LETTER OF APPROVAL WITH MODIFICATIONS
Town of Pilot Mountain
ATTN: Michael Boaz, Town Manager
124 W. Main St., Box 1
Pilot Mountain, NC 27041
RE: Project Name: Mount Airy Water Interconnect - Town of Pilot Mountain
Acres Approved: 13.2 Project ID: SURRY-2020-001
County: Surry City: Pilot Mountain Address: Old US HWY 52
River Basin: Yadkin-PeeDee Stream Classification: other
Submitted By: McGill Associates, ATTN: Joel A. Whitford, PE
Date Received by LQS: September 3, 2019
Plan Type: Municipal - Revised
Dear Michael Boaz,
This office has reviewed the subject erosion and sedimentation control plan. We find the
plan to be acceptable with modifications and hereby issue this letter of Approval with
Modifications. The Modifications Required for Approval are listed on the attached page. This
plan approval shall expire three (3) years following the date of approval, if no land -
disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the
NCGO10000 Construction Stormwater General Permit. This form MUST be submitted and
COC issued prior to the commencement of any land disturbing activity on the above -named
project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about
the NOI form to Annette Lucas at Annette.lucasOncdenr.gov or Paul Clark at
Paul.clarkOncdenr.gov. After you submit a complete and correct NOI Form, a COC will be
emailed to you within three business days. Initially, DEMLR will not charge a fee for
coverage under the NCG01 permit. However, a $100 fee will soon be charged annually. This
fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh.
Title 15A NCAC 413.0118(a) and the NCG01 permit require that the following documentation
be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
D EQ
�� North Carolina Department of Environmental Quality Division of Energy, Mineral and Land Resources
512 North Salisbury Street 11612 Mail Service Center Raleigh, North Carolina 27699-1612
NUNI�CAHULINA �
Oepan-1 of Envl—tal0ualftV /"S 919.707.9200
Letter of Approval
Town of Pilot Mountain
September 16, 2019
Page 2 of 3
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance -oriented,
requiring protection of existing natural resources and adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control
plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of
1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions
to the plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and
State water quality laws, regulations, and rules. In addition, local city or county ordinances
or rules may also apply to this land -disturbing activity. This approval does not supersede
any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided
in the Financial Responsibility Form, which you provided. This permit allows for a land -
disturbance, as called for on the application plan, not to exceed the approved
acres. Exceeding the acreage will be a violation of this permit and would require a revised
plan and additional application fee. You are requested to file an amended form if there is any
change in the information included on the form. In addition, it would be helpful if you notify
this office of the proposed starting date for this project. Please notify us if you plan to have
a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
Dylan Reinhardt
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
Modifications Required for Approval
NPDES NCG01 Fact Sheet
cc: Commercial Site Design
ATTN: Chris Clayton
8312 Creedmoor Road
Raleigh, NC 27613
Regional Office file
Letter of Approval
Town of Pilot Mountain
September 16, 2019
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Mount Airy Water Interconnect - Town of Pilot Mountain
Project ID: SURRY-2020-001
County: Surry
1. The plan is approved with the modifications shown in the digital copies emailed on
9/16/2019 3:44 PM. Please provide 2 physical copies of this final version to the
Winston-Salem Regional Office within 2 weeks or prior to commencement of
construction activity, whichever comes first.
2. Additional measures may be required - The applicant is responsible for the control
of sediment on -site. If the approved erosion and sedimentation control measures
prove insufficient, the applicant must take those additional steps necessary to stop
sediment from leaving this site. [15A NCAC 4B .0115]
Ref: G.S. 113A-54.1 through G.S. 113A-57
Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504
General Permit NCG 010000 NPDES for Construction Activities