HomeMy WebLinkAboutNCC221472_Site Plan or Location Map_20220414WS/FC EROSION CONTROL NOTICE
PLANS APPROVED FOR CONSTRUCTION
This plan complies with Chapter 8, Section 4 - Erosion Control
of the Winston-Salem/Forsyth County Unified Development
Ordinance. A printed set of the stamped/approved plans must
be kept on the construction site for reference when installing
required erosion control measures.
matthewo
12/21 /2021 11:12:53 AM
D v
DISTURBtD LIMNS
Q
rn
B
NO FO D
A �F
— — —— —
U82
P F v�:H y /- v v v ��_ —— — — — — ———— — — — — —— —
--
s--
.a&10 -- --
\ i D
INV 25 Vl
v A
v
yM/-- — -- — —— — — —— — — — — ——
G II D
J 11 (f'��---------- �1 —
AO NEW TEMPORARY CONSTRUCTION ENTRANCE/EXIT.
OB NEW TEMPORARY SEDIMENT FENCE.
CO NEW TEMPORARY SEDIMENT FENCE WITH STONE
OUTLET.
OD NEW TEMPORARY DIVERSION BERM.
OE NEW TEMPORARY SKIMMER SEDIMENT BASIN. THE
INSIDE SLOPES OF THE SKIMMER SEDIMENT BASIN SHALL
BE STABILIZED WITH NORTH AMERICAN GREEN S75
EROSION CONTROL MATTING UPON COMPLETION OF
CONSTRUCTION.
OF NEW COIR, JUTE OR BURLAP BAFFLES.
GO NEW TEMPORARY EMERGENCY SPILLWAY.
HO NEW TEMPORARY SKIMMER DEVICE.
lO NEW TEMPORARY 10'x10' CLASS "B" RIP RAP OUTLET
STABILIZATION PAD.
JO NEW TEMPORARY 18" CPP SLOPE DRAIN. SLOPE DRAINS
SHALL BE INSTALLED / RE -INSTALLED ON SLOPES AT 8 FT
INTERVALS MEASURED VERTICALLY.
EXISTING TREES/VEGETATION TO BE REMOVED TO LIMITS
OF NEW TREELINE. EXISTING TREE TO BE REMOVED TO
THE STUMP. NO STUMPS MAY BE REMOVED UNTIL THE
EROSION CONTROL MEASURES HAVE BEEN INSTALLED
AND APPROVED BY EROSION CONTROL INSPECTOR.
®POSSIBLE TEMPORARY STOCKPILE/STORAGE/STAGING
AREA.
1j //
STAGE 1 CONSTRUCTION SEQUENCE
1. OBTAIN GRADING/EROSION CONTROL PERMIT AND PLAN APPROVAL FROM THE FORSYTH COUNTY INSPECTIONS DIVISION.
2. CONTRACTOR IS REQUIRED TO FILL OUT AND SUBMIT AN ELECTRONIC NOTICE OF INTENT (e-NOI) FORM. ALL CONTRUCTION ACTIVITIES
ARE REQUIRED TO FOLLOW THE NEW NCGO1 PERMIT.
3. CONTACT EROSION CONTROL INSPECTOR TO ESTABLISH A MANDATORY PRECONSTRUCTION CONFERENCE AND AN INSPECTION
SCHEDULE.
4. THE CONTRACTOR SHALL CONDUCT SELF -INSPECTIONS OF THE EROSION AND SEDIMENT CONTROL MEASURES AND COMPLETE THE
FOLLOWING COMBINED SELF -INSPECTION FORM FOUND ON THE DEMLR WEBSITE;
(http://deq.nc.gov/about/divisions/energy-mineral-land-resources/erosion-sediment-control/forms). COMPLETE INSPECTIONS FORMS SHALL BE KEPT
ON -SITE AND AVAILABLE FOR INSPECTION AT ALL TIMES. IT IS RECOMMENDED THAT A COPY BE KEPT IN A PERMITS BOX.
SELF -INSPECTIONS FOR STABILITY AND FUNCTION OF EROSION AND SEDIMENTATION CONTROL MEASURES ARE TO BE PERFORMED AT
LEAST ONCE EVERY SEVEN CALENDAR DAYS AND WITHIN 24 HOURS OF EACH RAINFALL EVENT OF GREATER THAN 0.5 INCH. ANY NEEDED
REPAIRS SHALL BE MADE IMMEDIATELY TO MAINTAIN MEASURES AS DESIGNED. ALL EROSION AND SEDIMENTATION CONTROL MEASURES
SHALL BE MAINTAINED AS SPECIFIED IN THE CONSTRUCTION DETAILS ON THIS PLAN. A RAIN GAUGE SHALL BE INSTALLED AT THE PROJECT
SITE FOR MONITORING.
5. A COPY OF THE EROSION AND SEDIMENT CONTROL PERMIT, A HARD COPY OF THE PLAN, AND ALL SELF -INSPECTION RECORDS MUST BE
KEPT ON -SITE, PREFERABLY IN A PERMITS BOX, AND ACCESSIBLE AT ALL TIMES FOR INSPECTION.
6. INSTALL THE CONSTRUCTION ENTRANCE AND SEDIMENT FENCE ALONG EDGE.
7. BEGIN CLEARING AND GRUBBING JUST ENOUGH TO ALLOW FOR INSTALLATION OF THE SEDIMENT SKIMMER BASINS AND SEDIMENT FENCE.
STOCKPILE TOPSOIL ON -SITE WITHIN AREAS PROTECTED BY EROSION CONTROL MEASURES FOR LATER DISTRIBUTION.
8. THE SEDIMENT SKIMMER BASINS CAN NOW BE INSTALLED BEGINNING WITH THE REAR DAM ALONG WITH CORRESPONDING COMPONENTS.
9. ONCE THE DAM FOR THE SEDIMENT SKIMMER BASINS HAVE BEEN INSTALLED, THEN SEDIMENT FENCE SHOULD BE INSTALLED AT THE TOE
OF SLOPE WITH THE OCCASIONAL SECTION OF SEDIMENT FENCE WITH STONE STABILIZATION.
10.ONCE THE SEDIMENT SKIMMER BASINS HAVE BEEN INSTALLED AS DESCRIBED ABOVE, THEN CONSTRUCTION OF DIVERSION DITCHES AND
BERMS CAN BEGIN.
11.INSTALL TEMPORARY SLOPE DRAINS INTO SEDIMENT SKIMMER BASINS AS SHOWN.
12. SEED/STABILIZE DISTURBED AREAS IMMEDIATELY AFTER GRADES HAVE BEEN ACHIEVED. TEMPORARY VEGETATIVE COVER SHALL BE
PROVIDED WITHIN 7 DAYS ON PERIMETER AREAS AND SLOPES GREATER THAN 3:1. TEMPORARY VEGETATIVE COVER SHALL BE PROVIDED
WITHIN 14 DAYS ON ALL OTHER AREAS. PERMANENT GROUNDCOVER SHALL BE ESTABLISHED IN 15 WORKING DAYS OR 90 CALENDAR DAYS,
WHICHEVER IS SHORTER. HOWEVER, NPDES GROUNDCOVER REQUIREMENTS TAKE PRECEDENCE.
13.CONTINUE TO MAINTAIN EROSION CONTROL MEASURES UNTIL VEGETATIVE COVER HAS BEEN ESTABLISHED OVER ALL DISTURBED AREAS
AND SITE HAS BEEN STABILIZED. REMOVE EROSION CONTROL MEASURES ONLY AFTER FINAL INSPECTION AND APPROVAL BY INSPECTOR.
OWNER/DEVELOPER:
PIN ID: 6823-06-2028.00
ELAM POPE, LLC
6901 MAYNARD ROAD
SUMMERFIELD, NC 27358
PHONE: 336-339-2627
CONTACT:JOHN GRAMBERG
EMAIL: info@elaminvestment.com
ENGINEER:
ALLIED DESIGN, INC.
4720 KESTER MILL ROAD
WINSTON-SALEM, N.C. 27103
PHONE: (336) 765-2377
CONTACT: STEVE M. CAUSEY, PE
EMAIL: scausey@allied-engsurv.com
91�_
m
SITE
(� h
m
h
w
U
O
w
G�OLF�igO
R
o�
4Q7
2
pPOPE RD
Z7
o
co
o
�
z
>
�
m
WINDING
� RIDGE RD
oy-
�ti SWAIM RD
R/DGEL/V �Q
�aLU TEA BERRYLN
m�
VICINITY MAP
NOT TO SCALE
ME\
M
0
Z
N
Z_
J
U)
U
0
E
Q
0
o
0 #
00
� CO
Z
N
.'^
�/^
Z
CO
J 00
a
N
`J
lIJ
E
W
W
W (0
6
aZQ
a
N
Z_
_(o.
70
C9
W U) r—
CO
U Z C �
J
Y
a
0— ICU
FIRM LICENSE C-1891
i
II
O
0�
Z
v
J
J
O
LU
a
0"
0�
U)
0-
Z
a
a
0
2
Q�
J
Q�
LU
�
LLI
LU
1
~
O
(D
C/)
Z
M m
U
o
N
>Q
(n N
N
M
O
Zm
W
U
W Z Y
0 U ILi
77
z w �'
o z
w
Z U Z U
O cn
w
Ir a O
o' w
O a -
ILL
0 Lw
w cn
U)
U) w
w o 0
Q N N
p o0 0
O N
O
z Q m
SITE
STAGE 1
EROSION
CONTROL
PLAN
GRAPHIC SCALE SHEET
60 p 30 60 120 240 C2.3
( IN FEET )
1 inch = 60 ft»