Loading...
HomeMy WebLinkAboutNCC220141_ESC Approval Submitted_20220107TOWN OF WEDDINGTON EROSION and SEDIMENTATION CONTROL COMPLIANCE FORM Tracts Less than One -Acre Disturbed Residential and Commercial This compliance form shall be prominently displayed at the primary entrance to the site of the land disturbing activity Before construction begins and remain until all construction is complete. PROPERTY ADDRESS: 3147 Brayland Ave, Weddington NC PARCEL ID: 07150688 NAME OF SUBDIVISION: Weddington Acres LOT #: 16 NAME OF PROPERTY OWNER: Robert Kummerer NAME OF CONSTRUCTION COMPANY: New Old, LLC NAME OF CONSTRUCTION MANAGER: Troy Ludemann CONSTRUCTION MGR PHONE #: 704-975-3770 EMAIL: troy@newold.com PROPOSED START DATE OF CONSTRUCTION: 12- 20-21 PLEASE READ THE BACK SIDE BEFORE COMPLETING. EROSION CONTROL PLAN Choose one of the following approaches: (� r Pe O b ❑ The most appropriate option from the back of this form V rrt -- �Z\ is option Cor a combination of options and .X The sediment control plan is as drawn in the space to the right or is attached. Notes: /� j� cjiS}c,vl(�ec�. < u Z> QCz'+LS' See Attached THE UNDERSIGNED HEREBY CERTIFIES THAT HE/SHE HAS READ THE INFORMATION ON THE BACK OF THIS FORM AND IS AWARE OF THE STATED REQUIREMENTS OF THE EROSION AND SEDIMENTATION CONTROL ORDINANCE. THE OWNER MUST COMPLY WITH THE PROVISION OF THE ORDINANCE. THE UNDERSIGNED ACKNOWLEDGES FINANCIAL RESPONSIBILITY FOR PAYMENT OF ALL FEES ASSOCIATED WITH THIS PROJECT. Troy Ludemann PROPERTY OPNE8,A'[6T_HbA1ZED AGENT SIGNATURE PRINT NAME 704-975-3770 troy@newold.com 12-06-21 PHONE EMAIL DATE APPLICANT CHECKLIST: OFFICE USE ONLY ❑ Exempt from installation of ESC measures. REASON: ❑ ❑ An Erosion Control Plan Approval is required. REASON:1Ojn21 aver U-L� eV- r P ❑ Attach approved NCGO1 Certificate of Compliance (CoC) (available at www.deq.nc.gov) ❑ An Existing driveway will be used as the Temporary Construction Entrance. ❑— ❑ Install Temporary Gravel Construction Entrance in accordance with NCDENR detail attached and as / indicated above. (Atch A) ❑ Install Silt Fencing with steel posts in accordance with NCDENR detail attached and as indicated 1 L4' above.(Atch B) ❑ Confine siltation within 25% of lake or water course buffer zone per ESC Ord. Section 58.606 (a). lN' ❑ Call Gary Wright of LaBella Engineering (704) 351-5306 for inspection 48 hours prior to start of work for inspection of measures.—// J Groundcover on all slopes shall be established within 21 days of completion of any phase of construction L9/ (Sect. 58.606 (b)). Upon completion of any phase of construction permanent groundcover shall be established within 60 lendar days (Sect. 58.606 APPROVED BY: n DATE: /