Loading...
HomeMy WebLinkAboutSW4211101_Plansheet C-4.04 - Misc. Detail_20220125P.L.S. (PurityGermination): 100 PLANTING TYPE PLANTING RATES/ACRE PLAN TING DATES 1. Tolerances shall be those tabulated in USDA Bulletin No. 480. 2. Variety of grass for temporary grassing shall comply with the following TALL FESCUE (LOW MAINTENANCE) 100-150 LBS AUG 15 - OCT 15 schedule: Shoulders, Side Ditches, or Slopes (Max.4:1) FEB 15-MAY 2 TALL FESCUE WATERWAYS AND LAWNS 200-250 LBS. AUG 1 - OCT 15 DATE Type Planting Schedule (HIGH MAINTNENANCE) FEB 15 - MAY 1 Aug 15 - Nov 1 Tall Fescue 200 lbs./acre Nov 1 - Mar 1 Tall Fescue 200 lbs./acre BLEND OF TWO TURF -TYPE TALL FESCUES 200 - 250 LBS. AUG 15 - OCT 15 & Rye Grain 25 lbs./acre Mar 1 - Apr 15 Tall Fescue 200 lbs./acre (90%) AND TWO OR MORE FEB 15 - MAY 1 Apr 15 - Jun 30 Hulled Common IMPROVED KENTUCKY BLUEGRASS Bermuda grass 25 lbs./acre VARIETIES (10%) HIGH MAINTENANCE. Jul 1 - Aug 15 Tall Fescue and 125 lbs./acre *** Browntop Millet TALL FESCUE AND KOBE OR KOREAN 100 LBS AND 20-25 LBS FEB 15 - MAY 1 35 lbs./acre *** or Sorghum -Sudan 30 lbs./acre LESPEDEZA AUG 15 - OCT 15 Hybrids TALL FESCUE AND SERICEA LESPEDEZA 50 LBS AND 60 LBS NOV 1 - FEB 1 (unscarified) Slopes (4:1 to 2:1) TALL FESCUE AND GERMAN MILLET OR 60 LBS AND 30 LBS JULY AND AUGUST Mar 1 - June 1 Sericea Lespedeza 50 lbs./acre SUDANGRASS (scarified) TALL FESCUE AND RYEGRAIN 70 LBS AND 25 LBS NOV 1 - JAN 30 and (Mar 1 - Apr 15) Add Tall Fescue 120 lbs./acre COMMON BERMUDAGRASS 8 LBS (HULLED) APRIL 15 - JUNE 30 (Mar 1 - Jun 30) or Add Weeping Lovegrass 10 lbs./acre 15-20 LBS (UNROLLED) FEB 1 -MAR 30 (Mar 1 - Jun 30) or Add Hulled Common Bermuda grass 25 lbs./acre NOTES: Jun 1 - Sep 1 *** Tall Fescue and 120 lbs./acre *** Browntop Millet 35 lbs./acre 1. FOR SPRING SEEDING, USE SCARRED LESPEDEZA SEED. FOR LATE FALL AND WINTER SEEDING, USE or Sorghum -Sudan UNSCARIFIED SEED. Hybrids 30 lbs./acre 2. ANNUALS, SUCH AS MILLET, SUDANGRASS, AND RYEGRAIN, MUST BE KEPT AT 10-12" MAXIMUM HEIGHT. Sep 1 - Mar 1 Sericea Lespedeza (unhulled-unscarified) 70 lbs./acre PURPOSE and Tall Fescue 120 lbs./acre -TO PERMANENTLY STABILIZE DISTURBED AREAS CREATED BY CONSTRUCTION ACTIVITIES AND MINIMIZE SOIL (Nov 1 -Mar 1) Add Rye Grain 25 lbs./acre EROSION. PRACTICAL APPLICATIONS SPECIFICATIONS -WHERE BARE SOIL ON CONSTRUCTION ACTIVITIES IS NOT COVERED BY STRUCTURES OR OTHER EROSION CONTROL MEASURES. 1. UNIFORMLY APPLY GROUND AGRICULTURAL LIMESTONE AT THE RATE OF 1.5 TONS PER PREPARATION ACRE. UNIFORMLY APPLY A 10-10-10 GRADE FERTILIZER AT THE RATE OF 750 LBS PER -PREPARE SEEDBED BY RIPPING, CHISELING, HARROWING, OR PLOWING TO A DEPTH OF 6" TO PROVIDE A ACRE. INCORPORATE LIME AND FERTILIZER INTO THE TOP 4 TO 6 INCHES OF TOPSOIL. LOOSE, FRIABLE SURFACE. REMOVE ALL STONES, BOULDERS, STUMPS, OR DEBRIS FROM THE SURFACE WHICH WOULD PROHIBIT GERMINATION OR PLANT GROWTH. 2. IF GROUND SURFACE HAS BECOME SEALED OR CRUSTED, LOOSEN SURFACE PRIOR TO -INCORPORATE INTO THE SOIL 800-1000 LBS. OF 10-10-10 FERTILIZER PLUS 500 LBS. OF 20% SEEDING BY DISKING, RAKING, HARROWING OR OTHER SUITABLE METHODS. SUPERHPOSPHATE PER ACRE AND 2 TONS OF DOLOMITIC LIME PER ACRE UNLESS SOIL TESTS INDICATE THAT A LOWER RATE OF LIME CAN BE USED. 3. EVENLY APPLY SEED USING A CYCLONE SEEDER (BROADCAST), DRILL, CULTIPACKER -MULCH AFTER SEEDING WITH 1.5 TONS OF GRAIN STRAW PER ACRE AND CRIMP STRAW INTO THE SOIL OR SEEDER OR HYDROSEEDER. USE SEEDING RATES SPECIFIED ABOVE. BROADCASTING OR TACK WITH LIQUID ASPHALT AT 400 GALLONS PER ACRE OR EMULSIFIED ASPHALT AT 300 GALLONS PER ACRE. HYDROSEEDING SHALL BE USED FOR SLOPES STEEPER THAN THREE TO ONE. HAND BROADCASTING WILL NOT BE ALLOWED. PERMANENT SEEDING SPECIFICATIONS 4. PLANT SMALL GRAINS NO MORE THAN ONE INCH DEEP AND GRASSES AND LEGUMES NOT TO SCALE NO MORE THAN 1/2 INCH. BROADCAST SEED MUST BE COVERED BY RAKING OR CHAIN DRAGGING AND LIGHTLY COMPACTED WITH A ROLLER OR CULTIPACKER. HYDROSEEDED MIXTURES SHALL INCLUDE A WOOD FIBER (CELLULOSE) MULCH. 5. SPREAD A UNIFORM LAYER OF STRAW MULCH (WHEAT OR OATS) BY HAND OR WITH A MULCH BLOWER AT A RATE OF 70-90 LB (11/2 TO 2 BALES) OF STRAW PER 1,000 SQ. FT. AFTER SPREADING MULCH, NO MORE THAN 25% OF THE GROUND SURFACE SHOULD BE VISIBLE. ANCHOR MULCH IMMEDIATELY WITH A TRACTOR DRAWN MULCH ANCHORING TOOL OR BY APPLICATION OF A LIQUID MULCH BINDER OR TACKIFIER (EMULSIFIED ASPHALT). APPLY TACK AT A RATE OF 0.10 GALLONS PER SQ. YD. (10 GAL/1,000 SQ. FT.) TEMPORARY SEEDING SCHEDULE • Lumt 1. BERM SHALL BE STABILIZED WITH SEEDING ACCORDING TO TEMPORARY SEEDING SCHEDULE. TEMPORARY DIVERSION BERM NOT TO SCALE 0 5 10 15 20 25 D in feet PIPE DIAMETER RIP RAP OUTFALL PROTECTION DATA: 2:1 AND A HEIGHT NOT LESS THAN TWO THIRDS THE PIPE DIAMETER OR CULVERT HEIGHT. 2. THERE SHALL BE NO OVERFLOW FROM THE END OF THE APRON TO THE SHALL BE UNDERCUT SO THAT THE INVERT OF THE APRON SHALL BE AT THE SAME GRADE (FLUSH) WITH THE SURFACE OF THE RECEIVING CHANNEL. THE APRON SHALL HAVE A CUTOFF OR TOE WALL AT THE DOWNSTREAM END. 3. THE WIDTH OF THE END OF THE APRON SHALL BE EQUAL TO THE BOTTOM 4. ALL SUBGRADE FOR STRUCTURE TO BE COMPACTED TO 95% OR GREATER. 5. THE PLACING OF FILL, EITHER LOOSE OR COMPACTED IN THE RECEIVING CHANNEL SHALL NOT BE ALLOWED. 6. NO BENDS OR CURVES IN THE HORIZONTAL ALIGNMENT OF THE APRON WILL BE PERMITTED. 7. DEPENDING ON SOIL CONDITIONS, WASHED STONE OR FILTER FABRIC WILL BE NECESSARY UNDER RIP RAP. 8. ANY DISTURBED AREA FROM END OF APRON TO RECIEVING CHANNEL MUST BE STABILIZED. 9. H= RIP RAP TO TOP OF PIPE (MAX. H = D + T) T= 15" CLASS I OR II RIP RAP, UNLESS OTHERWISE SHOWN ON PLANS T= 12" CLASS 'B' RIP RAP, UNLESS OTHERWISE SHOWN ON PLANS D H TURAL GRADE �I NOTE: - -- ABRIC MINIMUM H = D + T SECTION VIEW RIP -RAP APRON DETAIL NOT TO SCALE Structure Velocity Pie Diameter D Zone Apron Length* L Aron Width O PieApron Width Thickness Rip -Rap Class No. ft sec Inches Feet Feet Feet Inches RIP RAP PAD 1 3.49 24" 1 10 6 12 9 Class B RIP RAP PAD 2 2.47 is" 1 10 4.5 11.5 9 Class B RIP RAP PAD 3 7.06 30" 2 12 7.5 14.5 1 13 1 Class B IP RAP PAD 4 5.85 is" 1 10 4.5 5.5 1 13 1 Class B NOTE EXTEND OUTLET PROTECTION TO LIMITS OF AREA DISTRUBED DURING SEDIMENT BASIN EXCAVATION AND BACKFlLL RIP RAP OUTFALL PROTECTION PER STATE RIP -RAP APRON CHARTS OF NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL CHAPTER 6: OUTLET STABILIZATION NOT TO SCALE STRUCTURE : PIPE OUTLET TO FLAT AREA W/ NO WELL DEFINED CHANNEL ( FIG. 6.41C 1 T T #5 OF WASHED W �YX ����71i�� A 1. BE' MIN. BEYOND 9" MIN. DITCH BANK WIRE FENCE FILTER CLOTH A PLAN VIEW 12" OF NCDOT #5 OR #57 1 °-6° WASHED STON� �� CLASS B RIPRAP STEEL POST �7 2' MAX. FILTER CLOTH AT CENTER WIRE MESH 2' HARDWARE CLOTH 23 GA. MIN. & 4' TO 6' SHALL HAVE 1/4" MESH OPENING SECTION A -A #5 of #57 NOTES: CROSS-SECTION VIEW INLET �2' MIN. #�o WASHED STONE 1. PLACE STONE OVER THE CHANNEL BANKS AS REQUIRED TO KEEP WATER 16" o FROM CUTTING AROUND THE DAM. o 2. FILTER FABRIC SHALL BE MIRAFI 500 OR EQUAL. 3.INSPECT CHECK DAMS AND CHANNELS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2 INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. CLEAN OUT SEDIMENT, STRAW, LIMBS, OR OTHER DEBRIS THAT COULD CLOG BOTTOM OF WIRE THE CHANNEL WHEN NEEDED. MESH EXTENDS V 4. REMOVE SEDIMENT ACCUMULATED BEHIND THE DAMS AS NEEDED TO PREVENT POST DRIVEN 18" HORIZ. UNDER STONE DAMAGE TO CHANNEL VEGETATION, ALLOW THE CHANNEL TO DRAIN THROUGH THE INTO GROUND STONE CHECK DAM, AND PREVENT LARGE FLOWS FROM CARRYING SEDIMENT OVER THE DAM. ADD STONES TO DAMS AS NEEDED TO MAINTAIN DESIGN HEIGHT AND TEMPORARY WIRE AND STONE INLET PROTECTION CROSS SECTION. NOT TO SCALE STONE CHECK DAM / I NOT TO SCALE Cross -Section �I'jlll r View 2 l} 2 2-3.5' �t Figure 6.54a Rock doughnut inlet protection plan view and cross-section view. Plan View Maintenance Inspect rock doughnut inlet protection at least weekly and after each significant (A inch or greater) rainfall event and repair immediately. To provide satisfactory inlet protection efficiency, remove sediment fiom the sediment pool area when the volume is decreased by half. This will help provide adequate storage volume for the next rain. Stabilize excavated material appropriately. Take care not to damage or undercut the structure during sediment removal. Remove debris from the inlet and replace stone as needed. If the inlet was covered with wire mesh the mesh should be cleaned of debris. When the contributing drainage area has been adequately stabilized, remove all materials and dispose of sediment properly. Bring the disturbed area to the grade of the drop inlet, Smooth and compact it as needed. Appropriately stabilize all bare areas around the inlet with ground cover. References Inlet protection 6.52, Block and Gravel Inlet Protection (Temporary) North Carolina Department oJ'Transportation Erosion & Sedimentation Guidelines 1'or Division Maintenance Operation, 1993. SILT FEN' ORANGE CONSI INDIES* 2-3- UNDER STONE 1. APPLICABLE AT ALL POINTS OF INGRESS & EGRESS UNTIL SITE IS STABILIZED, FREQUENT CHECKS OF THE DEVICE AND TIMELY MAINTENANCE MUST BE PROVIDED. 2. GRAVEL PAD TO BE 12' x 100' AND 6" THICK MINIMUM. 3. A TURNING RADIUS SUFFICIENT TO ACCOMMODATE LARGE TRUCKS SHALL BE PROVIDED. 4. ENTRANCE(S) SHOULD BE LOCATED TO PROVIDE FOR MAXIMUM UTILITY BY ALL 5. MUST BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR DIRECT FLOW OF MUD ONTO STREETS. PERIODIC TOPDRESSING WITH STONE WILL BE NECESSAR 6. ANY MATERIAL WHICH MAY BECOME TRACKED ONTO THE ROAD MUST BE CLEANED UP IA TEMP CONSTRUCTION ENTRANCE/EXIT NOT TO SCALE TEDIA ELY. WIRE FAM� WOVEN F1'L.TER NATURA GROUND STEEL POSTS 8'-0" MAX. STANDARD STRENGTH FABRIC WITH HOG WIRE PLASTIC OR WIRE TIES NATURAL GROUND EROSION CONTROL FABRIC - VIEW FROM DOWNSTREAM EROSION CONTROL FABRIC WIRE FENCE (SILT FENCE) (HOG WIRE) PLASTIC OR WIRE TIES BACKFILL WITH NCDOT #4 WASHED STONE 0 STEEL POSTS 0 ° 0 5' MIN. LENGTH 00000 6" DISTURBED UNDISTURBED 00000000 MIN. GROUND GROU D )0000 0000000°0000 0°0°0°0°00°0°° 0000000000000 UPS�� 0DO°O°O°O°O°0° °°°°°°°000°00°00° 6" 0 0 0 T 000000 0 `V1 6" MIN. NOTES: CROSS-SECTION VIEW MAXIMUM SEPARATION BETWEEN POSTS USING HOG WIRE WITH APPROVED EROSION CONTROL FABRICS SHALL BE 8'-0" POST: METAL T-POST 5-0" OR 6'-0" IN HEIGHT DEPENDING ON FILL SLOPE. FABRIC: MINIMUM 3'-0" IN WIDTH (MUST MEET ENGINEER'S SPECIFICATIONS FOR EROSION CONTROL). STONE: #4 WASHED STONE SHALL BE PLACED 1'-0" DEEP AT SILT FENCE. SEDIMENT FENCE NOT TO SCALE 1„ SEDIMENT FILTER OUTLET SHALL BE 16 INCHES HIGH BUT NO TALLER 'THAN 18 INCHES, 2. CLASS 1 OR 2 RIP' -RAP SHALL. BE; USED AND COVERED WrrH 66INCHES OF NCDOT /5 OR #57 WASHED STONE ON THE UPSLOPE SIDE. 1 POSTS SHALL BE NO MORE 1)" 4 FEET APART., 4. SITE OUTLETS AT ANY POINT SMALL. CONCENTRATED FLOWS ARE ANTICIPATED AND AT THE DIRECTION Of THE INSPEC70R, 5. ONE ACRE; MAX9MUM DRAINAGE AREA PER O1 1, FILTER OUTLETS SHALL BE INSPECTED BY THE FINANCIALLY RESPONSIBLE PARTY OR HIS AGENT IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING P'ROLONGEO RAINFAi.i.., ANY REPAIRS NEEDED SHALT," BE MADE IMMEDIATELY. 2. THE STONE SHALL BE REPLAC"EO PROMPIL.Y AFTER ANY EVENT THAT HAS CLOGGED OR REMOVED LT'. 3, SEDIMENT DEPOSITS SHOULD BE RE. -MOVED W!•iEN DEPOSITS REACH HALF THE [0GaH'T Or THE BARRIER, ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE StLT FENCE OUTLET IS REMOVED SHALL BE DRESSED TO CONFORM 'TO THE EXISPNG GRADE, PREPARED AND SEEDED. SEDIMENT FENCE STONE OUTLET NOT TO SCALE GREEN MOUNTAIN ENGINEERING, PLLC 7A WENDY CT GREENSBORO, NC 27409 Tel: 336.294.9394 CERTIFICATE #P-0826 www.greenmountainengineers.com SEALS: AVI)I1111EIip/dlgpr, CAR 4[/ /`''t� 0 45 off°�r 4 D. /I/dl(' P! dltlN. APPLICANT/DEVELOPER: WBY4, INC 7349 W. FRIENDLY AVE., STE.H GREENSBORO, NC 27410 ATTN: WILL YEARNS OFFICE: 336.202.8514 EMAIL: wyearns@mygronvillehome.com Z a � Fx � w of d � CA 0 O N � W w H U `! z 3 � O SITE AREA: 34.1 f ACRES PARCEL ID: 6878-07-7067 DESIGNED BY JDY CHECKED BY. VCT DATE: 2021.10.22 PROJECT: 20-066 REVISIONS: \,GI\014 MUST Co �LITY PRO!--O �w btio� BEFORE YOU DIG! CALL 811 N.C. ONE -CALL CENTER IT'S THE LAW! SHEET TITLE: EROSION AND SEDIMENT CONTROL -DETAILS I SCALE: 1 " = 100' SHEET NO.: C-4,04