Loading...
HomeMy WebLinkAboutNCC220737_ESC Approval Submitted_20220215Approval - Idolwood Subdivision EN2000097 From: Matthew Osborne (matthewo@cityofws.org) To: encompass.surveyengineering@gmail.com; ndm_eng@yahoo.com Cc: kentw@cityofws.org Date: Monday, February 7, 2022, 02:14 PM EST Application Type: 04.02) Grading/Erosion Control Permit Workflow: 04.02) Grading & Erosion Control Project: Idolwood Subdivision AT #: EN2000097 Acreage to be Disturbed: 14.00 https:Hwinston-salem.idtplans.com/secure/�P-roj t/? roj ectid=398818 Hello Clayton Properties Group, Inc., Thank you for submitting your project to City of Winston-Salem. Review of the plans for this project have been completed. The design is adequate to meet the ordinance standards and the plans have been approved. If you have not already done so, please provide an original signed and notarized Financial Responsibility/Ownership (FRO) form as applicable. This document is required prior to the issuance of the Grading/Erosion Control Permit. If this has already been provided, then please disregard this statement. Reminder that a completed FRO form is not required in the instance where a project qualifies to use the HB 489 Sketch Erosion Control Plan document. If this project will disturb more than 1 acre or is part of a larger common plan of development, the Grading/Erosion Control Permit cannot be issued until documentation is provided that coverage under the NCGO1 Construction Stormwater Permit (NPDES) has been obtained. Please obtain coverage under the permit at the following website (https.//edocs.deq.nc.gov/Forms/NCGOl-NOI). Once coverage is obtained please upload a copy to the project documents in the electronic plan review system. The Grading/Erosion Control Permit will not be issued until proof of coverage under NCGO1 is provided. As outlined in the Unified Development Ordinances (UDO) of Winston-Salem/Forsyth County, Village of Clemmons, Town of Lewisville, and Town of Walkertown, Erosion Control Division staff may periodically inspect sites of land disturbing activity to determine compliance with the Erosion Control ordinances and the approved Erosion Control Plan. No person shall willfully resist, delay, or obstruct an authorized representative, employee, or agent of the Erosion Control Division while that person is inspecting or attempting to inspect a land disturbing activity under the ordinance. Should you have any questions as you move forward please feel free to contact Matthew Osborne at 336-462-7480 or matthewo@cityofws.org. Matthew Osborne, CFM, CPESC Erosion Control/Floodplain Program Manager City Of Winston-Salem Field Operations Department Erosion Control Division PO Box 2511 (Mailing) 100 E. First Street, Suite 328 (Physical) Winston-Salem, NC 27101 Office: 336-747-7453 Mobile: 336-462-7480 Fax 336-727-2792 Electronic Plan Review Application Portal: https://winston-salem.iq!plans.com/secure/ Electronic Plan Review Application Instructions: https://winston-salem.idtplans.com/secure/training/Manual/ NOTICE: Beginning May 1, 2018, all Grading/Erosion Control, Floodplain Development, and Watershed Protection Permit Submittals MUST be submitted electronically. City of Winston-Salem ONE TEAM Committed to Excellence All a -mails including attachments sentto and from this address are subjectto being released tothe media and the public in accordance with the North Carolina Public Records taw.