Loading...
HomeMy WebLinkAboutNCC221265_ESC Approval Submitted_20220405Planning & Development Department LETTER OF APPROVAL WITH MODIFICATIONS March 28, 2022 Mr. Michael Parrish 21 Carolina Sunset Pass Asheville, NC 28804 RE: Project Name: The Village Acres Approved: 3.46 acres Project #: ER02021-00088 County: BUNCOMBE City: Woodfin Address: Old Home Road River Basin: French Broad Stream Classification: C Submitted By: Michael Parrish Date Received by: March 3, 2022 Plan Type: Vacation Rental Dear Mr. Parrish, William Jason Guess Erosion Control Officer NOTICE — This is not a permit This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. This approval shall become null and void if you have not made progress on the site within six months after the date of approval. A one-time six month extension can be granted for good cause shown upon receiving a written request from you before the expiration of the approved plan. This letter of approval is being issued prior to the issuance of the stormwater permit due to concurrent reviews, but any land disturbing activity associated with this project shall not begin prior to issuance off all required permits including the stormwater permit and the land disturbing permit. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is received, you will receive the COC via email. You MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions about the eNOI form to Annette Lucas at Annette.lucas(cr�,ncdenr. og_v or Paul Clark at Paul.clarkgncdenr.gov. If the owner/operator of this project changes in the future, the new responsible party is required to apply for his/her own COC. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. The Land Disturbing Permit must be posted at the job site. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, � 406.� UA" W. Jason Guess Erosion Control Officer Enclosures: NPDES NCGO1 Fact Sheet Cc: Wyatt Edsel, PE Planning & Development Department William Jason Guess Erosion Control Officer MODIFICATIONS FOR APPROVAL Project name: The Village Project No. ER02021-00088 Location: Old Home Road Person financially responsible: Michael Parrish Please confirm that all areas that have been currently disturbed on site, have been included in the plans/permit. During the previous inspection, an access road connecting Old Home Road Subdivision and The Village, was identified. This access road will need to be permitted under one of these projects. 2. Please add a comment on plans noting that the storm tech should not be installed until all areas have been stabilized, or installed with a bypass leading to an erosion control measure. 3. Include in the construction sequence, a specific notation for storm tech installation.