Loading...
HomeMy WebLinkAboutNCC221176_ESC Approval Submitted_20220328r SIM ROY COOPER ~ Governor 'r�n 4 ELIZABETH S. BISER 7 Secretary BRIAN WRENN NORTH CAF OIANA Director fnriranwRial Qawhly March 3, 2022 LETTER OF APPROVAL WITH MODIFICATIONS Davidson County Airport Authority ATTN: Rick Phillips, Chairman 1673 Aviation Way Lexington, NC 27292 RE: Project Name: Airfield Pavement Rehabilitation Acres Approved: 23.4 Project ID: DAVID-2022-041 County: Davidson City: Lexington Address: 1673 Aviation Way River Basin: Yadkin-PeeDee Stream Classification: C Submitted By: Talbert, Bright, & Ellington Inc. Date Received by LQS: February 10, 2022 Plan Type: New Dear Mr. Phillips: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this Letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. voreh [x�iina [kpr7n.�ne dinrxarw!n[r� Q,..dn, [�mmon of [nr�. I.�m�ral and land R{'�purrNy 1M4ela, Sake, Rao.wl Cffh i 1 450 Harr+ ► S R.-d Seal, Xk) 1 YL —1— 1-kr Vnr 1h 474-Ana TMI ill, 7-h QW Letter of Approval with Modifications Davidson County Airport Authority March 3, 2022 Page 2 of 3 Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, Digitally signed by Brett Brett Bell Dalte: 2022.03.03 10:25:02-05'00' Brett Bell, EIT Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NCG01 Fact Sheet cc: Rick Phillips of Davidson County Airport Authority (via email) Brian Voll, EIT of Talbert, Bright, & Ellington Inc. WSRO file Letter of Approval with Modifications Davidson County Airport Authority March 3, 2022 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Airfield Pavement Rehabilitation Project ID: DAVID-2022-041 County: Davidson Modifications pursuant to applicable North Carolina General Statutes and/or Regulations: 1. This ESC plan was approved based on information submitted via E-mail to Brett Bell, EIT on February 28, 2022. For inspection purposes, one copy of revised plans reflecting the E- mailed information must be delivered to this office by March 18, 2022, or prior to the beginning of construction, whichever date is earlier. Please reference Project Number DAVID-2022-041 in your cover memo. [15A NCAC 4B .0107(c)] Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities