HomeMy WebLinkAboutSW1210901_Stormwater Report_20220127STORMWATER MANAGEMENT REPORT FOR ASHEVILLE REGIONAL AIRPORT PARKING LOT D FLETCHER, NORTH CAROLINA INITIAL SUBMITTAL: SEPTEMBER 2021 REVISION #1: JAN UARY 2022 STORMWATER ENGINEER: AULICK ENGINEERING, LLC DAVID A. SKURKY, P.E. 600 PARK OFFICES DRIVE, SUITE 300 DURHAM, NC 27709 %\NCARol SEAL 040195 %Oq . FNGINV:-- � �AiI�SK\ I `\ 11 ULICK ENGINEERING LLC i� HYDRAULICS & HYDROLOGY I EROSION CONTROL Tm. AIRFIELD DESIGN I CONSTRUCTION MANAGEMENT & INSPECTION TABLE OF CONTENTS Section 1 PROJECT OVERVIEW 1.1 Narrative..............................................................................................................................3 1.2 Introduction and Site Description......................................................................................3 1.3 Construction Sequence and Cost........................................................................................3 Section 2 HYDROLOGY 2.1 Project Methodology...........................................................................................................4 2.2 Drainage and Erosion Control Design..................................................................................6 2.3 Operation and Maintenance Manual.................................................................................6 2.4 Design Software and Manuals............................................................................................6 Appendices REFERENCE MATERIAL Appendix A - Vicinity, Soil Survey, FEMA Maps and NOAA Rainfall Data Appendix B - Airport Layout Plan (ALP) Appendix C - Stormwater Sheets & Details, Erosion Control Sheets & Details, & Planting Plan Appendix D - Operation and Maintenance Manual Appendix E - Supplemental EZ Storm & Drainage Calculations Appendix F - BUA Exhibit Appendix G - Water of the U.S. Delineation Report Section 1 PROJECT OVERVIEW 1.1 Narrative The Asheville Regional Airport - Parking Lot D project includes the construction of a new parking lot, Lot D, and associated grading, drainage, landscaping and erosion control. This report includes the computations that show compliance with the NCDEQ High Density Project. A Secondary SCM (Dry Pond) will be used to treat the stormwater runoff from the proposed site. 1.2 Introduction and Site Description The site is located at Asheville Regional Airport in Fletcher, NC, south of Asheville, North Carolina near Airport Road (35°26' 13.99" N. 92032' 8.39"W). The area that includes airport related operations encompasses approximately 580 acres. For a larger vicinity map, see Appendix A. The Asheville Regional Airport Parking Lot D project site is located on an existing pad graded area in the eastern portion of the airport, located along Airport Road. It is just north of the Lot A project under permitting in early 2020. For hydrologic planning purposes, the site is comprised of Hydrologic Soil Group (HSG) B soils. Appendix A contains the NRCS Soil Survey Maps for O �v O Asheville o Regional Airport o - the parking lot. The existing land use of the project is grass, gravel, forest, and impervious. The proposed land use will impervious (parking lot) with a small amount of grass for landscaping. As shown in the FEMA FIRM 3700964300K (January 6, 2010) in Appendix A, the disturbance is not located within 200ft of a FEMA floodplain. 1.3 Construction Sequence and Cost As explained later in the report, a dry detention pond is proposed as a secondary stormwater conveyance measure (SCM). The rough outline of the permanent dry detention pond will occur during the grading phase of the project and a portion of it will be used as a temporary sediment trap to protect downstream receiving stormwater systems from construction activity. After the site is stabilized, the sediment trap will be cleaned out and re -graded to final dry detention pond design grades. No mechanical stabilization will occur. The cost of the dry detention pond is unknown at this time and will be finalized during bidding. The Asheville Regional Airport will be the end -user and responsible for annual inspection, maintenance and repairs of the system. Section 2.3 discusses the operation and maintenance of the cell. 3 ASHEVILLE REGIONAL AIRPORT - PARKING LOT D INITIAL SUBMITTAL: SEPTEMBER 2021, REVISION 1: JANUARY 2022 STORMWATER MANAGEMENT REPORT Section 2 HYDROLOGY 2.1 Project Methodology In order to qualify for a secondary Stormwater Conveyance Measure (SCM) for a Dry Pond, several minimum design criteria (MDC) must be met. The recommendations will also be met to maximum extent practical. NCDEQ Stormwater Design Manual Appendix E-4 Airports, Table 1 "SCMs that do not Pond Water with Suggestions for Airport Application". Below is a list justifying why the suggest SCMs were implausible for this site: Bioretention Cell requires 2ft of separation between its bottom and the SHWT along with a minimum of 2.5ft of soil underneath the surface layer. According to the soil report, bedrock was found 3ft below the surface. Therefore, with the required depth of soil and bedrock so shallow beneath the surface, a bioretention cell is not plausible. Infiltration System requires 2ft of separation between its bottom and the SHWT. According to the soil report, bedrock was found 3ft below the surface and a SHWT was not determined. Therefore, only one foot of stone would be allowed which is insufficient for an adequate infiltration system. Sand Filter requires 1-2ft of separation between its bottom and the SHWT along with a minimum of 1.5ft of filter bed + 1ft of sand above the underdrain pipe. According to the soil report, bedrock was found 3ft below the surface. Therefore, with the required about of filter bed + sand and bedrock so shallow beneath the surface, a sand filter is not plausible. Rainwater Harvesting is infeasible because the proposed project is only a parking lot that does not include a building, so roof drainage will not occur on the site. Permeable Pavement is not feasible with the amount of snow at this location. Airport maintenance requires salts and de-icers for safety precautions. The use of these additives is prohibited for permeable pavement and therefore makes this SCM infeasible. Treatment Swale (Secondary) the minimum inlet to outlet flow length of 100ft could not be achieved due to the limited green space that this project provides. Neither a Wet Pond nor a Stormwater Wetland are recommended at airports. These SMCs create standing water that attracts wildlife that pose safety risks as they may damage aircrafts. See Figure 3 in Appendix E-4 of the NCDEQ Stormwater Design Manual for data relating to this potential hazard. Below are the MDC for the proposed Dry Pond SCM, and how they have either been met or could not be met: MDC 1 Separation from the SHWT Boring logs for parking Lot D observed bedrock at approximately 3ft of depth so the season high water table for Lot D was assumed to be deeper than 3ft below the ground. The dry pond is 1ft deep, therefore, the lowest point of the dry pond will be greater than the minimum of 6 inches above the SHWT. 4 ASHEVILLE REGIONAL AIRPORT - PARKING LOT D INITIAL SUBMITTAL: SEPTEMBER 2021, REVISION 1: JANUARY 2022 STORMWATER MANAGEMENT REPORT MDC 2 Temporary Pool Depth There is no temporary pool in this dry detention pond due to its location at an airport (See Appendix E-4 of the NCDEQ Stormwater Design Manual, therefore the maximum depth of 10ft is not a concern. MDC 3 Uniform Grading and Positive Drainage The bottom of the dry pond will be graded uniformly to flow toward the outlet control structure without low or high spots, per the grading pond and detail. MDC 4 Location of Inlet(s) and Outlet The inlets and outlet of the pond are in a manner that will avoid short circuiting. The outlet control structure is the furthest point of the pond thus providing the longest flow path of water until the outlet location. MDC 5 Pretreatment An 8" gravel strip followed by a 3' grass strip are provided as pretreatment to settle sediment and prevent erosion before the runoff enters the dry detention pond. MDC 6 Drawdown Time The pond outlet control structure has an 0.8" orifice to provide drawdown of 40 hours. See calculations below: Drawn Down Calcs Vol Vol Vol Draw Qavg g Start Down Qavg Ext. Qcp. Havg A Draw Down Orifce and Detention Pond ID Provided Bottom Top c (ft/ Time (cfs) Det. (cfs) (ft) (ft^2) Elevation Orif/Weir (cf) Elev. Elev. s^2) hr cfs @ Elev. Dry Pond 1,707 2154.0 2155.0 40 0.01 0.0 0.01 0.5 0.6 32.2 0.003 0.8 @ 2154.0 2155.0 MDC 7 Protection of the Receiving Stream The post -development outfall flow rate is lower than the pre -development flow rate for the one- year, 24-hour storm. Therefore, hydrologic impacts in the downstream areas will not be adversely impacted. See flow rates below: Pre -Construction Post -Construction Post Project Storm Return Study Point Flow Total Flow Total Decrease Frequency (cfs) (cfs) W) 1 1 0.3 0.2 -13.8 MDC 8 Outlet There is no permanent pool in this dry detention pond due to its location at an airport. A trash rack is provided to prevent trash and debris from entering the outlet system. MDC 9 Vegetation A note has been added to detail sheet SW-03 with the MDC 9 dry pond vegetation requirements as show in the manual. Fescue is proposed in the parking lot landscape areas and the dam. 5 ASHEVILLE REGIONAL AIRPORT— PARKING LOT D INITIAL SUBMITTAL: SEPTEMBER 2021, REVISION 1: JANUARY 2022 STORMWATER MANAGEMENT REPORT The Rational Method was used for the parking lot design on the development. The Intensity Duration Frequency (IDF) curve for Fletcher, NC below was used for the calculations: ■ �On-�MENEMM� The following runoff coefficients were also used for hydraulic (storm inlet, pipe) analysis of Lot D: c = 0.30 (Grass, HSG B) c = 0.95 (Impervious area) 2.2 Drainage & Erosion Control Design A 15" RCP is proposed to the south of the parking lot to bypass flow from Access Lane around the parking lot to the existing inlet E-0. Additionally, an 18" RCP is proposed from the dry detention pond outlet control structure. This 18" RCP will tie into the existing inlet E-0 as well. These pipes have been designed to safely convey the 25-year storm. Pipe profiles and Hydraflow Storm Sewers results can be found on sheet SW-02 of the stormwater plans (Appendix Cl). 2.3 Operation and Maintenance Manual The dry detention pond requires maintenance in order to work properly. An O&M plan has been developed and can be found in Appendix D. 2.4 Design Software and Manuals The following design software programs were used in analysis and development of the stormwater and documents: • Hydraflow Hydrographs for AutoCAD Civil 3D 2019 • Hydraflow Storm Sewers for Auto CAD Civil 3D 2017 • AutoCAD Civil 3D 2018 • Microsoft Office 2017 The following design manuals and literature were used in analysis and development of the stormwater documents: • NCDEQ Storm water Design Manual — 2017 Edition 6 ASHEVILLE REGIONAL AIRPORT - PARKING LOT D INITIAL SUBMITTAL: SEPTEMBER 2021, REVISION 1: JANUARY 2022 STORMWATER MANAGEMENT REPORT APPENDIX A VICINITY MAP, SOILS SURVEY, FEMA MAPS & NOAA RAINFALL DATA a m Woodside rV Hills is Enka Village Candler �' Btltmore 8 Forest 0 F Bern Creek x5 Seaverdam Royal Pines • Avery Creek Arden �Asheville RegioAirport Regional Fletcher '31 rp Naples River Mountain Home VICINITY MAP NTS Goodlwk Swannanoa Op x1 CT Fairview Fruitland OIGtR Mautttai Garton 0 7a Edneyville 3 bo IV M Hydrologic Soil Group —Buncombe County, North Carolina, and Henderson County, North Carolina 3 IV M N W 360370 360410 360450 35° 26 ITIN 360490 360530 36W70 360610 i 360650 360680 i 360730 \ N W 360770 35° 26 18" N Mgt w 91 r � / * 1�JU115 r o 0 • dp Ir 0Ir it lft c le. 35° 26 9" N a ' 9L 360370 360410 360450 360490 360530 360570 360610 3 6D N Map Scale: 1:1,980 if printed on A landscape (11" x 8.5") sheet. Meters N 0 25 50 100 150 Feet 0 50 100 200 300 Map projection: Web Mercator Comer coordinates: WGS84 Edge tics: UTM Zone 17N WGS84 UsDA Natural Resources Web Soil Survey lim Conservation Service National Cooperative Soil Survey i UhE T_ 360650 360690 35° 269" N 360730 360770 N 2/7/2020 Page 1 of 5 Hydrologic Soil Group —Buncombe County, North Carolina, and Henderson County, North Carolina MAP LEGEND Area of Interest (AOI) 0 Area of Interest (AOI) Soils Soil Rating Polygons 0 A 0 A/D 0 B 0 B/D 0 C C/D 0 D 0 Not rated or not available Soil Rating Lines r r A r r A/D w4e B ~ B/D r .r C rwr C/D D Not rated or not available Soil Rating Points 0 A 0 A/D 0 B 0 B/D o C C/D D 0 Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways r US Routes Major Roads Local Roads Background Aerial Photography MAP INFORMATION The soil surveys that comprise your AOI were mapped at scales ranging from 1:12,000 to 1:20,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Buncombe County, North Carolina Survey Area Data: Version 16, Sep 16, 2019 Soil Survey Area: Henderson County, North Carolina Survey Area Data: Version 19, Sep 16, 2019 Your area of interest (AOI) includes more than one soil survey area. These survey areas may have been mapped at different scales, with a different land use in mind, at different times, or at different levels of detail. This may result in map unit symbols, soil properties, and interpretations that do not completely agree across soil survey area boundaries. Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: May 21, 2015—Nov 28, 2017 USDA Natural Resources Web Soil Survey 2/7/2020 Conservation Service National Cooperative Soil Survey Page 2 of 5 Hydrologic Soil Group —Buncombe County, North Carolina, and Henderson County, North Carolina MAP LEGEND MAP INFORMATION The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shiftina of mao unit boundaries may be evident. U� Natural Resources Web Soil Survey 2/7/2020 � Conservation Service National Cooperative Soil Survey Page 3 of 5 Hydrologic Soil Group —Buncombe County, North Carolina, and Henderson County, North Carolina Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI CSC Clifton sandy loam, 8 to 15 percent slopes B 0.4 0.7 2.9% 4.6% CuC Clifton -Urban land complex, 8 to 15 percent slopes B Ud Udorthents, loamy C 0.9 5.7% UhE Udorthents-Urban land complex, 2 to 50 percent slopes A 4.4 28.2% Ux Urban land 1.8 11.3% Subtotals for Soil Survey Area 8.2 15.5 52.6% Totals for Area of Interest 100.0% Map unit symbol Map unit name Rating Acres in AOI Percent of AOI HyC Hayesville loam, 7 to 15 percent slopes C 7.4 47.4% Subtotals for Soil Survey Area 7.4 47.4% Totals for Area of Interest 15.5 100.0% USDA Natural Resources Web Soil Survey 2/7/2020 Conservation Service National Cooperative Soil Survey Page 4 of 5 Hydrologic Soil Group —Buncombe County, North Carolina, and Henderson County, North Carolina Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff. None Specified Tie -break Rule: Higher usDA Natural Resources Web Soil Survey 2/7/2020 Conservation Service National Cooperative Soil Survey Page 5 of 5 STATE OF NORTH CAROLINA FIRM PANEL LOCATOR DIAGRAM �JUTIERIII T-1— DATUM INFORMATION NIu — re —*,F—IJ Dift.— d—, IIIWIE R Dd WRN _. I FFM Al meR are .1 S.= 'F'. E­ F- Fld�. % I.IRA --nr6lned I' III = NWC N M N, 1 1. 11 RN.dNR Riu RM ..=D eR N ...... I— Z —y ad 1-1 N' 121 NRI.gl NO E-1 "N—dd 1111*11 11-1 TIN, 11- -Doan did =P.111 -ur d.. FLOOD HI DATA TABLE .dPA1EET -NIET T —7 E A 7E � � �- ��-Ug ZONE. -INS . ZONE AE F,_F 7 'NO UFFFI�l FF= RN.' C Fl3'2CND P111. TFIE—R1 1,R) ZONE Z X ZONE. ZONE X ZONE AS ..HE' 1-�- AF,a, 3700,1 �, ZONE X n��,. �, I ZONE X ZONEAE Ny 7003-1 BUNCOMBE COUNTY HINICISCI COU— A` Ap —141 ZONE. sna ZONE x �ZOIE /ZONE BD x 17 111 —A R.— "IF 370625 anz ZONE X ZONEAE ZONI AN Oil PT T A—, 371R)3, 1 —PEFT 'Y uj Hi,- F —U, BUNCOMET COUNTY uj 2111 HE1111CON 11UNT1 170115 I A A ZONE ;V '0 ZONE "MI HE AB YA 7115FR v A 1—Z 2132 ZONE A —ARP NFIR— COLN, U— "1 1, 16 N ZONEO 37003 211, 1 2 211— A- 2­ 0 Lity f L Po 37 IS, Y- R K17 C E_ X, I.EL ---R— � , IINEN—N,Temm .wa —.i9. d1-1—MB.. .'A N. Flaw-- IFICCINE IATE OF —01 RISIRANCE RATE MAP PANEL P—d IF. acro F-d ODI-- EFFECTNE DATEN) OF PI TO THE PANEL F==­ B—Pi, df SA— IV== " IF el lne —.-d. I... euniene 'IN. I Ni,B d 1AN.AR—R' 1.1— p UH.. .1 R.11 C.:- 11 M7 !rll�%n.11-11 A—MAII 11111111111-11"111.1 ...d. d. A, .11 1--A . T7 ­1— TI. NN.luelaf F_ —.n. F.. = =-z' h T.1— I Lo:N) :.N — I d'RI FIR. _RM FI'R i'n'l., =T`7=1 d l. R N—I I—M. P_— j.. —I.. R-dpidl. III A =.=— P mrIvIm.ndloodmaps.com —.wn ewrws —M A. -FEMAIN.—IMC—N. NCD1d—E.­1.­ N-1—In—.".. Is,e LEGEND F- SPECIAL FLODD HAZARD AREAE NEFHAR SUBJECT TO HIIA. —R Al 2N� Zlll v 11 AN ME — P—ei R-d U, A` FLOOD— AREAS IN ZONE AE A THEIR FLOOD ARS xOOOTHER xee .11. a,a an:1. AREAS COASTAL BARRIER REBOURCES SYSTEM (CBRE) AREAS OTHERWISE PROTECTED AREAS (OPAQ 1111. M- N IEFT N. BM5510e —NI.- -HR, F—A. IdI tae :CALE V =,:N (I : 0.d001I. "BIT PANEL 961 FIRM FLOOD INSURANCE RATE MAP NORTH CAROLINA 0 PANEL 9643 REE—RD.—R.I.—F-11F. M MAP REVISED MAPNUMBER JANUARY6,2010 3700964300K SRI .17N.� C-1- � FMd B— MRFNPdFMNAgF.Ly 6/20/2019 Precipitation Frequency Data Server NOAA Atlas 14, Volume 2, Version 3 Location name: Fletcher, North Carolina, USA* Latitude: 35.4347°, Longitude:-82.53740 Elevation: 2145.24 ft** * source: ESRI Maps m y� ** source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, I Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/hour)1 Average recurrence interval (years) 1 2 5 10 25 50 100 200 500 1000 5-min 4.38 5.22 6.25 7.04 8.08 8.86 9.65 10.4 11.5 12.3 (3.95-4.87) (4.72-5.80) (5.64-6.95) 1 (6.32-7.81) 1 (7.20-8.94) 1 (7.86-9.79) 1 (8.52-10.7) 1 (9.16-11.6) 1 (9.92-12.8) 1 (10.5-13.8) 10-min 3.50 4.17 5.01 5.63 6.43 7.06 7.67 8.27 9.07 9.68 (3.16-3.89) (3.77-4.63) (4.51-5.57) 1 (5.06-6.24) 1 (5.74-7.12) 1 (6.26-7.80) 1 (6.77-8.50) 1 (7.25-9.19) 11 (7.85-10.1) 1 (8.30-10.9) 15-min 2.92 3.50 4.22 4.75 5.44 (2.63-3.24) 1 (3.16-3.88) 1 (3.80-4.70) 1 (4.27-5.26) 1 (4.85-6.02) 30-min 2.00 2.41 3.00 3.44 4.03 (1.80-2.22) 1 (2.18-2.68) 1 (2.70-3.34) 1 (3.09-3.81) 1 (3.59-4.46) 5.- 6 6.46 6.96 7.61 8.10 (5.28-6.58) 1 (5.70-7.16) 11 (6.10-7.73) 1 (6.59-8.50) 1 (6.94-9.10) 4.48 4.5 5.42 6.05 6.56 (3.98-4.96) 1 (4.37-5.48) 1 (4.75-6.02) 1 (5.24-6.77) 1 (5.62-7.37) 60-min 1.25 1.51 1.92 2.24 2.68 3.04 3.41 3.80 F 4.34 F 4.79 (1.12-1.39) 1 (1.37-1.68) 1 (1.73-2.14) 1 (2.01-2.48) 1 (2.39-2.97) (2.69-3.36) (3.01-3.78) 11 (3.33-4.22) (3.76-4.85) 11 (4.10-5.38) 2-hr 0.729 0.885 1.12 1.30 1.56 1.77 2.00 2.23 2.56 2.83 (0.655-0.809) (0.796-0.980) (1.00-1.24) 1 (1.16-1.44) 1 (1.39-1.73) (1.56-1.97) (1.75-2.22) 11 (1.94-2.48) (2.20-2.86) (2.40-3.18) 3-hr 0.520 0.626 0.786 0.916 1.11 1.26 1.43 1.62 1.88 2.10 (0.469-0.581) ( 0.564-0.698) ( 0.706-0.873) (0.820-1.02) (0.982-1.23) (1.11-1.41) 1 (1.25-1.60) 1 (1.40-1.80) 1 (1.60-2.11) 1 (1.76-2.37) 6-hr 0.325 0.387 0.477 0.554 0.666 0.761 0.864 0.976 1.14 1.27 (0.297-0.358) (0.353-0.425) (0.435-0.524) (0.503-0.609) (0.600-0.732) (0.680-0.835) (0.764-0.951) (0.853-1.08) (0.978-1.26) 1 (1.08-1.42) 12-hr 0.204 0.243 0.298 0.342 0.404 0.454 I 0.506 0.560 0.635 0.694 (0.188-0.223) (0.223-0.265) (0.274-0.325) (0.314-0.373) (0.368-0.440) (0.412-0.496) (0.457-0.553) (0.502-0.614) (0.563-0.702) (0.609-0.773) 24-hr 0.121 0.145 0.179 .2 006 .2 043 0.273 0.303 0.335 0.380 0.415 (0.112-0.131) ( 0.135-0.158) ( 0.166-0.194) ( 0.190-0.223) ( 0.223-0.262) (0.250-0.295) (0.277-0.328) (0.305-0.362) (0.342-0.411) (0.371-0.450) 2-day 0.072 0.086 0.105 0.120 0.140 0.157 I 0.174 0.192 0.216 ) 0.235 (0.067-0.078) (0.080-0.093) (0.097-0.113) (0.111-0.129) (0.130-0.151) F(O.145-0.169 ( 0.160-0.188) (0.175-0.207) (0.196-0.234 ( 0.212-0.255) 3-day 0.051 0.061 0.074 (0.048-0.055) (0.057-0.066) (0.069-0.079) 4-day 0.041 0.049 0.058 (0.038-0.044) (0.045-0.052) (0.054-0.062) 0.084 0.098 0.109 0.120 0.131 0.147 F 0.159 (0.078-0.090) (0.091-0.105) (0.100-0.117) (0.110-0.129) (0.120-0.141) (0.133-0.158) (0.144-0.172) 0.066 0.076 0.084 0.093 0.101 0.112 0.121 (0.061-0.071) (0.071-0.082) (0.078-0.090) (0.085-0.099) (0.093-0.108) (0.102-0.120) (0.110-0.130) 7-day 0.027 0.032 0.039 0.044 0.051 (0.025-0.029) (0.030-0.035) (0.036-0.041) (0.041-0.047) (0.047-0.054) 10-day F F0.022 0.026 0.031 0.034 0.040 (0.021-0.023) (0.024-0.027) (0.029-0.033) (0.032-0.037) (0.037-0.042) 0.056 F 0.062 0.067 0.075 0.081 (0.052-0.060) (0.057-0.066) (0.062-0.072) (0.069-0.081) (0.074-0.088) 0.044 0.048 0.052 0.057 0.0 22 (0.041-0.046) (0.044-0.051) (0.048-0.055) (0.053-0.061) (0.057-0.066) 20-day 0.015 0.017 0.020 0.022 0.025 0.027 0.030 0.032 0.034 0.036 (0.014-0.016) (0.016-0.018) (0.019-0.021) (0.021-0.024) (0.024-0.027) (0.026-0.029) (0.028-0.031) (0.030-0.033) (0.032-0.036) (0.034-0.038) P�-�day]F 0.012 0.014 0.016 (0.011-0.013) (0.013-0.015) (0.015-0.017) [Wd7ay 0.010 0.012 0.014 (0.010-0.011) (0.011-0.013) (0.013-0.014) 0.018 0.020 0.021 0.023 0.024 0.025 0.027 (0.017-0.019) (0.019-0.021) (0.020-0.022) (0.021-0.024) (0.022-0.025) (0.024-0.027) (0.025-0.028) 0.015 0.016 0.017 0.018 0.019 0.020 0.020 (0.014-0.015) (0.015-0.017) (0.016-0.018) (0.017-0.019) (0.018-0.020) (0.018-0.021) (0.019-0.021) 60-day 0.009 0,011 0.012 0.013 0.014 0.015 0.015 0,016 0.017 0.017 (0.009-0.010) (0.010-0.011) (0.011-0.013) (0.012-0.014) (0.013-0.015) (0.014-0.016) (0.015-0.016) (0.015-0.017) (0.016-0.018) (0.016-0.01 1 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). umbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a ven duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not iecked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. refer to NOAA Atlas 14 document for more information. Back to Top PF graphical https:Hhdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.4347&Ion=-82.5374&data=intensity&units=english&series=pds 1/4 6/20/2019 Precipitation Frequency Data Server 100.000 PDS-based intensity -duration -frequency (IDF) curves Latitude: 35.43471, Longitude:-82.53741 ---------- ............. --------- ------------- 0.001 C C C C C L L L }, }, }, }y }, }, }, 71 }. L L L L L rp rq r4 M r4 r4 rp r9 ru O O O N A4b H A 4 V � O O O U' O i r I m [a ry rn v n Duration 100.000 t 10.000 C ZI C 1.000 C e 0.100 a 0.010 0 001 i I i I I I I I I i 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NDAAAtlas 14, Volume 2, Version 3 Created {GMT}: Thu Jun 20 13:16:24 2019 Back to Top Maps & aerials Small scale terrain Average recurrence interval (years) — 1 2 — 1Q 25 50 100 200 500 1000 Duration — "in — 2-day — I D-min — 3-day I5-min — 4-day — 30�-min — 7-day — 60-min — 10-eay — 2-nr — 20-day — 3-hr — 34-day — 6-hr — 45-day — 12-hr — 6o-eay — 24-hr https:Hhdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.4347&Ion=-82.5374&data=intensity&units=english&series=pds 2/4 6/20/2019 Precipitation Frequency Data Server VIIIUa WR.— Fletcher. Fanlll �� AF MILLS .,. KIYO9 ;' 3km soff— 2mi N' Nbvles Large scale terrain Kingsport' Bristol r Johnson Ci—" 1�1 Winston-Salel- Knoxvllle'i. • ,E�� k G .. r-'1I Mitd7a11 rvlt ll `, —1 e�ille N 0 R T H C � Chark Greenville SOUTH l SOUTH CARO M& V Large scale map Kir,<jJ..-p 1 Ir.l•:;I Johnson Gi$r FSnox':lile Imo.---- . � 100km 60mi Large scale aerial https:Hhdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.4347&Ion=-82.5374&data=intensity&units=english&series=pds 3/4 6/20/2019 Precipitation Frequency Data Server Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Questions@noaa.gov Disclaimer https:Hhdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.4347&Ion=-82.5374&data=intensity&units=english&series=pds 4/4 6/20/2019 Precipitation Frequency Data Server NOAA Atlas 14, Volume 2, Version 3 Location name: Fletcher, North Carolina, USA* Latitude: 35.4347°, Longitude:-82.53740 Elevation: 2145.24 ft** * source: ESRI Maps m y� ** source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, I Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Average recurrence interval (years) Duration ����� 1 2 5 10 25 50 100 200 500 1000 0.365 0.435 0.521 0.587 0.673 0.738 0.804 0.870 0.955 1.02 5-min (0.329-0.406) (0.393-0.483) (0.470-0.579) (0.527-0.651) (0.600-0.745) (0.655-0.816) (0.710-0.891) (0.763-0.966) (0.827-1.07) (0.878-1.15) F--O.-58-4-71 0.695 0.835 0.939 1.07 1.18 1.28 1.38 1.51 1.61 10-min (0.526-0.649) (0.628-0.772) (0.752-0.928) (0.843-1.04) (0.956-1.19) 1 (1.04-1.30) 1 (1.13-1.42) 1 (1.21-1.53) (1.31-1.69) (1.38-1.81) 0.729 0.874 1.06 1.19 1.36 1.49 1.62 1.74 1.90 2.02 15-min (0.657-0.811) (0.789-0.971) (0.951-1.17) 1 (1.07-1.32) 1 (1.21-1.50) 11 (1.32-1.65) 1 (1.43-1.79) (1.53-1.93) (1.65-2.13) (1.74-2.28) 1.00 1.21 1.50 1.72 2.01 2.24 2.47 2.71 3.03 3.28 30-min (0.901-1.11) (1.09-1.34) (1.35-1.67) (1.55-1.91) (1.80-2.23) 1 (1.99-2.48) (2.18-2.74) (2.37-3.01) (2.62-3.38) (2.81-3.69) 60-min 1.25 1.51 1.92 2.24 2.68 3.04 3.41 3.80 4.34 4.79 (1.12-1.39) (1.37-1.68) (1.73-2.14) 11 (2.01-2.48) 1 (2.39-2.97) 11 (2.69-3.36) 1 (3.01-3.78) (3.33-4.22) (3.76-4.85) (4.10-5.38) 1.46 1.77 2.24 2.60 3.13 3.55 3.99 4.47 5.13 5.67 2-hr (1.31-1.62) (1.59-1.96) (2.00-2.47) (2.33-2.88) (2.77-3.47) (3.13-3.93) 1 (3.49-4.43) (3.88-4.96) (4.39-5.73) (4.81-6.37) 1.56 1.88 2.36 2.75 3.33 3.80 4.31 4.86 5.65 6.30 3-hr (1.41-1.75) (1.70-2.10) (2.12-2.62) (2.46-3.06) (2.95-3.70) (3.35-4.23) (3.76-4.79) (4.19-5.41) ( 4.80-6.34) (5.29-7.11) 6-hr 1.95 2.32 2.86 3.32 3.99 4.56 5.18 5- 6.82 7.64 (1.78-2.14) (2.11-2.55) (2.60-3.14) (3.01-3.65) (3.59-4.38) 1 (4.07-5.00) 11 (4.57-5.69) 1 (5.11-6.44) (5.86-7.56) (6.48-8.52) 2.46 2.93 3.59 4.12 4.87 5.47 6.09 6.74 7.65 8.36 12-hr (2.26-2.68) (2.69-3.20) 1 (3.30-3.92) 1 (3.78-4.50) 1 (4.44-5.31) 1 (4.97-5.97) 1 (5.50-6.66) 1 (6.05-7.40) (6.78-8.45) (7.34-9.31) 2.91 3.49 4.29 4.94 5.82 6.54 7.28 8.05 9.12 9.97 24-hr (2.69-3.15) 1 (3.24-3.79) 1 (3.97-4.66) 1 (4.56-5.34) 1 (5.36-6.30) 1 (6.00-7.07) 1 (6.65-7.86) 1 (7.31-8.70) (8.21-9.87) (8.90-10.8) 2-day 3.46 4.13 5.03 5.75 6.74 7.54 8.36 9.20 10.4 11.3 (3.22-3.73) 1 (3.84-4.45) 1 (4.67-5.42) 1 (5.33-6.19) 1 (6.23-7.25) 11 (6.94-8.11) 1 (7.67-9.00) 1 (8.40-9.93) (9.39-11.2) (10.2-12.2) 3.69 4.39 5.32 6.04 7.03 7.82 8.62 9.44 10.6 F-1-1.-4 3-day 1 (3.44-3.96) 1 (4.10-4.72) 1 (4.95-5.71) 1 (5.62-6.48) 1 (6.52-7.54) 1 (7.22-8.39) (7.93-9.27) (8.65-10.2) (9.60-11.4) (10.3-12.4) 3.92 4.67 5.60 6.34 7.33 8.10 8.89 9.68 10.7 11.6 4-day (3.66-4.19) (4.35-5.00) (5.22-5.99) (5.90-6.78) (6.80-7.84) 1 (7.50-8.67) (8.20-9.53) (8.90-10.4) (9.81-11.6) ( 10.5-12.5) 4.57 5.42 6.50 7.36 8.52 9.44 10.4 11.3 12.6 13.7 7-day (4.27-4.89) (5.07-5.82) (6.07-6.97) (6.86-7.88) (7.92-9.11) (8.75-10.1) (9.59-11.1) (10.4-12.1) (11.5-13.6) (12.4-14.7) 5.23 6.19 7.34 8.25 F 9.49 F 10.5 11.4 12.4 13.8 14.8 10-day (4.93-5.56) (5.83-6.58) (6.92-7.81) (7.77-8.77) (8.90-10.1) (9.79-11.1) (10.7-12.2) (11.6-13.2) (12.7-14.7) (13.6-15.9) 20-day 7.11 8.36 9.71 ) ( 10.8 12.1 13.2 14.2 ) ( 15.1 16.4 ) ( 17.4 ) (6.72-7.51) (7.91-8.84) (9.18-10.3 10.2-11.4) (11.4-12.8) (12.4-13.9) (13.3-15.0 14.2-16.0) (15.3-17.4 16.1-18.5 8.72 10.2 11.7 12.8 14.2 15.3 16.2 17.2 18.3 19.1 30-day (8.28-9.20) (9.72-10.8) (11.1-12.3) (12.2-13.5) (13.5-15.0) (14.4-16.1) (15.3-17.1) (16.2-18.1) (17.2-19.4) (17.9-20.3) 11.1 13.0 14.6 15.8 F 18.3 1 F-19-2---20.1iF-21.1 21.8 45-day (10.6-11.6) (12.3-13.6) (13.9-15.3) (15.0-16.6) (16.4-18.1) (17.4-19.2) 1 (18.2-20.2) 1 (19.0-21.1) (20.0-22.2) (20.6-23.0) 60-day 13.3 15.5 17.3 18.6 20.2 21.3 22.3 23.2 24.2 24.9 (12 7-14.0) (14.8-16.3) (16.5-18.2) (17.8-19.6) (19.2-21.3) (20.2-22.4) J (22.9-25.6) J (23.5-26.3) Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical https:Hhdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.htmI?lat=35.4347&Ion=-82.5374&data=depth&units=engIish&series=pds 1/4 6/20/2019 Precipitation Frequency Data Server PDS-based depth -duration -frequency (DDF) curves Latitude: 35.43471, Longitude:-82.5374 25 4 L L L L L ry ry �4 N �4 r4 � N� O O O N A4/3 r 4 A V 4 � O O O U' O -I H m [ar-I ry rn v Ln ❑uration 25 20 t C 15 e 0 2- Ld 2 iL 0 I 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NDAAAtlas 14, Volume 2, Version 3 Created {GMT}: Thu Jun 20 13:13:29 2019 Back to Top Maps & aerials Small scale terrain Average recurrence interval (years) — 1 2 — 5 — 1Q 25 50 100 200 500 1000 Duration — "in — 2-day — 16-min — 3-day 15-min — 4-day — 30�-min — 7-day — 60-min — 10�-eay — 2-nr — 20-day — 3-hr — 30-day — 6-hr — 45-tlay — 12-hr — 6o-eay — 24-hr https:Hhdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.htmI?lat=35.4347&Ion=-82.5374&data=depth&units=engIish&series=pds 2/4 6/20/2019 Precipitation Frequency Data Server JRuyn� r���ca Ar de rid. ASNFVRLE '' . r t R 7.NL Li AJ.RPD.R:i , � E -Ror i Fletcher'. .Fan njIZP MJLLS KIYO9 3km 2mi Large scale terrain s � Kingsport' Bristol JOln11 50�Ity� 1�1 Winston-Salel- Knoxville �'i. • E� k G .. k-•lt 1-'litG7a11 rvlt ll `, —1 e�ille NORTH C � Chark Greenville lookm*- SOUTH CAR() 60mi Large scale map _. KingFpert Bri,k•:•I Jahnson City K YYD?S':Ille I� 100km 60mi Large scale aerial https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.4347&Ion=-82.5374&data=depth&units=english&series=pds 3/4 6/20/2019 Precipitation Frequency Data Server Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Questions@noaa.gov Disclaimer https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.4347&Ion=-82.5374&data=depth&units=english&series=pds 4/4 APPENDIX B AIRPORT LAYOUT PLAN (ALP) APPENDIX C STORMWATER SHEETS & DETAILS N N N O N IT N 0 z 0 ❑ 0 z 07 LLI O OI U) OI 0 H LLI w U) w Lu N z CD U) w H 0 z ry J Q N o_ O CD Q 0 O 47 H U w 0 z 0 al O C� w w z_ CD z w Y U_ J g U_ J INV: 2,156.3' OG I IN n CI I I� (A) I 4"LBOLLARDY GRATE:2,160.22' -- ---------- ---C -- ----------------- 24" HDPE INV (A): 2,155.1' I ------ ------- ------------ --------------- INV (B): 2,154.8'-----------INV (C): 2,154.fy' I I "'--------------- ASPHALT PAVEMENT HENDERSON COUNTY ASPHALT PAVEMENTB AND GUTTER TYP) `V O \ S 88007' 11 " E 284.60' �i I FOI BUNCOMBE OUNTV ti� �I I I0 I--- — — — �I �--RpAD SI IN T � I III \ P I / I (A) \ z b O z O CD O m -D m0 r) z n m �p *� m O �n D � 0 O E. (n m m —I 216 — t TBM - 0d NAI W/ S INER — L j F_LEV TION: ,161.91' I 162 (C) I \\ \ \ — I/I CI \ GRATE: 2,157.53'" STORM MANHOLE INV: 2,153.4' RIM: 2,157.90' I I (B) INV (A): 2,152.9' INV (B) 15" RCP: 2,153.1' INV (C): 2,153.0'\\ OUT: 2,152.7' 1 �/ \ \ 2160 \ \ / /C 4E.2161134I ,' I IN INy (R): 2,1 9.7' 15" RCP 8 I \ STORM MANHOLE RIM: 2,155.42:1 1(A) INV (A): 2,150.51 1 / OTS \� 2157 INV (B): 2,150.8' 1 I CATV OUT: 2,150.3' / // I a 1 \ _ I I CI \ 2 \ NV: 2,1 6•�'1 115" R CI //�// I GRATE: 2,150.71' 1 1S \ �I 6 ,\\---------_-"i�f==0I = GRATE: 2,160.24' / / IN: 2,146.6' SATE: 2,153.01' \ _ / / B 18" �j _ _� / INV IN. 2,156.9' ( ) � I I vOUT: 2,146.3' RCP ,l15�d'%— — _ _ I � _ — � /— — — —�_—_ \INV OUT: 2,156.9' TDP GAS I \ (TYP)\T--�\ / G — TS \ 1 \ ly II \ N \ 1 \ it it \ RIM: 2,152.80 I \\11= 11� AIRPOF __\T\ PAR K RO;(aD SANITARY\SEWER EASEMENT /// C' CAN � REEK WATE\R AND SEWER [ ISTRICT I I/ SSMH DI I I \ I DI \ OF HENDEI SON COUNTY \ \ I I GRATE: 2152.09' RIM: 2,152.51 I I I GRATE: 2,152.69' \ \\ D.B. $��� PG. 821 \\ I I INV:2150.4' INV:2,150.4' I I ------ ---------------- ------ \ 24" CMP II 15"R — — 1 \ II 1 \ 1 1 I ASPHALT\\PAVEMENT �a 1 1 \ 1 1 \ 1 \\\ BUNCOMB\ COUNTY \\\ II TDP - -■■■m ■ ■■■(TYP)■■■ II II HENDERSON COUNTY I I I _ 9643-52-3284 I _ - GREATER ASHEVILLE REGIONAL I AIRPORT AUTHORITY I D.B.5565 PG. 1196 1 TRACT 2 DI 1 GRATE:2,150.71' I IN: 2,146.6' OUT: 2,146.3' I N / / / CI / GRATE:2,164.4 INV (A): 2,159. Jy INV (ox. cn 4, CI GRATE: 2, INV: 2,158. r—==----L>---------- --- II \ I \ N 96U-72-0 BGA ASSORTCD.B87 � PLA287 Cn 41) co i I I S 88007'01 " E --�1 23.58' (TIE) TBM - 60d NAIL W/ SHINER ELEVATION: 2,162.67' 0' 10' 20' 40' GRAPHIC SCALE IN FEET i i so* hevi e REGIONAL AIRPORT AVCON, INC. ENGINEERS & PLANNERS 13801 REESE BLVD, SUITE 160 HUNTERSVILLE, NC 28078 OFFICE: (704) 954-9008 www.avconinc.com ULICK ENGINEERING LLC STORMWATER I HYDRAULICS EROSIONCONTROL AIRFIELD & CIVIL SITE I CONSTRUCTION SERVICES NOT RELEASED FOR CONSTRUCTION .........\A CAR 1 SEAL 040195 - \k DAVID A. SKURKY, P.E. NC SEAL #040195 ATTENTION: THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC., FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE. WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED SCALE: 1" = 20' REVISIONS: NO. DATE BY DESCRIPTION 1 01/24/22 WMM NCDELM & NCDEQ COMMENTS DESIGNED BY: W.M.M. DRAWN BY: W.M.M. CHECKED BY: D.A.S. APPROVED BY: D.A.S. DATE: SEPTEMBER 2021 STATE LICENSE # N.C. P-1430 PROJECT NO. 400102 SHEET NUMBER i SW-00 C g INV: 2,156.3' N N O N N Z a J In Q U) H W W 07 W N_ W N z 07 W N_ 1-- 0 J z Y a I J a N O CD O J a CD 0 H U W O a z O al CD It CD z Ify W z_ (a z W Y _U J a Y _U J a II II ■ ■ ■ mmoppm 11 II II / I I DI GRATE: 2,150.71' IN: 2,146.6' OUT: 2,146.3' 1 —z4_(.;MP I\ \ x TDP HENDERSON COUNTY - - - 9643-52-3284 - - GREATER ASHEVILLE REGIONAL AIRPORT AUTHORITY D.B.5565 PG. 1196 1 TRACT 2 1 1 I I S 88007'01 " E 1 23.58' (TIE) TBM - 60d NAIL W/ SHINER ELEVATION: 2,162.67' >to". --", ■ s evi e Acz�GIONAL AIRPORT AVCON, INC. ENGINEERS & PLANNERS 13801 REESE BLVD, SUITE 160 HUNTERSVILLE, NC28078 OFFICE: (704) 954-9008 www.avconinc.com ULICK ENGINEERING LLC STORMNRTER HYDRAULICS I EROSION CONTROL AIRFIELD &CIVIL SITE I CONSTRl1CTION SERVICES NOT RELEASED FOR CONSTRUCTION CAR ���ttri t l I I I r r l l ll!!i 04 SEAL 040195 - }, �a a...5y�� !!llllllllll41t1��� DAVID A. SKURKY, P.E. NC SEAL #040195 ATTENTION: THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC., FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE. WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED SCALE:1 " = 20' REVISIONS: NO.I DATE I BY I DESCRIPTION 1 1 01/24/22 1 WMM I NCDELM & NCDEQ COMMENTS DESIGNED BY: W.M.M. DRAWN BY: W.M.M. CHECKED BY: D.A.S. APPROVED BY: D.A.S. DATE: SEPTEMBER 2021 STATE LICENSE # N.C. P-1430 PROJECT NO. 400102 SHEET NUMBER "l Ii sw-ol N N O N N 0 J Q W ❑ Lo O U) I— W W U) LLI N_ W N z Cn W N_ O J z Y Q IZ J Q N O r O O J Q r O O Cn H U W O z O Q O CD z ry W W z_ Ca z W Y U_ J Q Y U_ J Q EO 2155 2150 2145 0+00 D-1 D-3 r ❑ O CD O �? 0 0 co Ln Lo CD U-) r r N N + N .. .. CD �z z ❑ Q O W W C=C - - G N W ❑ r ti Q O r LO Lo N Ln r r N .. �z O O W W _ - Lo N N+ I r Q CC G V) M ❑ CD �.Lo r 00 ~ Lo r LC) N Lo o r r N + N Z co r O ❑ Q O W W C=C ❑ CD O O In CDLo [` LID r Lo N L r r N N.. -Z O O W W 15" RC xill 20.18 . - 1.04% 0 15" 12.27-L-.F - 1.63% 0+50 1+00 D-LINE STORM HORIZONTAL SCALE 1 " = 20' VERTICAL SCALE 1" = 5' 1 +50 2160 2155 'TING 15" RCP 2150 2145 1+74 xffl��. . r` r`CD r I I W � ❑ O ' O O O O 67 CD Lo W p. O O ❑ O r U CO co LO L M Lo N + r r r N N a)N LD 7-- 0 oQ-- N Z Z O N ❑ �O cnQ W W U O W W CO 1--- O U) I— 2160 1 1 2160 2155 2155 2150 2150 2145 2145 0+00 0+46 OCS LINE HORIZONTAL SCALE 1 " = 20' VERTICAL SCALE 1" = 5' s>roll- heville REGIONAL AIRPORT AVCON, INC. ENGINEERS & PLANNERS 13801 REESE BLVD, SUITE 160 HUNTERSVILLE, NC 28078 OFFICE: (704) 954-9008 —avconinc.— ULICK ENGINEERING LLC STORMWATER HYDRAULICS I EROSION CONTROL AIRFIELD & C341L SITE I CONSTRUCTION SERVICES NOT RELEASED FOR CONSTRUCTION ,,yy�y141111111/��� o`�� �ssiO�%''-- SEAL 040195 - Blom I I I m%�k� DAVID A. SKURKY, P.E. NC SEAL #040195 ATTENTION: THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC., FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE. WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED SCALE: N.T.S. REVISIONS: NO. DATE BY DESCRIPTION 1 01/24/22 WMM NCDELM & NCDEQ COMMENTS DESIGNED BY: W.M.M. DRAWN BY: W.M.M. CHECKED BY: D.A.S. APPROVED BY: D.A.S. DATE: SEPTEMBER 2021 STATE LICENSE # N.C. P-1430 PROJECT NO. 400102 SHEET NUMBER SW-02 I-1A M1/IA In I !'1T N N O N N U) J_ Q LLJ LI O U) I— LLJ Lu U) Lu N_ Lu N z U) Lu N_ O J z Y Q In J Q N O O O J Q r O O G7 H U Lu O z O Q O (D z ry Lu Lu z_ Ca z Lu Y U_ J Q Y U_ J Q DRY DETENTION POND N.T.S. NOTE: THE DRY DETENTION POND DAM, INCLUDING FRONT AND BACK EMBANKEMENT SLOPES SHALL BE PLANTED WITH NON -(:I I IMPIN(, TI IRF (,RA.q. ANn TRFF4 ANn \A/c)ny ON -WAY WN ON 2155.0 EXISTING INLET E-0 I "` I I II �`E GRADING AND DRAINAGE PLANS FOR SIZE AND LOCATION. SEE PIPE PROFILES FOR INVERTS, SHEET SW-02 'Al >roll. ■ s evi e Acz�GIONAL AIRPORT AVCON, INC. ENGINEERS & PLANNERS 13801 REESE BLVD, SUITE 160 HUNTERSVILLE, NC 28078 OFFICE: (704) 954-9008 --coninc.com ULICK ENGINEERING LLC STORM—IR HYDRAULICS I EROSION CONTRDL AIRFIELD &CIVIL SITE I CONSTRUCTION SERV-CES NOT RELEASED FOR CONSTRUCTION CAP 11.{115111411111!!!/�1/ Q q� - SEAL 040195 - FNGIN� ���!lillrlllll1l11 DAVID A. SKURKY, P.E. NC SEAL #040195 ATTENTION: THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC., FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE. WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED SCALE: N.T.S. REVISIONS: NO. DATE BY DESCRIPTION 01/24/22 WMM NCDELM & NCDEQ COMMENTS DESIGNED BY: W.M.M. DRAWN BY: W.M.M. CHECKED BY: D.A.S. APPROVED BY: D.A.S. DATE: SEPTEMBER 2021 STATE LICENSE # N.C. P-1430 PROJECT NO. 400102 SHEET NUMBER SW-03 N N O N_ N 0 ❑ W J Q W U) Ln1 O H W w W It w N i >0 In N z U) W In C14 In O 0 Z Q a J > Q 04 O CD O J > Q 0 O H U W z 0 Q O z Fy w w z_ 0 Z w Y _U J g Y _U J v vm 1--I a H • Z M C/) 0 0 r0-I--1cn 1—I Z n 2 O>m �I>z = O O O mr ar In ,n Q H caDnn � H O O Z m a N m z r N 1== � O cn �mn x C pb 0 0i = `v Z m v z Z o) r -n vC) 3 SHEET 1 OF 1 840.52 d vm C H z vCnO0 r� -l�G7 m M�=n _0 > n m _moo z " r -n . OOP "Dnn o Q - � N >z Z O o rs mN -1 > m Z D v 3 D m v a� a " v> C TI m 0 SHEET 1 OF 1 840.54 GENERAL NOTES USE 4000 PSI MINIMUM COMPRESSIVE STRENGTH CONCRETE. FABRICATE, ASSEMBLE AND DESIGN PRECAST MANHOLE COMPONENTS ACCORDANCE WITH AASHTO M199. ASSEMBLE RISER AND GRADE RINGS WITH THE STEPS SPACED 12" FROM THE TOP TO THE BOTTOM OF THE MANHOLE. WHERE THE MANHOLE IS EXPOSED TO ROAD TRAFFIC, CONSTRUCT THE TOP OF THE MANHOLE FLUSH WITH THE GROUND AND A MINIMUM OF 9" ABOVE THE GROUND AT OTHER LOCATIONS. LIMIT DEPTH OF FILL TO 30'-0" FROM FINISH GRADE TO TOP OF BOTTOM SLAB. THE MIN. SLAB THICKNESS 'T' IS THE DIMENSION OF THE THINNEST PORTION OF THE TOP/BOTTOM SLAB. * TOP MAT OF REINFORCEMENT MAY BE NEGLECTED IF TOP SLAB HAS A DISTINGUISHABLE TOP AND BOTTOM. 2' 0" D W T r- 1 ALTERNATE CONE SECTION 'D'+2'W' 1" MIN ADDITIONAL CLR. #4 REBAR IT, 1" MIN' USE MIN, AREA OF STEEL IN TOP CLR. SLAB OF #4'S @ 8" CTS. EACHWAY/EACH FACE *. FLAT TOP SLAB ADDITIONAL #4 EACH SIDE OF OPENING (1" CLEAR OF BOTTOM FACE PLACE BARS DIAGONAL TO CORNERS (TYP.) FRAME AND GRATES STD. NO. TRAFFIC BEARING 640.37 NONTRAFFIC BEARING: 840.22 840.24 B40.2G 840.29 840.33 -I = JL = � III ��I I =_ I`r —_ _JL 11 —IL JL__II r GRATED INLET OPTION A T L_ _ FRAME $ GRATE i �'' i i PLAN OF FRAME INTERNAL MIN. MIN. DIAMETER WALL TOP/BOTTOM (FT.) THICKNESS SLAB THICKNESS (IN.) (IN.) AS MIN. CIRCUMFERENTIAL IR IAL T AREA OF STEEL PER VERTICAL FT. (SQ. IN.} 4 1 4 6 0.12 5 5 8 0.15 6 1 6 1 6 10.18 2 GRADE RING ., C MIN. AREA OF STEEL IS 0.07 in. ECCENTRIC CONE a LOCATE WALL REINFORCEMENT IN MIDDLE THIRD OF WALL ADDITIONAL #4 EACH — SIDE OF OPENING (1" RISER CLEAR OF BOTTOM FACE) SEE STD. 040.54 FOR MANHOLE RING AND COVER 7 4 MANHOLE OPTION 6" MAX. SPACING OF CIRCUM. R/F STEP STD. NO. 840.66 AS 4W' (CIRCUMFERENTIAL REINFORCEMENT) LONGITUDINAL REINFORCEMENT W, BASE 7 J s � U r REINFORCED CONIC - - - e•, y, b•, -�FTG. (SEE STD. :s!' ..•P:i+• :.•C':ro' '.•d •:io' :.•d' 1525.01 IF USE MIN, AREA OF STEEL I REQUIRED) ~ I IN BASE SLAB OF I I - - - - - - 0.12 in2 PER LINEAR - - - - - - , FOOT EACH WAY TYPICAL MANHOLE SECTION SOLID COVER SHOWN PERFORATED. PERFORATED AVAILABLE IF SPECIFIED. STATE USE OF SYSTEM ON COVER (I.E.: SEWER, STORM DRAIN, ELECTRICAL) TOP OF COVER A B T L__ BOTTOM OF COVER 2'-114 1' il'%,r„ 110%g" \TYPE #1 ALTERNATE \ tf 2'-9111/44" y SECTION A -A I 1 / TYPE #2 1" R. PLAN OF COVER 1'-111�2" 1 OD N � 3'�II� r " �4%,r SECTION B-B MINIMUM WEIGHTS - LBS. FRAME - 180 COVER 120 TOTAL 300 z OU �a ¢a3 . zcc0U LL J a1-4Z cc ooNx H 0 = O = Q 1Oi cn F- LL O IJ 0" z jam CL,rt an w n W H W O � LL Lu c7 O Z d Z WI �aIL n_ n it'i It CC in v� Z W P cn J = O N cn Z T 4 J cz w� 4 W cc CL HEET 1 OF 1 840.52 z oO H� H QQ zC~C=rj 1-4 C'3 L.LJ2EE-1Z OOcn= L <<u- QU�OLu IO. CnHU OQU) z •' � ~ H [I ' Q ct o� o LU LL CD � z v Z �a O W CC0 H LL N W x J "s O CD Z z w HEET 1 OF 1 840.54 0 v -0 NOTES: INSTALL ALL STEPS PROTRUDING 4" FROM INSIDE FACE OF STRUCTURE WALL. z �Cn C Z STEPS DIFFERING IN DIMENSIONS, CONFIGURATION, OR MATERIALS FROM THOSE SHOWN MAY ALSO BE USED PROVIDED THE CONTRACTOR HAS FURNISHED F- Q �-I 0 THE ENGINEER WITH DETAILS OF THE PROPOSED STEPS AND HAS RECEIVED WRITTEN APPROVAL FROM THE ENGINEER FOR THE USE OF SUCH STEPS. x 0 m cc Hz�=D opaan�� „ 0o63 xmzym 1" Lu wQzw (0 m0 1 ° Ocn Q t2 " m 17--n "' i-=~zw U]Lr- C7=7JZ \ OOa (n �$" �\�-j r a o z r o 1� I I-� PLAN SIDE ELEVATION PLAN SIDE ELEVATION m x a az I--1 0 r 141R2 I I aw LL 1 0 CAST IRON CAST IRON z N _ ELEVATION ELEVATION W m m n v v 1 8 #6 BAR OR #8 BAR Q v m 1"16 GALV'D . Q � M>„� mz r mW CA 0 �a Z CA m o PLAN 1/2 POLYPROPYLENE SIDE PLASTIC SIDE J C7 1"1 ELEVATION COMPOSITE P LAN ELEVATION w OaC 0 rl '/ II CIF+ R77-7� i REINFORCING STEEL 12" ELEVATION NOTE: #3 DEFORMED 12" DO NOT USE IN STEEL ROD SECTION A -A "' ELEVATION SANITARY SEWER MANHOLES. SHEET 1 OF 1 SHEET 1 OF 1 84O.66 $40 . GG sheville 000 REGIONAL AIRPORT AVCON, INC. ENGINEERS& PLANNERS 13801 REESE BLVD, SUITE 160 HUNTERSVILLE, NC 28078 OFFICE: (704) 954-9008 www.avconinc.com ULICK ENGINEERING LLC STORMATER HYDRAJLICS I EROSION CONTROL ARE ELD & CIVIL SITE I CONSTRUCTION SERVICES NOT RELEASED FOR CONSTRUCTION 1�1ti11tiI[lI�'1`1rrrlrrrri SEAL 040195A. - �rr/111111141114111 DAVID A. SKURKY, P.E. INC SEAL #040195 ATTENTION: THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC., FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE. WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED SCALE: N.T.S. REVISIONS: DESIGNED BY: W.M.M. DRAWN BY: W.M.M. CHECKED BY: D.A.S. APPROVED BY: D.A.S. DATE: SEPTEMBER 2021 STATE LICENSE # N.C. P-1430 PROJECT NO. 400102 SHEET NUMBER SW-04 N N O N N rr V v) J_ Q w U) Lo O i Cn w w U) Lu N i >D w (N z 0 U) w N i O J 0 z Y Q IL J Q N O O O J Q r O O G7 H U w O IY IL z O ¢I O (D z Ir w w z_ (D z w Y U_ J g Y U_ J 6" PVC STAND PIPE WITH ORIFICE END CAP SEE DETAIL ON SW-06. 2" CLR (TYP.) STONE BEDDING F_ 12" „ 12" J 6 TRASH RACK REQUIRED ON TOP OF STRUCTURE. TRASH RACK SHALL BE APPROVED BY THE ENGINEER PRIOR TO CONSTRUCTION. SEE SHEET SW-06 FOR DETAILS. 8„ 36„ 8„ #4 @ 8" VERT. E.F. ♦. a A ° A 'n a ` #4 @ 8" VERT. E.F. 'A • C e • MANHOLE STEPS @ 1'-2" CTS ♦ 1 12„ TYP. e, ° f A A ORIFICE OPENING WITH AND a CAP. SEE ° ° DETAIL. ROUNDED ENTRANCE a FLOW A —�� A 1 1 ♦ .. d ° :7 41 OUTLET PIPE SECTION X-X (SEE SIDE VIEW - GRATE DETAIL) N.T.S. #5@8"E.W. TOP & BOTTOM 1: OUTLET CONTROL STRUCTURE N.T.S. 8„ 36„ 8„ 2155.0 J I VIVC uCuullNV SECTION Y-Y N.T.S. PRE -CAST CONCRETE STRUCTURE OR AN APPROVED EQUAL IS ACCEPTABLE. ALL ORIFICE AND WEIR ELEVATIONS SHALL BE MAINTAINED. 0 sheville REGIONAL AIRPORT AVCON, INC. ENGINEERS & PLANNERS 13801 REESE BLVD, SUITE 160 HUNTERSVILLE, NC 28078 OFFICE: (704) 954-9008 —avconinc.— ULICK ENGINEERING LLC STORM—IR I HYDRAULICS I EROSION CONTROL AIRFIELD & CIVIL SITE I CONSTRUCTION SERVICES NOT RELEASED FOR CONSTRUCTION CARO 11114111411111!!!!/�/ O;yq`- SEAL 040195 DAVID A. SKURKY, P.E. NC SEAL #040195 ATTENTION: THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC., FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE. WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED SCALE: N.T.S. REVISIONS: NO. DATE BY DESCRIPTION 1 01/24/22 WMM NCDELM & NCDEQ COMMENTS DESIGNED BY: W.M.M. DRAWN BY: W.M.M. CHECKED BY: D.A.S. APPROVED BY: D.A.S. DATE: SEPTEMBER 2021 STATE LICENSE # N.C. P-1430 PROJECT NO. 400102 SHEET NUMBER C g SW-05 N N O N It N ❑ U) J_ Q Lu >❑ U) Lid O U) Lu Lu U) Ll N_ >0 In Lu N z U) Lu In NIn H O z_ Y In J Q CV O CD O J Q 0 O H U Lu) Ify z O Qi O C� z Ir Lu Lu z z Lu Y _U J Q Y _U J a SCHEDULE 40 PVC THREADED END CAP WITH PVC THREADED PLUG 000 0000 SCHEDULE 40 0 0 0 PERFORATED PVC (6" MIN. 0000 o DIA.) (3/8" HOLE DIA.) i 100001 SCHEDULE 40 PLUG 1000 0000 00 l000 0000 1000 0000 1000 Mum 45° BEND TEE AND PIPE TO BE PERFORATED TO WITHIN 3" OF WALL/STRUCTURE CONCRETE WALL/OUTLET STRUCTURE ml LON -I I> CONTRACTOR TO SECURE STAND PIPE TO OUTLET CONTROL STRUCTURE. STRAP OR OTHER DEVICE SHALL BE WATER RESISTANT AND SHALL BE APPROVED BY THE ENGINEER PRIOR TO CONSTRUCTION. SCHEDULE 40 SOLID PVC (6" MIN. DIA.) ORIFICE STAND PIPE DETAIL N.T.S. SCHEDULE 40 PVC THREADED END CAP WITH PVC THREADED PLUG 0.8" 3" CLEAR (MIN.) SH RACK SPACING S TRASH RACK N.T.S. 6" DIAM. SCHEDULE 40 PVC 6" DIAM. SCHEDULE 40 PVC THREADED END CAP DRILL 0.8" DRAWDOWN ORIFICE HOLE IN CENTER OF THREADED PLUG FILL GAP BETWEEN STRUCTURE AND PVC PIPE WITH MORTAR ORIFICE END CAP DETAIL N.T.S. 6" DIAM. PVC THREADED PLUG. PLUG MAY BE PERIODICALLY REMOVED FROM END CAP FOR CLEANING AND MAINTENANCE. (DO NOT CEMENT PLUG TO END CAP) 1 >too" sheville REGIONAL AIRPORT ILE AVCON, INC. ENGINEERS & PLANNERS 13801 REESE BLVD, SUITE 160 HUNTERSVILLE, NC 28078 OFFICE: (704) 954-9008 —avconinc.— ULICK ENGINEERING LLC STORMW.ATER HYDRAULICS I ER0519N CONTROL AIRFIELD&CIVIL SITE I CONSTRUCTION SERVICES NOT RELEASED FOR CONSTRUCTION 04 `,�1�111 l l I I r r l lll!!i SEAL 040195 - }, �a a...5y�� !!llllllllll4111�1� DAVID A. SKURKY, P.E. NC SEAL #040195 ATTENTION: THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC., FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE. WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED SCALE: N.T.S. REVISIONS: NO. DATE BY DESCRIPTION NCDELM & NCDEQ COMMENTS DESIGNED BY: W.M.M. DRAWN BY: W.M.M. CHECKED BY: D.A.S. APPROVED BY: D.A.S. DATE: SEPTEMBER 2021 STATE LICENSE # N.C. P-1430 PROJECT NO. 400102 SHEET NUMBER SW-06 X, N 0 CCV ti LU 0 z a In 06 LU 0 LU LU U) LU N 0 LU N z 0 in LU N 0 J 0 z Q a J Q CV 0 0 0 J Q 0 0 w 0 rY a z 0 Q o� C� z IY LU LU z_ z LU Y _U J g Y _U J GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCGO1 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCGO1 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales, ditches, and 7 None perimeter slopes (b) High Quality Water 7 None (HQW) Zones (c) Slopes steeper than If slopes are 10' or less in length and are 3:1 7 not steeper than 2:1, 14 days are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 -7 days for perimeter dikes, swales, (d) Slopes 3:1 to 4:1 14 ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed -7 days for perimeter dikes, swales, (e) Areas with slopes ditches, perimeter slopes and HQW Zones flatter than 4:1 14 -10 days for Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below: Temporary Stabilization Permanent Stabilization • Temporary grass seed covered with straw or • Permanent grass seed covered with straw or other mulches and tackifiers other mulches and tackifiers • Hydroseeding • Geotextile fabrics such as permanent soil • Rolled erosion control products with or reinforcement matting without temporary grass seed • Hydroseeding • Appropriately applied straw or other mulch • Shrubs or other permanent plantings covered • Plastic sheeting with mulch • Uniform and evenly distributed ground cover sufficient to restrain erosion • Structural methods such as concrete, asphalt or retaining walls • Rolled erosion control products with grass seed POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste, Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site. 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the tmeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. -, NORTH CAR LII A r Environmental Quality CLIN LT IIARPD 513M NRI m TEVR:E CWXW II BM BELOW GRA M UNSITE CONCRETE WASHUUT STRUCTURE WITH LINER SLUM1 k LOCATRIN J" rU LQ P. THE CdCFM YAIIWT STRUCTURES SHALL s NARLTANRED 1MrH TIE L=11111 AN01/gt SMD REALTE! 75X IF THE STRUCn■aS RAPNBZ<TT. CLLW N NNW I DUT STRUCTURE �01 Spa ��CIf a LaC IM �1E10■� M p•rJMI T NAR!(EU SIUMIE nm NOTRIri CEVILE arxw WD P. TIE CUItlETE VASHM STRUCTURES SH&L K NlIiWARES TP VM TIE Lun ANL/OI m m REOAM 710 IF TIE STiACFU KS CNP=ff IU PI ARM47L R■■A1M ppL�� LYdi " ABOVE GRADE WASHOUT III= TO X CLEW KIIIII D YLTH S� � IIEVIM STRUCTURE CONCRETE WASHOUTS 1. Do not discharge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC WASTE 1. Create designated hazardous waste collection areas on -site. 2. Place hazardous waste containers under cover or in secondary containment. 3. Do not store hazardous chemicals, drums or bagged materials directly on the ground. NCGO1 GROUND STABILIZATION AND MATERIALS HANDLING EFFECTIVE: 04/01/19 >V*01. _", sheville REGIONAL AIRPORT AVCON, INC. ENGINEERS & PLANNERS 13801 REESE BLVD, SUITE 160 HUNTERSVILLE, NC 28078 OFFICE: (704) 954-9008 www.avconinc.com ULICK ENGINEERING LLC 3701IM-113 HYDR11111- I EROSION CCNTRDL ARE ELD & CIVIL SITE I CONSTRUCTION SERVICES NOT RELEASED FOR CONSTRUCTION CA R rrrri SEAL 040195 - .4GINt�-�. �rrl11111114111" DAVID A. SKURKY, P.E. NC SEAL #040195 ATTENTION: THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC., FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE. WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED SCALE: N.T.S. REVISIONS: DESIGNED BY: W.M.M. DRAWN BY: W.M.M. CHECKED BY: D.A.S. APPROVED BY: D.A.S. DATE: SEPTEMBER 2021 STATE LICENSE # N.C. P-1430 PROJECT NO. 400102 SHEET NUMBER ES-01 N C) CCN ti CD LU I- O Z a U n 06 LU 0 Cn H LU LU 17 U) LU N 0 LU N z 0 U) LU N I- O J 0 Z_ Y Q a J Q CV _) CD O J Q CD O I- w O rY a I z 0 Q o' z IY LU LU Z_ C� z LU Y _U J g Y _U J PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION A: SELF -INSPECTION Self -inspections are required during normal business hours in accordance with the table below. When adverse weather or site conditions would cause the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition, when a storm event of equal to or greater than 1.0 inch occurs outside of normal business hours, the self -inspection shall be performed upon the commencement of the next business day. Any time when inspections were delayed shall be noted in the Inspection Record. Frequency Inspect (during normal Inspection records must include: business hours) (1) Rain gauge Daily Daily rainfall amounts. maintained in If no daily rain gauge observations are made during weekend or good working holiday periods, and no individual -day rainfall information is order available, record the cumulative rain measurement for those un- attended days (and this will determine if a site inspection is needed). Days on which no rainfall occurred shall be recorded as "zero." The permittee may use another rain -monitoring device approved by the Division. (2) E&SC At least once per 1. Identification of the measures inspected, Measures 7 calendar days 2. Date and time of the inspection, and within 24 3. Name of the person performing the inspection, hours of a rain 4. Indication of whether the measures were operating event 3 1.0 inch in properly, 24 hours 5. Description of maintenance needs for the measure, 6. Description, evidence, and date of corrective actions taken. (3) Stormwater At least once per 1. Identification of the discharge Outfalls inspected, discharge 7 calendar days 2. Date and time of the inspection, outfalls (SDOs) and within 24 3. Name of the person performing the inspection, hours of a rain 4. Evidence of indicators of stormwater pollution such as Oil event> 1.0 inch in sheen, floating or suspended solids or discoloration, 24 hours 5. Indication of visible sediment leaving the site, 6. Description, evidence, and date of corrective actions taken. (4) Perimeter of At least once per If visible sedimentation is found outside site limits, then a record site 7 calendar days of the following shall be made: and within 24 1. Actions taken to clean up or stabilize the sediment that has left hours of a rain the site limits, event> 1.0 inch in 2. Description, evidence, and date of corrective actions taken, and 24 hours 3. An explanation as to the actions taken to control future releases. (5) Streams or At least once per If the stream or wetland has increased visible sedimentation or a wetlands onsite 7 calendar days stream has visible increased turbidity from the construction or offsite and within 24 activity, then a record of the following shall be made: (where hours of a rain 1. Description, evidence and date of corrective actions taken, and accessible) event > 1.0 inch in 2. Records of the required reports to the appropriate Division 24 hours Regional Office per Part III, Section C, Item (2)(a) of this permit of this permit. (6) Ground After each phase 1. The phase of grading (installation of perimeter E&SC stabilization of grading measures, clearing and grubbing, installation of storm measures drainage facilities, completion of all land -disturbing activity, construction or redevelopment, permanent ground cover). 2. Documentation that the required ground stabilization measures have been provided within the required timeframe or an assurance that they will be provided as soon as possible. NOTE: The rain inspection resets the required 7 calendar day inspection requirement. - :"� NORTH CAROLINA �, tx 1P Envil"Dnme!' tal Quality PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION B: RECORDKEEPING 1. E&SC Plan Documentation The approved E&SC plan as well as any approved deviation shall be kept on the site. The approved E&SC plan must be kept up-to-date throughout the coverage under this permit. The following items pertaining to the E&SC plan shall be documented in the manner described: Item to Document Documentation Requirements (a) Each E&SC Measure has been installed Initial and date each E&SC Measure on a copy and does not significantly deviate from the of the approved E&SC Plan or complete, date locations, dimensions and relative elevations and sign an inspection report that lists each shown on the approved E&SC Plan. E&SC Measure shown on the approved E&SC Plan. This documentation is required upon the initial installation of the E&5C Measures or if the E&SC Measures are modified after initial installation. (b) A phase of grading has been completed. Initial and date a copy of the approved E&SC Plan or complete, date and sign an inspection report to indicate completion of the construction phase. (c) Ground cover is located and installed Initial and date a copy of the approved E&SC in accordance with the approved E&5C Plan or complete, date and sign an inspection Plan. report to indicate compliance with approved ground cover specifications. (d) The maintenance and repair Complete, date and sign an inspection report. requirements for all E&5C Measures have been performed. (e) Corrective actions have been taken Initial and date a copy of the approved E&SC to E&SC Measures. Plan or complete, date and sign an inspection report to indicate the completion of the corrective action. 2. Additional Documentation In addition to the E&SC Plan documents above, the following items shall be kept on the site and available for agency inspectors at all times during normal business hours, unless the Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This general permit as well as the certificate of coverage, after it is received. (b) Records of inspections made during the previous 30 days. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. (c) All data used to complete the Notice of Intent and older inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. Occurrences that must be reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: • They are 25 gallons or more, • They are less than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or • They are within 100 feet of surface waters (regardless of volume). (a) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (b) Anticipated bypasses and unanticipated bypasses. (c) Noncompliance with the conditions of this permit that may endanger health or the environment. 2. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Division's Emergency Response personnel at (800) 662-7956, (800) 858-0368 or (919) 733-3300. Occurrence Reporting Timeframes (After Discovery) and Other Requirements (a) Visible sediment e Within 24 hours, an oral or electronic notification. deposition in a • Within 7 calendar days, a report that contains a description of the stream or wetland sediment and actions taken to address the cause of the deposition. Division staff may waive the requirement for a written report on a case -by -case basis. • If the stream is named on the NC 303(d) list as impaired for sediment - related causes, the permittee may be required to perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure compliance with the federal or state impaired -waters conditions. . Within 24 hours, an oral or electronic notification. The notification (b) Oil spills and release of shall include information about the date, time, nature, volume and hazardous location of the spill or release. substances per Item 1(b)-(c) above (c) Anticipated a A report at least ten days before the date of the bypass, if possible. bypasses [40 CFR The report shall include an evaluation of the anticipated quality and 122.41(m)(3)] effect of the bypass. (d) Unanticipated • Within 24 hours, an oral or electronic notification. bypasses [40 CFR + Within 7 calendar days, a report that includes an evaluation of the 122.41(m)(3)] quality and effect of the bypass. (e) Noncompliance • Within 24 hours, an oral or electronic notification. with the conditions a Within 7 calendar days, a report that contains a description of the of this permit that noncompliance, and its causes; the period of noncompliance, may endanger including exact dates and times, and if the noncompliance has not health or the been corrected, the anticipated time noncompliance is expected to environment[40 continue; and steps taken or planned to reduce, eliminate, and CFR 122.41(1)(7)] prevent reoccurrence of the noncompliance. [40 CFR 122.41(l)(6). Division staff may waive the requirement for a written report on a case -by -case basis. NCGO I SELF -INSPECTION, RECORDKEEPING AND'TkEPORTING EFFECTIVE: 04/01/19 >Y001. _"' sheville REGIONAL AIRPORT AVCON, INC. ENGINEERS & PLANNERS 13801 REESE BLVD, SUITE 160 HUNTERSVILLE, NC 28078 OFFICE: (704) 954-9008 www.avconinc.com ULICK ENGINEERING LLC STORMATER HYDRAJLICS I EROSION CONTROL AIRF'.ELD & CIVIL SITE I CONSTRUCTION SERVICES NOT RELEASED FOR CONSTRUCTION CA r!!!i SEAL 040195 - �r!l11111114111" DAVID A. SKURKY, P.E. NC SEAL #040195 ATTENTION: THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC., FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE. WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED SCALE: N.T.S. REVISIONS: DESIGNED BY: W.M.M. DRAWN BY: W.M.M. CHECKED BY: D.A.S. APPROVED BY: D.A.S. DATE: SEPTEMBER 2021 STATE LICENSE # N.C. P-1430 PROJECT NO. 400102 SHEET NUMBER ES-02 N N CD N N 0 Q n a. n 06 N CD U) I— w w U) w N_ U w N_ z U) w N_ 0 z Y Q n J Q N O CD O J Q 0 a H U w 0 IL z 0 Q CD U z_ ry w w z z w Y U_ J Q Y J Q EROSION CONTROL MAINTENANCE CONTACT: NAME: GREATER ASHEVILLE REGIONAL AIRPORT AUTHORITY PHONE: 828-684-2226 EMAIL: MREISMAN@a FLYAVL.COM ADDRESS: 61 TERMINAL DRIVE, SUITE 1 FLETCHER, NC 28732 IF THE SAME PERSON CONDUCTS THE LAND -DISTURBING ACTIVITY & ANY RELATED BORROW OR WASTE ACTIVITY, THE RELATED BORROW OR WASTE ACTIVITY SHALL CONSITUTE PART OF THE LAND -DISTURBING ACTIVITY UNLESS THE BORROW OR WASTE ACTIVITY IS REGULATED UNDER THE MINING ACT OF 1971, OR IS A LANDFILL REGULATED BY THE DIVISION OF WASTE MANAGEMENT. IF THE LAND -DISTURBING ACTIVITY AND ANY RELATED BORROW OR WASTE ACTIVITY ARE NOT CONDUCTED BY THE SAME PERSON, THEY SHALL BE CONSIDERED SEPARATE LAND -DISTURBING ACTIVITIES AND MUST BE PERMITTED EITHER THROUGH THE SEDIMENTATION OG POLLUTION CONTROL ACT AS A ONE -USE BORROW SITE OR THROUGH \() THE MINING ACT. I IN O 114� CI (A) I 4" BOLLARD (TYP) / GRATE:2,160.22' �—C---— — — — — — — — — — — — — — — — — — — — — — — — — — — — — — ______ 24" HOPE (A) / CI INV (A): 2,155.1' I — — — — — — — — — — — — — — — — — — — — — — — -----------------4" HOPE ------------------ _ / GRATE: 2,164.2 ---- INV (B): 2,154.8'�) )---------- _ ----------------- INV (C): 2,154.fy' I I ---------------------- / SETBACK LINE - INV (A): 2,159. I I C 6' / (B) INV (B): 2,159 1' ASPHALT PAVEMENT HENDERSON COUNTY / I I ASPHALT PAVEMENT / I I CURB AND GUTTER TYP) `� \\\ PROPERTY LINE I I S 88°07'11" E 284.60' I .r — LOD = LOD- Lou LW �- —Lap us - _ _ — � 04 73 7\' W �t9D I 1 p I- - - - BUNCOMAE-COUNTY of ✓ AD SIFN 7 �I J INV: 2,156.3' 15 ZZ'_ / A) (C) I LIMITS OF DISTURBANCE 1/1 STORM MANHOLE z RIM: 2,157.90' I I (B) C7 INV (A): 2,152.9' p INV (B) 15" RCP: 2,153.1' I O INV (C): 2,153.0' 1 OUT: 2,152 " Z TEMPORARY DIVFRSI( O o G 0 m —D m0O z n m �p *� m O U� D V1 0 O E. U7 m m —I ES&PCP LEGEND SILT FENCE :: INLET SEDIMENT TRAP SFSF— BLOCK AND GRAVEL � CURB INLET SEDIMENT LIMITS OF DISTURBANCE :..-: TRAP LOD LOD LOD DC DUST CONTROL TEMPORARY DIVERSION DISTURBED AREA GRAVEL TS STABILIZE WITH TEMP. CE CONSTRUCTION SEEDING ENTRANCE EXISTING CONTOUR 1.0 FT INTERVAL DISTURBED AREA 88 pS STABILIZE PROPOSED CONTOUR 1.0 FT INTERVAL WITH PERM. SEEDING 4 GR 2, 57 INV:�&L 3. \ \ \ \ 216 TBM - IW/ S NER LI W �EVT161.91' \\ \ \ \ W N \,, \ / J \ CE _ \\ c�co IIII/ STORM MANHOLE'x _ RIM: 2,155.42'1 1(A) a INV (A): 2,150.5'1 1 INV (B): 2,150.8' I 1 OUT: 2,150.3' i I GRATE: 2,150.71 IN:2,146.6' (B) nNi I OUT: ,146.3' SILT FENCE WITH REINFORCED I \ � I \ 2160 \\ I o \ / I p \ COIR FIBER BAFFLES \ \\ / IcI\� c I ; CA VARIABLE LENGTH TE: 2,161/34 AT / I °C. i 7 \ \ IN �( A): 2,1 4G4 y: � IN ) 215g \ TEMPORARY \�\\ / I \\ SEDIMENT TRAP #1 DC TS / �\ COIR FIBER BAFFLES Is' Is' VARIABLE LENGTHiL 2 7 1 c — \ )� \ 6 ------ -- NV: 2,1 ' �15" R .� 2,153.01 _ / INV IN: 2, . INV OUT: 2, \ LIMITS OF DISTURBANCE 1 BGA ASSO LTD D.B. 7 F STABILIZED OUTLET I DP `� `�----�-'�• S I I PLAT: - - CURB INLET c LOD F--- Lop SF \ SEDIMENT TRAP I % INLET SEDIMENT TRAP ------- � � _ SF SF � � \ X I 6FT WIDE 4FT LONG Lop LOD — // I I� (EXISTING INLET) ROCK SPILLWAY ` -'o \ \ TEMPORARY DIVERSION #2 \ ► I II 1\ III \ ; I I / RIM: 2,152.80 \ I � \ __ \\ A K RO D I1 I \ 100 \ 20 SANITARY SEWER EASEMENT I 1 ASPHALT \ P A V E M ENT ° RVp f� I 1 \ I I // CANCREEK WATE'� AND SEWER [ISTRICT j I I/ SSMH DI I 1 \ DI \ OF HENDEI SON COUNTY I I sRIM: 2,152.51 VA2.09' I I \\NE.52.69'\\ \D.B.80�, PG. 821 L N250 4' V: 2,150 4\BUNCOMB\� COUNTY 1 YS 24" CMP 88007'01" E ------------ — 1 23.58' (TIE) II--��--------- -- -■■■m ■ ■■■ (TYP) ■■■ ---/' A 11■■■�■■■��■■■ ■■■�r�■ � 11 II ' ■ HENDERSON COUNTY TBM - 60d NAIL W/ SHINER ELEVATION: 2,162.67' EROSION CONTROL CONSTRUCTION SEQUENCE INITIAL FINAL 1. OBTAIN ALL NECESSARY PERMITS FROM ALL REGULATORY AUTHORITIES. 10. REMOVE INITIAL PHASE TEMPORARY SEDIMENT TRAP, BEGIN GRADING AND STORM DRAIN INSTALLATION 2. CONTACT THE ASHEVILLE REGIONAL OFFICE ENVIRONMENTAL SPECIALIST PRIOR TO COMMENCING AS SHOWN ON PLANS. CONSTRUCTION ACTIVITIES. 11. CONTRACTOR SHALL NOT PERFORM MAJOR GRADING ACTIVITIES DURING OR BEFORE PREDICTED WET 3. CONTRACTOR SHALL LOCATE ALL UNDERGROUND UTILITIES PRIOR TO ANY EXCAVATION. SOFT DIG WEATHER. UTILITIES WITHIN GRADING AREA TO IDENTIFY POTENTIAL CONFLICTS. 12. SEED AND MULCH DENUDED AREA, AS REQUIRED, AFTER FINISHED GRADES ARE ESTABLISHED. 4. MAINTAIN NPDES TEMPORARY SEEDING SCHEDULE FOR ALL EXPOSED SOILS FOR THE DURATION OF 13. MAINTAIN SOIL EROSION CONTROL MEASURES UNTIL PERMANENT GROUND COVER ESTABLISHED. CONSTRUCTION. 14. MAINTAIN ALL EROSION CONTROL MEASURES IN THE FINAL PHASE UNTIL AFTER THE PERMANENT PIPES 5. INSTALL CONSTRUCTION ENTRANCE (CE). ARE INSTALLED AND THE AREA IS PERMANENTLY STABILIZED. 6. INSTALL SILT FENCE AND INLET SEDIMENT TRAPS AS SHOWN ON PLANS, APPLY DUST CONTROL AND 15. INSTALL ALL PAVEMENT. TEMPORARY SEEDING AS NECESSARY. 16. INSTALL PERMANENT SCMs. 7. INSTALL TEMPORARY SEDIMENT TRAP #1 AND TEMPORARY DIVERSIONS #1 AND #2 AS SHOWN ON PLANS. 17. REQUEST FINAL APPROVAL BY CONSTRUCTION INSPECTOR. APPLY DUST CONTROL AND TEMPORARY SEEDING AS NECESSARY. 18. REMOVE ALL TEMPORARY SOIL EROSION CONTROL MEASURES AND STABILIZE THESE AREAS. 8. CLEAN SEDIMENT TRAPS WHEN ONE-HALF FULL. 19. SUBMIT NOTICE OF TERMINATION (NCG01) TO NCDEQ AFTER THE SITE IS COMPLETED. 9. REPAIR OR REPLACE ALL EROSION CONTROL MEASURES AS NEEDED. 1 LOT D LIMITS OF DISTURBANCE: 0.74 ACRES �. 87 1287 N 0' 10' 20' 40' GRAPHIC SCALE IN FEET >e*000. -'I ■ s evi e Ar:�GIONAL AIRPORT AVCON, INC. ENGINEERS & PLANNERS 13801 REESE BLVD, SUITE 160 HUNTERSVILLE, NC 28078 OFFICE: (704) 954-9008 —avconinc.— ULICK ENGINEERING LLC STORMWATER HYDR0.ULIC5 I EROSION CONTROL AIRFIELD &CIVIL SITE I CONSTRUCTION SERV-CES NOT RELEASED FOR CONSTRUCTION 1�1111114111111!!!/�/ ,�•`�o�� CAP 0 ! SEAL 040195 111s DAVID A. SKURKY, P.E. NC SEAL #040195 THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC., FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE. WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED SCALE:1 " = 20' REVISIONS: NO. DATE BY DESCRIPTION 1 01/24/22 NCDELM & NCDEQ COMMENTS DESIGNED BY: W.M.M. DRAWN BY: W.M.M. CHECKED BY: D.A.S. APPROVED BY: D.A.S. DATE: SEPTEMBER 2021 STATE LICENSE # N.C. P-1430 PROJECT NO. 400102 SHEET NUMBER ES-03A N N O N N 0 z Q J I a. 11 06 w N 0 U) I— w w 07 Lu N_ w N z (D U) w N_ 0 J z Y Q I J N O_ O O J Q 0 a G7 H U w 0 z 0 Q CD U z_ ry w w z z w Y U_ J Q Y J Q INV: 2,156.3' 15RC O 'O (- O m - n� m� m0 X� m, z D m �m ­7 �rl Q1 O E. Q7 2 m m ES&PCP LEGEND SILT FENCE :: INLET SEDIMENT TRAP SFSF- BLOCK AND GRAVEL � CURB INLET SEDIMENT LIMITS OF DISTURBANCE :..-: TRAP LOD LOD LOD DC DUST CONTROL TEMPORARY DIVERSION DISTURBED AREA CE GRAVEL TS STABILIZE WITH TEMP. CONSTRUCTION SEEDING ENTRANCE EXISTING CONTOUR 1.0 FT INTERVAL DISTURBED AREA 88 _ pS STABILIZE PROPOSED CONTOUR 1.0 FT INTERVAL WITH PERM. SEEDING SSMH DI I I DI \ OF HENDEI' SON COUNTY 1\ I I RIM: 2,152.51 GRATE: 2152.09' \GRATE: 2,152.69' \\ D.B. 80�, PG. 821 \ I I INV:2150.4' INV:2,150.4' \ I I ------ ----- \-------- -- \ 24" CMP I I 15�. R — ------ ----- I VL 1 LIV I IV IY IF V19V P•11 1 LI% �\ UPSTREAM SITE HAS BEEN \\B U N C STABILIZED. II TDP - -■■■� ■ ■■■-(TYP)■■■ 11 II HENDERSON COUNTY EROSION CONTROL CONSTRUCTION SEQUENCE co I / L% YS I 88007'01 " E --�I 23.58' (TIE) TBM - 60d NAIL W/ SHINER ELEVATION: 2,162.67' INITIAL FINAL 1. OBTAIN ALL NECESSARY PERMITS FROM ALL REGULATORY AUTHORITIES. 10. REMOVE INITIAL PHASE TEMPORARY SEDIMENT TRAP, BEGIN GRADING AND STORM DRAIN INSTALLATION 2. CONTACT THE ASHEVILLE REGIONAL OFFICE ENVIRONMENTAL SPECIALIST PRIOR TO COMMENCING AS SHOWN ON PLANS. CONSTRUCTION ACTIVITIES. 11. CONTRACTOR SHALL NOT PERFORM MAJOR GRADING ACTIVITIES DURING OR BEFORE PREDICTED WET 3. CONTRACTOR SHALL LOCATE ALL UNDERGROUND UTILITIES PRIOR TO ANY EXCAVATION. SOFT DIG WEATHER. UTILITIES WITHIN GRADING AREA TO IDENTIFY POTENTIAL CONFLICTS. 12. SEED AND MULCH DENUDED AREA, AS REQUIRED, AFTER FINISHED GRADES ARE ESTABLISHED. 4. MAINTAIN NPDES TEMPORARY SEEDING SCHEDULE FOR ALL EXPOSED SOILS FOR THE DURATION OF 13. MAINTAIN SOIL EROSION CONTROL MEASURES UNTIL PERMANENT GROUND COVER ESTABLISHED. CONSTRUCTION. 14. MAINTAIN ALL EROSION CONTROL MEASURES IN THE FINAL PHASE UNTIL AFTER THE PERMANENT PIPES 5. INSTALL CONSTRUCTION ENTRANCE (CE). ARE INSTALLED AND THE AREA IS PERMANENTLY STABILIZED. 6. INSTALL SILT FENCE AND INLET SEDIMENT TRAPS AS SHOWN ON PLANS, APPLY DUST CONTROL AND 15. INSTALL ALL PAVEMENT. TEMPORARY SEEDING AS NECESSARY. 16. INSTALL PERMANENT SCMs. 7. INSTALL TEMPORARY SEDIMENT TRAP #1 AND TEMPORARY DIVERSIONS #1 AND #2 AS SHOWN ON PLANS. 17. REQUEST FINAL APPROVAL BY CONSTRUCTION INSPECTOR. APPLY DUST CONTROL AND TEMPORARY SEEDING AS NECESSARY. 18. REMOVE ALL TEMPORARY SOIL EROSION CONTROL MEASURES AND STABILIZE THESE AREAS. 8. CLEAN SEDIMENT TRAPS WHEN ONE-HALF FULL. 19. SUBMIT NOTICE OF TERMINATION (NCG01) TO NCDEQ AFTER THE SITE IS COMPLETED. 9. REPAIR OR REPLACE ALL EROSION CONTROL MEASURES AS NEEDED. 1 LOT D LIMITS OF DISTURBANCE: 0.74 ACRES 40' ET >to". _­' ■ s evi e REGIONAL AIRPORT AVCON, INC. ENGINEERS & PLANNERS 13801 REESE BLVD, SUITE 160 HUNTERSVILLE, NC28078 OFFICE: (704) 954-9008 www.a —in—om ULICK ENGINEERING LLC STORM —ER HYDRAULICS I EROSION CONTROL AIRFIELD&CIVIL SITE I CONSTRUCTION SERV-CES NOT RELEASED FOR CONSTRUCTION CAP 0 11.{1151114111111l117j/ Q q< - SEAL 040195 16 ���!lillrlllll1l11 DAVID A. SKLIRKY, P.E. NC SEAL #040195 .001 ATTENTION: THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC., FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE. WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED SCALE:1 " = 20' REVISIONS: NO. DATE BY DESCRIPTION 1 01/24/22 NCDELM & NCDEQ COMMENTS DESIGNED BY: W.M.M. DRAWN BY: W.M.M. CHECKED BY: D.A.S. APPROVED BY: D.A.S. DATE: SEPTEMBER 2021 STATE LICENSE # N.C. P-1430 PROJECT NO. 400102 SHEET NUMBER ES-03B i N N O N N CO J_ Q W a. n 06 co I CD U) I— LU LU U) LU N_ W N z U) W N 0 z Y Q n J Q N O CD O J Q r 0 a H U LU z o_ z 0 a CD I z ry LU LU z_ (a z W Y U_ J Q Y U_ J Q MAINTENANCE: INSPECT SILT FENCE AT LEAST ONCE A WEEK OR AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. SHOULD THE FABRIC OF THE SILT FENCE COLLAPSE, TEAR, DECOMPOSE, OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. i �s'1112G-— lT�I�I"11111ITl11 11 � III—l1=.I I=11 11, 11,�11SIDE VIE] - STEEL T POST WIRE FENCING (18' TO 36") SILT FENCE FABRIC (36" MIN WIDTH) WIRE OR PLASTIC TIES (3 WN) FILL SLOPE N 8" MIN. COVER OVER SKIRT (SEE NOTE 2) T POST WIRE/PL TIE MIN. 14 GA. FENCING EXISTING GRADE IIRE FENCE SILT FENCE TOP VIEW NOTES: 1. SILT FENCE MUST BE PLACED 18" (MIN) FROM TOE OF SLOPE. IT CAN NOT BE USED TO HOLD BACK FILL MATERIALS 2. BOTTOM 12 INCHES OF SILT FENCE MUST BE BURIED. PLACE IT IN A TRENCH 8" DEEP AND 4" WIDE 3. USE SILT FENCE ONLY WHEN DRAINAGE AREA DOES NOT EXCEED 1/4 ACRE AND NEVER IN AREAS OF CONCENTRATED FLOW OR IN A STREAM BED. City of Asheville, NC Standard Specifications and Details Manual 8' M AX. I VARIABLE AS DIRECTED BY THE ENGINEER SILT FENCE WIRE FENCE. 14 GA. MIN/6' OPENING MAX STANDARD TEMPORARY SILT FENCE FRONT VIEW MAXIMUM SLOPE LENGTH AND SLOPE WHICH SEDIMENT FENCE IS APPLICABLE* SLOPE SLOPE LENGTH FT MAXIMUM AREA SQ FT G2% 100 10,000 2 TO 5% 75 7,500 5 TO 10% 50 5,000 10 TO 20% 25 2,500 >20% 15 1,500 * TABLE INFORMATION TAKEN FRON THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, DETAIL 6.62A. =vlalvrva STD. N0. DESCRIPTION 7.01 MAINTENANCE: MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOPDRESSING WITH 2-INCH STONE. AFTER EACH RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS. 50' MIN. NOTES: 1. THIS ENTRANCE APPLIES ONLY TO ENTRANCES FOR COMMERCIAL SITES. 2. FIRST 5' MUST DRAIN AWAY FROM THE STREET (MIN Y4" PER 1' FALL) 3. FLOW FROM PROJECT SHALL NOT ENTER THE PUBLIC STREET. 4. FABRIC MAY BE ADDED UNDER THE STONE WHICH WOULD ADD TOTAL LIFE TO THE CONSTRUCTION ENTRANCE. d 4 a o a 25' OR WIDTH OF 0 PROPOSED STREET, c RAILROAD BALLAST STONE WHICHEVER IS 0 GREATER. z X Uj PLAN REMOVE CURB AND GUTTER NEW CONSTRUCTION EXISTING ROADWAY 6" MIN. CROSS SECTION City of Asheville, NC COMMERCIAL REVISIONS STD. NO. DATE DESCRIPTION 7.03 Standard Specifications CONSTRUCTION ENTRANCE and Details Manual Imo— 4' MAX. —} CDnNI_F 1/IC4Af NOTES: 1. SET FABRIC HEIGHT AT 1 FT MAXIMUM BETWEEN SUPPORT POSTS SPACED NO MORE THAN 4 FT APART. 2. SET OUTLET ELVATION SO THAT WATER DEPTH CANNOT EXCEED 1.5 IT AT THE LOWEST POINT ALONG THE FFNCFHNF. 3. INSTALL A HORIZONTAL BRACE BETWEEN THE SUPPORT POSTS TO SERVE AS AN OVERFLOW WEIR AND TO SUPPORT TOP OF FABRIC. 4. PROVIDE A RIPRAP SPLASH PAD AS SHOWN ABOVE. EXCAVATE FOUNDA11ON FOR THE SPLASH PAD A MINIMUM 5 FT WIDE, 1FT DEEP, AND 5 FT LONG ON LEVEL GRADE. THE FINISHED SURFACE OF THE RIPRAP SHOULD BLEND WITH SURROUNDING AREA, ALLOWING NO OVERALL THE AREA AROUND THE PAD MUST BE STABLE. 5. DIG A V—TRENCH IN THE LINE OF THE FENCE AS SHOWN ABOVE. 6. AVOID JOINTS, PARTICULARLY AT LOW POINTS IN THE FENCE LINE. WHERE JOINTS ARE NECESSARY, FASTEN FABRIC SECURELY TO SUPPORT POSTS AND OVERLAP TO THE NEXT POST. 7. TO REDUCE MAINTENANCE, EXCAVATE A SHALLOW SEDIMENT STORAGE AREA ON UPSLOPE SIDE OF FENCE WHERE SEDIMENTATION IS EXPECTED. PROVIDE GOOD ACCESS TO DEPOSITION AREAS FOR CLEANOUT AND MAINTENANCE. City of Asheville, NC Standard Specifications and Details Manual Cross -Section TEMPORARY SEDIMENT TRAP EMBANKMENTS SHALL BE PROVIDED WITH ADEQUATE GROUNDCOVER IMMEDIATELY UPON CONSTRUCTION. SILT FENCE FABRIC (36" MIN WIDTH) STANDARD TEMPORARY SILT FENCE (SEE STD. DETAIL 7.01) 5' MIN. SIDE VIEW STANDARD TEMPORARY SILT FENCE WITH REINFORCED STABILIZED OUTLET 1 " min. of 14CUOT ## 5 or #57 washed stone 51 M In 1511 STD. NO. 7.01 A be -sign settled Overfill b" far top settlenient Plan View -Emerge.rl-y iby- r �a ps 6" beg ow ----------- ------ 5---------- min, Y settled tarp iDf T fill 1f dam r --------------- t43tural 31 r� Llr�d f1 DETAIL FROM NCDENR EROSION AND SEDIMENT i � mall, DETAIL fob CONTROL PLANNING AND DESIGN MANUAL TEMPORARY SEDIMENT TRAP II SEDIMENT TRAP #1 VOLUME CRITERIA: DISTURBED AREA (A): 0.74 AC REQUIRED VOL: (3.600 CF PER DISTURBED AREA AC) PROPOSED VOL: 2,876 CF 1 SEDIMENT TRAP 91 SURFACE AREA CRITERIA: Q10 INFLOW: 1.30 AC REQUIRED SURFACE AREA: 435 SF PER CFS INFLOW) PROPOSED SURFACE AREA: 2,278 CF 1 >too. ■ s evi e Acz�GIONAL AIRPORT 1 AVCON, INC. ENGINEERS & PLANNERS 13801 REESE BLVD, SUITE 160 HUNTERSVILLE, NC28078 OFFICE: (704) 954-9008 www.a —in—om ULICK ENGINEERING LLC STORMWATER HYDR0.ULIC5 I EROSION CONTROL AIRFIELD&CIVIL SITE I CONSTRUCTION SERV-CES NOT RELEASED FOR CONSTRUCTION CAP 0 11.{1151114111111l117j/ Q q� - SEAL 040195 - FNGIN6 "f111HIH1111 DAVID A. SKURKY, P.E. INC SEAL #040195 ATTENTION: THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC., FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE. WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED SCALE: N.T.S. REVISIONS: NO. DATE BY I DESCRIPTION 1 1 01/24/22 1 1 NCDELM & NCDEQ COMMENTS DESIGNED BY: W.M.M. DRAWN BY: W.M.M. CHECKED BY: D.A.S. APPROVED BY: D.A.S. DATE: SEPTEMBER 2021 STATE LICENSE # N.C. P-1430 PROJECT NO. 400102 SHEET NUMBER ES-04 W N N O N N CO J_ Q LU a. U n 06 LU co I CD U) I— LU LU U) LU N_ LU N z U) LU N_ 0 J z Y Q n J Q N O CD O J Q O Q U LU L.L z O Q I CD z ry LU LU z_ (a z LU Y J Q Y U_ J Q MAINTENANCE: INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSION RIDGE. CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED. WHEN THE AREA PROTECTED IS PERMANENTLY STABILIZED, REMOVE THE RIDGE AND THE CHANNEL TO BLEND WITH THE NATURAL GROUND LEVEL AND APPROPRIATELY STABILIZE IT. 2' MIN I€I—III-!I—II,III 00 STEEP CUT OR FILL SLOPE �IIITI€ I 2:1 SLOPE (MAX) �ITi--ICI I�,I - STABILIZE DIVERSION DITCH I� CROSS SECTION WITH TEMPORARY SEEDING AND EROSION CONTROL NETTING UPSLOPE TOE POSITIVE GRADE 1.0% MAX. z y y N SIDE SLOPES 2 : 1 (MAX.) STEEP CUT OR FILL SLOPE PLAN VIEW City of Asheville, NC REVISIONS STD. NO. DATE DIVERSION DITCH Standard Specifications 7.04 and Details Manual - I •- I I • I • • •- I 1 • • 1 •• I • • • I • 9 a. I• • • • I I •. �.., i. �, i i-i. i. i, i.. ., i, ..r - I • • - • ir_•• - ir_ � •• • •:f� ate- •r. •� • . ar, . • • ar ► •.• • ••r, • ♦ •Y :" •Y ♦ :Y •Y�a7�y7 • �7 � 1r7 � y��•Y �7 �Y - r� r�r��r � r�'�=vr r �i r��'r� r'�'r��r r • r- . . I - .. . y., I I f•yI I I y. I I y. I I I Y. . . y. ., -*�-r r• r=`r�Lfi_.i `�-`�i�s .r_ s �i``�i�`i_����G=i=i� • ME ME No No No No No No No loommosommus �, Iuuuuuu..a.un ice! •!• - rr.• aan .`s'r��r• ■.uuuuuu.aula..r1,- - i'�i� ■nnnnnnnnann].... ;fir-u-ri ■.............. NOMINEES] -�Y-'• ,! :• i1�.ri/ nuuuuuuuu.I.urE�.ri�i �Y:� •• uuuuuuuuu.lu..l • 7y�• ::::::::::::::HHHHHHHHHHHUM MENNEN . ..rid I.■■■■■■■■■■■■■■■■■aaa.I.anl.. . � . Y • r � •7 •7: : =..r.• iooaaaaaaa000000a■■nl r moommoommimmoni -� i000.ono.00..ou.lau.l �■iaioo■aiiMIN r=r / u■■oom ME MIN III_ j r r •7�i .•.uaaaaa■■ao■■..aoaunlau.r!�!iY�� mommommommoomm ������ -•�Y...............................I■■■Eam.............................uIlil�r.i� r ...0 •7-. �; • l�j�.` ........................... a a �� - ��®®� -�• �.r; .■u.ou.ounnnuunnnn..nn!r;..1:�. r- ., •,..,r+.� :r.a�r.Y..�., ��L u • • • • • � • • _y�� • -yap, a �•�, a �:� • - • a7:�•,,�Y,�`C�• � �•7,�Y r ..�7, •Y • ,�•.-a7�y7.0 aY- • � IIII � • 1 r � 1 � f • � • r • dard SpecificationsDetails �-�Q I II• Manual Diversion Ditch Calculations Drainage Shear Q10 Velocity ID Area Stress Diversion Lining (cfs) (fps) (ac) (I11I #1 0.19 0.33 1.44 0.70 GRASS #2 0.25 0.44 1.63 0.49 GRASS >roll. ■ s evi e Acz�GIONAL AIRPORT 1 AVCON, INC. ENGINEERS & PLANNERS 13801 REESE BLVD, SUITE 160 HUNTERSVILLE, NC28078 OFFICE: (704) 954-9008 www.a —in—om ULICK ENGINEERING LLC STORM-11 HYDRAULICS I EROSION CONTROL AIRFIELD&CIVIL SITE I CONSTRUCTION SERV-CES NOT RELEASED FOR CONSTRUCTION CAP 0 11.{1151114111111l117j/ Q q� — SEAL 040195 — FNGIN6 ���!lillrlllll1l11 DAVID A. SKURKY, P.E. NC SEAL #040195 ATTENTION: THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC., FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE. WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED SCALE: N.T.S. REVISIONS: DESIGNED BY: W.M.M. DRAWN BY: W.M.M. CHECKED BY: D.A.S. APPROVED BY: D.A.S. DATE: SEPTEMBER 2021 STATE LICENSE # N.C. P-1430 PROJECT NO. 400102 SHEET NUMBER ES-05 N N O N N (D CO J Q Lu a U n 06 Cn LU �I O U) H LU LU Cn LU N_ 0 LU N Z Cn LU N_ 1— O 1 r V ry Y ^Q n J Q N O O O J Q CD O W H U LLJ O IY a Z O U Q CD C� Z IY LU LU Z_ (D Z LU Y _U J Q Y _U J a TEMPORARY SEEDING SCHEDULE Temporary Seeding 13 P Y g Installation Seedbed Apply soil amendments evenly and incorporate to a depth of 4-6 inches, Preparation if possible. Follow recommendations of soil tests or apply 2000 lb/acre ground agriculture limestone and 700-1000 lb/acre 10-10-10 fertilizer. Loosen surface just before broadcasting seed (reference Practice 6.11, Permanent Seeding). Plant Select an appropriate temporary species based on the calendar in Figure Selection 6.10b. Avoid seeding in December or January. If necessary to seed at these times, use rye grain and a securely tacked mulch. Mountains Above 2500' Below 2500' Piedmont Coastal Plain Recommended Plantings Legend I MAINTENANCE: RESEED AND MULCH AREAS WHERE SEEDING EMERGENCE IS POOR, OR WHERE EROSION OCCURS, AS SOON AS POSSIBLE. DO NOT MOW. PROTECT FROM TRAFFIC AS MUCH AS POSSIBLE. 2 1 Korean Lespedeza with .............................. 50 lb/acre Rye Grain .................................................. 120 lb/acre 2 Kobe Lespedeza with .................................. 50 lb/acre Rye Grain .................................................. 120 lb/acre c. • 1 vacre * 1lb/acre Figure 6.10b Calendar for scheduling temporary seedings. 6.10.2 PERMANENT SEEDING SCHEDULE 6.11 Seedbed 0 Apply ground agricultural limestone, unless a soil test indicates pH Preparation 6.0 or greater. If a soil test is not available, use a rate based on soil texture: Coarse textured: 1 - 1 1/2 tons/acre Fine textured: 2 - 3 tons/acre ■ Apply a complete fertilizer at rates recommended by soil tests. In the absence of soil test, use the following as a guide: Grasses: 800-1200 lb/acre of a 10-10-10 analysis fertilizer (or equivalent) Grass -legume mixtures: 800-1200 lb/acre of a 5-10-10 fertilizer (or equivalent) ■ Incorporate lime and fertilizer to a depth of 4-6 inches by disking or chiseling on slopes up to 3: 1. Do not mix lime and fertilizer prior to application. ■ Fill in depressions that can collect water. Where mowing is planned, continue tillage until a uniform, finely pulverized seedbed is achieved. Jan I Feb I Mar I Apr I May I Jun I Jul I Aug I Sep I Oct I Nov I Dec rn Tall fescue (above 2500') c Tall fescue (below 2500') Tall fescue (low maint.) c 0 E Tall fescue (high maint.) a Common Bermudagrass Tall fescue mixture c a Hybrid Bermudagrass W Common Bermudagrass 0 U Centipedegrass = Optimum Possible Figure 6.11 b Calendar for permanent seeding recommendations by region. 6.11.3 Extend • gauge ' 1 • . side r • •anc • Drape baffle♦ I 1 4 bafflesecure with 1 1' of basin1 rverticalit i plastic1 • F • ------------ I j4 if -u-arl la-ua---uua-■-aa-annual -•-- +���!'w��p +^' Jf ■tutu[ luar■uaraualaraaraBaral --- �-.�y ■aaa■+�**rt+ I`�j •Gauge1 uunul unuanunuuuaaranal ur r■•r+^w •.,-'�} Ilona■-aa{ luau■a-■-■a-■r■noonannual tar �+r ■ra tr r+-. f auuuan uwuuuuuuuuuual ru 1�'rr Mom+ 1 rlrrrarrr, urrrrarrrrararrrrrrrrarw -•■ ++�+r• ++ /'G • • - • # ' . • wuu■-, uuromuuaauuaunal ur ■Aar"' r'f anneal uuunnnununuuw -u 1M�. f+� aunun uuuumuanun■-ow -o r 1 Posouppor I�1i=11=11=11=11 la=ii=11=11=11=11-1;•� , • - - - - - - - = - - r• • • •. • • • • • - . , •.cwi 1 Baffle Material " If the temporary sediment basin will be converted to a permanent stormwater basin of greater depth, the baffle height should be based on the pool depth during use as a temporary sediment basin. Note: Install three (3) coir fiber baffles in basins at drainage outlets with a spacing of 1 /4 the basin length. Two (2) coirfiber baffles can be installed in the basins less than 20 ft in length with a spacing of 1/3 the basin length. Baffle Material 11 Gauge Landscaping Staple I I I I I I I Steel Post I I 2'-0" Depth I l Baffle Material should be secured to the bottom and sides of basin using 12" landscape staples Figure 6.65b Coir Fiber Baffle Detail Cross section of a porous baffle in a sediment basin. COIR BAFFLE DETAIL 13 Permanent Seeding Fertilization Satisfactory establishment may require refertilizing the stand in the sec- ond growing season. ■ Do not fertilize cool season grasses in late May through July. ■ Grass that looks yellow may be nitrogen deficient- ■ Do not use nitrogen fertilizer if stand contains more than 20% le- gumes. Table 6.11 a Tolerance, Maintenance, and Propagation Characteristics of Erosion Control Plants Mainte- Region Drainage Planting Tolerance nance � C _ Qp O O CL L O O j ❑Cn LL Grasses Bahiagrass • • • • • • • • • • 14-28 000 • Bermudagrass (common) • • • • • • • • • • 21 • • • • Bermudagrass (hybrid) • • • • • • • • • — • • • Centipedegrass • • • • • • • • • 28 • • • Fescue, tall • • • • • • • • 5-14 • • • • • Fescue, red • • • • • • • • • 7-28 • • • • • German milletz • • • • • • • • • • 4-14 • Kentucky bluegrass • • • • • • • • • 10-28 • • • Redtop • • • • • • • • • 5-10 • • • Rye grain • • • • • • • • • • 4-7 • Sudangrass • • • • • • • • • • 4-10 • Legumes Crown vetch • • • • • • • • 14-21 • • Kobe lespedeza • • • • • • • • • • 5-14 • • ar e SEE NOTE 3 r' a - 8 ,Number of days required for majority of seeds to germinate under favorable conditions. 2 Also "Foxtail millet" 3. SERICEA LESPEDEZA IS CONSIDERED AN INVASIVE SPECIES. CONTRACTOR SHALL CONSIDER ALTERNATIVES SUCH AS SWITCHGRASS (PANICUM VIRGATUM), SPLITBEARD BLUESTEM (ANDROPOGON TERNARIUS), BEGGARLICE (DESMODIUM SPP.), PARTRIDGE PEA (CHAMAECRISTA FASCICULATA). 1 fi.11.6 *CONTRACTOR TO COORDINATE EXACT GRASSING SPECIES WITH LANDART >too" s heville REGIONAL AIRPORT AVCON, INC. ENGINEERS & PLANNERS 13801 REESE BLVD, SUITE 160 HUNTERSVILLE, NC 28078 OFFICE: (704) 954-9008 www.avconinc.com ULICK ENGINEERING LLC STCRMATER I HYDRAJLICS i EROSION CONTROL AIRF.ELD & CIVIL SITE I CONSTRUCTION SERVICES NOT RELEASED FOR CONSTRUCTION CA ti��`,``❑%0 � S �OC`'Y f�fi SEAL 040195 - 4GIN6 !!lI111111114111�T� DAVID A. SKURKY, P.E. NC SEAL #040195 ATTENTION: THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC., FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE. WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED SCALE: N.T.S. REVISIONS: NO. DATE BY DESCRIPTION 1 01/24/22 NCDELM & NCDEQ COMMENTS DESIGNED BY: W.M.M. DRAWN BY: W.M.M. CHECKED BY: D.A.S. APPROVED BY: D.A.S. DATE: SEPTEMBER 2021 STATE LICENSE # N.C. P-1430 PROJECT NO. 400102 SHEET NUMBER ES-06 M, F:\PROJECTS\l 6035\16035-01 \PDATA\AVL-LANDSCAPE.DWG 1 /19/2022 Wo0 m 0 c= D D n p n D Oman DO ZC vxixO '�'T'cm„ TW =nT, Dz'm Sp � • • CZ n WDm n0 v T� CEO fn m v a rt n C.n v (D mo �( O OF O a < m m /A c� 3 \V �7 o � BCD ® N y O c C C O W p N N cn N— Q' cn 0. W V n -n up 1-W -A -AW o n > m DD C 0D n O O O D0 M M m� nz Cz ppZ nn,�z D n m n c c n N n D n > D T D 3 3 D D D n D nD=� Z n c n n p D n 0o cn0 nn0 cnmCO DQ 00 33Q DTmo N� �noc) � D O D > " > D m n> D m = m � n m � m �Zo 0> m V) m 0Dr cn WT =N0 m <D OD�n mN n c 3D 00 �D Nn N� �m D-u Z T Z rn m D c„ m M r W cril � W m <D W mUZI C p >n p p � n m �N m cn cn Nn Jn WWn WWWn O O 00 Q° Q° O Q° Q° Q° O p Z D Z m m= o m m= cn W N N N _n m u'- D D m > n r > > > r r Cn N Cn 7 m 7 7 m Z ? Z Z cn Io cn 2 m m r� z C 9 Ou m X O O N N r � Z C 3 �T J O rn�rn Z 70 r D m z D ((DD Q Z � z O =J CD Z ` ' D r O D m Z Z D z O `m 0 I Z O D m r n m z m �-0 m w O< m v oo m 0 m v 00W n Z m m v m C 1D O W00 o z n 4 j _ N N A 0 L6" W 0 r � p m � Cn r n m D 3 0 3 z m 70 m p D p 0 p C r n W n Z5 :En2Kn rrnZpZn�Um0z Z Orn=OncI3 z D—=W�—p-rnpmrnm,Z7070 O rn D D D m U (=O ZD z0c0�Zm 0Z r-�=00 70 )Z=OZ�70 �70Z70 rn Z 7 <T M mmD 7O 3700 m �mDrn�70 -n ZO7<rrn0Wam>�DOm 0Zmrn OC- ZZZ n7 �0D70 Dnnm0� rn T r n'�' 0 n, � n< p D o ��� =0Z70 <p oor,.,0,-,�,O>- -n--AM 0r-rn00 rnZ/-3-, nD (�=0 ZZ00 OZ O n M -n0-n rn D 70 rn m m= u u �70 z0rn 3D�0u mM70� �CJDD�z u 0o0 Z70g� Cn�0m 0 )rn�� G)0ZOO OZOm>Z D Zrn 70C� rn D D �G)C,-Zp �n71 ZO> nZ- DnDZG)rn =DO�Z Z<7n Ocm�z mmm � �rM z�0Oo �Dm _ -n D C ) u 70z O n m ---I r (D D � cn r Q Q O Q Q_ y X :3 � Q-- rn Q �Dn O O D 00 (D ���W(rn N `� (Q O N CQ cn Cn 00 Cn c/) W ;aCP O vr' W N �` n C 00 D o°oo rn n � 0 (n X m O z N C.) IN m x M O 0 m 3 m Z Cn Cl) 0 0 -nn ;00 ;0 - D cn r cOmdtn oIc<00 rn =?==Do Ommmrc rmmzrm 00-0mO� z�mm=0 ncnpnz Dp`2A=D � zAninz D m N 0 m Azmx y� z to -1 -1 n I m G 22 0mZDy�T z r ��mo<m N� -0 zOx> Am0A0Z 0,�1D<o = D o W=nyom mCO0noom O o Z T< A _ 0EF)>m c0-0<V m>;O z < 0 z n m r z H m C r m m m n m m m 0 m z O 1 m y y 0 m v r m O m D �-I # 30N3�3=38 -L03('02�d •1.O 4 O N /I v 1330S 109 I/ \ 2�3d AyM-=O-IHJ�Zi '��N /1 \\\ ad0� l�pd2�ld r \\ r \\ r \\ D \\ Z \\ III /1 o T l/ Q N o. m r D z O 0 v i D ^^z V, r 0 i Z7 m DDI 0 ii m �0 'u CO m ;u U) cn D m ;MOC)�C<N z N G� = r N c �0m� z Q m �2 0 z s 00 c z 0 O 00 m 0 O c z EN i W� WCID : / .,: • . D 90 D m }" O7 m ;. i�v go W O ;.:. D O7 m n 90m W m rn n. N z 71 m m m 3z z z 0 z - v go m O °O m m 0 N W.m UZI ;pu 90 go o� W 0 C S 05'52'57"W 30.43' �• y X F� S 06*29'16" W IL�I 35.32' 9643-72-3740 BGA ASSOC LTD PRTNRSHP D B 797 P PLAT: SLD 287 Oo (n W N N O o Oo (n W N O Oo OnnDm--- nrnnO7p3nrnD--- c'rnDrn: �0OmrnZrn700y0r>- >0 Oy��D' m z N- n m D T m Z m C TI z _- c rn rn Z O Q rn rn Z rn p D— rn m m D� rn Z c NncO 1-,>nOnDODn3m---I ()c Tin, rn�—cn�N�Zm �rn On �70o n7a =mmm-oOmcZ�„NF oZcc�nZ`_ n O Z= 0 0 D 0„_ Zp �_ -n z D- W W �CCZinv'mmm'DD-uOnD zmnDn�zc �DrG)rnmDrnO�r3ZAD rnG)�rn c D rn r' gym, y Z r< 0 m> cO 0 v, � N rn O D nz-nOQ=Nzm,mm �� >70 r O,Trn- m -u -<D 0mDZWZ-U 70 rnp Zm�m= m>--n-nn<Tn0mm 0OD cOnD�70 pZ m Z Z rn T� rn rn m O rn D Z = Z rn3=mM r-4> >= o�Gi DcNncm„D� r ,-Dr�,3c"Dr-npO mrn W Dpnr n�in—DO<DmDrcn< rnZ rn>m�rn 1-2no4mzDODy= �0 czi,UZZ70D TO�ZrnoNWZm� =m y3O�o r O m n �° D o O m. n rnp p° m D r DmzZyOM70 UZO -U r- cnD�OZp Np�rnrnZ�Z - DD Oc"-L, 30(Djrn�DODDZpOD M-7 Np=W�rK Zn0D rrn��rnn mQ On0„D irn�� cnpDZy� ?T 3pZOF C/) D�ONv1r oy �N=OCJ z. D WZZZ Oc cD- DZ Dm�y� r =�pO Zn �c�„m �O rnn�z3 K 3 z y 7 p m O c C z� � n m z = ZGiZm _'p NNrn mac" nDnr— �cDi1 m<n y r.-imi yo20rv, r, m n. DZ m O-u OD W rnZCrn 7 p Z D � rn m D 7a Zp n I p0 rn C > z 700 pC 0 m n n m m D m Dv, m— g0�0p o� 70 D 0 r- ---I --i z Z 0 •m rn cn Z r Z � O m 70 O O m O D z m n = Z m Dc„ mN Dr nDDz G� DD 30 D3 m- D0m rn W Z Z p D 'n z O< rnp 00 p z p� D _ �(i Z m� rn-n nx3crn/1 � rn I G) -u 0mGiZ Z m rn m p O D D m D rn Drn = Z O n D O m m m � Z R, = Z 0 m Z 3 m= rn�O�Dnrnrnrn� O�- pOrnO�-D rn nDDrnr- n 0OD Do�0rn0crn0711-> rn70 NOOOD 0 om� -1m�Z---I >mZ=O�DrnOzDDo� =rn>-MN=�00 n y N y= O Z -<N c OO m o z -CI oO Z= m m 3 0 m O m Z D n Z T 5nrno-m 0= rnOn---1 cnOmmD �000n-nn��rn '- m m r 0 rn = O O m D= p m� O7 rn O O D O O rn D N D W 3 W = Z 3 0 n m D D= y rn D rn m-n n= O �Wcnocn,mzn -0 >mTrnnm �DnDN mm�v,DOQrnrnrn M D rn D „ p 0 rn m D N N= 70 Z0 D 3 rn n< 3 m N >rn�Cr-m>m Nm„D<-0-z�mcn p DO�p� DC *>m—n„0= 0>ZzmomooFzc, rn rnTm W0 M jzmiO0Q�D �z>--- Z �",WOz cn rn=n-<� C3 )OrnmZ-U m� mv'Drnp�rn� rn7.ncn z D-u Drn oOWO=�'m rn0nDrnrnO0DD�0> C (3=:— K yo Z0 3z�m zpmzy= rnnm cNn ZDzcDn DZ prnm0prn— ZDDZ71)M rnm�0 rn Em W �V)70 W 70 'rnp<�30o cOnci�n-:�mrOO��T D rnD3 �'Z nrnmmzZ�O OmrnZOO��Q nc m O mrnZ mG) ><O >pNy �3 np�cn�T �z p z�� OD 'Z=Z0m Z =Z O�cnOTrnO �� = D=m 3D '- -- DZcn— Z D.' �n�cnQ 0z o� rnzqn r � �0czn70�0 O mac" rn=r=rn� rn0 - DnFrn 7,D o? rn rn T� D W D O rn 0 D D Z ? N` = rn p < z n O 00 .rn rF� c— -u > �� 70 AZ y Cr m�pMcnZ =cc, n = 0 x .- Div' o DD=� cn 10W mm--q 00 mrn rn m 07,n rnm o Z D m 3 rn o 0 3 0 3 m o p M m T oyyy 0 mm ZDNZmcci� Zp M, = Z rrn � mZ3- 70 o� 3� pDW Zy m z a: 7 r_pm0 � �rn CD mcnrn 03: vm, rn mCD =in ° <v,E2Z O Op r-< porn y x rncnZ y C -<DD D =-< =m �00 �rn� � 000� n0 n �mN r= �0 nN0 Win= G) ��M M0 `O cDn D n z r rn 3 O rn D p O D O m W o0OO - oZ Nm >m. p0 'b. D 1 70 Nrn� OZ N n 0 rn n p = rn y p D rn= Dm ' mDrn czn rnn OZ Orn OZ3 O Fmz �rn �O-n D D� �� rnO ON 0 c 00z� Z. > Z r .{7 rn D rn r r cn = O r = cnrn 00 Z O y0 = rn D =7 = Zm rnrn rn 3 n=rn pZ E D C D n rn p cn m rn n rn D v, C cn n Z n� m (� O < 0 70 0 n D rn 70 - n m z rn m rn D 3 0 W m Z rn D o r -< p 0- D = 3 rn D p 0 rn Z n o �D D rnA o n t o 00 o z o, T 000 x m z o m O m z z Wn 1 / gom W r m O go m W> �C Npr<Dto Ctn 0-Mm 77 m�3 wto 3Z70700 r-wDOpD o 3�Dy=3cn�rn�3rn arn,O�NmDQ1O3D0� ZZNyv yQpwm"Dc70r Z r rn M D'm— 3 Z Z in Ocnrnp n -4F=>> � 0==r-ZDD 0v) - p �rn> zr <>3:mE,0> ri{7ri{7r mZCm nn=D�<n� ���T��m z O D Z c p Z0 < n 0 m m Z m 3Zrn=rn=� -OorD rn D g_ m D mp D rn Z N m� m y O rn � Z rn C —> M aOD 70 Dmm�O7o z„ Z 0 0 0 to = p T rn r r N D c= rn *D rnQrnD DmZmnmcmn rnZrnDZ ?cnc�p=C)� Z��rn3<pN 3 o Z3n3 0 O m T nQ m D rn o D rn D Z < _ 0 -0�O-0Z W D 0OmmZ�i ma rn 0 D D o m i w o n c 3rnrnp0�0 D D00 0-U —moo p Zmcn m 3Doo0 rn <Q=c�'„0m D 70 —Mcm cOoz>3n D npG�rn' m O� Z Zp Z rn D Z z Z 0 0�rrnv'�Z oo I mZ Dv'3T3z `nc m zC 070 -G0cnT30D y p� Dn 00=rnrnm� mO -m 070 -<0mx n rnm=n?n 0p cn M =Tn T 0�D mZmm OF z ry=n0 �n --,3 rnrnOmZ m 70 v,D rn �C/) - Z m� Drn Z mzo��� w �D v1Q O mpm0r Z rn p° mZNQrnrn 0m nz O m c c< O � 70 0 p m rn N p O _ C0 ? D r = ' = C N m70 Z Z c"G)D� n -. �� o nO�p rA �D O Dcn=Z r -=j D rO�D Dr Z a 70 p7 O O rn < Z wL m z m D r r D v n m z O m N ma � a c O y m Wz a _I y Z C o m w Z o c > " J C 07 V1 �vrr� (D O.�r� m �. r ® m oN� zZ D ca. a W mom 2 ti. w rmm - c 3 0 ( ` F:\PROJECTS\l 6035\16035-01 \PDATA\AVL-LANDSCAPE.DWG 1 /19/2022 0 P < p zAa0 Sp _ =r N m m a f'F v N m p m CD m�on N O a \V O �Dnr CD •OY CQ r < �0. v v m m z z O z v m z D m m z D z �o — — —7z = 0 n> 0 =-„ � OO > 0 mm D -M Z-n m rn p n o = D O n m� C D Z rn O w rn ry Z70� rn mm- O fll m Dom- rnrnz�_=n = 0�p =Zmr-Oz 0 �D� Drn O Z 70707OD < n Z II m 0 O F= m z= m rn Z m m m Z rn rn 70, �_ �_ m p >Tr�D� >OWmrm n�rnv (� -0 Z�O.Zmirn o w O�Zmrn -0 m r M Z7 = ���Orn:ziO rn m - �rn�Om n D(�rn 3t�T'O � > wm MOD ���m Or-m00 ZZW�z M -zi 111> u->rnw (�=n�0 0< G) =D CO OD rtn zp=zrn >70M m ��'Z m Z-n>-nm C p O M rn �(JDDrZ oZQop m Z70g� z-n--A m 0 )M ��Z� OZOM>_Z �D�G)Z� �D�Zm �71z0� 70n-- W >()DZG)= =DG)�Z �(�2= Z<�(� o Ocm m �r� z 0 0 0 D M _ D O m � m Cm Z� n . m cn 2 m m r� NZ C 9 Ou m X ` M 0 I Z O D m r n m z m �-0mn m w O< m v oo 0 m y W- z oo mp z v W m C 1D W00 z j j N no X m z N v 0-n 0 ;00 ;0 - D cn r comdtn oC,<00 rn =?==Do Ommmrc rmmzrm 00-0mO� m zcfamx0 0 to z DO�A=D <zAninz D mv y0m X m Azmyz z -1to -10 ImG 22 0mZ! ycn z r �Cmo<m 0 v zOA> X0OAOZ O,TD<p = D 0 rA=nyo0 my0noom O O z T< A c0EF)>m c0-0<V m>;O Z -I <OZ z n m N � � () D w w > Zm m �pD 70rn 3 3 C rn =W np p=rn 03 N O m r m> 0C,, < rn rnv� � rn m z0� rn n D = D D n -< m mrn Z r N D D r � D� Z O�rn G) - cn -n 0 Cn Z = D 0 rn m m O I I z 1/ 8' MIN. z tiW m r � O ^ z, D D iA m 0 W m is& 0 F n O D O /� z z ?� s• Z vayaY O n i9✓ N Ar ,i • A As m 3 rn m `Z re - 20 yifST 4 n Z (1) to D _ 0 _ M r .�_ �r D70vZ ' A IJ Z 0 2 D D m N 70- z m 70> 3 i � o ;,, 0 m z v n Z D O,? D D V• Z c Z N Z Z V• 0�i2 v, Z mG��T�00 m m r m rn 70 OOOmo70x� ��D D m m r w m= ^ r m W ■ O �0ny�m70�0Dv>py m1v>0ND= Cv>�D C m=�>rnm=��m--��r� Ornrn CD„nZmO�rnrnm l7bwrnmr ZO--On=m2mOmOn- z=mzOnO> O nK 0p0Oy-0h O myz(- m 70 O �DrnZ O rn 70 OZrnZrnD mmZ OOrn p D Z Z 70 C`n=n WnZ-Z�O m rn rn(Z��rn OO DA0- 0=M=nOm>nZ�n70< Dr�=nN70 D nr-iz0 vMM> MrnMm ZZ�M==DOnm-nDz rn= Z Z D ,0rn -1 70�mm fn r-- D K m TD�=rn D rn mw0 0,2:70 'Oz70KM>- � OOQr -1 00 70 n rn w T Cl) rn 70 0 D D D-, Z OD O D� m z D O O< D O O O 7q m m M T n C r D 0 D= 70 70 M m ��Kw�� =rnx70KD0mZm!Ti Dvvi>�N��70 m70 m tnrrtn�r 70• �rnDrmr0 m Z�_ 0 0 - mw O O Z = Z rn m D Z M, �mm0F) z0ODrv>70ppv>0 'm -n v>Kj� cZz0"D=G)HNrnr-0 0>nD70 0 nn::Emm nDymv)nh0=700 ->mzwE2 n� 0:zi D D- p m Z 71 m-1 y = r Z= D c) m = -rn rn r>-2j: vDiM nm F—== NF)OZD mm -rNG�- 0 Darn 70 rnrn>m = rn�=� 70 70 m Z m=�== 0 n 0 D 0 0- OD Z < 0 m M 00 rn 0 Z 0 p5Z m� Z n O Z- m om m�rm 070 (� =>vv) �^� W-0rn> w��� D D m D D Z 0 vmi 7 n m n z = m Q 70 m nZ() DDZA,rDZ rn0=N� z 0c, umDmi= �T y rn ZOrnZO OrnOp�K W MM- c0 �M0W D OD��� 1 DD0m(-)> Dm �„�Q� ( n70 Es�= -Onzo Z- Z rD DDZ�rn rnZrn0Z < DKr�> �rnEj 0= �(�Zmrn y 70 rn �rnm=`��(�0 C �rnrn AZ�D� rn n�7_v>DN0�Z D, 0�. KD 0mC) m 'r- -Om WOm D= �Z Zw � m C 0 Q z O n- p n w 70 M m NM -0 rn m= =Cf�i�= fD7 W �N-n- =ZOM� mD Z D0 mm zZ 0 -<zZO>nr pD 75 0 nz 0 � rn 0 -- ,m D n m ZO�rn�rn rn,rn�rnWrnO� oy z 70n (� Dm 70m m �(�> fn70 z:zi rn(-) DO ()y tn70 0 70 rnT n0 D=_ 70_0 0 �� 0 0 -4p =r- ZZ 3y z yD 0 m K Z z Z Z � 7 0 w� rn 0 D > n 0 O n m m= m t n m m p m D 2 .� In A NA3 m O m m y 3 a m () ? DO3� �D 3 c a D y n �3DOx rD Z Z y y ycmC10 z3 yz P 03. 0 y 11 2 0r yn D m -0--.. oD.11lr O 00 z�•F fix O0. N z 3m0 3gi 03 mo 30 po C Z;; Q m ZZ. m Z w D m A (X7 m Z A m T m O D T x .^� a A x .=I 002 Oy D Z A D 0 2 D 0 y m w y D D D x Z w C OC)z �p r� D m y O 0 D = m A m a Z m O D Z O w C A D W ~ z " O_ m r N to ;muZ 3 W c A T V! !g y D M > M va D x n 2 N P .� m m M 0' 1 =� 0 Z M DD D Dv'-z702DK�-0P m r.� �oKp-mO20�-<ZO rn � m C m == T= 0 O D D710 -0 D� Z w m N Z Dm2Drnv'mzO rn rnrn= 00 Z> m 0 rn rn rn m D omO=� =O7OOgwrOr D O m Z m a M P D C� w Z -0rfn =m m0 �O m�� 0� D z Z m w m rn NDyrn= om wmOD070 0OZ�p Z N D ? �rn rnrnrn=Z()=�rn W Ozu T m �< r=> 0 w= m� D� D D m wpm--<DO-OzO()T> z mD�=ZO0� _ Z rn�OD mp.. W-3:3: M0>--- ci7<m�Z�rn Z rn Z=� O C m y r m= p m cn D=KZ-�6rz O O m o 70= m m N M� = O � D M O�� O= D= O ZO = Z rn m 7a 70��wQp�r S7Z�(� O O w M M O D 7 O O v> O, m< w, P Z D m rn m r m m K O O rn m D--I --1 v'70rnfnmv>C0 r70 ��=0DCZrnDODOG)m � M= Z Z r Z= Q n D _ r C D OZ Dv>70C rmw4�0�rn� =wm�� -0m rn rn Q m m m> D = TO r C, --I N!nr—. 70w0 -<--I Dm< � 0 n zrnfn - r T O r r p 0 7 D in r wr��� M M � _ r m Z 'mD =CODO> �00 70 0 �DwO NZrn00 M 700 D � n< D m Z m w rn � m m Z0 T rr D D 0 m m 0 D= m O T 0 m0 f2r- m m m Z =�mpT D � 70mv> w070Z Z = m D rn Z D D D v> D N rn� > �Z� Z0 v>� D ODDfO„G) M rn D 70 n r 70 rn O 0 O. m m y m m C m m� _ (= z D m rn = v> m --Av> v> ODti Om O7Dc zm� m "0 w Z C y a O Z a a ^� m = A z m w N A j O w 0 0 < 0 0 y Z 2 m i< < 3 W A y m C D3T mD0 y T CIz 2 y Z N y Z?x 2 y 2 Zm^� m m yD N y OVO A0m_ a to l m I Z 0 r T MIN. oDw zm �vC W G <71 OmM T po r � r O N C O m n O -0 r3 A y rn y y 3 w m m 0 =�<3ozz mA�mtAi, 00 m Z y m D c A Z < D O�mO. W p a W a O < nOgGlmOc a m ti Z m Z CO A< D O A m < D A Z A r= ? z O O m W y m O m O y m _ 0 D 0 m M> 0 0 3. D X00Zm3Z m x p < - y Z P Z p° D� w DZ rmrnr n D Z m Z V• 0 �> �o70D �o�� rn J�0 W N�Ornp-4 n70rn() - _ _ -< 0 70 K_ z z (�rn(�ODD=tGZ �ZMM>00 MOMM rn Om0Zrrm�j m 0-0M H G)v�m 70o 70 >ZO� TD65 DDyO nZnD D D O S- D m= D K 7a K c m D N Z D� O m 70 D O 0 Q�� D rn w Z O n•• z m0�c� nHo�0�� n�z 0�D cZ�O yzy�ZDD DZ z r rpv,Z Drr m��7 v 700 Z�D� G)>-mr- )y mNr O rn D rn (� D rnyfmn ��n� 0p-7Om Omm • 0 -nn �m� Drm 0Z070 0DO c� D p n ZO M� > 70 m Z n T 0 N > p m 0 () r .-S7 v'ZOw rn n� Zzn�cm C�� m F7arn ()z�w f"NOZv C 70= y p 470 O>rnv) ��(�NO z�w P17 0:zi�D �m00 ZZC �� =rm O D 0 D 0> �' O C) D Z N n m ZZF rTC W 'm c) rnrn nO� i^^i Zrrn �_--I DSO ZZ ��0 l J 0> mm- �OZ D� OD3 70 Z 70 � 0 D m� Z D z n m �� z O (=n00 O7000D �Kn 0m n70m A-0� 0-may =Z0 -nZ =DD O rn m w m D m z m z rn Z-n 56 m> �rnzm 0� D() m�� Z N n n N N C � Z n rn N w m =0„0 �7 �Z „m� N m n �� O Z D n rn C C) rn�Z N><-< 0rn �n �wD 70 C w >� 0 n � N = 0 D c m p m> O rn Z m n � rzm C) w�0 0 N rn m rn � y �WO� 0z D�T m � ��r 70. mNrm vmi m m G) 0 000 OO> m 70 < f„D Z 0 p::Ev> o w- wr to r m0 �w 00 m 70 T ma � a c C1 y m Wz Cl) 24 o m w > �vrr� (D (J " 0 "C ti . r m D ca. Tm - c 3 0 ( ` APPENDIX D OPERATION AND MAINTENANCE MANUAL NCDEQ Stormwater Desiqn Manual Nc- Environmental Quality A-7. SCM Operation & Maintenance • Access & Maintenance Easements • Inspection & Maintenance Agreements • Inspection & Maintenance Record Keeping • Maintenance Responsibilities • Providing for Maintenance Expenses • Emergency Maintenance • Debris & Litter Removal • Sediment Removal & Disposal • Stability & Erosion Control • Maintenance of Mechanical Components • Vegetation Maintenance • Maintenance of the Aquatic Environment • Insect Control • Maintenance of Other Project Features SCMs are crucial in protecting water quality from the impacts of development. However, no matter how well they are designed and constructed, SCMs will not function correctly nor remain attractive unless they are properly operated and maintained. Maintenance problems with SCMs are also less costly to correct when they are caught early. Regular inspection and maintenance is an ongoing regulatory responsibility for most required SCMs— These responsibilities typically include regular inspections throughout the year, maintaining inspection records, and often annual inspections and reporting. A qualified professional should conduct SCM inspections. NC State University offers a SCM Inspection and Maintenance Certification Program: http://www.bae.ncsu.edu/topic/bmp-im/ There are also many companies in NC that specialize specifically in SCM inspection and maintenance. This chapter will discuss the logistical issues associated with SCM operation and maintenance as well as provide an overview of some of the typical tasks associated with maintaining most SCMs. Each of the individual SCM chapters in this manual also include a table explaining specific inspection and maintenance activities required for a particular SCM to ensure its proper functioning. A-7. SCM Operation & Maintenance 1 Revised: 2-11-2018 Environmental NCDEQ Stormwater Design Manual 1C. Quality Access and Maintenance Easements SCMs on private property should have access and maintenance easements to provide the legal authority for inspections and maintenance activities. The location and configuration of easements should be established during the design phase and be clearly shown on the design drawings. The entire footprint of the SCM system should be included in the access and maintenance easement, plus an additional ten or more feet around the SCM to provide enough room for the equipment and activities necessary to complete maintenance tasks. This SCM system includes components such as the side slopes, forebay, riser structure, SCM device, and basin outlet, dam embankment, outlet, and emergency spillway. Access and maintenance easements should be designed and constructed considering the maintenance tasks that may be needed. If heavy equipment will be necessary to perform maintenance tasks (such as for devices with a forebay that will require sediment clean -out), typically a roadway with a minimum width of ten feet to the SCM needs to be available. Easements are usually held by the person responsible for the SCM facility, whether an individual, a corporation, or a government. Easements for SCMs that are not publicly maintained require provisions that allow the permitting entity access for inspection and maintenance. Inspection & Maintenance Agreements SCM facilities are typically built, owned and maintained by non -governmental entities. To insure proper long-term maintenance, an Inspection and Maintenance Agreement should be part of the design plans for any SCM. For regulatory purposes, authorities may require that these agreements be signed and notarized. An Inspection and Maintenance Agreement will typically include the following: • The frequency of inspections that are needed (based on the type of SCM proposed). • The components of the SCM that need to be inspected. • The types of problems that may be observed with each SCM component. • The appropriate remedy for any problems that may occur. Sample Inspection and Maintenance Agreement provisions are included at the end of each SCM chapter. The most effective Inspection and Maintenance Agreements are site- specific for the SCM components that are used on the site as well as any conditions that are unique to the site (for example, the presence of steep slopes that should be inspected for soil stability). A-7. SCM Operation & Maintenance 2 Revised: 2-11-2018 Environmental NCDEQ Stormwater Design Manual KC Quality Table 1: Required Inspection Frequency for SCMs Monthly and within 24 hours after every water quality storm (greater than 1.5 inches in Coastal Counties and greater than 1.0 inch elsewhere) Quarterly and within 24 hours after every water quality storm (greater than 1.5 inches in Coastal Counties and greater than 1.0 inch elsewhere) Stormwater Wetlands Wet Detention Basins Bioretention Cells Level Spreaders Infiltration Devices Sand Filters Extended Dry Detention Basins Permeable Pavement Rooftop Runoff Management Filter Strips * Grassed Swales Restored Riparian Buffers *Although these devices require quarterly inspection, mowing will usually be done at more frequent intervals during the growing season. To summarize Table 1, devices that include vegetation in a highly engineered system require inspection monthly and after large storm events to catch any problems with flow conveyance or vegetative health before they become serious. All other SCMs should be inspected at least quarterly and after large storm events. When required, signed and notarized Inspection and Maintenance Agreements should be recorded with the appropriate Register of Deeds. The responsible party should keep a copy of the Inspection and Maintenance Agreement along with a current set of SCM plans at a known set location. It is also crucial that these documents be passed on when responsibility for maintenance is transferred to a different party. Inspection & Maintenance Record Keeping All inspection and maintenance activities should be recorded. One easy way to do this is to create an Inspection and Maintenance checklist based on the Inspection and Maintenance Agreement. The checklist, at a minimum, should include the following: • Date of inspection. • Condition of each of the SCM elements. • Any maintenance work that was performed (as well as who performed the work). • Any issues noted for future maintenance (sediment accumulating, vegetation needing pruning or replacement, etc.). A-7. SCM Operation & Maintenance 3 Revised: 2-11-2018 Environmental NCDEQ Stormwater Design Manual KC Quality Each SCM should have its own maintenance record. Records should be kept in a log in a known set location. Any deficient SCM elements noted in the inspection should be corrected, repaired or replaced in a timely manner. Some deficiencies can affect the integrity of structures, safety of the public, and the function of the SCM. Major repairs or maintenance work should include the same level of inspection and documentation as original installations. Inspection checklists and record logs should be kept in a known set location. Maintenance Responsibilities As stated in the section above, maintenance is usually the responsibility of the owner, which in most cases is a private individual, corporation, or home owner's association. Simple maintenance items such as minor landscaping tasks, litter removal, and mowing can be done by the owner, or can be incorporated in conventional grounds maintenance contracts for the overall property. Although a non-professional can undertake many maintenance tasks effectively, a professional should be consulted periodically to ensure that all needs of the SCM facility are met. Some elements that would benefit from professional judgment include structures, outlets, embankments, and dams by a professional engineer, as well as plant system health by an appropriate plant professional. Some developing problems may not be obvious to the untrained eye. In addition, it is advisable to have professionals do the more difficult or specialized work. Filling eroded areas and soil -disturbing activities, such as re -sodding or replanting vegetation, are tasks that are best assigned to a professional landscaping firm. If the work is not done properly the first time, not only will the effort have been wasted, but also the facility may have been damaged by excessive erosion. Grading and sediment removal are best left to professional contractors. Appropriate professionals (e.g. SCM maintenance specialists, professional engineers, aquatic plant specialists, etc.) should be hired for specialized tasks such as inspections of vegetation and structures. Providing for Maintenance Expenses The expenses associated with maintaining a SCM are highly dependent on the SCM type and design. However, the most important factor that determines the cost of SCM maintenance is the condition of the drainage area upstream of the SCM. If a drainage area conveys a high load of sediment and other pollutants to a SCM, the cost of maintaining the SCM will increase dramatically. Preventing pollution in the drainage area as much as possible will reduce the cost of SCM maintenance. A funding mechanism should be created and maintained at a level that provides adequate funding to pay for the maintenance expenses over the lifetime of the SCM. One option is to A-7. SCM Operation & Maintenance 4 Revised: 2-11-2018 Environmenm! NCDEQ Stormwater Design Manual Quality establish an escrow account, which can be spent solely for sediment removal, structural, biological or vegetative replacement, major repair, or reconstruction of the SCMs. In the case of a residential subdivision, the escrow account could be funded by a combination of an initial payment by the developer and regular contributions by the homeowners' association. For an example of how to legally structure such an account, please see the Phase 11 model stormwater ordinance at the Stormwater Program web site. Routine maintenance costs may be relatively easy to estimate, and include the expenses associated with the following activities: • Conducting SCM inspections at the intervals shown in Table 1. • Maintaining site safety, including any perimeter fences and other access inhibitors (trash racks or pipe grates). • Removing trash. • Removing sediment that has accumulated in any components of the SCM. • For infiltration -type systems, maintaining the filtering media and cleaning or replacing it when necessary. • Restoring soils to assure performance. • Mowing turf grasses or maintaining other types of ground covers • Controlling weeds and other invasive plants • Pruning woody vegetation. • Thinning desired vegetation • Replacing dead vegetation. • Stabilizing any eroding side slopes. • Repairing damaged or eroded outlet devices and conveyance systems. • Repairing embankments, dams, and channels due to erosion or rodents. Emergency maintenance costs are more difficult to estimate. They depend on the frequency of occurrence and the nature of the problem, which could vary from storm erosion repairs to complete failure of a structure. Emergency Maintenance Maintenance after floods and other emergencies requires immediate mobilization. It can include replanting and repairs to structures. Living systems are likely to need at least minor repairs after emergencies. Following an emergency such as a flood, standing water may pose health risks because of mosquitoes. Mosquito control should be considered if this becomes a problem. For all installations, obstructions and debris deposited during storm events should be removed immediately. Exceptions include debris that provides habitat and does not damage vegetation or divert currents to, from, or in the SCM. In fact, because of the high quality habitat that can be found in woody debris, careful re -positioning rather than complete removal may be desirable. There may be instances where debris is even added. Such locations should be noted so that this debris is not accidentally removed. Educating adjacent property owners about the habitat benefits of debris and vegetation can decrease requests for removal. A-7. SCM Operation & Maintenance 5 Revised: 2-11-2018 Environmenm! NCDEQ Stormwater Design Manual Quality Debris & Litter Removal Regularly removing debris and litter is well worth the effort and can be expected to help in the following ways: • Reduce the chance of clogging in outlet structures, trash racks, and other facility components. • Prevent damage to vegetated areas. • Reduce mosquito breeding habitats. • Maintain facility appearance. • Reduce conditions for excessive surface algae. • Reduce the likelihood of stagnant pool formation. Special attention should be given to removing floating debris, which can clog outlet devices and risers. Sediment Removal & Disposal Sediment gradually accumulates in many SCMs. For most SCMs, accumulated sediment must eventually be removed. However, removal intervals vary so dramatically among facilities that no "rules of thumb" are applicable. The specific setting of a SCM is important in determining how often sediment must be removed. Important factors that determine rates of sedimentation include the current and future land uses upstream and the presence of other sediment -trapping SCMs upstream. Before installing a SCM, designers should estimate the lifetime sediment accumulation that the SCM will have to handle. Several time periods may be considered, representing expected changes in land use in the watershed. To estimate sediment accumulation, first, an estimate of the long term sediment load from upstream is needed, then an estimate of SCM sediment removal efficiency (see Sections 3.0 and 4.0). The analysis of watershed sediment loss and SCM efficiency can be expedited by using a sediment delivery computer model. The frequency of sediment removal is then based on the sediment accumulation rate described above versus the amount of sediment storage volume that is inherently provided in the SCM without affecting treatment efficiency or stormwater storage volume. Again, the frequency of sediment removal is SCM and site specific, and could be as frequent as every couple years, or longer than 15-25 years. The volume of sediment needing to be removed and disposed of per dredging cycle is the volume calculated above multiplied by any density or dewatering factors, as appropriate. Wet sediment is more difficult and expensive to remove than dry sediment. Ideally, the entire facility can be drained and allowed to dry sufficiently so that heavy equipment can operate on the bottom. Provisions for draining permanent pools should be incorporated in the design of water impoundments where feasible. Also, low flow channels and outlets should be included in all SCMs to bypass stormwater flow during maintenance. However, in many impoundments, periodic rainfall keeps the sediment soft, preventing access by heavy equipment. In these A-7. SCM Operation & Maintenance 6 Revised: 2-11-2018 NCDEQ Stormwater Desiqn Manual Environmenm! Quality cases, sediment may have to be removed from the shoreline by using backhoes, grade-alls, or similar equipment. Proper disposal of the sediment removed from a SCM must be considered. It is least expensive if an onsite area or a nearby site has been set aside for the sediment. This area should be located outside of the floodplain to prevent migration of the sediment if flooding occurs prior to stabilization. If such a disposal area is not set aside, transportation and landfill tipping fees can greatly increase the cost of maintaining the SCM, especially where disposal of wet sediment is not allowed in the local landfill., Often, the material must be dewatered before disposal, which again adds more cost and requires land area where wet material can be temporarily placed to d ry. Sediment removal is usually the largest single cost of maintaining a SCM facility so the necessary funds should be allocated in advance. Since sediment removal costs are so site specific and dependent on disposal plans, it is difficult to provide good estimates. Actual estimates should be obtained during the design phase of the SCM from sediment removal contractors based on the planned situation. The estimates should include: mobilization expenses, sediment removal expenses, material transport expenses (if applicable), and disposal expenses (if applicable). Stability & Erosion Control The best way to promote soil stability and erosion control is to maintain a healthy ground cover in and around SCMs. Areas of bare soil quickly erode, potentially clogging the facility with sediment and threatening its integrity. Therefore, bare areas must be re- stabilized as quickly as possible. Newly seeded areas should be protected with mulch and/or an erosion mat that is securely staked. For SCM's that rely on filtration, such as bioretention facilities, it is critical that adjacent soils do not contaminate the selected media during or after construction. If the site is not permanently stabilized with vegetation when the filter media is installed, the best design practice is to specify sod or other robust erosion control practices for all slopes in and immediately around the SCM. Erosion more often occurs in or around the inlet and outlet of SCM facilities and should be repaired as soon as possible. The roots of woody growth such as young trees and bushes in embankments are destabilizing and may result in premature failure if unchecked. Consistent mowing of the embankment controls stray seedlings that take root. Woody growth, such as trees and bushes, further away from the embankment should not pose a threat to the stability of the embankment and can provide important runoff filtering benefits. Trees and bushes may be planted outside maintenance and access areas. Animal burrows also diminish the structural integrity of an embankment. Muskrats, in particular, burrow tunnels up to 6 inches in diameter. Efforts should be made to control animal burrowing. Burrows should be filled as soon as possible. A-7. SCM Operation & Maintenance 7 Revised: 2-11-2018 Environmental NCDEQ Stormwater Design Manual K C Quality Maintenance of Mechanical Components SCMs may incorporate mechanical components that need periodic attention. For example, valves, sluice gates, fence gates, locks, and access hatches should be functional at all times. The routine inspection, exercising, and preventive maintenance on such mechanical components should be included on a routine inspection and maintenance checklist. Vegetation Maintenance Vegetation maintenance is an important component of any maintenance program. The grasses and plants in all SCMs, but particularly in vegetative SCMs such as filter strips, grass swales, restored riparian buffers, bioretention facilities, and stormwater wetlands, require regular attention. The development of distressed vegetation, bare spots, and rills indicates that a SCM is not functioning properly. Problems can have many sources, such as: • Excessive sediment accumulation, which clogs the soil pores and produces anaerobic conditions. • Nutrient deficiencies or imbalances, including pH and potassium. • Water-logged conditions caused by reduced soil drainage or high seasonal water table. • Competition from invasive weeds. • Animal grazing The soil in vegetated areas should be tested every other year and adjustments made to sustain vigorous plant growth with deep, well -developed root systems. Aeration of soils is recommended for filter strips and grassed swales where sediment accumulation rates are high. Ideally, vegetative covers should be mown infrequently, allowing them to develop thick stands of tall grass and other plant vegetation. Also, trampling from pedestrian traffic should be prevented. Areas immediately up and downstream of some SCM plant installations are more likely to experience increased erosion. Properly designed, located, and transitioned installations experience may reduce accelerated erosion. All erosion should be repaired immediately to prevent spreading. Table 2 below describes some typical vegetation maintenance. It is important to note that specific requirements related to some management practices, such as those performed within buffers, must be followed. In addition, any vegetation that poses threats to human safety, buildings, fences, and other important structures should be addressed. Finally, vegetation maintenance activities typically change as the project ages. A-7. SCM Operation & Maintenance 8 Revised: 2-11-2018 Environmental NCDEQ Stormwater Design Manual KC Quality Table 2: Vegetation Maintenance for SCMs Replacement All dead plants should be removed and disposed of. Before vegetation that of Dead has failed on a large scale is replaced, the cause of such failure should be Plants investigated. If the cause can be determined, it should be eliminated before any reinstallation. The objective of fertilizing at a SCM is to secure optimum vegetative growth rather than yield (often the objective with other activities such as farming). Fertilization Infertile soils should be amended before installation and then fertilized periodically thereafter. Fertilizer can be composed of minerals, organic matter (manure), compost, green crops, or other materials. Watering of the vegetation can often be required during the germination and establishment of the vegetation, as well as occasionally to preserve the Irrigation/ vegetation through drought conditions. This can typically be accomplished Watering by pumping water retained in the SCM or from the stream, installing a permanent irrigation system or frost -proof hose bib, or using portable water trucks. Mulching should be used to maintain soil temperature and moisture, as Mulching well as site aesthetics. A half -inch layer is typically adequate. Ideally, mulch should be removed before winter to prevent an infestation of rodents. Weeding is often necessary in the first growing season, particularly if herbaceous grasses are out -competing the young woody vegetation growth. The need for weeding may be largely eliminated by minimizing the amount Weeding of seed used for temporary erosion control. Weeding may also be required if, over time, invasive or undesirable species are entering the site and out - competing plants that are specifically involved in the treatment of the stormwater. Cultivating/ Hoeing is often required to loosen overly compacted soil and eliminate Hoeing weeds that compete with the desirable vegetation. Pruning Pruning is used to trim to shape and remove dead wood. It can force single - shoot shrubs and trees to assume a bushier configuration. A-7. SCM Operation & Maintenance 9 Revised: 2-11-2018 NCDEQ Stormwater Desiqn Manual Environmental Quality Thinning dense vegetation may be necessary to thrive, to maintain open areas of water as well as aesthetics, increase the vigor of individual specimens, to reduce Thinning flow obstructions, and to increase the ability of maintenance staff to access the entire SCM. Tall maturing trees, for the most part, have no place in a SCM (except for buffers) and should be removed as soon as possible. Saplings of tall trees planted in or near the SCM may require staking. Care Staking should be taken not to damage the tree's roots with stakes. Stakes should be kept in place for 6 to 18 months, and the condition of stakes and ties should be checked periodically. Wound The wounds on any trees found broken off or damaged should be dressed Dressing following recommendations from a trained arborist. Disease Based on monitoring observations, either insecticides or (preferably) organic means Control of pest and fungal control should be used. Fencing and signage should be installed to warn pedestrians and to prevent damage due to trampling. These measures are often most necessary during early Protection phases of installation but may be required at any time. Measures for controlling from Animal human foot traffic include signs, fencing, floating log barriers, impenetrable bushes, & Human ditches, paths, and piled brush. Wildlife damage is caused by the animals browsing, Foot Traffic grazing, and rubbing the plants. The use of chemical wildlife repellents should be avoided. Fences and meshes can be used to deter entry to the SCM. Tree tubes can be used to prevent damage to individual specimens. Mowing of perennial herbaceous grasses and wildflowers, especially once seed heads have set, promotes redistribution of seed for this self-sustaining system. Mowing Mowing should be carefully controlled, however, especially when performed for aesthetics. As adjacent property owners and customers in general learn more about SCMs, their vision of what is aesthetically pleasing can change. Grasses, in healthy herbaceous stands, should never be mown more than once per year. Maintenance of the Aquatic Environment An important yet often overlooked aspect of SCMs that maintain a permanent pool is the need to regularly monitor and manage conditions to promote a healthy aquatic environment. An indicator of excess nutrients (a common problem) is excessive algae growth in the permanent pool of water. Often, these problems can be addressed by encouraging the growth of more desirable aquatic and semi -aquatic vegetation in and around the permanent pool. The plants selected should be tolerant of varying water levels and have a high capacity to incorporate the specific nutrients associated with the problem. Unchecked algae growth may result in aesthetic and odor problems and algae -laden water can be washed downstream during rain contributing to nuisance odors and stresses in downstream aquatic habitat. A-7. SCM Operation & Maintenance 10 Revised: 2-11-2018 NCDEQ Stormwater Desiqn Manual Environmental Quality Insect Control Under the right conditions, ponded water can become a breeding ground for mosquitoes. Many mosquito problems can be minimized through proper design and maintenance. The best control technique for SCMs that maintain a permanent pool of water is to ensure that the design discourages mosquito breeding habitat and encourages mosquito predators. Research at NC State University has shown that Mosquitofish (Gambusia holbrooki) can be effective in the control of mosquito populations in SCMs. This may include establishing combinations of deep and shallow areas that encourage Mosquitofish as well as avoiding overhanging trees and other vegetation that creates shade conducive to mosquito breeding and discourages dragonflies, birds, bats, and other desirable predators. In larger basins, fish, which feed on mosquito larvae, can be stocked. Additionally, splash aerators can be employed to prevent stagnant water, however, this requires electricity at the site, increases maintenance costs and must be properly designed so as to not decrease the settling efficiency of the SCM. Where feasible, SCMs may incorporate a source of steady dry weather flow to reduce stagnant water. Maintenance of Other Project Features All other devices and features associated with the SCM should be monitored and maintained appropriately. These additional items could affect the safety or aesthetics of the facility, which can be as important if not more important than the operational efficiency of the facility. Such items could include: • Fences • Access roads • Trails • Lighting • Signage (e.g. no trespassing, emergency notification contact information, etc.) • Nest boxes • Platforms • Watering system A-7. SCM Operation & Maintenance 11 Revised: 2-11-2018 NCDEQ Stormwater BMP Manual Environmental Quality Maintenance Important maintenance procedures: - The drainage area will be managed to reduce the sediment load to the dry extended detention basin. - Immediately after the dry extended detention basin is established, the vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). - No portion of the dry extended detention pond will be fertilized after the first initial fertilization that is required to establish the vegetation. - I will maintain the vegetation in and around the basin at a height of approximately six inches. - Once a year, a dam safety expert will inspect the embankment. After the dry extended detention basin is established, it will be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. Table 1: Sample Operation and Maintenance Provisions for Dry Ponds The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the dry pond The inlet device: pipe or swale Areas of bare soil and/or erosive gullies have formed The pipe is clogged The pipe is cracked or otherwise damaged. Erosion is occurring in the swale. Regrade the soil if necessary to remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Unclog the pipe. Dispose of the sediment off -site. Replace the pipe. Regrade the swale if necessary to smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. C-12. Dry Pond 6 Revised: 1-3-2017 NCDEQ Stormwater BMP Manual Environmental Quality The forebay The main treatment area The embankment Sediment has accumulated to a depth greater than the original design depth for sediment storage. Erosion has occurred Weeds are present. Sediment has accumulated to a depth greater than the original design sediment storage depth. Water is standing more than 5 days after a storm event. Weeds and noxious plants are growing in the main treatment area. Shrubs have started to grow on the embankment. Evidence of muskrat or beaver activity is present. A tree has started to grow on the embankment. An annual inspection by an appropriate professional shows Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Check outlet structure for clogging. If it is a design issue, consult an appropriate professional. Remove the plants by hand or by wiping them with pesticide (do not spray). Remove shrubs immediately. Use traps to remove muskrats and consult a professional to remove beavers. Consult a dam safety specialist to remove the tree. Make all needed repairs. C-12. Dry Pond 7 Revised: 1-3-2017 NCDEQ Stormwater BMP Manual Environmental Quality The outlet device / The receiving water that the embankment needs repair. Clogging has occurred The outlet device is damaged Erosion or other signs of damage have occurred at the outlet impacting the receiving stream or wetlands. Clean out the outlet device. Dispose of the sediment off - site. Repair or replace the outlet device. Contact the local NCDEQ Regional Office for assistance. Revised: 1-3-2017 APPENDIX E SUPPLEMENTAL EZ STORM SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION PM 1 Project Name Asheville Regional Airport Parking Lot D 2 Project Area (ac) 0.65 3 Coastal Wetland Area (ac) 0 4 Surface Water Area (ac) 0 5 Is this project High or Low Density? High 6 Does this project use an off -site SCM? No COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks provided (feet) N/A 8 Will the vegetated setback remain vegetated? N/A 9 Is BUA other that as listed in .1003(4)(c-d) out of the setback? N/A 10 Is streambank stabilization proposed on this project? N/A NUMBER AND TYPE OF SCMs: 11 Infiltration System 0 12 Bioretention Cell 0 13 Wet Pond 0 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 1 Sand Filter 0 17 Rainwater Harvesting (RWH) 0 18 Green Roof 0 19 Level Spreader -Filter Strip (LS-FS) 0 20 Disconnected Impervious Surface (DIS) 0 21 Treatment Swale 0 22 Dry Pond 1 23 Storm Filter 0 24 Silva Cell 0 25 Bayfilter 0 26 1 Filterra 0 FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Dave Skurky, Chief Stormwater Engineer 28 Organization: Aulick Engineering, LLC. 29 Street address: 600 Park Offices Drive, Suite 300 30 City, State, Zip: Durham, NC, 27709 31 Phone number(s): 919-819-4242 32 Email: I dskurky@aulickengineering.com Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. Signature of Designer Date DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so, number of drainage areas/SCMs 1 3 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 4 T e of SCM Dry Pond 5 Total BUA in project (sq ft) 18774 sf 6permitting) New BUA on subdivided lots (subject to s ft sf 7 New BUA outside of subdivided lots (subject to permitting) (sf) 18774 sf 8 Off site - total area (sq ft sf 9 Offsite BUA (sq ft) sf 10 Breakdown of new BUA outside subdivided lots: Parking (sq ft) 18774 sf Sidewalk (sq ft sf Roof (sq ft) sf Roadway s ft sf Future (sq ft) sf Other, please specify in the comment box below (sq ft sf 11 New infiltrating permeable pavement on subdivided lots (sq ft) sf 12 New infiltrating permeable pavement outside of Isubdivided lots (sq ft sf 13 Exisitng BUA that will remain (not subject to permitting) (sq ft) sf 14 Existing BUA that is already permitted (sq ft sf 15 Existing BUA that will be removed (sq ft) sf 16 Percent BUA 67% 17 Design storm (inches) 3 in 18 IDesign volume of SCM cu ft 3454 cf 19 1 Calculation method for design volume Hydrographs INFORMATION Please use this space to provide any additional information about the 20 pond was designed to drawn down in 40 hours rather than 48 hours ause this is an airport project and permanent pooling must be avoided. DRAINAGE AREA INFORMATION Entire Site 1 4 Type of SCM Dry Pond 5 Total BUA from project (sq ft 18774 sf 6 1995 rules SL 2006-246 2008 rules 2017 rules New BUA on subdivided lots (subject to permitting) (sq ft) 1995 rules SL 2006-246 7 sf 2008 rules 2017 rules 8 New BUA outside of subdivided lots (subject to Dermittina (sf)18774 sf 1995 rules SL 2006-246 2008 rules 2017 rules 9 Offsite - total area (sq ft sf 1995 rules SL 2006-246 2008 rules 2017 rules 10 Offsite BUA (sq ft) sf 1995 rules SL 2006-246 2008 rules 2017 rules 11 Design storm inches 1 in 1995 rules SL 2006-246 2008 rules 2017 rules 12 Breakdown of new BUA: Parking (sq ft 18774 sf Sidewalk (sq ft) Roof (sq ft Roadway (sq ft) Future (sq ft Other, please specify in the comment box below (sq ft) 13 New infiltrating permeable pavement on subdivided lots (sq ft sf 14 New infiltrating permeable pavement outside of Isubdivided lots (sq ft) sf 15permitting) Exisitng BUA that will remain (not subject to s ft sf 16 Existing BUA that is already permitted (sq ft) sf 17 Existing BUA that will be removed (sq ft sf 18 Percent BUA 67% 19 Design volume of SCM cu ft 3454 cf 20 1 Calculation method for design volume Simple Method ADDITIONAL INFORMATION 21 Please use this space to provide any additional information about the drainage area(s): DRY POND 1 1Drainage area number 1 2 IDesign volume of SCM (cu ft) c GENERAL MDC FROM 02H .1050 3 Is the SCM sized to treat the SW from all surfaces at build -out? Yes 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM (H:V)? 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No 7 Are the inlets, outlets, and receiving stream protected from erosion (10-year storm)? Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes g What is the method for dewatering the SCM for maintenance? Drawdown Orifice 10 If applicable, will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC (8)? Yes 12 Does the drainage easement comply with General MDC (9)? Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC (10)? No 14 Is there an O&M Agreement that complies with General MDC (11)? Yes 15 Is there an O&M Plan that complies with General MDC (12)? Yes 16 Does the SCM follow the device specific MDC? Yes 17 Was the SCIVI designedy an NC licensed professional? Yes DRY POND MDC FROM 02H .1062 18 SHWT elevation (fmsl) unknown 19 Elevation of the bottom of the dry pond (fmsl) 2154 20 Distance from bottom to SHWT (feet) >3ft 21 Elevation of the temporary pool during the design storm (feet) 2155 ft 22 Ponding depth of the design storm (feet) 1 ft 23 Will the dry pond be uniformly graded to flow toward the outlet? Yes 24 Is a low flow channel being provided? No 25 Are the inlet(s) and outlet located in a manner that avoids short-circuiting? Yes 26 Will berms or baffles be provided to increase the flow path? No 27 What method of pretreatment will be provided? Gravel and grass strip 28 Diameter of drawdown orifice (in) .8 in 29 Drawdown time for the temporary pool (hours) 40 30 Does the pond minimize impacts to the receiving channel from the 1-yr, 24-hr storm? Yes 31 Is there a small permantent pool near the orifice to prevent clogging? No 32 Will the outlet be designed to prevent clogging? No 33 Are the dam and embankment planted in non- clumping turf grass? Yes 34 Species of turf that will be used on the dam and embankment Fescue 35 �Will trees and shrubs e prevented from growing on the dam and embankment? Yes ADDITIONAL INFORMATION 36 Please use this space to provide any additional 1 information about the infiltration system(s): Dry Pond 4 8:42 AM 1/27/2022 Dry Pond 5 8:42 AM 1/27/2022 APPENDIX F 11_\ *:/:I I:1 k \ Lu c II Ip Iv SSMH RIM: 2,152.80 IMPERVIOUS SURFACE AREA CALCULATIONS ON -SITE PARKING (SF): 18,774 EXISTING BUA (SF): 0 TOTAL IMPERVIOUS AREA (SF): 18,774 TOTAL IMPERVIOUS AREA (AC): 0.43 TOTAL PROJECT AREA (AC): 0.65 PROJECT PERCENT OF IMPERVIOUS AREA: (TOTAL IMPERVIOUS AREA / TOTAL PROJECT AREA) X 100 0.43 AC / 0.65 AC X 100 = AR ASPHALT PAVEMENT HENDERSON COUNTY ASPHALT PAVEMENT S88° 07' 11.45"E Ou,, 2.5.lMBE rnl INITV PROPOSED ON -SITE PARKING: 18,744 SF 77 J Nch 120.678 g N88° 41' 18.74"W AIRPORT PARK ROAD PROPERTY/PROJECT AREA: 0.65AC 20' SANITARY SEWER EASEMENT A LN 4°4T37" W 3 BGA ASSO D.B. �. 87 1287 BUILT -UPON -AREA MAP 40' 0' 40' 80' ULICK ENGINEERING LLC FOR STORMWATER I HYDRAULICS I EROSION CONTROL ASHEVILLE REGIONAL AIRPORT 1" = 40' AIRFIELD & CIVIL SITE I CONSTRUCTION SERVICES PA R K I NI (-, I C)T n APPENDIX G WATERS OF THE U.S. DELINEATION REPORT October 31, 2019 AVCON, Inc. 13801 Reese Blvd., Suite 160 Huntersville, North Carolina 28078 Attention: Mr. James Moose, P.E. Reference: Waters of the U.S. Delineation Asheville Regional Airport — Proposed Parking Areas Fletcher, Buncombe County, North Carolina S&ME Project No. 4335-19-141 Dear Mr. Moose: S&ME, Inc. (S&ME) is pleased to submit this letter report detailing results of the waters of the U.S. delineation recently performed at the above -referenced property. These services were performed in general accordance with S&ME Proposal No. 43-1900805, dated October 21, 2019 and the Master Agreement for Continuing Professional Services between AVCON and S&ME dated May 1, 2017. The waters of the U.S. delineation was conducted by S&ME Natural Resources Professionals on October 24, 2019. This report is based on the observations made on the date noted and using the procedures described herein. The opinions included herein are based on this information and our professional experience. Project Information The location of the project area is proposed parking lots and are outlined in Figures 1 and 2 (Figure 3). The subject property is vacant and consists of open maintained turf fields, and a former stormwater sediment basin. Airport Park Road transects the northern portion of the subject property. Site photographs are included as an attachment to this report. A waters of the U.S. delineation was requested in order to assist in the site development planning. Methodology The services performed by S&ME are described and outlined in the referenced proposal. S&ME first reviewed relevant supporting information, including United States Geological Survey (USGS) topographic maps, the United States Department of Agriculture (USDA) Natural Resource Conservation Service (NRCS) Mecklenburg County Soil Survey, the U.S. Department of Agriculture publication Hydric Soils of the U.S., 2017 Light Detection and Ranging (LiDAR) topography, and representative aerial imagery. S&ME Natural Resources Professionals visited the project site on October 24, 2019 to evaluate the area for features that exhibit characteristics that are consistent with jurisdictional waters of the U.S. This determination was S&ME, Inc. 19751 Southern Pine Boulevard I Charlotte, NC 28273 1 p 704.523.4726 1 www.smeinc.com = 0 Waters of the U.S Delineation Asheville Regional Airport — Proposed Parking Areas Fletcher, Buncombe County, North Carolina Project No. 4335-19-141 performed following the procedures set forth in the 1987 USACE Wetlands Delineation Manual' and the Eastern Mountains and Piedmont Region Supplemental Guidance'. Detailed information required to determine wetland conditions was collected during the field reconnaissance and documented on USACE Wetland Determination Data Forms. S&ME also assessed the site for the presence of stream channels, utilizing North Carolina Division of Water Resources (NCDWR) Stream Identification Forms (Version 4.11). Stream and wetland boundaries were marked in the field with sequentially numbered flagging, and the locations of these flags were estimated using GPS equipment capable of sub -meter accuracy. The findings of this assessment are detailed below and in the attached Site Photographs and Site Map (Figure 3). Findings Field review identified one jurisdictional (first order, perennially -flowing) stream (Stream S1). Stream S1 enters the subject property from a culvert, parallels New Airport Road for approximately 70 feet, then flows offsite through a culvert. See attached NCDWR stream identification form for additional characteristics of Stream S1. Standing water was observed within the southern portion of the subject property. This area did not exhibit soils or vegetation characteristic of a jurisdictional wetland. See attached USACE Wetland Determination Form for data point U1 for additional characteristics of this upland area. No jurisdictional wetlands of the U.S. were identified in the subject property. Conclusions and Recommendations The jurisdictional waters of the U.S. assessment conducted by S&ME identified 70 If of one perennially flowing stream (S1). Please note that while S&ME's assessment can be used for general planning purposes, it is not considered official until verified and approved in writing by the USACE through a Notice of Jurisdictional Determination (JD). In order to receive Approved Jurisdictional Determination from the USACE, a Request for Approved JD package and supporting information can be submitted. The USACE will review the package and likely schedule an on -site visit to evaluate the delineation. Upon confirmation of the delineated boundaries, the USACE will provide a Notice of JD letter, and the NCDWR will provide supporting documentation for the accuracy of the determination. Following receipt of the Notice of JD letter from the USACE, the jurisdictional boundaries may be surveyed and depicted on a map prepared by your Civil Engineering contractor in accordance with USACE protocols. The survey map can then be mailed to the USACE for final approval. The USACE will sign the survey map, which will then be considered an accurate representation of the delineated boundary for five years. Upon request, S&ME can provide you with scope and a change order for the submission of a JD package to the USACE. ' Environmental Laboratory. 1987. Corps of Engineers wetlands delineation manual, Technical Report Y-87-1, U.S. Army Engineer Waterways Experiment Station, Vicksburg, MS. NTIS No. AD A176. ' Environmental Laboratory. 2012. Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Eastern Mountains and Piedmont Region (version 2.0). U.S. Army Corps of Engineers Engineer Research and Development Center, Vicksburg, MS. ERDC/EL TR-12-9 October 31, 2019 Waters of the U.S Delineation Asheville Regional Airport — Proposed Parking Areas Fletcher, Buncombe County, North Carolina Project No. 4335-19-141 Alternatively, a Preliminary JD (P-JD) may be requested from the USACE. P-JDs only indicate the likely presence of jurisdictional features for use in site planning and in calculation of project impacts for 404/401 permitting; they do not confirm the absence of features. If impacts to S1 can be avoided, it is unlikely submittal of a JD request would be required. In the event that project design requires impacts to of the potential jurisdictional waters identified herein, a submittal of a JD request and permitting of impacts either via an individual permit or through the Army Corps of Engineers Nationwide Permit 39 (Commercial and Institutional Developments) would be required. Closing S&ME appreciates the opportunity to provide this assessment of on -site waters of the U.S. for this project. Please contact us at (704) 523-4726 if you have questions regarding the information provided, or if we may be of further assistance. Sincerely, S&ME, Inc. Suzanne L. Knudsen Kristy Smedley Environmental/Natural Resources Project Scientist Natural Resources Senior Reviewer Attachments: Figures: Figure 1 - Vicinity Map Figure 2 - USGS Topographic Map Figure 3 - Site Map Attachment 1: Site Photographs Attachment 2: Data Forms October 31, 2019 3 Figures yr F r �k r� o- ARK=RD , i Stream 51 --� Approx. 70 LF in Project Area = — lxj � O J'w'7g 6 N `P APi 200 ^y �1 Cn� �Y�N -•1� �� (F@ET' v ° , JURISDICTIONAL STREAM 3"; f' UPLAND DATA FORM Q PROJECT AREA * " REFERENCE: 2019 AERIAL PHOTOGRAPH - 2 GIS BASE LAYERS WERE OBTAINED FROM BUNCOMBE COUNTY AND , NEARMAP. JURISDICTIONAL FEATURES WERE DELINEATED IN THE FIELD BY �! t S&ME ON 10/24/19 AND LOCATED WITH GPS CAPABLE OF SUB -METER a ACCURACY. FEATURES HAVE NOT BE VERIFIED BY THE USACE. ALL I c FEATURE LOCATIONS DISPLAYED ARE APPROXIMATED. THEY ARE NOT ISE. N M o BASED ON CIVIL SURVEY INFORMATION, UNLESS STATED OTHERWo N N 0 SCALE: FIGURE NO. SITE MAP 1 " = 100 ' DATE: III E 10-31-19 3 ASHEVILLE REGIONAL AIRPORT - PROPOSED PARKING AREAS PROJECTNUMBER FLETCHER, BUNCOMBE COUNTY, NORTH CAROLINA 4335-19-141 Attachment I — Site Photographs Asheville Regional Airport - Proposed Parking Areas _ Fletcher, Buncombe County, NC Project #: 4335-19-141 r Sheet 1 of 3 III i Photo 1 _ N N - Y'SZ�t� FR �'�'Av.F, �..-r+ W T,�y.�1 r _� ` -_' _-r � ff4�-- � u7,'--j ` � +j+.r� ,Z •ti i•- -�'� u ,�a�+•... ............���.�a.k Y Y Vl i ¢ , ' O Location North of and adjacent to Airport Park Road Remarks Maintained swale and stormwater grate F- 14, ti:r._.. F yy� t � ,\•�•' ` �/� ' � ��. ..4.��'' y •Y ��' . :ice ..,Zf, � �rir � 4. ���'' ~ '.. � ,'i: ;� ice. '��' • j}' � i'li�.�� �'��.i F v 'fir � Y. ,•f•� ,�J � :! F`' - ..7'.;�" a.� F- i¢"{..• r • �-- - sue_ .. -} _ �rf' Lwr. a �,y...__'aas 7- a'.ti�J� 4Pt I}.4 't � •�� S ` - � I Yz �` � • } .. - � r .fly f -. �_'� •f. > 1. �� � �_� �_ _k " c-� 45`- - 3. - ._ .�{ _ / - . V yam• y .r L. Attachment II — Data Forms U.S. Army Corps of Engineers OMB Control #: 0710-xxxx, Exp: Pending WETLAND DETERMINATION DATA SHEET — Eastern Mountains and Piedmont Region Requirement Control Symbol EXEMPT: See ERDC/EL TR-07-24; the proponent agency is CECW-CO-R (Authority: AR 335-15, paragraph 5-2a) Project/Site: Asheville Regional Airport Parking Lots A and D City/County: Fletcher/Buncombe Sampling Date: 10/24/19 Applicant/Owner: AVCON, Inc/Asheville Regional Airport State: NC Sampling Point: U1 Investigator(s): S. Knudsen and L. Slagle Section, Township, Range: Landform (hillside, terrace, etc.): Local relief (concave, convex, none): Slope (%): Subregion (LRR or MLRA): LRR N, MLRA 130B Lat: 35.435413 Long:-82.535511 Datum: Soil Map Unit Name: Udorthents-Urban land complex, 2 to 50 percent slopes (UhE) NW I classification: Are climatic / hydrologic conditions on the site typical for this time of year? Yes x No (If no, explain in Remarks.) Are Vegetation x Soil x or Hydrology x significantly disturbed? Are "Normal Circumstances" present? Yes No x Are Vegetation Soil or Hydrology naturally problematic? (If needed, explain any answers in Remarks.) SUMMARY OF FINDINGS — Attach site map showing sampling point locations, transects, important features, etc. Hydrophytic Vegetation Present? Yes No x Is the Sampled Area Hydric Soil Present? Yes No x within a Wetland? Yes No X Wetland Hydrology Present? Yes X No Remarks: standing water in sediment/stormwater pond HYDROLOGY Wetland Hydrology Indicators: Secondary Indicators (minimum of two required) Primary Indicators (minimum of one is required; check all that apply) _Surface Soil Cracks (136) x Surface Water (Al) _True Aquatic Plants (614) _Sparsely Vegetated Concave Surface (138) _ High Water Table (A2) —Hydrogen Sulfide Odor (C1) —Drainage Patterns (B10) _Saturation (A3) _Oxidized Rhizospheres on Living Roots (C3) _Moss Trim Lines (1316) —Water Marks (131) —Presence of Reduced Iron (C4) _ Dry -Season Water Table (C2) _Sediment Deposits (132) _Recent Iron Reduction in Tilled Soils (C6) _Crayfish Burrows (C8) _Drift Deposits (133) _Thin Muck Surface (C7) _Saturation Visible on Aerial Imagery (C9) _Algal Mat or Crust (134) _Other (Explain in Remarks) _Stunted or Stressed Plants (D1) _ Iron Deposits (135) —Geomorphic Position (D2) _ Inundation Visible on Aerial Imagery (137) —Shallow Aquitard (D3) —Water-Stained Leaves (139) Microtopographic Relief (D4) Aquatic Fauna (1313) FAC-Neutral Test (D5) Field Observations: Surface Water Present? Yes x No Depth (inches): 1 Water Table Present? Yes No x Depth (inches): Saturation Present? Yes x No Depth (inches): 0 Wetland Hydrology Present? Yes X No (includes capillary fringe) Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspections), if available: Remarks: standing water, recent heavy rains ENG FORM 6116-4-SG, JUL 2018 Eastern Mountains and Piedmont —Version 2.0 VEGETATION (Four Strata) - Use scientific names of plants. Sampling Point: U1 Absolute Dominant Indicator Tree Stratum (Plot size: ) % Cover Species? Status Dominance Test worksheet: 1 Number of Dominant Species 2. That Are OBL, FACW, or FAC: 0 (A) 3. Total Number of Dominant 4. Species Across All Strata: 1 (B) 5. Percent of Dominant Species 6. That Are OBL, FACW, or FAC: 0.0% (A/B) 7. Prevalence Index worksheet: =Total Cover Total % Cover of: Multiply by: 50% of total cover: 20% of total cover: OBL species 0 x 1 = 0 Sapling/Shrub Stratum (Plot size: ) FACW species 0 x 2 = 0 1. FAC species 0 x 3 = 0 2. FACU species 50 x 4 = 200 3. UPL species 0 x 5 = 0 4. Column Totals: 50 (A) 200 (B) 5. Prevalence Index = B/A = 4.00 6. Hydrophytic Vegetation Indicators: 7. _ 1 - Rapid Test for Hydrophytic Vegetation 8. 2 - Dominance Test is >50% 9. 3 - Prevalence Index is 53.0' =Total Cover 4 - Morphological Adaptations' (Provide supporting 50% of total cover: 20% of total cover: data in Remarks or on a separate sheet) Herb Stratum (Plot size: 5 ) -Problematic Hydrophytic Vegetation' (Explain) 1. Schedonorus arundinaceus 50 Yes FACU ' Indicators of hydric soil and wetland hydrology must be 2. present, unless disturbed or problematic. Definitions of Four Vegetation Strata: 3. 4. Tree - Woody plants, excluding vines, 3 in. (7.6 cm) or 5. more in diameter at breast height (DBH), regardless of 6 height. 7. Sapling/Shrub - Woody plants, excluding vines, less 8. than 3 in. DBH and greater than or equal to 3.28 ft 9 (1 m) tall. 10. Herb - All herbaceous (non -woody) plants, regardless 11. of size, and woody plants less than 3.28 ft tall. 50 =Total Cover Woody Vine - All woody vines greater than 3.28 ft in 50% of total cover: 25 20% of total cover: 10 height. Woody Vine Stratum (Plot size: ) 1. 2. 3. 4. 5. Hydrophytic =Total Cover Vegetation 50% of total cover: 20% of total cover: Present? Yes No x Remarks: (Include photo numbers here or on a separate sheet.) maintained field ENG FORM 6116-4-SG, JUL 2018 Eastern Mountains and Piedmont -Version 2.0 VEGETATION (Five Strata) - Use scientific names of plants. Sampling Point: U1 Tree Stratum (Plot size: ) % Cover Species? Status Dominance Test worksheet: 1 Number of Dominant Species 2. That Are OBL, FACW, or FAC: (A) 3. Total Number of Dominant 4. Species Across All Strata: (B) 5. Percent of Dominant Species 6. That Are OBL, FACW, or FAC: (A/B) =Total Cover Prevalence Index worksheet: 50% of total cover: 20% of total cover: Total % Cover of: Multiply by: Sapling Stratum (Plot size: ) OBL species x 1 = 1. FACW species x 2 = 2. FAC species x 3 = 3. FACU species x 4 = 4. UPL species x 5 = 5. Column Totals: (A) (B) 6. Prevalence Index = B/A = =Total Cover Hydrophytic Vegetation Indicators: 50% of total cover: 20% of total cover: _ 1 - Rapid Test for Hydrophytic Vegetation Shrub Stratum (Plot size: ) 2 - Dominance Test is >50% 1. 3 - Prevalence Index is 53.0' 2. 4 - Morphological Adaptations' (Provide supporting 3 data in Remarks or on a separate sheet) 4. -Problematic Hydrophytic Vegetation' (Explain) 5. 'Indicators of hydric soil and wetland hydrology must be 6. present, unless disturbed or problematic. Definitions of Five Vegetation Strata: =Total Cover 50% of total cover: 20% of total cover: Tree - Woody plants, excluding woody vines, Herb Stratum (Plot size: ) approximately 20 ft (6 m) or more in height and 3 in. 1 (7.6 cm) or larger in diameter at breast height (DBH). 2. Sapling - Woody plants, excluding woody vines, 3. approximately 20 ft (6 m) or more in height and less 4 than 3 in. (7.6 cm) DBH. 5. Shrub - Woody Plants, excluding woody vines, 6 approximately 3 to 20 ft (1 to 6 m) in height. 7. Herb -All herbaceous (non -woody) plants, including 8. herbaceous vines, regardless of size, and woody 9 plants, except woody vines, less than approximately 3 ft (1 m) in height. 10. 11. Woody Vine - All woody vines, regardless of height. =Total Cover 50% of total cover: 20% of total cover: Woody Vine Stratum (Plot size: ) 1. 2. 3. 4. 5. Hydrophytic =Total Cover Vegetation 50% of total cover: 20% of total cover: Present? Yes No Remarks: (Include photo numbers here or on a separate sheet.) ENG FORM 6116-4-SG, JUL 2018 Eastern Mountains and Piedmont - Version 2.0 SOIL Sampling Point: U1 Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.) Depth Matrix Redox Features (inches) Color (moist) % Color (moist) % Type' Loc2 Texture Remarks 0-12 5YR 5/6 100 Loamy/Clayey 'Type: C=Concentration, D=Depletion, RM=Reduced Matrix, MS=Masked Sand Grains. Hydric Soil Indicators: _ Histosol (Al) _ Histic Epipedon (A2) —Black Histic (A3) —Hydrogen Sulfide (A4) —Stratified Layers (A5) _ 2 cm Muck (A10) (LRR N) —Depleted Below Dark Surface (A11) _Thick Dark Surface (Al2) _Sandy Mucky Mineral (S1) —Sandy Gleyed Matrix (S4) —Sandy Redox (S5) —Stripped Matrix (S6) Dark Surface (S7) Restrictive Layer (if observed): Type: Depth (inches): Remarks: _ Polyvalue Below Surface (S8) (MLRA 147, 148) _Thin Dark Surface (S9) (MLRA 147, 148) —Loamy Mucky Mineral (F1) (MLRA 136) _ Loamy Gleyed Matrix (F2) _ Depleted Matrix (F3) _ Redox Dark Surface (F6) —Depleted Dark Surface (F7) _ Redox Depressions (F8) _ Iron -Manganese Masses (F12) (LRR N, MLRA 136) _ Umbric Surface (F13) (MLRA 122, 136) —Piedmont Floodplain Soils (F19) (MLRA 148) Red Parent Material (F21) (MLRA 127, 147, 148) 2Location: PL=Pore Lining, M=Matrix Indicators for Problematic Hydric Soils3: _ 2 cm Muck (A10) (MLRA 147) —Coast Prairie Redox (A16) (MLRA 147, 148) —Piedmont Floodplain Soils (F19) (MLRA 136, 147) —Red Parent Material (F21) (outside MLRA 127, 147, 148) —Very Shallow Dark Surface (F22) Other (Explain in Remarks) 31ndicators of hydrophytic vegetation and wetland hydrology must be present, unless disturbed or problematic. Hydric Soil Present? Yes No x ENG FORM 6116-4-SG, JUL 2018 Eastern Mountains and Piedmont —Version 2.0 VEGETATION Continued (Four Strata) - Use scientific names of plants. Sampling Point: U1 HDsoiuie uominam inaicaior Tree Stratum % Cover Species? Status Definitions of Four Vegetation Strata: 8. Tree - Woody plants, excluding vines, 3 in. (7.6 cm) or 9. more in diameter at breast height (DBH), regardless of 10. height. 11. Sapling/Shrub - Woody plants, excluding vines, less 12. than 3 in. DBH and greater than or equal to 3.28 ft (1 13. m) tall. 14. Herb - All herbaceous (non -woody) plants, regardless =Total Cover of size, and woody plants less than 3.28 ft tall. 50% of total cover: 20% of total cover: Sapling/Shrub Stratum Woody Vine - All woody vines greater than 3.28 ft in 10. height. 11. 12. 13. 14. 15. 16. 17. 18. =Total Cover 50% of total cover: 20% of total cover: Herb Stratum 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 50 =Total Cover 50% of total cover: 25 20% of total cover: 10 Woody Vine Stratum 6. 7. 8. 9. 10. =Total Cover 50% of total cover: 20% of total cover: Remarks: (Include photo numbers here or on a separate sheet.) ENG FORM 6116-4-SG, JUL 2018 Eastern Mountains and Piedmont -Version 2.0 VEGETATION Continued (Five Strata) - Use scientific names of plants. Sampling Point: U1 Tree Stratum 7. 8. 9. 10. 11. 12. 50% of total cover: Sapling Stratum 7. 8. 9. 10. 11. 12. 50% of total cover Shrub Stratum 7. 8. 9. 10. 11. 12. 50% of total cover Herb Stratum 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 50% of total cover: _ Woody Vine Stratum 6. 7. 8. 9. 10. % Cover Species? Status _=Total Cover 20% of total cover: _=Total Cover 20% of total cover: _=Total Cover 20% of total cover: _=Total Cover 20% of total cover: =Total Cover 50% of total cover: 20% of total cover: Remarks: (Include photo numbers here or on a separate sheet.) Definitions of Five Vegetation Strata: Tree - Woody plants, excluding woody vines, approximately 20 ft (6 m) or more in height and 3 in. (7.6 cm) or larger in diameter at breast height (DBH) Sapling - Woody plants, excluding woody vines, approximately 20 ft (6 m) or more in height and less than 3 in. (7.6 cm) DBH. Shrub - Woody Plants, excluding woody vines, approximately 3 to 20 ft (1 to 6 m) in height. Herb -All herbaceous (non -woody) plants, including herbaceous vines, regardless of size, and woody plants, except woody vines, less than approximately 3 ft (1 m) in height. Woody Vine - All woody vines, regardless of height. ENG FORM 6116-4-SG, JUL 2018 Eastern Mountains and Piedmont - Version 2.0 NC Division of Water Quality -Methodology for Identification of Intermittent and Perennial Streams and Their Origins v. 4.11 NC DWQ Stream Identification Form Version 4.11 Date: October 24, 2019 Project/Site: Asheville Regional Airport Latitude: 35.4362 Evaluator:S. Knudsen and L. Slagle County:ASheville Longitude:-82.5362 Total Points: Stream 31 Stream Determination (circle one) Other Skyland, NC is at least intermittent if>_ 19 or perennial if>_ 30' 1 Perennial e.g. Quad Name: A. Geomorphology (Subtotal = 12.5 ) Absent Weak Moderate Strong 1 a. Continuity of channel bed and bank 0 1 ® 2 © 3 2. Sinuosity of channel along thalweg 0 • 1 2 3 3. In -channel structure: ex. riffle -pool, step -pool, ripple -pool sequence 0 ® 1 ® 2 © 3 4. Particle size of stream substrate 0 1 ® 2 © 3 5. Active/relict floodplain 0 0 1 2 3 6. Depositional bars or benches 0 1 2 3 7. Recent alluvial deposits 0 1 2 3 8. Headcuts 0 • 1 2 3 9. Grade control 0 ® 0.5® 1 © 1.50 10. Natural valley 00 0. 1 0 1.5® 11. Second or greater order channel No = 0 • Yes = 3 a artificial ditches are not rated; see discussions in manual B. Hydrology (Subtotal = 11 ) 12. Presence of Baseflow 0 ® 1 ® 2 ® 3 13. Iron oxidizing bacteria 0 1 2 3 14. Leaf litter 1.50 1 ® 0.5® 0 15. Sediment on plants or debris 0 ® 0.5 1 ® 1.5 16. Organic debris lines or piles 0 0.5 1 1.5 17. Soil -based evidence of high water table? No = 0 ® Yes = 3 O C. Biology (Subtotal = 7.5 ) 18. Fibrous roots in streambed 30 2 in 0 19. Rooted upland plants in streambed 30 2 in 0 20. Macrobenthos (note diversity and abundance) 0 1 2 3 21. Aquatic Mollusks 0 • 1 2 3 22. Fish 0 • 0.50 10 1.5 23. Crayfish 0 • 0.50 1 1.5 24. Amphibians 0(D 0.5® 1 ® 1.5 25. Algae 0 0.5 1 1.5 26. Wetland plants in streambed ® FACW = 0.7500BL = 1.500ther = 0 "perennial streams may also be identified using other methods. See p. 35 of manual. Notes: Piped upstream and downstream. 70 feet da li hted in subject property Sketch: 41