RE: EROSION and SEDIMENTATION CONTROL PLAN APPROVAL
Project: HPU Residential Style Housing
Location: at/near 1220 Guilford Avenue, High Point, NC 27262
Land Disturbing Permit: # EN 210265 2401
Dear Sir or Madame:
The Engineering Services Department has completed the review process for the Soil Erosion
Sedimentation Control Plan submitted to our department on 10/15/2021 for the project
referenced above. Based on our review, the revision (Building Site Details only) is hereby
approved.
Conditions of the Permit
• This approval is for the disturbed areas shown on the approved plan only. Any additional
disturbance will need to be approved prior to disturbing.
This plan approval will specifically cover the Erosion and Sediment Control measures required
for both the Grading Phase and the Building Phase for the proposed Disturbed Area under SP
210058.
You may appeal if you disagree with the approval and/or the conditions of the above approval by
writing to the Board of Adjustment within fifteen (15) days following the date of the approval.
Information regarding the City of High Point Board of Adjustment can be found at the following
link - Board of Adjustment I High Point, NC (highpointnc.gov) or upon written request to Engineering
Services.
The Erosion Control Measures shown on the plan(s) are approximate. Some field adjustment
may be required to make the measures work correctly.
This letter will serve notice that:
• As per NCGS 15A NCAC 04B .0120 (b) and (c), INSPECTIONS AND
City of High Point, P.O. Box 230, 211 South Hamilton Street, High Point, NC 27261 USA
Fax:336.883.4118 Phone:336.883.3194 TDD:336.883.8517
INVESTIGATIONS, this letter shall serve as notice that inspection of sites shall be
carried out by the staff of Department of Environmental Quality or other qualified
persons authorized by the Commission or Department of Environmental as necessary to
carry out its duties under the Act and no person shall refuse entry or access to any
representative of the Commission or any representative of a local government who
requests entry for purposes of inspection.
• As per High Point Development Ordinance 2.5.10.G.1 and 2, the Land -Disturbing Permit
will become null and void one (1) year from the date of issuance. You may request in
writing, 180-day permit extension 30 days prior to the expiration date, for good cause.
• The approval of the draft Erosion and Sediment Control Plan and the Land Disturbing
Permit issued by the City of High Point is conditional based on the applicant's
compliance with Federal and State water quality laws, regulations, and rules.
• The approval of the draft Erosion and Sediment Control Plan is based in part on the
accuracy of the information provided on the submitted Financial Responsibility Form. If
any changes to the submitted Financial Responsibility Form (e.g. ownership, address,
company name) occur, then you are required to submit an amended form showing such
changes.
• The approval of the draft Erosion and Sediment Control Plan does not supersede any
other permit or approval.
• This Letter of Approval must be posted at the site of the land disturbing activity along
with the Land -Disturbing Permit and the approved Erosion and Sediment Control Plan.
• Records of Inspections must be kept on site for twelve (12) months.
• Construction site pollutants must be maintained on -site and not allowed to reach the
state's waters. Any spent fluids from construction traffic must be cleaned up and disposed
of properly. Any herbicide, pesticide and fertilizer must be used in accordance to the
label restrictions. All wastes composed of building materials shall be disposed of in
accordance with North Carolina General Statues, Chapter 130A, Article 9 — Solid Waste
Management, and rules governing the disposal of solid waste (NC Administrative Code
Section 15A NCAC 1313). No dumping of paint and other liquid building material waste
in storm drains. Concrete materials onsite, including excess concrete, must be controlled,
and managed to avoid contact with surface waters, wetlands, or buffers. No concrete
slurry shall be discharged from the site.
• Only minor deviation from the approved plan can be approved by the Erosion Control
Inspector. Deviations are limited to the following deficiencies:
o Addition of E&SC measures (e.g., silt fence, inlet protection, check dam, rolled
erosion control practices, etc.).
o Relocation of E&SC Measures that improve the overall stormwater and sediment
control.
• Erosion Control Measures must be maintained until site is stabilized with sufficient
ground cover. The Sedimentation Pollution Control Act of 1973 (NCGS I I 3A-51
through 66) is performance -oriented, requiring protection of existing natural resources
and adjoining properties. If following the commencement of this project, the approved
E&SCP is inadequate to meet the requirements of the Sedimentation Pollution Control
Act of 1973, revisions to the plan may be required by the Erosion Control Inspector.
• A condition of this approval is that the streets in this phase must be kept free of sediment.
• Erosion Control Measures to prevent construction traffic from tracking sediment onto the
streets must be maintained. Any debris or sediment shall be cleaned from the street
N
City of High Point, P.O. Box 230, 211 South Hamilton Street, High Point, NC 27261 USA
Fax: 336.883.4118 Phone: 336.883.3194 TDD: 336.883.8517
surface immediately.
Site Data:
Project Name: HPU Residential Style Student Housing — NW Area
Land -Disturbing Permit (CHP Project Tracking ID): # EN 210265 2401
Limits of Disturbance (in acres) approved: 3.1 acre per FR/OF
Address: at/near 1220 Guilford Avenue
City: High Point
State: NC
Zip Code: 27262
County: Guilford
Latitude (in decimal degrees): 35.976 degrees
Longitude (in decimal degrees):-80.000 degrees
River Basin: Cape Fear
Receiving Water -Body: Boulding Branch*
Stream Index: 17-3-2*
Draft E&SCP submitted by: Jamestown Engineering Group, Incorporated
Date(s) draft E&SCP Received: June 2, 2021
Plan Type: E&SCP
Is this site part of a project covered under a common plan of development: No (new plan)
* at/near Construction Entrance
** Had trouble opening the information on NC Surface Water Classifications Map
10-21-2021. Information shown could be incorrect.
Additional Information:
You will be required to complete and submit an electronic Notice of Intent (NOI) form
requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater
General Permit from the Department of Environmental Quality (DEQ). Detailed information
can be found on the North Carolina Environmental Quality's website at
https:Hdeg.nc. gov/about/divisions/energyy-mineral-land-resources/energy-mineral-land-
permits/stormwater-permits/construction-sw
Please call me if you have any questions or comments.
Sincerely,
Scott E. Ford
Engineering Services Department
(336) 883-3353
cc: File,
Jamestown Engineering Group, Incorporated, PO Box 365, Jamestown, NC 27282 (via
email)
City of High Point, P.O. Box 230, 211 South Hamilton Street, High Point, NC 27261 USA
Fax:336.883.4118 Phone:336.883.3194 TDD:336.883.8517