Loading...
HomeMy WebLinkAboutNCC221427_ESC Approval Submitted_20220412"RISTATE� ROY COOPER Governor S_ ELIZABETH S. BISER Secretary 4aM� BRIAN WRENN NORTH CAROUNA Director Environmental Quality March 31, 2022 LETTER OF APPROVAL WITH MODIFICATIONS Windsor Contracting, LLC ATTN: William Seymour, President PO Box 9205 Greensboro, NC 27429 RE: Project Name: Davie Industrial - Lot 2 a.k.a. Davie Industrial Center Acres Approved: 70 (3 newly added) Project ID: DAVIE-2019-005 County: Davie City: Mocksville Address: Gildan Rd. River Basin: Yadkin-PeeDee Stream Classification: C Submitted By: Timmons Group Date Received by LQS: March 17, 2022 Plan Type: Revised Dear Sir or Madam: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this Letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed atdeq.nc.gov/NCGO1. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. _E Q North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Winston-Salem Regional Office 1 450 Hanes Mill Road, Suite 300 1 Winston-Salem, North Carolina 271O3 336.776.9800 Letter of Approval with Modifications Windsor Contracting, LLC March 31, 2022 Page 2 of 3 Title 15A NCAC 413 .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, Digitally signed by Zachary I } Lentz Zachary L e n lZ Date: 2022.03.31 11:26:45 -04'00' Zachary Lentz, PE Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NCG01 Fact Sheet cc: Jacob Moore, PE of Timmons Group (via e-mail) WSRO file Letter of Approval with Modifications Windsor Contracting, LLC March 31, 2022 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Davie Industrial - Lot 2 a.k.a. Davie Industrial Center Project ID: DAVIE-2019-005 County: Davie Modifications pursuant to applicable North Carolina General Statutes and/or Regulations: 1. Please note that this approval is only for the additional area proposed in the current revision. All other areas must continue to follow previously approved plans, and the financially responsible party is still responsible for erosion control and stabilization of the previously approved disturbed areas. 2. Due to this revised plan approval, the financially responsible party must submit and eNOI and attain a COC per the second paragraph of this letter. 3. Additional measures may be required, particularly downstream of the newly approved access to the road and the rear perimeter slopes. The applicant is responsible for the control of sediment on -site. If the approved erosion and sedimentation control measures prove insufficient, the applicant must take those additional steps necessary to stop sediment from leaving this site.