Loading...
HomeMy WebLinkAboutSW8070208_Historical File_20070309P. 01 TRANSACTION REPORT MAR-12-2007 MON 08:53 AM FOR: NCDENR 9103502004 SEND �c DATE START RECEIVER TX TIME PAGES TYPE NOTE M# DP MAR-12 08:52 AM 97635631 57" 5 FAX TX OK 250 TOTAL 57S PAGES: 5 Stage OfNor& Carorwa DeparftU t of Faavit McUt and Natural Resources Wilmiugtoo Re&n l Office Mxcwl F. Easley, Governor William G. 31ms Jr., Secretary FAX COVER SHEET Daft.h. Na Of Pages: (adefts raver) To: 4 , ,g - s CA a.i e.� Front: FAX #�, � mod_S� / FAX#: 910-350-20044 = C *nl Dive ZUeWou.Wffo PLC-78 45 Te CAM VM "&7MB Fits 019? 3.5024 An E1ppa�tngiq►1l► Ad�mp Emplmyer State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Michael F. Easley, Governor W1l = G. Ross Jr., Secretary FAX CO,VER SHEET Date: 31/ Z10 -7 No. Of Pages: (excieding rover) To: From: "-re C�ir�e CO: NC DENR FAX #: !Z�.3 —6 / FAX#: 910-350-2004 127 Canftal Drive Extension, WHmingtoa, N.C. 29405 3845 Telephone (918) 796-7215 Fax (910) 350-2004 An Egnal Oppurtooft ASirmafte Action Employer TRIPP ENGmEmNG9 P.C. 41 419 Chestnut Street Wilmington, North Carolina 28401 Phone: (910) 763-5100 • FAX: (910) 763-5631 March 8, 2007 NCDENR Division Water Quality 127 Cardinal Drive Wilmington, NC 28405-3845 Attn: Mary Jean Naugle Re: Timber Creek Plantation — EXPRESS REVIEW Project No. SW8 070208 TE 06119 Dear Mary Jean: t�;kOF Ogol In response to your comments dated February 20, 2007, we offer the following: 1. Swales have been revised to more closely meet the 100 R per acre of drainage area. Please see highlighted calculations. 2. Note has been added to the plan that all trails are to be raised, open wood decking. 3. Note has been added to the plan. 4. Wetlands delineation map is enclosed. Letters of submittal to the State and Corps are enclosed. 5. Property boundary has been dimensioned. 6. Impacted wetland areas are delineated on the plans. 7. $500 resubmittal fee is enclosed. Please review for approval and contact us with any questions, comments or if you need additional information. Thank you. Sincerely, Tripp Engineering, P.C. Charles D. Lazier, P.E. CDC:dcb Enc. MAR 0 8 2 007 BY '23/ 2bb r 11j: 48 yJiUbb1.iy f 5 1 HtULAKKUKUU PAGE 01r IJ5 llli CLAM GRoup Goo-Bnvizwmej2d Services LindlHydrographic Surveys FACSI XIL.E TRANSMISSION FACSIMILE NUMBER- { 910) 602-3975 DATE: • TIME- UliIUL N1 JKVIU L 11NZ ©off-O "fi FAX NO: 4�'S SG 3 � TO' c5 4 FROM: cj�p►2,� RE: CLARK PROJECT NO: 6 (1p ZLO,S ORIGINAL TO BE MAILED: YES_ NO _ NO. OF PAGES TRANSMITTED (INCLUDING COVER PAGE): 5 MESSAGE: cc; File THE INFORMATION CONTAINED IN THIS FACSIMILE MESSAGE IS PRIVILEGED AND CONFIDENTIAL INFORMATION INTENDED ONLY FOR THE RECIPIENT NAMED ABOVE. (F THE READER OF TIHIS MESSAGE IS NOT THE INTENDED RECIPIENT OR THE EMPLOYEE OR AGENT RESPONSIBLE FOR DELIVER(NG IT TO THE INTENDED RECIPIENT. YOU ARE HERF.BY NOTIFIED THAT ANY DISSEMINATION_ DISTRiBI1TION OR COPYING OF THIS COMMUNICATION IS STRICTLY PROHIBITED. IF YOU HAVE RECEIVED THIS COMMUNICATION IN ERROR. PLEASE NOTIFY US BY TELEPHONE AND RETURN THE ORIGINAL MESSAGE TO (IS AT THE CORPORATE ADDRESS BELOW VIA U.S. POSTAL SERVICE. THANK YOU. iF TRANSMISSION IS INCOMPLETE OR ILLEGIBLE. 1�c��-%�,7 PLEASE TELEPHONE ( 910) (102.3900 IMMEDIATELY MAR 0 8 I00? FEB 23,2007 09:30A 9106023975 pagq 1 BY;—__ .___ -- -- '23/2007 10:48 9106023975 THECLARKGROU PAGE 02/05 ,T,w CLAm GRoup Geo-E,uvu'oamenlsl services L ndlHydrograpbie Surveys .Forersay Services VITA HAND DELI.VERY February 23, 2007 NC Department of Environment and Natural Resources Division of Water Quality Attn: Ms, Noelle Lutheran 127 Cardinal Drive Extension Wilmington, NC 28405 Re: 83.5f/- Acre Tract Old Lennon Road, Brunswick County, North Carolina Clark Project No. 06205 Dear Ms. Lutheran: On behalf of our client, Mr. Jack Stocks, this letter is to verify that documentation concerning the jurisdictional limits of the Waters and Wetlands of the US/NC for the referenced project was hand delivered to the US Army Corps of Engineers, Wilmington District, Wilmington Field Office, on January 25, 2007. Proof of receipt by the Corps of Engineers is confirmed by the attached checklist executed by Mr. Tom Farrell. Copies were also delivered to your office on the same date. Determinations were made utilizing the US Army Corps of Engineers' YR 87 Wetland Delineation Manual and findings were subsequently surveyed by Mark A. Stocks, PLS, PC, and depicted on the aforementioned map. This correspondence is regarding a parcel North of and adjacent to Old Lennon Road, South of and adjacent to Timber Creek, near Supply, Brunswick County, North Carolina., bainS more accuratiely described by a map prepared by Mark A, Stocks, PLS, PC (Wilmington, North Carolina) and identified as Tract l of the Lucy J. Lennon Division, dated December 29, 2006. By this correspondence, we are confirming that the appropriate documentation hag been submitted for concurrence of these findings. Since Gary A. Mitchell Regulatory Wetlands Consultant Senior Vice President, Wetlands Division Cc: Mr. Jack Stocks Corporate: 5000 Bluc Clay Road Castle Hayne, NC 28429 - Post Office Box 10136 Wilmington, NC 28404 (910) 602-3900 Office - (910) 602-3975 Facsimile www.clark.RMuV.us REL � M FEB 23,2007 09:30A 9106023975 page 2 /23l2007 10:48 9106023975 FEB .14.2W' r nT iii USWE:D WILMINGTON I,- ChealSit ppmky ovfAaer: nam mmliM adds phdno _.4ppt (ifs Sam prapinty m=): nanxe THECLARKGROU- PAGE 03/05 NO.�Ul r.I/I at - - — C) J Ilill�. {y►�. 0 ?0 zw au�porizadaKt iiom tba ownst' to er m ft s4te hYsi site sddress (road fLmuber, taw¢, eta.)• ec i. l 5ubdivisian n=c, Lot cr- diMadoas to Ow - svat!s!' body why the sitols• logicalty = n`�, c� ��� P.Lv�- V*=e of nearest aacd �,l�ame ofncrost V=edl vtveW body to the sb (if isolat4• �, 1gme of die bazar. Lllr06e-e— 4 N ,%Deci�egu+es kwadon of the sits (availablo ft'als topOzoo'e.cam), diffe�ar scafres to proms a o"a effbanittta site: =e of UW S qW4 to whin Ile so L9 j0uw . '�"•�� .. _ZA mrg or prp,,My m=MtbAt l'-WM4Y $h°ws the propel bo�dat9As- fTow Mms wpmmmtam in antes) of ft sip. Aga,, (VPmVtoaa c iu acres) of iuriadictl watIoil �2 a �� t G Ll MAR 0 8 2007 FEB 23,2007 09:30A 9106023975 page 3 3/8/2007 Timber Creek Plantation cdc Swale Calculations Swale Calculations Intensity lio = 6.3 in/hr 5 :1 swales RH = [(5)(D) / 2(sgrt(25+1)) v = 0.49D A = (5D)(D) 1 5 ❑ = 5DZ Q = (1,49/n)(A)(RH)nS)'2 Q = (1.49/n)(5D2)(0.49d) (S)'n 5D 111 I Ill D813 = ((Q)(n/1.49)) / ((5)(.49)2 3(S)in) Swale 1 Drainage Area = Q = CIA 3.09 acres Runoff C = 0.50 = 9.73 cis swale length = 180 ft. difference in height = 3 ft Slope (S) = 0.0167 n = 0.03 Dw = 0.49 AMITI"L- D = 0.76 ft MO 3 % Vel. = 3.33 f . Swale 3 Drainage Area = 2.87 acres Q = CIA Runoff C = 0.50 = 9.04 cfs swale length = 100 ft. difference in height = 2 ft. Slope (S) = 0.0200. n = 0.03 DW = 0.41 i�o, %4PL- D = 0.72 ft. Vel. = 3.50 fps Swale 5 Drainage Area = Q = CIA 3.07 acres Runoff C = 0.50 = 9.67 cfs swale length = 220 ft. difference in height = 1 ft. Slope (S) = 0.0045 n = 0.03 Da = 0.93 do' D = 0.97 ft. Vel. = 2.04 fps 06119 p ' FESS/0 Swale 2 Drainage Area= 1.15 acres = a SEAL f. - Q = CIA - 032555 ; _ ' Runoff C = 0.50 �'i length 3.62 cfsswale 112 / • . GIN •r ES difference in height = ft. ID Slope (S) = 0.0182 n = 0.03 17 Dw = 0.17 D = 0.52 ft. Val e 7 An fna Swale 4 Drainage Area = 1.17 acres Q = CIA Runoff C = 0.50 = 3.69 cfs swaie length = 100 ft. difference in height = 3 ft. Slope (S) = 0.0300 n = 0.03 Dw = 0.14 ICV \JEL-i D = 0.48 ft. Vel. = 3.26 fps Swale 6 Drainage Area = 1.66 acres Q = CIA Runoff C = 0.50 = 5.23 cfs swale length. = 150 ft. difference in height = 4 ft. Slope (S) = 0.0267 n = 0.03 DW = 0.21 D = 0.55 ft. Vel. = 3.40 fp 1d1 VF b tiC.l'. 4 sl .. MAR 0 A 2RI,,l swales5sw 1 of 3 3/8/2007 cdc Jwdle / Drainage Area = 2.19 acres Q = CIA Runoff C = 0.50 = 6.90 cfs swale length = 170 ft. difference in height = 1.5 ft. Slope (S) = 0.0088 n = 0.03 D813 = 0.48 D = 0.76. ft. Ve1.= 2.41 fps Swale 9 Drainage Area = 3.41 acres Q = CIA Runoff C = 0.50 = 10.74 cfs swale length = 290 ft. difference in height = 1 ft Slope (S) = 0.0034 n = 0.03 D = 1.07 ft. NL.Pb"( EX" Vel. = 1.89 fps OwGIC II Drainage Area = 8.84 acres Q = CIA Runoff C = 0.50 = 27.85 cfs swale length = 120 ft. difference in height = 2.5 ft. Slope (S) = 0.0208 n = 0.03 Dm = 1.25 � D= . 1.09 ft. Vel.= 4.71 fps 5waie 13 Drainage Area = 5.05 acres Q = CIA Runoff C = 0.50 = 15.91 cfs swale length = 100 ft. difference in height = 0.5 ft. Slope (S) = 0.0050 n = 0.03 D8!3 = 1.46 'jam, D = 1.15 ft ``� Vel. = 2.40 fps Timber Creek Plantation Swale Calculations swaie 8 .Drainage Area = 2.66 acres Q = CIA Runoff C = 0.50 8.38 c's swale length = 190 ft. difference in height = 1.5 ft. Slope (S) = 0.0079 n = 0.03 115`NI�� Dw = 0.61 D = 0.83 ft. Vel. = 2.42 fps Swale 10 Drainage Area = 2.07 acres Q = CIA Runoff C = 0.50 = 6.52 cfs swale length = 140 ft. difference in height = 5.5 ft. Slope (S) = 0.0393 n = 0.03 D8/3= 0.21 ?fJ` D = 0.56 ft. Vel. = 4.16 fps Swale 12 Drainage Area = 2.29 acres Q = CIA Runoff C = 0.50 = 7.21 cfs swale length = 125 ft. difference in height = 3.5 ft. Slope (S) = 0.0280 n = 0.03 D8/3 = 0.28 Vt T(-t4 NOT D = 0.62 ft. 15X�:ACZ )Lkj Vel. = 3.76 fps Swale 14 Drainage Area = 2.61 acres Q = CIA Runoff C = 0.50 = 8.22 cfs swale length - 125 ft. difference in height = 3 ft. Slope (S) = 0.0240 n = 0.03 Dw = 0.34 D = 0.67 ft. Vel. = 3.66 fps swales5sw 2 of 3 RECEI D MAR 0 8 zoo? BY: 06119 I 348fi2007Tmber Creek Plantation cdc Swale Calculations Swale 15 q Swale 16 Drainage Area= 1.43 acres Q = CIA Runoff C = 0.50 = 4.50 cfs swale length = 110. ft. difference in height = 0.5 ft. Slope (S) = 0.0045 n = 0.03 Dw = 0.43 D = 0.73 ft. Vel. = 1.69 fps' Swale 17 Drainage Area = 2.93 acres Q = CIA Runoff C = 0.50 = 9.23 cfs swale length = 220 ft. difference in height = 0.5 ft. Slope (S) = 0.0023 n = 0.03 Dew = 1.25 � D = 1.09 ft. Vel. = 1.56 f s Drainage Area = 1.38 acres Q = CIA Runoff C = 0.50 4.35 cfs swale length = 100 ft difference in height = 2.5 ft. . Slope (S) = 0.0250 n = 0.03 D8' = 0.18 125 \IIIFIIf;o D = 0.52 ft. Vel. = 3.17 fps Swale 18 Drainage Area = 1.72 acres Q = CIA Runoff C = 0.50 = 5.42 cfs swale length = 145 ft. difference in height = 0.5 ft Slope (S) = 0.0034 n = 0.03 Dw 0.60 D = 0.82 ft. Vel. = 1.59 fps 06119 '. &tXRoo P&L_ M -S PLOW CIE-A44 IAv RECEIVED MAR 0 8 2007 swales5sw 3 of 3 BY: z Re: Timber Creek Plantation - SW8 070208 Subject: Re: Timber Creek Plantation - SW8 070208 From: Mary Jean Naugle <Mary.Naugle@ncmail.net> Date: Wed, 28 Feb 2007 08:32:33 -0500 To: charlie-trippeng@ec.rr.com, cameron.weaver@ncmail.net, mary.naugle@ncmail.net Charlie; Results of field surveys indicate that too many stormwater projects are not performing as intended and some of the problems have been with swales, so there is reason to adhere more closely to the rule and burp design guidelines. Some of your swales were significantly over the 1 acre per 100 ft of swale length, for example swale # 11 is 8.84 acres for —1201f and #13 - 5:100. Is there another measure that you have provided to meet the intended goal of infiltration on the swales with large drainage areas? Are you meeting the other design requirements on the swales such as'<5% longitudinal slope 9 I just noticed a note on plan #C3, under the scour hole detail, that you are not providing level spreaders on swale 9, 11, or 13. If the stormwater outlets drains to wetlands or surface waters, then a level spreader is required. It appears that swale i 1 and 13 on both plans C 1 and C2 drain to wetlands or surface waters. It is best to call out the level spreader on the plan where the swale is located, which is C 1 and C2. In reference to your note below about the due date: the required due date is set by express process which requires additional information to be submitted ,,,vithin 5 working days of the notice. An extension to March 8, 2007 to provide the additional information for this project is allowed per your request below. Mary Jean Naugle NC DENR Express Permitting -WiRo Charlie wrote: Mary Jean, I have been working on this project and have a question. I understand where it discusses length of 100'per each acre of drainage area to the swales design in the BMP manual. This has been in the. manual for many years but has not been the basis for review. The historical review of these projects has been for 100' of 5•'1 swale length period. We have relied on these historical reviews in the design of the project. Is your office now changingits review policy or is this what you would like to see on this particular project? I ha ve all other items addressed and ready to send back. The redesign to meet you're new policy will take longer then the deadline you have set for us. Sincerely, Charles D. Cazier, P.E. Tripp Engineering 910-763-5100 2/28/2007 8:33 AM III. DESIGN INFORMATION Complete the following table. If additional space is needed, the information should be provided in the same format as Table 1 and attached to this form. Rainfall intensity data can be found in Appendix 8.03 of the State of North Carolina Erosion and Sediment Control Planning and Design Manual. 4,s� Table 1. Vt Swale Design Information 1�p -�XZWI 1 Swale No. Drainage Area (ac) Impervious Area (ac) Grassed Area (ac) C Q (cfs) V allow (fps) V actual (fps) Flow Depth (ft) 0.77 2.32 0.50 9.73 5.0 3.33 0.76 2 2.02 `�o 0.51 1.52 0.50 6.36 5.0 3.10 0.64 3 2.87 0.72 2.15 0.50 9.04 5.0 3.50 0.72 4 1.17 0.29 0.88 0.50 3.69 5.0 3.26 0.48 5 ?: 3.07 r 0.77 2.30 0.50 9.67 5.0 2.75 0.84 6 2.87 0.72 2.15 0.50 9.04 5.0 3.90 0.68 7 2.74 �,� 0.69 2.06 0.50 8.63 5.0 2.67 0.80 8 2.66 sf'+� 0.80 1.86 0.50 8.38 5.0 2.53 0.81 9 3.41 0.85 2.56 0.50 10.74 5.0 1.89 1.07 10 2.07 vxo 0.62 1.45 0.50 6.52 5.0 4.16 0.56 11 8.84 ,:< 2.21 6.63 0.50 27.85 5.0 4.71 1.09 12 3.44 1.03 2.41 0.50 10.84 5.0 4.16 0.72 13 5.05 1.26 3.79 0.50 15.91 5.0 2.40 1.15 14,,c 3.09 0.93 2.16 0.50 9.73 5.0 3.82 0.71 15 1.43 ::� 0.36 1.07 0.50 4.50 5.0 1.69 0.73 ^. 16 1.38 \ 0.41 0.97 0.50 4.35 5.0 3.17 0.52 17 2.93 0.73 2.20 0.50 9.23 5.0 2.09 0.94 18 2.41 �,�'" 0.61 1.80 0.50 7.59 5.0 1.99 0.87 19 20 21 22 23 24 25 Form SWU-105 Ver 3.99 Page 2 of 3 W ATF� 7r Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director 'Division of Water Quality February 20 2007 w Jack G. Stocks, President { ". Timber Brook, Inc. 211 North Fifth Street �. •< 4 4` Wilmington, NC 28401 Subject: Request for Additional Information' '` x Stormwater Project No. SW8 070208 `� 4 Timber Creek Plantation, Brunswick County - Dear Mr. Stocks:- } , The Wilmington Regional Office received a Stormwater Management Permit Application for Timber Creek`. Plantation on February 9, 2007. A preliminary review of that information has determined that the application is not d , complete. The following information is needed to continue the stormwater review: JV Provide length of swale to be approximately 100 feet per acre of drainage area. Reference the April 1999 BMP section 5.6 and the rule section 15 NCAC 2H.1008 (g)(2). Provide note on the plans that the walking trail and elevated walkway in the wetland and/or ..A'K surface water areas are constructed of raised, open wood decking (or the equivalent) with a detail on the plans. VY,,n Provide built -upon area allocation in square feet for the walking trail on the application in section III (6) and in the Low Density Supplement section II, or provide a note on the plans that the walking trail is constructed of raised, open wood decking (or the equivalent) in all areas on site with a detail on the plans. ,✓ Provide a wetlands delineation map for the site, disturbed or undisturbed. acp 5.A—i Provide dimensioned property boundary on plans per Application section VI (1) and rule. Lf! Delineate wetland areas impacted in square feet on the plans. It appears that the impacts for roads crossings and Bagwell access total approximately 0.15 acres. Provide a copy of the request for DWQ 401 concurrence of impacted wetland areas. The Clark Group letter did not f provide this information with letter dated January 11, 2007. ,ter. Provide a $ 500 resubmittal fee for additional information required to complete the application. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to February 28, 2007, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. If you have any questions concerning this matter please feel free to call me at (910) 796-7215. Si erely, Y��� Mary J an angle ENB/mjn: S:1WQSISTORMWATERIADDINF0120071070208 feb07 cc: Charles Cazier, Tripp Engineering, P.C. 910-763-5100 [fax 5631] M.J. Naugle �ICarolina dVuitarlllff North Carolina Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Phone (910) 796-7215 Customer Service Wilmington Regional Office Internet: www.nonteraualiiy.org Fax (910) 350-2004 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper ' TRANSACTION REPORT Pr01 FEB-20-2007 TUE 01:24 PM FOR: NCDENR SEND DATE START RECEIVER FEB-20 01:24 PM 97635631 of WA7Z4 a r O � February 20. 2007 Jack G. Stocks, President Timber Brook, Inc. 211 North Fifth Street Wilmington, NO 2a401 9103502004 TX TIME PAGES TYPE NOTE 181, 1 FAX TX Subject: Request for Additional Information Stormwater Project No, Sucre omtoe Timber Creak Plantation, Brunswick County Dear Mr. Stocks: TOTAL : 18S PAGES: M11011201 R r,eaky, Governor WRllam G. Pees Jr., secretary Nmth Camuna DcoanmeK of Bovhenment and Nabnal Reaoureea Alan W. Klimek, P.Q. MwW Division or Water Quality The Wilmington Regional Mob received a Stowater Management Permit Application for Timber Creek Plantation mion February 9, 2007. A preliminary review of that Infonnation has deterrnined that the application is not complete_ The following Information is needed to continue the stormwater review. - Provide length of Swale to be approximately 100 feet per acre of drainage area. Reference the April 1999 BMP section 5.6 and the rule section 16 NCAC 21-1.1008 (g)(2). 2. Provide note on the plans that the walking trail and elevated walkway in the wetland and/or Surface water areas are cons11I.MW of raised, open wood decking (or the equivalent) with a detail on the plans. 3. Provide twlit-upon area allocation in square feel for the walking trail on the application In mollon 111(6) and In the Low Density Supplement section 11, or provide a note on the plans that the walking trail) is constructed of raised, open wood decking (or the equivalent) in all areas on Site with a detail on the plans. 4. Provide a wetlands delineation map for the offs, disturbed or undisturbed. 5. Provide dimensioned property boundary on plans per Application section VI (1) and rule. e. DRUMM Welland areas Impacted in square feet on the plans. It appears that the impacts for made crossings and Bagwell access total approximately 0.15 acres. Provide a copy of the request for DWQ 401 concurrence of impacted wetland areas. The Clark Group letter did not provide this Information with letter dated January 11, 2007. 7. Provide a $ 500 resubmitfal fee for additional Intormabori required to complete the application. Please note that this request for additional Information is In response to a preliminary review. The requested Inf le nadon should be received by this Office prior to February 26, 2007, or the application will be retumed as incomplete. The return of a project will necessitate resubmittol of all required items, including the application fee. The construction of any ImpeMous surfaces, other than a construction entrance under an approved Sedimentation !erosion Control Plan, Is a violation of NCOS 143-216.1 and Is subject to enforcement action pursuant to NCGS 143-21SAA. Please reference the State assigned project number on all correspondence. If you have any questions concerning this matter Mae" feet fires to Call me at (910) 7W7215. Sir rely , / Mary J nBugle ENS/mjn: 8:IWQSW^TORMWATERIADDfNFO12007W70208 feb07 cc: Charles Cazier, Tripp Engineering, P.C. 910-763-6100 [fax 5831] M.J. Naugle Nay` wr&Careflm naDivisionofwawQwHty 127CardinalDrive6odon WRmin®ton,No294mre p5 Ph(919)79672t9 Cuatomarsemce tarn Regional COW Inarntl. vnw.nevnrw ,,.n .. Fax (910)390-20134 1477,623.5748 M# DP * 122 Anrheat7pIDIIIM lAl-ftAdMbWWW-M%Rmydedri0%PodC...Pbpar North Carolina Secretary of State Page 1 of 1 Nodh Caroline Elaine F marshal! DEPARTMENT oF THt Secretary SECRE T'ARY O STATE PO Sox 29822 Raleigh, NC 276264622 (91"07-2000 CORPORATIONS Corporations Home Search By Corporate Name Search For New Corporation Search By Registered Agent Important Notice Corporations FAQ Tobacco Manufacturers Dissolution Reports Non -Profit Reports Verify Certification Online Annual Reports LINKS & LEGISLATION KBBE B2B Annual Reports SOSID Number Correction 2001 Bill Summaries 1999 Senate Bills Annual Reports 1997 Corporations 1997 Register for E-Procurement Dept. of Revenue ONLINE ORDERS Start An Order New Payment Procedures CONTACT US Securities Administrator Secretary of State's web site TOOLS Secretary of State Home Printable Page Date: 2/19/2007 Click here to: View Document Filings I Print apre-populated Annual Report Form I Annual Report Count I File an Annual Report I Corporation Names Name Name Type NC TIMBER BROOK, INC. Legal NC BIG JACK, INC. Prev Legal Business Corporation Information SOSID: Status: Date Formed: Citizenship: State of Inc.: Duration: Registered Agent Agent Name: Registered Office Address: Registered Mailing Address: Principal Office Address: Principal Mailing Address: Stock 0460389 Current -Active 5/27/1998 Domestic NC Perpetual Stocks, Jack G 211 North Fifth St Wilmington NC 28401 211 North Fifth St Wilmington NC 28401 211 North Fifth St Wilmington NC 28401-4012 No Address Class Shares No Par Value COMMON 100000 Yes For questions or comments about the secretary of State's web site, please send e-mail to Webmaster. Par Value N/A http://www.secretary.state.nc.us/corporations/Corp.aspx?PitemId=4582813 2/19/2007 QppA �ma BUSINESS CORPORATION "K ANNUAL REPORT NAME OF BUSINESS CORPORATION: TIMBER BROOK INC. FISCAL YEAR ENDING: SECRETARY OF STATE CORPORATE ID NUMBER: 0460389 NATURE OF BUSINESS: Land Development REGISTERED AGENT: STOCKS, JACK G REGISTERED OFFICE MAILING ADDRESS: 211 North Fifth St Wilmington, NC 28401 1-5974582813 STATE OF INCORPORATION: NC REGISTERED OFFICE STREET ADDRESS: 211 North Fifth St Wilmington, NC 28401 NEWHANOVER County SIGNATURE OF THE NEW REGISTERED AGENT: SIGNATURE CONSTITUTES CONSENT TO THE APPOINTMENT PRINCIPAL OFFICE TELEPHONE NUMBER: (910) 520-3083 PRINCIPAL OFFICE MAILING ADDRESS: PRINCIPAL OFFICE STREET ADDRESS: 211 North Fifth St Wilmington, NC 28401-4012 PRINCIPAL OFFICERS: Name: jackg. stocks Title: President Address: 211 North Fifth St Wilmington, NC 28401-4012 CERTIFICATION OF ANNUAL REPORT MUST BE COMPLETED BY ALL BUSINESS CORPORATIONS FORM MUST BE SIGNED BY AN OFFICER OF THE CORPORATION TYPE OR PRINT NAME DATE TYPE OR PRINT TITLE ANNUAL REPORT FEE: $20 MAIL TO: Secretary of State • Corporations Division • Post Office Box 29525 • Raleigh, NC 27626-0525 TRIPP ENGINEERING, P.C. d C C� 41 419 Chestnut Street Wilmington, North Carolina 28401 Phone: (910) 763-5100 • FAX: (910) 763-5631 February 9, 2007 NCDENR Division Water Quality 127 Cardinal Drive Wilmington, NC 28405-3845 Attn: Mary Jean Naugle Re: Timber Creek Plantation — EXPRESS REVIEW Brunswick County, NC TE 06119 Dear Mary Jean: FEB 0 9 7007 Enclosed please find two (2) sets of plans, one (1) signed original and one (1) copy of the application form with narrative, one (1) low density supplement, one (1) curb outlet supplement, one (1) level spreader operation and maintenance agreement, deed restrictions, two (2) sets of calculations and a check for the express review fee. Please review for approval and contact us with any questions, comments or if you need additional information. Thank you. Sincerely, Tripp Engineering, P.C. Charles D. Cazier, P.E. CDC:dcb Enc. 02/09/07 Stormwater Narrative Timber Creek Plantation Brunswick County, NC TE06119 Timber Creek Plantation is a proposed 110.99 acre residential subdivision of one hundred and ninety six lots. Approximately twenty four acres will be disturbed for the construction of roads, swales, basins and clubhouse area. Each lot will be allocated 5,000 sf each (980,000 sf total) with 393,312 sf of roads and 35,973 sf for the clubhouse area. This is a total of 1,409,285 sf and 28.89% impervious. Runoff will be treated by 5:1 grass swales of 100 ft minimum length. Overflow will discharge to Timber Creek, a tributary of the Lockwood Folly River. Sedimentation control will be by constructed basins, silt fence, vegetated swales, construction entrances, energy dissipators and sheet flow of existing heavy vegetation. FEB 0 UZ001 TE CLARKGRoup Geo Environmental Services Land/Hydrographic Surveys VIA HAND DELIVERY January 11, 2007 Tripp Engineering Attn: Mr. Charlie Cazier 419 Chesnut St. Wilmington, NC 28401 Dear Mr. Cazier: This correspondence is in regard to the property consisting of approximately 110+/- acres owned by Mr. Jack Stocks and located on. Old Lennon Road, County of Brunswick State of North Carolina. I have enclosed the wetland map and upland/ wetland determination forms concerning the aforementioned property that will be reviewed in the field by The US Army Corps of Engineers, Wilmington District's regulatory agent. Upon their review and concurrence, verbal approval of our jurisdictional determination by this agent will grant Mr. Stocks the ability to move forward with a sediment and erosion control plan, until the Corps is once again allowed by the federal government to sign wetland determination maps this verbal approval is sufficient. The Corps currently has the same map that you now have and as soon as a meeting onsite can be scheduled with the Corps and our jurisdictional determination is approved we will contact you with this information. We greatly appreciate your time and understanding concerning this project. Should you find that you have any questions or comments, please do not hesitate to contact me at (910)602-3900. Sin erely, �A" J;aB. Edwards Manager, Wetlands Division FEB . 9.2007 Corporate Office: 5000 Blue Clay Rd. Castle Hayne, NC 28429 • P.O. Box 10136 Wilmington, NC 28404 (910) 602-3900 Office • (910) 602-3975 Facsimile • www.clarkgroup.us Project / Site: p 11, Applicant I Owner:. Investigator:- r1 e DATA FORM ROUTINE WETLAND DETERMINATION (1987 COE Wetlands Determination Manual) Date: .l 7. 7 i-2D/06 State: file — Do normal circumstances exist on the site? is the site significantly disturbed (Atypical situation)? Yas is the area a potential problem area? Yes (explain on reverse if needed) VEGETATION ®eminent Plant soecies Stratum Indicator Flu 2. 3. }fins 4- 4. Cary a1r TG V r �.7. OL - Community ID: ar . Transect1b: Plot to: XS kJ 79' 13' 1 ?.3 " — Dominant Plant Soeeies s&atwn ln&waftw 9. 1a 11. 12. 13. 14. 45. 1f. percent of Dominant Species that are OBL, FACW, or FAC excluding FAG). 9 Remarks: //,q erY,;.,c`r1'!'�� a [.8� G�^��o.�✓1;� .HYDROLOGY _ Recorded Data (Describe In Remarks): _ Stream, Lake, or aide Gauge Aerial Photographs /:_ Other o Recorded Data Available Field Observations: Depth of Surface Water. O on.) Depth to Free Water in Pit: 7 ! 0L) Wetland Hydrology Indicators Depth to Saturated Soil: 7 _l an.) f Remarks: ,Ve 0. Primary Indicators: Inundated FEB 0 9.20 _Saturated in Upper 12" Water .t BY: _ 0A Lines Sediment Dep"ts _ Drainage Pattems in WWands Secondary Indicators: 0xidbod-Roots Channels in Upper 12" _ Water-aWned Leaves LaaW Soil ftr vy 0-aft _ FAC-Neutral Test Other (Explain in Remarks) �\yArolty �'�f�— Ti SOILS Map Unit Name (Series and Phase): -A-hn ,-I„n ,J_� t i3D(_) Drainage Class: Taxonomy (Subgroup):...r_e.n,G N � �.\�.5 Confirm Mapped Type? Yes No Profile Descrinum., Depth Matrix cobs Mottle Colors Mottle Texture, Concretions, i fires horizon (Munsea Matsu + (Munsell blobt! AbundanceXantrast . structure, ete. o3 -10 Y� f I� l.ne mynt� Sdrt� 11-16+ I0YR $/6 F;,,� Hydric Soil Indicators: Histosol _ Concretions Histic Epipedon _ High Organic Content in Surface Layer in sandy Soils Sulfidie Odor Organic Stroealdng in Sandy Soils Aquie Moisture Regime Listed On Local Hydric soils List Reducing Conditions Listed on National Hydric Soils List Gleyed or Low-Chroma Colors _ Other (Explain In Remarks) Remarks: p h i P i C. S 3 ; , C__ at a rz C Pam_ Oa s JE e� Qf WETLAND DETERMINATION Hydrophytic Vegetation Present? Yes No Is the Sampling Point Wetland Hydrology Present? Yes No Within a Wedand? Yes No Hydric Soils Present? Yes No Remarks: RECEIVED FEB 0 91007 Y: DATA FORM ROUTINE WETLAND DETERMINATION (1987 COE Wetlands Determination Manual) project/site. 01d Le rtprt KI• / I p Rc. Tro-�-4- Date: i ©/g b Applicant / Owner. Z2.(Jk Coentp: R�ti� cu3 L Invesdgator:ThG G1a.r�� C���� 1 �v,v��on e. ��o�? State: A)L Do normal circumstances exist on the site? Yes - No Community ID: ti✓Im,4 is the site significantly disturbed (Atypical situation)? Yes No Transact ID: Is the area a potential problem area? tree No� Plot ID: =�� Al 3'1' oe' � b, 3� (explain on reverse N needed) tin/ 7S • 90 ' ' 1. o VEGETATION Dominant Pbw SOeOies Stratum Indicator Dominant Plant Snedes Stratum Indkator 1. l za e,Jy1V. LiZ1or4. T 0$ S. F &+- 10. 3. Air fu.�r�,,m �_L 11. _FP,U 12. FC( 13. ®P L= 14. Percent of Dominant Species that arts OBL, FACW, or FAC excluding FAG). Remarks: HYDROLOGY _ Recorded Data (Describe In Remarks): _ Stream, Lake, or Tide Gauge Aerial Photographs Other Y No Recorded Data Available Field Observations: Depth of Surface Water. Depth to Free Water in Pit: Depth to Saturated Soil: Remarks: Wetland Hydrology Indicators Primary Indicators: FEB p 9 _ I area L Y:� _Lelaturated in Upper 12" Water.dlarks __��BDrriiRtnLin" _ ✓ ant Deposits _ Drainage Patterns in Wetlands 0 n.) Secondary Indicators: __,,asldiaed.R®ots Channels in Upper 12" (n �iFAC44sub-al ter.Stained Leaves ✓al soil Survey Data Test D (in.)- Other (Explain in Remarks) 4o O�rC�r,nio2 .STr�n�n/1, SOILS Map Unit Name (Series and Phase}: v r o�rR !rn wc.�,G Drainage Class: V erg r�A a ri, ram; Taxonomy (Subgroup): T � >n e.� Ll Confirm Mapped Type? Yes No ProfBe Daserio6on: Cepth Ma&k Colors Mottle Colors Mottle Texture, concretions;, �i ) Horizon lumseN Moist) nwunself Maim Abmdance/Contrast . Structure, eie. p l Z -7Z// 1 M a_/I�k/ Hydric Soil Indicators: Histosol oncredons — Histic Epipedon High Organic Content in Surface Layer in Sandy Soils SuiSdic Odor Organic Streaking in Sandy Soils Aquic Moisture Regime Listed On Local Hydric Solis List Reducing Conditions Listed on National Hydric Soils List Gleyed or Low-Chroma Colors _ Other (Explain in Remarks) Remarks: WETLAND DETERMINATION Hydrophydc Vegetation Present? Yes . Wetland Hydrology Present? Yes Hydric Soils Present? Yes Remarks: No Is the Sampling Point Within a Wedand? Yes 1/ No EIVED FEB 0 9 2007 BY: DATA FORM ROUTINE WETLAND DETERMINATION (1987 COE Wetlands Determination Manual) Project / S:te: v= Applicant ! Owner:. Investigator, T= Do normal circumstances exist on the situation)? Yes No the site significantly disturbed (Atypical Is the area a potential problem area? Yes No (explain on reverse if needed) VEGETATION P� Soeeies S atrin In icator 1. �1„ ��.. svl��•4�.. v r. Ire . ra�,� OBL 2. fain ss +aedc FAG 3. I�?rL�s ,•, ram. 1 I FAL f�, FP fiat. 5. CsnriaOnGLz rek—,FAI- � ��� i. — & Date: %until: State: Community ID: , +, Transact lb. — plot N 3yA ®aminant Plant saea es St lndeator 10. 11. 12. 12. - 14. 15. 16. Percent of Dominant Species that are OBL, FACW, or FAC excluding FAG). Remarks: Nd �,;�n;,�a,�l �er��c-G�ws lacy 2, a4vsQrve.a HYDROLOGY Recorded Data (Describe In Remarks): am, Lake, or Tide Gauge al Photographs _ Other No Recorded Data Available Field Observations: Depth of Surface Water. Depth to Free Water in Pit: Depth to Saturated Soil: Remarks: Wetland Hydrology Indicators Primary Indicators: FEB a 9 ndated • =SaWmted in Upper, 1 r L y. Water.Marks _ Drift Lines Sediment Deposits Drainage patterns in Wetlands Secondary Indicators: oxidized Channels in Upper 1 �,oxidized D Water-Stained Leaves Soli survey Data AC-IYeutral Test other (Explain in Remarks) SOILS Map Unit Name (Series and Phase): DDcnyo-l\ . M.Le-4 Drainage Class: Ve-ru Poo(iv Lra.t. Taxonomy (Subgroup):,r- Confirm Mapped Type? Yes No P—rdit DeserioNow Depth Matrix Colors Mottle Colors Mottle Texture, Concretions, rum*") Horizon (Mansell Moist) (Mansell Moisd AbundawaaC ntrast structure. aft 2-7 io 2/ A„v -16 1aYR 3 / 1 Hydric Soil Indicators: Histosol __Concretions _ Histic €pipedon High Organic Content in Surface Layer in Sandy Soils Sulfidic Odor Organic Streaking in Sandy Soils Aquic Moisture Regime Listed On Local Hydric Soils List Reducing Conditions Listed on National Hydric Soils List Gleyed or Low-Chroma Colors _ Other (Explain in Remarks) Remarks: WETLAND DETERMINATION Hydrophyde Vegetation Present? Yes Wetland Hydrology Present? Yes Hydric Soils Present? Yes Remarks: No Is the Sampling Point / Within a Wetland? Yes 1/ No FEB r .4 [UU1 SOILS Map Unit Name (Series and Phase): 6rye so il, C SP�Drainage Class: WCJ l Dro-�^eA Taxonomy (S4bgroup): A r e A r <- N 0.d��. w i. S Confirm Mapped Type? Yes No Pr+dNle oescriotion: Oepth Matrix Colors Mottle Colors Motile Texture. Cancreuvas, an Horiion !Munson Moist) IMemsell uoist) Abundaneecontrast . Structure. ett. Hyddc Soil Indicators: _ Histosol _ Concretions Fisch- Epipedon _ High Organic Content in Surface Layer in Sandy Soils SuEdic Odor Organic Streaking in Sandy Soils �Aquie Moisture Regime Listed On Local Hydrie Soils List Reducing Conditions Listed on National Hydric Soils ListGleyed Gleyed or Low Chroma Colors _ Other (Explain in Remarks) Remarks: All �,yd,ic 50;s ice, �;Gwkvr� were ob�erve-1 a-;- J-L,.-" WETLAND DETERMINATION Hydrophytic Vegetation Present? Yes Wedand Hydrology Present? Yes Hydric Soils Present? Yes _ Remarks: No Is the Sampling Point No Within a Wetland? Yes No — No No F IVED 8,2007 DATA FORM ROUTINE WETLAND DETERMINATION (1987 COE Wetlands Determination Manual) _ I I I L9 e. T, Date: 1 _/�. Pro `sKe: Of 11 � �r+bl� county: Applicant ! Owner. - State: Al L Investigator' r Ciro.a 1Env r�m��I7;v,std� r/ Community ID: la es exist on the site? Yes . No Do normal circumstances No Transact ID: Is the site significantly disturbed (Atypical situation)? Yes Plot ID: ! is the area a potential problem area? Yes -- No Al 3q oo ® 3-2- (explain on reverse if needed) w 7 0` VEGETATION n..n.inant Plant S^�I�� Ind" -r Fw _U 2.- 3. 0� %. -1=A(-U 5` Dominant Plant Sawies r ,fir 9. " 10. 11. 12. 13. 14. 15. tll. percent of Dominant Species that are 08L, FACW, or FAC excluding FAC-j Remarks: HYDROLOGY Recorded Data (Describe In Remarks): _ Stream, Lake, or Tide Gauge Aerial Photographs Other INO Recorded Data Available Field Observations: Depth of Surface Water. (1°-) Depth to Free Water in Pit: Lin.) Depth to Saturated Soil: -� . (in.) Remarks: N a uoe� -H a- r d ! r o i a 6,- - +L,- 3 F6-�, Wetland Nydrology Indicators Primary Indicators: 0 9 Inundated _Saturated in Upper i r LFEB ._� Water Narks Drift Lines Sediment Deposits _ Drainage Patterns in Wetlands Secondary Indicators: Wdiaed Rots ChannWis in Upper 12" Water.Mined Leaves Loma) Soil Survey Data FAGNeutral Test other (Explain in Remarks) s ..�er� �?,s�/✓ Azrx NCDENR North Carolina Department of Environment and Natural Resources Division of Land Resources James D. Simons, PG, PE Director and State Geologist Timber Brook, Inc. Jack Stocks, President 211 N. 5th Street Wilmington, NC 28401 Land Quality Section 1-22-07 LETTER OF RECEIPT OF EROSION CONTROL PLAN RE: Project Name: Timber Creek Plantation Project ID: Bruns-2007-254 County: Brunswick, Old Lennon Rd. River Basin: Lumber Submitted By: Tripp Engineering Date Received by LQS: January 22, 2007 Plan Type: NEW Dear Mr. Stocks: Michael F. Easley, Governor William G. Ross Jr., Secretary *EXPRESS OPTION LN2 �iVED Z/00 This office has received a soil erosion and sediment control plan for the project listed above which was submitted as required by the North Carolina Sedimentation Pollution Control Act (G.S. 113A-57 (4)). The Act requires that all persons disturbing an area of one or more acres of land must obtain approval of a soil erosion control plan prior to the commencement of the land -disturbing activity (G.S. 113A-54(d) (4)). The review period for an express review.is three days from receipt of a complete plan. If additional information is requested, it must be submitted within five working days of receipt. Commencement or continuation of a land -disturbing activity under the jurisdiction of this Act prior to the approval of an erosion and sediment control plan is a violation of the Act. We have performed a preliminary review of your submitted plan and have determined that additional information will be necessary before a final review can be completed. Enclosed is a checklist of items that must be submitted before we can complete the review process. Failure to provide the additional information may result in disapproval of your plan, The approval of an erosion and sediment control plan is conditioned on the applicant's compliance with Federal and State water quality laws, regulations and rules. If you have questions please do not hesitate to contact this office. Your cooperation in this matter is appreciated and we look forward to working with you on this project. Sincerely, Chastity N. Clark Assistant Regional Engineer cc: Charles Cazier, Tripp Engineering, P.C. LQS-WiRO; SWS-WiRO Wilmington Regional Office 127 Cardinal Drive Ext., Wilmington, North Carolina 28405-3845 - Phone: 910-796-7215 / FAX: 910-350-2004 NORTH CAROLINA DEPARTMENT OF ENVIRONMENT & NATURAL RESOURCES LAND QUALITY SECTION EROSION and SEDIMENTATION CONTROL PLAN PRELIMINARY REVIEW CHECKLIST PROJECT NAME: Timber Creek Plantation DATE: 1/22/2007 PROJECT NO.: Bruns-2007-254 COUNTY: Brunswick To expedite the approval process, a cursory review of your submitted Erosion and Sediment Control Plan application has been made and has shown the need for additional information as specified below. To meet our review schedule, any additional information should be received by this office no later than _1-26-2007 . Failure to meet this schedule may result in disapproval of your plan. The following items shall be incorporated with respect to specific site conditions, in an erosion and sediment control plan: LOCATION INFORMATION Project location (roads, streets, landmarks) North arrow and scale GENERAL SITE FEATURES (Plan elements) Legend: North arrow, scale, etc. Property lines Existing contours (topographic lines) Proposed contours Limits of disturbed area (provide acreage total, delineate limits, and label) Planned and existing building locations and elevations Planned & existing road locations & elevations Lot and/or building numbers Geologic features: rock outcrops, seeps, springs, wetland and their limits, streams, lakes, ponds, dams, etc. Easements and drainageways Profiles of streets, utilities, ditchlines, etc. Stockpiled topsoil or subsoil locations If the same person conducts the land -disturbing activity & any related borrow or waste activity, the related borrow or waste activity shall constitute part of the land -disturbing activity unless the borrow or waste activity is regulated under the Mining Act of 1971, or is a landfill regulated by the Division of Waste Management. If the land -disturbing activity and any related borrow orwaste activity are not conducted by the same person, they shall be considered separate land -disturbing activities and must be permitted either thru the Sedimentation Pollution Control Act as a one -use borrow site or through the Mining Act. Required Army Corps 404 permit and Water Quality 401 certification (e.g. stream disturbances over 150 linear feet) EROSION CONTROL MEASURES (on plan) Legend Location of temporary measures Location of permanent measures X Construction drawings and details for temporary and permanent measures Maintenance requirements of measures Contact person responsible for maintenance SITE DRAINAGE FEATURES Existing and planned drainage patterns (include off -site areas that drain through project) Method of determination of and calculations for Acreage of land being disturbed Size and location of culverts and sewers Soil information: type, special characteristics Soil information below culvert storm outlets Name and classification of receiving water course (only where stormwater discharges are to occur) Comments: STORMWATER CALCULATIONS Pre -construction runoff calculations for each outietfrom the site (at peak discharge points) Design calculations for peak discharges of runoff (including the construction phase & the final runoff coefficients of the site) Design calcs of culverts and storm sewers Discharge and velocity calculations for open channel and ditch flows (easement & right-of-ways) Design calcs of cross sections and method of stabilization of existing and planned channels (include temporary linings) Design calcs and construction details of energy dissipators below culvert and storm sewer outlets (diameters & apron dimensions) Design calcs and dimension of sediment basins _ Surface area and settling efficiency information for proposed sediment traps and/or basins VEGETATIVE STABILIZATION Area & acreage to be vegetatively stabilized Method of soil preparation Seed type & rates (temporary & permanent) Fertilizer type and rates Mulch type and rates NOTE: Plan should include provisions for groundcover on exposed slopes within 15 working days or 30 calendar days (whichever is shorter), following completion of any phase of grading; permanent groundcover for all disturbed areas within 15 working days or 90 calendar days (whichever is shorter) following completion of construction or development. FINANCIAL RESPONSIBILITY/OWNERSHIP FORM Completed, signed & notarized FR/O Form Accurate application fee ($50.00 per acre rounded up the next acre with no ceiling amount) X Certificate of assumed name, if the owner is a partnership _ Name of Registered Agent (if applicable) Copy of the most current Deed for the site NOTE: For the Express Permitting Option, inquire at the local RegionalOffice for availability. NARRATIVE AND CONSTRUCTION SEQUENCE Narrative describing the nature and purpose of the construction activity Construction sequence related to erosion and sediment control(including installation of critical measures prior to the initiation of the land -disturbing activity & removal of measures after areas they serve are permanently stabilized) Bid specifications related only to erosion control Continuation of Erosion and Sedimentation Control Plan Preliminary Review Checklist: Project Name: Timber Creek Plantation Project Number: Bruns-2007-254 1. Provide documentation that supports the Landowner of Record and Timber Brook Corportation are both representative of Mr. Jack G. Stocks. 2. Provide a detail for the proposed sediment traps on the plan sheets. 3. Sediment Trap #5 has been undersized and requires enlargement, in order to adequatley handle the existing drainage area. Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, NC 28405 Phone: 910-395-3900 Fax: 910-350-2004