HomeMy WebLinkAboutSW4211101_Plansheet C-4.04 - Misc. Detail_20220125P.L.S. (PurityGermination):
100
PLANTING TYPE PLANTING RATES/ACRE PLAN TING DATES
1. Tolerances shall be those tabulated in USDA Bulletin No. 480.
2. Variety of grass for temporary grassing shall comply with the following
TALL FESCUE (LOW MAINTENANCE) 100-150 LBS AUG 15 - OCT 15
schedule:
Shoulders, Side Ditches, or Slopes (Max.4:1)
FEB 15-MAY 2
TALL FESCUE WATERWAYS AND LAWNS 200-250 LBS. AUG 1 - OCT 15
DATE Type Planting Schedule
(HIGH MAINTNENANCE) FEB 15 - MAY 1
Aug 15 - Nov 1 Tall Fescue 200 lbs./acre
Nov 1 - Mar 1 Tall Fescue 200 lbs./acre
BLEND OF TWO TURF -TYPE TALL FESCUES 200 - 250 LBS. AUG 15 - OCT 15
& Rye Grain 25 lbs./acre
Mar 1 - Apr 15 Tall Fescue 200 lbs./acre
(90%) AND TWO OR MORE FEB 15 - MAY 1
Apr 15 - Jun 30 Hulled Common
IMPROVED KENTUCKY BLUEGRASS
Bermuda grass 25 lbs./acre
VARIETIES (10%) HIGH MAINTENANCE.
Jul 1 - Aug 15 Tall Fescue and 125 lbs./acre
*** Browntop Millet
TALL FESCUE AND KOBE OR KOREAN 100 LBS AND 20-25 LBS FEB 15 - MAY 1
35 lbs./acre
*** or Sorghum -Sudan 30 lbs./acre
LESPEDEZA AUG 15 - OCT 15
Hybrids
TALL FESCUE AND SERICEA LESPEDEZA 50 LBS AND 60 LBS NOV 1 - FEB 1 (unscarified)
Slopes (4:1 to 2:1)
TALL FESCUE AND GERMAN MILLET OR 60 LBS AND 30 LBS JULY AND AUGUST
Mar 1 - June 1 Sericea Lespedeza 50 lbs./acre
SUDANGRASS
(scarified)
TALL FESCUE AND RYEGRAIN 70 LBS AND 25 LBS NOV 1 - JAN 30
and
(Mar 1 - Apr 15) Add Tall Fescue 120 lbs./acre
COMMON BERMUDAGRASS 8 LBS (HULLED) APRIL 15 - JUNE 30
(Mar 1 - Jun 30) or Add Weeping Lovegrass 10 lbs./acre
15-20 LBS (UNROLLED) FEB 1 -MAR 30
(Mar 1 - Jun 30) or Add Hulled Common
Bermuda grass 25 lbs./acre
NOTES:
Jun 1 - Sep 1 *** Tall Fescue and 120 lbs./acre
*** Browntop Millet 35 lbs./acre
1. FOR SPRING SEEDING, USE SCARRED LESPEDEZA SEED. FOR LATE FALL AND WINTER SEEDING, USE
or Sorghum -Sudan
UNSCARIFIED SEED.
Hybrids 30 lbs./acre
2. ANNUALS, SUCH AS MILLET, SUDANGRASS, AND RYEGRAIN, MUST BE KEPT AT 10-12" MAXIMUM HEIGHT.
Sep 1 - Mar 1 Sericea Lespedeza
(unhulled-unscarified) 70 lbs./acre
PURPOSE
and Tall Fescue 120 lbs./acre
-TO PERMANENTLY STABILIZE DISTURBED AREAS CREATED BY CONSTRUCTION ACTIVITIES AND MINIMIZE SOIL
(Nov 1 -Mar 1) Add Rye Grain 25 lbs./acre
EROSION.
PRACTICAL APPLICATIONS
SPECIFICATIONS
-WHERE BARE SOIL ON CONSTRUCTION ACTIVITIES IS NOT COVERED BY STRUCTURES OR OTHER EROSION
CONTROL MEASURES.
1. UNIFORMLY APPLY GROUND AGRICULTURAL LIMESTONE AT THE RATE OF 1.5 TONS PER
PREPARATION
ACRE. UNIFORMLY APPLY A 10-10-10 GRADE FERTILIZER AT THE RATE OF 750 LBS PER
-PREPARE SEEDBED BY RIPPING, CHISELING, HARROWING, OR PLOWING TO A DEPTH OF 6" TO PROVIDE A
ACRE. INCORPORATE LIME AND FERTILIZER INTO THE TOP 4 TO 6 INCHES OF TOPSOIL.
LOOSE, FRIABLE SURFACE. REMOVE ALL STONES, BOULDERS, STUMPS, OR DEBRIS FROM THE SURFACE WHICH
WOULD PROHIBIT GERMINATION OR PLANT GROWTH.
2. IF GROUND SURFACE HAS BECOME SEALED OR CRUSTED, LOOSEN SURFACE PRIOR TO
-INCORPORATE INTO THE SOIL 800-1000 LBS. OF 10-10-10 FERTILIZER PLUS 500 LBS. OF 20%
SEEDING BY DISKING, RAKING, HARROWING OR OTHER SUITABLE METHODS.
SUPERHPOSPHATE PER ACRE AND 2 TONS OF DOLOMITIC LIME PER ACRE UNLESS SOIL TESTS INDICATE THAT A
LOWER RATE OF LIME CAN BE USED.
3. EVENLY APPLY SEED USING A CYCLONE SEEDER (BROADCAST), DRILL, CULTIPACKER
-MULCH AFTER SEEDING WITH 1.5 TONS OF GRAIN STRAW PER ACRE AND CRIMP STRAW INTO THE SOIL OR
SEEDER OR HYDROSEEDER. USE SEEDING RATES SPECIFIED ABOVE. BROADCASTING OR
TACK WITH LIQUID ASPHALT AT 400 GALLONS PER ACRE OR EMULSIFIED ASPHALT AT 300 GALLONS PER ACRE.
HYDROSEEDING SHALL BE USED FOR SLOPES STEEPER THAN THREE TO ONE. HAND
BROADCASTING WILL NOT BE ALLOWED.
PERMANENT SEEDING SPECIFICATIONS
4. PLANT SMALL GRAINS NO MORE THAN ONE INCH DEEP AND GRASSES AND LEGUMES
NOT TO SCALE
NO MORE THAN 1/2 INCH. BROADCAST SEED MUST BE COVERED BY RAKING OR CHAIN
DRAGGING AND LIGHTLY COMPACTED WITH A ROLLER OR CULTIPACKER. HYDROSEEDED
MIXTURES SHALL INCLUDE A WOOD FIBER (CELLULOSE) MULCH.
5. SPREAD A UNIFORM LAYER OF STRAW MULCH (WHEAT OR OATS) BY HAND OR WITH A
MULCH BLOWER AT A RATE OF 70-90 LB (11/2 TO 2 BALES) OF STRAW PER 1,000 SQ.
FT. AFTER SPREADING MULCH, NO MORE THAN 25% OF THE GROUND SURFACE SHOULD
BE VISIBLE. ANCHOR MULCH IMMEDIATELY WITH A TRACTOR DRAWN MULCH ANCHORING
TOOL OR BY APPLICATION OF A LIQUID MULCH BINDER OR TACKIFIER (EMULSIFIED ASPHALT).
APPLY TACK AT A RATE OF 0.10 GALLONS PER SQ. YD. (10 GAL/1,000 SQ. FT.)
TEMPORARY SEEDING SCHEDULE
• Lumt
1. BERM SHALL BE STABILIZED WITH SEEDING ACCORDING
TO TEMPORARY SEEDING SCHEDULE.
TEMPORARY DIVERSION BERM
NOT TO SCALE
0 5 10 15 20 25
D in feet
PIPE DIAMETER
RIP RAP OUTFALL PROTECTION DATA:
2:1 AND A HEIGHT NOT LESS THAN TWO THIRDS THE PIPE DIAMETER OR
CULVERT HEIGHT.
2. THERE SHALL BE NO OVERFLOW FROM THE END OF THE APRON TO THE
SHALL BE UNDERCUT SO THAT THE INVERT OF THE APRON SHALL BE AT THE
SAME GRADE (FLUSH) WITH THE SURFACE OF THE RECEIVING CHANNEL. THE
APRON SHALL HAVE A CUTOFF OR TOE WALL AT THE DOWNSTREAM END.
3. THE WIDTH OF THE END OF THE APRON SHALL BE EQUAL TO THE BOTTOM
4. ALL SUBGRADE FOR STRUCTURE TO BE COMPACTED TO 95% OR GREATER.
5. THE PLACING OF FILL, EITHER LOOSE OR COMPACTED IN THE RECEIVING
CHANNEL SHALL NOT BE ALLOWED.
6. NO BENDS OR CURVES IN THE HORIZONTAL ALIGNMENT OF THE APRON
WILL BE PERMITTED.
7. DEPENDING ON SOIL CONDITIONS, WASHED STONE OR FILTER FABRIC
WILL BE NECESSARY UNDER RIP RAP.
8. ANY DISTURBED AREA FROM END OF APRON TO RECIEVING CHANNEL
MUST BE STABILIZED.
9. H= RIP RAP TO TOP OF PIPE (MAX. H = D + T)
T= 15" CLASS I OR II RIP RAP, UNLESS OTHERWISE SHOWN ON PLANS
T= 12" CLASS 'B' RIP RAP, UNLESS OTHERWISE SHOWN ON PLANS
D
H
TURAL GRADE
�I
NOTE: - --
ABRIC MINIMUM H = D + T
SECTION VIEW
RIP -RAP APRON DETAIL
NOT TO SCALE
Structure
Velocity
Pie Diameter D
Zone
Apron Length* L
Aron Width O PieApron
Width
Thickness
Rip -Rap Class
No.
ft sec
Inches
Feet
Feet
Feet
Inches
RIP RAP PAD 1
3.49
24"
1
10
6
12
9
Class B
RIP RAP PAD 2
2.47
is"
1
10
4.5
11.5
9
Class B
RIP RAP PAD 3
7.06
30"
2
12
7.5
14.5
1 13
1 Class B
IP RAP PAD 4
5.85
is"
1
10
4.5
5.5
1 13
1 Class B
NOTE EXTEND OUTLET PROTECTION TO LIMITS OF AREA DISTRUBED DURING SEDIMENT BASIN EXCAVATION AND BACKFlLL
RIP RAP OUTFALL PROTECTION PER STATE RIP -RAP APRON CHARTS
OF NORTH CAROLINA EROSION AND SEDIMENT
CONTROL PLANNING AND DESIGN MANUAL
CHAPTER 6: OUTLET STABILIZATION NOT TO SCALE
STRUCTURE : PIPE OUTLET TO FLAT AREA W/
NO WELL DEFINED CHANNEL ( FIG. 6.41C 1 T T
#5 OF
WASHED
W
�YX
����71i��
A 1. BE' MIN.
BEYOND
9" MIN. DITCH BANK
WIRE FENCE
FILTER CLOTH
A
PLAN VIEW
12" OF NCDOT
#5 OR #57 1 °-6°
WASHED STON� ��
CLASS B RIPRAP
STEEL POST �7 2' MAX.
FILTER CLOTH AT CENTER
WIRE MESH
2' HARDWARE CLOTH
23 GA. MIN. & 4' TO 6'
SHALL HAVE 1/4"
MESH OPENING SECTION A -A
#5 of #57 NOTES: CROSS-SECTION VIEW
INLET �2' MIN. #�o WASHED STONE 1. PLACE STONE OVER THE CHANNEL BANKS AS REQUIRED TO KEEP WATER
16" o FROM CUTTING AROUND THE DAM.
o 2. FILTER FABRIC SHALL BE MIRAFI 500 OR EQUAL.
3.INSPECT CHECK DAMS AND CHANNELS AT LEAST WEEKLY AND AFTER EACH
SIGNIFICANT (1/2 INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY.
CLEAN OUT SEDIMENT, STRAW, LIMBS, OR OTHER DEBRIS THAT COULD CLOG
BOTTOM OF WIRE THE CHANNEL WHEN NEEDED.
MESH EXTENDS V 4. REMOVE SEDIMENT ACCUMULATED BEHIND THE DAMS AS NEEDED TO PREVENT
POST DRIVEN 18" HORIZ. UNDER STONE DAMAGE TO CHANNEL VEGETATION, ALLOW THE CHANNEL TO DRAIN THROUGH THE
INTO GROUND STONE CHECK DAM, AND PREVENT LARGE FLOWS FROM CARRYING SEDIMENT OVER
THE DAM. ADD STONES TO DAMS AS NEEDED TO MAINTAIN DESIGN HEIGHT AND
TEMPORARY WIRE AND STONE INLET PROTECTION
CROSS SECTION. NOT TO SCALE STONE CHECK DAM
/ I NOT TO SCALE
Cross -Section
�I'jlll r View 2 l} 2
2-3.5'
�t
Figure 6.54a Rock doughnut inlet
protection plan view and cross-section
view.
Plan View
Maintenance Inspect rock doughnut inlet protection at least weekly and after each significant
(A inch or greater) rainfall event and repair immediately.
To provide satisfactory inlet protection efficiency, remove sediment fiom
the sediment pool area when the volume is decreased by half. This will
help provide adequate storage volume for the next rain. Stabilize excavated
material appropriately.
Take care not to damage or undercut the structure during sediment removal.
Remove debris from the inlet and replace stone as needed. If the inlet was
covered with wire mesh the mesh should be cleaned of debris.
When the contributing drainage area has been adequately stabilized, remove
all materials and dispose of sediment properly. Bring the disturbed area to the
grade of the drop inlet, Smooth and compact it as needed.
Appropriately stabilize all bare areas around the inlet with ground cover.
References Inlet protection
6.52, Block and Gravel Inlet Protection (Temporary)
North Carolina Department oJ'Transportation
Erosion & Sedimentation Guidelines 1'or Division Maintenance Operation,
1993.
SILT FEN'
ORANGE CONSI
INDIES* 2-3-
UNDER STONE
1. APPLICABLE AT ALL POINTS OF INGRESS & EGRESS UNTIL SITE IS STABILIZED,
FREQUENT CHECKS OF THE DEVICE AND TIMELY MAINTENANCE MUST BE PROVIDED.
2. GRAVEL PAD TO BE 12' x 100' AND 6" THICK MINIMUM.
3. A TURNING RADIUS SUFFICIENT TO ACCOMMODATE LARGE TRUCKS SHALL BE PROVIDED.
4. ENTRANCE(S) SHOULD BE LOCATED TO PROVIDE FOR MAXIMUM UTILITY BY ALL
5. MUST BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR DIRECT
FLOW OF MUD ONTO STREETS. PERIODIC TOPDRESSING WITH STONE WILL BE NECESSAR
6. ANY MATERIAL WHICH MAY BECOME TRACKED ONTO THE ROAD MUST BE CLEANED UP IA
TEMP CONSTRUCTION ENTRANCE/EXIT
NOT TO SCALE
TEDIA ELY. WIRE FAM�
WOVEN F1'L.TER
NATURA
GROUND
STEEL POSTS
8'-0" MAX. STANDARD STRENGTH FABRIC WITH HOG WIRE
PLASTIC OR
WIRE TIES
NATURAL
GROUND
EROSION CONTROL FABRIC -
VIEW FROM DOWNSTREAM
EROSION CONTROL FABRIC
WIRE FENCE
(SILT FENCE)
(HOG WIRE)
PLASTIC OR
WIRE TIES BACKFILL WITH NCDOT
#4 WASHED STONE
0
STEEL POSTS
0 ° 0
5' MIN. LENGTH
00000 6" DISTURBED
UNDISTURBED
00000000 MIN. GROUND
GROU D
)0000
0000000°0000
0°0°0°0°00°0°°
0000000000000 UPS��
0DO°O°O°O°O°0°
°°°°°°°000°00°00° 6"
0 0 0
T 000000
0
`V1
6" MIN.
NOTES: CROSS-SECTION VIEW
MAXIMUM SEPARATION BETWEEN POSTS USING HOG WIRE WITH APPROVED
EROSION CONTROL FABRICS SHALL BE 8'-0"
POST: METAL T-POST 5-0" OR 6'-0" IN HEIGHT DEPENDING ON FILL SLOPE.
FABRIC: MINIMUM 3'-0" IN WIDTH (MUST MEET ENGINEER'S SPECIFICATIONS FOR
EROSION CONTROL).
STONE: #4 WASHED STONE SHALL BE PLACED 1'-0" DEEP AT SILT FENCE.
SEDIMENT FENCE
NOT TO SCALE
1„ SEDIMENT FILTER OUTLET SHALL BE 16 INCHES HIGH BUT NO TALLER 'THAN 18 INCHES,
2. CLASS 1 OR 2 RIP' -RAP SHALL. BE; USED AND COVERED WrrH 66INCHES OF NCDOT /5 OR
#57 WASHED STONE ON THE UPSLOPE SIDE.
1 POSTS SHALL BE NO MORE 1)" 4 FEET APART.,
4. SITE OUTLETS AT ANY POINT SMALL. CONCENTRATED FLOWS ARE ANTICIPATED AND AT THE
DIRECTION Of THE INSPEC70R,
5. ONE ACRE; MAX9MUM DRAINAGE AREA PER O1
1, FILTER OUTLETS SHALL BE INSPECTED BY THE FINANCIALLY RESPONSIBLE PARTY OR
HIS AGENT IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING
P'ROLONGEO RAINFAi.i.., ANY REPAIRS NEEDED SHALT," BE MADE IMMEDIATELY.
2. THE STONE SHALL BE REPLAC"EO PROMPIL.Y AFTER ANY EVENT THAT HAS CLOGGED
OR REMOVED LT'.
3, SEDIMENT DEPOSITS SHOULD BE RE. -MOVED W!•iEN DEPOSITS REACH HALF THE [0GaH'T
Or THE BARRIER, ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE StLT
FENCE OUTLET IS REMOVED SHALL BE DRESSED TO CONFORM 'TO THE EXISPNG
GRADE, PREPARED AND SEEDED.
SEDIMENT FENCE STONE OUTLET
NOT TO SCALE
GREEN
MOUNTAIN
ENGINEERING, PLLC
7A WENDY CT
GREENSBORO, NC 27409
Tel: 336.294.9394
CERTIFICATE #P-0826
www.greenmountainengineers.com
SEALS:
AVI)I1111EIip/dlgpr,
CAR
4[/ /`''t�
0 45
off°�r 4 D. /I/dl(' P! dltlN.
APPLICANT/DEVELOPER:
WBY4, INC
7349 W. FRIENDLY AVE., STE.H
GREENSBORO, NC 27410
ATTN: WILL YEARNS
OFFICE: 336.202.8514
EMAIL: wyearns@mygronvillehome.com
Z
a
� Fx
� w
of
d �
CA
0
O
N
� W
w
H
U `!
z 3
� O
SITE AREA: 34.1 f ACRES
PARCEL ID: 6878-07-7067
DESIGNED BY JDY
CHECKED BY. VCT
DATE: 2021.10.22
PROJECT: 20-066
REVISIONS:
\,GI\014 MUST Co
�LITY PRO!--O
�w btio�
BEFORE YOU DIG!
CALL 811 N.C. ONE -CALL CENTER
IT'S THE LAW!
SHEET TITLE:
EROSION AND
SEDIMENT
CONTROL -DETAILS I
SCALE: 1 " = 100'
SHEET NO.:
C-4,04