Loading...
HomeMy WebLinkAboutNCC221185_Site Plan or Location Map_20220328�0 �_ r--U ' ^ z N _1 v ' CD U Q N Z w NC 42 Q Q LU Q C7 Z u] _3 v W LI � T z Q z � J O LLI • cl- Q . o6 N .. N = rLLI n Z LLI u0i M I O z � QD z Z / � o� LLI — — I / SITE _ p ¢00 � � pp z I _ _ 3 ` BUS 30 \ \ C O U 29 300 AVISTOC 8 \ 1 I / O N L U o) O \ 1 I LES�oNE C I I I VICINITY MAP N.T.S. I cc o \ I c� I \ I I I ®_ _ ,- CON T. EN I`RANCE I 16 1 SITE DATA WAY ENT &U�IY S 1 •. I 8 7 S G PROJECT NAME: CREEKSIDE COMMONS SUBDIVISION �o�,,, OWNER/DEVELOPER: -PHASE 6- GLENWOOD HOMES, LLC s o % i PO BOX 90427 RALEIGH, NC 27675 = _ g3�'I6-22 o I 63 I 320 I 12%791/sf � � ' CONTACT: PENNY SEKADLO ,,,,,���...... � ' I / 4 9,2A5 I / � I 9220 FAIRBANKS DR SUITE 220 ���YN 5��� 0 RALEIGH NC 27613 10,7 I / 919-848-1461 I I DICE gSIN #� I SE I 2 I �� / I I/ l 66 12,25 \� pennyengineer@aol.com �I I TOWNSHIP: COUNTY: CLAYTON JOHNSTON 13 7%21 / / \ I I �� �,6 PARCEL ID NUMBER: 05HO3041 Q z 6 15,080 I / / OFF / \ I I� i \� \ P.I.N. ID: 166810-25-5300 0 Q 50 �f -- —I P� \ I I �� PROPERTY SIZE: 2.53± AC � c) I17 PROPERTY LOCATION: INSIDE CITY LIMITS EXISTING ZONING: PD-R GOB ` o I EXISTING USE: VACANT � Z SILT FEN E 0 TLET I i PROPOSED USE: SINGLE FAMILY RESIDENTIAL PROPOSED LOTS: 8 SINGLE FAMILY LOTS 61\ PROPOSED DENSITY: 3.16 DU/AC � F PROPOSED IMPERVIOUS AREA: 0.80 AC (3000 SF/LOT) TOTAL DISTURBED AREA: 2.07 AC Ilk- �® U \ REFERENCES cn COBBLESTONE SD `— o PHASE 4B 1. THIS IS PHASE 6 OF SIX PHASES APPROVED FOR I CONSTRUCTION IN CREEKSIDE COMMONS SUBDIVISION BY STEWART—PROCTOR, PLLC ENGINEERING AND IA SURVEYING DATED 3-11-11 REV'D 7-21-11. TYPICAL LOT DIMENSIONS EROSION CONTROL NOTES: II ALL WORK AND MATERIALS SHALL CONFORM TO THE STATE OF NORTH CAROLINA STANDARDS AND SPECIFICATIONS. 20' REAR 52' WIDTH NO SEDIMENT LADEN RUNOFF SHALL LEAVE SITE. z Q ALL SEDIMENT LADEN RUNOFF SHALL BE DIVERTED AN EROSION CONTROL DEVICE PRIOR TO LEGENDTOWARDS NOTE: PURSUANT TO G.S. 113A-57(2), THE ANGLE FOR GRADED SLOPES LEAVING SITE. ALL REQUIRED PERMITS SHALL BE OBTAINED PRIOR TO Q U AND FILLS SHALL BE NO GREATER THAN THE ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER OR OTHER ADEQUATE *UNLESS OTHERWISE w STATED THE START OF GRADING. DUE TO FIELD CONDITIONS, THE LOCATION, PLACEMENT, LIMITS OF DISTURBANCE 0 EROSI❑N—C❑NTR❑L DEVISE OR STRUCTURES, IN ANY EVENT, SLOPES LEFT EXPOSED WILL, WITHIN 21 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING, BE PLANTED OR ❑THERWISE PR❑VIDED WITH DIVERSIONS SHALL THIS TEMPLATE.* FOLLOW 6'MIN. f G AND QUANTITY OF EROSION CONTROL DEVICES AND DRAINAGE STRUCTURES MAY VARY TO BETTER CONFORM TO FIELD CONDITIONS. CONSULT WITH COUNTY ENGINEER SF —SF— TEMPORARY SILT FENCE n �IJ I z � TEMPORARY OR PERMANENT GROUND COVER, DEVICES, OR STRUCTURES FABRIC AND ENGINEER OF RECORD PRIOR TO ANY CHANGES 0 SUFFICIENT TO RESTRAIN ER❑SI❑N. PURSUANT TO G.S. 113A-57(3), COUNTERSUNK INTO TEMPORARY DIVERSION DITCH PROVISI❑NS FOR PERMANENT GR❑UNDC❑VER SUFFICIENT TO RESTRAIN EROSION MUST BE ACCOMPLISHED FOR ALL DISTURBED AREAS WITHIN INTO EARTH 20'FRONT MIN. AREA s200 SF ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES WO 15WORKING DAYS ❑R 90 CALENDAR DAYS (WHICHEVER IS SHORTER) 3:1 g 0 3:1 WILL BE INSTALLED IF DEEMED NECESSARY BY ON —SITE INLET PROTECTION FOLLOWING COMPLETI❑N OF C❑NSTRUCTI❑N OR DEVELOPMENT, F �f so' R W INSPECTION OF LOCAL, STATE OR PROJECT ENGINEER OFFICIALS. THIS PLAN SHALL NOT BE CONSIDERED AS ALL INCLUSIVE, SCALE. DRAWN. NOTE: b _ 3"101111mmPRECAUTIONS AS THE GRADING CONTRACTOR SHALL TAKE ALL NECESSARY TO PREVENT SOIL SEDIMENT FROM LEAVING ASILT FENCE OUTLET 1 "= 100' MTM THE SEDIMENTATION POLLUTION CONTROL ACT WAS IIIII�IIIII THE SITE. — 40' PRIVATE DRIVEWAY,ACCESS &UTILITY EASMENT DATE: CHK'D: AMENDED IN 2006 TO REQUIRE THAT PERSONS RESPONSIBLE FOR LAND —DISTURBING ACTIVITIES INSPECT A PROJECT AFTER EACH PHASE OF THE BASIN CHART BASIN NUMBER DRAINAGE AREA DENUDED AREA Q VALUE OUTFALL STORAGE REQUIRED SURFACE AREA REQUIRED WEIR LENGTH WEIR HEIGHT SURFACE AREA PROVIDED STORAGE PROVIDED SKIMMER SIZE ORIFICE SIZE GRAVEL CONSTRUCTION ENTRANCE 1-24-22 PLS PROJECT TO MAKE SURE THAT THE APPROVED EROSION SKIMMER BASIN #1 2.07 AC 2.07 AC 0.60 7.22 IN/HR 8.97 CFS 3,758 CU FT 3,906 SQ FT 10' 90' X 45' X 2' 4,050 SQ FT 6,576 CU FT 3.0" 1.25" REV'D AND SEDIMENTATION CONTROL PLAN IS BEING CHECK DAM - FFT FOLLOWED. RULES DETAILING THE DOCUMENTATION OF ALL SEDIMENT LADEN RUNOFF SHALL BE DIVERTED INTO AN EROSION CONTROL DEVICE 3-14-22 TOWN COMMENTS THESE INSPECTIONS TOOK EFFECT OCTOBER 1, 2010. INSPECT BASINS AFTER EACH RAINFALL OCCURANCE BASINS ARE TO BE CLEANED AS NEEDED LOCATION, QUANTITY, AND PLACEMENT OF DRAINAGE NOTES: LIMITS OF DISTURBANCE THE SELF —INSPECTION PROGRAM IS SEPARATE FROM DEPTH EXCLUDES 1' FREEBOARD PIPES AND EROSION CONTROL DEVICES MAY VARY THE WEEKLY MONITORING PROGRAM OF THE NPDES ALL BASINS TO HAVE POROUS BAFFLES TO BETTER CONFORM TO FIELD CONDITIONS. — PRESENT LAND USE IS WOODED AND FALLOW. STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES. — WATER SYSTEM WILL CONSIST OF TOWN OF CLAYTON. THE FOCUS OF THSE INSEPCTION REPORT IS THE NOTE: — SEWER SYSTEM WILL CONSIST OF TOWN OF CLAYTON. INSTALLATION AND MAINTANCE OF EROSION AND THERE ARE NO EXISTING BUILDINGS ON SITE. ALL WORK AND MATERIALS SHALL CONFORM TO — ALL EROSION CONTROL MEASURES WILL BE COMPLIED SEDIMENTATION CONTROL MEASURES ACCORDING TO THE OPEN SPACE TO BE OWNED AND MAINTAIN BY THE STANDARDS AND SPECIFICATIONS OF THE WITH DURING CONSTRUCTION APPROVED PLAN. THE INSPECTIONS MUST BE HOMEOWNERS ASSOCIATION OF STATE NORTH CAROLINA. THE CONTRACTOR — ALL TEMPORARY AND PERMANENT EROSION CONTROL MEASURES SHALL BE SHALL OBTAIN A COPY OF THESE STANDARDS Susan Locklear, PE CONDUCTED AFTER EACH PHASE OF THE PROJECT, AND IN ACCORDANCE WITH NC SEDIMENT AND EROSION CONTROL TO CONSTRUCTION. Erosion Control Plan Approval CONTINUED UNTIL PERMANENT GROUND COVER IS IPRIOR ORDINANCE. 03/17/2022 ESTABLISHED. SHEET 100 50 100 200 G 1 ❑F PR❑J. # SCALE 1 "= 100 ' P 1912