HomeMy WebLinkAboutNCC220079_Site Plan or Location Map_20220106APPROVED EXCEPTION5
THE FOLLOWING ITEM5 HAVE BEEN APPROVED AS EXCEPTION5 FOR THI5 DRAWING
BY THE TOWN OF APEX DEPARTMENT DIRECTOR(5), AND TO THE BEST OF MY
KNOWLEDGE AND BELIEF, THI5 DRAWING CONFORMS TO THE REQUIREMENTS
ESTABLISHED BY THE DIRECTOR(S) ALLOWING DEVIATION FROM THE STANDARD
5PEC1FICAT ION5 AND STANDARD DETAILS OF THE TOWN OF APEX, THE 51GNATURE
BELOW REPRE5ItNT5 THAT THE REQUESTING ENGINtER HAS BEEN GRANTED A
VARIANCE ONLY FOR THE ITEMS LISTED. THE DEVELOPER/EN GINI-ER/CONTRACTOR 15
50LELY KE5PON51BLE FOR MEETING ALL APPLICABLE REQUIREMENTS.
APPROVED EXCEPTION DIRECTOR GRANTING CXC1 PTION
BY: DATE:
(REQUESTING ENGINEER)
BUILDING INSPECTIONS * PFRMfT5 - TOWN OF APEX CERTIFICATION
THI5 DRAWING HAS BEEN REVIEWED BY THE TOWN OF APEX BUILDING IN5PECTI0N5
PERMITS DEPARTMENT, AND TO THE BEST OF MY KNOWLEDGE AND 5ELIEF, CONFORMS
TO THE REQUIREMENTS E5TABL151-IED WITHIN THE TOWN'5 CODE OF ORDINANCES AND
THE NORTH CAROLINA STATE BUILDING CODES. HOWEVER, THI5 SIGNATURE DOES NOT
CONSTITUTE A VARIANCE FROM ANY REQUIREMENTS CONTAINED IN ANY FEDERAL, STATE,
OR LOCAL CODE, LAW, SPECIFICATION, RULE OR ORDINANCE. IT 15 THE 5OLE
RESPON51BILITY OF THE OWN ER/DEVf=LOPER, OR ANY OF H15 AGENTS OR CONTRACT
PROFE5510NAL5 TO ENSURE THAT THIS CONSTRUCTION PLAN MEETS ALL THE
AFOREMENTIONED REQUIREMENT5.
BY: Approved DATE:
sewens 07/13/2021 9:29:37 AM
PARKS, RECREATION, AND CULTURAL RESOURCES - TOWN OF APEX CERTIFICATION
THESE PLANS HAVE BEEN REVIEWED BY THE TOWN OF APEX, AND TO THE PEST OF MY
KNOWLEDGE AND BELIEF, CONFORM TO REPRESENTATIONS MADE BY THE DEVELOPER
TO MYSELF AND THE PARKS, RECREATION, AND CULTURAL RESOURCE ADV150KY
CCMM15510N CONSISTENT WITH THE FKOJECT5 REQUIREMENTS FOR PUBLIC PARKS
AND RECREATION, EITHER IN TOTAL OR IN PART, AS OUTLINED IN THE TOWN OF APEX
UNIFIED DEVELOPMENT ORDINANCE AND TOWN OF APEX CODE OF ORDINANCES.
HOWEVER, THIS 51GNATLIRE DO 15 NOT CONSTITUTE A VARIANCE FROM ANY
REQUIREMENTS CONTAINED IN ANY Ff'DERAL, STATE, OR LOCAL CODE, LAW,
SPECIFICATION, RULE OR ORDINANCE. IT IS THE SOLE RESPONSIBILITY OF THE
OWNER/DEVELOPER, OR ANY OF HIS AGENTS OR CONTRACT PROFESSIONALS TO
ENSURE THAT THIS CONSTRUCTION PLAN MEETS ALL THE AFORFMENTIONI=D
REQUIREMENTS.
Approved BY: areincke 07106120219:22: 18 AM DA"IY
E:
I WATER RESOURCES UTILITY ENGINEERING - TOWN OF APEX CERTIFICATION
THIS DRAWING HAS BEEN REVIEWED BY THE TOWN OF APEX WATER RESOURCES
DEPARTMENT, AND TO THE BEST OF MY KNOWLEDGE AND BELIEF, CONFORMS TO THE
REQUIREMENTS ESTABLISHED IN THE STANDARD 5PECIFICATION5 AND STANfDARD
DETAILS OF THE TOWN OF APEX. HOWEVER, THIS SIGNATURE DOES NOT CONSTITUTE A
VARIANCE FROM ANY REQUIREMENTS CONTAINED IN ANY FEDERAL, STATE, OR LOCAL
CODE, LAW, SPECIFICATION, RULE 0R ORDINANCE. I 15 THE SOLE RE5PON5181L.ITY OF
THE OWN ER/D1*VELOPER, OR ANY OF 1-115 AGENTS OR CONTRACT PROFES510NAL5 TO
ENSURE THAT THIS CONSTRUCTION PLAN MEETS ALL THE AFOREMENTIONED
REQUIREMENTS,
Approved
BY: jdillon 07/09/2021 1106:39 AM DATE:
FIRE DEPARTMENT - TOWN OF APEX CERTIFICATION
THIS DRAWING HAS BEEN REVIEWED BY THE TOWN OF APEX FIRE DEPARTMENT, AND TO
THE BEST OF MY KNOWLEDGE AND BELIEF, CONFORMS TO THE REQUIREMENTS
ESTABLISHED WITHIN THf= TOWN'S STANDARD 5PECIFICAT[ 0N5, FIRE PROTECTION
ORDINANCE5, AND THE NORTH CAROLINA INTERNATIONAL FIRE CODE. HOWEVER, THIS
SIGNATURE DOES NOT CONSTITUTE A VARIANCE FROM ANY REQUIREMENTS
CONTAINED IN ANY FEDERAL, STATE, OR LOCAL CODE, LAW, SPECIFICATION, RULE OR
ORDINANCE. IT 15 THE SOLE RESPONSIBILITY OF THE OWNER/DEVELOPER, OR ANY OF
HIS AGENTS OR CONTRACT PROFES51ONAL5 TO ENSURE THAT THIS CONSTRUCTION
PLAN MENTIONED (REQUIREMENTS.
Approved
BY: khuegerich 07/06/2021 10:41:54 AM DATE:
PLANNING/ZONING - TOWN Of APEX CERTIFICATION
THIS CONSTRUCTION DRAWING HAS BEEN REVIEWED BY THE TOWN OF APEX PLANNING
DEPARTMENT, AND TO THE BEST OF MY KNOWLEDGE AND BELIEF, CONFORMS TO THE
SUBDIVISION OR SITE PLAN THAT WAS APPROVED BY THE TOWN OF APEX TOWN
COUNCIL OR TECHNICAL REVII<W COMMITTEE, AS APPROPRIATE, AND MEET5 THE
STANDARD5 OF THE TOWN OF APEX UNIFIED DEVELOPMENT ORDINANCE. THIS
51GNATURE DOES NOT CONSTITUTE A VARIANCE FROM ANY REQUIREMENTS OF THE
ORIGINALLY APPROVED 5UBDIV1510N OR SITE PLAN CITED ABOVE, OR ANY FEDERAL,
STATE, 0R LOCAL CODE, LAW, SPECIFICATION, RULE, GUIDELINE, 0R ORDINANCE. IT 15
THE SOLE RESPONSIBILITY OF THE OWNER/DEVELOPER, OR ANY OF HIS AGENTS OR
CONTRACT PROFE551ONAL5 TO ENSURE THAT TH15 CONSTRUCTION PLAN MELTS ALL
THE AFOREMENTIONED REQUIREMENTS.
----L
Approved
BY: Istaudenmaier 07/06/2021 8:04:27 AM DATE:
lsl jI[dPas]IaA(-aamM.Al►&iZi3MIF:YIIC�7►�Ce1►,►n[el�1T ��1:i�f�CsL•�1Ci]►
THI5 DRAWING HAS BEEN REVIEWED BY THE TOWN OF APEX PUBLIC WORKS �
TRANSPORTATION DEPARTMENT, AND TO THE BEST OF MY KNOWLEDGE AND BELIEF,
PROVIDES AN ACCEPTABLE TRANSPORTATION 5Y5TEM WITH CONSIDERATION FOR THE
ELEMENTS CONTAINED WITHIN THE TRANSPORTATION PLAN CONFORMING TO THE
REQUIREMENTS ESTABLISHED IN THE STANDARD SPECIFICATIONS � STANDARD DETAILS
AND THE UNIFIED DEVELOPMENT ORDINANCE OF THE TOWN OF APEX. HOWEVER, THIS
SIGNATURE DOES NOT CONSTITUTE A VARIANCE FROM ANY REQUIREMENTS
CONTAINED IN ANY FEDERAL, STATE, OR LOCAL CODE, LAW, SPECIFICATION, RULC OR
ORDINANCE. IT 15 THE SOLE RESPONSIBILITY OF THE OWNER/DEVELOPER, OR ANY OF
1115 AGENTS OR CONTRACT PROFESSIONALS TO ENSURE THAT THI5 CONSTRUCTION
PLAN M1<ET5 ALL THE AFOREMENTIONED REQUIREMENT5.
Approved
BY. DATE:
rdalton 07/06/2021 9:09:27 AM
ELECTRIC - TOWN OF APEX CERTIFICATION
THIS DRAWING HAS 13EEN REVIEWED BY THE TOWN OF APEX ELECTRIC DEPARTMENT,
AND TO THE 13EST OF MY KNOWLEDGE AND BELIEF, CONFORMS TO THE
REQUIREMENTS E5TA51-151HED IN THE STANDARD SPECIFICATIONS AND CONSTRUCTION
DETAIL5 AND THE UNIFIED DEVELOPMENT ORDINANCE OF THE TOWN OF APEX.
HOWEVER, THIS SIGNATURE DOES NOT CONSTITUTE A VARIANCE FROM ANY
REQUIREMENTS CONTAINED IN ANY FEDERAL, STATE, OR LOCAL CODE, LAW,
SPECIFICATION, RULE OR ORDINANCE. IT IS THE SOLE RESPON5151LITY OF THE
OWNER/DEVELOPER, OR ANY OF HIS AGENTS OR CONTRACT PROFE5510NAL5 TO
ENSURE THAT THIS CONSTRUCTION PLAN MEETS ALL THE AFOREMENTIONED
REQUIREMENTS.
Approved
BY. rsmith 07/06/2021 2:39:54 PM DATE.-
PEAK CITY BUSINESS PARK
BUILDING 13
CONSTRUCTION DRAWINGS
u
s
rn
STANDARD SPECIFICATIONS � 5TANDARD DL7AIL5
VERSION: MARCH 23, 2021
i`vrs,nAevr eLvo
WATER RESOURCES SOIL ER0510N * SEDIMENTATION CONTROL - TOWN OF APEX CERTIFICATION I WATER RESOURCES 5TORMWATER ENGINEERING -TOWN OF APEX CERTIFICATION
THIS DRAWING HAS BEEN REVIEWED BY THE TOWN OF APEX, AND TO THE BEST OF MY
KNOWLEDGE AND BELIEF, CONFORMS TO THE REQUIREMENTS ESTABLISHED IN THI< 501L
ER0510N AND 51rDIMIrNTAT10N CONTROL ORDINANCE OF THE TOWN OF APEX. HOWEVER, THI5
5IGNATURE DOES NOT CONSTITUTE A VARIANCE FROM ANY REQUIREM ENT5 CONTAINED IN ANY
FEDERAL, STATE, OR LOCAL CODE, LAW, SPECIFICATION, RULE OR ORDINANCE. IT 15 THE 50LE
RESPONSIBILITY OF THE OWNER/DEVELOPER, OR ANY OF HIS AGENTS OR CONTRACT
PR0FE5510NAL5 TO ENSURE THAT TIH15 CONSTRUCTION PLAN MEET5 ALL THE AFOREMENTIONED
REQUIREMENTS.
THI5 51GNATURE DOES NOT CONSTITUTE PLAN APPROVAL, ONLY PLAN REQUIREMENTS. A
5EPARATE LETTER OF PLAN APPROVAL WILL BE MAILED TO THE FINANCIALLY RE5PON5113LE PERSON
AT A LATER DATE ACCORDING TO THE CONSTRUCTION SEQUENCE.
Approved
BY: sfortier 07/13/2021 110027 AM DATE:
THIS DRAWING HAS BEEN REVIEWED BY THE TOWN OF APEX WATER RE50URCE5
STORMWATER tUTILITY ENGINEERING DIVISION AND TO THE BEST OF MY
KNOWLEDGE AND BELIEF, CONFORMS TO THE REQUIREMENTS ESTABLISHED IN THE
STANDARD 5FECIFICATION5 AND STANDARD DETAILS AND THE UNIFIED
DEVELOPMENT ORDINANCE OF THE TOWN OF APEX. HOWEVER, THIS SIGNATURE
DOES NOT CONSTITUTE A VARIANCE FROM ANY REQUIREMENTS CONTAINED IN ANY
FEDERAL, STATE, OR LOCAL CODE, LAW, SPECIFICATION, RULE OR ORDINANCE. IT 15
THE 5OLE RESPO N 51 BI LITY OF THE OWN E R/D EVE LO FE K, OR ANY OF H15 AGENTS OR
CONTRACT PROFESSIONALS TO ENSURE THAT THI5 CONSTRUCTION PLAN MEETS
ALL THE AFOREMENTIONED REQUIREMENT5. THI5 SIGNATURE 5ERVE5 A5 THE
STORMWATER PERMIT FOR THIS PROJECT.
Approved
BY: sfortier 07/13/2021 11:00:20 AM DATE:
VICINITY MAP
N.T.5,
SITE DATA
PROJECT NAME
PEAK CITY BUSINESS PARK - BUILDING 1 3
PROJECT ADDRESS
2030 ENERGY DRIVE
PREPARER'5 CONTACT INFORMATION
JONES t CN055EN ENGINEERING, FLLC
P.O. BOX I OG2
APEX, NORTH CAROLINA 27502
PHONE - 91 9-387-1 174
FAX - 91 9-387--3375
CONTACT PERSON - FATRICK KIERNAN
DEVELOPER CONTACT INFORMATION
PEAK CITY PARTNERS, LLC
1 330 SUNDAY DRIVE, SUITE 105
RALEIGH, NC 27GO7
PHONE: (919) 2 10-1 99G
CONTACT: VA15HAV DHAWAN
ANNEXATION NUMBER
33G
CURRENT PROPERTY ZONING
L I
WAKE COUNTY PIN
0741-98-5444
TOTAL PROJECT AREA
1.00 AC
PROPOSED BUILT UPON AREA
O.G9 AC (G3%)
WATERSHED PROTECTION OVERLAY DI5TRICT
SECONDARY
MINIMUM FRONT YARD SETBACK
20'
MINIMUM REAR YARD SETBACK
20'
MINIMUM 51DE YARD SETBACK
20'
FEMA FL.00DPLAIN INFORMATION
MAP #3720074 1 OOJ (DATED MAY 2, 200G)
PROJECT 15 NOT WITHIN 100 YEAR FLOODPLAIN.
2045 LAND USE MAP
OFFICE +- INDUSTRIAL EMPLOYMENT
PROPOSED USE
OFFICE FLEX EMPLOYMENT
COMMUNITY AMENITIE5
2 BENCHE5
COORDINATES FOR CENTROID
35.72°,-78.530
MINOR SITE PLAN APPROVAL DATE
3/24/2 1
MINOR SITE PLAN EXPIRATION DATE
3/24/24
CONSTRUCTION DRAWING SHEET INDEX
I COVER SHEET
2 EXISTING CONDITIONS PLAN
3 51TE LAYOUT PLAN
4 GRADING AND UTILITY PLAN
5 STAGING t- DEMOLITION PLAN
G EROSIONS CONTROL DETAILS
7 CONSTRUCTION DETAIL5
LA- I LANDSCAPE PLAN
5L- I SITE LIGHTING PLAN
5L-2 LIGHTING CUT 5HEET5
5L-3 LIGHTING CUT SWEETS
AIA ARCHITECTURAL FOOTPRINT
5A I ARCHITECTURAL ELEVATIONS
BUILDING SUMMARY
PROP05ED BUILDING SQUARE FOOTAGE - 9,GOQ 51'
OFFICE AREA - 9,G00 5F
FROF05ED BUILDING HEIGHT - 20' MAXIMUM
NUMBER OF STORIES - I
AUTOMATIC FIRE PROTECTION - NO
PARKING SUMMARY
BASIS OF DETERMINATION -
NOTES:
I . NO RCA 15 REQUIRED FOR THIS SITE BECAUSE
RCA WAS PROVIDED FOR THE OVERALL
PROJECT.
2. IMPERVIOUS SURFACES FOR THE ffNTIRETY OF
PEAK CITY BUSINESS PARK (FORMERLY
SCHIEFFELIN ROAD INDUSTRIAL PARK) SHALL
NOT EXCEED 70% OF THE TOTAL AREA OF THE
PARK.
3. 5TORMWATER REQUIREME1NT5 FOR THIS
BUILDING 15 MET USING THE WET POND
PROVIDED FOR THE OVERALL PROJECT (LOCATED
BEHIND PCBP - BUILDING 1 ).
I PER 300 5F OFFICE AREA - 32
TOTAL SPACES REQUIRED - 32 SPACES (2 H/C (1 VAN))
MAXIMUM 5PACE5 ALLOWED - 40 SPACES (1.25 x MIN.)
TOTAL SPACES PROVIDED - 38 SPACES (2 H/C (I VAN))
PARKING ON 51DE + REAR - 38 (1 00%)
BICYCLE PARKING REQUIRED - 2 SPACES
51CYCLE PARKING PROVIDED - 2 SPACES
PERVIOUS SURFACES SUMMARY:
TOTAL AREA OF ORIGINAL DEVELOPMENT (SCHIEFFELIN INDUSTRIAL PARK}
45.G7 AC.
MAXIMUM ALLOWABLE IMPERVIOUS SURFACE AREA
3 1 .97 AC. (7076)
MINIMUM PERVIOUS SURFACE AREA REQUIRED
13.70 AC. (30%)
PERVIOU5 5URFACff AREA RECORDED WITH ORIGINAL DEVELOPMENT
13.84 AC. (30.3%)
PUBLIC WKOVEMENT 5UMMARY
5QUARE FOOTAGE OF NEW PUBLIC KOAD5
N/A
LINEAR FOOTAGE OF PUBLIC ROAD WIDENING
N/A
LINEAR FOOTAGE OF PUBLIC CURB * GUTTER
5G LF
5QUARE YARDAGE OF PUBLIC 51DEWALK
N/A
5QUARE YARDAGE OF PUBLIC GREENWAY
N/A
LINEAR FOOTAGE OF PUBLIC 5ANITARY SEWER
N/A
LI NEAR FOOTAGE OF FLIP LIC WATIERLI NE
6" DIP - 11 LF
LINEAR FOOTAGE OF PUPLIC 5TORM DRAINAGE
I N/A
0 100 200 400
GRAPHIC SCALE
J
J
0
(D
-�
U
Z
W
E
W
Z
Q3
C
(D
VZ
L
C
Q
W
C
m
C
N
C
w
V
221 N. SALEM ST.
SUITE 001
PO Box 1062
APE7(, NC 275M
Office: 919-387-1174
Regh&atlon: P-0151
www.lonemosson.com
',.`10"'1CAR
1111tlrrt,,�r'..
4-FE551'p'
SEAL
'• '� rNG I INEr '
�CK L K!,►''�,
z
Q
u
z z 0
IL :
< C)
0
u
L W
V J
L/
L�
,�I� ll
❑ 0
z
0_
�z
( ,
V
L J ry
L
z EL
Q
0 o
{ � D
CALE RA4Wl
1 =2.., r LK
MAY 3, 2021
i IAFFROVAL5ET
OG it 32-9