Loading...
HomeMy WebLinkAboutNCC221315_ESC Approval Submitted_202204072019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.I (a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. Any addition in impervious surface, over that already noted on the approved plan, would also require a revised plan to verify the appropriateness of the erosion control measures and the stormwater retention measures. (GS 113A-54.1(b)). In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, Chris Baker Assistant Regional Engineer DEMLR - Fayetteville Regional Office Enclosures: Certificate of Approval cc: Kevin Varnell, P. E., Stocks Engineering, P. A. — email copy Joseph Stanton, City of Fayetteville Permit Office — email copy Fayetteville Regional Office ROY COOPER Goyefnor ELI ABETH S. BISER Secretary BRIAN WRENN Director NORTH CAROLINA Environmental Quality April 1, 2022 LETTER OF APPROVAL Boddie -Noel] Enterprises, Inc. Michael Hancock, Executive President Post Office Box 1908 Rocky Mount, NC 27802 RE: Project Name: Hardees at Cliffdale Acres Approved: 1.09 Project ID: CUMBE-2022-122 County: Cumberland, City: Fayetteville Address: Cliffdale Road River Basin: Cape Fear Stream Classification: Other Submitted by: Kevin Varnell Date Received by LQS: February 23, 2022 Plan Type: Commercial Dear Mr. Hancock: The subject erosion and sedimentation control plan has been approved by default. The Sedimentation Pollution Control Act (hereinafter "Act") states that this plan must be filed a minimum of 30 days (15 days for revised plans) prior to the activity and the approving authority must approve or disapprove the submitted plan within 30 days (15 days for revised plans) of receipt of G.S. 113A-54.1. The Act further states that if the approving authority fails to approve or disapprove the submitted plan within the 30-day (15 days for revised plans) period, the plan will be deemed approved. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land - disturbing activity has been undertaken, as is required by Title 15A NCAC 413 .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted and COC issued prior to the commencement of any land disturbing activity on the above -named project. The NOI form may be accessed at deq.nc.gou/NCGO 1. Please direct questions about the NOI form to Annette Lucas at Annette.lucas riedenuov or Paul Clark at Paul.clark&n,cden,r.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCGOI permit. However, on or after June 1, � North Carolina Departmemt of Environmental Quality ; Division of Gnerciy, Mineral and Land Itesnut'ces Fayetteaitle kvgional Office 1225 Green Street, Suite'7141 FayeacAllp, North Carolina 28301 Or:�x,� n : v anm�tnl x slli3 910.433.3300