Loading...
HomeMy WebLinkAboutNCC221305_ESC Approval Submitted_20220405ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Interim Dfrector NORTH CAROLINA Environmental Quality September 16, 2019 LETTER OF APPROVAL WITH MODIFICATIONS Town of Pilot Mountain ATTN: Michael Boaz, Town Manager 124 W. Main St., Box 1 Pilot Mountain, NC 27041 RE: Project Name: Mount Airy Water Interconnect - Town of Pilot Mountain Acres Approved: 13.2 Project ID: SURRY-2020-001 County: Surry City: Pilot Mountain Address: Old US HWY 52 River Basin: Yadkin-PeeDee Stream Classification: other Submitted By: McGill Associates, ATTN: Joel A. Whitford, PE Date Received by LQS: September 3, 2019 Plan Type: Municipal - Revised Dear Michael Boaz, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land - disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted and COC issued prior to the commencement of any land disturbing activity on the above -named project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at Annette.lucasOncdenr.gov or Paul Clark at Paul.clarkOncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit. However, a $100 fee will soon be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Title 15A NCAC 413.0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. D EQ �� North Carolina Department of Environmental Quality Division of Energy, Mineral and Land Resources 512 North Salisbury Street 11612 Mail Service Center Raleigh, North Carolina 27699-1612 NUNI�CAHULINA � Oepan-1 of Envl—tal0ualftV /"S 919.707.9200 Letter of Approval Town of Pilot Mountain September 16, 2019 Page 2 of 3 Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land - disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, Dylan Reinhardt Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NPDES NCG01 Fact Sheet cc: Commercial Site Design ATTN: Chris Clayton 8312 Creedmoor Road Raleigh, NC 27613 Regional Office file Letter of Approval Town of Pilot Mountain September 16, 2019 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Mount Airy Water Interconnect - Town of Pilot Mountain Project ID: SURRY-2020-001 County: Surry 1. The plan is approved with the modifications shown in the digital copies emailed on 9/16/2019 3:44 PM. Please provide 2 physical copies of this final version to the Winston-Salem Regional Office within 2 weeks or prior to commencement of construction activity, whichever comes first. 2. Additional measures may be required - The applicant is responsible for the control of sediment on -site. If the approved erosion and sedimentation control measures prove insufficient, the applicant must take those additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B .0115] Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities