Loading...
HomeMy WebLinkAboutSW8980521_Current Permit_20130404NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality . Pat McCrory Charles Wakild, P. E. Governor Director April 4, 2013 Waterway Landing Homeowners Association, Inc. Nancy Hughes - Miller 1135 Park Road Sunset Beach, NC 28468 Subject: Stormwater Permit No. SW8 980521 Renewal Waterway Landing High Density Project Brunswick County Dear Ms. Miller: John E. Skvarla, III Secretary On August 5, 2009, the Governor signed Session Law 2009-406. This law impacts any development approval issued by the Division of Water Quality under Article 21 of Chapter 143 of the General Statutes, which is current and valid at any point between January , 2008, and December 31, 2010. The law extends the effective period of any stormwater penmit that is set to expire during this time frame to three (3) years from its current expiration date. On August 2, 2010, the Govemor signed Session Law 2010-177 which grants an extra year for a total of four (4) years extension. Accordingly, Stormwater Permit # SW8 980521, which expired on December 10, 2008, was granted the 4 year extension until December 10, 2012 On April 2, 2012, the Division of Water Quality (DWQ) received updated permit holder contact information and a complete *8 year Stormwater Management permit Renewal Application from Waterway Landing Homeowners Association, Inc. This site was inspected on April 3, 2013. As noted in the enclosed inspection report the site is currently in compliance with the terms and conditions of the current state stormwater permit. The Division is hereby notifying Waterway Landing Homeowners Association, Inc. that permit SW8 980521 has been renewed on April 4, 2013, and shall be effective until December 10, 2020. The plans previously approved on December 10 1998, in accordance with the regulations set forth in Title 15A NCAC 2H.1000 effective September 1, 1995, remain in full force and effect. Please attach this cover letter and permit addendum to your High Density Permit originally issued on December 10, 1998. This permit is subject to the conditions and limitations as specified therein. Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed restrictions, procedures for changes of ownership, transferring the permit, and renewing the permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions, to transfer the permit, or to renew the permit, will result in future compliance problems. . If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150E of the North Carolina General Statutes, and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. Wilmington Regional Office One, ,. 127 Cardinal Drive Extension, W�nington, North Carolina 28405 -One Phone: 910-796-72151 FAX: 910-350-20041 DENR Assistance:1-877-623-6748 �atur !!� Internet www.ncwaterquality.org An Equal Opportunity 1 AiBrmative Adon Employer State Stormwater Management Permit # SW8 980521 If you have any questions, need additional copies of the permit or approved plans, please contact David Cox with the Division of Water Quality in the Wilmington Regional Office at (910) 796-7215. Sin , rely, Charles Zakild. P.E., Director Division of Water Quality GDS/dwc: S:1WQS1Stor[nwaterlPermits & Projects119981980521 HD12013 04 permit 980521 cc: PwTrlpp C-"hris11 Goya; c_A s Wilmington Regional Office 2 State Stormwater Management Permit # SW8 980521 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Waterway Landing Homeowners Association, Inc. Waterway Landing Park Road, Sunset Beach, NC - Brunswick County FOR THE operation and maintenance of a infiltration basin in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "storrnwater fulesl and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. The permit is hereby renewed subject to the following addendums, clarifications, conditions and limitations: The original permit conditions contained in the permit issued on December 10, 1998 remain in full force and effect, except as amended herein. (An additional copy of this original permit can be obtained from the Division of Water Quality, Wilmington Regional Office.) 2. This permit shall be effective from the date of issuance until December 10, 2020. 3. The permittee shall submit a permit renewal application request at least 180 days prior to the expiration date of this permit. The renewal request must include the applicable documentation and the processing fee. 3 Permit Number:`���4�� / (to be provided by DWQ) Drainage Area Number: Stormwater Wetland Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — Immediately following construction of the stormwater wetland, bi-weekly inspections will be conducted and wetland plants will be watered bi-weekly until vegetation becomes established (commonly six weeks). — No portion of the stormwater wetland will be fertilized after the first initial fertilization that is required to establish the wetland plants. — Stable groundcover will be maintained in the drainage area to reduce the sediment load to the wetland. — Once a year, a dam safety expert should inspect the embankment. After the stormwater wetland is established, I will inspect it monthly and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: Entire BMP Trash debris is present. Remove the trash/debris. Perimeter of wetland Areas of bare soil and/or erosive Regrade the soil if necessary to remove the gullies have formed. gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too long. Maintain vegetation at an appropriate height. Inlet device: pipe or The pipe is clogged (if applicable). Unclog the pipe. Dispose of the sediment swale offsite. The pipe is cracked or otherwise Replace the pipe. -damaged if applicable), Erosion is occurring in the swale (if Regrade the swale if necessary to smooth applicable). it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Form SW401-Wetland O&M-Rev.4 EC E'VE APR 0 2 2013 BY: pane of 3 Permit Number: (to be provided by DWQ) BMP element: Potentialproblem: How I will remediate theproblem: Forebay Sediment has accumulated in the Search for the source of the sediment and forebay to a depth that inhibits the remedy the problem if possible. Remove forebay from functioning well. the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If a pesticide is used, wipe it on the plants rather than spraying. Deep pool, shallow water Algal growth covers over 50% of the Consult a professional to remove and and shallow land areas deep pool and shallow water areas. control the algal growth. Cattails, phragmites or other invasive Remove invasives by physical removal or plants cover 50% of the deep pool and by wiping them with pesticide (do not shallow water areas. spray) - consult a professional. Shallow land remains flooded more Unclog the outlet device immediately. than 5 days after a storm event. Plants are dead, diseased or dying. Determine the source of the problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if necessary. Best professional practices show that Prune according to best professional pruning is needed to maintain optimal practices. -plant health. Sediment has accumulated and Search for the source of the sediment and reduced the depth to 75 % of the remedy the problem if possible. Remove original design depth of the deep the sediment and dispose of it in a location pools. where it will not cause impacts to streams or the BMP. Embankment A tree has started to grow on the Consult a dam safety specialist to remove embankment. the tree. An annual inspection by appropriate Make all needed repairs. professional shows that the embankment needs repair. Evidence of muskrat or beaver activity Consult a professional to remove muskrats is present. or beavers. Micropool Sediment has accumulated and Search for the source of the sediment and reduced the depth to 75 % of the remedy the problem if possible. Remove original design depth. the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. Receiving water Erosion or other signs of damage have Contact the NC Division of Water Quality occurred at the outlet. the at-91 3-1786. Form SW401-Wetland O&M-Rev.4 APR 0 2 2013 BY: age o_ Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: Waterway Landing BMP drainage area number: 1 Print name: Nancy Hughes -Miller Title: President, Waterway Landing Homeowners Association Inc Address:__ President, Waterway Landing Homeowners Association, Inc. Note: The legally responsible parry should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. 1, e _ .11 O 2 , a Notary Public for the State of P�QYA,\ 0-Ayb 1 i (w�,, County of -r3!P kY\S W t c�, , do hereby certify that Y- personally appeared before me this ay of �Q_ 19 ir Lk 0,rL 9 2 , and acknowledge the due execution of the forgoing stormwater wetland maintenance requirements. Witness my hand and official seal, ,OQ� 1E 11151�!On''''�i NOTA ?R ,`` MY COMMISSION EXPIRES BU CO��,`,`, SEAL My commission expires i 2 1 A a\ to 946�-- �5 - �ECEiVED APR 0 210q BY.• Form SW401-Wetland O&M-Rev.4 Page 3 of 3 DWQ USE ONLY Dlt Received Fee Paid Permit Number State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT RENEWAL APPLICATION FOR This form maybe photoc ied for use, as an original I. GENERAL INFORMATION 1. Stormwater Management Permit Number: SW8 980521 2. Permit Holder's name (specify the name of the corporation, individual, etc.): Waterway Landing Homeowners Association, Inc. 3. Print Owner/Signing Official's name and title (person legally responsible for permit): Nancy Hughes -Miller 4. Mailing Address for person listed in item 2 above: 1135 Park Road City: Sunset Beach / W`� State: NC Zip: 28468 Phone: ( q I 0 ) 2 5 le 2 Fax: ( Email: 5. Project Name: Waterway Landing 6. Location of Project (street address): 1135 Park Road City: Sunset Beach County: Brunswick Zip: 28468 7. Directions to project (from nearest major intersection): From intersection of NC Hwy 179 & NC Hwy 904 in Sunset Beach, drive west on Sunset Blvd. North 1 block, left on Park Rd SW, project at end of Park Rd on left at ICWW. II. PERMIT INFORMATION: 1. Specify the type of stormwater treatment: ®Constructed Wetland ❑Bioretention ❑Wet Detention Basin ❑Dry Detention Basin ❑Infiltration Basin []Infiltration Trench []Sand Filter [-]Other: 2. List any changes from project that was originally approved (attach additional pages if needed): APR 0 2 2013 Form SWU-102 (Renewal Form) Rev 06May2010 Page 1 of 3 "V:._ -M_._...,,. __-.__..._..._. 3. r Do you have a copy of the original Operation and Maintenance Agreement? (check one) ❑Yes (If yes, submit the attached (page 3) Operations and Maintenance verification sheet.) ®No (If no, then submit a new Operations and Maintenance Agreement that can be located on the Division of Water Quality Home Page under the BMP Manual link: http://h2o.enr.state.nc.us/su/bmp_forms.htm) III. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Office. (Appropriate office may be found by locating project on the interactive online map at hft://12ortal.ncdenr.oig/web/iyws/su/maps) 1. Please indicate that you have provided the following required information by initialing in the space provided next to each item. Initials • Original & 1 copy of the Stormwater Management Permit Renewal Application Form d-1 "/Y) • Application fee of $505.00 (made payable to NCDENR) /1 It • Operation & Maintenance Verification or a new O&M Agreement 4ZM22 • SWU-101 Application Form (if requesting a modification to the permit) q4d lJ-J H#47 2. If you are also requesting a ownership change or a name change then also submit the "State Stormwater Name Ownership change Form" available at: http://portal.ncdenr.org web/wq/ws/su/statesw/forms docs. When requesting a permit ownership change please make sure that all signatures and initials for both parties are filled in on this form or the transfer cannot be completed and the original owner will remain as the permit holder. VI. APPLICANT'S CERTIFICATION I, (print or type name of person listed in General Information, item 3) Nancy Hughes -Hiller certify that I have a copy of the Permit and O&M Agreement on -site and that the information included on this permit renewal application is,i#o W. best o,�myJTigwledge, correct and complete. Date: Z ' 02- - ZD Note: Additional copies of the original permit can be obtained from the appropriate Regional Office of the Division of Water Quality. (http://vortal.ncdenr.oW web/wq/home/ro) ECEiVED All 012013 BY: Form SWU-102 (Renewal Fong) Rev 06May2010 Page 2 of 3 Operations and Maintenance Verification I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed in the original Operations and Maintenance Agreement. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: Nancy Hughes -Miller Title: President, Waterway Landing Homeowners Association, Inc. Address: President, Waterway Landing Homeowners Association, Inc. Phone: j"Iy di!tj 202,1 Date: , z2- 7 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, 'Soa � C-� '9'rko"Q , a Notary Public for the State of QArA s e\o� County of $ wu 1Rsy j i d- , do hereby certify that g&yAe u 41-xa l�ks � (key - personally appeared before me this day of rj K& P-A 126 and acknowledge the due execution of the forgoing stormwater BMP maintenance requiLejnents. Witness my hand and official seal, Notary Signature: . �pTARY MY COMMISSION EXPIRES My commission expires: Q�L� 1.:�, , 26% to ECEIVE APR 0 2 2013 BY: ------------ Form SWU-102 (Renewal Form) Rev 06May2010 Page 3 of 3 ANA 5 2013 NCDENR North arolina Department of Environment and Natural Resources Ly-----.=-r - — Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary STATE STORMWATER PERMIT NAME/OWNERSHIP CHANGE FORM I. CURRENT PERMIT INFORMATION 1. Stormwater Management Permit Number: SW8 980521 2. Project Name: Waterway Landing (Waterway Project) 3. Current Permit Holder's Company Name/Organization: Sea Trail Corporation 4. Signing Official's Name: Dana A. Connelly Title: President 5. Mailing Address: 211 Clubhouse Road City: Sunset Beach, State: NC Zip: 28468 6. Phone: 91 287-1100 Fax: (910 287-1145 11. PROPOSED PERMITTEE / OWNER / PROJECT / ADDRESS INFORMATION This request is for: (please check all that apply) ® Name change of the owner (Please complete Items 1, 2 and 3 below) ❑X Name change of project (Please complete Item 5 below) ® Change in ownership of the property/company (Please complete items 1, 2, 3, and 4 below) ® Mailing address / phone number change. (Please complete Item 4 below) ❑ Other (please explain): 1. Proposed permittee's company name/organization: Waterway Landing Homeowners Association, Inc. 2. Proposed permittee's signing official's name: Nancy Hughes -Miller 3. Proposed permittee's title: President 4. Mailing Address: 1135 Park Road City: State: NC Zip Phone: LqLp j yb 2-021 Fax: Sunset Beach 28468 5. New Project Name to be placed on permit: _Waterway Landing Please check the appropriate box. The proposed permittee listed above is: ® HOA or POA (Attach documentation showing that the HOA or POA owns, controls, or has a recorded easement for all areas that contain stormwater system features. Print name of HOA or POA in #1 above and provide name of HOA/POA's authorized representative in #2 above) ❑ The property/ owner ❑ Lessee (Attach a copy of the lease agreement and complete Property Owner Information on page 4) ❑ Purchaser (Attach a copy of the pending sales agreement. Final appro � �q i be granted upon receipt of a copy of the recorded deed) ❑ Developer (Complete Property Owner Information on page 4) APR 0 2 2013 SSW N/O Change Revl5Feb20l l Pagel of 4 BY: III. REQUIRED ITEMS A request to transfer a permit will not be approved by the Division of Water Quality (DWQ) unless all of the applicable required items listed below are included with the submittal. Failure to provide the listed items may result in processing delays or denial of the transfer. 1. This completed and signed form. This certification must be completed and signed by both the current permit holder and the new applicant if this is a change of ownership. 2. Legal documentation of the property transfer to a new owner. 3. A copy of any recorded deed restrictions, covenants, or easements, if required by the permit. 4. The designer's certification (DWQ Engineer and Designer Certification Forms are available from each DWQ Regional office), if required by the permit and if not already submitted to DWQ. 5. If the proposed permittee is a firm, partnership, association, institution, corporation, limited liability company, or other corporate entity, provide documentation showing the authority of the named representative to act on behalf of the proposed permittee. 6. The $40.00 processing fee. If this is an initial transfer from the original permittee the processing fee is not required. Subsequent ownership transfers will require the $40.00 processing fee. IV. CURRENT PERMITTEE'S CERTIFICATION Please check one of the following statements and fill out the certification below that statement: ❑ Check here if the current permittee is only changing his/her/its name, the project name, or mailing address, but will retain the permit. I, , the current permittee, hereby notify the DWQ that I am changing my name and/or I am changing my mailing address and/or I am changing the name of the permitted project. I further attest that this application for a name/ownership change is accurate and complete to the best of my knowledge. l understand that if all required parts of this application are not completed or if all required supporting information and attachments listed above are not included, this application package will be returned as incomplete. ® Check here if current permittee is transferring the property to a new owner and will not retain ownership of the permit. I, Dana A. Connelly , the current permittee, am submitting this application for a transfer of ownership for permit # SW8 980521 . I hereby notify DWQ of the sale or other legal transfer of the stormwater system associated with this permit. I have provided a copy of the most recent permit, the designer's certification for each BMP, any recorded deed restrictions, covenants, or easements, the DWQ approved plans and/or approved as -built plans, the approved operation and maintenance agreement, past maintenance records, and the most recent DWQ stormwater inspection report to the proposed permittee named in Sections II and V of this form. I further attest that this application for a name/ownership change is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed or if all required supporting information and attachments listed above are not included, this application package will be returned as incomplete. I assign all rights and obligations as permittee to the proposed permittee named in Sections II and V of this form. I understand that this transfer of ownership cannot be approved by the DWQ unless and until the facility is in compliance with the permit. f Signature: of forgoing instrument. W Notary Signature of J otary Publ of do hereby certify that appeared before me this the _, and acknowledge the due execution of the official seal, (Notary Seal) SSW N/O Change Rev15Feb2011 Page 2 of 4 E4.�.....�VF APR 0 2 2013 av: 3� Y V. PROPOSED PERMITTEE CERTIFICATION: (This section must be completed by the Proposed Permittee for all transfers of ownership) I, Nancy Hughes -Miller , hereby notify the DWQ that I have acquired through sale, lease or legal transfer, the responsibility for operating and maintaining the permitted stormwater management system, and, if applicable, constructing the permitted system. I acknowledge and attest that I have received a copy of: (check all that apply to this permit) [N the most recent permit the designer's certification for each BMP ❑ any recorded deed restrictions, covenants, or easements ❑ the DWQ approved plans and/or approved as -built plans © the approved operation and maintenance agreement epast maintenance records from the previous permittee (where required) DWQ stormwater inspection report showing compliance within 90 days prior to this transfer I have reviewed the permit, approved plans and other documents listed above, and I will comply with the terms and conditions of the permit and approved plans. I acknowledge and agree that I will operate and maintain the system pursuant to the requirements listed in the permit and in the operation and maintenance agreement. I further attest that this application for a name/ownership change is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed or if all required supporting information and attachments listed above are not i cluded, thi ap ication pack •-ge will be returned as incomplete. Signature: Date: a Notary Public for the State of arWj1 0,AY D I t s1, �, County of -by-ayA5yoi C_V_ , do hereby certify that personally appeared before me this the a-2ar'-4 day o F@ �) ;u a ram! , 20J-3-1 and acknowledge the due execution of the for ing instrument. Witness my hand and official seal, ,.'�pi E. siy, ' �.1QTAR f, (Notary Seal) =MY Not ignature COMMISSION EXPIRES %G2�, 'QUBLIG �p lKnCo +���� Additional copies of the original permit and the approved Operation and Maintenance agreement can be obtained from the appropriate Regional Office of the Division of Water Quality. This completed form, including all supporting documents and processing fee (if required), should be sent to the appropriate Regional Office of the North Carolina Department of Environment and Natural Resources, Division of Water Quality, as shown on the attached map. Please note that if the Proposed Permittee listed aboveis not the property owner, the property owner must complete and sign page 4 of this document. Both the lessee / developer and the property owner will appear on the permit as permittees. APR 0 2 2013 SSW N/O Change Rev15Feb2011 Page 3 of 4 VI. PROPERTY OWNER CONTACT INFORMATION AND CERTIFICATION If the Proposed Permittee listed in Sections 11 and V of this form is not the Property Owner, the Property Owner must provide his/her Contact Information below and sign this form: Printed Name: Organization: Title within the Organization: Street Address: City: Mailing Address: City: Phone: Email: State: (if different from street address) State: Fax: Zip: I certify that I own the property identified in this permit transfer document and have given permission to the Proposed Permittee listed in Sections II and V to develop and/or, lease the property. A copy of the lease agreement or other contract, which indicates the party responsible for the construction and/or operation and maintenance of the stormwater system, has been provided with the submittal. As the legal property owner I acknowledge, understand, and agree by my signature below, that I will appear as a permittee along with the lessee/developer and I will therefore share responsibility for compliance with the DWQ Stormwater permit. As the property owner, it is my responsibility to notify DWQ by submitting a completed Name/Ownership Change Form within 30 days of procuring a developer, lessee or purchaser for the property. I understand that failure to operate and maintain the stormwater treatment facility in accordance with the permit is a violation of NC General Statute (NCGS) 143-215.1, and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Signature of the property owner A County of Date: a Notary Public for the State of __, do hereby certify that personally appeared before me this the day of , 20 , and acknowledge the due execution of the forgoing instrument. Witness my hand and official seal, Notary Signature SSW N/O Change Rev15Feb2011 Page 4 of 4 (Notary Seal) PtECEIVEIAPR 421013 • JECEIVE FEB 2 8 200 BY V. PROPOSED PERMITTEE CERTIFICATION: (This section must be completed by the Proposed Permittee for all transfers of ownership) I, 2)9t�,%J \'O 'S-rlE-? tom , hereby notify the DWQ that I have acquired through sale, lease or legal transfer, the responsibility for operating and maintaining the permitted stormwater management system, and, if applicable, constructing the permitted system. I acknowledge and attest that I have received a copy of: (check all that apply to this permit) the most recent permit the designer's certification for each BMP ❑ any recorded deed restrictions, covenants, or easements ❑ the DWQ approved plans and/or approved as -built plans ❑ the approved operation and maintenance agreement epast maintenance records from the previous permittee (where required) DWQ stormwater inspection report showing compliance within 90 days prior to this transfer I have reviewed the permit, approved plans and other documents listed above, and I will comply with the terms and conditions of the permit and approved plans. I acknowledge and agree that I will operate and maintain the system pursuant to the requirements listed in the permit and in the operation and maintenance agreement. I further attest that this application for a name/ownership change is accurate and com lete to the best of my knowledge. I understand that if all required parts of this applica are not c p ' leted or if all required supporting information and attachments listed above are no in ludedhi plication Lp-wW 1 be returned as incomplete. Signature: Date: W `2 7-- / 3 a Notary Public for the State of Any- l /�l"�/iyr� , County of /UAW 0/42my °r , do hereby certify that personally appeared before me this the day of ���iltti 1' S , 20/1 and acknowledge the due execution of the forgoing instrument. Witness my hand and official seal, CAN" g1,M`jA, otary ignature NEW HANOvElloo{ M W COMMISSION EMM06" Additional copies of the original permit and the approved Operation and Maintenance agreement can be obtained from the appropriate Regional Office of the Division of Water Quality. This completed form, including all supporting documents and processing fee (if required), should be sent to the appropriate Regional Office of the North Carolina Department of Environment and Natural State Stormwater Management Systems Permit No SW8 980521 XVaterwsy Project Stormwater Permit No. SWS 980521 )Brunswick County Engineer's Certification i, C. Lawrence Sneeden, Jr. PE , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, Waterway Landing (Waterway Project) (Project) for Waterway Landing Homeowners Assn, Inc(Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Noted deviations from approved plans and specification: Signature _ �i� X, Registration Number 010972 Date May 15, 2012 �seaQc�ea�_ 1 • • yr� : low '♦ "'} �O %i�P' j I r ♦ cu ." 'r � r VV S/arf/. SEAL ECIC IV APR 0 2 2013 BY: A