HomeMy WebLinkAboutNCC220949_Site Plan or Location Map_202203081. 2. 3. 4. 5. 6. 7. 8. 9. 10. GENERAL CONTRACTOR REQUIREMENTS THE CONTRACTOR SHALL MAINTAIN A COMPLETE SET OF APPROVED DRAWINGS OF THE WORK SITE AT ALL TIMES THAT THE CONTRACTOR IS PERFORMING WORK. THE CONTRACTOR SHALL VERIFY THAT ALL NECESSARY PERMITS FOR CONSTRUCTION HAVE BEEN OBTAINED PRIOR TO THE START OF CONSTRUCTION. WITHIN ALL NOTES PROVIDED IN THE PLANS, THE TERM 'CONTRACTOR' SHALL MEAN THE GENERAL CONTRACTOR AND ANY SUBCONTRACTOR, VENDOR, OR SUPPLIER PERFORMING CONSTRUCTION ON THE SITE. THE CONTRACTOR SHALL VERIFY EXISTING FIELD CONDITIONS AND REPORT ANY DISCREPANCIES OR CONFLICTS TO THE ENGINEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ENGINEER OF ANY DISCREPANCIES ON THE DRAWINGS OR IN THE FIELD, EITHER PRIOR TO BEGINNING WORK OR DURING CONSTRUCTION IN THE FIELD. THE CONTRACTOR IS DIRECTED TO CONTACT THE UTILITY LOCATION SERVICE AT LEAST 72 HOURS PRIOR TO BEGINNING CONSTRUCTION. THE CONTRACTOR IS RESPONSIBLE FOR LOCATING AND VERIFYING ALL UNDERGROUND AND OVERHEAD UTILITIES PRIOR TO CONSTRUCTION AND IS RESPONSIBLE FOR ANY DAMAGE TO THEM DURING CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO EXISTING INFRASTRUCTURE WITHIN THE PROJECT SITE OR ALONG ADJOINING PROPERTIES, INCLUDING BUT NOT LIMITED TO PAVEMENT, CURB, UTILITIES, SIDEWALK, LANDSCAPING, DRAINAGE PIPES, ETC. THE CONTRACTOR SHALL REPAIR AND/OR REPLACE AS REQUIRED ALL DAMAGED ITEMS IMMEDIATELY, IF NECESSARY, OR PRIOR TO THE END OF THE PROJECT AT NO COST TO THE OWNER. REPAIRS SHALL BE IN ACCORDANCE WITH LOCAL REGULATION REQUIREMENTS AND SHALL BRING THE DAMAGED ITEM TO A CONDITION SUBSTANTIALLY EQUAL TO ITS PRIOR STATE. THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER PRIOR TO MAKING FIELD ADJUSTMENTS IN THE EVENT OF CONFLICTS WITH WATER, SEWER, DRAINAGE, OR UTILITY LINES, EXISTING OR PROPOSED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL AND DISPOSAL OF ALL TRASH, CONSTRUCTION DEBRIS, AND ORGANIC MATERIAL OFF -SITE AND IN A LEGAL MANNER. for WINTERVILLE - PITT COUNTY - NORTH CAROLINA EROSION CONTROL NARRATIVE, NOTES, & SCHEDULES ��� aT..� i�d40_1:7O_1i LIMITS OF DISTURBANCE IS AS SHOWN BY THE SILT FENCE LINE IS ROUNDED UP TO 16 ACRES. 2. EXISTING CONDITIONS: THE EXISTING SITE IS PRIMARILY CLEARED FIELD WITH SOME WOODED AND ENVIRONMENTALLY PROTECTED LOW-LYING PERIME7 AREAS. 3. SCOPE: CURRENT: CLEARING & GRUBBING FUTURE: CONSTRUCTION OF LOCAL SINGLE-FAMILY LOWDENSITY RESIDENTIAL SUBDIVISION. 4. RIVER BASIN: NEUSE 5. RECEIVING STREAMS: RECEIVING STREAM FOR THIS PROJECT IS AN UNNAMED TRIBUTARY OF SWIFT CREEK (27-97-(0.5)). 6. POST -CONSTRUCTION STORMWATER MANAGEMENT: LOTS WILL GENERALLY DRAIN TOWARDS ROADWAY CURB AND GUTTER SECTIONS OR SHEET FLOW TO PROPERTY REARS AND LOW-LYING AREAS. CURB AND GUTTER SECTIONS WILL BE PIPED TO ONE OF SEVERAL CURB OUTLET GRASSED SWALES AS PER LOW -DENSITY STORMWATER REQUIREMENTS. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. GENERAL WORK INCLUDED IN THESE DRAWINGS IS NOT TO BE COMPLETED PRIOR TO PROJECT PERMIT DOCUMENTS BEING OBTAINED. THE CONTRACTOR SHOULD NOTIFY THE ENGINEER IF QUESTIONS ARISE CONCERNING PERMIT STATUS. THE CONTRACTOR IS TO SCHEDULE AND HOLD PRE -CONSTRUCTION CONFERENCE AT LEAST ONE WEEK PRIOR TO STARTING CONSTRUCTION WITH ALL APPLICABLE PARTIES. THE CONTRACTOR SHALL PERFORM ALL WORKAND CLEARING ACTIVITY IN ACCORDANCE WITH THE NORTH CAROLINA EROSION A SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. THE CONTRACTOR SHALL INSTALL APPROVED EROSION AND SEDIMENTATION CONTROL MEASURES PRIOR TO CLEARING, WITH TI- EXCEPTION OF THOSE OPERATIONS NECESSARY TO INSTALL MEASURES. THE CONTRACTOR SHALL PROVIDE AND INSTALL SILT FENCING AND OTHER EROSION CONTROL DEVICES TO CONTROL SOIL EROS PRIOR TO BULK CLEARING OPERATIONS. ANY DISTURBED AREAS SHALL BE GRADED, TEMPORARILY SEEDED, AND STABILIZED IMMEDIATELY FOLLOWING THE GRADING AR WHERE CLEARING AND GRUBBING IS COMPLETE. FAILURE OF THE CONTRACTOR TO PROPERLY INSTALL AND MAINTAIN EROSION CONTROL DEVICES SHALL RESULT IN THE CONSTRUCTION ACTIVITIES BEING HALTED UNTIL SUCH TIME AS THE MEASURES ARE CONSTRUCTED AS APPROVED. ALL OPEN BURN PERMITS SHALL BE APPLIED FOR AND OBTAINED BY THE CONTRACTOR PRIOR TO BEGINNING ANY BURNING OPERATIONS. NO OPEN BURNING OF CLEARED DEBRIS SHALL OCCUR WITHIN 500 FEET OF AN OCCUPIED RESIDENCE. PROVIDE A GROUND COVER (TEMPORARY OR PERMANENT) ON EXPOSED SLOPES WITHIN 14 CALENDAR DAYS (7 DAYS FOR SLOPE STEEPER THAN 3:1) FOLLOWING COMPLETION OF ANY PHASE OF GRADING; AND, A PERMANENT GROUND COVER FOR ALL DI STUFF AREAS WITHIN 15 WORKING DAYS OR 90 CALENDAR DAYS (WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF CONSTRUCTIC DEVELOPMENT. REFER TO SECTION 02270 FOR EROSION CONTROL SPECIFICATIONS. REFER TO SECTION 02930 FOR SEEDING AND MULCHING SPECIFICATIONS. NO PERMANENT AND/OR TEMPORARY STRUCTURAL HAUL ROADS ARE PLANNED FOR THE CLEARING & GRUBBING ACTIVITY. CONSTRUCTION SEQUENCE SCHEDULE AND HOLD PRECONSTRUCTION CONFERENCE. INSTALL PERMIT SIGNING, JOB BOX WITH APPROVED PLANS, AND RAIN GAUGE AT THE PROJECT ENTRANCE. INITIALLY PERFORM ONLY THAT CLEARING NECESSARY TO INSTALL PERIMETER EROSION CONTROL MEASURES AS SHOWN ON THc PLANS, WHICH INCLUDES BUT IS NOT LIMITED TO TEMPORARY CONSTRUCTION ENTRANCE AND SILT FENCING, PRIOR TO ANY BULK CLEARING AND GRUBBING OPERATIONS. INSTALL TEMPORARY CONSTRUCTION ENTRANCE AT REQ'D LOCATIONS. THE CONTRACTOR AND ALL SUBCONTRACTORS SHALL ACCESS THE SITE VIA CONSTRUCTION ENTRANCES AS SHOWN ON THE PLAN AND INSTALLED AS PER THE TEMPORARY GRAVEL CONSTRUCTION ENTRANCE DETAIL. THE CONTRACTOR SHALL TAKE NECESSARY ACTION TO ENSURE THAT THE TRACKING OF MUD AND DEBRIS ONTO ADJACENT PAVED ROADWAYS IS MINIMIZED, AND SHALL DAILY REMOVE ALL MUD AND SEDIMENTS FROM OFFSITE PAVEMENTS. BEGIN SITE LOGGING, CLEARING, GRUBBING, AND STRIPPING ORIGINALLY ONLY AT THE AREAS NECESSARY FLAGGED AS NECESSARY TO INSTALL THE TEMPORARY SEDIMENT BASINS, IF REQ'D. INSTALL SKIMMER SEDIMENT BASIN WITH BAFFLE, SKIMMER, AND OVERFLOW SPILLWAY WEIR AS SIZED AND PROVIDED IN THE DETAILS. COMPLETE SITE CLEARING UPSTREAM OF THE TEMPORARY SEDIMENT BASINS AND INSTALL TEMPORARY DIVERSION DITCHES WITH WATTLES AND TEMPORARY SEEDING AS SOON AS THESE AREAS ARE CLEARED. THE WORK AREA SHALL BE GRADED, SHAPED, AND OTHERWISE DRAINED IN SUCH A MANNER AS TO MINIMIZE SOIL EROSION, SILTATION, OF DRAINAGE CHANNELS, DAMAGE TO EXISTING VEGETATION, AND DAMAGE TO PROPERTY OUTSIDE THE LIMITS OF THE WORK AREA. MAINTAIN ALL STORMWATER DRAINAGE INTO THE SKIMMER SEDIMENT BASINS DAILY. FINISH ALL SLOPES AS SOON AS ROUGH GRADING IS COMPLETE. LEAVE THE SURFACE SLIGHTLY ROUGHENED AND VEGETATE AND MULCH IMMEDIATELY AFTER PHASE CLEARING & GRUBBING IS COMPLETE. AFTER SITE IS STABILIZED, REMOVE ALL TEMPORARY MEASURES. ANY FILL MATERIAL NECESSARY TO COMPLETE PROJECT GRADING WHICH IS NOTABLE TO BE GENERATED FROM THE SITE SHALL BE OBTAINED FROM AN APPROPRIATELY PERMITTED BORROW FACILITY. ANY EXCESS MATERIAL HAULED OFF -SITE WHICH IS UNABLE TO BE USED IN SITE GRADING SHALL BE EXPORTED TO AN APPROPRIATELY PERMITTED BORROW FACILITY. MAINTENANCE SEQUENCE 1. THE FIELD CONTACT FOR THE MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL DEVICES SHALL BE THE CONTRACTOR'S SUPERINTENDENT. 2. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY RUNOFF PRODUCING RAINFALL EVENT, BUT IN NO CASE LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED. 3. SEDIMENT WILL BE REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN IT BECOMES ABOUT 61NCHES DEEP AT THE FENCE. THE SEDIMENT FENCE WILL BE REPAIRED AS NECESSARY TO MAINTAIN A BARRIER. 4. THE CONTRACTOR SHALL MAINTAIN INSPECTION AND MONITORING RECORDS BY COMPLETING NC DEMLR SELF -INSPECTION MONITORING FORMS WEEKLY AND/OR AFTER RAIN EVENTS. 5. REFER TO INDIVIDUAL EROSION CONTROL DEVICE DETAILS FOR SPECIFIC DEVICE INSPECTION AND MAINTENANCE REQUIREMENTS. 6. PRIOR TO CONTRACTOR LEAVING SITE, ENTIRE SITE SHALL BE INSPECTED AND ANY DEFICIENT AREAS STABILIZED ACCORDINGLY. 1. BOUNDARY INFORMATION AS SHOWN IS AS PROVIDED ON THE 'BOUNDARY SURVEY FOR NOLAN COMMERCIAL CONTRACTORS, INC. "AS PREPARED BY HERBERT J. NOBLES, JR., PLS (#L-2703), DATED JANUARY 10, 2022, AND RECORDED IN PLAT BOOK 87, PAGE 191 OF THE PITT COUNTY REGISTRY. 2. DEED REFERENCE: DB 4231, PG 685. 3. NCPIN# 4665712299, 4665712692, & 4665615975. 4. PARCEL# 19880, 80704, & 82582. 5. CURRENT ASSIGNED PROPERTYADDRESS IS 2668 RED FORBES ROAD, WINTERVILLE, NC, 28590. 6. ZONING IS R-10. 7. TOTAL PROJECT ACREAGE IS 22.73 AC ±. 8. TOTAL DISTURBED ACREAGE IS ROUNDED UP TO 16 AC. 9. SITE ENTRANCE COORDINATES ARE LAT 35.529451' N, LONG-77.728553'W. 10. THE EXISTING SITE IS PRIMARILY CLEARED FIELD WITH SOME WOODED AND ENVIRONMENTALLY PROTECTED LOW-LYING PERIMETER AREAS. 11. ANYAERIAL IMAGES PROVIDED ARE FOR ILLUSTRATIVE PURPOSES ONLY AND MAY OR MAY NOT ACCURATELY REFLECT ACTUAL FIELD CONDITIONS. 12. ELEVATIONS ARE BASED ON NAVD 88. 13. EXISTING CONTOUR INTERVALS SHOWN ARE AT ONE FOOT. 14. PROPOSED FUTURE PROJECT IS LOW DENSITY, WITH LESS THAN 24% CO VER AND GENERALLY A CURB OUTLET SWALE SYSTEM. 15. PORTIONS OF THIS THIS PROJECT SCALES WITHIN ZONE 'X' AND ZONE 'AE" AS PER FLOOD INSURANCE RATE MAP 3720466500K, ALL DATED JULY 07, 2014 AS ESTABLISHED BY FEMA. HOWEVER, LOT BUILDING ENVELOPES DO NOT FALL WITHIN THE 100 YEAR FLOOD LINE. THIS REPORT IN NOWAY SUPERCEDES THE ABOVE MENTIONED FIRM. 16. BASE FLOOD ELEVATION DOWNSTREAM OF THIS PROJECT IS 53.01 . 17. BLUE -LINE STREAMS EXIST ON THIS TRACT AND AREAS SHOWN. 18. SECTION 404 WETLANDS EXIST ON THIS TRACT AND AREAS SHOWN. THESE AREAS WILL NOT BE IMPACTED AS A PART OF THIS WORK WETLANDS DELINEATION IS AS PROVIDED BY PITTMAN SOIL CONSULTING DATED AUGUST 31, 2021. 19. THIS PROJECT IS NOT IN AN AREA OF ENVIRONMENTAL CONCERN. 20. THIS SITE IS IN THE NEUSE RIVER BASIN. 21. RECEIVING STREAM FOR THIS PROJECT IS AN UNNAMED TRIBUTARY OF SWIFT CREEK (27-97-(0.5)). 22. EXISTING AND PROPOSED WATER SERVICE OWNER IS BELL-ARTHUR WATER CORPORATION. 23. EXISTING AND PROPOSED SEWER SERVICE OWNER IS THE TOWN OF WINTERVILLE. 24. REFUSE SERVICE TO BE PROVIDED BY THE TOWN OF WINTERVILLE. 25. ELECTRICAL TO BE DESIGNED AND PROVIDED BY GUC. 26. DESIGN OF ELECTRICAL, CABLE, TELEPHONE, GAS, ETC. UTILITIES SHALL BE BY OTHERS. ALL UTILITIES TO BE LOCATED UNDERGROUND. 27. PROPOSED GRADING AND TOPOGRAPHY TO BE SHOWN ON FULL CONSTRUCTION PLAN AND PROFILE DRAWINGS. 1 note Know what's below. Call before you dig. SCHEDULE OF DRAWINGS .g14FFT AIAAAF 1 COVER & VICINITY 2 CLEARING & GRUBBING PLAN 3 EROSION CONTROL DETAILS 4 NCG01 DETAILS ® PROJECT REVISIONS NO. DESCRIPTION I BY I DATE OWNER & DEVELOPER NOLAN COMMERCIAL CONTRACTORS, INC 754 RAMSEY ROAD, SUITE F JACKSONVILLE, NC 28546 OFFICE: 910.219.4770 CONSULTING ENGINEER/SURVEYOR THOMAS ENGINEERING, P.A. P.O. BOX 1309 - 1316-B COMMERCE DRIVE NEW BERN, NORTH CAROLINA 28563 OFFICE: 252.637.2727 FAX: 252.636.2448 COPYRIGHT © 2022 BY THOMAS ENGINEERING, P.A. ALL RIGHTS RESERVED. THESE DRAWINGS ARE INSTRUMENTS OF SERVICE AND AS SUCH REMAIN THE PROPERTY OF THOMAS ENGINEERING, P.A. NEITHER THIS DOCUMENT NOR ANY PART OF THIS DOCUMENT MAYBE REUSED, REPRODUCED OR TRANSMITTED IN ANY FORM OR BY ANY MEANS, ELECTRONIC OR MECHANICAL INCLUDING BUT NOT LIMITED TO PHOTOCOPYING, MICROFILMING AND RECORDING, OR BYANY INFORMATION STORAGE AND RETRIEVAL SYSTEM, WITHOUT PERMISSION IN WRITING FROM THOMAS ENGINEERING, P.A. FINAL DRA WINGS Released for permits only, not released for construction. 11/11111IIIIIIIII �titi'` .�G I NEEh, ''elf SEAL boy a o C-438ti CAgo ff'ff 1 9 8,3 lI1'I1111111111111 COVER & VICINITY VILLA GRANDE PHASE THREE WINTERVILLE - PITT COUNTY - NORTH CAROLINA SCALE: 1 ' = 1000' 1 DATE: 01.19.22 PROJECT #: 2015-004 1 SHEET. 01 of 04 00 14* M OM N v � z �Lr) s � w � � Q m zW� O � � M rn � o � ni m � Ln C O M *.a W lw S Q �7