Loading...
HomeMy WebLinkAboutNCC220669_Site Plan or Location Map_20220211ER05ION CONTROL G05TRUCTION 5EQUENGE 1. Obtain gradY!g/eroslon control plan aapppprroval and permit from NGDW - 2. Obtain Certificate of Coverage for NPI�ES NG601 permit from NGDW H - HBO 3. Contact Erosion Control Inspector to establish a pre -construction conference ad Inspection schedule. self Ins ction-Effective March 1, 2014, persons conductinci land-clisturbincir Shall f the self Inspection procedures establish buy the NGVEQ (see dkIched work sheet) The phases are as follows: \, 1. Installation of perimeter Erosion and Sediment Gontrol Measures. -� 2. Clearing and grubbing of existing ground cover. / -- 3. Completion of any phase of gadinngg of slopes or fills. �- - 4. Installation of storm drainage facllltles. IAll 5. Completion of construction or development. J I / con / 65 6. Establishment of permanent ground cover sufficient to restrain Erosion. Ir 4. Cleo site ONLY as necessary to install Initial Erosion Corrtrol measures as follows: a. Temporary construction entrance/exlt b. Temporary sediment basins. For sites over one (1) acre, outlet structures (skinners) that only wlthdrem water from the surface of the basin, Shall be utilized. No sediment traps or rock dams allowed. c. Temporary diversion berms and Slope drain d. Temporary silt fencing and silt fence rock outlets Seed embankments and disturbed areas of devices (Incl imq 'clean' Water diversion) upon completion of construction. See Ground 5ta6ilization Criteria below for more information. 5. Obtain an erosion control Inspection and have temporary measures approved 4. Begin clearing, grubbing, and stripping of site as required. Faarthen-naterlal stockpiles on -site for I I I � / / o later distrlbuElon and/or removal, areas dedicated for management of land clearing and demolition, P I NIb S 5 5 3 1 2 S construction and domest� waste, and hazardous or toxic waste shall be located aE least 50 feet / A�1 E 5 1 W. H 0 6 I�5 away from storm daln Inlets ad surface waters (unless It cam be shown that no other alternatives /E R M F. XE A K 5 cre reasonably available), aid within areas protected by Erosion Control measures. I D. B. 1 1 4 4 q, P. V 135 � 5. Begin site g"adN starting South moving North, contractor to leave area behind construction access at a grade R / I \ not greater than 10%. Maintain Erosion Control devies in accordance with the maintenance plan. Install additional / ZO/ 1 Erosion Control measures as required. Device specific maintenance requirements detailed on EG- 2. 6. Install slope stabilization per manufacturer Installation specifications once areas shore to be matted exceed 33' In length. NOTE: Contractor to maintain access to the primary stockpile util It is exhausted with a max slope of / �I \ 1 s 1. Site Ls to be completely stabilized prior to contacting the Erosion Control Inspector. / I / ~ DITCH 8. Prior to the Contractor demobllizN from the site (at approximately 45 days prior to demoblllzatlon), I / ART: 645.0 the Financially Responsible Pay (or the des") will notify the de lgInated Erosion Control inspector of their anticipated date to leave / �6 the site. An on -site Inspection will be conducted prior to the leave date by the Finaclallly Responsible Party � � rn or representative and the designated Erosion Control Inspector to make certain all action Items have been / w addressed by the Contractor. i "' X la - - 175. 0' 9. Continue to maintain Erosion Control measures until vegetative cover has been established over all disturbed / I f a TEMP. areas and site has been stabilized. Remove Erosion Control measures ONLY after approval by Inspector. / / IO.Obtaln a final Inspection from Inspector to close the gradiInngg permit. i / \DIVERSION 11. File notice of termination wlth the NGDEQ to close the NPI E5 NC601 permit. / / �u, I TYP6 l TEMPORARY 5EEDIN6 5PEG5 N E Planting Type Planting Rates/ Acres Planting Dates ( /� Q Rye grain 120 lbs. Dec. 1- Apr. 15 / / I /- SM 65 \ Lespedeza [Kobe] 50lbs. \ \POR US / FL S HO - 7L HD HO�� - - -� " SHA PE RD (5. 2156 Lum 6 7_ 50 P BLIG RIGHT- F-W Y 1O / L / d 68 �z n� VMP. -4_-__ i- �\ \ DRAINAGE ARE mob✓ - 6.60J - - \ \\ 0.�C ` 655 660 \ \ Q = OAC *5.60 INJ�*O+(9- �� - 659 �9-6 �\ \ F S - J � _ \ \ Q _ Q CO �Q VEHICLE 65� �� �- 67�` �- A-CUMS� - - �656 652 - - - _654 - L 6S0 �� \\�� 652 -- �653�32ni SAS\ 649 - 651 _ / MAIN CONSTR TIO 649� 650 4 JA S�8'09 58 E 9.54 ACCESS PA WITH A RAD� (TOTAL) OF LESS THAN % AS NEEVTO J \ a a a a U _ 644ESS S 2 .54' a 4 4 4 4 < \ / 645 643 , 4a4 4�4a < �ia4 < <�A a 4a 42. 4 4 4 4 4 4 4 <4 CI aqG 4 4 a �< / 4 < a \\ 642.5 CY) < German Millet or Sudan grass 40 lbs. April 15 -Aug. 15 6" Rye grain 120 lbs. Aug. 15 - Dec. 30 I SILT 0 (3� 642.50 Purpose \ FENCE,rn A To temporarily stabilize denuded areas that will not be brought to final grade / I 00 TYP. 644 for a period of more than 21 calendar days. I P I (: bp 5 5 1 0 1 �oO,1 d � 643 Temporary seeding controls runoff and erosion until permanent vegetation or J A L E 5 1 A W.14 6 H 5 / SF I other erosion control measures can be established. In addition, it provides � RVA F W E A 5 OUTLET\ 642\ residue for soil protection and seedbed preparation, and reduces problems of I D B. 11 �/q, P. . 13 4 / --\Typ E-W TERIN mud and dust production from bare soil surfaces during construction. / ZONED: R5-20 J \ K SKIMMER \ Practical Applications �/ / / SKI RB IN 641 RIP RAP SLO Where bare soil has been exposed by construction activities, and vegetative cover is needed for less than -TOP A�M�: 6 4 (v-3 J \ PRO CTION one year. These areas may include temporary sediment traps, diversions, stockpiles, building pads, etc. It / -FIN SI>e641' \ \ < may also be used as a temporary perimeter buffer. I - RGTN7 SPIL: 642.5 O Preparation -S�IDE : / 640A- 5. 5 ac \ \ bbb �I , , AJEA �; • ,. ER �'i►000D0►'G: •NEb •' ' SONO .._.�►.►. o a ►...� DR INAGE ' AREA .► I�1 :, • I :INj 7 CTSM o - • A 7 • 2 1 i 1) /0', J �O�N /ANT: N P TT9R5ON ■ 006 .►��. a •..�..,,... ►.I.I► .►.!.I►►. • 5-5 it►.I. 11 l► •�I►.►°. Q►4p II�.�►..11�.1►.I. .�►:�. a �►.. a �►.�. ►.► M►F1W ►'►'0. MAT S-bQPE 00 4 I►�► LU u.r• u.n►o ;►0 4f, EX AVATION TO i!GI► � i!iidGl►' iJ ' u .1► q• a► . !..i....,..► 1 .. i:► �ioiCiGPER MAI ,..►a.,u.. . . 1 • • �!i►:►a�!i !iil� o.►.u• u• i i 3 5I .I•a►oa•n►o.nn► CS ZONEDi Gib! .i► a. o .► e�• „ Fu .. a .u'ii. •i .i►...•, . I .►9i!n► i!�i!�i►'G►ii ►a. u'.►.. u'.► 1 ■ v.i.n►o'.i•• o.i .►,a. •a o a•.I► u a oa uoa••1►.►a ■ .o..••I►o u•a►u .I►..•►..►..•! .I►. ,oa..noa. i►o - i► a ►.. u i ► r u r l I .►.I 1► .►.b 4► 0 On any cleared, unvegetated, or sparsely vegetated soil surface where vegetative cover is .. u.n<►o.:► . ,�►G►i.�i'ii �r'� . needed.. include diversions, dams, temporary sediment basins, temporary road banks, and topsoil stockpiles. A•• 11 111 lbs.of 1 1 1 fertilizer and up to 1-1.5 tons of per • not be required if a soil test indicates a pH of 6.0 or higher). I S Mulch after seeding with 1.5 tons of grain straw per acre and crimp straw into the soil or tack with with • , liquid ashalt at 400 gallons per or emulsified asphalt1 1 gallons • • �- _ • rIVA • ' 1 ER05ION GONTROL MAINTENANCE PLAN 1.Inspect all sedimentation and Erosion Control devices for stability and function each week and following each rainfall event. Remove silt/sediment from temporay devices when accumulated volume has reached 50% capacity. Remove accumulated silt/sediment from behind temporary sediment fence when depth exceeds approximately 05'. Repair and replace silt fence as necessary. Seed and stabilize temporary diversion berms immediately after construction Including 'clean' water diversion berms. Re--gg""ade/r=r berms as required. Gom7h^actor stxm11 appoint an on'slte inspector ad maintain records of Inspections in accordance wlth the provlsions of the general NPOES 5ta rNater discharge point for construction actMties. NOTIFICATION OF LAND RESOURCES SEDIMENT AND EROSION CONTROL SELF -INSPECTION PROGRAM: SEE FOLLOWING PAGES NOTE: 6RADIN6/51TE GONTRAGTOR 15 RESPONSIBLE FOR GROUND GOVER AT THE 51TE UNTIL GRADING PERMIT 15 CLOSED OUT AN0/0R THE 51TE 15 RELEASED FROM THE APPROPRIATE IN5PEGTOR FROM NGDEQ AND/OR THE LOCAL AUTHORITY HAYING "15DIGTION. GENERAL NOTES 1. Borrow and/or waste areas (Note: If the same person conducts the land -disturbing activity & any related borrow or waste activity, the related borrow or waste activity shall constitute part of the land -disturbing activity unless the borrow or waste activity is regulated under the Mining Act of 1971, or is a landfill regulated by the Division of Waste Management. If the land -disturbing activity and any related borrow or waste activity are not conducted by the same person, they shall be considered separate land -disturbing activities and must be permitted either through the Sedimentation Pollution Control Act as a one -use borrow site or through the Mining Act.) SKIMMER SEDIMENT BA51N #1 SKIMMER 5EDIMENT BA51N #1 [ LAR6E POND] DRAINA6E AREA: 535 AG514 DISTURBED AREA: 4DO AGSA) USING RATIONAL METHOD, COMPUTE Q po) DISGHAR,6E: C = Oh, INTENSITY = 5.60 INA R. 00 YR. , 24 HR STORM, TG=IOMIW Q(io) = G X I X A = Ob X 5b0 INA R X 535 AGS. = 11.518 C.F.5. CALCULATE REQUIRED 5URFAGE AREA (S.A,): 5A = 325 X Q 00) = 325 X IlAb GF5 = 5044 S.F. CALCULATE REQUIRED VOLUME (V): V = 1,800 GF. X DISTURBED AREA = 1,800 G.F. X 4DO AGS. = 1,200 G.F. SURFACE AREA (SA) PROVIDED (ELEV. 64250): b)bl S.F. (O.K) VOLUME PROVIDED 0". 64250-641): 1,113D7 G.F. (OK) SKIMMER ORIFICE DIAMETER [2.5" FAIRGLOTH SKIMMER] - [NOTE MANUF 51ZIN6 GALG51 V = 1,T0.01 G.F. (5E E PREY) T(DAY5 TO DRAIN) = 3 DAYS 2.0' SKIMMER DRAINS C!" GF IN 3DAYS ORR RRAREA] = V/ MANUF. SIZING FACTOR = 1,T0.01 GF / 3,36q = 231 6 R A P H I G 5 G A L E 50IN; R = (231/0.14)r5 = 0.86' OR D = 1.12' USE L15' DIAMETER ORIF. OVERFLOW WEIR GALGULATION5 [55 #11 0 20' 40' 80' 120' I60' Q(1o) = 11.518 GF5. (TC=IOMIN); HEIR LENGTH = 18 FT Q=11.Q8GF5=GwXLX015)=3DX18FTX015) 1.=401 H = 0.48' FT. (OK) I' FREEBOARD; No-T�� - 1 �� '. t t t t J t t •I t � t t i t t t •I t t t Z<2<< 1 t t 1 1 t A1 1. ii ii II ii �I rn 5 \ \ \ \ P \ I \ a E 5 I \\ �� < <\ \ I \ 4 \ \ \ \ EMPORARY IVERSION \ 1 ( \ I \ I \ \ \ DRAINAGAREA =1.21 AC' \ Q = 1.�1AC4*5.60 07 CFSMR *�0.60 \ I 1 \ \ \ \ �u`,� P 6 N: 883552546 Mm AFTAN B. FREEMAN \ I\ \ \ \ ZONED: R5-5 \ \ 00 M ( I \6 \ rn \ \ \ \ \ �' IVERSION\ \ / \S6 \ \ rn \ \ DISTURBED-- M J \ \\ \ J ss IT w \ \ \\ \ \ DITCH \ I PI :\ 355 53�6 \ \ \ \ \ \ S\ T: 651.00 \ J 5 5 A L K R \ / 1 N I \ MAR\I A WA,�KER00 \ \ I o� / \ I ZONEXR5-5 \ I T 2 R6 O1 THE \ \ 6Sp \ \ \ M \ \� \ �b.9Ns S� \,46 \ PIN: bb 5 2�386 \ \ \ 6QS \LINDA 0. D0050-K, D. Lib 6 10, P. 6. 2 16 3 '' \ LLj a VIGINITY MAP N. T. 5. E6END PROPOSED (INTERMIDIATE) CONTOURS EXISTING CONTOURS POROUS BAFFLES - SILT FENCE - TEMPORARY DIVERSION DITCH - STONE CONSTRUCTION ENTRANCE GRAVEL / WIRE INLET PROTECTION SILT FENCE ROCK OUTLET QC TD TD > 1 LEGEND FLOW PATH ---�-�- EX. WATER LINE --�-�- EX. SAN. SEWER LINE EX. STORM SEWER LINE EX. OVERHEAD ELEGTRIG EX. SANITARY EASEMENT Os EX. SANITARY MANHOLE DD EX. STORM MANHOLE EX. SERVICE GONNEGTION - - PROP. R/W LINE PROP. PROPERTY LINE PROP. WATER LINE PROP. SAN. 5EWER LINE PROP. STORM 5EWER LINE - - - - - EX. FIRE HYDRANT/ WATER TEE ® 0 EX. CURB INLET ■ ® PROP GURB / DROP INLET �f POWER POLE STREET L16HT HANDICAP PARKING D.L. PROP. DISTURBED LIMIT Engineers Awl Planners Survevors Borum, Wade and Associates, P.A. 621 Eugene Court, Suite 100, Greensboro, NC 27401-2711 PO Box 21882 Greensboro, NC 27420-1882 Phone:336-275-0471 Fax:336-275-3719 Web: w«w.borum-«ade.com N.C. License #: C-0868 5EAL5: PROJECT: LU .. LU O � V < Z S O fY O LL_ J V o LU ',D LULU X O � NZ LULU O _ 0 CY- OWNER/DEVELOPER: DEW 5HARPE, LG 3105 WE5T MARKET STREET SUITE A 6REEN5BORO, NORTH GAROLINA 21403 PH: (330-2q2-1104 M: (33(b) 60-4160 DRAWN BY: JMM DATE: 12-22-2021 REVISIONS: 01-23-22 SHEET TITLE: ER05ION GONTROL PLAN FILE NO: F:\NED PIERCEV325 DEW SHARPE RD\ADD LAND DRAWING 5GALE: 1"=40' PLAN 5HEET NO. E G-I