Loading...
HomeMy WebLinkAboutNCC220250_Site Plan or Location Map_20220114I\ \\ \ \ rJ \ 1 1 I Md S ` \l 11 R/9-4.69' \ \ j . 1 \ I /NI UT=835.09 \, I � II \ r� any I 1 1 I J \ WS/FC EROSION CONTROL NOTICE PLANS APPROVED FOR CONSTRUCTION LEVI NATHANIEL PRESTON TEMPORARY SKIMMER t►y=11911►T11=11►1r MT 111►F3 (SIZED FOR STAGE 1) DISTURBED AREA=4.77 AC DRAINAGE AREA=5.00 AC REQ'D VOLUME=8,586 CF Q 10=CXlxA (0.25x5.5 IN/HRx5.00 AC)=6.9 REQ'D SURFACE AREA=Q10x325= 6.9x325=2,243 SF SURFACE AREA LENGTH=85' SURFACE AREA WIDTH=45' WEIR LENGTH=8' BOTTOM OF BASIN=815.0 SURFACE AREA=818.0 TOP OF DAM=819.0 DEPTH OF STORAGE=3' SURFACE AREA PROVIDED=2,387 SF SURFACE AREA ELEVATION=815.0 VOLUME PROVIDED=8,589 CF VOLUME ELEVATION=817.85 / y 2.0" SKIMMER W/ 1.75" ORIFICE 4 I��Igr/ L� / �-'�259.42`T'0T�LA �47 DEWATRINTIME=297DAY//I----- TEMPORARY SKIMMER _ _ SEDIMENT BASIN #3 r / / _ _ J�aqu\ ,/ / f/ / D /r // \ \ /I / - _ (SIZED FOR STAGE 2) - - - \ / O/ / / I / / ?� o� \ - \ DISTURBED AREA=1.80 AC ��f/ JJ `ST(i�,/ DRAINAGE AREA=1.91 AC REQ'D VOLUME=3,240 CF -840- Q10=CxIxA W \ \\\� / / / �� (0.25x5.5 IN/HRx1.91 AC)=2.6 _ W \\\ / o / / / i / / / e1 ' \ \ ------ m REQ'D SURFACE AREA=Q10x325= 2.6x325=845 SF SURFACE AREA LENGTH=66' Z❑ =i \ \ \ / / / / szo / / / - \ \ I / SURFACE AREA WIDTH=37' \x' / / ,% /' / / / / / / ' �' �' 1 I WEIR LENGTH=8' \ BOTTOM OF BASIN=812.0 �D /__,� /// /////��% ��/��� -i \\ /\ \\ ` SURFACE AREA=814.0 -\---- TOP OF DAM=815.0 F ' / / ' // / ' /� \�---- DEPTH OF STORAGE=2' , �� / ��'� 1 X =X SURFACE AREA PROVIDED=1,665 SF E� i m /' / / / / i ja°4� SURFACE AREA ELEVATION=812.0 -A, VOLUME PROVIDED=3,241 CF I °-DAVIDPFHARTNESSAND----- // /' , _�/�� /�� //////// / _ \ WAYNE_E_WEB-- - VOLUME ELEVATION=813.64 / , /� / / --- �\ - \ - _� \ \ \ ROBERTANTHOMY-MA-TTHEWS, 2.0" SKIMMER W/ 1.0" ORIFICE �= / / / �)J / / /' ',/ // / / \ TI�USTEESOFTHEAPofElUDED - DEWATERING TIME=3.43 DAYS AND RESTATED-WAYN- E I�V=R ` - / / F / / qN� ► c' F EMPORA'RY/SKI i / / �' - - - - - \ \ RE-V-9 JBi EfPoI€NT` �4{ E D TEDA(>GU 0 19 \ fv rax NJ��i E- �/ \ Q / I / \ ,/l H \\ ^ / /D I T P RA 1lSKIMM R ' / EDIMEJ\1 A IN # \\_ \I - _\\II I E \\ \ \ w°'i -_/ // AV L&tYE�TRAI DISTURBED LIM f / _ / / / \ l IR III IFX\ \ TEMPORARY SKIMMER t►y=11911►Til=11►1r MT 111►F.,yj (SIZED FOR STAGE 1) DISTURBED AREA=7.58 AC DRAINAGE AREA=9.20 AC REQ'D VOLUME=13,644 CF Q10=CXlXA (0.25x5.5 IN/HRx9.20 AC)=12.7 REQ'D SURFACE AREA=Q10x325= 12.7x325=4,128 SF SURFACE AREA LENGTH=141' SURFACE AREA WIDTH=80' WEIR LENGTH=12' BOTTOM OF BASIN=772.0 SURFACE AREA=773.0 TOP OF DAM=778.0 DEPTH OF STORAGE=4' SURFACE AREA PROVIDED=4,169 SF SURFACE AREA ELEVATION=770.00 VOLUME PROVIDED=21,172 CF VOLUME ELEVATION=776.00 3" SKIMMER W/ 2.5" ORIFICE DEWATERING TIME=2.93 DAYS TEMPORARY SKIMMER t►y=11911►Til=11►1r MT 111►FMI! (SIZED FOR STAGE 1) DISTURBED AREA=12.7 AC DRAINAGE AREA=12.7 AC REQ'D VOLUME=22,867 CF Q10=CxIxA (0.25x5.5 IN/HRx12.7 AC)=17.5 REQ'D SURFACE AREA=Q10x325= 17.5x325=5,688 SF SURFACE AREA LENGTH=178' SURFACE AREA WIDTH=134' WEIR LENGTH=16' BOTTOM OF BASIN=748.5 SURFACE AREA=748.5 TOP OF DAM=759.0 DEPTH OF STORAGE=3.5' SURFACE AREA PROVIDED=7,001 SF SURFACE AREA ELEVATION=748.5 VOLUME PROVIDED=31,911 CF VOLUME ELEVATION=752.0 4" SKIMMER W/ 3" ORIFICE DEWATERING TIME=2.66 DAYS THE INSIDE SLOPES OF THE SKIMMER SEDIMENT BASIN SHALL BE STABILIZED WITH NORTH AMERICAN GREEN S75 (STAPLE PATTERN D) EROSION CONTROL MATTING UPON COMPLETION OF CONSTRUCTION. /X /`CpISQy�Bp I II % B TEMPORARY SKIMMER , SEDIMENT BASIN #1/ / _ RIM=785.60'_+ 'o -hVV N-779.50`+ -/INVOUY=.Z79.42± Ni �800- JJ J \ qD \ NHNS 1M=N\4.�s; \ \\ \ ?A1=7X8 5,Y \ \� l <JT- 8.k \ I I I / / / / / / / / / // / \ - x \ - \ \ I I 1 III I l l l; �I \ \\\\\ \ 0 I I III ,�I IS \ 1 I \ IIII I 1 I I�� \1\�\ ♦ / � \ \ \ \ \ I I v � I I I /Illy 11 \ ♦ \ \� \ \ \ _ \--- - --- ------ _ - - - - - - - \ 7A.7� \ \ I III II I 09' \ \. // / I I IIII 11 I I ill \\ \` \ \ / \ - I T-761.21 - / � ' c1 ' - - - - - - \\ \ \� / / / I I I 'A'i1111 � 790 /�/Illal lyl / \i\W W\TP S XH€JEAIVTR >5 Eli "\# REVOCAB[� ST/ 6 6 ' / `� / // / / / � / I\ \� � � ♦ � � , - - ' � \ \ � � � \ ____ / , / I I I I I /\ i \"� � \�\ � \ W \ W \ W TAX PIN: �4� / C-11_ ' --�� ( \ \--- III III j r�i\ \ \ , I I I _ r.w fXj \\V,�\\.I� L\ �\ / \ \ \ \ \ / / / I 1 1 A \� \ w '��� N� S I't��111� !�\- �'�3 \� \ \\ \ \\ / / f I I\\�\ ,�\1\\��\� 1 1 1 V A A �v v� 1 ♦ y,- A� v A \ v o \\\\\ �\ s�. III ` 1 W 1 ^NIUN- qq \ \ \\\ \ / / ♦ \ \ \ nn �� + lNV 0UT=72 Y(T LE 784.43 \ FENCE \ \ \\ \ \� \ \ \\\\����•~\\\\\\� , \� �� �\ �� �� \ ��-�� /'_��\ ---' �/ // // I I=I\ �,�� \\\'I�j ��`__ _ ' �\ I b/LAP/DATED \ \\\ \ \ \y = -� \ ^�. \\ \ �'( �\\ \ h \ \ ♦ - - / / / \ ,� 7 11 \ T - - - ' AM,j DA SMART TINGLE \ \ \ \ " - / DB 3222, P(I 81 \ T1 \\\\\\_-_-�,I) A0016- \ �^ \ \ \ � - � ` �\ \ \\ � �� � ��'.-.`'G� i, \\_� � � \\ ♦ ��� _.cam - = �L�� ��� �•�� - \�\,�� _ -37 S EPHEN\R. PAELPS \ \ V75.11' \ \ \ \ B 2252, 111 3J 11 TA W 58�2-46 63 This plan complies with Chapter C, Article 4 - Erosion Control of the Village of Clemmons Unified Development Ordinance. A printed set of the stamped/approved plans must be kept on the construction site for reference when installing required erosion control measures. matthewo 1/10/2022 1:17:37 PM SITE DATA OWNER: PIN: 5892-58-2261 DEVELOPER: PORTION OF PIN: 5892-57-8680 PORTION OF PIN: 5892-57-0376 OLD MILL SUBDIVISION, LLC 3411 HEALY DRIVE, SUITE A WINSTON SALEM, NC 27103 PHONE: (336) 345-1214 TODDISENHOUR ENGINEER: ALLIED DESIGN, INC. 4720 KESTER MILL ROAD WINSTON-SALEM, N.C. 27103 PHONE: (336) 765-2377 FAX: (336) 760-8886 STEVE M. CAUSEY, P.E. scausey@allied-engsurv.com STAGE 1 CONSTRUCTION SEQUENCE 1. OBTAIN GRADING/EROSION CONTROL PERMIT AND PLAN APPROVAL FROM THE FORSYTH COUNTY INSPECTIONS DIVISION. 2. CONTRACTOR IS REQUIRED TO FILL OUT AND SUBMIT AN ELECTRONIC NOTICE OF INTENT (e-NOI) FORM. ALL CONTRUCTION ACTIVITIES ARE REQUIRED TO FOLLOW THE NEW NCGO1 PERMIT. 3. CONTACT EROSION CONTROL INSPECTOR TO ESTABLISH A MANDATORY PRECONSTRUCTION CONFERENCE AND AN INSPECTION SCHEDULE. 4. THE CONTRACTOR SHALL CONDUCT SELF -INSPECTIONS OF THE EROSION AND SEDIMENT CONTROL MEASURES AND COMPLETE THE FOLLOWING COMBINED SELF -INSPECTION FORM FOUND ON THE DEMLR WEBSITE; (http://deq. nc.gov/about/divisions/energy-mineral-land-resources/erosion-sediment-control/forms) COMPLETE INSPECTIONS FORMS SHALL BE KEPT ON -SITE AND AVAILABLE FOR INSPECTION AT ALL TIMES. IT IS RECOMMENDED THAT A COPY BE KEPT IN A PERMITS BOX. SELF -INSPECTIONS FOR STABILITY AND FUNCTION OF EROSION AND SEDIMENTATION CONTROL MEASURES ARE TO BE PERFORMED AT LEAST ONCE EVERY SEVEN CALENDAR DAYS AND WITHIN 24 HOURS OF EACH RAINFALL EVENT OF GREATER THAN 0.5 INCH. ANY NEEDED REPAIRS SHALL BE MADE IMMEDIATELY TO MAINTAIN MEASURES AS DESIGNED. ALL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE MAINTAINED AS SPECIFIED IN THE CONSTRUCTION DETAILS ON THIS PLAN. A RAIN GAUGE SHALL BE INSTALLED AT THE PROJECT SITE FOR MONITORING. 5. A COPY OF THE EROSION AND SEDIMENT CONTROL PERMIT, A HARD COPY OF THE PLAN, AND ALL SELF -INSPECTION RECORDS MUST BE KEPT ON -SITE, PREFERABLY IN A PERMITS BOX, AND ACCESSIBLE AT ALL TIMES FOR INSPECTION. 6. INSTALL THE CONSTRUCTION ENTRANCE AND SEDIMENT FENCE ALONG EDGE. 7. BEGIN CLEARING AND GRUBBING JUST ENOUGH TO ALLOW FOR INSTALLATION OF THE SEDIMENT SKIMMER BASINS AND SEDIMENT FENCE. STOCKPILE TOPSOIL ON -SITE WITHIN AREAS PROTECTED BY EROSION CONTROL MEASURES FOR LATER DISTRIBUTION. 8. THE SEDIMENT SKIMMER BASINS CAN NOW BE INSTALLED BEGINNING WITH THE REAR DAM ALONG WITH CORRESPONDING COMPONENTS. 9. ONCE THE DAM FOR THE SEDIMENT SKIMMER BASINS HAVE BEEN INSTALLED, THEN SEDIMENT FENCE SHOULD BE INSTALLED AT THE TOE OF SLOPE WITH THE OCCASIONAL SECTION OF SEDIMENT FENCE WITH STONE STABILIZATION. 10.ONCE THE SEDIMENT SKIMMER BASINS HAVE BEEN INSTALLED AS SHOWN ABOVE, THEN CONSTRUCTION OF DIVERSION DITCHES AND BERMS CAN BEGIN. 11.INSTALL TEMPORARY SLOPE DRAINS INTO SEDIMENT SKIMMER BASINS AS SHOWN. 12. BEGIN DEMOLITION OPERATIONS AS SHOWN ON SHEET C1.1 13. SEED EMBANKMENTS AND DISTURBED AREA OF BASINS, DITCHES, AND BERMS UPON COMPLETION OF CONSTRUCTION. PERMANENT GROUNDCOVER SHALL BE ESTABLISHED IN 15 WORKING DAYS OR 90 CALENDAR DAYS, WHICHEVER IS SHORTER. HOWEVER, NPDES GROUNDCOVER REQUIREMENTS TAKE PRECEDENCE. 14.TEMPORARY SEDIMENT BASINS TO REMAIN IN PLACE UNTIL THE SITE DRAINING TO THESE BASINS HAS BEEN SUFFICIENTLY STABILIZED. 100 VICINITY MAP " NOT TO SCALE KEY NOTES OA NEW TEMPORARY CONSTRUCTION ENTRANCE/EXIT. OB NEW TEMPORARY SEDIMENT FENCE. ONEW TEMPORARY SEDIMENT FENCE WITH STONE OUTLET. O NEW TEMPORARY DIVERSION BERM. ONEW TEMPORARY SKIMMER SEDIMENT BASIN. THE INSIDE SLOPES OF THE SKIMMER SEDIMENT BASIN SHALL BE STABILIZED WITH NORTH AMERICAN GREEN S75 EROSION CONTROL MATTING UPON COMPLETION OF CONSTRUCTION. O NEW COIR, JUTE OR BURLAP BAFFLES. OG NEW TEMPORARY EMERGENCY SPILLWAY. OH NEW TEMPORARY 10'x10' CLASS "B" RIP RAP OUTLET STABILIZATION PAD. O NEW TEMPORARY SKIMMER DEVICE. JO NEW TEMPORARY 18" CPP SLOPE DRAIN. SLOPE DRAINS SHALL BE INSTALLED / RE -INSTALLED ON SLOPES AT 8 FT INTERVALS MEASURED VERTICALLY. OK NEW OUTLET STRUCTURE AND OUTLET BARREL. REFER TO SHEET SWM4 AND SWM5 FOR DETAILS. OL NEW PRECAST HEADWALL. NCDOT STANDARD DETAIL 838.80. OM NEW OUTLET STRUCTURE AND OUTLET BARREL. REFER TO SHEET SWM7 AND SWM8 FOR DETAILS. ON NEW TEMPORARY ON -SITE CONCRETE WASHOUT STRUCTURE WITH LINER. PROVIDE CLEARLY MARKED SIGNAGE NOTING DEVICE LOCATION. NEW POTENTIAL TOPSOIL STOCKPILE AREA. EXISTING TREES/WOODS TO BE REMOVED TO LIMITS OF DISTURBANCE. EXISTING TREE TO BE REMOVED TO THE STUMP. NO STUMPS MAY BE REMOVED UNTIL STAGE 1 EROSION CONTROL MEASURES HAVE BEEN INSTALLED AND APPROVED BY EROSION CONTROL INSPECTOR. EXISTING TREE SAVE AREA (96,650 SF). THE TSA MUST BE PROTECTED FROM DIRECT AND INDIRECT ROOT DAMAGE, AND TRUNK AND CROWN DISTURBANCE. THE FOLLOWING STANDARDS SHALL APPLY: (A) THE TREE SAVE AREA (TSA) SHALL INCLUDE ALL AREA LOCATED WITHIN THE CRITICAL ROOT ZONE. I CONSTRUCTION SITE ACTIVITIES, SUCH AS PARKING, MATERIAL STORAGE, DIRT STOCKPILING, CONCRETE WASHOUT, AND OTHER SIMILAR ACTIVITIES, SHALL NOT BE PERMITTED WITHIN A TREE SAVE AREA (TSA). I PROTECTIVE BARRIERS SHALL BE INSTALLED AROUND THE TREE SAVE AREA (TSA) AS NECESSARY PRIOR TO THE ISSUANCE OF A GRADING PERMIT. EXISTING TREES/WOODS TO BE REMOVED TO LIMITS OF DISTURBANCE. EXISTING TREE TO BE REMOVED TO THE STUMP. NO STUMPS MAY BE REMOVED UNTIL STAGE 1 EROSION CONTROL MEASURES HAVE BEEN INSTALLED AND APPROVED BY EROSION CONTROL INSPECTOR. EXISTING SITE CONDITIONS ARE SHOWN ON THIS SHEET. REFER TO SHEET C1.1 FOR DETAILED INFORMATION ON DEMOLITION/REMOVAL REQUIREMENTS. GRAPHIC SCALE so 100 200 ( IN FEET ) 1 inch = 100 ft» 400 M 0 Z N � Q Z J U U 0 E Q 0 T_ o 0 O r Z N .'^ z N co J 1 00 r- a) QW E W W a? -6 Z Q _(0 .a) 70 0 W U) 0 r CO 1z�� � a) J Y 0 _ c FIRM LICENSE C-1891 J J Z J O W U Z J Fn 0 Z m Z) z LLI O J J Q w J U O CN 0 > W N N N0 M 0 O Z U m Z W m 0 W U bi d 0 0 U O Z W � 0 5 z cn cn W0 ~ ~ a- w w Z U z 00 o cn z 0 O O w 7 n O U U LU 0' cr a m w 0 0 O O a a a LL LL 0 0 0 0 0 w w cn cn cn 52 Ln W W W W Q N N N N N 0 0 0 60- a \ m0 o O O oo U W Z Q SITE STAGE 1 EROSION CONTROL PLAN SHEET C2.2