptly after any significant rainfall event, and collected water within containments shall be drained to maintain adequate spill storage capacity within the containment. A current list of all liquids and chemicals and their associated secondary containment provisions is maintained in eTrac and is also provided in Appendix F. Documentation for periodic inspections for leaks and recordation of accumulated storm water releases are documented in Appendix 1. 2.2.3 Best Management Practices (BMPs) Summary IS IN Permit Reference, Part ll, Section A.2 (c) A number of best management practices are currently in place at the station. These BMPs were instituted over a number of years as a result of various regulatory drivers and good housekeeping objectives. While a chosen practice provides some level of pollution prevention as it relates to the management of storm water discharges under this permit, the historic rationale behind implementing such a practice is comprehensive of a number of contributing factors. To document the ongoing implementation of these practices as part of the SWPPP, Table 2 from the Industrial Storm Water Fact Sheet for Steam Electric Power Generating Facilities (EPA-833-F-06-030) was reviewed and evaluated, and is provided in Appendix O. A high-level review of the BMPs is provided below along with a rationale for implementation. The detailed listing of these BMPs for each drainage area is provided in the outfall descriptions in Appendix B where information regarding the industrial activities and significant sources of pollutants are also compiled. The compiled information in the appendix captures an ongoing assessment process for BMP selection and implementation. 12 Duke Energy Progress, LLC Brunswick Steam Electric Plant National Pollutant Discharge Elimination System Individual Industrial Stormwater Permit Application Attachment 5 Form 1 — Section 6.1 — Existing Environmental Permits Duke Energy Progress, LLC Brunswick Steam Electric Plant National Pollutant Discharge Elimination System Individual Industrial Stormwater Permit Application Attachment 5 Form 1 - Section 6 - Existing Environmental Permits Issuing Agency Type of Permit Permit or ID Number NCDEQ - DWR NPDES - WW NCO007064 NCDEQ - DWR NPDES - CSW NCG010000 NCDEQ - DWR NPDES - SSW SW8030811 NCDEQ - DWR NPDES - SSW SW8040344 NCDEQ - DWR NPDES - SSW SW8081006 NCDEQ - DWR NPDES - SSW SW8081010 NCDEQ - DWR NPDES - SSW SW8090528 NCDEQ - DWR NPDES - SSW SW8911203 NCDEQ - DWR NPDES - SSW SW8120103 NCDEQ - DWR NPDES - SSW SW8200709 NCDEQ - DCM Coastal Resources Commission 293 NCDEQ - DAQ Synthetic Minor 05556 NCDEQ - DWM EPA Hazardous Material Waste Generator Number NCDO91570960 (SQG) NCDEQ - DWM Oil Spill Prevention Control and Countermeasure Plan (SPCC) incorporated into SWPPP NA NCDEQ - DWM Certification of Registration of Oil Terminal Facility 104021005 Nuclear Regulatory Commission Renewed Facility Operating License DPR-71, DPR-62 Duke Energy Progress, LLC Brunswick Steam Electric Plant National Pollutant Discharge Elimination System Individual Industrial Stormwater Permit Application Attachment 6 Form 1 -- Section 7.1 — Maps Duke Energy Progress, LLC Brunswick Steam Electric Plant National Pollutant Discharge Elimination System Permit Number NCO007064 Attachment 6 Form 1 — Item 6 - Topographic Map _.�.- µ •i 5r Nr T Y jai j ' 35 - i 4 1 r f irl g17g Brun iciC''�,' i StemEjec ! , t z Ake Ake anal, ►yv' �' �5r f 1 r �Q t� r WMP i_'�s-��4�,;`t.~1- •w ^ At t _-AIW4hts Received Igo# For'N auigation 1 Duke Energy Progress, LLC Brunswick Steam Electric Plant National Pollutant Discharge Elimination System Permit Number NG0007064 Attachment 6 Form 1 — — item 6 - Location Map Brunswick Ocean Discharge Area 2 4 Kilometers Miles 2 W Atlantic Ocean Duke Energy Progress, LLC Brunswick Steam Electric Plant National Pollutant Discharge Elimination System Individual Industrial Stormwater Permit Application Attachment 7 Form 2F — Section 3.1 — Site Drainage Map ' VNIIOEVD HPJQN'AlNnOD HDIMSNnda l'dOdHlnOs NOUVE v3iDnN ND MSNna 'A w '- w wN avw DixavuOOJOlL SOsn th got IT 4 t � �3� ,✓� is � r � -'t„(` �- \ - c ,Ol - +.''!- 1 - fr'F,YVn.4. �_ t /'� • tti" .�p,. m f tJ,r OD m 0. �"- tom, ) n �� � a ' 11•L or 'o ci co co cq iv zo bo 4� dip 1` �ayt" riot — - - � - - •�t.. t it L ' i 1 m Duke Energy Progress, LLC Brunswick Steam Electric Plant National Pollutant Discharge Elimination System Individual Industrial Stormwater Permit Application Attachment 8 Form 2F — Section 4.3 — Outfall Locations and Descriptions Appendix B - Stormwater Outfali Summaries BSEP Storm Water Pollution Prevention Plan (SWPPP) Storm Water Outfall SWO07 Discharge 18 inch HDPE ►. �._ Structure - Location West of Clean Material Processing ` , Facilityr Receiving Nancy's Creek Water Body Latitude N 330 5755" Longitude W 780 00' 29" Drainage Area 6 acres Percent 20 % Impervious Drainage Area The contributing drainage area for SWO07 includes the Clean Material Description Processing Facility buildings and surrounding laydown areas, miscellaneous exterior storage areas and storage buildings, the Meteorological Tower, and rassed and wooded areas. Industrial The Clean Material Processing Facility is comprised of two buildings and Activities surrounding laydown areas located outside of the protected area. The first building is a central processing area used for monitoring waste for the presence of radioactivity prior to leaving the site. A trash compactor Is located adjacent to the main building and is used for compacting routine trash generated at the plant. The second building is used for segregating and storing chemical wastes, hazardous wastes, waste oil, used fluorescent bulbs, batteries, paints, oily wastes, etc. The storage areas contain inert wood and metal materials. Significant Clean Material Processing Facility: Waste chemical and oils, solid and Materials/ hazardous wastes, used fluorescent bulbs, batteries, paints, routine trash. Potential Pollutants Storage areas: miscellaneous wood, structural steel, cable, and other metal. BMP Summary Clean Material Processing Facility: • The buildings are designed with curbed concrete floors and dead end sumps to contain an liquid spills within the buildings. • Plant procedures are followed regarding storage, handling and transfer of all waste materials. • No waste materials that could impact storm water are stored in exterior areas. • Plant personnel are trained in appropriate spill response procedures. Storage Areas: • Stored materials that could impact storm water are covered or stored inside buildings. • A curbed containment structure with lockable drainage valves is used for equipment storage. Storm Water Outfall SWO08 Discharge 36 inch RCP Structure Location West of.. Switchyard "k Receiving Nancy's Creek Water Body;- M " ' Latitude Longitude N 330 57' 38" W 780 00' 40" Drainage Area 10 acres Percent 20 %`' Impervious i area for SWO08 includes the gravel -surfaced Drainage Area The contributing drainage Description Switchyard, an asphalt perimeter road, and grassed areas. Industrial The Switchyard contains two buildings and electrical equipment including Activities transformers, circuit breakers, switchgear and associated steel support structures. Significant Switchyard: Mineral oil is used as a dielectric fluid inside two uncontained SY Materials/ transformers. Mineral oil is also stored inside one spare Startup Auxiliary Potential Transformer and one spare Unit Auxiliary Transformer located in the northern Pollutants area of the Switchyard. BMP Summary ® The spare Startup and Unit Auxiliary Transformers are located within a single lined concrete containment basin equipped with oleophilic discharge valve. The valve freely drains clean rainwater onto the Switchyard, but will close automatically in contact with oil. ® Routine inspections are performed in accordance with the requirements specified in the plant SPCC Plan. • System monitoring is used to detect any adverse conditions associated with oil -filled equipment. ® Plant personnel are trained in appropriate spill response procedures. Storm Water Outfall SW099 Discharge 15 inch HDPE Structure Location West of Materials j Control Laydown Area,. Receiving Nancy's Creek`_ Water Body' Latitude N 33° 5748"`` Longitude W 780 00' 39" P. Drainage Area 5 acres Percent 70 °1° Impervious Drainage Area The contributing drainage area for SWO09 includes the Materials Control Description Laydown Area, the Container Van Storage Area, a railroad spur, and grassed and wooded areas. Industrial Outage materials Activities Significant Materials Control Laydown Area: Inert materials used for maintenance and Materials/ fabrication are stored in the external laydown area. Potential Pollutants Container Van Storage Area: Outage specialty materials are stored inside the container vans. BMP Summary Materials Control Laydown Area: • Only inert materials are stored on external laydown areas Container Van Storage Area: • Outage specialty materials are stored inside the container vans